This document provides an overview of the PRINCE2 processes and management products. It begins by explaining that a PRINCE2 project is typically triggered by a project mandate from either a program or corporate management. The first process is Starting Up a Project which establishes the project board and manager and produces the Project Brief and initiation stage plan. The second process is Initiating a Project which takes place in the initiation stage and produces the Project Initiation Documentation, which defines the risk, quality, change, and communication management approaches.
The document provides an overview of the PRINCE2 project management methodology. It introduces the 7 PRINCE2 processes: starting up a project, directing a project, initiating a project, controlling a stage, managing product delivery, managing a stage boundary, and closing a project. For each process, it describes the purpose, objective, context, activities, and tailoring guidelines. It also discusses how to tailor the processes for different project situations like simple projects, agile projects, and supplier-led projects.
Prince 2 Flashcard for exam preperationsscharique01
This document summarizes the key components and processes of PRINCE2, a project management methodology. It discusses the 8 processes, which include starting and initiating a project, directing stages, controlling stages, managing delivery and boundaries, planning, and closing projects. It also outlines the 8 components, including organization roles, business case, plans, change, quality, progress, risk, and lessons learned. Overall, the document provides a high-level overview of the main elements that make up PRINCE2.
This document discusses PRINCE2, a structured method for project management. It was originally developed in the UK for IT projects, but is now a generic project management method. PRINCE2 provides a standardized framework for managing projects, processes, roles, and stages. It aims to make project management more efficient for organizations managing multiple concurrent projects by standardizing procedures. The key elements of PRINCE2 include processes, components, techniques, and management stages that divide the project into distinct units for control and reporting.
PRINCE2 is a structured project management methodology based on experience from thousands of projects. It consists of principles, themes, processes and tailoring for each project. The document provides an overview of PRINCE2 including its 7 principles, 7 themes, 7 processes, roles, structure, techniques and key templates used such as business case, project plan, risk register and issue log.
The document describes IBM's Actuate program for project launches. Actuate aims to ensure projects are started right by facilitating key startup activities within 45 days. These activities are grouped under 10 focus areas like project scope, risk assessment, governance, and tools setup. IBM has seen benefits of Actuate like reduced surprises, improved risk assessment, and faster startup phase completion. Over time, Actuate coverage has increased while duration to complete activities has decreased, showing improved efficiency. Lessons learned include addressing delays in input documents and stakeholder availability.
Software Project Management | An Overview of the Software Project ManagementAhsan Rahim
Management is the process of getting things done through others, it is the process of coordinating people & other resources to achieve the goals of the organization. A project is a set of related tasks that are coordinated to achieve a specific objective in a given time limit. A project is well-defined task, which is a collection of several operations done in order to achieve a goal. Software is the program & all associated documentation & configuration data which is needed to make these programs operate correctly.
A Software Project is the complete procedure of software development from requirement gathering to testing & maintenance, carried out according to the execution methodologies, in a specified period of time to achieve intended software product.
This PRINCE2 Principles ebook is an ideal revision guide for PRINCE2 Foundation students, a helpful aid to newly qualified PRINCE2 Practitioners or those who are looking to implement PRINCE2 on their projects for the first time.
Grasp the 7 PRINCE2 Principles in straight forward fashion with this free ebook by Knowledge Train. Forget your usual boring diagrams and flowcharts, this ebook includes 7 colourful, hand-illustrated mindmaps that are easy on the eye and will make sure the information sticks. Forget the thick text books!
Download this free 10 page ebook to understand the basis of PRINCE2, revise for your PRINCE2 Foundation exam or to learn whether your organization is managing their projects correctly with PRINCE2.
You will need to learn the PRINCE2 Principles, Themes and Processes for your PRINCE2 Foundation exam. You can download the full set of revision e-books and mind maps here: http://www.knowledgetrain.co.uk/project-management-ebooks.php
---------------------------------------------------------------------------------------------------------------------------------
Here is what others have said about the PRINCE2 revision e-books:
“Excellent PRINCE2 revision e-books. Extremely well put together and I’m very impressed! I’d say
that you’ve met or even exceeded your aims. They look brilliant, thanks very
much. The world needs more people like you :-)” - Dave Sands, Managing Director at DS Consulting (2005) Co Ltd
“The proof that a picture says more than a thousand words becomes reality within
these PRINCE2 revision e-books. Definitely worthwhile reading.” - Henny Portman, PMO consultant at ING Insurance
“These e-books are really well done! I secretly envy designers like you guys!” - Cesar Abeid, Project Manager at Remontech
“Never has PRINCE2 been explained so beautifully.” - Paul Naybour, Project Management Training Consultant at Parallel Project Training
ebook, prince2, prince2 course, prince2 foundation exam, prince2 principles, prince2 revision, prince2 training, project management, prince2 exam, studying, self-study, self study, guide, learning, project manager
The document provides an overview of the PRINCE2 project management methodology. It introduces the 7 PRINCE2 processes: starting up a project, directing a project, initiating a project, controlling a stage, managing product delivery, managing a stage boundary, and closing a project. For each process, it describes the purpose, objective, context, activities, and tailoring guidelines. It also discusses how to tailor the processes for different project situations like simple projects, agile projects, and supplier-led projects.
Prince 2 Flashcard for exam preperationsscharique01
This document summarizes the key components and processes of PRINCE2, a project management methodology. It discusses the 8 processes, which include starting and initiating a project, directing stages, controlling stages, managing delivery and boundaries, planning, and closing projects. It also outlines the 8 components, including organization roles, business case, plans, change, quality, progress, risk, and lessons learned. Overall, the document provides a high-level overview of the main elements that make up PRINCE2.
This document discusses PRINCE2, a structured method for project management. It was originally developed in the UK for IT projects, but is now a generic project management method. PRINCE2 provides a standardized framework for managing projects, processes, roles, and stages. It aims to make project management more efficient for organizations managing multiple concurrent projects by standardizing procedures. The key elements of PRINCE2 include processes, components, techniques, and management stages that divide the project into distinct units for control and reporting.
PRINCE2 is a structured project management methodology based on experience from thousands of projects. It consists of principles, themes, processes and tailoring for each project. The document provides an overview of PRINCE2 including its 7 principles, 7 themes, 7 processes, roles, structure, techniques and key templates used such as business case, project plan, risk register and issue log.
The document describes IBM's Actuate program for project launches. Actuate aims to ensure projects are started right by facilitating key startup activities within 45 days. These activities are grouped under 10 focus areas like project scope, risk assessment, governance, and tools setup. IBM has seen benefits of Actuate like reduced surprises, improved risk assessment, and faster startup phase completion. Over time, Actuate coverage has increased while duration to complete activities has decreased, showing improved efficiency. Lessons learned include addressing delays in input documents and stakeholder availability.
Software Project Management | An Overview of the Software Project ManagementAhsan Rahim
Management is the process of getting things done through others, it is the process of coordinating people & other resources to achieve the goals of the organization. A project is a set of related tasks that are coordinated to achieve a specific objective in a given time limit. A project is well-defined task, which is a collection of several operations done in order to achieve a goal. Software is the program & all associated documentation & configuration data which is needed to make these programs operate correctly.
A Software Project is the complete procedure of software development from requirement gathering to testing & maintenance, carried out according to the execution methodologies, in a specified period of time to achieve intended software product.
This PRINCE2 Principles ebook is an ideal revision guide for PRINCE2 Foundation students, a helpful aid to newly qualified PRINCE2 Practitioners or those who are looking to implement PRINCE2 on their projects for the first time.
Grasp the 7 PRINCE2 Principles in straight forward fashion with this free ebook by Knowledge Train. Forget your usual boring diagrams and flowcharts, this ebook includes 7 colourful, hand-illustrated mindmaps that are easy on the eye and will make sure the information sticks. Forget the thick text books!
Download this free 10 page ebook to understand the basis of PRINCE2, revise for your PRINCE2 Foundation exam or to learn whether your organization is managing their projects correctly with PRINCE2.
You will need to learn the PRINCE2 Principles, Themes and Processes for your PRINCE2 Foundation exam. You can download the full set of revision e-books and mind maps here: http://www.knowledgetrain.co.uk/project-management-ebooks.php
---------------------------------------------------------------------------------------------------------------------------------
Here is what others have said about the PRINCE2 revision e-books:
“Excellent PRINCE2 revision e-books. Extremely well put together and I’m very impressed! I’d say
that you’ve met or even exceeded your aims. They look brilliant, thanks very
much. The world needs more people like you :-)” - Dave Sands, Managing Director at DS Consulting (2005) Co Ltd
“The proof that a picture says more than a thousand words becomes reality within
these PRINCE2 revision e-books. Definitely worthwhile reading.” - Henny Portman, PMO consultant at ING Insurance
“These e-books are really well done! I secretly envy designers like you guys!” - Cesar Abeid, Project Manager at Remontech
“Never has PRINCE2 been explained so beautifully.” - Paul Naybour, Project Management Training Consultant at Parallel Project Training
ebook, prince2, prince2 course, prince2 foundation exam, prince2 principles, prince2 revision, prince2 training, project management, prince2 exam, studying, self-study, self study, guide, learning, project manager
The document discusses the project life cycle and its various phases. It begins with an introduction to project management and the importance of understanding the project life cycle. It then describes the five main phases of a typical project life cycle: initiation, planning, execution, monitoring and control, and closure. For each phase, it provides an overview of the key steps and deliverables. It also discusses other important aspects that influence the project life cycle such as cost and staffing levels over time, risks, organizational structures, and interactions between project management processes.
2 Project Management Life CycleKemaltaneriStockThinkstoc.docxeugeniadean34240
The document discusses the project management life cycle which consists of 5 phases: initiation, planning, execution, monitoring, and closeout. Each phase has a key purpose and involves specific activities to move the project forward. Project governance oversees the entire process and ensures projects are properly structured and supported. Governance includes establishing standards, procedures, and a project management office for guidance and support. Following a structured life cycle helps ensure projects progress in a coordinated manner from start to finish.
PRINCE2 (PRojects IN Controlled Environments) is a structured project management methodology widely used in various industries worldwide. It provides a clear and organized approach to managing projects, ensuring they are completed successfully and efficiently. The PRINCE2 process is a fundamental component of this methodology, outlining a step-by-step guide for project management.
The document discusses project scope definition and management. It states that project scope involves identifying and describing all work needed to produce the project's product in sufficient detail so the team understands their tasks and reasonably foreseeable work is included. It also discusses defining the scope of the project and product, developing a project scope statement, identifying deliverables, and using a "Green Car" example to illustrate scope concepts.
The document discusses project phases and management. It describes the typical 5 phases of a project - initiation, planning, execution, monitoring and control, and closure. It provides details on each phase, including developing a project charter and business case in initiation, creating a project plan and defining roles in planning, executing the project in the execution phase, monitoring and controlling the project, and closing the project. It also discusses the importance of project feasibility studies and setting goals using SMART and CLEAR frameworks to help define goals that cater to dynamic project environments.
The objective of this document is to help explain the PRINCE2 terms. The glossary provided in the PRINCE2 manual is very good but can be a bit difficult to understand if you do not already have experience with PRINCE2. Therefore this glossary provides more information to explain each term and uses examples where necessary.
This will enable you not just to learn these terms but also able to explain them
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docxjessiehampson
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredecessors% CompleteStatusAssigned ToCommentsStartFinishCritical1. Intiation14d10/02/1910/15/1999%CompleteJevin 1.1 Recommendation & evaluation3d10/02/1910/04/19100%CompletedJenny 1.2 Project chart Deveelopment2d10/05/1910/06/19100%CompletedJenny 1.3 Outline of deliverable2d10/07/1910/08/19100%CompletedMark 1.4 Stakeholders analysis3d10/09/1910/11/194100%CompletedJoe 1.5 Charter signed by Authority4d10/12/1910/15/1995%In ProgressJoe2. Planning22d10/16/1911/07/19 2.1 Make a scope management2d10/16/1910/17/190%Not StartedJudy 2.2 Design the project team4d10/18/1910/21/090%Not StartedMolly 2.3 Intial meeting to boost the project3d10/22/1910/24/190%Not StartedMolly 2.4 Development of project plan2d10/25/1910/26/19130%Not StartedJudy 2.4.1 Create the schedules2d10/27/1910/28/190%Not StartedAlex 2.4.2 Analysis the critical path3d10/29/1911/01/190%Not StartedAlex 2.5 Submission of Project plan4d11/02/1911/05/190%Not StartedTim 2.6 Approval for project Plan2d11/06/1911/07/19120%Not StartedTiana3. Designing20d11/08/1911/27/19 3.1 Meeting to boost the team2d11/08/1911/09/190%Not StartedMandy 3.2 Verify the user requirements3d11/10/1911/12/190%Not StartedMandy 3.3 Designing of system4d11/13/0911/16/190%Not StartedKathy 3.4 procurement of software and hardware3d11/17/1911/19/190%Not StartedKathy 3.5 Installation of development system2d11/20/1911/21/190%Not StartedTim 3.6 Initiate testing3d11/22/1911/24/190%Not StartedHarry 3.7 Installation of live system2d11/25/1911/26/19200%Not StartedHarry 3.8 Training of users1d11/27/1911/27/190%Not StartedTiana4. Control20d11/28/1912/18/19 4.1 Management of Project4d11/28/1912/01/190%Not StartedMolly 4.2 Meetings to track the status of the meeting4d12/02/1912/05/190%Not StartedMolly 4.3 Risk management8d12/06/1912/13/190%Not StartedManoj 4.4 Updation of project management plan5d12/14/1912/18/190%Not StartedMandy5. Closing11d12/19/1912/29/19 5.1 Audit procurement4d12/19/1912/22/190%Not StartedAlisha 5.2 Updating and revision of documents2d12/23/1912/24/19300%Not StartedPrem 5.3 Update records and files2d12/25/1912/26/190%Not StartedHari 5.4 Receive the acceptance formally1d12/27/1912/27/190%Not StartedJames 5.5. Archieve Documents and files2d12/28/1912/29/190%Not StartedJames
Comments
Running Head: PROJECT PLAN-BUSINESS REQUIRMENT DOCUMENT 1
PROJECT PLAN-BUSINESS REQUIRMENT DOCUMENT 21
Project Plan-Business Requirement Document
CIS 599 Graduate Info Systems Capstone
Abstract
After finishing project plan inception with introduction Docume ...
Project Plan For A Project Management ProjectMary Stevenson
Here are the key steps for the induction program project plan:
1. Define project objectives - Clearly state what the project aims to achieve.
2. Develop project schedule - Create a timeline that outlines all tasks and their deadlines.
3. Assign roles and responsibilities - Designate project manager and team member roles.
4. Create communication plan - Determine how the team will communicate status and issues.
5. Develop budget - Estimate costs for all project activities and materials.
6. Identify risks - Anticipate potential challenges and have contingency plans.
7. Plan evaluations - Determine how the project and team performance will be assessed.
8. Get sign-off - Obtain final approval
The funkiest PRINCE2 Processes revision guide on the internetKnowledge Train
A PRINCE2 Foundation course lasts about 3 days - that's a lot of information to take in. This e-book has been designed with the anxious student in mind, using simple descriptions and a graphical, cartoon-style mind map for each PRINCE2 Process.
For your PRINCE2 exam, you will need to master the PRINCE2 Principles, Themes and Processes. You can download the full set of PRINCE2 mind map e-books here:
http://www.knowledgetrain.co.uk/project-management-ebooks.php
Here is what others have said about the PRINCE2 revision e-books:
“Excellent PRINCE2 revision e-books. Extremely well put together and I’m very impressed! I’d say
that you’ve met or even exceeded your aims. They look brilliant, thanks very
much. The world needs more people like you :-)” - Dave Sands, Managing Director at DS Consulting (2005) Co Ltd
“The proof that a picture says more than a thousand words becomes reality within
these PRINCE2 revision e-books. Definitely worthwhile reading.” - Henny Portman, PMO consultant at ING Insurance
“These e-books are really well done! I secretly envy designers like you guys!” - Cesar Abeid, Project Manager at Remontech
“Never has PRINCE2 been explained so beautifully.” - Paul Naybour, Project Management Training Consultant at Parallel Project Training
prince2, prince2 course, prince2 foundation exam, prince2 processes, prince2 revision, prince2 training, project management, project management course, prince2 foundation course, revision guide, revision tips
The document discusses key concepts in project management including:
1) It defines a project according to the ISO, PRINCE, and PMI definitions as a temporary endeavor with a start and end date aimed at delivering a unique product or service.
2) The main areas of expertise needed for project management are the general PM body of knowledge, understanding the project environment, management skills, and interpersonal skills.
3) Successful project management requires planning, having defined objectives and results, and using resources like time, cost, and people efficiently. Frameworks like PRINCE2 provide structure and controls for the project life cycle from start to finish.
The updated Prince2 2009 version focuses on transparency and clarifying roles like the sponsor and steering committee. While some terminology changes, the core principles remain the same. It provides greater customization guidance for varying project complexity. Organizations already using Prince2 will need training to transition successfully to the new terminology and process descriptions, in order to better control project risks and ensure goals are met through regular reviews and decision points. Prince2 is scalable and not intended as a rigid set of rules, but a means to ensure the right project management steps and decisions.
The updated 2009 version of Prince2 focuses on transparency and clarifying roles like the sponsor and steering committee. While some terminology changes, the core principles remain the same. The changes mostly relate to classifications and terms. Organizations already using Prince2 will need to adapt to the new terminology but the improvements make the methodology easier to use for varying project complexities. Prince2 provides structure for controlled project start, execution, and closure through defined roles and decision points to help ensure projects deliver intended benefits.
The updated Prince2 2009 version focuses on transparency and clearly defining roles like the sponsor and steering committee. While some terminology changes, the core principles remain the same. The changes are primarily to classifications and terms. Prince2 provides structure for controlled project delivery and regular evaluation of objectives. The new version gives greater emphasis to the sponsor and steering committee roles through a separate manual.
This document outlines a 10-step process called Step Wise for project planning. It involves selecting the project, identifying objectives and scope, analyzing project characteristics, identifying products and activities, estimating effort, identifying risks, allocating resources, reviewing and publishing the plan, and executing the plan through lower levels of detailed planning. Project planning establishes objectives, analyzes the project, and identifies an infrastructure, products, activities, resources, and quality controls to guide successful execution.
The document discusses the project life cycle and its various phases. It begins with an introduction to project management and the importance of understanding the project life cycle. It then describes the five main phases of a typical project life cycle: initiation, planning, execution, monitoring and control, and closure. For each phase, it provides an overview of the key steps and deliverables. It also discusses other important aspects that influence the project life cycle such as cost and staffing levels over time, risks, organizational structures, and interactions between project management processes.
2 Project Management Life CycleKemaltaneriStockThinkstoc.docxeugeniadean34240
The document discusses the project management life cycle which consists of 5 phases: initiation, planning, execution, monitoring, and closeout. Each phase has a key purpose and involves specific activities to move the project forward. Project governance oversees the entire process and ensures projects are properly structured and supported. Governance includes establishing standards, procedures, and a project management office for guidance and support. Following a structured life cycle helps ensure projects progress in a coordinated manner from start to finish.
PRINCE2 (PRojects IN Controlled Environments) is a structured project management methodology widely used in various industries worldwide. It provides a clear and organized approach to managing projects, ensuring they are completed successfully and efficiently. The PRINCE2 process is a fundamental component of this methodology, outlining a step-by-step guide for project management.
The document discusses project scope definition and management. It states that project scope involves identifying and describing all work needed to produce the project's product in sufficient detail so the team understands their tasks and reasonably foreseeable work is included. It also discusses defining the scope of the project and product, developing a project scope statement, identifying deliverables, and using a "Green Car" example to illustrate scope concepts.
The document discusses project phases and management. It describes the typical 5 phases of a project - initiation, planning, execution, monitoring and control, and closure. It provides details on each phase, including developing a project charter and business case in initiation, creating a project plan and defining roles in planning, executing the project in the execution phase, monitoring and controlling the project, and closing the project. It also discusses the importance of project feasibility studies and setting goals using SMART and CLEAR frameworks to help define goals that cater to dynamic project environments.
The objective of this document is to help explain the PRINCE2 terms. The glossary provided in the PRINCE2 manual is very good but can be a bit difficult to understand if you do not already have experience with PRINCE2. Therefore this glossary provides more information to explain each term and uses examples where necessary.
This will enable you not just to learn these terms but also able to explain them
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docxjessiehampson
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredecessors% CompleteStatusAssigned ToCommentsStartFinishCritical1. Intiation14d10/02/1910/15/1999%CompleteJevin 1.1 Recommendation & evaluation3d10/02/1910/04/19100%CompletedJenny 1.2 Project chart Deveelopment2d10/05/1910/06/19100%CompletedJenny 1.3 Outline of deliverable2d10/07/1910/08/19100%CompletedMark 1.4 Stakeholders analysis3d10/09/1910/11/194100%CompletedJoe 1.5 Charter signed by Authority4d10/12/1910/15/1995%In ProgressJoe2. Planning22d10/16/1911/07/19 2.1 Make a scope management2d10/16/1910/17/190%Not StartedJudy 2.2 Design the project team4d10/18/1910/21/090%Not StartedMolly 2.3 Intial meeting to boost the project3d10/22/1910/24/190%Not StartedMolly 2.4 Development of project plan2d10/25/1910/26/19130%Not StartedJudy 2.4.1 Create the schedules2d10/27/1910/28/190%Not StartedAlex 2.4.2 Analysis the critical path3d10/29/1911/01/190%Not StartedAlex 2.5 Submission of Project plan4d11/02/1911/05/190%Not StartedTim 2.6 Approval for project Plan2d11/06/1911/07/19120%Not StartedTiana3. Designing20d11/08/1911/27/19 3.1 Meeting to boost the team2d11/08/1911/09/190%Not StartedMandy 3.2 Verify the user requirements3d11/10/1911/12/190%Not StartedMandy 3.3 Designing of system4d11/13/0911/16/190%Not StartedKathy 3.4 procurement of software and hardware3d11/17/1911/19/190%Not StartedKathy 3.5 Installation of development system2d11/20/1911/21/190%Not StartedTim 3.6 Initiate testing3d11/22/1911/24/190%Not StartedHarry 3.7 Installation of live system2d11/25/1911/26/19200%Not StartedHarry 3.8 Training of users1d11/27/1911/27/190%Not StartedTiana4. Control20d11/28/1912/18/19 4.1 Management of Project4d11/28/1912/01/190%Not StartedMolly 4.2 Meetings to track the status of the meeting4d12/02/1912/05/190%Not StartedMolly 4.3 Risk management8d12/06/1912/13/190%Not StartedManoj 4.4 Updation of project management plan5d12/14/1912/18/190%Not StartedMandy5. Closing11d12/19/1912/29/19 5.1 Audit procurement4d12/19/1912/22/190%Not StartedAlisha 5.2 Updating and revision of documents2d12/23/1912/24/19300%Not StartedPrem 5.3 Update records and files2d12/25/1912/26/190%Not StartedHari 5.4 Receive the acceptance formally1d12/27/1912/27/190%Not StartedJames 5.5. Archieve Documents and files2d12/28/1912/29/190%Not StartedJames
Comments
Running Head: PROJECT PLAN-BUSINESS REQUIRMENT DOCUMENT 1
PROJECT PLAN-BUSINESS REQUIRMENT DOCUMENT 21
Project Plan-Business Requirement Document
CIS 599 Graduate Info Systems Capstone
Abstract
After finishing project plan inception with introduction Docume ...
Project Plan For A Project Management ProjectMary Stevenson
Here are the key steps for the induction program project plan:
1. Define project objectives - Clearly state what the project aims to achieve.
2. Develop project schedule - Create a timeline that outlines all tasks and their deadlines.
3. Assign roles and responsibilities - Designate project manager and team member roles.
4. Create communication plan - Determine how the team will communicate status and issues.
5. Develop budget - Estimate costs for all project activities and materials.
6. Identify risks - Anticipate potential challenges and have contingency plans.
7. Plan evaluations - Determine how the project and team performance will be assessed.
8. Get sign-off - Obtain final approval
The funkiest PRINCE2 Processes revision guide on the internetKnowledge Train
A PRINCE2 Foundation course lasts about 3 days - that's a lot of information to take in. This e-book has been designed with the anxious student in mind, using simple descriptions and a graphical, cartoon-style mind map for each PRINCE2 Process.
For your PRINCE2 exam, you will need to master the PRINCE2 Principles, Themes and Processes. You can download the full set of PRINCE2 mind map e-books here:
http://www.knowledgetrain.co.uk/project-management-ebooks.php
Here is what others have said about the PRINCE2 revision e-books:
“Excellent PRINCE2 revision e-books. Extremely well put together and I’m very impressed! I’d say
that you’ve met or even exceeded your aims. They look brilliant, thanks very
much. The world needs more people like you :-)” - Dave Sands, Managing Director at DS Consulting (2005) Co Ltd
“The proof that a picture says more than a thousand words becomes reality within
these PRINCE2 revision e-books. Definitely worthwhile reading.” - Henny Portman, PMO consultant at ING Insurance
“These e-books are really well done! I secretly envy designers like you guys!” - Cesar Abeid, Project Manager at Remontech
“Never has PRINCE2 been explained so beautifully.” - Paul Naybour, Project Management Training Consultant at Parallel Project Training
prince2, prince2 course, prince2 foundation exam, prince2 processes, prince2 revision, prince2 training, project management, project management course, prince2 foundation course, revision guide, revision tips
The document discusses key concepts in project management including:
1) It defines a project according to the ISO, PRINCE, and PMI definitions as a temporary endeavor with a start and end date aimed at delivering a unique product or service.
2) The main areas of expertise needed for project management are the general PM body of knowledge, understanding the project environment, management skills, and interpersonal skills.
3) Successful project management requires planning, having defined objectives and results, and using resources like time, cost, and people efficiently. Frameworks like PRINCE2 provide structure and controls for the project life cycle from start to finish.
The updated Prince2 2009 version focuses on transparency and clarifying roles like the sponsor and steering committee. While some terminology changes, the core principles remain the same. It provides greater customization guidance for varying project complexity. Organizations already using Prince2 will need training to transition successfully to the new terminology and process descriptions, in order to better control project risks and ensure goals are met through regular reviews and decision points. Prince2 is scalable and not intended as a rigid set of rules, but a means to ensure the right project management steps and decisions.
The updated 2009 version of Prince2 focuses on transparency and clarifying roles like the sponsor and steering committee. While some terminology changes, the core principles remain the same. The changes mostly relate to classifications and terms. Organizations already using Prince2 will need to adapt to the new terminology but the improvements make the methodology easier to use for varying project complexities. Prince2 provides structure for controlled project start, execution, and closure through defined roles and decision points to help ensure projects deliver intended benefits.
The updated Prince2 2009 version focuses on transparency and clearly defining roles like the sponsor and steering committee. While some terminology changes, the core principles remain the same. The changes are primarily to classifications and terms. Prince2 provides structure for controlled project delivery and regular evaluation of objectives. The new version gives greater emphasis to the sponsor and steering committee roles through a separate manual.
This document outlines a 10-step process called Step Wise for project planning. It involves selecting the project, identifying objectives and scope, analyzing project characteristics, identifying products and activities, estimating effort, identifying risks, allocating resources, reviewing and publishing the plan, and executing the plan through lower levels of detailed planning. Project planning establishes objectives, analyzes the project, and identifies an infrastructure, products, activities, resources, and quality controls to guide successful execution.
International Conference on NLP, Artificial Intelligence, Machine Learning an...gerogepatton
International Conference on NLP, Artificial Intelligence, Machine Learning and Applications (NLAIM 2024) offers a premier global platform for exchanging insights and findings in the theory, methodology, and applications of NLP, Artificial Intelligence, Machine Learning, and their applications. The conference seeks substantial contributions across all key domains of NLP, Artificial Intelligence, Machine Learning, and their practical applications, aiming to foster both theoretical advancements and real-world implementations. With a focus on facilitating collaboration between researchers and practitioners from academia and industry, the conference serves as a nexus for sharing the latest developments in the field.
Introduction- e - waste – definition - sources of e-waste– hazardous substances in e-waste - effects of e-waste on environment and human health- need for e-waste management– e-waste handling rules - waste minimization techniques for managing e-waste – recycling of e-waste - disposal treatment methods of e- waste – mechanism of extraction of precious metal from leaching solution-global Scenario of E-waste – E-waste in India- case studies.
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTjpsjournal1
The rivalry between prominent international actors for dominance over Central Asia's hydrocarbon
reserves and the ancient silk trade route, along with China's diplomatic endeavours in the area, has been
referred to as the "New Great Game." This research centres on the power struggle, considering
geopolitical, geostrategic, and geoeconomic variables. Topics including trade, political hegemony, oil
politics, and conventional and nontraditional security are all explored and explained by the researcher.
Using Mackinder's Heartland, Spykman Rimland, and Hegemonic Stability theories, examines China's role
in Central Asia. This study adheres to the empirical epistemological method and has taken care of
objectivity. This study analyze primary and secondary research documents critically to elaborate role of
china’s geo economic outreach in central Asian countries and its future prospect. China is thriving in trade,
pipeline politics, and winning states, according to this study, thanks to important instruments like the
Shanghai Cooperation Organisation and the Belt and Road Economic Initiative. According to this study,
China is seeing significant success in commerce, pipeline politics, and gaining influence on other
governments. This success may be attributed to the effective utilisation of key tools such as the Shanghai
Cooperation Organisation and the Belt and Road Economic Initiative.
artificial intelligence and data science contents.pptxGauravCar
What is artificial intelligence? Artificial intelligence is the ability of a computer or computer-controlled robot to perform tasks that are commonly associated with the intellectual processes characteristic of humans, such as the ability to reason.
› ...
Artificial intelligence (AI) | Definitio
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Sinan KOZAK
Sinan from the Delivery Hero mobile infrastructure engineering team shares a deep dive into performance acceleration with Gradle build cache optimizations. Sinan shares their journey into solving complex build-cache problems that affect Gradle builds. By understanding the challenges and solutions found in our journey, we aim to demonstrate the possibilities for faster builds. The case study reveals how overlapping outputs and cache misconfigurations led to significant increases in build times, especially as the project scaled up with numerous modules using Paparazzi tests. The journey from diagnosing to defeating cache issues offers invaluable lessons on maintaining cache integrity without sacrificing functionality.
Comparative analysis between traditional aquaponics and reconstructed aquapon...bijceesjournal
The aquaponic system of planting is a method that does not require soil usage. It is a method that only needs water, fish, lava rocks (a substitute for soil), and plants. Aquaponic systems are sustainable and environmentally friendly. Its use not only helps to plant in small spaces but also helps reduce artificial chemical use and minimizes excess water use, as aquaponics consumes 90% less water than soil-based gardening. The study applied a descriptive and experimental design to assess and compare conventional and reconstructed aquaponic methods for reproducing tomatoes. The researchers created an observation checklist to determine the significant factors of the study. The study aims to determine the significant difference between traditional aquaponics and reconstructed aquaponics systems propagating tomatoes in terms of height, weight, girth, and number of fruits. The reconstructed aquaponics system’s higher growth yield results in a much more nourished crop than the traditional aquaponics system. It is superior in its number of fruits, height, weight, and girth measurement. Moreover, the reconstructed aquaponics system is proven to eliminate all the hindrances present in the traditional aquaponics system, which are overcrowding of fish, algae growth, pest problems, contaminated water, and dead fish.