2. INTRODUCTION:
In earlier days projects were simple & of short duration (1-3 yrs.)
With Increasing population &globalization ,demand in industry is increasing resulting in more n more complex design in building sector.
Second largest industry of our country.
Traditional methods are becoming ineffective
Hence use of algorithms , software's comes into existence. It solves
1. what activities are to be done?
2. who has to perform?
3. how to perform?
3. SOFTWARE:
PRIMAVERA generally known as P-6 is a software developed by the ORACLE corporation.
It helps the project manager to efficiently manage large & complex projects with accuracy
and precision.
It helps to satisfy the needs of each participant, stakeholder ,their responsibility & skills.
It includes features like Gantt chart, cost histograms ,network charts & resource allocation
tools.
P-6 helps in
1. planning
2. scheduling
3. cost control
4. reporting.
4. LITERATURE REVIEW:
Name Year Description
Venay kumar 2016 Importance of project management
Md zakir haider 2016 Use of P6 to plan, schedule & allocate resources.
sridhar 2017 P6 – supervision, time saving, monitoring
John J 2017 P6- critical path
S.S Bodke 2018 P6-G+7 structure
M Katherine 2019 P6- G+13 structure
Md Azim Eirgash 2019 Time cost trade analysis
Dr. Jayeshkumar 2020 P6- analysis to save time & cost
Pravin N 2022 P6- road project
5. OBJECTIVES:
1. To schedule the project
2. Perform resource optimization.
3. Identify risk & it’s sources.
4. Identify nature of risk assessment approach.
5. Develop a risk response plan.
5
8. POSSIBLE OUTCOME:
7/1/20XX
1. Resource optimization is achieved.
2. Risk & its sources are identified.
3. Risk assessment approach is been identified.
4. High exposure risks are sorted.
5. risk is mitigated and controlled.