2. Key changes from Zachman Framework v2.0 to v3.0
Enterprise Architecture Firm
1 9 Process Transformations (2004) to Process Flows
Graphic is subtitled, “The Enterprise Ontology.”
Integration lines ( across the horizontal cells) Network Nodes (2004) to Distribution
2 10
Note: such lines exist for all the cells in each row Networks
Vertical Integration Lines (Crooked transformation 11 Organization Groups to Responsibility
3
symbol), across the cells. Assignments
Reification process down each column 12 Timing Periods, to Timing Cycles
4
Identify, define, represent, specify, config, instantiate
13 Audience perspective moved to the
5 Audience perspective (label)
LHS, earlier RHS.
Model Names Model names are moved to RHS, also the
6 14 names have changed
15 Composite Integration
Classification Names
7
Alignment Transformation
Enterprise classification 16
8
Note: Zachman Framework is registered
Copyright 2012 iCMG http://www.iCMGworld.com trademark of Zachman International