1. Sr.
No.
Date Job Card No. Equipment Received By Nature of rework(defect) Qty
1 08.02.2023 RU1/HX/SO-0043 PHE nozzle (H1) liner welding found crock 1
2 24.04.2023
MA/U1-HX/SO-
0100
PHE
PHE leaked due to plate and gasket assembly
mismatched
1
3 15.07.2023
MD/U1-HX/SO-
0011
PHE
Frame and Pressure plate paint damage at corner
due to improper handling
1
ADHIAM THERMAL SYSTEMS & SOLUTION PVT L
Rework Register_2023
2.
3.
4. ATSS/MF/02 REV.00
Rework
Time
Reqd.
Cost Incurred
Person
responsible for
CA/PA report no.
dismentaling of PHE , LPT
testing ,Rewleding of nozzle
liner, Retesting
4 hrs 625 Mr.SHUBHAM G. ATSS/NC/23/02-01
dismetaling of PHE and
rearrange plates with proper
fitment and retesting
2 hrs 400 Mr.SHUBHAM G. ATSS/NC/23/04-01
polish damaged paint area by
sutaible paper and touchup
required area by paint brush
1 hrs 300 Mr.SHUBHAM G. ATSS/NC/23/07-01
STEMS & SOLUTION PVT LTD.
rk Register_2023