Acharya Jagdish Chandra Bose Hall,
Krishi Bhawan, New Delhi
DEPARTMENT OF AGRICULTURE & CANE DEVELOPMENT
GOVERNMENT OF JHARKHAND
Sl.No. Crop Productivity (kg/ha)
2006-07 2011-12 % increase 2012-13 targeted
(As per2nd advance
estimate)
1 Paddy 1832 3197 42.69 2722
2 Pigeonpea 637 904 29.53 955
3 Black gram 597 709 84.20 906
4 Green gram 640 654 15.80 619
5 Horse gram
(Kulthi)
408 606 33.00 581
6 Chickpea 923 1066 13.40 820
7 Lentil 609 840 28.00 820
8 Pea 987 1135 13.05 1125
1. Cropwise Comparative Productivity 2006 – 07, 2011-12 and 2012 - 13
1
2
2 a. Targeted Area, Production and Productivity as per crop cutting experiment
2012-13*
Sl.No
.
Crop Area ‘000 ha Production ‘000 tonn Productivity (Kg/ha)
1 Paddy (Total) 1420 3780.148 3020
2 Arhar 195.685 185.759 1040
3 Blackgram 98.230 90.695 995
4 Green gram 25.825 15.921 815
5 Horse gram 20.225 11.325 769
Total Pulses 339.965 303.700 905
* As per Crop cutting experiment
2 b .Target Area, Production and Productivity 2012-13*
Sl.No. Crop Area ‘000ha Production ‘000
tonns
Productivity (Kg/ha)
Crop - Paddy
Paddy(Total) 1407.758 3831.226 2722
Crop - Pulses
1 Arhar 199.787 190.803 955
2 Black Gram 104.602 94.791 906
3 Green Gram 26.016 16.102 619
4 Horse Gram 21.078 12.255 581
5 Gram 130.288 108.139 830
6 Lentil 45.550 37.351 820
7 Pea 41.820 47.047 1125
Pulses(Total) 578.821 511.524 883
Area – ’000 ha
Production – ‘000 ha
Productivity – (Kg/ha)
* As per State own assessment 3
3 a. Expenditure as on 31.12.2012 under NFSM Scheme during 2012-13
Sl.
No.
Schemes Allocation
as per work
plan
(2012-13)
O.B. As
on
1.04.201
2
1st
instalme
nt
released
from
Govt. of
India
(2012-
13)
2nd
instalme
nt
released
from
Govt. of
India
(2012-
13)
Total
fund
available
(2012-13)
Expenditur
e upto
date
Balance Remarks
1 2 3 4 5 6 7 8 9 10
1 NFSM - Rice 850.560 283.800 528.050 - 811.850 576.875 234.975
2
(i)
NFSM-
Pulses
1291.970 247.510 605.190 89.270 941.970 590.247 351.723
(ii) IPM in
Pigeonpea
for
Productivity
enhanceme
nt
375.00 - 170.000 170.000 84.000 86.000
Total 2517.530 531.310 1303.240 89.270 1923.820 1251.122 672.698
(Rs. in lakh)
Cont..
4
3 (a). Expenditure as on 31.12.2012 under NFSM Scheme during 2012-13
Sl.No. Schemes Allocation
as per
work plan
(2012-13
O.B. As
on
1.04.2012
as per
U.C. of
2011-12
1st
instalment
released
from
Govt. of
India
(2012-13)
2nd
instalment
released
from
Govt. of
India
(2012-13)
Total
fund
availabl
e (2012-
13)
Expendit
ure upto
date
Balance Remar
ks
1 2 3 4 5 6 7 8 9 10
3. (i) NFSM –
A3P
418.000 71.189 90.980 109.500 200.480 195.405 5.075
(ii) Addition
al area
coverage
during
rabi/
summer
(2012-13
530.000 - 390.000 - 390.000 41.600 348.400
Total 948.000 71.189 480.980 109.500 590.480 237.005 353.475
Grand
Total
3465.530 563.574 1784.220 198.770 2475.38
0
1254.997 1220.383
Rs. in lakh
5
3(b).Likely Anticipated expenditure during 2012-13 under NFSM Schemes in Jharkhand
uptodate
(Rs. in lakh)
Sl.No. Scheme Allocation
(2012-13)
Expenditure
till 31.12.2012
Anticipated
expenditure
(2012-13)
Remarks
1. NFSM- Rice 850.560 576.875 273.685
2. (i) NFSM - Pulses 1291.970 590.247 701.723
(ii) NFSM- Pulses
IPM Pigeonpea
for Productivity
enhancement
375.000 84.000 291.000
3. (i) NFSM – A3P 418.000 195.405 222.595
(ii)
Additional area
coverage under
Pulses during
rabi/summer
(2012-13)
530.000 149.750 380.250
Total 3465.530 1596.277 1869.253
6
3 (c) . Requirement of fund during 2012-13 if any
Inlight of allocation under NFSM during 2012-13 following fund is required to
achive the target :
Sl.No. Scheme Allocation
(2012-13)
Fund released
(2012-13)
Fund
required
Remarks
1 NFSM -Rice 850.560 811.850 NIL As per audit
report revised
AAP approval is
to be taken
2 (i) NFSM -Pulses 1291.970 941.970 350.00
(ii) IPM in Pigeonpea
for Productivity
enhancement
375.00 170.00 205.00
3 (i) NFSM –A3P 418.00 200.48 217.52
(ii) Additional area
coverage under
Pulses during
rabi/summer
(2012-13)
530.00 390.00 140.00
Total 3465.530 2514.300 951.230
7
Sl.No. Component Unit Target Achievement
Phy. Fin. Phy. Fin.
1. Cluster Demonstration by
State Department of
Agriculture with the
technical backstopping of
ICAR/ SAUs/ IRRI (One
Cluster of 100 ha.)
a Direct seeded rice / Line
transplanting /SRI (Target
1.5% Area of District)
Ha 4000 268.08 4000 218.555
b Cluster Demonstration
Hybrid Rice (One cluster of
100 ha) (Target 0.5% Area of
District)
Ha 2000 134.04 2000 108.451
c Cluster Demonstration
Swarna Sub-1 / Sahbhagi
Dhan of 100 ha Each
Ha - - - -
4. Physical & Financial Progress of NFSM – Rice (2012-13) Dec, 2012
(Rs. In lakh)
8
Sl.No. Component Unit Target Achievement
Phy. Fin. Phy. Fin.
d Front Line Demonstrations by
ICAR / SAUs on Hybrids
Varities (Cluster of Min 10 ha
each)
Ha - - - -
2. Seed Distribution
a Hybrid Rice seed Qtls 600.00 12.00 180.29 4.722
b HYVs Seeds Qtls 50000.0 250.0 12017.83 51.205
3 Plant & Soil Protection
Management
a Micronutrients Ha 800.00 4.00 620 2.160
b Liming in Acidic soils Ha 1000.00 5.00 737.14 2.638
c Plant Protection Chemicals &
Bio-agents
Ha 1500.0 7.50 1264.24 4.607
Physical & Financial Progress of NFSM – Rice (2012-13) Dec, 2012
(Rs. In lakh)
9
Sl.No. Component Unit Target Achievement
Phy. Fin. Phy. Fin.
4 Resource Conservation
Techniques / Tools
a Conoweeder Nos. 500 15.00 472 8.736
b Knapsack sprayer Nos. 350 10.500 6.091
c Zero Till Seed Drills Nos. 5 0.75 2 0.30
d Multi Crop Planters Nos. 0 0 0 0
e Seed Drills Nos. 0 0 0 0
f Power weeders Nos. 0 0 0 0
g Zero Till Multi crop Planters Nos. 5 0.75 1 0.15
h. Ridge Furrow Planter Nos. 5 0.750 0 0
i Rotovator Nos. 6 1.80 3 0.90
Physical & Financial Progress of NFSM – Rice (2012-13) Dec, 2012
(Rs. In lakh)
10
Sl.No. Component Unit Target Achievement
Phy. Fin. Phy. Fin.
j Laser Land Leveler Nos. 0 0 0 0
5 Incentive for Pump Set Nos. 250 25.00 195 13.039
6 Cropping System based trainings
(four sessions i.e. one before kharif,
One each during kharif and rabi
crops and one after rabi harvest)
Nos. 50 7.00 50 6.68
7 Misc. Expenses
a ) Project Management team& other
Misc. Expenses at District Level.
No. of
District
7 44.520 1 19.985
b ) Project Management team&
other Misc. Expenses at State Level.
1 13.870
Local Initiatives
(Focus should be water harvesting
structures for promotion of SRI and
providing irrigation)
50.00 13.12
Total 850.560 461.340
Physical & Financial Progress of NFSM – Rice (2012-13) Dec, 2012
(Rs. In lakh)
11
Sl.No. Component Unit Target Achievement
Phy. Fin. Phy. Fin.
1 Distribution of Certified Seed :
(a) For Varieties less than 10 years
Qtls. 5000 110.00 160 0.00
a (b) For Varieties more than 10 years
old
Qtls. 15000 180.00 828 11.87
2. Demonstration on Improved
Technologies :
(a) Cluster Demonstrations (of 100
ha each) on Inter - cropping /
Improved Varieties / farm
implements like Ridge furrow
marks / seed drill
Ha 6500 325.00 8480 253.25
(b) Frontline Demonstrations by
ICAR/ SAUs in cluster of 10 ha each
Ha - - - -
Physical & Financial Progress of NFSM – Pulses (2012 – 13) Dec, 2012
(Rs. In lakh)
12
Sl.No. Component Unit Target Achievement
Phy. Fin. Phy. Fin.
3 Integtated Nurtient
Management
(a) Micro- nutrients
Ha. 4000 20.00 2447.658 10.18
(b)Lime / Gypsum / 80%
WG Sulphur
Ha 20000 150.00 13477.677 98.53
c. Rhizobium culture/
Phosphate Solublizing
Bacteria Distribution/
Micorrizha
Ha 10000 10.00 6236.486 5.25
4 Integrated Pest
Management (IPM)
(a) IPM Package
Ha 4000 30.00 2636.501 17.24
(b) Distribution of NPV Ha. 400 1.00 181.965 0.447
Physical & Financial Progress of NFSM – Pulses (2012-13) Dec, 2012
(Rs. In lakh)
13
Sl.No. Component Unit Target Achievement
Phy. Fin. Phy. Fin.
(c) Distribution of PP
Chemicals
Ha. 4000 20.00 3023.280 14.07
(d) Weedicides Ha 500 2.50 227.423 1.05
5 Resources Conservation
Technologies Tools :
(a) Knapsack Sprayers Nos. 1260 37.800 980 24.83
(b) Zero Till Seed Drills Nos. 17 2.550 5 0.75
(c) Multicrop Planters Nos. 0.00 0.00 0 0.00
(d) Seed Drills Nos. 17 2.550 4 0.60
(e) Zero till Multi Crop
Planters
Nos. 0.00 0.00 0 0.00
(f) Ridge Furrow Planters Nos. 0.00 0.00 0 0.00
Physical & Financial Progress of NFSM – Pulses (2012-13) Dec, 2012
(Rs. In lakh)
14
Sl.No. Component Unit Target Achievement
Phy. Fin. Phy. Fin.
(g) Rotavator Nos. 17 5.10 10 3.0
(h) Lasser Land Levelers Nos. 0.00 0.00 0 0.00
6 Efficient Water Application
Tools :
(a) Distribution of Sprinkler
Sets
Ha - - - -
(b) Incentive for Mobile
Sprinkler Raingun
Nos. 100 15.00 26 3.90
(c) Incentive for Pumpsets Nos. 500 50.00 506 49.32
(d) Pipe for carrying water
from source to the field
Nos. 200 30.00 127 18.90
Physical & Financial Progress of NFSM – Pulses (2012-13) Dec, 2012
(Rs. In lakh)
15
Sl.No. Component Unit Target Achievement
Phy. Fin. Phy. Fin.
7 Cropping System based training
(Four Sessions i.e. One before
Kharif, one each during Kharif &
Rabi crops and one after rabi
harvest)
Nos. 130 18.200 124 15.75
8 Miscellaneous Expenes
(a) Project Management Team &
and other Miscellaneous Expenes
at District level
No. of
District
17 75.990 11 16.14
( b) Project Management Team &
and other Miscellaneous Expenes
at State level
No. of
State
1 6.280 1 4.49
(c) Misc. Expenses to State for
other Districts
( District of ISOPOM)
No. of
District
0 0.00 0 0.00
Physical & Financial Progress of NFSM – Pulses (2012-13) Dec, 2012
(Rs. In lakh)
16
Sl.No. Component Unit Target Achievement
Phy. Fin. Phy. Fin.
9 Local Initiatives
(Water charges for two
protectives irrigation may be
supported under Local
initiatives to the farmers/
groups given mobile
sprinkler raingun
0 200.00 1 7.08
Total 1291.970 556.652
Physical & Financial Progress of NFSM – Pulses (2012-13) Dec, 2012
(Rs. In lakh)
17
Sl.No. Component Unit Target Achievement
Phy. Fin. Phy. Fin.
1. Seed Mini kit Qtls. 280 28.0 270 23.562
2. Lime/dolomite Qtls. 21000 67.2 6352 45.522
3. Micronutrients (Borax) Qtls. 700 42.0 5875 35.400
4. Rhizobium culture Ha. 7000 5.25 5750 4.350
5. PSB Ha. 7000 5.25 5750 4.350
6 Urea(foliar spray) Ha. 7000 4.20 6750 3.743
7. Fungicides for seed
treatment
Ha. 7000 5.60 4000 3.929
Physical & Financial Progress of NFSM - A3P Kharif (Pulses) 2012-13 Dec, 2012
(Rs. In lakh)
18
Sl.No. Component Unit Target for 7 units Achievement
Phy. Fin. Phy. Fin.
8. Insecticides/pesticides/biogent
(NPV) &biopesticides,
insecticides, Pheromene traps,
lures etc suitable for IPM
recommendation in the crop.
Ha. 7000 94.50 3648.51 46.560
9. e- pest surveillance Ha. 7000 14.00 2500 2.750
10. Total 266.00 170.165
Physical & Financial Progress of NFSM - A3P Kharif (Pulses) 2012-13 Dec, 2012
(Rs. In lakh)
19
Sl.No. Component Unit Target for 4 units Achievement
Phy. Fin. Phy. Fin.
1. Seed Minikit Qtls. 240 14.40 60 1.80
2. Lime/dolomite Qtls. 12000 38.40 3000 10.80
3. Micronutrients (Borax) Qtls. 400 24.00 100 6.00
4. Rhizobium culture Ha. 4000 3.00 1000 0.25
5. PSB Ha. 4000 3.00 1000 0.25
6 Urea(foliar spray) Ha. 4000 2.40
7. Fungicides for seed
treatment
Ha. 4000 3.20 1000 2.00
Physical & Financial Progress of NFSM - A3P Rabi (Pulses) 2012-13 Dec, 2012
(Rs. In lakh)
20
Sl.No. Component Unit Target Achievement
Phy. Fin. Phy. Fin.
8. Insecticides/pesticides/biogent
(NPV) &biopesticides,
insecticides, Pheromene traps,
lures etc suitable for IPM
recommendation in the crop.
Ha. 4000 56.80 250.00 3.940
9. e- pest surveillance Ha. 4000 6.80 118 0.200
10. Total 152.00 25.240
Physical & Financial Progress of NFSM - A3P Rabi (Pulses) 2012-13 Dec, 2012
(Rs. In lakh)
21
5. Major focus on different inputs under NFSM
•Availability of improved quality seeds of rice and pulses to
increase productivity.
• Low cost input like :
 Lime/ dolomite/ LD slag to improve soil health.
 Micronutrient (Borax) / Zinc to remove nutrient deficiencies in
soil to improve crop productivity.
 Seed innoculation with Rhizobium culture/ PSB to improve
nitrogen and phosphate availavility.
22
Contd..
Major focus on different inputs under NFSM
 Use of Fungicides for seed treatment to protect the crop from
seed born diseases.
 Use of weedicides to manage the weed population below their
threshold value to affect crop productivity.
 Use of IPM e.g. Insecticides/Pesticides /Bioagents NPV and
biopesticides to protect the rice and pulses crops from insect
pest to harvest higher yield.
23
6. Physical and Financial target and achievement under A3P during 2012-13
(1 unit = 100 ha)
Sl. No. Crop Physical (No. of units) Financial Remarks
Target Achievement Target Achievement
1 2 3 4 5 6 7
1 Pigeonpea 70 70 266.00 170.165 The financial
achievement is in
progress
2 Chickpea 20 - 76.00 - Due to unavailability
of seed the cluster
demonstration on
Chickpea (2 units)
and Lentil one unit
could not be
conducted . The
target shall be
completed during
Summer Pulses
(Green gram)
3 Lentil 20 10 76.00 25.240
4 Green gram 30 - 114.90 -
Total 140 80 532.90 195.405
Rs. in lakh
24
7. Status of implementation of Pest Surveillance in A3P during
2011-12 and 2012-13 in Jharkhand
Sl.No. Period Season Physical (ha) Financial Remarks
Target Achievement Target Achievement
1 2011-12 Kharif 9000 4150 18.00 8.30
Rabi 17000 9470 28.90 16.10
Total 26000 13620 46.90 24.40
2 2012-13 Kharif 7000 7000 14.00 2.75 Program
me is
under
progress
Rabi 11000 11000 18.70 1.10
Total 18000 18000 32.70 3.85
Grand Total 44000 31620 79.60 28.25
(Rs. in lakh)
25
8. Physical and Financial Progress under implementation of
Special Plan of Pulses Production during Rabi/ Summer 2012-13
Sl.No. Crop Physical (ha.) Financial (Rs. in lakh) Remarks
Target Achievement Target Achievement
1 Chickpea 6000 6000 229.800 41.600
Programme is
under progress
2 Lentil 4000 4000 153.200 46.150
3 Summer*
green gram
4000 - 174.000 -
Total 14000 10000 530.000 87.750
26
* The Seed & other inputs Procurement is under progress.
9.Additional area Coverage under NFSM – A3P Pulses during Rabi/ Summer 2012-13
(1 unit = 100 ha)
Sl.
No.
Crop Physical (No. of units) Financial Remarks
Target Achievement Target Achievement
1 2 3 4 5 6 7
1 Chickpea 60 52 229.80 41.600 Physical target of
Chickpea could not
be completed due to
unavailability of seed.
It will be completed
in summer season in
Green gram
2 Lentil 40 40 153.20 46.150
4 Green gram 40 - 147.00 - The Procurement of
seed & other input is
in progress & Target
shall be achieved
Total 140 92.00 530.00 87.750
Rs. in lakh
27
10. Planning of Summer Rice and Pulses crops
• 5000 q rice seed to be distributed in summer.
• Distribution of INM/IPM in 450 ha .
• Target of Farm implements to be achieved.
• 1000 q Pulses seed to be distributed during summer.
•4000 ha area of field demonstration under NFSM – Pulses to be
conducted on summer moong.
28
Planning of Summer Rice and Pulses crops
• 12000 ha INM & 2000 ha IPM area taken up under
NFSM –Pulses .
• Target under Farm implement to be completed under
NFSM - Pulses.
• 7000 ha area of Cluster Demonstration under NFSM – A3P
taken up with summer moong.
29
11. Status of online submission of Progress report
• 100 % On line reporting at district and state
level.
30
12. Appointment of Project Management Team (PMT)
at district level
• Re advertised for the Post of State/ District
Consultant/STA/ TA .
• Walk in interview to be conducted very shortly.
31
14. Specific issues and Suggestion
• State level Training Programme be continued.
• Capacity building of Personnel desirable for effective
execution of the programmes of NFSM.
• Consolidated amount of PMT to be enhanced.
• uncertainity of continuation of the schemes PMT
personnel remain in search of better employment.
32
• NFSM – Wheat Programme to be given to the State
• 60,000 Pulses villages scheme to be given to state.
33
Jharkhand.ppt

More Related Content

Similar to Jharkhand.ppt

Project profilevol 1
Project profilevol 1Project profilevol 1
Project profilevol 1
Himato Sema
 
Success story of tidal swamp farming system in barito kuala
Success story of tidal swamp farming system in barito kualaSuccess story of tidal swamp farming system in barito kuala
Success story of tidal swamp farming system in barito kuala
pdatarawa
 
Dr. Babaji Giri (Director - Agriculture, Govt of Orissa)
Dr. Babaji Giri (Director - Agriculture, Govt of Orissa)Dr. Babaji Giri (Director - Agriculture, Govt of Orissa)
Dr. Babaji Giri (Director - Agriculture, Govt of Orissa)
Ajatus Software
 
Integrated Farming System-A Holistic Approach for Food and Livelihood Security
Integrated Farming System-A Holistic Approach for Food and Livelihood SecurityIntegrated Farming System-A Holistic Approach for Food and Livelihood Security
Integrated Farming System-A Holistic Approach for Food and Livelihood Security
naveen kumar
 

Similar to Jharkhand.ppt (20)

Project profilevol 1
Project profilevol 1Project profilevol 1
Project profilevol 1
 
Ayurvedic vati gutika manufacturing unit
Ayurvedic vati gutika manufacturing unitAyurvedic vati gutika manufacturing unit
Ayurvedic vati gutika manufacturing unit
 
Food farming Issues
Food farming  Issues Food farming  Issues
Food farming Issues
 
Ppt baban 18-04
Ppt baban 18-04Ppt baban 18-04
Ppt baban 18-04
 
UP PPT_0.ppt
UP PPT_0.pptUP PPT_0.ppt
UP PPT_0.ppt
 
PSI Uttarakhand
PSI UttarakhandPSI Uttarakhand
PSI Uttarakhand
 
Success story of tidal swamp farming system in barito kuala
Success story of tidal swamp farming system in barito kualaSuccess story of tidal swamp farming system in barito kuala
Success story of tidal swamp farming system in barito kuala
 
Icm seminar2011
Icm seminar2011Icm seminar2011
Icm seminar2011
 
Dr. Babaji Giri (Director - Agriculture, Govt of Orissa)
Dr. Babaji Giri (Director - Agriculture, Govt of Orissa)Dr. Babaji Giri (Director - Agriculture, Govt of Orissa)
Dr. Babaji Giri (Director - Agriculture, Govt of Orissa)
 
Recent Advances in Dryland Agriculture
Recent Advances in Dryland AgricultureRecent Advances in Dryland Agriculture
Recent Advances in Dryland Agriculture
 
Integrated farming system in Chhattisgarh
Integrated farming system in Chhattisgarh Integrated farming system in Chhattisgarh
Integrated farming system in Chhattisgarh
 
Ayurvedic tablets manufacturing unit
Ayurvedic tablets manufacturing unitAyurvedic tablets manufacturing unit
Ayurvedic tablets manufacturing unit
 
Advances in dryland agriculture
Advances in dryland agricultureAdvances in dryland agriculture
Advances in dryland agriculture
 
agriculture AJK 2014.pptx
agriculture AJK 2014.pptxagriculture AJK 2014.pptx
agriculture AJK 2014.pptx
 
Rice Mill ToR (1).pptx
Rice Mill ToR (1).pptxRice Mill ToR (1).pptx
Rice Mill ToR (1).pptx
 
EMC e City - Rev meeting Aug 2018.ppt
EMC e City - Rev meeting Aug 2018.pptEMC e City - Rev meeting Aug 2018.ppt
EMC e City - Rev meeting Aug 2018.ppt
 
Farm pond anadhowapara
Farm pond anadhowaparaFarm pond anadhowapara
Farm pond anadhowapara
 
PROJECT WORK ON BANANA TISSUE CULTURE
PROJECT WORK ON BANANA TISSUE CULTUREPROJECT WORK ON BANANA TISSUE CULTURE
PROJECT WORK ON BANANA TISSUE CULTURE
 
Integrated Farming System-A Holistic Approach for Food and Livelihood Security
Integrated Farming System-A Holistic Approach for Food and Livelihood SecurityIntegrated Farming System-A Holistic Approach for Food and Livelihood Security
Integrated Farming System-A Holistic Approach for Food and Livelihood Security
 
Project Achievements – Key learning and Recommendations
Project Achievements – Key learning and Recommendations Project Achievements – Key learning and Recommendations
Project Achievements – Key learning and Recommendations
 

More from ssuser72a1812 (12)

1 Soil fertility and productivity.pptx
1 Soil fertility and productivity.pptx1 Soil fertility and productivity.pptx
1 Soil fertility and productivity.pptx
 
Soil Fertility evaluation techniques.ppt
Soil Fertility evaluation techniques.pptSoil Fertility evaluation techniques.ppt
Soil Fertility evaluation techniques.ppt
 
micronutrient transformation in soil.ppt
micronutrient transformation in soil.pptmicronutrient transformation in soil.ppt
micronutrient transformation in soil.ppt
 
9b chemistry of soil Ca & Mg.pptx
9b chemistry of soil Ca & Mg.pptx9b chemistry of soil Ca & Mg.pptx
9b chemistry of soil Ca & Mg.pptx
 
5 organic farming basic concepts.pptx
5 organic farming basic concepts.pptx5 organic farming basic concepts.pptx
5 organic farming basic concepts.pptx
 
1 history of soil fertility.pptx
1 history of soil fertility.pptx1 history of soil fertility.pptx
1 history of soil fertility.pptx
 
SAC 502- Lec 14.ppt
SAC 502- Lec 14.pptSAC 502- Lec 14.ppt
SAC 502- Lec 14.ppt
 
Soil fertility and soil productivity concepts.pptx
Soil fertility and soil productivity concepts.pptxSoil fertility and soil productivity concepts.pptx
Soil fertility and soil productivity concepts.pptx
 
lac 3 CULTIVATION OF ROSE2.ppt
lac 3 CULTIVATION OF ROSE2.pptlac 3 CULTIVATION OF ROSE2.ppt
lac 3 CULTIVATION OF ROSE2.ppt
 
Landscaping.ppt
Landscaping.pptLandscaping.ppt
Landscaping.ppt
 
SAMPLING Theory.ppt
SAMPLING Theory.pptSAMPLING Theory.ppt
SAMPLING Theory.ppt
 
Seminar- balaganesh.ppt
Seminar- balaganesh.pptSeminar- balaganesh.ppt
Seminar- balaganesh.ppt
 

Recently uploaded

2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
MadhuKothuru
 

Recently uploaded (20)

74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - Poster
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
 
2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.
 
NGO working for orphan children’s education
NGO working for orphan children’s educationNGO working for orphan children’s education
NGO working for orphan children’s education
 
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
 
Vasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
Vasai Call Girls In 07506202331, Nalasopara Call Girls In MumbaiVasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
Vasai Call Girls In 07506202331, Nalasopara Call Girls In Mumbai
 
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30
 
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
2024 asthma jkdjkfjsdklfjsdlkfjskldfgdsgerg
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
tOld settlement register shouldnotaffect BTR
tOld settlement register shouldnotaffect BTRtOld settlement register shouldnotaffect BTR
tOld settlement register shouldnotaffect BTR
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
3 May, Journalism in the face of the Environmental Crisis.
3 May, Journalism in the face of the Environmental Crisis.3 May, Journalism in the face of the Environmental Crisis.
3 May, Journalism in the face of the Environmental Crisis.
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
 
Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218
 
Honasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdfHonasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdf
 
unang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog versionunang digmaang pandaigdig tagalog version
unang digmaang pandaigdig tagalog version
 

Jharkhand.ppt

  • 1. 18.01.2013 Acharya Jagdish Chandra Bose Hall, Krishi Bhawan, New Delhi DEPARTMENT OF AGRICULTURE & CANE DEVELOPMENT GOVERNMENT OF JHARKHAND
  • 2. Sl.No. Crop Productivity (kg/ha) 2006-07 2011-12 % increase 2012-13 targeted (As per2nd advance estimate) 1 Paddy 1832 3197 42.69 2722 2 Pigeonpea 637 904 29.53 955 3 Black gram 597 709 84.20 906 4 Green gram 640 654 15.80 619 5 Horse gram (Kulthi) 408 606 33.00 581 6 Chickpea 923 1066 13.40 820 7 Lentil 609 840 28.00 820 8 Pea 987 1135 13.05 1125 1. Cropwise Comparative Productivity 2006 – 07, 2011-12 and 2012 - 13 1
  • 3. 2 2 a. Targeted Area, Production and Productivity as per crop cutting experiment 2012-13* Sl.No . Crop Area ‘000 ha Production ‘000 tonn Productivity (Kg/ha) 1 Paddy (Total) 1420 3780.148 3020 2 Arhar 195.685 185.759 1040 3 Blackgram 98.230 90.695 995 4 Green gram 25.825 15.921 815 5 Horse gram 20.225 11.325 769 Total Pulses 339.965 303.700 905 * As per Crop cutting experiment
  • 4. 2 b .Target Area, Production and Productivity 2012-13* Sl.No. Crop Area ‘000ha Production ‘000 tonns Productivity (Kg/ha) Crop - Paddy Paddy(Total) 1407.758 3831.226 2722 Crop - Pulses 1 Arhar 199.787 190.803 955 2 Black Gram 104.602 94.791 906 3 Green Gram 26.016 16.102 619 4 Horse Gram 21.078 12.255 581 5 Gram 130.288 108.139 830 6 Lentil 45.550 37.351 820 7 Pea 41.820 47.047 1125 Pulses(Total) 578.821 511.524 883 Area – ’000 ha Production – ‘000 ha Productivity – (Kg/ha) * As per State own assessment 3
  • 5. 3 a. Expenditure as on 31.12.2012 under NFSM Scheme during 2012-13 Sl. No. Schemes Allocation as per work plan (2012-13) O.B. As on 1.04.201 2 1st instalme nt released from Govt. of India (2012- 13) 2nd instalme nt released from Govt. of India (2012- 13) Total fund available (2012-13) Expenditur e upto date Balance Remarks 1 2 3 4 5 6 7 8 9 10 1 NFSM - Rice 850.560 283.800 528.050 - 811.850 576.875 234.975 2 (i) NFSM- Pulses 1291.970 247.510 605.190 89.270 941.970 590.247 351.723 (ii) IPM in Pigeonpea for Productivity enhanceme nt 375.00 - 170.000 170.000 84.000 86.000 Total 2517.530 531.310 1303.240 89.270 1923.820 1251.122 672.698 (Rs. in lakh) Cont.. 4
  • 6. 3 (a). Expenditure as on 31.12.2012 under NFSM Scheme during 2012-13 Sl.No. Schemes Allocation as per work plan (2012-13 O.B. As on 1.04.2012 as per U.C. of 2011-12 1st instalment released from Govt. of India (2012-13) 2nd instalment released from Govt. of India (2012-13) Total fund availabl e (2012- 13) Expendit ure upto date Balance Remar ks 1 2 3 4 5 6 7 8 9 10 3. (i) NFSM – A3P 418.000 71.189 90.980 109.500 200.480 195.405 5.075 (ii) Addition al area coverage during rabi/ summer (2012-13 530.000 - 390.000 - 390.000 41.600 348.400 Total 948.000 71.189 480.980 109.500 590.480 237.005 353.475 Grand Total 3465.530 563.574 1784.220 198.770 2475.38 0 1254.997 1220.383 Rs. in lakh 5
  • 7. 3(b).Likely Anticipated expenditure during 2012-13 under NFSM Schemes in Jharkhand uptodate (Rs. in lakh) Sl.No. Scheme Allocation (2012-13) Expenditure till 31.12.2012 Anticipated expenditure (2012-13) Remarks 1. NFSM- Rice 850.560 576.875 273.685 2. (i) NFSM - Pulses 1291.970 590.247 701.723 (ii) NFSM- Pulses IPM Pigeonpea for Productivity enhancement 375.000 84.000 291.000 3. (i) NFSM – A3P 418.000 195.405 222.595 (ii) Additional area coverage under Pulses during rabi/summer (2012-13) 530.000 149.750 380.250 Total 3465.530 1596.277 1869.253 6
  • 8. 3 (c) . Requirement of fund during 2012-13 if any Inlight of allocation under NFSM during 2012-13 following fund is required to achive the target : Sl.No. Scheme Allocation (2012-13) Fund released (2012-13) Fund required Remarks 1 NFSM -Rice 850.560 811.850 NIL As per audit report revised AAP approval is to be taken 2 (i) NFSM -Pulses 1291.970 941.970 350.00 (ii) IPM in Pigeonpea for Productivity enhancement 375.00 170.00 205.00 3 (i) NFSM –A3P 418.00 200.48 217.52 (ii) Additional area coverage under Pulses during rabi/summer (2012-13) 530.00 390.00 140.00 Total 3465.530 2514.300 951.230 7
  • 9. Sl.No. Component Unit Target Achievement Phy. Fin. Phy. Fin. 1. Cluster Demonstration by State Department of Agriculture with the technical backstopping of ICAR/ SAUs/ IRRI (One Cluster of 100 ha.) a Direct seeded rice / Line transplanting /SRI (Target 1.5% Area of District) Ha 4000 268.08 4000 218.555 b Cluster Demonstration Hybrid Rice (One cluster of 100 ha) (Target 0.5% Area of District) Ha 2000 134.04 2000 108.451 c Cluster Demonstration Swarna Sub-1 / Sahbhagi Dhan of 100 ha Each Ha - - - - 4. Physical & Financial Progress of NFSM – Rice (2012-13) Dec, 2012 (Rs. In lakh) 8
  • 10. Sl.No. Component Unit Target Achievement Phy. Fin. Phy. Fin. d Front Line Demonstrations by ICAR / SAUs on Hybrids Varities (Cluster of Min 10 ha each) Ha - - - - 2. Seed Distribution a Hybrid Rice seed Qtls 600.00 12.00 180.29 4.722 b HYVs Seeds Qtls 50000.0 250.0 12017.83 51.205 3 Plant & Soil Protection Management a Micronutrients Ha 800.00 4.00 620 2.160 b Liming in Acidic soils Ha 1000.00 5.00 737.14 2.638 c Plant Protection Chemicals & Bio-agents Ha 1500.0 7.50 1264.24 4.607 Physical & Financial Progress of NFSM – Rice (2012-13) Dec, 2012 (Rs. In lakh) 9
  • 11. Sl.No. Component Unit Target Achievement Phy. Fin. Phy. Fin. 4 Resource Conservation Techniques / Tools a Conoweeder Nos. 500 15.00 472 8.736 b Knapsack sprayer Nos. 350 10.500 6.091 c Zero Till Seed Drills Nos. 5 0.75 2 0.30 d Multi Crop Planters Nos. 0 0 0 0 e Seed Drills Nos. 0 0 0 0 f Power weeders Nos. 0 0 0 0 g Zero Till Multi crop Planters Nos. 5 0.75 1 0.15 h. Ridge Furrow Planter Nos. 5 0.750 0 0 i Rotovator Nos. 6 1.80 3 0.90 Physical & Financial Progress of NFSM – Rice (2012-13) Dec, 2012 (Rs. In lakh) 10
  • 12. Sl.No. Component Unit Target Achievement Phy. Fin. Phy. Fin. j Laser Land Leveler Nos. 0 0 0 0 5 Incentive for Pump Set Nos. 250 25.00 195 13.039 6 Cropping System based trainings (four sessions i.e. one before kharif, One each during kharif and rabi crops and one after rabi harvest) Nos. 50 7.00 50 6.68 7 Misc. Expenses a ) Project Management team& other Misc. Expenses at District Level. No. of District 7 44.520 1 19.985 b ) Project Management team& other Misc. Expenses at State Level. 1 13.870 Local Initiatives (Focus should be water harvesting structures for promotion of SRI and providing irrigation) 50.00 13.12 Total 850.560 461.340 Physical & Financial Progress of NFSM – Rice (2012-13) Dec, 2012 (Rs. In lakh) 11
  • 13. Sl.No. Component Unit Target Achievement Phy. Fin. Phy. Fin. 1 Distribution of Certified Seed : (a) For Varieties less than 10 years Qtls. 5000 110.00 160 0.00 a (b) For Varieties more than 10 years old Qtls. 15000 180.00 828 11.87 2. Demonstration on Improved Technologies : (a) Cluster Demonstrations (of 100 ha each) on Inter - cropping / Improved Varieties / farm implements like Ridge furrow marks / seed drill Ha 6500 325.00 8480 253.25 (b) Frontline Demonstrations by ICAR/ SAUs in cluster of 10 ha each Ha - - - - Physical & Financial Progress of NFSM – Pulses (2012 – 13) Dec, 2012 (Rs. In lakh) 12
  • 14. Sl.No. Component Unit Target Achievement Phy. Fin. Phy. Fin. 3 Integtated Nurtient Management (a) Micro- nutrients Ha. 4000 20.00 2447.658 10.18 (b)Lime / Gypsum / 80% WG Sulphur Ha 20000 150.00 13477.677 98.53 c. Rhizobium culture/ Phosphate Solublizing Bacteria Distribution/ Micorrizha Ha 10000 10.00 6236.486 5.25 4 Integrated Pest Management (IPM) (a) IPM Package Ha 4000 30.00 2636.501 17.24 (b) Distribution of NPV Ha. 400 1.00 181.965 0.447 Physical & Financial Progress of NFSM – Pulses (2012-13) Dec, 2012 (Rs. In lakh) 13
  • 15. Sl.No. Component Unit Target Achievement Phy. Fin. Phy. Fin. (c) Distribution of PP Chemicals Ha. 4000 20.00 3023.280 14.07 (d) Weedicides Ha 500 2.50 227.423 1.05 5 Resources Conservation Technologies Tools : (a) Knapsack Sprayers Nos. 1260 37.800 980 24.83 (b) Zero Till Seed Drills Nos. 17 2.550 5 0.75 (c) Multicrop Planters Nos. 0.00 0.00 0 0.00 (d) Seed Drills Nos. 17 2.550 4 0.60 (e) Zero till Multi Crop Planters Nos. 0.00 0.00 0 0.00 (f) Ridge Furrow Planters Nos. 0.00 0.00 0 0.00 Physical & Financial Progress of NFSM – Pulses (2012-13) Dec, 2012 (Rs. In lakh) 14
  • 16. Sl.No. Component Unit Target Achievement Phy. Fin. Phy. Fin. (g) Rotavator Nos. 17 5.10 10 3.0 (h) Lasser Land Levelers Nos. 0.00 0.00 0 0.00 6 Efficient Water Application Tools : (a) Distribution of Sprinkler Sets Ha - - - - (b) Incentive for Mobile Sprinkler Raingun Nos. 100 15.00 26 3.90 (c) Incentive for Pumpsets Nos. 500 50.00 506 49.32 (d) Pipe for carrying water from source to the field Nos. 200 30.00 127 18.90 Physical & Financial Progress of NFSM – Pulses (2012-13) Dec, 2012 (Rs. In lakh) 15
  • 17. Sl.No. Component Unit Target Achievement Phy. Fin. Phy. Fin. 7 Cropping System based training (Four Sessions i.e. One before Kharif, one each during Kharif & Rabi crops and one after rabi harvest) Nos. 130 18.200 124 15.75 8 Miscellaneous Expenes (a) Project Management Team & and other Miscellaneous Expenes at District level No. of District 17 75.990 11 16.14 ( b) Project Management Team & and other Miscellaneous Expenes at State level No. of State 1 6.280 1 4.49 (c) Misc. Expenses to State for other Districts ( District of ISOPOM) No. of District 0 0.00 0 0.00 Physical & Financial Progress of NFSM – Pulses (2012-13) Dec, 2012 (Rs. In lakh) 16
  • 18. Sl.No. Component Unit Target Achievement Phy. Fin. Phy. Fin. 9 Local Initiatives (Water charges for two protectives irrigation may be supported under Local initiatives to the farmers/ groups given mobile sprinkler raingun 0 200.00 1 7.08 Total 1291.970 556.652 Physical & Financial Progress of NFSM – Pulses (2012-13) Dec, 2012 (Rs. In lakh) 17
  • 19. Sl.No. Component Unit Target Achievement Phy. Fin. Phy. Fin. 1. Seed Mini kit Qtls. 280 28.0 270 23.562 2. Lime/dolomite Qtls. 21000 67.2 6352 45.522 3. Micronutrients (Borax) Qtls. 700 42.0 5875 35.400 4. Rhizobium culture Ha. 7000 5.25 5750 4.350 5. PSB Ha. 7000 5.25 5750 4.350 6 Urea(foliar spray) Ha. 7000 4.20 6750 3.743 7. Fungicides for seed treatment Ha. 7000 5.60 4000 3.929 Physical & Financial Progress of NFSM - A3P Kharif (Pulses) 2012-13 Dec, 2012 (Rs. In lakh) 18
  • 20. Sl.No. Component Unit Target for 7 units Achievement Phy. Fin. Phy. Fin. 8. Insecticides/pesticides/biogent (NPV) &biopesticides, insecticides, Pheromene traps, lures etc suitable for IPM recommendation in the crop. Ha. 7000 94.50 3648.51 46.560 9. e- pest surveillance Ha. 7000 14.00 2500 2.750 10. Total 266.00 170.165 Physical & Financial Progress of NFSM - A3P Kharif (Pulses) 2012-13 Dec, 2012 (Rs. In lakh) 19
  • 21. Sl.No. Component Unit Target for 4 units Achievement Phy. Fin. Phy. Fin. 1. Seed Minikit Qtls. 240 14.40 60 1.80 2. Lime/dolomite Qtls. 12000 38.40 3000 10.80 3. Micronutrients (Borax) Qtls. 400 24.00 100 6.00 4. Rhizobium culture Ha. 4000 3.00 1000 0.25 5. PSB Ha. 4000 3.00 1000 0.25 6 Urea(foliar spray) Ha. 4000 2.40 7. Fungicides for seed treatment Ha. 4000 3.20 1000 2.00 Physical & Financial Progress of NFSM - A3P Rabi (Pulses) 2012-13 Dec, 2012 (Rs. In lakh) 20
  • 22. Sl.No. Component Unit Target Achievement Phy. Fin. Phy. Fin. 8. Insecticides/pesticides/biogent (NPV) &biopesticides, insecticides, Pheromene traps, lures etc suitable for IPM recommendation in the crop. Ha. 4000 56.80 250.00 3.940 9. e- pest surveillance Ha. 4000 6.80 118 0.200 10. Total 152.00 25.240 Physical & Financial Progress of NFSM - A3P Rabi (Pulses) 2012-13 Dec, 2012 (Rs. In lakh) 21
  • 23. 5. Major focus on different inputs under NFSM •Availability of improved quality seeds of rice and pulses to increase productivity. • Low cost input like :  Lime/ dolomite/ LD slag to improve soil health.  Micronutrient (Borax) / Zinc to remove nutrient deficiencies in soil to improve crop productivity.  Seed innoculation with Rhizobium culture/ PSB to improve nitrogen and phosphate availavility. 22 Contd..
  • 24. Major focus on different inputs under NFSM  Use of Fungicides for seed treatment to protect the crop from seed born diseases.  Use of weedicides to manage the weed population below their threshold value to affect crop productivity.  Use of IPM e.g. Insecticides/Pesticides /Bioagents NPV and biopesticides to protect the rice and pulses crops from insect pest to harvest higher yield. 23
  • 25. 6. Physical and Financial target and achievement under A3P during 2012-13 (1 unit = 100 ha) Sl. No. Crop Physical (No. of units) Financial Remarks Target Achievement Target Achievement 1 2 3 4 5 6 7 1 Pigeonpea 70 70 266.00 170.165 The financial achievement is in progress 2 Chickpea 20 - 76.00 - Due to unavailability of seed the cluster demonstration on Chickpea (2 units) and Lentil one unit could not be conducted . The target shall be completed during Summer Pulses (Green gram) 3 Lentil 20 10 76.00 25.240 4 Green gram 30 - 114.90 - Total 140 80 532.90 195.405 Rs. in lakh 24
  • 26. 7. Status of implementation of Pest Surveillance in A3P during 2011-12 and 2012-13 in Jharkhand Sl.No. Period Season Physical (ha) Financial Remarks Target Achievement Target Achievement 1 2011-12 Kharif 9000 4150 18.00 8.30 Rabi 17000 9470 28.90 16.10 Total 26000 13620 46.90 24.40 2 2012-13 Kharif 7000 7000 14.00 2.75 Program me is under progress Rabi 11000 11000 18.70 1.10 Total 18000 18000 32.70 3.85 Grand Total 44000 31620 79.60 28.25 (Rs. in lakh) 25
  • 27. 8. Physical and Financial Progress under implementation of Special Plan of Pulses Production during Rabi/ Summer 2012-13 Sl.No. Crop Physical (ha.) Financial (Rs. in lakh) Remarks Target Achievement Target Achievement 1 Chickpea 6000 6000 229.800 41.600 Programme is under progress 2 Lentil 4000 4000 153.200 46.150 3 Summer* green gram 4000 - 174.000 - Total 14000 10000 530.000 87.750 26 * The Seed & other inputs Procurement is under progress.
  • 28. 9.Additional area Coverage under NFSM – A3P Pulses during Rabi/ Summer 2012-13 (1 unit = 100 ha) Sl. No. Crop Physical (No. of units) Financial Remarks Target Achievement Target Achievement 1 2 3 4 5 6 7 1 Chickpea 60 52 229.80 41.600 Physical target of Chickpea could not be completed due to unavailability of seed. It will be completed in summer season in Green gram 2 Lentil 40 40 153.20 46.150 4 Green gram 40 - 147.00 - The Procurement of seed & other input is in progress & Target shall be achieved Total 140 92.00 530.00 87.750 Rs. in lakh 27
  • 29. 10. Planning of Summer Rice and Pulses crops • 5000 q rice seed to be distributed in summer. • Distribution of INM/IPM in 450 ha . • Target of Farm implements to be achieved. • 1000 q Pulses seed to be distributed during summer. •4000 ha area of field demonstration under NFSM – Pulses to be conducted on summer moong. 28
  • 30. Planning of Summer Rice and Pulses crops • 12000 ha INM & 2000 ha IPM area taken up under NFSM –Pulses . • Target under Farm implement to be completed under NFSM - Pulses. • 7000 ha area of Cluster Demonstration under NFSM – A3P taken up with summer moong. 29
  • 31. 11. Status of online submission of Progress report • 100 % On line reporting at district and state level. 30
  • 32. 12. Appointment of Project Management Team (PMT) at district level • Re advertised for the Post of State/ District Consultant/STA/ TA . • Walk in interview to be conducted very shortly. 31
  • 33. 14. Specific issues and Suggestion • State level Training Programme be continued. • Capacity building of Personnel desirable for effective execution of the programmes of NFSM. • Consolidated amount of PMT to be enhanced. • uncertainity of continuation of the schemes PMT personnel remain in search of better employment. 32
  • 34. • NFSM – Wheat Programme to be given to the State • 60,000 Pulses villages scheme to be given to state. 33