ASSIGNMENT
DRIVE SPRING 2016
PROGRAM MBA
SEMESTER IV
SUBJECT CODE & NAME PM 0017 – PROJECT QUALITY MANAGEMENT
BK ID B2013
Credit & Marks 4 CREDITS AND 60 MARKS
Note: Answer all questions. Kindly note that answers for 10 marks questions should be
approximately of 400 words. Each question is followed by evaluation scheme.
Question.1. Explain various terms used in quality management? In
a group of about 3 to 5 people,discuss the benefits of traditional
method and contemporary method of qualityassurance. List the
benefits on a flipchart or the whiteboard. Which benefit do
youthink is the most beneficial and why?
Answer: Whenpeople are askedwhattheyare afraidof,the firstthingthat usuallycomesto mind is
speaking before a group. Most people have at least some level of apprehension about public
speaking,andyetmostbusinesscareers require oral presentations at least periodically. Some jobs
require oral presentations almost immediately; others may not require them until you’ve been on
the job a while.If youare to advance inyour career,however,itiscertainthatyouwill eventuallybe
called upon to deliver an oral presentation.
Question.2. Explain the major project management standards and
frameworks.
Answer:Project management is the discipline of initiating, planning, executing, controlling, and
closingthe workof a teamto achieve specific goals and meet specific success criteria. A project is a
temporary endeavor designed to produce a unique product, service or result with a defined
beginning and end (usually time-constrained, and often constrained by funding or deliverables)
undertakentomeetunique goalsandobjectives,typicallytobringaboutbeneficial change or added
value. The temporary nature of projects stands in
Question.3. What are the benefits of quality metrics? Explain the 3
categories of quality metrics.
Answer:Before improvingaprocess,itisnecessarytodefine whatis"improvement."Thatdefinition
will leadtothe identificationof ameasurement,ormetric. In other words, if you are going to play a
game, you will want to know "how do you score?"
A givenprocess maybe measurable in many different ways depending on the type of data that are
collected, and how the data are characterized. Variable Data may offer a much higher information
content than Attribute Data. For example, the actual measured weight of an object (variable data)
includes more information than merely making an
Question.4. Discuss the major barriers to project quality
improvement.
Answer:First and most important – Almost all barriers to quality improvement are deficiencies in
management & leadership. These deficiencies can take a few different forms but usually look
something like:
 Lack of a desire to change or improve
 Lack of strategic planning needed to identify improvements
 Poor communication & oversight of
Question.5. What is SIPOC (Suppliers, Inputs, Process, Outputs, and
Customers)? Which 3factors should you focus on developing SIPOC?
Explain.
Answer:In process improvement, a SIPOC (sometimes COPIS) is a tool that summarizes the inputs
and outputsof one or more processesintable form.The acronymSIPOCstandsfor suppliers,inputs,
process,outputs,andcustomerswhichform the columns of the table. It was in use at least as early
as the Total Quality Management programs of the late 1980s and continues to be used today in Six
Sigma, Lean manufacturing, and business process
Question.6. Explain Statistical Process Control (SPC) along with SPC
theory and tools?
Answer:Statistical process control (SPC) is a method of quality control which uses statistical
methods. SPC is applied in order to monitor and control a process. Monitoring and controlling the
process ensures that it operates at its full potential. At its full potential, the process can make as
much conforming product as possible with a minimum (if not
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
help.mbaassignments@gmail.com
or
call us at : 08263069601

More Related Content

What's hot

Mb0047 – management information systems
Mb0047 – management information systemsMb0047 – management information systems
Mb0047 – management information systemssmumbahelp
 
Qm0011 principles & philosophies of quality management
Qm0011   principles & philosophies of quality managementQm0011   principles & philosophies of quality management
Qm0011 principles & philosophies of quality managementsmumbahelp
 
Ms 05 management of machines and materials
Ms 05 management of machines and materialsMs 05 management of machines and materials
Ms 05 management of machines and materialssmumbahelp
 
Ms – 05 management of machines and materials
Ms – 05 management of machines and materialsMs – 05 management of machines and materials
Ms – 05 management of machines and materialssmumbahelp
 
Process improvement using six sigma (1)
Process improvement using six sigma (1)Process improvement using six sigma (1)
Process improvement using six sigma (1)Meezan Bank
 
Om 0017 advanced production planning and control
Om 0017   advanced production planning and controlOm 0017   advanced production planning and control
Om 0017 advanced production planning and controlsmumbahelp
 
Sc0007 category management in purchasing
Sc0007   category management in purchasingSc0007   category management in purchasing
Sc0007 category management in purchasingsmumbahelp
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project managementsmumbahelp
 
Ms 05 management of machines and materials
Ms 05 management of machines and materialsMs 05 management of machines and materials
Ms 05 management of machines and materialssmumbahelp
 
Based on the additional information you have gathered since you
Based on the additional information you have gathered since you Based on the additional information you have gathered since you
Based on the additional information you have gathered since you ssuser454af01
 
Developing performance measurements_and_objectives_loflin,_rebecca_lynn
Developing performance measurements_and_objectives_loflin,_rebecca_lynnDeveloping performance measurements_and_objectives_loflin,_rebecca_lynn
Developing performance measurements_and_objectives_loflin,_rebecca_lynnrls0709
 
How to measure effectiveness
How to measure effectiveness How to measure effectiveness
How to measure effectiveness Mr President
 
Pm0010 – interduction to project management
Pm0010 – interduction to project managementPm0010 – interduction to project management
Pm0010 – interduction to project managementsmumbahelp
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project managementsmumbahelp
 
Mba206 project management
Mba206   project managementMba206   project management
Mba206 project managementsmumbahelp
 

What's hot (19)

Mb0047 – management information systems
Mb0047 – management information systemsMb0047 – management information systems
Mb0047 – management information systems
 
Qm0011 principles & philosophies of quality management
Qm0011   principles & philosophies of quality managementQm0011   principles & philosophies of quality management
Qm0011 principles & philosophies of quality management
 
Ms 05 management of machines and materials
Ms 05 management of machines and materialsMs 05 management of machines and materials
Ms 05 management of machines and materials
 
Benchmarking
Benchmarking Benchmarking
Benchmarking
 
Ms – 05 management of machines and materials
Ms – 05 management of machines and materialsMs – 05 management of machines and materials
Ms – 05 management of machines and materials
 
Process improvement using six sigma (1)
Process improvement using six sigma (1)Process improvement using six sigma (1)
Process improvement using six sigma (1)
 
Om 0017 advanced production planning and control
Om 0017   advanced production planning and controlOm 0017   advanced production planning and control
Om 0017 advanced production planning and control
 
Sc0007 category management in purchasing
Sc0007   category management in purchasingSc0007   category management in purchasing
Sc0007 category management in purchasing
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project management
 
Ms 05 management of machines and materials
Ms 05 management of machines and materialsMs 05 management of machines and materials
Ms 05 management of machines and materials
 
Based on the additional information you have gathered since you
Based on the additional information you have gathered since you Based on the additional information you have gathered since you
Based on the additional information you have gathered since you
 
Developing performance measurements_and_objectives_loflin,_rebecca_lynn
Developing performance measurements_and_objectives_loflin,_rebecca_lynnDeveloping performance measurements_and_objectives_loflin,_rebecca_lynn
Developing performance measurements_and_objectives_loflin,_rebecca_lynn
 
How to measure effectiveness
How to measure effectiveness How to measure effectiveness
How to measure effectiveness
 
CV
CVCV
CV
 
Pm0010 – interduction to project management
Pm0010 – interduction to project managementPm0010 – interduction to project management
Pm0010 – interduction to project management
 
Mb0049 project management
Mb0049   project managementMb0049   project management
Mb0049 project management
 
SharanyaBhuvan-2016
SharanyaBhuvan-2016SharanyaBhuvan-2016
SharanyaBhuvan-2016
 
Mba206 project management
Mba206   project managementMba206   project management
Mba206 project management
 
Free CAPM® Exam Sample Question
Free CAPM® Exam Sample QuestionFree CAPM® Exam Sample Question
Free CAPM® Exam Sample Question
 

Similar to Pm0017 project quality management

Pm 0017 – project quality management
Pm 0017 – project quality managementPm 0017 – project quality management
Pm 0017 – project quality managementsmumbahelp
 
Creating Effective Challenge Statements
Creating Effective Challenge StatementsCreating Effective Challenge Statements
Creating Effective Challenge StatementsCoby Skonord
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality managementconsult4solutions
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality managementconsult4solutions
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality managementconsult4solutions
 
Om0017 advanced production planning and control
Om0017   advanced production planning and controlOm0017   advanced production planning and control
Om0017 advanced production planning and controlStudy Stuff
 
Bba501 production and operations management
Bba501  production and operations managementBba501  production and operations management
Bba501 production and operations managementsmumbahelp
 
Om0017 advanced production planning and control
Om0017   advanced production planning and controlOm0017   advanced production planning and control
Om0017 advanced production planning and controlsmumbahelp
 
Om0017 advanced production planning and control
Om0017   advanced production planning and controlOm0017   advanced production planning and control
Om0017 advanced production planning and controlsmumbahelp
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Page 1 of 3 Human Resource Mgt & Talent Development ©20.docx
Page 1 of 3 Human Resource Mgt & Talent Development  ©20.docxPage 1 of 3 Human Resource Mgt & Talent Development  ©20.docx
Page 1 of 3 Human Resource Mgt & Talent Development ©20.docxbunyansaturnina
 
Sc0007 category management in purchasing
Sc0007   category management in purchasingSc0007   category management in purchasing
Sc0007 category management in purchasingsmumbahelp
 
Pm0017 summer-2016
Pm0017 summer-2016Pm0017 summer-2016
Pm0017 summer-2016smumbahelp
 
Six sigma awareness
Six sigma awarenessSix sigma awareness
Six sigma awarenesssawate
 
total quality management
total quality management total quality management
total quality management Chandan Bangde
 

Similar to Pm0017 project quality management (20)

Pm 0017 – project quality management
Pm 0017 – project quality managementPm 0017 – project quality management
Pm 0017 – project quality management
 
Creating Effective Challenge Statements
Creating Effective Challenge StatementsCreating Effective Challenge Statements
Creating Effective Challenge Statements
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality management
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality management
 
Pm0017 project quality management
Pm0017 project quality managementPm0017 project quality management
Pm0017 project quality management
 
Om0017 advanced production planning and control
Om0017   advanced production planning and controlOm0017   advanced production planning and control
Om0017 advanced production planning and control
 
Bba501 production and operations management
Bba501  production and operations managementBba501  production and operations management
Bba501 production and operations management
 
Om0017 advanced production planning and control
Om0017   advanced production planning and controlOm0017   advanced production planning and control
Om0017 advanced production planning and control
 
Om0017 advanced production planning and control
Om0017   advanced production planning and controlOm0017   advanced production planning and control
Om0017 advanced production planning and control
 
Six Sigma Way
Six Sigma Way Six Sigma Way
Six Sigma Way
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
CI Introduction
CI IntroductionCI Introduction
CI Introduction
 
Page 1 of 3 Human Resource Mgt & Talent Development ©20.docx
Page 1 of 3 Human Resource Mgt & Talent Development  ©20.docxPage 1 of 3 Human Resource Mgt & Talent Development  ©20.docx
Page 1 of 3 Human Resource Mgt & Talent Development ©20.docx
 
Sc0007 category management in purchasing
Sc0007   category management in purchasingSc0007   category management in purchasing
Sc0007 category management in purchasing
 
Pm0017 summer-2016
Pm0017 summer-2016Pm0017 summer-2016
Pm0017 summer-2016
 
Six sigma awareness
Six sigma awarenessSix sigma awareness
Six sigma awareness
 
Total Quality Managment
Total Quality ManagmentTotal Quality Managment
Total Quality Managment
 
total quality mgmt
 total quality mgmt total quality mgmt
total quality mgmt
 
Mgs3100 slides15a
Mgs3100 slides15aMgs3100 slides15a
Mgs3100 slides15a
 
total quality management
total quality management total quality management
total quality management
 

Recently uploaded

Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupJonathanParaisoCruz
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
MICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxMICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxabhijeetpadhi001
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitolTechU
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 

Recently uploaded (20)

Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized Group
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
MICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxMICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptx
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 

Pm0017 project quality management

  • 1. Dear students get fully solved assignments Send your semester & Specialization name to our mail id : help.mbaassignments@gmail.com or call us at : 08263069601 ASSIGNMENT DRIVE SPRING 2016 PROGRAM MBA SEMESTER IV SUBJECT CODE & NAME PM 0017 – PROJECT QUALITY MANAGEMENT BK ID B2013 Credit & Marks 4 CREDITS AND 60 MARKS Note: Answer all questions. Kindly note that answers for 10 marks questions should be approximately of 400 words. Each question is followed by evaluation scheme. Question.1. Explain various terms used in quality management? In a group of about 3 to 5 people,discuss the benefits of traditional method and contemporary method of qualityassurance. List the benefits on a flipchart or the whiteboard. Which benefit do youthink is the most beneficial and why? Answer: Whenpeople are askedwhattheyare afraidof,the firstthingthat usuallycomesto mind is speaking before a group. Most people have at least some level of apprehension about public speaking,andyetmostbusinesscareers require oral presentations at least periodically. Some jobs require oral presentations almost immediately; others may not require them until you’ve been on the job a while.If youare to advance inyour career,however,itiscertainthatyouwill eventuallybe called upon to deliver an oral presentation. Question.2. Explain the major project management standards and frameworks. Answer:Project management is the discipline of initiating, planning, executing, controlling, and closingthe workof a teamto achieve specific goals and meet specific success criteria. A project is a temporary endeavor designed to produce a unique product, service or result with a defined beginning and end (usually time-constrained, and often constrained by funding or deliverables)
  • 2. undertakentomeetunique goalsandobjectives,typicallytobringaboutbeneficial change or added value. The temporary nature of projects stands in Question.3. What are the benefits of quality metrics? Explain the 3 categories of quality metrics. Answer:Before improvingaprocess,itisnecessarytodefine whatis"improvement."Thatdefinition will leadtothe identificationof ameasurement,ormetric. In other words, if you are going to play a game, you will want to know "how do you score?" A givenprocess maybe measurable in many different ways depending on the type of data that are collected, and how the data are characterized. Variable Data may offer a much higher information content than Attribute Data. For example, the actual measured weight of an object (variable data) includes more information than merely making an Question.4. Discuss the major barriers to project quality improvement. Answer:First and most important – Almost all barriers to quality improvement are deficiencies in management & leadership. These deficiencies can take a few different forms but usually look something like:  Lack of a desire to change or improve  Lack of strategic planning needed to identify improvements  Poor communication & oversight of Question.5. What is SIPOC (Suppliers, Inputs, Process, Outputs, and Customers)? Which 3factors should you focus on developing SIPOC? Explain. Answer:In process improvement, a SIPOC (sometimes COPIS) is a tool that summarizes the inputs and outputsof one or more processesintable form.The acronymSIPOCstandsfor suppliers,inputs, process,outputs,andcustomerswhichform the columns of the table. It was in use at least as early as the Total Quality Management programs of the late 1980s and continues to be used today in Six Sigma, Lean manufacturing, and business process
  • 3. Question.6. Explain Statistical Process Control (SPC) along with SPC theory and tools? Answer:Statistical process control (SPC) is a method of quality control which uses statistical methods. SPC is applied in order to monitor and control a process. Monitoring and controlling the process ensures that it operates at its full potential. At its full potential, the process can make as much conforming product as possible with a minimum (if not Dear students get fully solved assignments Send your semester & Specialization name to our mail id : help.mbaassignments@gmail.com or call us at : 08263069601