Prepared By,
Aditya T Parmar,
Student,
Department Of Electrical Engineering,
Charotar University Of Science & Technology,
Email – adisoni624@gmail.com
Abstract
 Boeing Commercial Airplane is the most leading airplane
manufacturing company in the world.
 It has manufactured thousands of commercial airplanes till date.
Among all the airplanes, the latest airplane Boeing 787 is most fuel
efficient and economical airplane.
 Unfortunately after some time of launch, many airlines complained
about battery failure in Boeing 787 during flight.
 My article talks about how the problem was raised, which airlines were
suffered from this problem and how this problem was faced by the
Boeing Commercial Airplane to solve it within a short time to operate
B787 in the sky successfully.
Introduction
 The Boeing 787 Dreamliner is a
long-range, mid-size wide-
body, twin-engine jet
airliner developed by Boeing
Commercial Airplanes.
 Its variants seat 210 to 335
passengers.
 It is Boeing's most fuel-
efficient airliner and the world's
first major airliner to
use composite materials as the
primary material in the
construction of its airframe.
 The 787 has been designed to be
20% more fuel efficient than
the 767 it is to replace. Boeing
has made 32$ billion to of
expenditure on the making and
testing of Boeing 787 upto 2011.
The unit price of Boeing 787 is
218.3$ million in 2013.
 First commercial flight of
Boeing 787 is operated on
October 26,2011 by All Nippon
Airways. And other primary
users operating Boeing 787 is
Japan Airlines, Air India,
Ethiopian Airline.
Impacts Of Battery Failure On Airlines
 On January 16, 2013, All Nippon
Airways Flight NH-692, en route
from Yamaguchi Ube Airport
to Tokyo Haneda, had a battery
problem warning followed by a
burning smell while climbing
from Ube about 35 nautical
miles west of Takamatsu, Japan.
The aircraft diverted to
Takamatsu and was evacuated
via the slides; three passengers
received minor injuries during
the evacuation.
 A similar incident took place
with Japan Airline’s 787
at Boston's Logan International
Airport within the same week.
 These two incidents has made
Federal Administration Of
Aviation force to ground all the
Boeing 787 in service at that time.
 On the same day Japan Airline
and All Nippon Airways
announced that they are
voluntarily grounding or
suspending flights of their fleets
of 787s after multiple incidents,
including emergency landing.
 These two airlines were operating 24 of the 50 787 Dreamliners
delivered to date.
 The grounding is reported to have a cost All Nippon Airways to lost 93$
million.
 Chile’s Directorate General Of Civil Aviation grounded LAN Airline’s 3
787s.
 The Indian Directorate General Of Civil Aviation directed Air India to
ground its six 787 Dreamliners.Qatar Airways grounded its all five
787s.
 And Ethiopian Airlines was the last operator to announce temporary
grounding of its four 787s.
 Finally By, January 17,2013, All 50 of the aircraft delivered to date had
been grounded.
 On January 18, Boeing announced that it was halting 787 deliveries
until the battery problem is resolved.
Actions Taken By Boeing Commercial
Airplane
 Boeing Commercial Airplane was very eager to solve Boeing 787’s
battery problem as early as possible to resume the delivery of 787s
as well as to resume the fleets which were grounded by many
primary airlines worldwide.
 Mr. Mike Sinnett, vice president and chief project engineer,787
Program, Boeing Commercial Airplane Said that “ We've come up
with a comprehensive set of solutions that result in a safer battery
system, We have found a number of ways to improve the battery
system and we don't let safety improvements go once they are
identified. We incorporate them into our processes and products."
 The first step was taken by Boeing is to control the manufacturing
process of the batteries in Japan. The Boeing teamed with Thales, The
provider of the integrated power conversion system, and battery maker
GS Yuasa to develop enhanced production standards and tests to
further reduce any possibility for variation in the production of the
individual cells as well as the overall battery.
 They have also added new 4 tests to screen cell production and total of
10 distinct tests. Each cell of the battery was going through more
rigorous testing in the month of manufacturing including 14 day test
during which discharge rates were being taken every hour. This team
also decided to narrow the level of charge for the battery by lowering
the highest charge allowed and raising the lower level allowed for
discharge. Also they had redesigned the two pieces of battery- The
battery monitoring system and charger. Charger was also designed so to
lower the stresses on the battery during charging process.
 Team had also designed new fireproof battery enclosure made up of
stainless steel. It isolates the battery from the rest of the equipment in
the electronic equipment bays. This enclosure has a facility to direct
vent to carry battery vapors outside the airplane.
 After 200,000 hours of engineering work, team was successful to make
a new 100 % secured battery for Boeing 787. FAA permitted Boeing for
the battery tests to get FAA Approval and after completing very
difficult and critical tests of 100,000 hours, new design was approved
by FAA.
 President and CEO of Boeing Commercial Airplane Raymond L Conner
said “ We are following all of the necessary protocols to get our new
design fully approved and properly installed so that we can help our
customers start flying as soon as possible. We're simultaneously
moving out on an effort to resume deliveries but completing our
certification work and getting the delivered fleet flying again is our first
priority, Our customers and their passengers have been incredibly
patient as we have worked through this process and we thank them
very sincerely for their continued support and confidence in the 787.”
Conclusion
 Boeing Commercial Airplane introduced very efficient and economic
airplane that is Boeing 787, popularly known as Dreamliner. As every
successful designs need to face the difficulties, Boeing 787 was also
having battery failure problem but the infinite efforts made by Boeing
team made it possible to put 787s again to touch the sky.
Reference
 www.Boeing.com
 www.wikipedia.org

More Related Content

What's hot

Boieng and airbus.
Boieng and airbus.Boieng and airbus.
Boieng and airbus.samoraah2008
 
Boeing Company Presentation
Boeing Company PresentationBoeing Company Presentation
Boeing Company PresentationContractor
 
Brief history of aviation by madhav
Brief history of aviation   by madhavBrief history of aviation   by madhav
Brief history of aviation by madhavksudarsh
 
Boeing Case Study
Boeing Case StudyBoeing Case Study
Boeing Case Studydlcolgrove
 
The Boeing 737 MAX Saga
The Boeing 737 MAX SagaThe Boeing 737 MAX Saga
The Boeing 737 MAX SagaGregory Travis
 
Wright brothers
Wright brothersWright brothers
Wright brothersZoe Gallou
 
Case study presentation on Boeing
Case study presentation on BoeingCase study presentation on Boeing
Case study presentation on BoeingManisha Yadav
 
New product development Airbus A380
New product development  Airbus A380New product development  Airbus A380
New product development Airbus A380Sameer Bonde
 
failed stratergies of kingfisher
failed stratergies of kingfisher failed stratergies of kingfisher
failed stratergies of kingfisher Vinay Nadar
 
Customer service at singapore airlines
Customer service at singapore airlinesCustomer service at singapore airlines
Customer service at singapore airlinesdilamo
 
Jet Blue : A Strategic Management Case Study
Jet Blue : A Strategic Management Case StudyJet Blue : A Strategic Management Case Study
Jet Blue : A Strategic Management Case Studyfawadsiddequi
 

What's hot (20)

Boieng and airbus.
Boieng and airbus.Boieng and airbus.
Boieng and airbus.
 
Boeing Company Presentation
Boeing Company PresentationBoeing Company Presentation
Boeing Company Presentation
 
Brief history of aviation by madhav
Brief history of aviation   by madhavBrief history of aviation   by madhav
Brief history of aviation by madhav
 
Jet Blue
Jet BlueJet Blue
Jet Blue
 
Boeing vs airbus
Boeing vs airbusBoeing vs airbus
Boeing vs airbus
 
Boeing Case Study
Boeing Case StudyBoeing Case Study
Boeing Case Study
 
The Boeing 737 MAX Saga
The Boeing 737 MAX SagaThe Boeing 737 MAX Saga
The Boeing 737 MAX Saga
 
Airbus
AirbusAirbus
Airbus
 
boeing 737
boeing 737 boeing 737
boeing 737
 
Boeing analysis
Boeing analysisBoeing analysis
Boeing analysis
 
Airbus A380
Airbus A380Airbus A380
Airbus A380
 
Wright brothers
Wright brothersWright brothers
Wright brothers
 
Qatar airways
Qatar airwaysQatar airways
Qatar airways
 
B737 Max 8 conflict of interest Case study presentation
B737 Max 8 conflict of interest Case study presentationB737 Max 8 conflict of interest Case study presentation
B737 Max 8 conflict of interest Case study presentation
 
Case study presentation on Boeing
Case study presentation on BoeingCase study presentation on Boeing
Case study presentation on Boeing
 
New product development Airbus A380
New product development  Airbus A380New product development  Airbus A380
New product development Airbus A380
 
failed stratergies of kingfisher
failed stratergies of kingfisher failed stratergies of kingfisher
failed stratergies of kingfisher
 
Customer service at singapore airlines
Customer service at singapore airlinesCustomer service at singapore airlines
Customer service at singapore airlines
 
Jet Blue : A Strategic Management Case Study
Jet Blue : A Strategic Management Case StudyJet Blue : A Strategic Management Case Study
Jet Blue : A Strategic Management Case Study
 
Spicejet Complete
Spicejet CompleteSpicejet Complete
Spicejet Complete
 

Similar to Impact of boeing 787’s battery failure on airlines

Strategic Operation Management - Boeing
Strategic Operation Management - BoeingStrategic Operation Management - Boeing
Strategic Operation Management - BoeingVikash Jaiswal
 
Case analysis boeing 787
Case analysis boeing 787Case analysis boeing 787
Case analysis boeing 787Ashish Michael
 
Introduction of boeing Autosaved)
Introduction of boeing Autosaved)Introduction of boeing Autosaved)
Introduction of boeing Autosaved)Mostafa ElGhamrawy
 
The Race For The Future Of Aircraft Seating
The Race For The Future Of Aircraft SeatingThe Race For The Future Of Aircraft Seating
The Race For The Future Of Aircraft SeatingTorben Haagh
 
1-2 pages of five supply chain lessons learned from the Bo.pdf
1-2 pages of  five supply chain lessons  learned from the Bo.pdf1-2 pages of  five supply chain lessons  learned from the Bo.pdf
1-2 pages of five supply chain lessons learned from the Bo.pdfConceptcreations1
 
Design and Fabrication of Blended Wing Body
Design and Fabrication of Blended Wing BodyDesign and Fabrication of Blended Wing Body
Design and Fabrication of Blended Wing Bodyvivatechijri
 
AMT Magazine - MAR 2015
AMT Magazine - MAR 2015AMT Magazine - MAR 2015
AMT Magazine - MAR 2015Beth Baumann
 
Business Comm Aircraft Man Present
Business Comm Aircraft Man PresentBusiness Comm Aircraft Man Present
Business Comm Aircraft Man Presentkankan.paul
 
Boeing Presentation
Boeing PresentationBoeing Presentation
Boeing PresentationRyan Gunhold
 
Boeing 777 Group Case StudyAssuming the perspective of your ro.docx
Boeing 777 Group Case StudyAssuming the perspective of your ro.docxBoeing 777 Group Case StudyAssuming the perspective of your ro.docx
Boeing 777 Group Case StudyAssuming the perspective of your ro.docxAASTHA76
 
Volume 11 issue 34 - september 9
Volume 11   issue 34 - september 9Volume 11   issue 34 - september 9
Volume 11 issue 34 - september 9owengeach
 
668 Part 6 CasesBoeings newest commercial jet aircraft, .docx
668 Part 6 CasesBoeings newest commercial jet aircraft, .docx668 Part 6 CasesBoeings newest commercial jet aircraft, .docx
668 Part 6 CasesBoeings newest commercial jet aircraft, .docxevonnehoggarth79783
 
03_03_6 newspaper articles
03_03_6 newspaper articles03_03_6 newspaper articles
03_03_6 newspaper articlesJurgen Viehrig
 
Boeing Company_Microeconomics
Boeing Company_Microeconomics Boeing Company_Microeconomics
Boeing Company_Microeconomics Amritha Siddharth
 

Similar to Impact of boeing 787’s battery failure on airlines (20)

Strategic Operation Management - Boeing
Strategic Operation Management - BoeingStrategic Operation Management - Boeing
Strategic Operation Management - Boeing
 
Pom final boeing
Pom final boeingPom final boeing
Pom final boeing
 
v06i02
v06i02v06i02
v06i02
 
Boeing 787 Dreamliner
Boeing 787 DreamlinerBoeing 787 Dreamliner
Boeing 787 Dreamliner
 
BOEING Complete
BOEING CompleteBOEING Complete
BOEING Complete
 
Case analysis boeing 787
Case analysis boeing 787Case analysis boeing 787
Case analysis boeing 787
 
Introduction of boeing Autosaved)
Introduction of boeing Autosaved)Introduction of boeing Autosaved)
Introduction of boeing Autosaved)
 
The Race For The Future Of Aircraft Seating
The Race For The Future Of Aircraft SeatingThe Race For The Future Of Aircraft Seating
The Race For The Future Of Aircraft Seating
 
1-2 pages of five supply chain lessons learned from the Bo.pdf
1-2 pages of  five supply chain lessons  learned from the Bo.pdf1-2 pages of  five supply chain lessons  learned from the Bo.pdf
1-2 pages of five supply chain lessons learned from the Bo.pdf
 
Design and Fabrication of Blended Wing Body
Design and Fabrication of Blended Wing BodyDesign and Fabrication of Blended Wing Body
Design and Fabrication of Blended Wing Body
 
AMT Magazine - MAR 2015
AMT Magazine - MAR 2015AMT Magazine - MAR 2015
AMT Magazine - MAR 2015
 
Business Comm Aircraft Man Present
Business Comm Aircraft Man PresentBusiness Comm Aircraft Man Present
Business Comm Aircraft Man Present
 
Boeing Presentation
Boeing PresentationBoeing Presentation
Boeing Presentation
 
Boeing 777 Group Case StudyAssuming the perspective of your ro.docx
Boeing 777 Group Case StudyAssuming the perspective of your ro.docxBoeing 777 Group Case StudyAssuming the perspective of your ro.docx
Boeing 777 Group Case StudyAssuming the perspective of your ro.docx
 
Volume 11 issue 34 - september 9
Volume 11   issue 34 - september 9Volume 11   issue 34 - september 9
Volume 11 issue 34 - september 9
 
668 Part 6 CasesBoeings newest commercial jet aircraft, .docx
668 Part 6 CasesBoeings newest commercial jet aircraft, .docx668 Part 6 CasesBoeings newest commercial jet aircraft, .docx
668 Part 6 CasesBoeings newest commercial jet aircraft, .docx
 
03_03_6 newspaper articles
03_03_6 newspaper articles03_03_6 newspaper articles
03_03_6 newspaper articles
 
Boeing Company_Microeconomics
Boeing Company_Microeconomics Boeing Company_Microeconomics
Boeing Company_Microeconomics
 
Group Project Final
Group Project FinalGroup Project Final
Group Project Final
 
Boeing aac einternation_17092013
Boeing aac einternation_17092013Boeing aac einternation_17092013
Boeing aac einternation_17092013
 

Recently uploaded

KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 

Recently uploaded (20)

(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 

Impact of boeing 787’s battery failure on airlines

  • 1. Prepared By, Aditya T Parmar, Student, Department Of Electrical Engineering, Charotar University Of Science & Technology, Email – adisoni624@gmail.com
  • 2. Abstract  Boeing Commercial Airplane is the most leading airplane manufacturing company in the world.  It has manufactured thousands of commercial airplanes till date. Among all the airplanes, the latest airplane Boeing 787 is most fuel efficient and economical airplane.  Unfortunately after some time of launch, many airlines complained about battery failure in Boeing 787 during flight.  My article talks about how the problem was raised, which airlines were suffered from this problem and how this problem was faced by the Boeing Commercial Airplane to solve it within a short time to operate B787 in the sky successfully.
  • 3. Introduction  The Boeing 787 Dreamliner is a long-range, mid-size wide- body, twin-engine jet airliner developed by Boeing Commercial Airplanes.  Its variants seat 210 to 335 passengers.  It is Boeing's most fuel- efficient airliner and the world's first major airliner to use composite materials as the primary material in the construction of its airframe.
  • 4.  The 787 has been designed to be 20% more fuel efficient than the 767 it is to replace. Boeing has made 32$ billion to of expenditure on the making and testing of Boeing 787 upto 2011. The unit price of Boeing 787 is 218.3$ million in 2013.  First commercial flight of Boeing 787 is operated on October 26,2011 by All Nippon Airways. And other primary users operating Boeing 787 is Japan Airlines, Air India, Ethiopian Airline.
  • 5. Impacts Of Battery Failure On Airlines  On January 16, 2013, All Nippon Airways Flight NH-692, en route from Yamaguchi Ube Airport to Tokyo Haneda, had a battery problem warning followed by a burning smell while climbing from Ube about 35 nautical miles west of Takamatsu, Japan. The aircraft diverted to Takamatsu and was evacuated via the slides; three passengers received minor injuries during the evacuation.
  • 6.  A similar incident took place with Japan Airline’s 787 at Boston's Logan International Airport within the same week.  These two incidents has made Federal Administration Of Aviation force to ground all the Boeing 787 in service at that time.  On the same day Japan Airline and All Nippon Airways announced that they are voluntarily grounding or suspending flights of their fleets of 787s after multiple incidents, including emergency landing.
  • 7.  These two airlines were operating 24 of the 50 787 Dreamliners delivered to date.  The grounding is reported to have a cost All Nippon Airways to lost 93$ million.  Chile’s Directorate General Of Civil Aviation grounded LAN Airline’s 3 787s.  The Indian Directorate General Of Civil Aviation directed Air India to ground its six 787 Dreamliners.Qatar Airways grounded its all five 787s.  And Ethiopian Airlines was the last operator to announce temporary grounding of its four 787s.  Finally By, January 17,2013, All 50 of the aircraft delivered to date had been grounded.  On January 18, Boeing announced that it was halting 787 deliveries until the battery problem is resolved.
  • 8. Actions Taken By Boeing Commercial Airplane  Boeing Commercial Airplane was very eager to solve Boeing 787’s battery problem as early as possible to resume the delivery of 787s as well as to resume the fleets which were grounded by many primary airlines worldwide.  Mr. Mike Sinnett, vice president and chief project engineer,787 Program, Boeing Commercial Airplane Said that “ We've come up with a comprehensive set of solutions that result in a safer battery system, We have found a number of ways to improve the battery system and we don't let safety improvements go once they are identified. We incorporate them into our processes and products."
  • 9.  The first step was taken by Boeing is to control the manufacturing process of the batteries in Japan. The Boeing teamed with Thales, The provider of the integrated power conversion system, and battery maker GS Yuasa to develop enhanced production standards and tests to further reduce any possibility for variation in the production of the individual cells as well as the overall battery.  They have also added new 4 tests to screen cell production and total of 10 distinct tests. Each cell of the battery was going through more rigorous testing in the month of manufacturing including 14 day test during which discharge rates were being taken every hour. This team also decided to narrow the level of charge for the battery by lowering the highest charge allowed and raising the lower level allowed for discharge. Also they had redesigned the two pieces of battery- The battery monitoring system and charger. Charger was also designed so to lower the stresses on the battery during charging process.  Team had also designed new fireproof battery enclosure made up of stainless steel. It isolates the battery from the rest of the equipment in the electronic equipment bays. This enclosure has a facility to direct vent to carry battery vapors outside the airplane.
  • 10.  After 200,000 hours of engineering work, team was successful to make a new 100 % secured battery for Boeing 787. FAA permitted Boeing for the battery tests to get FAA Approval and after completing very difficult and critical tests of 100,000 hours, new design was approved by FAA.  President and CEO of Boeing Commercial Airplane Raymond L Conner said “ We are following all of the necessary protocols to get our new design fully approved and properly installed so that we can help our customers start flying as soon as possible. We're simultaneously moving out on an effort to resume deliveries but completing our certification work and getting the delivered fleet flying again is our first priority, Our customers and their passengers have been incredibly patient as we have worked through this process and we thank them very sincerely for their continued support and confidence in the 787.”
  • 11. Conclusion  Boeing Commercial Airplane introduced very efficient and economic airplane that is Boeing 787, popularly known as Dreamliner. As every successful designs need to face the difficulties, Boeing 787 was also having battery failure problem but the infinite efforts made by Boeing team made it possible to put 787s again to touch the sky.