+++++General
With the rapid development of national economy and the improvement of people's living
standard, people's demand for electricity is increasing day by day. It puts forward higher request to
the reliability and quality of power supply. However. Distribution network construction is seriously
lagging behind, the grid is weak, facilities aging, line length, small diameter, most of the power
distribution transformers are high energy consumption, network loss is increasingly prominent.
Voltage quality is one of the important indicators to measure the power quality of power
system, and its quality depends on whether the power flow distribution is reasonable or not. Due to
the increasing load and the power supply, the network structure of the power system not only
changes the network structure of the power system, but also changes the power distribution of the
system. May even cause serious problems in local areas, the situation is generally low voltage level.
This is not only related to the power system to provide users with power quality issues, but also
directly affect the safety and economic operation of the power grid. At the same time, it is
necessary to consider the power factor and voltage of the network, because the network power
factor and voltage reduction will make the electrical equipment is not fully utilized, thereby reducing
the transmission capacity of the network, and cause loss increase.
Reactive power compensation benefits
l Improves system power factor
l Reduces network losses
l Avoid penalty charges from utilities for
excessive consumption of reactive power
l Reduces cost and generates higher revenue
for the customer
l Increases system capacity and saves cost on
new installations
l Improves voltage regulation in the network
l .Increases power availability
Reactive power compensation
Farady Electric Co.,:Ltd
3. The need for capacitors in electric power system
+++++Product scope
Rated voltage๏ผš6kV to 35kV
๏ผˆ30kVโ€”230kV Power transformer substation๏ผ‰
Rated frequency๏ผš50Hz, 60Hz
Rated reactive power capacity๏ผš50kvarโ€”36000kvar
Environment temperature๏ผš-45โ„ƒโ€”+55โ„ƒ
Altitude๏ผš๏ผœ4500m
Compensation taps๏ผš9 to 25 taps
Voltage regulation range๏ผš50%Unโ€”100%Un
Regulation reactive power range๏ผš25%Qnโ€”100%Qn
Impedance๏ผš๏ผœ2.0%
Controller system๏ผšDWK controller
Reactive power compensation
Farady Electric Co.,:Ltd
+++++ Working principle
The work principle of Farady regulating type capacitors is that: Connect all the capacitors to the electric
network with voltage regulator ,the output reactive power will be adjust by voltage regulator, refer to the
capacitor output power formula: QnUnUQc 2
)/(= .
The set of equipment is made up by following equipments:
1. Load break switch
2. Insolating switch
3. Voltage regulator
4. Intelligent controller
5. Capacitors
6. Lighting arrester
7. Metering CT, PT
Assuming that the nominal capacitance of the capacitor is Qn , the connected voltage regulator
regulation range is 50%Unโ€”100%Un, so refer to the formula QnUnUQc 2
)/(= ,voltage regulator is
designed with 9 taps tap changer to change the network voltage, see figure 2 , the output reactive
power in every regulator position
Reactive power compensation
Farady Electric Co.,:Ltd
Taps Voltage of capacitors( U) Output capacitors๏ผˆ Qc๏ผ‰
1 0.6 0.36
2 0.65 0.42
3 0.7 0.49
4 0.75 0.56
5 0.8 0.64
6 0.85 0.72
7 0.9 0.81
8 0.95 0.90
9 1 1
Figure 1 the output reactive power in every regulator position
+++++ Advantages
The traditional way of reactive power compensation is changing the quantity of capacitors to
adjust output reactive power, change method is usually switch or contactor, will result in following
hazards
1. The conventional reactive power compensation method has a large compensation capacity
and the adjustment is not flexible, it will lead to the compensation is not suitable , often appear over
and not enough.
2. The capacitor switching can cause over-voltage and inrush current, and it will seriously affect
and reduce the service life of the switch.
3. When the capacitor is switched on, as the capacitor will charged and discharged, when it need
to switch on again, which affects the speed of the switching.ใ€‚
According to the above problems, o company developed the FLYK type reactive power
compensation device, has the following advantages๏ผš
Reactive power compensation
Farady Electric Co.,:Ltd
1.Energy conservation: Farady voltage regulating type capacitors will change the output
reactive power by regulating voltage on capacitors, so that the reactive power can be adjusted
smoothly. Comparing with other method, it can ensure the capacitors in best condition, the
energy saving effect is much better
2.Low cost๏ผšIf the old power transformer substation need to reform, only need to add a voltage
regulator between the circuit breaker and capacitors, the original circuit breakers, reactors,
capacitors can be reuse, greatly reduce the cost of transformation
3.Maintance Free๏ผšWhen traditional circuit breaker and contactor switching, switching devices
and capacitors often damaged because of the above problems, result in high maintenance costs,
using Farady devices, automatic control reactive power output, there is no potential risks of other
equipments, greatly reducing maintenance and staff costs in power transformer substation
Method Switch contactor Vol regulating type
No. of components Few Many Many
Compensation taps 1 4 9-25
Switch times 10000 times 100000times 100000times
Capacitor utilization Low Low High
Reduce inrush current With reactor With reactor No need of reactor
Over voltage High High Low
Impact on Power Grid Big Big small
Need Charge or not Yes Yes No
Action interval 30min 10min 1min
Switch failure rate High High Low
capacitor failure rate High High Low
Install type Outdoor& indoor indoor Outdoor& indoor
Cost Low Hight Low
Figure 2 Comparison of Three types compensation
Reactive power compensation
Farady Electric Co.,:Ltd
+++++ Intelligent controller
Figure 3 DWK controller
1. A controller can control the 1-2 power transformer, 1-2 capacitor group, through the menu
settings to meet different control situation. The control panel circuit can be used in different
equipment. Especially considering a series of adjustable capacitors and with a set of adjustable
capacitors, to achieve the maximum performance.
2. A voltage regulator is designed in accordance with the nonlinear voltage, so that the reactive
power capacity of each tap is equal. According to reactive power control and not according to the
power factor control, switching shocks does not appear.
3. According to the line switch and the main switch automatically determine substation operation
mode and automatically adjust reactive decision signal.
4. Dedicated capacitor protection, while protecting both the two regulator and capacitors, it will
set the protection value according to tap position of voltage regulator. Also with current delay,
instantaneous trip, opening voltage, overvoltage and under voltage protection system.
5. Each capacitor can be cast back at any time by pressing plate. Capacitor failure can
automatically exit the fault equipment, does not affect the operation of other equipment. Automatic
removal of the capacitor switch cabinet, and alarm.
6. With the communication interface and the contact type pressure regulating interface,
convenient and comprehensive automation.
8. A variety of models to meet the different needs of the controller.
Reactive power compensation
Farady Electric Co.,:Ltd
+++++ Equipment application
1๏ผŽCompact type
This type of devices install all electrical components in the cabinet that required, cabinet made of
galvanized steel or stainless steel, the voltage is 3 5kV and below, capacitance below 4000kvar will
use such structure. This type of structure is orderly, the installation and the maintenance are
convenient, the occupied area is small, and the structure is suitable for the interior installation of a
new power transformer substation.
Reactive power compensation
Farady Electric Co.,:Ltd
2 Outdoor type
This install type with a fence around the equipment enclosure , occupy an area of slightly larger,
but the maintenance is very convenient, also have in indoor and outdoor for use, this kind of
installing usually for old power transformer substation reforming and factory reactive power
compensation.
Reactive power compensation
Farady Electric Co.,:Ltd
3.Other applications
1๏ผŽWhen capacitor is the main compensation power, the reactive power problem is solved, the
line power factor is improved, the voltage drop is reduced, the reactive power loss is reduced, and
the terminal voltage level of the stable line is reduced. Suitable for urban and rural fringe areas,
since the overhead line is long, result in the voltage is too low,
2๏ผŽWhen the reactor is the main compensation reactive power, it mainly solves the problem of
large and seasonal voltage difference between day and night, and the problem of voltage instability.
Suitable for ultra high voltage hub substation, urban power grid, the day and night pressure
difference, the night capacitive reactive surplus places to install and use. The power frequency
voltage rise caused by the capacitance effect of long lines can be weakened when the overhead
line is empty or light load. Such end Voltage rise is due to the high voltage overhead line no-load or
light load, the line of the power grid for capacitive reactive power charging, resulting in line terminal
voltage is higher than the first voltage,
3๏ผŽWhen the capacitor and shunt reactor are combined as the main compensation of reactive
power, can Synthetically solve the problem of voltage reactive power. Suitable for large power,
power factor, voltage levels have higher requirements for the installation and use places.
4๏ผŽThe high voltage filter compensation device is used as the main compensation and harmonic
control of reactive power which mainly solves the problem of excessive harmonic and low power
factor. At the same time, it can also reduce the voltage drop, reduce the reactive power loss and
harmonic additional loss, and stabilize the terminal voltage level. For a harmonic source, medium
voltage overhead lines long, low voltage, low power factor of the installation site
Reactive power compensation
Farady Electric Co.,:Ltd
Copyright 2014 Farady Electric
Zhejiang Farady Electric Co.,Ltd
TEL:0086-577-61722510/61777258
Fax:0086-577-61777257
Http://www.farady.cn
Email:info@farady.cn
Add:Suโ€™ao,Liushi,Yueqing,Zhejiang,P.R.China, 325604

More Related Content

What's hot

Sharavati receiving station
Sharavati  receiving stationSharavati  receiving station
Sharavati receiving stationH.C.Naveen Kumar
ย 
Voltage Regulation and Control in Transmission Lines
Voltage Regulation and Control in Transmission LinesVoltage Regulation and Control in Transmission Lines
Voltage Regulation and Control in Transmission LinesToshaliMohapatra
ย 
Switchyard design overview
Switchyard design overviewSwitchyard design overview
Switchyard design overviewMilind Punj
ย 
protection scheme of a grid substation prsentation
protection scheme of a grid substation prsentationprotection scheme of a grid substation prsentation
protection scheme of a grid substation prsentationabu jubayer
ย 
Power Transformer Parts And Functions
Power Transformer Parts And FunctionsPower Transformer Parts And Functions
Power Transformer Parts And FunctionsNitendra Kumar Singh
ย 
summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...Rahul Akinapelli
ย 
uppcl training in moradabad report
uppcl training in moradabad reportuppcl training in moradabad report
uppcl training in moradabad reportMONU KUMAR
ย 
132kv substation inplant training seminar
132kv substation inplant training seminar132kv substation inplant training seminar
132kv substation inplant training seminarShrikant Bhansali
ย 
132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCLAman Rajput
ย 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptAshutosh Srivastava
ย 
application of power electronics
application of power electronicsapplication of power electronics
application of power electronicsYasir Hashmi
ย 
Major electrical equipment in power plants
Major electrical equipment in power plantsMajor electrical equipment in power plants
Major electrical equipment in power plantsFateh Singh
ย 
Uttar Pradesh Power Corparation Ltd. Training Report
Uttar Pradesh Power Corparation Ltd. Training ReportUttar Pradesh Power Corparation Ltd. Training Report
Uttar Pradesh Power Corparation Ltd. Training ReportAmitKumar6931
ย 
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipurramesh kumawat
ย 
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATIONPPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATIONSwatantra SwAt
ย 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV Girish Gupta
ย 
training at uppcl khurram nagar 132/33 kv
training at uppcl khurram nagar 132/33 kvtraining at uppcl khurram nagar 132/33 kv
training at uppcl khurram nagar 132/33 kvamitietlko
ย 
33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE 33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE Lalit Kumar
ย 
OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1
OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1
OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1md muzahidul haque
ย 
KSEB Training Reporty
KSEB Training ReportyKSEB Training Reporty
KSEB Training ReportyVaisakh Shanmughan
ย 

What's hot (20)

Sharavati receiving station
Sharavati  receiving stationSharavati  receiving station
Sharavati receiving station
ย 
Voltage Regulation and Control in Transmission Lines
Voltage Regulation and Control in Transmission LinesVoltage Regulation and Control in Transmission Lines
Voltage Regulation and Control in Transmission Lines
ย 
Switchyard design overview
Switchyard design overviewSwitchyard design overview
Switchyard design overview
ย 
protection scheme of a grid substation prsentation
protection scheme of a grid substation prsentationprotection scheme of a grid substation prsentation
protection scheme of a grid substation prsentation
ย 
Power Transformer Parts And Functions
Power Transformer Parts And FunctionsPower Transformer Parts And Functions
Power Transformer Parts And Functions
ย 
summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...summer internship report on erection, commissioning and pre-comissioning of50...
summer internship report on erection, commissioning and pre-comissioning of50...
ย 
uppcl training in moradabad report
uppcl training in moradabad reportuppcl training in moradabad report
uppcl training in moradabad report
ย 
132kv substation inplant training seminar
132kv substation inplant training seminar132kv substation inplant training seminar
132kv substation inplant training seminar
ย 
132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL
ย 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation ppt
ย 
application of power electronics
application of power electronicsapplication of power electronics
application of power electronics
ย 
Major electrical equipment in power plants
Major electrical equipment in power plantsMajor electrical equipment in power plants
Major electrical equipment in power plants
ย 
Uttar Pradesh Power Corparation Ltd. Training Report
Uttar Pradesh Power Corparation Ltd. Training ReportUttar Pradesh Power Corparation Ltd. Training Report
Uttar Pradesh Power Corparation Ltd. Training Report
ย 
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
ย 
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATIONPPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
PPT ON SUMMER TRAINING FROM UPPCL 132/33 KV SUB STATION
ย 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
ย 
training at uppcl khurram nagar 132/33 kv
training at uppcl khurram nagar 132/33 kvtraining at uppcl khurram nagar 132/33 kv
training at uppcl khurram nagar 132/33 kv
ย 
33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE 33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE
ย 
OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1
OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1
OPERATION & MAINTENANCE OF 33/11 kV SUBSTATION AT DHAKA PALLI BIDYUT SAMITY-1
ย 
KSEB Training Reporty
KSEB Training ReportyKSEB Training Reporty
KSEB Training Reporty
ย 

Similar to Automatic reactive voltage regulator

Automatic voltage regulator(avr)
Automatic voltage regulator(avr)Automatic voltage regulator(avr)
Automatic voltage regulator(avr)JoeChueng
ย 
Power factor improvement
Power factor improvementPower factor improvement
Power factor improvementharshal567
ย 
IRJET- Power Saver for Industrial and Commercial Establishments by Power Fact...
IRJET- Power Saver for Industrial and Commercial Establishments by Power Fact...IRJET- Power Saver for Industrial and Commercial Establishments by Power Fact...
IRJET- Power Saver for Industrial and Commercial Establishments by Power Fact...IRJET Journal
ย 
Application of Capacitors to Distribution System and Voltage Regulation
Application of Capacitors to Distribution System and Voltage RegulationApplication of Capacitors to Distribution System and Voltage Regulation
Application of Capacitors to Distribution System and Voltage RegulationAmeen San
ย 
IRJET- Automated Energy Monitering System and Power Factor Improvement
IRJET-  	  Automated Energy Monitering System and Power Factor ImprovementIRJET-  	  Automated Energy Monitering System and Power Factor Improvement
IRJET- Automated Energy Monitering System and Power Factor ImprovementIRJET Journal
ย 
Lsvr lt step voltage regulator
Lsvr lt step voltage regulatorLsvr lt step voltage regulator
Lsvr lt step voltage regulatorJoeChueng
ย 
MINOR PROJECT gb 08 (3).pdf
MINOR PROJECT gb 08 (3).pdfMINOR PROJECT gb 08 (3).pdf
MINOR PROJECT gb 08 (3).pdfDrSabhyataSoni
ย 
IRJET-Management of power factor and harmonic
IRJET-Management of power factor and harmonicIRJET-Management of power factor and harmonic
IRJET-Management of power factor and harmonicIRJET Journal
ย 
Presentation 2014
Presentation 2014Presentation 2014
Presentation 2014pinki199319
ย 
Applications of Smart Grid through Harmonic Current & Reactive Power Compensa...
Applications of Smart Grid through Harmonic Current & Reactive Power Compensa...Applications of Smart Grid through Harmonic Current & Reactive Power Compensa...
Applications of Smart Grid through Harmonic Current & Reactive Power Compensa...IJMTST Journal
ย 
Energy Efficiency in Electrical Systems.pptx
Energy  Efficiency in Electrical Systems.pptxEnergy  Efficiency in Electrical Systems.pptx
Energy Efficiency in Electrical Systems.pptxPoojaAnupGarg
ย 
An Asymmetrical Dc-Dc Converter with a High Voltage Gain
An Asymmetrical Dc-Dc Converter with a High Voltage GainAn Asymmetrical Dc-Dc Converter with a High Voltage Gain
An Asymmetrical Dc-Dc Converter with a High Voltage GainIJMER
ย 
APFC project presentation
APFC project presentationAPFC project presentation
APFC project presentationkartickmp613
ย 
IRJET - Design of High Gain DC-DC Step Up Converter
IRJET -  	  Design of High Gain DC-DC Step Up ConverterIRJET -  	  Design of High Gain DC-DC Step Up Converter
IRJET - Design of High Gain DC-DC Step Up ConverterIRJET Journal
ย 
IRJET- Automatic Power Factor Correction
IRJET- Automatic Power Factor CorrectionIRJET- Automatic Power Factor Correction
IRJET- Automatic Power Factor CorrectionIRJET Journal
ย 
5T Intemediate Frequency Furnace
5T Intemediate Frequency Furnace5T Intemediate Frequency Furnace
5T Intemediate Frequency FurnaceGuo ke
ย 
Automatic load sharing of transformer using microcontroller
Automatic load sharing of transformer using microcontrollerAutomatic load sharing of transformer using microcontroller
Automatic load sharing of transformer using microcontrollerPrakhar Anand
ย 
POWER FACTOR.pptx
POWER FACTOR.pptxPOWER FACTOR.pptx
POWER FACTOR.pptxShariqAhmed75
ย 
power quality improvement in distrution system using D statcom
power quality improvement in distrution system using D statcompower quality improvement in distrution system using D statcom
power quality improvement in distrution system using D statcom7867867869
ย 

Similar to Automatic reactive voltage regulator (20)

Automatic voltage regulator(avr)
Automatic voltage regulator(avr)Automatic voltage regulator(avr)
Automatic voltage regulator(avr)
ย 
Power factor improvement
Power factor improvementPower factor improvement
Power factor improvement
ย 
IRJET- Power Saver for Industrial and Commercial Establishments by Power Fact...
IRJET- Power Saver for Industrial and Commercial Establishments by Power Fact...IRJET- Power Saver for Industrial and Commercial Establishments by Power Fact...
IRJET- Power Saver for Industrial and Commercial Establishments by Power Fact...
ย 
Application of Capacitors to Distribution System and Voltage Regulation
Application of Capacitors to Distribution System and Voltage RegulationApplication of Capacitors to Distribution System and Voltage Regulation
Application of Capacitors to Distribution System and Voltage Regulation
ย 
IRJET- Automated Energy Monitering System and Power Factor Improvement
IRJET-  	  Automated Energy Monitering System and Power Factor ImprovementIRJET-  	  Automated Energy Monitering System and Power Factor Improvement
IRJET- Automated Energy Monitering System and Power Factor Improvement
ย 
Lsvr lt step voltage regulator
Lsvr lt step voltage regulatorLsvr lt step voltage regulator
Lsvr lt step voltage regulator
ย 
MINOR PROJECT gb 08 (3).pdf
MINOR PROJECT gb 08 (3).pdfMINOR PROJECT gb 08 (3).pdf
MINOR PROJECT gb 08 (3).pdf
ย 
IRJET-Management of power factor and harmonic
IRJET-Management of power factor and harmonicIRJET-Management of power factor and harmonic
IRJET-Management of power factor and harmonic
ย 
Presentation 2014
Presentation 2014Presentation 2014
Presentation 2014
ย 
Applications of Smart Grid through Harmonic Current & Reactive Power Compensa...
Applications of Smart Grid through Harmonic Current & Reactive Power Compensa...Applications of Smart Grid through Harmonic Current & Reactive Power Compensa...
Applications of Smart Grid through Harmonic Current & Reactive Power Compensa...
ย 
Energy Efficiency in Electrical Systems.pptx
Energy  Efficiency in Electrical Systems.pptxEnergy  Efficiency in Electrical Systems.pptx
Energy Efficiency in Electrical Systems.pptx
ย 
An Asymmetrical Dc-Dc Converter with a High Voltage Gain
An Asymmetrical Dc-Dc Converter with a High Voltage GainAn Asymmetrical Dc-Dc Converter with a High Voltage Gain
An Asymmetrical Dc-Dc Converter with a High Voltage Gain
ย 
APFC project presentation
APFC project presentationAPFC project presentation
APFC project presentation
ย 
IRJET - Design of High Gain DC-DC Step Up Converter
IRJET -  	  Design of High Gain DC-DC Step Up ConverterIRJET -  	  Design of High Gain DC-DC Step Up Converter
IRJET - Design of High Gain DC-DC Step Up Converter
ย 
IRJET- Automatic Power Factor Correction
IRJET- Automatic Power Factor CorrectionIRJET- Automatic Power Factor Correction
IRJET- Automatic Power Factor Correction
ย 
5T Intemediate Frequency Furnace
5T Intemediate Frequency Furnace5T Intemediate Frequency Furnace
5T Intemediate Frequency Furnace
ย 
Automatic load sharing of transformer using microcontroller
Automatic load sharing of transformer using microcontrollerAutomatic load sharing of transformer using microcontroller
Automatic load sharing of transformer using microcontroller
ย 
Solar ppt
Solar pptSolar ppt
Solar ppt
ย 
POWER FACTOR.pptx
POWER FACTOR.pptxPOWER FACTOR.pptx
POWER FACTOR.pptx
ย 
power quality improvement in distrution system using D statcom
power quality improvement in distrution system using D statcompower quality improvement in distrution system using D statcom
power quality improvement in distrution system using D statcom
ย 

Recently uploaded

Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
ย 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
ย 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
ย 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
ย 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
ย 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
ย 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
ย 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
ย 
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...Call Girls in Nagpur High Profile
ย 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
ย 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
ย 
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night StandCall Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Standamitlee9823
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
ย 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
ย 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
ย 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
ย 

Recently uploaded (20)

Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
ย 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
ย 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
ย 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
ย 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
ย 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
ย 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
ย 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
ย 
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
ย 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
ย 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
ย 
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night StandCall Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
ย 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
ย 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
ย 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
ย 

Automatic reactive voltage regulator

  • 1. Reactive power compensation Farady Electric Co.,:Ltd Automatic Reactive Voltage regulator Zhejiang Farady Electric Co.,Ltd
  • 2. Reactive power compensation Farady Electric Co.,:Ltd +++++General With the rapid development of national economy and the improvement of people's living standard, people's demand for electricity is increasing day by day. It puts forward higher request to the reliability and quality of power supply. However. Distribution network construction is seriously lagging behind, the grid is weak, facilities aging, line length, small diameter, most of the power distribution transformers are high energy consumption, network loss is increasingly prominent. Voltage quality is one of the important indicators to measure the power quality of power system, and its quality depends on whether the power flow distribution is reasonable or not. Due to the increasing load and the power supply, the network structure of the power system not only changes the network structure of the power system, but also changes the power distribution of the system. May even cause serious problems in local areas, the situation is generally low voltage level. This is not only related to the power system to provide users with power quality issues, but also directly affect the safety and economic operation of the power grid. At the same time, it is necessary to consider the power factor and voltage of the network, because the network power factor and voltage reduction will make the electrical equipment is not fully utilized, thereby reducing the transmission capacity of the network, and cause loss increase. Reactive power compensation benefits l Improves system power factor l Reduces network losses l Avoid penalty charges from utilities for excessive consumption of reactive power l Reduces cost and generates higher revenue for the customer l Increases system capacity and saves cost on new installations l Improves voltage regulation in the network l .Increases power availability
  • 3. Reactive power compensation Farady Electric Co.,:Ltd 3. The need for capacitors in electric power system +++++Product scope Rated voltage๏ผš6kV to 35kV ๏ผˆ30kVโ€”230kV Power transformer substation๏ผ‰ Rated frequency๏ผš50Hz, 60Hz Rated reactive power capacity๏ผš50kvarโ€”36000kvar Environment temperature๏ผš-45โ„ƒโ€”+55โ„ƒ Altitude๏ผš๏ผœ4500m Compensation taps๏ผš9 to 25 taps Voltage regulation range๏ผš50%Unโ€”100%Un Regulation reactive power range๏ผš25%Qnโ€”100%Qn Impedance๏ผš๏ผœ2.0% Controller system๏ผšDWK controller
  • 4. Reactive power compensation Farady Electric Co.,:Ltd +++++ Working principle The work principle of Farady regulating type capacitors is that: Connect all the capacitors to the electric network with voltage regulator ,the output reactive power will be adjust by voltage regulator, refer to the capacitor output power formula: QnUnUQc 2 )/(= . The set of equipment is made up by following equipments: 1. Load break switch 2. Insolating switch 3. Voltage regulator 4. Intelligent controller 5. Capacitors 6. Lighting arrester 7. Metering CT, PT Assuming that the nominal capacitance of the capacitor is Qn , the connected voltage regulator regulation range is 50%Unโ€”100%Un, so refer to the formula QnUnUQc 2 )/(= ,voltage regulator is designed with 9 taps tap changer to change the network voltage, see figure 2 , the output reactive power in every regulator position
  • 5. Reactive power compensation Farady Electric Co.,:Ltd Taps Voltage of capacitors( U) Output capacitors๏ผˆ Qc๏ผ‰ 1 0.6 0.36 2 0.65 0.42 3 0.7 0.49 4 0.75 0.56 5 0.8 0.64 6 0.85 0.72 7 0.9 0.81 8 0.95 0.90 9 1 1 Figure 1 the output reactive power in every regulator position +++++ Advantages The traditional way of reactive power compensation is changing the quantity of capacitors to adjust output reactive power, change method is usually switch or contactor, will result in following hazards 1. The conventional reactive power compensation method has a large compensation capacity and the adjustment is not flexible, it will lead to the compensation is not suitable , often appear over and not enough. 2. The capacitor switching can cause over-voltage and inrush current, and it will seriously affect and reduce the service life of the switch. 3. When the capacitor is switched on, as the capacitor will charged and discharged, when it need to switch on again, which affects the speed of the switching.ใ€‚ According to the above problems, o company developed the FLYK type reactive power compensation device, has the following advantages๏ผš
  • 6. Reactive power compensation Farady Electric Co.,:Ltd 1.Energy conservation: Farady voltage regulating type capacitors will change the output reactive power by regulating voltage on capacitors, so that the reactive power can be adjusted smoothly. Comparing with other method, it can ensure the capacitors in best condition, the energy saving effect is much better 2.Low cost๏ผšIf the old power transformer substation need to reform, only need to add a voltage regulator between the circuit breaker and capacitors, the original circuit breakers, reactors, capacitors can be reuse, greatly reduce the cost of transformation 3.Maintance Free๏ผšWhen traditional circuit breaker and contactor switching, switching devices and capacitors often damaged because of the above problems, result in high maintenance costs, using Farady devices, automatic control reactive power output, there is no potential risks of other equipments, greatly reducing maintenance and staff costs in power transformer substation Method Switch contactor Vol regulating type No. of components Few Many Many Compensation taps 1 4 9-25 Switch times 10000 times 100000times 100000times Capacitor utilization Low Low High Reduce inrush current With reactor With reactor No need of reactor Over voltage High High Low Impact on Power Grid Big Big small Need Charge or not Yes Yes No Action interval 30min 10min 1min Switch failure rate High High Low capacitor failure rate High High Low Install type Outdoor& indoor indoor Outdoor& indoor Cost Low Hight Low Figure 2 Comparison of Three types compensation
  • 7. Reactive power compensation Farady Electric Co.,:Ltd +++++ Intelligent controller Figure 3 DWK controller 1. A controller can control the 1-2 power transformer, 1-2 capacitor group, through the menu settings to meet different control situation. The control panel circuit can be used in different equipment. Especially considering a series of adjustable capacitors and with a set of adjustable capacitors, to achieve the maximum performance. 2. A voltage regulator is designed in accordance with the nonlinear voltage, so that the reactive power capacity of each tap is equal. According to reactive power control and not according to the power factor control, switching shocks does not appear. 3. According to the line switch and the main switch automatically determine substation operation mode and automatically adjust reactive decision signal. 4. Dedicated capacitor protection, while protecting both the two regulator and capacitors, it will set the protection value according to tap position of voltage regulator. Also with current delay, instantaneous trip, opening voltage, overvoltage and under voltage protection system. 5. Each capacitor can be cast back at any time by pressing plate. Capacitor failure can automatically exit the fault equipment, does not affect the operation of other equipment. Automatic removal of the capacitor switch cabinet, and alarm. 6. With the communication interface and the contact type pressure regulating interface, convenient and comprehensive automation. 8. A variety of models to meet the different needs of the controller.
  • 8. Reactive power compensation Farady Electric Co.,:Ltd +++++ Equipment application 1๏ผŽCompact type This type of devices install all electrical components in the cabinet that required, cabinet made of galvanized steel or stainless steel, the voltage is 3 5kV and below, capacitance below 4000kvar will use such structure. This type of structure is orderly, the installation and the maintenance are convenient, the occupied area is small, and the structure is suitable for the interior installation of a new power transformer substation.
  • 9. Reactive power compensation Farady Electric Co.,:Ltd 2 Outdoor type This install type with a fence around the equipment enclosure , occupy an area of slightly larger, but the maintenance is very convenient, also have in indoor and outdoor for use, this kind of installing usually for old power transformer substation reforming and factory reactive power compensation.
  • 10. Reactive power compensation Farady Electric Co.,:Ltd 3.Other applications 1๏ผŽWhen capacitor is the main compensation power, the reactive power problem is solved, the line power factor is improved, the voltage drop is reduced, the reactive power loss is reduced, and the terminal voltage level of the stable line is reduced. Suitable for urban and rural fringe areas, since the overhead line is long, result in the voltage is too low, 2๏ผŽWhen the reactor is the main compensation reactive power, it mainly solves the problem of large and seasonal voltage difference between day and night, and the problem of voltage instability. Suitable for ultra high voltage hub substation, urban power grid, the day and night pressure difference, the night capacitive reactive surplus places to install and use. The power frequency voltage rise caused by the capacitance effect of long lines can be weakened when the overhead line is empty or light load. Such end Voltage rise is due to the high voltage overhead line no-load or light load, the line of the power grid for capacitive reactive power charging, resulting in line terminal voltage is higher than the first voltage, 3๏ผŽWhen the capacitor and shunt reactor are combined as the main compensation of reactive power, can Synthetically solve the problem of voltage reactive power. Suitable for large power, power factor, voltage levels have higher requirements for the installation and use places. 4๏ผŽThe high voltage filter compensation device is used as the main compensation and harmonic control of reactive power which mainly solves the problem of excessive harmonic and low power factor. At the same time, it can also reduce the voltage drop, reduce the reactive power loss and harmonic additional loss, and stabilize the terminal voltage level. For a harmonic source, medium voltage overhead lines long, low voltage, low power factor of the installation site
  • 11. Reactive power compensation Farady Electric Co.,:Ltd Copyright 2014 Farady Electric Zhejiang Farady Electric Co.,Ltd TEL:0086-577-61722510/61777258 Fax:0086-577-61777257 Http://www.farady.cn Email:info@farady.cn Add:Suโ€™ao,Liushi,Yueqing,Zhejiang,P.R.China, 325604