Writing A Descriptive Essay About A Place
Writing an essay on the topic of describing a place may initially seem like a straightforward task,
but delving into the intricacies of creating a vivid and captivating description can present its
own set of challenges. The difficulty lies not only in choosing the right words to convey the
sensory details but also in maintaining a coherent structure that engages the reader.
One of the challenges is finding a balance between providing enough information to paint a clear
picture and avoiding overwhelming the reader with excessive details. Striking this balance
requires a keen understanding of the significance of each detail and its contribution to the overall
atmosphere. It's a delicate dance between specificity and brevity.
Additionally, capturing the essence of a place goes beyond just describing its physical attributes.
A successful descriptive essay should evoke emotions and create a connection between the
reader and the place being depicted. This requires a thoughtful selection of adjectives,
metaphors, and other literary devices to enhance the imagery and evoke a sensory experience for
the reader.
Organizing the essay poses another challenge. Deciding on the sequence of details and
structuring the narrative in a way that builds a coherent and engaging story can be demanding. A
well-organized essay should guide the reader through the described place seamlessly, creating a
natural flow that enhances the overall reading experience.
Furthermore, avoiding clichГ©s and employing original language is crucial to prevent the essay
from becoming mundane. Finding fresh and unique ways to express common observations can
elevate the quality of the writing, making it more memorable and impactful.
In conclusion, while the task of writing a descriptive essay about a place may seem
straightforward at first glance, the intricacies lie in balancing detail, emotion, and structure. It
demands a thoughtful approach to language, a keen sense of storytelling, and an ability to
engage the reader on a sensory level.
If you find yourself struggling with such assignments, it's worth noting that similar essays and a
variety of writing assistance can be easily obtained through services like HelpWriting.net.
Professionals can provide support in crafting well-written and engaging essays on a wide range
of topics, making the writing process more manageable for those seeking assistance.
Writing A Descriptive Essay About A PlaceWriting A Descriptive Essay About A Place
What Is The Importance Of Multilingualism In Business
Language is a very important feature of business as companies need to coordinate
activities internally, communicate with each other and connect with customers and
suppliers.
The Importance of Multilingualism for Business according to Antonella Sorace, a
Professor of Developmental Linguistics at the University of Edinburgh, are an
improvement in decision making, negotiating, prioritising and taking the viewpoint
of other people. In relation to decision making, the ability to make rational decisions
is improved by the use and understanding of different languages and cultures as it
prevents bias and emotional reactions to situations. In 1999, Joseph Nye, an
American political scientist, stated that the most beneficial way of negotiating is
persuading others through attraction, rather than coercion or payment . This
statement suggests that by emotionally connecting with someone through an
understanding of a language or the culture of a certain country, it enables the two
bodies in the negotiation to build trust between them. Furthermore, Nye believes that,
in relation to prioritising, attention rather than information becomes the scarce
resource, and those who can distinguish valuable information from background
clutter gain power . This is present in language where linguists are able to read a
piece of information and break it down so that they are able to pass on that
information to customers, who may not speak the same language fluently. The final
advantage of multilingualism is the ability to take the viewpoint of other people.
Philip Tetlock states that bilingual and bicultural individuals become quite good at
determining which responses will fit with the expectations of others . This suggests
that multilingual people are able to go through data and find the pieces of
information that will fit with the expectation of their customers.
Deutscher s novel Through the language glass. Why the world looks different in
other languages looks into whether language affects how you think and how you
perceive things. Deutscher started to look into this after reading Homer s Odyssey
which presented the sea as wine dark . This lead Deutscher to question whether the
sea was expressed like this because there was no
Nonprofit Organization
Certainly, nonprofit organization s mission and fanatical factors are linked.
Therefore, the nonprofit organization should develop a plan that meets the financial
requirements as well as the programming. Negatively, the institution will be affected
if these areas are not well managed.
Specifically, implementation and financial policies are one of the nonprofit s tactics
to maintain an excellent functioning. The goal is to provide more services with fewer
resources. At the same time, it is an expectation that funding enhance the organization
success. Funds should be used to grow programs, promote the agency and many
others. Then, the organization expenses should be record on the balance sheet.
Accordingly, managers make decisions on program ... Show more content on
Helpwriting.net ...
Congress in 2002. This SOX act propones to defend financiers from fraudulent
bookkeeping activities. The Act directed modifications to influence corporations
financial disclosure and other accounting fraud. Actually, The SOX Act was created
in response to accounting malpractice in the early 2000s, when public scandals such
as Enron Corporation, Tyco International plc, and WorldCom shook investor
confidence in financial statements and demanded an overhaul of regulatory standards
(Investopedia, 2017). The act rules and policies affected the legislation related to
security regulations. The Sarbanes Oxley Act Section 302 and Section 404 are the
main points. The rules and enforcement policies outlined by the SOX Act amend or
supplement existing legislation dealing with security regulations. The two key
provisions of Section 302 is a mandate that requires senior management to certify the
accuracy of the reported financial statement. Section 404 is a requirement that
management and auditors establish internal controls and reporting methods on the
adequacy of those controls. Section 404 has very costly implications for publicly
traded companies as it is expensive to establish and maintain the required internal
controls (Investopedia,
Statistical Data Focus On Statistical Information Essay
Introduction
The subsequent statistical data focus on statistical information from the AJ Davis
Dept. Store. The department store endeavors to unearth the veracity about their credit
customers. The Data are incorporated of a sample of 50 credit customers based on
five different variables namely the location (rural, urban, suburban), incomes, year,
and the credit balance.
1.LOCATION (Rural, Urban, Suburban)
2.INCOME (in $1,000 s be careful with this)
3.SIZE (Household Size, meaning number of people living in the household)
4.YEARS (the number of years that the customer has lived in the current location)
5.CREDIT BALANCE (the customers current credit card balance on the store s
credit card, in $)
1. Location (Rural, Urban, Suburban)
I/ Descriptive Statistics.
We will describe the location, the income and household size.
A/ Descriptive Statistics: Location
The first individual variable is Location . We can characterize it as a categorical
variable. For this reason, its (the Location ) three subcategories are Urban, Suburban
and Rural. Because, it s a categorical variable, the events and measures of its central
tendency and descriptive statistics cannot be calculated. However, we count:
Urban: 21
Suburban: 15
Rural: 14
LocationFrequencyRelative Frequency
Urban210.42
Suburban150.30
Rural140.28
Total501
From this number above, we may estimate the Mean, median and standard deviation
as next: Mean: 16.66;
Internal Analysis Of Deutsche Bank
5.INTERNAL ANALYSIS
5.1Introduction
In this chapter, an analysis of Deutsche Bank s internal environment will be
conducted, using primary and secondary data from a number of internal company
sources.
5.2Company profile
Company overview
Deutsche Bank in the Netherlands is an international universal bank made up of
several divisions: Asset Wealth Management, Corporate Banking Securities, Global
Transaction Banking and Private Business Clients. The focus here is the Global
Transaction Banking (GTB) division s TF/CMC department. Their most important
client segments are: Mid Cap and Large Cap. The focus for this marketing plan is on
the Mid Cap segment, which consists of clients whose mother company is of Dutch
origin, is an international player, and has turnover upwards of EUR 50 million (L.
Hedges, personal communication, November 7th, 2014). ... Show more content on
Helpwriting.net ...
However, this department is not of importance to this specific marketing plan.
Finances
Revenue developments in the past 3 years are as follows: in 2011 Deutsche Bank s net
revenue (after provisions for credit losses) was €31,389m, in 2012 it was €32,015
and in 2013 it was €29,860m (AG, Deutsche Bank Facts and Figures, 2014),
(Deutsche Bank, 2014). For Deutsche Bank N.V. s profit and loss account please
refer to chapter 5.5 on page 33.
Ratings for Deutsche Bank, carried out by established rating agencies, can be
compared to those of competitors (see CH4) (Deutsche Bank A.G., 2014).
Short TermLong Term
Moody sP 2A3
S PA 1A
FitchF1
Genetically Modified Organisms And Health
Genetically Modified Organisms and Health Genetically Modified Organisms, or
GMOs, are organisms that have been engineered to contain and express genes
from different organisms ( GMOs: Good or Bad for People and the Environment?
). A wide variety and the majority of food and resource crops in the United States
are genetically modified, including corn, canola and cotton, and the United States
is one of the five countries which produce over 90% of GMOs in the world market (
How Common Are Genetically Modified Foods? ). Even though GMOs have been
produced and consumed on a large scale since 1996, there is controversy over
whether or not GMOs are generally good or bad for the human body(OECD). Many
believe that GMOs carry serious health risks... Show more content on Helpwriting.net
...
However, it is possible that GMOs cause negative effects within the environment that
outweigh the positive goals. Environmental affects are important to consider in the
context of human health because, as Caitlin Shetterley constantly argues in
Modified: Gmos and the Threat to Our Food, Our Land, Our Future, humanity and
nature are inextricably intertwined, and therefore harm done to nature is a direct
harm to humans. The process of growing GMOs involves the use of heavy
pesticides, which has led to the evolution of herbicide resistant weeds that cause
major crop loss (Yang). Scientists are becoming increasingly concerned that GMO
crops have the ability to spread their genetic material to non GMO organisms.
Contaminating non GMO crops can cause mutations within the organism, leaving
crops vulnerable to disease (Yang). Also, studies regarding whether GMO crops and
non GMO crops can coexist are showing coexistence is nearly impossible (OECD).
This inability to co exist reduces plant diversity which negatively impacts ecological
systems. The combined effects of mutating weeds and reducing plant diversity
support the idea that the negative impact of GMOs outweigh the positive
Contraction Of Exercise Lab Report
Obervations
Systolic pressure increases significantly when intensity of exercise increases.
It refers to the peak blood pressure during the contraction of ventricles.
It could be used as an indicator of the pumping force of the heart.
When heart pumps stronger, systolic pressure increases.
Compared with systolic pressure, diastolic pressure has a rather mild increase when
intensity of exercise increases.
It refers to the lowest blood pressure when the contraction of ventricles ends.
It is mainly affected by the dilation of arteries during diastole.
When arterioles dilate, the peripheral resistence decreases, resulting in a lower
diastolic pressure.
Pulse pressure increases when intensity of exercise increases.
It is essentially
The Impact Of The Northwest Ordinance Of 1787
Throughout the course of United States history, there have been multiple occurrences
in which influenced and impacted the United States as it is today. Since the
colonization of the colonies, the United States has proven to have improved its nation
through many acts, movements, political persons, and governmental theories.
However; the Northwest Ordinanceof 1787, the creation of the Erie Canal, Henry
Clay s American System , the Fugitive Slave Act, and the Emancipation Proclamation
were all specific occurrences and events that impacted the development of the United
Statespolitically and economically.
The Northwest Ordinance of 1787 was an important occurrence that effected the
United States politically and economically because it was one of the first
movements that introduced the abolition or freedom of slaves. The Northwest
Ordinance of 1787 was a land act that provided for orderly settlement and established
a process by which settles territories would become the states of Ohio, Illinois,
Indiana, Michigan, and Wisconsin. It therefore banned the slavery in these Northwest
Territories. Furthermore, this Ordinance prohibited slavery and ear marked funds
from land sales for the support of schools. The land ordinances of the 1780s were a
great and enduring achievement of the Confederation Congress. It therefore provided
for an orderly settlement and the admission of new states based on equality; there
would be no politically dependent colonies in the West. The Northwest
Rousseau Confessions
Confessions (1789), an autobiography by Jean Jacques Rousseau (1712 1778) is
seen as a reaction against Augustine s Confessions and stands as a rebuttal to the
latter s understanding of human nature. Rousseau is considered to have invented
modern autobiography in his compositions of Confessions, Rousseau, Judge of Jean
Jacques (1776) and The Reveries of a Solitary Walker (1778). The idea of confession
and in naming the book as such, the narrative presented in Confessionscan be seen as
an attempt on behalf of Rousseau to persuade the reader by offering his life as an
example of his philosophy. In the religious act of confession, it is assumed that the
person confessing will speak the truth and that he will accept the judgment conferred
upon... Show more content on Helpwriting.net ...
I have neither omitted anything bad, nor interpolated anything good. (p.3) By the act
of writing an autobiography, the author, narrator and protagonist has to be identical,
using the proper name of the author as reference (Lejeune, 1973, p. 298) and this
trinity of an identity must refuse to give others the same status that they claim for
themselves. The concept of autobiography requires inequality of treatment between
others and Rousseau and this brings in the possibility of untruthfulness; as he writes
at the beginning of the Confessions, I know the feelings of my heart, and I know
men (Rousseau 1789, p.3). Everything is an object for knowledge, while the I is the
sole
The Planet Of Planet Mercury
Introduction
The planet Mercury is very difficult to study from the Earth because of its proximity
to the Sun.
It is the second smallest planet (it was believed to be the smallest until the discovery
that Pluto is actually much smaller than originally thought), and also the fastest in its
orbit since it is the innermost planet.
Solar System Records
Highest uncompressed density.
Highest diurnal variation in temperature.
Only Solar System object with a 3:2 spin orbit resonance. it rotates on its axis exactly
three times for every two revolutions it makes around the Sun
Geological history ended the earliest among terrestrial planets.
Smallest planet with global magnetic field.
Most Earth like magnetosphere.
Name
Named after the Roman messenger god who was known for his ability to travel
quickly with wings on his feet. Mercury travels in orbit the shortest time of all planets
Distance From The Sun
Mercury is located 57, 910, 000km (0.38AU) from the Sun.
Mercury is the inner most planet in our solar system.
Orbit
The orbit of Mercury is the most eccentric of the planets in the solar system.
At perihelion it is 46,001,200km from the Sun
At aphelion it is 69,816,200km from the Sun
A difference of 23,815,700km giving it an eccentricity of 0.21
Orbit
Mercury is the only object Solar System with a 3:2 spin orbit resonance. This means
it rotates on its axis exactly three times for every two revolutions it makes around the
Sun
The length of a day on Mercury 58.63 Earth days.
Search Theory, Linear And Random Walk Moving Target
On The...
Abstract. This paper presents the cooperation between two searchers at the origin to
seek for a random walk moving target on the line. Any information of the target
position is not available to the searchers all the time. Rather than finding the
conditions that make the expected value of the first meeting time between one of the
searchers and the target is finite, we show the existence of the optimal search strategy
which minimizes this first meeting time. The effectiveness of this model is illustrated
using numerical example.
Mathematics Subject Classification: 37A50, 60K30, 90B40.
Keywords: Search theory, Linear search, Random walk. 1.Introduction The prime
focus of searching for a randomly moving particle on the real line is to ... Show more
content on Helpwriting.net ...
Recently, Mohamed et al. [15] studied this problem when the target moves on one of
n intersected real lines in which any information of the target position is not available
to the searchers all the time. Mohamed et al. formulate a search model and find the
conditions under which the expected value of the first meeting time between one of
the searchers and the target is finite. Furthermore, they showed the existence of the
optimal search plan that minimizes the expected value of the first meeting time
and found it. More recently, El Hadidy [16] considered a search problem for a d
dimensional Brownian target that moves randomly on d space. He found the
conditions that make the expected value of the first meeting time between one of
the searchers and the target is finite. In addition, he showed the existence of the
optimal search plan that minimizes the expected value of this first meeting time. A
comprehensive discussion of many aspects of search problem is found in El
Hadidy et al. [18 30]. Finding a Random walk moving target inside a cylinder has
numerous applications in physics. One of the famous search methods, is the
coordinated linear search method which consider two unit speed searchers starting at
the origin point seek for a random walk target. A target is assumed to move
randomly on a line according to a
American Frontier Hero Research Paper
The American frontier hero is very present in our culture, and those heroes have come
from different traditions of males in the eighteenth and nineteenth centuries. The start
of the American frontier hero goes back into the early decades of American
colonization. There have been investigations of the heroic stereotype that suggests
that American frontierheroes played a very important role in the shaping of
American literature and culture than had previously been known by Denise
MacNeil and Mary Rowlandson. Following up after reading The Account of Mary
Rowlandson and Other Indian Captivity Narratives, it was an eye opener for myself.
Furthermore, it was an eye opener, because many of us take life for granted and do
not realize someone... Show more content on Helpwriting.net ...
According to Mary Rowlandson and the Foundational Mythology, it makes it evident
that MacNeil and Rowlandson believe the American frontier is present. Also, they
believe that without the American frontier some of our history would not be known
or may not have happened. I also agree with them, I believe that the American frontier
hero is present in our culture today. For instance, it states Rowlandson here recounts
learning another Native American wilderness technique, using a beaver dam as a
bridge (Rowlandson 333). This is relevant of proving how the American frontier
heroes are still current, because without these heroes today, student and people
would not be able to learn about the Native American history or the way of life. Like
stated, Rowlandson learned how the Native Americans used a beaver dam as a
bridge, without these heroes showing and telling others about this information,
humans today would leave beaver dams alone since it is an animals home. Another
reason the American frontier hero is important is to learn the crucial element of
wilderness survival is the ability Rowlandson developed to successfully reconcile
Native American and Puritan ways (Rowlandson 333). This is vital information,
because without the American frontier hero s students or people would not be fully
aware or informed on how to
Dreams Essay examples
Dreams
Although the idea of dreams has always been a psychological one, there is a
philosophical side to them. Descartes once said, For all I know, I might be dreaming
(Bruder/Moore, Philosophy, 81). This conjecture of Descatres was one that
explained the concept of dreams. He asked the question, How do we know that we
are not dreaming and our whole life is but a dream? There can never be an answer to
this question but it proves that there is a philosophical view of dreams. A dream is
a form of mental activity that occurs during sleep. Dreams reveal our inner most
secrets and even allow us to emerge our hidden selves. Because they unleash some of
our most intimate experiences, every dream is unique. Most dreams are in ... Show
more content on Helpwriting.net ...
Essayist, humanist, and skeptic Michel Montaigne wrote I believe it to be true that
dreams are the true interpreters of our inclinations; but there is art required to sort
and understand them (Gardner, Skeptical, 10). One idea of what dreams are, can be
found from the Indian philosophy. A realist claims that objects that experience
presents as existing externally do in fact exist internally. The denial of externality
appeals both to those who doubt that experience is identical with existing objects,
and those who think that experience is there only if objects are not external. Dream
are a great appeal to those philosophers who deny externality. Objects appear as
distinct from the cognition of them. They do not appear as if they were in the
subjects cognition alone, since to dream of an object is to dream of an object located
in space. Both the Cartesian skeptic and the Berkeleyan idealist use dreams to
challenge externality. The idealist accepts the doubt that dream cast upon externality
but idea not accept the implication of the non verdicality of cognition. The
disagreement about the consequence of denying externality was recognized by Kant.
He distinguished between the Cartesian problematic idealism and Berkeleyan
dogmatic idealism. But there were two famous philosophers that have differing views
on the way that dreams are used. Buddhist Vasubandhu and Advaitin Sankara are the
two men that wrote about the ideas of dream and
Structure Of The Atomic Structure
TASK 1: Describe the structure (including the atomic structure) associated with
1.Metal
2.Polymer Elastomer
3.Ceramic
4.Composite Carbon Fibre
5.Smart Material
пѓ METAL: Metals are chemical components with general characteristics and
similar Physical and Chemical Properties underneath traditional conditions. The study
of metals is named science. Not all of the metals have the properties and
characteristics below. Several components is also classified as metals consistent with
one set of properties and as non metals consistent with another
Metals are large structures of atoms command along by bronze bonds. Giant implies
that giant however variable numbers of atoms are concerned counting on the scale of
the little bit of metal. The structures of pure metals square measure straight Forward
to explain as a result of the atoms that type these metals may be thought of as
identical good spheres. Constant may be aforesaid regarding the structure of the
rare gases (He, Ne, Ar, so on) at terribly low temperatures. These substances all
crystallize in one in all four basic structures: straightforward cube like (SC), body
cantered cube like (BCC), polygon closest packed (HCP), and cube like closest
packed (CCP).
Most metals are shut packed that s, they match as several atoms as potential into the
out there volume. Every atom within the structure has twelve touching neighbours.
Such a metal is delineated as 12 co ordinated.
Each atom has half dozen different atoms
The Diary Of A Young Girl By Anne Frank
Humans don t realize how much they appreciate something until they lose it. This is
especially true when it comes to freedom. In the novel, Anne Frank: The Diary of a
Young Girl, the main character, Anne Frank, and her family were prosecuted for
being Jews during World War 2. Along with two other families, to save their lives,
they took refuge in entering the Secret Annex to escape the barbaric prosecution by
the Nazis. However, they paid a heavy price by sacrificing their freedoms. Their
yearning for freedom affected their decisions and choices made in hiding. The
emotional events and experiences illustrated in the novel highlight the human needfor
freedom and how it impacted their lives of those in the Annex. The writing reveals
Anne Frankwas greatly affected by the loss of freedom, and her need for freedom
was evident. Anne was a normal teen; she had a mood swings, her arguments with
her parents, her crushes, and most importantly, she had friends. Upon entering the
Secret Annex, Anne was discouraged from communicating with her closest friends
for fear of being caught by the Nazis. She lost the freedom to share about her
feelings to the friends. Anne had to find other ways to discuss her feelings and
found company with a boy named Peter. In the novel, it states, How Margot and I
have only recently gotten to know each other and yet still tell each other very little,
since we re always together. [Peter and I] talked about every imaginable thing, about
trust,
The Incorporation of Aviaton Assets to Help Support
Ground...
Over the course of history, the battlefield has changed with technology. The
incorporation of aviation assets to help support ground operations has created many
benefits. Close air support for joint operations provides over watch and security with
great firepower and precision. Another great benefit is the ability for medical
evacuation, support, and resupply. The combination of air assets with ground forces
aids in battlefield momentum and domination over the enemy when performed
without hesitation. An example of air and ground forces complimenting each other
would start in the planning phase with intended joint use participants. Next would be
the employment of an insertion team days before an operation. This team would
collect human intelligence by over watching possible targets in the area, routines
identified, and gathering information from locals. All information would be
forwarded to high headquarters and used for planning future operations. The ground
team is tasked with the important mission of maintaining eyes on the objective as
well as security with local support by fire as needed when the mission dictates.
While the team is in place, ground assets would push out and start to establish traffic
control points. The incorporation of presence patrols just outside the area to restrict
the flow of traffic and potential for possible targets to leave the area of interest.
Utilization of biometrics would also be incorporated to ensure that other unknown
Merchant Of Venice Character Analysis
Portia in The Merchant Of Venice, has been considered as one of the most perfectly
developed female protagonist. The heiress of Belmont represents the nexus of the
play, as the quest for her hand creates a motive for Bassanio to borrow money which
initiated the bond plot and the ring plot. Furthermore she manipulates the trial and
resolves the bond episode and the ring episode. Portiais introduced in the play as
being a wealthy heiress whom many suitors try to court. Her significance and
characteristic in the play can be seen in her genuine love, her graciousness and her
witty yet playful traits. She further represents the comparison between Belmont and
Venice, herself and shylockand most importantly, love and self interest, one of the
key themes in the play. Critics liked to compare Portia with Shylock and the
comparison brings out the salient traits of her character. One of them stated that while
Portia stand for everything bright, generous, and noble while Shylock represents
wickedness and evil .
The language used in the play suggests that money is a source of power and desire.
The penniless Bassanio feels inferior to Portia who is intelligent, noble and
refined. Portia s speech, unlike a woman in the Elizabethan era, seems to be
heavily loaded with financial expressions. Her language reveals how comfortable
she is in the masculine, world and her unwillingness to leave it. Her speech also
demonstrates her intelligence and eloquence and seems to mock the existing social
norms. Indeed Portia has shown to be far from obedient to patriarchy. Portia s
father had left a clause in his will that the suitor will pick the correct casket to in
order to marry her. Although she couldn t break the clause, her intelligence serves
her well in her pursuits of Bassanio as she manipulates the test for her own purpose.
It reveals the casket choosing event itself was a gimmick and rather Portia was
controlling the entire situation according to her will and treating her suitors as mere
puppets. On the other hand, while men around the world are vying for her attention,
she is apparently considers herself as superior and better position to judge men s
masculinity. However her intolerance and hypocrisy is suggestive
In-Service Case Study
Dr. Shapiro,
Your role in the In Service will be more discussion oriented. The itinerary I have for
the In Service will feature 8 different activities (mostly video based) that help other
student advisors and ProStaff members familiarize themselves with different
concepts of diversity and intersectionality such how white people discuss race,
racism within the gay community, male body image issues, etc (I can send you the
itinerary I have, if you want). Then you and various other members apart of the
Truman community who apart of the panel will share their knowledge and
experience about concepts of diversity, factors they related to or wanted to expand on
that were featured in the videos or their own personal experience with how they
balance intersectionality of their identities. The whole In Service should last about an
hour to an hour and a half, depending on the audience response (which will other
student advisors and ProStaff of Residence Life) with the material. If you have any
more questions/concerns. Please let me know. Thank you.
Sincerely,
Mac
On Mon, Aug 29, 2016 at 3:33 PM, Shapiro, Paul wrote:
Ms. Smith,
I might be able to participate. But first a few questions.
Are you ... Show more content on Helpwriting.net ...
I am a current senior communication major and psychology minor, currently
working as a student advisor in Dobson Hall. I sent you this e mail inquiring if you
would be willing to be a part of an In Service I am planning for Residence s Life on
Thursday, September 15th at 5 p.m (Location: TBA) that focuses on inclusion and
diversity training. This In Service will specifically emphasize the concept know as
intersectionality. If you would be willing, I would ask you to share your variable
knowledge about social issues and concepts of power due to your educational
background with sociology. If you have any questions/concerns about the In Service,
please feel free to let me know. Thank you so much for your
Three Times The Trouble In Macbeth
Three Times the Trouble In Macbeth by William Shakespeare, the number three is
used numerous amounts of times. In the 17th century, when Shakespeare wrote
Macbeth, there was a lot of superstitious beliefs about the number three. The number
three is believed to be an unlucky number . That s exactly the case in Macbeth, events
following objects associated with the number three are just simply unlucky. The
readers of Macbeth will find out that objects associated with the number three, such
as: three witches, three murders, and three ghostly apparitions eventually cause the
downfall of Macbeth. The three witches appear to Macbeth in act one, bringing
prophecies to him. They exclaim, Fair is foul, and foul is fair. Hover through the fog
and... Show more content on Helpwriting.net ...
Those of which were Duncan, Banquo, and Lady Macduff. Those three murders
are what merely caused the downfall of Macbeth. Why is it necessary for there to
be three of them? This all goes back to the metaphysical beliefs of the time period
in which Shakespeare was writing Macbeth. As a consequence of Duncan s
murder it causes Macbeth to have a guilty conscience. He claims that he has
murdered sleep. In Act 2, Scene 2, right after the murder of King Duncan he cries,
Sleep no more! Macbeth does murder sleep (Shakespeare 330). Banquo s death
caused great disturbance among Macbeth. One of the murders told Macbeth My
lord, his throat is cut; that I did for him (Shakespeare 350). While at a banquet the
ghost of Banquo appears and causes Macbeth to be quite demented. His ghost
represents the guilt that is felt after the murder of Banquo. After the order to kill
Lady Macduff a huge red target is now on Macbeth. This just goes to show how evil
that he has become. The unsteadiness doesn t stop
Decentralization Reforms Of Pakistan During Ayub Khan
Period
DECENTRALIZATION REFORMS IN PAKISTAN DURING AYUB KHAN
PERIOD
Pakistan inherited a feudal based political framework during those center of the
governmental issues. The Most exceedingly bad and only it might have been
uncovered before long following those destruction of the Quiad e Azam muhammad
ali jinnah. The investigation of decentralization uncovers the interior Shortcomings of
the political framework Furthermore it Additionally uncovers that now and again in
the political history about pakistan those political clashes and rifts expanded will
such levels that those entirety Dependability of the framework might have been set to
risk. It is accurate that the extent of the issues in every last one of measurements e. G.
Political, budgetary Furthermore social and so on might have been colossal and the
emergency of the heading settled on it Most exceedingly bad. In any case absence of
political investment and the doubt of the individuals for pakistan in the punctual time
of the national political historical backdrop is a central point which guided those
musings of the primary tyrant with feel the pulse of the kin i. e. Should include them
done political settings of the particular nation. Idea of decentralization gets its
backing starting with the political performance by those government officials in the
early days following those demise for Quiad e Azam muhammad ali jinnah.
Turbulence from claiming political history confused those national targets Also
pretentious each
The Chair Of Reniseneb
On display in The Metropolitan Museum is the Chair of Reniseneb, which was
constructed in 1450 B.C. in Egypt during the New Kingdom period. The Chair of
Reniseneb is a wooden chair veneered with ebony, a heavy dark brown timber, and
ivory, a hard creamy white substance. The chair is made up of small pieces of wood
that is pieced together almost like a puzzle. Egyptian trees did not grow big or
thick, therefore big panels of wood needed to be imported which was very
expensive. Thus the Egyptian carpenters became really adapt in inlaid work made
from small pieces of variously colored wood or other materials. In Ancient Eygypt,
the higher ranked an individual was, the taller was the chair or furniture he sat on.
The Chair of Reniseneb belonged to the scribe Renyseneb, therefor the chair sits
higher on beaded blocks. The legs of the furniture were often carved in the form of
animal legs or the hind parts of some animal such as the lion. Therefore, the foot of
the Chair of Reniseneb is shaped as an animal paw and the legs of the chair are
shaped similar to an animals leg. Both the legs and the feet are veneered with
ebony, a heavy dark brown color. The Egyptians enjoyed having cushions which
were often were stuffed with dried leaves or goose down, creating a plush seat.
Therefore, the seat of the chair was restored to have a woven seat... Show more
content on Helpwriting.net ...
Furthermore, even with the disadvantage of their lack of trees, the Egyptians found
a way around it to instead piecing together small pieces of wood. It goes to show
that while most other parts of the world were still in the Stone Age, the Egyptians
were way ahead of their time creating furnitures, building palaces, and writing on
papyrus. The Egyptians were great artists of their time and their furniture remains as
one of the few things that is left and that can be appreciated and
Pure And Simple Dolly Parton Analysis
Journalists from across the United States gathered together July 5 via conference
call to interview Dolly Parton about her new album Pure and Simple and her
international tour, also titled Pure and Simple, which will be coming to the
UCCU Center in Orem July 26. Over 30 journalists who work for newspapers,
magazines, and websites such as The New York Times, The Guardian, St. Louis
Post, The Windsor Era, The Daily Herald and the UVU Review, assembled to have
the opportunity to each ask Parton one question of their own choosing. The majority
of questions asked were about her music and her sold out Pure and Simple tour,
which will be coming to over 60 cities in the United States and Canada. In addition to
her recent tour, Parton is releasing her 43rd studio album Pure and Simple which
contains 12 songs that Parton wrote and produced herself. When asked about what
this particular album, Parton explained that the title of the album is the essence of
each song.... Show more content on Helpwriting.net ...
Her hope for the new album is that people can find a song that they like and
connect with. Along with that, Parton hopes that her tour, Pure and Simple, will be
relatable. A journalist from the St. Louis post asked Parton if she tries to
incorporate new songs, stories or other things into each stop along her tour. Parton
stated that because she has performed countless shows and that this is her first tour
in over 20 years, she does have new things that she wants to introduce into
performances. Parton loves to enjoy each concert and to do this, she tries to add new
moments in every time. Parton laughed as she admitted that she likes to crack jokes
and make the audience laugh to keep them entertained. She also likes to include
stories and gospel
Reasons for the failure of 1848- 1849 revolutions in...
The revolutionaries in Italy had longstanding grievances, some were nationalists and
some were liberals. Despite all having different ideas and aims they all resoundingly
agreed that Italy needed change. The hopes of the various revolutionary groups had
been raised by the election of Pope Pius and Charles Albert the King of Piedmont
Sardinia. However, their hopes and resulting revolutions were crushed due to many
concerning factors. A crushing factor of the failure of the revolutions was the
trouncing of the Piedmontese army at both the battles of Novara and Custoza. These
defeats were resounding as the Piedmontese army had no chance against the might of
the super power that was the Austrian army. The Piedmontese army met the forces of
... Show more content on Helpwriting.net ...
Radetsky s army was not just huge but well led, organised and well equipped. Under
such authoritative and commanding leadership the Piedmontese army was soon
defeated. Radetsky s army in addition also crushed the revolts in Venice and Tuscany
(who had declared themselves as republics) and who had previously resisted Austrian
siege warfare until February 1849. However, it was not just the power of Austria and
it s army which contributed to the failures of the revolutions, but the revolutionaries
also contributed to their own downfall. Despite wanting change in Italy, there were
numerous divisions between the revolutionaries such as the liberals and nationalists
having different aims and incompetence in the face of Austria. Such divisions not
only affected morale but had physical impacts such as in the battle of Custoza where
the Papal States and Naples withdrew their troops in favour of their own interests.
Furthermore, the divisions between the revolutionaries were accentuated when the
Roman Republic was declared in favour of the Pope being the leader of the Papal
States. The previous Pope, Pius IX had fled to Naples after not being able to declare
war on a fellow Catholic state and continued to work with a constitutional government
until his flight from Rome. The republic was led by Mazzini who took care of all
political issues and provided inspiration whilst Garibaldi was in charge of
How Does Vitamin D Improves The Plyometric Performance
Research Question: Does Vitamin D improves the plyometric performance in young
basketball athletes?
Part 1
A fat soluble vitamin D is an essential vitamin which works as precursor steroid in
biological and metabolic processes happening in human body (1). Deficiency of
Vitamin D has shown a verity of adverse psychological, skeletal and muscular health
issues (2). Vitamin D deficiency rate has been increased remarkably from year 1994
to 2004. There are many factors responsible for this like sun avoidance sunblock use
which are mostly evident in athletes, and other factors like increase in obesity rates
which causes sequestration of vitamin D (3). Deficiency of Vitamin D is linked with
many musculoskeletal systems related health issues. ... Show more content on
Helpwriting.net ...
They came to conclusion that there is a significant co relationship between VO2max
and 25(OH)D (9). Vitamin D has also exigent effect on immune system, and
inflammatory modulation, and it is also essential for optimal muscle function, glucose
metabolism, cardiovascular health and skeletal muscle performance (10).
Part 3
Research has supported that maintained level of 25(OH)D in the range of 75 100
nmol/L and along with other essential nutrients intake in proper amount like vitamin
K is a key step for recovery as well as performance (11). Supplemental vitamin D can
improve recovery of force production following intense activities and can also hinder
the increasing biomarker which causes muscle damage (12). After intense exercise,
recovery in a peak isometric force can be enhanced by vitamin D supplementation.
The increased recovery in this isometric peak force provides information that vitamin
D is an essential modulating mechanism of weakness of muscle (12). All these studies
prove an interesting theme that vitamin D have potential effect on human metabolism
and biological process which can enhance multiple physiological benefits. Therefore,
the purpose of present study was to test the hypothesis that does Vitamin D improve
plyometric performance in young basketball athletes.
1.Dahlquist, D.T., Dieter, B.P., Koehle, M.S. (2015). Plausible ergogenic effects of
vitamin D on athletic performance and recovery. Journal of the International Society
of Sports Nutrition,
Effective Use Of Dramatic Irony In Shakespeare s Hamlet
In his tragic play, Hamlet, William Shakespeare staunchly demonstrates how one s
vehemence in a deathly scheme may lead to his/her own demise. Shakespeare uses
tragedy to convey the madness that Hamlet progressively develops from his uncle s
betrayal, dramatic irony to emphasize the corruption of King Claudius, and religious
allusion to allow for better understanding of the betrayal between King Claudius and
his brother.
The main conflict of the play stems from King Claudius betrayal of his own brother.
When Hamlet discovers that King Claudius killed his father, Hamlet makes it his
priority to avenge for the death of the former king. The chain of events that unfold
after Hamlet s discovery expresses the tragedy that Shakespeare utilizes. ... Show
more content on Helpwriting.net ...
One of these stories is the one about the two brothers, Cain and Abel. Cain was
envious of God s favoring of Abel, so Cain murdered his own brother. The murder
of King Hamlet, carried out by King Claudius, is an allusion to the story of Cain
and Abel. Claudius is envious of King Hamlet s power. As a result, Claudius kills
King Hamlet in order to reach his potential. This is revealed by the ghost of King
Hamlet in Act 1, Scene 5: Now, Hamlet, hear: Tis given out that, sleeping in my
orchard, A serpent stung me. So the whole ear of Denmark Is by a forgГ©d
process of my death Rankly abused. But know, thou noble youth, The serpent that
did sting thy father s life Now wears his crown (Shakespeare 111). Shakespeare s
use of allusion to the story of Cain and Abel allows for better comparison of one
betrayal to another, which emphasizes the importance of the
What Is Racial Fetishism
From as early as the 1760 s, prostitution has been referred to by different names.
French philosophers used the word fetichisme, which loosely translated to mean
primitive religion. Later, according to Anne McClintock, Marx, in 1887, used the
term commodity fetish which was believed to mean primitive magic to express the
idea of an economic side to the fetish, thus claiming it to be an industry. McClintock
goes on to explain that Freud evolved fetishismin to sexuality and finally into what is
known as erotic perversions. Later, religion combined the term sexuality and money,
therefore removing the primitive idea, making prostitutiona racial and sexual
degeneration (McClintock, 1992). It is believed by certain scholars, however,... Show
more content on Helpwriting.net ...
For instance, according to Lucas, Mexican women were placed in to two sub
groups: Spanish, would be referencing a good woman while Mexican would be
referencing a bad woman and more likely to engage in prostitution. The same was
true of other races like the Chinese who were considered depraved, and the Irish
who were considered animalistic with a love for vicious excitement . Black, Native
American and Mexican women were considered uncivilized and openly available to
white men regardless of their personal preferences. This assumption was common
among high ranking public officials, law enforcement as well as the civilian male.
Being caught with a prostitute who happens to be a woman of color, was considered
more the fault of the prostitute than on the man she was servicing (Lucas,
Islam Through Western Eyes Analysis
This type of primary source is a written document by Jonathan Lyons in which he
describes Islam through western eyes. In Islam Through Western Eyes, Jonathan
Lyons unloads Western propensities for contemplating Islam, directing a watchful
examination of the West s great totalizing story crosswise over one thousand years of
history. He watches the talk s destructive consequences for the sociologies, including
human science, legislative issues, theory, religious philosophy, worldwide relations,
security studies, and human rights grant. He takes after its influence on research,
speeches, political system, and government approach, keeping the West from reacting
viably to its most noteworthy twenty first century challenges: the ascent of Islamic
power, the rise of religious savagery, and the growing pressure between built up social
qualities and multicultural rights among Muslimforeigner populaces.... Show more
content on Helpwriting.net ...
Thoughts, dialects, subjects, issues crossing disciplines that all things considered, we
tend to see as partitioned. An uncommonly fertile, social condition which created any
semblance of Maimonides, an awesome Jewish medieval mastermind who in
numerous regards is a Muslim, an Islamic scholar. Classifications for example, the
law that Maimonides expounds on is basically not justifiable unless you comprehend
Islamic law. In this way, it s likewise a flawlessly outlined book. Along these lines, I
believe it s an exceptionally complex inquiry and I won t attempt to answer it enough.
In any case, I will state that the circumstance varies drastically starting with one
setting then onto the
An Understanding Of God And A New World Of Faith
Faith, a word that has a different meaning to every individual that walks this Earth,
cannot be so easily defined. Faith, when talking about it in the religious sense, makes
it even that much harder to understand. Everyone believes in something, and each of
those beliefs have an enormous effect on how they live their lives. Gerald O Collins,
a Jesuit Priest, states that within the Christian faith, lies two components: Fides Quae
and Fides Qua. Fides Quae is the faith which is believed, or the content of that faith.
Fides Qua is the individuals own personal commitment to God. Throughout this paper
I will demonstrate faith using The Compendium, and A New World of Faith to show
how a good understanding of faith can reveal the truth from... Show more content on
Helpwriting.net ...
This statement simplified would essentially mean that in order to have faith you must
be able to trust in God, even though we
2
cannot physically be in his presence on Earth. To elaborate, a faithful follower of
christ must first have knowledge of the religion, agree to the terms, and then trust in
that faith. Faith requires an individual to not only trust in God himself, but to also
firmly believe the scriptures and teachings from within the Bible as well. Both this
knowledge and trust is very crucial to the understanding and involvement with the
Catholic faith. So many people simply agree with the teachings of the Bible, but
do not fully trust in its meaning. For example, every Catholic understands that
Jesus was nailed to the cross and died for our salvation, but they don t believe that
in the harder times in life, that Jesus will come through on this promise for us.
Being humble and opening oneself up to this idea of a loving faith relationship
with God is what truly defines the term above all else. A good example of this
concept from scripture would be from (John 3:16) For God so loved the world that
he gave his one and only Son, that whoever believes in him shall not perish but
have eternal life. This type of knowledge trust relationship we have with God is a
type of rational faith, or fides et ratio. We must have strongly backed reasoning for
what we
Act 4 Scene 1 in Much Ado About Nothing by William...
Act 4 Scene 1 in Much Ado About Nothing by William Shakespeare
The play is a comedy, which centres on two couples and their love affairs, although
there are other subplots, which involve disguise and trickery. The scene itself
focuses on the wedding of Claudio and Hero during which Claudio strongly rejects
Hero. It is a dramatic scene where the tension of the audience is most raised during
the play. This is due to the characters theatrical behaviorand language. It also opens
new doors for other relationships to evolve such as Beatrice and Benedick, who
overcome their hatred for each other and fall in love. In some ways this scene has its
advantages and disadvantages. If this scene had not happened ... Show more content
on Helpwriting.net ...
Leonato s excuse for being too busy to listen because of the wedding is known as
dramatic irony because something this important should make Leonato listen.
Because of Leonato not wanting to listen to Dogberry, the audience are given the
expectation that the wedding may not be a perfect affair.
The part of the scene where Hero is rejected is very powerful. In many productions
of this play the character of Claudio is made violent, this also happens in the
production by Kenneth Brag , which we studied. Such ways as pushing Hero and
shouting at her with abusive language of that time make Claudio s behavior
vicious and shocking. Claudio rejects Hero in a very dreadful approach using
various techniques of behaviour and body language. His behavior is strong and
alarming, he shuffles her on her arms, almost shaking her and pushes her onto the
ground in a disgusted manner. As well as his shocking behavior, Claudio also uses
abusive language to bring out his feelings. Such examples of language that he uses
are a rotten orange , that she is a bad thing, that she looks virtuous on the outside, but
not on the inside. Another example of language that he uses is approved wanton , in
those days known as a proven whore that she is not worth a lot, in fact very little.
Throughout Claudio s behaviour he uses the
The Program For Homeless Veterans
In January 2014, approximately 49,933 American veterans were homeless on a given
night. This number represents approximately 11% of the entire homeless adult
population in the United States. Of those homeless veterans, 64% were reported to be
sleeping in an emergency shelter or transitional housing and 36% were living on the
streets or other places not meant for human habitation. Today, the federal government
has many programs targeted to end veteran s homelessness; however, the Department
of Veterans Affairs (VA) currently has only one program offering a permanent
supportive housing solution for homeless veterans the U.S. Department of Housing
and Urban Development (HUD) and Department of Veterans Affairs (VA)
Supportive Housing program (HUD VASH). With this program HUD provides
eligible homeless veterans with a Section 8 Housing Choice Voucher (HCV), while
the VA provides clinical case management and supportive services through its health
care system. The purpose of this evaluation synthesis is to assess the HUD VASH
program s effectiveness in targeting limited resources to the needs of homeless
veterans today, as well as to provide specific policy recommendations so as to
improve the overall taxpayer value of this program.
Background
Homelessness has always been a social problem in the United States; however, it
only began to take precedence as an important policy problem to be solved by our
nation s lawmakers in the 1970s and 1980s. Homeless veterans initially
Research Paper On Neverland
Neverland is the land of childhood, immortality, and escapism. Neverland is the
sanctuary for who we are. The place we can escape to in our own minds. Neverland
is that place that holds all our childhood memories and fantasies. Peter Pan, the
gatekeeper, keeping all evil from entering the home of Neverland. Lost Boys home of
No Adults Allowed. Once you enter Neverland, you can never leave.
It was Mitch s last year of school. He was a senior in highschool. The bell rang at
the end of the last day of school and he walked out to his car with his two best
friends Jake and Riley. As he slammed the door to his car his tinkerbell car
ornament swung back and forth. We re going into college now Mitch, Get this
childish stuff out of here man Jake says as he tosses the tinkerbell to the back of the
car, Riley catching it. Oh c mon it s cute she says examining it. Mitch starts up the
car and they pull out of the parking lot, taking one last look at the school they had so
many memories at.
The sun didn t rise in Neverland, instead it was very cloudy and dark out. Everyone
in Neverland looked around panicked. Peter Pan met with Tinkerbell leaving the
house walking to town square. What s happening ... Show more content on
Helpwriting.net ...
He saw the Stitch his sister had fell out and was laying in the floor. As he was
about to take it to the rest of the boxes he hesitated, Looking at it. This was the last
piece of his childhood he had, and he couldn t bring himself to get rid of it. He
would give it to his sister when he saw her again as a gift, as she showed great
interest in it. He went back in his car and headed straight to Raleigh. He would ve
roomed with Jake but he got accepted at a college closer to home that he preferred.
Walking into his new dorm room carrying a large stack of boxes he tripped at the
entrance but someone caught the boxes before they fell. He was greeted with a hand
to help him up. The name s Pete, You must be
Norfolk State University Personal Statement
Out of all of the skin care products in the world, your bathroom cabinet needs to be
filled with products researched and designed by me. When I entered high school, I
discovered my passion for selecting lip sticks, lip glosses, lotions, perfumes, and
makeup foundations. You name it. After learning about the connections between the
information in my chemistryclass and these items, a light bulb went off! I maintained
an A average in chemistry throughout the whole year! Additionally, in 2014, I
became a student in the Academy of Engineering and Technology, which also
heightened my interests in chemistry. In a science fair at that academy, there was a
chemistry course where we made colorful slime, and during that process, I learned
that I get an adrenaline rush when I am mixing different chemicals together to see
what the outcome is. Majoring in chemistry at Norfolk State University will
definitely prepare me for a very successful future in chemistry! My ultimate goal is to
conduct research and development for chemical cosmetics. I plan to obtain
employment at the greatest companies in the world such as L OrГ©al and Avon.
I am thoroughly excited to possess the opportunity to go to my top school of choice,
Norfolk State University! They make sure that they thoroughly prepare ... Show more
content on Helpwriting.net ...
Being able to attend this university, knowing that I am surrounded by other future
chemists would mean a lot to me. Norfolk State has a legacy of African Americans
excelling academically, starting professional careers after immediately graduation,
and simply, being successful. I would be honored, to continue the legacy of
African Americans striving for excellence in at Norfolk State University. Achieving
wonderful goals in all that I do has always been the top priority of my life. I will
always be dedicated to nothing but excellence, and I am more than ready to share my
ideas of chemistry with Norfolk State University. Go
A brief overview of the Harley-Davidson’s video is
that...
A brief overview of the Harley Davidson s video is that Harley Davidson, a brand
with tremendous staying power. Their motorcycles have become part of an
Americana. Truly, proprietors have a special bond with their motorcycle and a
passionate relationship that has blossomed into a world largest company s sponsor
owners club. In addition, the motorcyclegives you a pleasant feeling of freedom while
on the road. Several people feel a boldness after getting on their Hog. In 1903 Harley
Davidsons motor company was founded in Milwaukee, Wisconsin by three
Davidson brothers and a friend, Bill Harley. They had an idea in a shed to create a
better bike, and they put an engine on a bicycle and Harley Davidson was born. In
1911 they built their... Show more content on Helpwriting.net ...
Harley Davidson has remained true to their brand and understands that they cannot be
everything to everybody. In addition, the company have a brand that can work
efficiently worldwide, and the brand is alike no matter where you are in the world. As
a result, marketing the brand internationally has changed drastically over the years,
and execution of communication of the brand may vary since each country represents
the brand differently. The organization s marque is protected without adding a
dictatorship.
Moreover, the key to success in future is knowing who you are and sticking to it,
understanding the customers bases, looking for market opportunities, and applying
you brand properly. Harley Davidson offers attributes, such as clothing, shoes, and
caps etc. for the shoppers who want to associate themselves to the brand. Consistency
is the key for the business.
Lastly, the brand will remain the same for over l00 years, but what has changed is
various ways Harley Davidson can reach out and communicate with potential
customers. The brand has sustain itself showing an unlimited strength and resilient
while advertising is compelling. The best marketing vehicle they have is their
passion riders. When the customers are riding on the roads, they express joy and
pleasure of being a part of Harley Davidson s brand. The riders are the Harley
Davidson brand; they have grown into
Noox Vs Rimadyl Essay
Novox versus Rimadyl
Ostearthritis and operative procedures are the most common causes of pain among
dogs. Statistics show that one out of five adult dogs suffer from this debilitating
condition. Dog arthritis is brought by the deterioration of joints and cartilage
resulting to limping gait, difficulty in engaging in activities, and decreased
movements of the affected joint.
Hence, the Animal Health Care Industry has introduced in the late 90 s, the
medications to control the inflammation and pain in dogs. Aside from the
conventional measures you can apply to provide comfort to your pet, you can ask
your veterinarian to prescribe breakthrough pain medication. To ease pain from a
surgery, doctors give pain medicines prior to the surgery.
What is Rimadyl
Rimadyl for dogs is one of the leading painkillers manufactured for canines. It belongs
to the non steroidal anti inflammatory drug (NSAID) category for the treatment of
pain and inflammation due to surgery or arthritis of dogs. The drug is available in
chewable e and caplets form.
Taking Rimadyl with other NSAID and corticosteroids is not advisable due to
possible adverse reactions. In addition, dogs suffering from bleeding disorders,
inflammatory bowel disease, liver disease and gastrointestinal ulcers cannot take
Rimadyl due to ... Show more content on Helpwriting.net ...
Generic drugs undergo extensive research and clinical trials to prove that their
efficiency is comparable to other branded drugs. Drug authorities ensure that all
generics such as Novox for dogs has met all the criteria to match the quality of
other brands. Novox has the same mechanism of action and absorption rate of the
active ingredient, Carprofen. Many veterinarians prefer to prescribe Novox over
the leading brands because it is as potent, but at a reasonable price. Expensive cost of
medicine can hinder proper dog care. Morever, the drug has lesser side
Essay about Edna St. Vincent Millay
Edna St. Vincent Millay
Her career that spanned three decades and her work that ranges from lyrics to
verse play and political commentary. Edna St. Vincent Millay is mostly known for
her earlier works, such as Renascence , Few Figs Thistles, and Second April. Millay
wrote about things such as mystical views on the universe, god, death, celebration
of feminism, and free love. It s almost as if she was a writer from today and with
that, I believe that she would be comfortable with today s free America. Edna St.
Vincent Millay was born in Rockland, Maine on February 2, 1892. She was the first
daughter of three girls; her parents, Cora Buzzelle Millay and Henry Tolman Millay.
Millay s parents divorced in 1900 and her mother ... Show more content on
Helpwriting.net ...
At this time Millay and her sister Norma moved to Greenwich Village in New York
where Millay tried to make a living in acting(Millay par. 5). In the Village, Millay
found a new side of herself and was for women s rights and free love, which made
living life to the absolute fullest. James Gray writes, For two decades of her ever
rising popularity the twenties and thirties of the century she seemed to personify
the spirit of time: it s exuberance, it s defiance of conversation, it s determination to
discover and to declare a sharply defined identity (Gray;Press 5). It s was also often
pointed out Millay s numerous love affairs as well as the all night parties and their
customary drinking. She soon found out that this was not the easy life, for
financially she, again was not doing well. Millay would find in today s America
the people do experiment, not everyone, but sometimes that s the only way to find
themselves. In Millay s case, these experiences helped her write some of her best
poems and plays, because she wrote about reality. Also, it was rumored that Millay
had encounters with the same sex and was criticized for her experiments, if that to
be true; she would be pleased with today s America and how were fighting and
trying to get used to the fact of free love . Millay returned to writing and stuck with it.
She was a prolific writer with more than fifteen
The Case Of The Fbi Essay
Former Rep. George Miller (D CA) was absolutely floored by Trump s shameless
testimony. He said, In my 19 years here, I don t know that I ve heard more
irresponsible testimony... Miller was irritated that Trump suggested that he had
additional knowledge of the extent of organized crime beyond what the FBI, the
IRS, the Treasury, and others have suggested (during the same hearing). In addition,
Miller responded, You don t know this; you suspect this perhaps... Trump s
accusations were in complete opposition to all of the credible authorities at that
hearing. In fact, that same hearing featured written testimony from Jim Moody, the
FBI s former Chief of the organized crime section. The FBI does not see a
coordinated, concerted effort by organized crime families to raid the Indian gambling
industry, wrote Moody. As legalized gaming spreads throughout the United States, we
are seeing that those states with strong regulations and enforcement are not
experiencing an influx of organized crime activity.
Obviously, a cash heavy, multi billion dollar industry that is exempt from corporate
federal taxes, such as the Indian casino industry, certainly has great potential for
corruption. However, there aren t many documented cases of actual mafia
involvement. It s the kind of issue that makes for juicy rumors, but there isn t much
evidence to back it up. As time has passed, federal authorities have concluded that
there is very little mafia involvement with Indian gaming. For
Media Journal A Critical Analysis of The Daily Show with...
The Daily Show pronounces itself as a fake news program, and it pulls its comedy
and satire from current news reports, politicians, media companies, and often, features
of the show itself. The show usually begins with an extended monologue from host,
Jon Stewart, communicating new headlines and regularly includes discussions with
several correspondents, who assume ridiculous or amusingly overstated takes on
recent events against Stewart s straightforward character. The concluding segment
contains a celebrity interview, with guests varying from authors and political
figures to actors and musicians. Critics contend the show is a major source for news
for the 18 to 34 year old age group because of their satire and sharp witted lampoon of
... Show more content on Helpwriting.net ...
Newscasters current view of balance is to report both sides of an issue, despite the
consequences. Straightforward news has descended into a wacky belief that replaces
balance for accuracy and truth.
Virtually every matter can be described as a debate between two conflicting sides,
and the journalist is apprehensive of expressing that one side has it right, and the
other side does not. It leaves the audience in the position of having to consider
opposing factual assertions, often without enough info to properly choose that one
side is clearly right, and the other side is striving to create doubt with propaganda.
Interpretation
An interpretation of the show reflects that many viewers consider Stewart a
reputable, true journalist who provides a genuine take on current events. Many
watchers obtain their news and opinions from his show. Comparing the show s news
outline with that of the more conventional news media and investigating the listing of
guests and segments, then placing the program into some kind of media framework
shows the structures are quite similar. This leads to the audience giving credibility to
the show as an authentic source for news. There are questions raised on how Stewart
achieves this. What is Stewart accomplishing on his program, The Daily Show with
Jon Stewart, which may affect people to believe him as a trustworthy commentator?
How is the show comparable to, and unlike from, what people get from the
mainstream media? The
Kurt Rosenwinkel s Caipi, An Influential American
Guitarist
Influential American guitarist Kurt Rosenwinkel opted to radically change direction
in Caipi, a Brazilian jazz fusion record whose concept and compositions had been
worked on over the last ten years.
Accompanying the virtuoso guitarist, who also sings and plays bass, keyboards, and
percussion, are international artists of undeniable quality. The lineup includes the
saxophonist Mark Turner, multi instrumentalist Pedro Martins, and intermittent
appearances of violinist Frederika Krier, French horn player Chris Komer, baritone
guitarist Alex Kozmidi, drummer Andi Haberl, rock/bluesguitarist Eric Clapton, and
a quartet of vocalists.
A myriad of colorful confetti covers the tropical landscapes described by the title
track, where typical Brazilian rhythms fuse seamlessly with the straight ahead post
bop style that the guitarist has been plunging in. On top of the highly colored
acoustic voicings, the radiance of his effect drenched electric guitar sound is
completely identifiable with previous works, even if applied to a new context. ...
Show more content on Helpwriting.net ...
The former is inundated with synth vibes, acquiring an R B feel that takes us back
to the 80s. In turn, the latter is encircled by a Brazilian pop folk that combines many
influences, from Gilberto Gil to Hermeto Pascoal. Rosenwinkel mesmerizes every
time he expresses himself on the guitar.
Summer Song is a breezy, ear catching piece that features singable melodies over an
underground dream pop
Woodstock Essay
Woodstock
Woodstock Woodstock was a rock music festival that took place near Woodstock,
New York in a town called Bethel. The festival took place over three days, August
15, 16, and 17, 1969. The original plan for Woodstock was an outdoor rock festival,
three days of peace and music in the Catskill village of Woodstock. The festival
was expected to attract 50,000 to 100,000 people. It was estimated that an
unexpected 400,000 or more people attended. If it weren t for Woodstock, rock and
roll wouldn t be where it is today. Woodstock became a symbol of the 1960s
American counterculture and a milestone in the history of rock music. The original
plan for Woodstock had been to build a recording studio in the town of Woodstock
(Sandow, ... Show more content on Helpwriting.net ...
They knew that they were all on our way to the same place to enjoy three days of
peace and music. Had the festival lasted much longer, as many as one million
youths might have made the trip to Bethel. What started off as a promotion for a
music studio, ended up as one of the most significant political and sociological
events of the age. The main attraction of the festival was an all star cast of top rock
artists. Some of the greatest musicians of the 1960s performed, including singers
Janis Joplin, Ravi Shankar, Arlo Guthrie, and Joan Baez as well as the bands The
Stone; and Creedence Clearwater Revival (Sandow, 1). Singer Joe Cocker and guitar
player Carlos Santana, up to then unknown, became overnight stars. Some performers
who were scheduled to appear could not due to traffic problems. Jimi Hendrix ended
the event with a freeform solo guitar performance of The Star Spangled Banner.
The dictionary defines a hippie as one who doesn t conform to society s standards
and advocates a liberal attitude and lifestyle. Most of the people at Woodstock were
not hippies in the commonly accepted sense: a good half of them, at least, were high
school or college students from middle class homes ( The Big Woodstock, 33 ). But
at Woodstock they exhibited to the world many of the hippie values and life styles,
from psychedelic clothing to spontaneous, unashamed nudity to open and casual sex,
and also illicit drugs. Youthful imaginations were
Green Blazer Short Story
The story Green Blazer brings order with representation of the foundation with build
up the presentation and top of the story. The story has woven plot, the author has
woven together every components and character to build up a story. In the story there
is just a single peak zone, which demonstrates the falling and ascending of the
activities. We can see that the story starts with the outline of the foundation, which
incorporates the foundation of Raju, the place they are situated at, his family, his
general publicand not to overlook the foundation of the green overcoat. In story the
author demonstrates the way of life of towns, and the city circumstance. At the point
when the story builds up the stories turn out to be more confounded and the argument
emerges gradually. The author gradually shows the circumstance of the Raju, the
motivation behind why Raju pick the calling, it is providing in the between of the
presentation of story and the peak of the story. In this story the contention plot begins
from paragraph 2 until the section 8, where Raju first pickpockets the wallet from
the green blazer and again chooses to return it. The difficulty and conflict inside Raju
creates from here, when he comes to realize that the balloon in that purse the
motherless kid to remember green jacket. All through he likewise observe diverse
Turing point inside the story. At the point when Raju choose to give the wallet back,
the feeling he experiences when he came to realize that he didn t
Farewell To Arms War
Imagine a time that had no point, no further meaning to life beside sex and
alcohol.In A Farewell to Arms by Ernest Hemingway, the main character Lt Henry
is an ambulance driver for the Italian army. While he s in the war, he is blown up,
loses his love, and loses his child. Ernest Hemingway shows the reader that life is
nothing but a game. To begin, The Book Farewell to Arms shows that life is a game
through the war. The Italians are fighting the Austrians and the Italians are losing
and can t do anything about it. Lt. Henry asks the other soldiers, And the ones who
would not make war? Can they stop it? (71). This a good quote because there is no
point to this war because they don t know why they are fighting and can t do
anything to... Show more content on Helpwriting.net ...
There was a couple that s made up of Catherine Barkley and Frederic Henry who
started dating on the front of the war. Lt. Henry states I wish we had some place
we could go (31). Henry and Catherine were having sex in a slim alley way. Their
relationship started mostly about sex. Which its like a game of life cause it
started as henry wanted to have sex and he got it. Then there were Henry and
Rinaldi who were best friends on the front Rinaldi was a doctor on the front. Lt.
Henry said I m not drunk, Rinin, really (40).So, Lt. Henry and Rinaldi becoming
closer friends but it s does not matter because they will most likely never see one
another again.They are good friends but this shows that life is nothing more than a
game. There is one more friendly relationship, of Catherine Barkley and Helen
Ferguson. Ferguson is worried that Catherine and Lt. Henry wouldn t last even
know they have a baby on the way. But Catherine assured Ferguson that We ll be
married Fergy (248). There not going to have time to get married with Catherine
dying and all. Them not being able to get married but them being in love shows how
life is a game and the characters are being
Old Imperialism In Africa
Throughout history, Africa and the Middle East have been colonized by many
different countries around the world. Imperialism and colonialism have had great
impacts on the occupied country, economically, socially, and culturally.
Imperialism is a policy of growing a powerful country by extending its rule over
foreign, weaker countries, often to gain influence in that country s politics and
economy. Imperialism is often carried out to take advantage of resources in another
country. During the Age of Imperialism , there were two different eras: Old
Imperialism and New Imperialism. During the Old Imperialism Age, Europeans were
seeking routes to Asia, and started to colonize in the Americas, Africa, and Asia. From
the 1800s to the 1900s, it was ... Show more content on Helpwriting.net ...
There are themes of Africa s past versus its present, economic problems in the new
countries, corruption, and women s rights and roles in African society. African
literature has many characteristics, such as appropriating colonial languages,
colonial discourse, the history of Africa, decolonization struggles, and nationalism.
Some major authors are Buchi Emecheta, who wrote Second Class Citizen, Bessie
Head, who wrote A Question of Power, Ousmane SembГЁne, who wrote Xala,
Ngugi wa Thiong o, who wrote A Grain of Wheat, Nuruddin Farah, who wrote Maps,
and Wole Soyinka, who wrote A Play of
Early Childhood Development In The United States
The first part in the life cycle of a butterfly is the egg. The small egg is placed on a
leaf by the adult female butterfly. Like how the eggs genetics come from the adult
butterfly, our ethnicity and heritage can affect our culture. In the article What Is
Cultural Heritage? it states, Today, we find that heritage is not only manifested
through tangible forms such as artefacts, buildings or landscapes but also through
intangible forms. We get more than antiques from our ancestors we get our food,
genetics, values, stories, traditions, and possibly religion. Like the caterpillar is
placed on a leaf our heritage becomes the foundation of our culture. My ancestors
were mainly English, Swedish, and German. I our household we have traditions...
Show more content on Helpwriting.net ...
Like caterpillars, as kids we absorb everything our parents tell us. The values,
beliefs, and morals our parents teach us molds and sculpts our culture. in the
article The Impact of Culture on Early Childhood Development in the United
States by Damon Verial it states, The United States is a blending of many cultures
that feature many stable and different subcultures. Where a child grows up and
who her parents are will influence the cultural wisdom, or emphasis of certain
values and skills, that are passed to her. A lot of what my parents have taught me
culturally is through food. My father spent two years of his life in Switzer land
and the South of France. My father has introduced a lot of French culture into our
home. On Christmas Eve, we eat shrimp scampy rather than chicken or turkey,
which is most common in the United States. On Sunday morning when we were
little, our dad would make us omelets. For dinner, we have learned to like crepes,
raklet, and fondue. My mom grew up in Idaho. Every meal has some form of
potato and a side of salad; almost without fail. My parents raised us in the Church
of Jesus Christ of Latter day Saints. In our church, we have a set of guidelines
called the Word of Wisdom, which teaches us our bodies are sacred and we should
watch what we put in them. For example, we do not drink alcohol or addictive
beverages. My parents and their cultures have had momentous effects on my own
culture. This however is not restricted just by foods. In positions on contradicting
beliefs, I often find my views to mirror the ones of my parents. As I grow older I do
not personally know to what extent my parents influence my culture and if my views
will change or shift toward or away from what they are
The Battle Of Technology And Technology
The Battle of Technology Within the 21st century, technology has become very
advanced and even addictive for some individuals. With the rapid growth of
technology, there has been a debate on if we are overusing technology in our lives.
Some people see technology as a force that has escaped from human control while
others feel that technology is continually improving the quality of life. In the past,
mobile phones were only used as a means to communicate via phone call or text.
Today, they are more than just a mere communication device. They are now
considered to be an essential part of our everyday lives. Technology continues to
advance day by day, and at the same time people are continuing to rely more and more
on them. The negative effects of cellphone use are displayed through the reduction of
human interaction, instant gratification, and human health issues. There have been
significant advancements in the field of technology and science over the past several
decades, for example the mobile phone, which was introduced in the mid 1980 s.
Although, these developments offer many benefits, they bring upon many negative
side effects as well. Consequently, the most important side effect to visit upon is the
reduction of human interaction. We live in a world where communication through
modern technology is more or so required than optional, from school to work,
professor or boss, emailing, iMessaging, and social networking. Mobile phones are
changing the way the humans
Community s Reaction to the Fire in Yackandandah Forest
in...
Embers
Campion Descents play Embers examines the connection between individuals and the
community as they react to significant events. The communities residents reaction to
the fire in yackandandah forest, The story of the Blue Duck hotel ... and the
kangaroo and the story of danny and don ... and the horses. Campion uses a wide
range of techniques such as repetition, Irony, alliteration and Imagery
/onomatopoeia.This is also shown by quotes from Campion s interview by the abc on
the 2003 Victorian bushfires.
The connection of the community and individuals is shown by Campion in The
Communities residents reaction to the fire in yackandandah forest. Skinny,
Slippery Path (pg 41) is the use of alliteration by campion to show how dangerous
the experience of a bushfire real is and the things they would have to overcome to
be able to save themselves and others they cared about. Campion also uses
Repetition Burn me hands because it doesn t work, it doesn t work like it does in
the movies. (pg 41) this conveys that they done what they need/had to do to save
the animals that the cared dearly as her plan did not work according to her plan. An
additional example of this would be Then as that roar got closer you couldn t hear a
thing (pg 42) this is alliteration, of the word roar which show that the fire was very
loud and dangerous as it came closer to them in the mineshaft.This shows that no
matter how dangerous the situation got the community would do there best to keep
History Of The Masons
History of The Masons
This paper is about who the Masons are and how they began. I will explain what
exactly they do and how they have come to be now in society. This paper will also
explain why they formed as a group in the first place and some common
misconceptions of the group themselves.
The Masons, or Freemasonry as it is most often referred to, is one of the world s
first and oldest secular fraternal societies. It is also one of the largest (Roberts). In
the Middle Ages, the term freemason was awarded to highly skilled stonemasons
who were hired as free agents to build castles and cathedrals in England and
Scotland. Because of the inherent danger of their work, stonemasons formed local
organizations, called lodges, to take care of ... Show more content on Helpwriting.net
...
Along with religion Freemasonry is also non political, and the discussion of
politics at Masonic meetings is also forbidden. Another misconception is that to be
a Freemason is to be in secrecy of your affiliation with the fraternity, when in fact
the fraternity is not a secret society. Rich goes on to briefly say that membership in
Masonry is not a secret and that all members are free to acknowledge their
membership. There is no secret about any of Masonry s aims or principles (Rich).
Rich goes on saying that there is essentially only in one sense the statement of
secrecy true, for any social group or private business is indeed secret in the sense
that its business meetings may be open only to its members. Although Masonry s
constitutions and rules are available to the public, and meeting locations are clearly
identifiable, like many similar organizations, some of Masonry s internal affairs,
such as ceremonies, grips, and passwords, are regarded as private matters for members
A Closer Look On How Foreign Doctors Are Discriminated
A Closer Look on how Foreign Doctors are discriminated A lot of people are
bewildered why more foreign doctors are not invited to work in American
workplaces. There is a severe discrimination and prejudice amongst anyone who is
not an innate U.S. citizen. One of the main reasons why Americans are trying to
push foreigners away is for the safety of their nation. Some Americans think that all
foreigners are terrorists and are set out to destroy Americans but this is not true at
all. In fact, statistics show that foreigners actually bring good to the nation. Brian
Palmer, author of Slate magazine says, During the 1990s, a series of studies
showed that graduates of foreign medical colleges performed slightly worse on
exams than their U.S. trained colleagues, and program heads gave marginally better
reviews to domestic physicians. By the turn of the century, however, that gap had
disappeared. International graduates now score higher than U.S. educated doctors
on many exams (Palmer). This was shocking to know that even though foreign
doctors are doing better than domestic doctors, they are still mistreated.
Mistreatment of doctors not only spans out nationwide but hits close to home as
well. I know a person who had to endure this cruel experience. I truly care for her and
she inspires me to be a doctorlike she is. For the sake of anonymity and spilling
private personal information, I will call her Jane Doe and omit some details. A
couple weeks ago, I interviewed her on
Retake The Driving Test Persuasive Essay
Some people think that seniors should be required to retake the driving test because
they think that with age comes decreased vision, hearing, and reaction time. This is
certainly true to a certain extent because this occurs to different people at different
speeds. I think that once a person reaches about 75 they should have annual
appointments for vision and hearing tests, and if they don t do to well then they
should be required to retake the drivingtest. Once people reach a certain age their
health starts to degrade. It is more severe with some people than with others
because it can faster to some people and slower to others. This severely affects a
person s driving capabilities. You need to have keen vision to spot hazards on the
road.
Perpetua s Defiance Of The Young Christian Martyr
Throughout the life of the young Christian martyr, Vibia Perpetua, she was placed
under strict expectations based on her gender by the Roman society. Perpetua defied
the expectations placed upon her since birth by converting to Christianity, yet she
still showed ambivalence towards her role as a woman in the new community. This
essay will analyze Perpetua s defiance of the gender expectations of both the Roman
community and Christian church and the way Perpetua defined her own role as a
womanin conflicting societies. In Perpetua s time, the Roman culture had strict
views on gender and the role of a woman in society. Early Roman society families
had a patriarchal structure meaning the father was the head of the family. The
strongest tie within the family was that between a father and a daughter.
Daughters were expected to [forge] political and social ties for fathers (Salisbury
6). A Roman daughter was favored the most; they received the best education
overseen by their fathers. The purpose of a strong education was to pass on to their
sons the values of Rome as well as help her to be a good mother in the future
(Salisbury 7). A woman s purpose in the Roman culture was reproduction in order
to continue lineage. In addition to strict family and social rules, Roman women
joined cults with specific rituals for females to perform. A woman s role in Roman
society was defined by cults...to preserve social order (Salisbury 12). Women joined
a specific cult depending on the
Mental Health Status
Mental Health is based on emotional, psychological, and social well being. These
factors are based on social interactions, actions, and thoughts. There are various
factors that can influence an individual s mental health such as biological factors,
social exclusion, and inclusion, as well as societal pressures. However, someone s
mental healthcan be compromised when they encounter physical abuse, sexual abuse,
and depression. This can cause the individual to develop PTSD which generally
cultivates after facing a traumatic situation such as a near death experience.
Consequently, when proper care and resources aren t given to people in need they
are unable to function to the best of their ability. Though, PTSD can be largely
considered an issue... Show more content on Helpwriting.net ...
Since this is an issue amongst children who have grown up in homes of neglect,
programs for after schools should be integrated. Programs such as Big Brother/Big
Sister have been instituted to help students who are in risk of facing judicial issues
amongst other issues. However, there is challenges associated with creating these
programs because of funding. In order to get additional funding for programs such
as after schools they re needs to be enough money in the budget to pay the employer
s, pay for necessary equipment, and other expenses. Generally, single income
households and neglectful homes are usually lower income households; therefore,
the program would have to be free or at a reduced price which can also pose as an
issue.
The importance of help for people in juvenile detention halls is very important and
can be very dire. Programs and prevention programs need to be instituted for proper
care to be given so that help can be received and so when the rejoin society they can
be flourishing
Diversity And Learning Environment
Diversity was tragically scarce in my hometown. The unspoken common goal,
seemingly, was to be the exact same as all the other students with regard to clothes,
boots, and even designer lunch boxes. Many students acted, dressed, and even spoke
differently at home, meaning diversity in the students existed, but was not accepted.
Diversity carries little to no meaning without inclusivity. However, inclusivity brings
meaning to diversity by ensuring a positive and consequently productive learning
environment. I believe a diverse and inclusive learning environment is essential to a
productive work environment because diverse ideas bring innovation. Repetitive
contributions are hardly helpful when the information shared is neither new nor
different
Unit 8 C1 Term Paper
Question 3. Identify the constraints that are relevant to the system and its acquisition
(conduct activities C1.1.2, C1.1.3, and C1.1.4). Briefly describe the impact of each
constraint and how it would need to be taken into account throughout the design
process.
Assumptions
Operators, workers and maintainers are considered constraints(Ryan, 2016).
Logs will be provided for recording daily events; Safety (e.g. incident or near miss),
Daily Incident (e.g. delays, lost time, late personnel/machinery), Environmental,
Defect and medical.(Turner et al., 2007).
SPST will be paying for the facilities. The budget allows for this, although if project
cost problems occur, more funding will be requested from the Tasmania State
Government.
SPST Project Schedule allocates enough time for the project to reach completion, ...
Show more content on Helpwriting.net ...
They are supplement to business constraints in system development(Ryan, 2016).
They include:
Business environment (including economic availability and licensing whilst affecting
component availability and proposed design).
Conformance to laws and regulations (including frequency of operation, hazardous
materials, disposal/recycling regulations and airworthiness regulations).
Compliance with industry standards (including system engineering processes, design
procedures, emission frequency levels, building codes and materials).
Ethical considerations.
Requirement for interoperability, interfacing with systems operating environment
(including; capability, temperature, humidity, radiation and robustness).
Capability of competitors.
Human resources availability.
Specific skill sets.
Technologies and tools.
(Ryan, 2016)
Design
Investigating The Effect Of Ligand On The TFT Properties...
To investigate the effect of ligand on the TFT properties, we focused on the In2O3
NCs films cured at 150 В°C. Both the ligand molecules OA and BET were
conserved on the NCs surface in the TFT devices at a curing temperature of 150
В°C. The TGA curves confirmed no weight loss at 150 В°C (Figure. 4). Moreover,
the FTIR spectrum of the thin films cured at 150 В°C also supported the existence
of the ligand molecules OA and BET with high intensity peaks of the alkyl group
Csp3 H and carboxylate group COO (Figures 5(a) and 5(b)). Therefore, The Вµ
increased after the ligand exchange process because of the decrease ligand length
from OA (1.97 nm) to BET (0.48 nm). In the In2O3 NCs films cured at 150 В°C, the
NCs are separated by insulating ligand OA... Show more content on Helpwriting.net
...
Table 1. TFT characteristics of the In2O3 OA NCs and In2O3 BET NCs thin films
annealed at different temperatures.
The Вµ of In2O3 OA NC and In2O3 BET NC thin films increased by 2 4 orders of
magnitude with increasing annealing temperatures from 150 В°C to 350 В°C, at
which the OA or BET ligands decomposed as discussed in the TGA (Figure 4) and
FTIR results (Figures 5(a) and 5(b)). Specially, the highest mobility obtained in this
study are 4.1 cm2V 1s 1 for the In2O3 BET NC TFT annealed at 350 В°C. This can
be explained by thermal decomposition of the organic ligands OA or BET on the NC
surface, decreasing the d between the neighboring nanocrystals with increasing
annealing temperatures [15]. This was further supported by investigating the
crystalline domain sizes of the NCs from the XRD pattern of the thin films (in the
supplementary information). The crystalline domain sizes were not significantly
affected by the annealing temperature, indicating that the In2O3 NC thin films still
consisted of an assembly of the single crystalline NCs [15].
Temperature dependence of In2O3 NC TFT devices To know the charge transport
mechanism, the relationship between the mobility and temperature was investigated.
The temperature dependence of the mobility takes the general form
The Gas Ladies And Gentlemen
Both S. A Novel About the Balkans by Slavenka Drakulic and This Way for the
Gas, Ladies and Gentlemen by Tadeusz Borowski are novels that tell the tale of
those who were victims of some of the worst crimes ever committed in human history.
The main characters of each novel are subjected to terrible conditions but
nevertheless both defeat the odds and survive. Survivors of such events often struggle
to deal with their past. The authors of each noveldeal with this struggle in different
ways through the characters.
In her novel, Slavenka writes in a dynamic way about the women s rape camps
established Bosnia during the Bosnian War in the early 1990 s. The main character
of the book is a woman named S. who was a normal well respected school teacher. ...
Show more content on Helpwriting.net ...
face similarly deplorable conditions but they both still survive. This is only
because they take a number of measures to ensure that they survived. Borowski
saved food for himself even when he had enough that he could have spared. He did
not give food to those who he knew were going to die because he knew it would
just be a waste of food. Even though it may have not been the most kind way of
doing things the choices he made were ones that helped him to survive his time in
the camp. The only way that he survived was because others died. It is nearly
impossible for one to survive such conditions and to help others. The only way he
survived the camp was through an every man for himself mentality. After being
liberated from the camp Borowski struggled with this survivor s guilt. Even
though the novel is not an exact autobiography it is based on his life inside the
camps. Just six years after being released from the camp Borowski committed
suicide. Borowski opened a gas valve on July 1, 1951 (pg. 11) One can conclude
from this suicide that the events from the camp and his own survivor s guilt most
likely contributed to his tragic death. In a similar way S. used makeup to preserve
herself. S. began wearing makeup in the camp as a way to gain power. When she
was wearing makeup she almost had a power over the men that the other women did
not have. The other women could not understand why she was wearing makeup but
this was only because they did not that
Identical Twins And How The Epigenomes Can Be Affected
By...
I feel stress is something that can overtake a person when an event or problem
happens in their life that becomes difficult for them to handle. However according to
Soomo (2014. Chapter one) we learned about the epigenetics of identical twins and
how the epigenomes can become affected by environment, health and even stress.
These things do change the epigenomes they just trigger signals that turn the
epigenomes on and off, which in much later years of life can make identical twins
become quite different from each other. According to Soomo (2014. chapter two) we
learned about the sympathetic system and how if something alarms you like stress
your sympathetic system will increase your heart rate, high pressure, raise your
blood sugar (Soomo, 2014) Even prolong effect of stress can cause brain changes that
may lend to anxiety, depression, and even addiction (Harvard Health Publishing,
2011). It also works together with the parasympathetic nervous system when stress
lessens to create an opposite effect (Soomo,2014).
Stress can also play a part in our intelligence. According to Soomo, (2014 chapter
three) when someone who has high general intelligence has suffered from brain
damage due to a tumor, their emotional intelligence can diminish. In Neuroscientist
Antonio Damasio (1994) case of Elliott a successful businessman, he showed no
emotion and no response to others feeling after the brain damage which, lead to job
lost, bankruptcy, failed marriages, placed in the care of
Analysis Of The Book Zeitoun By Dave Eggers
I am currently a Junior at Mills High School and I m also enrolled in the AP
Language and Composition class. For our summer assignment, we were assigned to
read Zeitoun by Dave Eggers, which recounts the story of a Muslim American man
named Abdulrahman Zeitoun who remained in New Orleans during 2005 s deadly
Hurricane Katrina. While trapped in the city, Zeitoun paddles in his canoe in the
flooded streets aiding those who are in danger; however, Zeitoun is suddenly
arrested under accusations of being affiliated with an Al Qaeda Terrorist Cell.
Throughout the novel, Zeitoun is portrayed as a gentle and compassionate man who
puts his own life on the line to save others. Through Zeitoun s actions he defies the
harsh stereotypes that surround Muslim Americans following 9/11. While Zeitoun
certainly redefines the views of the reader on Muslim Americans and portrays a real
struggle for Muslims in our America today; would you still appreciate this story s
message and meaning if I informed you that the real Abdulrahman Zeitoun was a man
known for committing domestic violenceto his wife? Mr. Zeitoun has indeed abused
his wife and has been under trial several times and was convicted of domestic
violenceand later faced allegations of hiring attacks on his wife, Kathy. This
controversy divided my class into two distinct advocates: some of my classmates
support Zeitoun to be remain in the AP Language and Composition curriculum.
While others, including myself, agree that by reading,
Sense Of Horror In Macbeth
How does Shakespeare create a sense of horror?
Shakespeare creates a sense of horror when Macbeth realises that the dead will have
their revenge, in act 3 scene 4 but Shakespeare creates a sense of horror earlier on in
the play.
In Macbeth, blood is a re occurring image of horror, as well as symbolising murder
and guilt.
In Act 3 scene 4, Macbeth becomes aware of the dead having their revenge. This is
clear in the line it will have blood; they say, blood will have blood. Repetition of the
word blood creates a sense of horror as it shows Macbeth s state of mind. In other
words, all he can think of is murder and how it will lead to his own fate; it shows
paranoia.
Repetition the word blood also shows that Macbeth sees murder as his only option,
he first killed Duncan and then ordered the murderers to kill Banquo, the third blood
could symbolise Macbeth s own fate or it could symbolise Fleance having his
revenge against Macbeth.
In the following line stones have been known to move and trees to speak
Shakespeare uses personification to create a sense of horror. The phrase stones have
been known to move could symbolise the realisation that occurred after the deaths of
Duncan and Banquo. This creates a sense of horror as Macbeth s mind is corrupted
with his earlier murders, it could show Macbeth having no other choice but to commit
to murder to continue his reign of being king.
After this, Macbeth asks Lady Macbeth what is the night? with Lady Macbeth
responding

Writing A Descriptive Essay About A Place

  • 1.
    Writing A DescriptiveEssay About A Place Writing an essay on the topic of describing a place may initially seem like a straightforward task, but delving into the intricacies of creating a vivid and captivating description can present its own set of challenges. The difficulty lies not only in choosing the right words to convey the sensory details but also in maintaining a coherent structure that engages the reader. One of the challenges is finding a balance between providing enough information to paint a clear picture and avoiding overwhelming the reader with excessive details. Striking this balance requires a keen understanding of the significance of each detail and its contribution to the overall atmosphere. It's a delicate dance between specificity and brevity. Additionally, capturing the essence of a place goes beyond just describing its physical attributes. A successful descriptive essay should evoke emotions and create a connection between the reader and the place being depicted. This requires a thoughtful selection of adjectives, metaphors, and other literary devices to enhance the imagery and evoke a sensory experience for the reader. Organizing the essay poses another challenge. Deciding on the sequence of details and structuring the narrative in a way that builds a coherent and engaging story can be demanding. A well-organized essay should guide the reader through the described place seamlessly, creating a natural flow that enhances the overall reading experience. Furthermore, avoiding clichГ©s and employing original language is crucial to prevent the essay from becoming mundane. Finding fresh and unique ways to express common observations can elevate the quality of the writing, making it more memorable and impactful. In conclusion, while the task of writing a descriptive essay about a place may seem straightforward at first glance, the intricacies lie in balancing detail, emotion, and structure. It demands a thoughtful approach to language, a keen sense of storytelling, and an ability to engage the reader on a sensory level. If you find yourself struggling with such assignments, it's worth noting that similar essays and a variety of writing assistance can be easily obtained through services like HelpWriting.net. Professionals can provide support in crafting well-written and engaging essays on a wide range of topics, making the writing process more manageable for those seeking assistance. Writing A Descriptive Essay About A PlaceWriting A Descriptive Essay About A Place
  • 2.
    What Is TheImportance Of Multilingualism In Business Language is a very important feature of business as companies need to coordinate activities internally, communicate with each other and connect with customers and suppliers. The Importance of Multilingualism for Business according to Antonella Sorace, a Professor of Developmental Linguistics at the University of Edinburgh, are an improvement in decision making, negotiating, prioritising and taking the viewpoint of other people. In relation to decision making, the ability to make rational decisions is improved by the use and understanding of different languages and cultures as it prevents bias and emotional reactions to situations. In 1999, Joseph Nye, an American political scientist, stated that the most beneficial way of negotiating is persuading others through attraction, rather than coercion or payment . This statement suggests that by emotionally connecting with someone through an understanding of a language or the culture of a certain country, it enables the two bodies in the negotiation to build trust between them. Furthermore, Nye believes that, in relation to prioritising, attention rather than information becomes the scarce resource, and those who can distinguish valuable information from background clutter gain power . This is present in language where linguists are able to read a piece of information and break it down so that they are able to pass on that information to customers, who may not speak the same language fluently. The final advantage of multilingualism is the ability to take the viewpoint of other people. Philip Tetlock states that bilingual and bicultural individuals become quite good at determining which responses will fit with the expectations of others . This suggests that multilingual people are able to go through data and find the pieces of information that will fit with the expectation of their customers. Deutscher s novel Through the language glass. Why the world looks different in other languages looks into whether language affects how you think and how you perceive things. Deutscher started to look into this after reading Homer s Odyssey which presented the sea as wine dark . This lead Deutscher to question whether the sea was expressed like this because there was no
  • 3.
    Nonprofit Organization Certainly, nonprofitorganization s mission and fanatical factors are linked. Therefore, the nonprofit organization should develop a plan that meets the financial requirements as well as the programming. Negatively, the institution will be affected if these areas are not well managed. Specifically, implementation and financial policies are one of the nonprofit s tactics to maintain an excellent functioning. The goal is to provide more services with fewer resources. At the same time, it is an expectation that funding enhance the organization success. Funds should be used to grow programs, promote the agency and many others. Then, the organization expenses should be record on the balance sheet. Accordingly, managers make decisions on program ... Show more content on Helpwriting.net ... Congress in 2002. This SOX act propones to defend financiers from fraudulent bookkeeping activities. The Act directed modifications to influence corporations financial disclosure and other accounting fraud. Actually, The SOX Act was created in response to accounting malpractice in the early 2000s, when public scandals such as Enron Corporation, Tyco International plc, and WorldCom shook investor confidence in financial statements and demanded an overhaul of regulatory standards (Investopedia, 2017). The act rules and policies affected the legislation related to security regulations. The Sarbanes Oxley Act Section 302 and Section 404 are the main points. The rules and enforcement policies outlined by the SOX Act amend or supplement existing legislation dealing with security regulations. The two key provisions of Section 302 is a mandate that requires senior management to certify the accuracy of the reported financial statement. Section 404 is a requirement that management and auditors establish internal controls and reporting methods on the adequacy of those controls. Section 404 has very costly implications for publicly traded companies as it is expensive to establish and maintain the required internal controls (Investopedia,
  • 4.
    Statistical Data FocusOn Statistical Information Essay Introduction The subsequent statistical data focus on statistical information from the AJ Davis Dept. Store. The department store endeavors to unearth the veracity about their credit customers. The Data are incorporated of a sample of 50 credit customers based on five different variables namely the location (rural, urban, suburban), incomes, year, and the credit balance. 1.LOCATION (Rural, Urban, Suburban) 2.INCOME (in $1,000 s be careful with this) 3.SIZE (Household Size, meaning number of people living in the household) 4.YEARS (the number of years that the customer has lived in the current location) 5.CREDIT BALANCE (the customers current credit card balance on the store s credit card, in $) 1. Location (Rural, Urban, Suburban) I/ Descriptive Statistics. We will describe the location, the income and household size. A/ Descriptive Statistics: Location The first individual variable is Location . We can characterize it as a categorical variable. For this reason, its (the Location ) three subcategories are Urban, Suburban and Rural. Because, it s a categorical variable, the events and measures of its central tendency and descriptive statistics cannot be calculated. However, we count: Urban: 21 Suburban: 15 Rural: 14 LocationFrequencyRelative Frequency Urban210.42 Suburban150.30 Rural140.28 Total501 From this number above, we may estimate the Mean, median and standard deviation as next: Mean: 16.66;
  • 5.
    Internal Analysis OfDeutsche Bank 5.INTERNAL ANALYSIS 5.1Introduction In this chapter, an analysis of Deutsche Bank s internal environment will be conducted, using primary and secondary data from a number of internal company sources. 5.2Company profile Company overview Deutsche Bank in the Netherlands is an international universal bank made up of several divisions: Asset Wealth Management, Corporate Banking Securities, Global Transaction Banking and Private Business Clients. The focus here is the Global Transaction Banking (GTB) division s TF/CMC department. Their most important client segments are: Mid Cap and Large Cap. The focus for this marketing plan is on the Mid Cap segment, which consists of clients whose mother company is of Dutch origin, is an international player, and has turnover upwards of EUR 50 million (L. Hedges, personal communication, November 7th, 2014). ... Show more content on Helpwriting.net ... However, this department is not of importance to this specific marketing plan. Finances Revenue developments in the past 3 years are as follows: in 2011 Deutsche Bank s net revenue (after provisions for credit losses) was €31,389m, in 2012 it was €32,015 and in 2013 it was €29,860m (AG, Deutsche Bank Facts and Figures, 2014), (Deutsche Bank, 2014). For Deutsche Bank N.V. s profit and loss account please refer to chapter 5.5 on page 33. Ratings for Deutsche Bank, carried out by established rating agencies, can be compared to those of competitors (see CH4) (Deutsche Bank A.G., 2014). Short TermLong Term Moody sP 2A3 S PA 1A FitchF1
  • 6.
    Genetically Modified OrganismsAnd Health Genetically Modified Organisms and Health Genetically Modified Organisms, or GMOs, are organisms that have been engineered to contain and express genes from different organisms ( GMOs: Good or Bad for People and the Environment? ). A wide variety and the majority of food and resource crops in the United States are genetically modified, including corn, canola and cotton, and the United States is one of the five countries which produce over 90% of GMOs in the world market ( How Common Are Genetically Modified Foods? ). Even though GMOs have been produced and consumed on a large scale since 1996, there is controversy over whether or not GMOs are generally good or bad for the human body(OECD). Many believe that GMOs carry serious health risks... Show more content on Helpwriting.net ... However, it is possible that GMOs cause negative effects within the environment that outweigh the positive goals. Environmental affects are important to consider in the context of human health because, as Caitlin Shetterley constantly argues in Modified: Gmos and the Threat to Our Food, Our Land, Our Future, humanity and nature are inextricably intertwined, and therefore harm done to nature is a direct harm to humans. The process of growing GMOs involves the use of heavy pesticides, which has led to the evolution of herbicide resistant weeds that cause major crop loss (Yang). Scientists are becoming increasingly concerned that GMO crops have the ability to spread their genetic material to non GMO organisms. Contaminating non GMO crops can cause mutations within the organism, leaving crops vulnerable to disease (Yang). Also, studies regarding whether GMO crops and non GMO crops can coexist are showing coexistence is nearly impossible (OECD). This inability to co exist reduces plant diversity which negatively impacts ecological systems. The combined effects of mutating weeds and reducing plant diversity support the idea that the negative impact of GMOs outweigh the positive
  • 7.
    Contraction Of ExerciseLab Report Obervations Systolic pressure increases significantly when intensity of exercise increases. It refers to the peak blood pressure during the contraction of ventricles. It could be used as an indicator of the pumping force of the heart. When heart pumps stronger, systolic pressure increases. Compared with systolic pressure, diastolic pressure has a rather mild increase when intensity of exercise increases. It refers to the lowest blood pressure when the contraction of ventricles ends. It is mainly affected by the dilation of arteries during diastole. When arterioles dilate, the peripheral resistence decreases, resulting in a lower diastolic pressure. Pulse pressure increases when intensity of exercise increases. It is essentially
  • 8.
    The Impact OfThe Northwest Ordinance Of 1787 Throughout the course of United States history, there have been multiple occurrences in which influenced and impacted the United States as it is today. Since the colonization of the colonies, the United States has proven to have improved its nation through many acts, movements, political persons, and governmental theories. However; the Northwest Ordinanceof 1787, the creation of the Erie Canal, Henry Clay s American System , the Fugitive Slave Act, and the Emancipation Proclamation were all specific occurrences and events that impacted the development of the United Statespolitically and economically. The Northwest Ordinance of 1787 was an important occurrence that effected the United States politically and economically because it was one of the first movements that introduced the abolition or freedom of slaves. The Northwest Ordinance of 1787 was a land act that provided for orderly settlement and established a process by which settles territories would become the states of Ohio, Illinois, Indiana, Michigan, and Wisconsin. It therefore banned the slavery in these Northwest Territories. Furthermore, this Ordinance prohibited slavery and ear marked funds from land sales for the support of schools. The land ordinances of the 1780s were a great and enduring achievement of the Confederation Congress. It therefore provided for an orderly settlement and the admission of new states based on equality; there would be no politically dependent colonies in the West. The Northwest
  • 9.
    Rousseau Confessions Confessions (1789),an autobiography by Jean Jacques Rousseau (1712 1778) is seen as a reaction against Augustine s Confessions and stands as a rebuttal to the latter s understanding of human nature. Rousseau is considered to have invented modern autobiography in his compositions of Confessions, Rousseau, Judge of Jean Jacques (1776) and The Reveries of a Solitary Walker (1778). The idea of confession and in naming the book as such, the narrative presented in Confessionscan be seen as an attempt on behalf of Rousseau to persuade the reader by offering his life as an example of his philosophy. In the religious act of confession, it is assumed that the person confessing will speak the truth and that he will accept the judgment conferred upon... Show more content on Helpwriting.net ... I have neither omitted anything bad, nor interpolated anything good. (p.3) By the act of writing an autobiography, the author, narrator and protagonist has to be identical, using the proper name of the author as reference (Lejeune, 1973, p. 298) and this trinity of an identity must refuse to give others the same status that they claim for themselves. The concept of autobiography requires inequality of treatment between others and Rousseau and this brings in the possibility of untruthfulness; as he writes at the beginning of the Confessions, I know the feelings of my heart, and I know men (Rousseau 1789, p.3). Everything is an object for knowledge, while the I is the sole
  • 10.
    The Planet OfPlanet Mercury Introduction The planet Mercury is very difficult to study from the Earth because of its proximity to the Sun. It is the second smallest planet (it was believed to be the smallest until the discovery that Pluto is actually much smaller than originally thought), and also the fastest in its orbit since it is the innermost planet. Solar System Records Highest uncompressed density. Highest diurnal variation in temperature. Only Solar System object with a 3:2 spin orbit resonance. it rotates on its axis exactly three times for every two revolutions it makes around the Sun Geological history ended the earliest among terrestrial planets. Smallest planet with global magnetic field. Most Earth like magnetosphere. Name Named after the Roman messenger god who was known for his ability to travel quickly with wings on his feet. Mercury travels in orbit the shortest time of all planets Distance From The Sun Mercury is located 57, 910, 000km (0.38AU) from the Sun. Mercury is the inner most planet in our solar system. Orbit The orbit of Mercury is the most eccentric of the planets in the solar system. At perihelion it is 46,001,200km from the Sun At aphelion it is 69,816,200km from the Sun A difference of 23,815,700km giving it an eccentricity of 0.21 Orbit Mercury is the only object Solar System with a 3:2 spin orbit resonance. This means it rotates on its axis exactly three times for every two revolutions it makes around the Sun The length of a day on Mercury 58.63 Earth days.
  • 11.
    Search Theory, LinearAnd Random Walk Moving Target On The... Abstract. This paper presents the cooperation between two searchers at the origin to seek for a random walk moving target on the line. Any information of the target position is not available to the searchers all the time. Rather than finding the conditions that make the expected value of the first meeting time between one of the searchers and the target is finite, we show the existence of the optimal search strategy which minimizes this first meeting time. The effectiveness of this model is illustrated using numerical example. Mathematics Subject Classification: 37A50, 60K30, 90B40. Keywords: Search theory, Linear search, Random walk. 1.Introduction The prime focus of searching for a randomly moving particle on the real line is to ... Show more content on Helpwriting.net ... Recently, Mohamed et al. [15] studied this problem when the target moves on one of n intersected real lines in which any information of the target position is not available to the searchers all the time. Mohamed et al. formulate a search model and find the conditions under which the expected value of the first meeting time between one of the searchers and the target is finite. Furthermore, they showed the existence of the optimal search plan that minimizes the expected value of the first meeting time and found it. More recently, El Hadidy [16] considered a search problem for a d dimensional Brownian target that moves randomly on d space. He found the conditions that make the expected value of the first meeting time between one of the searchers and the target is finite. In addition, he showed the existence of the optimal search plan that minimizes the expected value of this first meeting time. A comprehensive discussion of many aspects of search problem is found in El Hadidy et al. [18 30]. Finding a Random walk moving target inside a cylinder has numerous applications in physics. One of the famous search methods, is the coordinated linear search method which consider two unit speed searchers starting at the origin point seek for a random walk target. A target is assumed to move randomly on a line according to a
  • 12.
    American Frontier HeroResearch Paper The American frontier hero is very present in our culture, and those heroes have come from different traditions of males in the eighteenth and nineteenth centuries. The start of the American frontier hero goes back into the early decades of American colonization. There have been investigations of the heroic stereotype that suggests that American frontierheroes played a very important role in the shaping of American literature and culture than had previously been known by Denise MacNeil and Mary Rowlandson. Following up after reading The Account of Mary Rowlandson and Other Indian Captivity Narratives, it was an eye opener for myself. Furthermore, it was an eye opener, because many of us take life for granted and do not realize someone... Show more content on Helpwriting.net ... According to Mary Rowlandson and the Foundational Mythology, it makes it evident that MacNeil and Rowlandson believe the American frontier is present. Also, they believe that without the American frontier some of our history would not be known or may not have happened. I also agree with them, I believe that the American frontier hero is present in our culture today. For instance, it states Rowlandson here recounts learning another Native American wilderness technique, using a beaver dam as a bridge (Rowlandson 333). This is relevant of proving how the American frontier heroes are still current, because without these heroes today, student and people would not be able to learn about the Native American history or the way of life. Like stated, Rowlandson learned how the Native Americans used a beaver dam as a bridge, without these heroes showing and telling others about this information, humans today would leave beaver dams alone since it is an animals home. Another reason the American frontier hero is important is to learn the crucial element of wilderness survival is the ability Rowlandson developed to successfully reconcile Native American and Puritan ways (Rowlandson 333). This is vital information, because without the American frontier hero s students or people would not be fully aware or informed on how to
  • 13.
    Dreams Essay examples Dreams Althoughthe idea of dreams has always been a psychological one, there is a philosophical side to them. Descartes once said, For all I know, I might be dreaming (Bruder/Moore, Philosophy, 81). This conjecture of Descatres was one that explained the concept of dreams. He asked the question, How do we know that we are not dreaming and our whole life is but a dream? There can never be an answer to this question but it proves that there is a philosophical view of dreams. A dream is a form of mental activity that occurs during sleep. Dreams reveal our inner most secrets and even allow us to emerge our hidden selves. Because they unleash some of our most intimate experiences, every dream is unique. Most dreams are in ... Show more content on Helpwriting.net ... Essayist, humanist, and skeptic Michel Montaigne wrote I believe it to be true that dreams are the true interpreters of our inclinations; but there is art required to sort and understand them (Gardner, Skeptical, 10). One idea of what dreams are, can be found from the Indian philosophy. A realist claims that objects that experience presents as existing externally do in fact exist internally. The denial of externality appeals both to those who doubt that experience is identical with existing objects, and those who think that experience is there only if objects are not external. Dream are a great appeal to those philosophers who deny externality. Objects appear as distinct from the cognition of them. They do not appear as if they were in the subjects cognition alone, since to dream of an object is to dream of an object located in space. Both the Cartesian skeptic and the Berkeleyan idealist use dreams to challenge externality. The idealist accepts the doubt that dream cast upon externality but idea not accept the implication of the non verdicality of cognition. The disagreement about the consequence of denying externality was recognized by Kant. He distinguished between the Cartesian problematic idealism and Berkeleyan dogmatic idealism. But there were two famous philosophers that have differing views on the way that dreams are used. Buddhist Vasubandhu and Advaitin Sankara are the two men that wrote about the ideas of dream and
  • 14.
    Structure Of TheAtomic Structure TASK 1: Describe the structure (including the atomic structure) associated with 1.Metal 2.Polymer Elastomer 3.Ceramic 4.Composite Carbon Fibre 5.Smart Material пѓ METAL: Metals are chemical components with general characteristics and similar Physical and Chemical Properties underneath traditional conditions. The study of metals is named science. Not all of the metals have the properties and characteristics below. Several components is also classified as metals consistent with one set of properties and as non metals consistent with another Metals are large structures of atoms command along by bronze bonds. Giant implies that giant however variable numbers of atoms are concerned counting on the scale of the little bit of metal. The structures of pure metals square measure straight Forward to explain as a result of the atoms that type these metals may be thought of as identical good spheres. Constant may be aforesaid regarding the structure of the rare gases (He, Ne, Ar, so on) at terribly low temperatures. These substances all crystallize in one in all four basic structures: straightforward cube like (SC), body cantered cube like (BCC), polygon closest packed (HCP), and cube like closest packed (CCP). Most metals are shut packed that s, they match as several atoms as potential into the out there volume. Every atom within the structure has twelve touching neighbours. Such a metal is delineated as 12 co ordinated. Each atom has half dozen different atoms
  • 15.
    The Diary OfA Young Girl By Anne Frank Humans don t realize how much they appreciate something until they lose it. This is especially true when it comes to freedom. In the novel, Anne Frank: The Diary of a Young Girl, the main character, Anne Frank, and her family were prosecuted for being Jews during World War 2. Along with two other families, to save their lives, they took refuge in entering the Secret Annex to escape the barbaric prosecution by the Nazis. However, they paid a heavy price by sacrificing their freedoms. Their yearning for freedom affected their decisions and choices made in hiding. The emotional events and experiences illustrated in the novel highlight the human needfor freedom and how it impacted their lives of those in the Annex. The writing reveals Anne Frankwas greatly affected by the loss of freedom, and her need for freedom was evident. Anne was a normal teen; she had a mood swings, her arguments with her parents, her crushes, and most importantly, she had friends. Upon entering the Secret Annex, Anne was discouraged from communicating with her closest friends for fear of being caught by the Nazis. She lost the freedom to share about her feelings to the friends. Anne had to find other ways to discuss her feelings and found company with a boy named Peter. In the novel, it states, How Margot and I have only recently gotten to know each other and yet still tell each other very little, since we re always together. [Peter and I] talked about every imaginable thing, about trust,
  • 16.
    The Incorporation ofAviaton Assets to Help Support Ground... Over the course of history, the battlefield has changed with technology. The incorporation of aviation assets to help support ground operations has created many benefits. Close air support for joint operations provides over watch and security with great firepower and precision. Another great benefit is the ability for medical evacuation, support, and resupply. The combination of air assets with ground forces aids in battlefield momentum and domination over the enemy when performed without hesitation. An example of air and ground forces complimenting each other would start in the planning phase with intended joint use participants. Next would be the employment of an insertion team days before an operation. This team would collect human intelligence by over watching possible targets in the area, routines identified, and gathering information from locals. All information would be forwarded to high headquarters and used for planning future operations. The ground team is tasked with the important mission of maintaining eyes on the objective as well as security with local support by fire as needed when the mission dictates. While the team is in place, ground assets would push out and start to establish traffic control points. The incorporation of presence patrols just outside the area to restrict the flow of traffic and potential for possible targets to leave the area of interest. Utilization of biometrics would also be incorporated to ensure that other unknown
  • 17.
    Merchant Of VeniceCharacter Analysis Portia in The Merchant Of Venice, has been considered as one of the most perfectly developed female protagonist. The heiress of Belmont represents the nexus of the play, as the quest for her hand creates a motive for Bassanio to borrow money which initiated the bond plot and the ring plot. Furthermore she manipulates the trial and resolves the bond episode and the ring episode. Portiais introduced in the play as being a wealthy heiress whom many suitors try to court. Her significance and characteristic in the play can be seen in her genuine love, her graciousness and her witty yet playful traits. She further represents the comparison between Belmont and Venice, herself and shylockand most importantly, love and self interest, one of the key themes in the play. Critics liked to compare Portia with Shylock and the comparison brings out the salient traits of her character. One of them stated that while Portia stand for everything bright, generous, and noble while Shylock represents wickedness and evil . The language used in the play suggests that money is a source of power and desire. The penniless Bassanio feels inferior to Portia who is intelligent, noble and refined. Portia s speech, unlike a woman in the Elizabethan era, seems to be heavily loaded with financial expressions. Her language reveals how comfortable she is in the masculine, world and her unwillingness to leave it. Her speech also demonstrates her intelligence and eloquence and seems to mock the existing social norms. Indeed Portia has shown to be far from obedient to patriarchy. Portia s father had left a clause in his will that the suitor will pick the correct casket to in order to marry her. Although she couldn t break the clause, her intelligence serves her well in her pursuits of Bassanio as she manipulates the test for her own purpose. It reveals the casket choosing event itself was a gimmick and rather Portia was controlling the entire situation according to her will and treating her suitors as mere puppets. On the other hand, while men around the world are vying for her attention, she is apparently considers herself as superior and better position to judge men s masculinity. However her intolerance and hypocrisy is suggestive
  • 18.
    In-Service Case Study Dr.Shapiro, Your role in the In Service will be more discussion oriented. The itinerary I have for the In Service will feature 8 different activities (mostly video based) that help other student advisors and ProStaff members familiarize themselves with different concepts of diversity and intersectionality such how white people discuss race, racism within the gay community, male body image issues, etc (I can send you the itinerary I have, if you want). Then you and various other members apart of the Truman community who apart of the panel will share their knowledge and experience about concepts of diversity, factors they related to or wanted to expand on that were featured in the videos or their own personal experience with how they balance intersectionality of their identities. The whole In Service should last about an hour to an hour and a half, depending on the audience response (which will other student advisors and ProStaff of Residence Life) with the material. If you have any more questions/concerns. Please let me know. Thank you. Sincerely, Mac On Mon, Aug 29, 2016 at 3:33 PM, Shapiro, Paul wrote: Ms. Smith, I might be able to participate. But first a few questions. Are you ... Show more content on Helpwriting.net ... I am a current senior communication major and psychology minor, currently working as a student advisor in Dobson Hall. I sent you this e mail inquiring if you would be willing to be a part of an In Service I am planning for Residence s Life on Thursday, September 15th at 5 p.m (Location: TBA) that focuses on inclusion and diversity training. This In Service will specifically emphasize the concept know as intersectionality. If you would be willing, I would ask you to share your variable knowledge about social issues and concepts of power due to your educational background with sociology. If you have any questions/concerns about the In Service, please feel free to let me know. Thank you so much for your
  • 19.
    Three Times TheTrouble In Macbeth Three Times the Trouble In Macbeth by William Shakespeare, the number three is used numerous amounts of times. In the 17th century, when Shakespeare wrote Macbeth, there was a lot of superstitious beliefs about the number three. The number three is believed to be an unlucky number . That s exactly the case in Macbeth, events following objects associated with the number three are just simply unlucky. The readers of Macbeth will find out that objects associated with the number three, such as: three witches, three murders, and three ghostly apparitions eventually cause the downfall of Macbeth. The three witches appear to Macbeth in act one, bringing prophecies to him. They exclaim, Fair is foul, and foul is fair. Hover through the fog and... Show more content on Helpwriting.net ... Those of which were Duncan, Banquo, and Lady Macduff. Those three murders are what merely caused the downfall of Macbeth. Why is it necessary for there to be three of them? This all goes back to the metaphysical beliefs of the time period in which Shakespeare was writing Macbeth. As a consequence of Duncan s murder it causes Macbeth to have a guilty conscience. He claims that he has murdered sleep. In Act 2, Scene 2, right after the murder of King Duncan he cries, Sleep no more! Macbeth does murder sleep (Shakespeare 330). Banquo s death caused great disturbance among Macbeth. One of the murders told Macbeth My lord, his throat is cut; that I did for him (Shakespeare 350). While at a banquet the ghost of Banquo appears and causes Macbeth to be quite demented. His ghost represents the guilt that is felt after the murder of Banquo. After the order to kill Lady Macduff a huge red target is now on Macbeth. This just goes to show how evil that he has become. The unsteadiness doesn t stop
  • 20.
    Decentralization Reforms OfPakistan During Ayub Khan Period DECENTRALIZATION REFORMS IN PAKISTAN DURING AYUB KHAN PERIOD Pakistan inherited a feudal based political framework during those center of the governmental issues. The Most exceedingly bad and only it might have been uncovered before long following those destruction of the Quiad e Azam muhammad ali jinnah. The investigation of decentralization uncovers the interior Shortcomings of the political framework Furthermore it Additionally uncovers that now and again in the political history about pakistan those political clashes and rifts expanded will such levels that those entirety Dependability of the framework might have been set to risk. It is accurate that the extent of the issues in every last one of measurements e. G. Political, budgetary Furthermore social and so on might have been colossal and the emergency of the heading settled on it Most exceedingly bad. In any case absence of political investment and the doubt of the individuals for pakistan in the punctual time of the national political historical backdrop is a central point which guided those musings of the primary tyrant with feel the pulse of the kin i. e. Should include them done political settings of the particular nation. Idea of decentralization gets its backing starting with the political performance by those government officials in the early days following those demise for Quiad e Azam muhammad ali jinnah. Turbulence from claiming political history confused those national targets Also pretentious each
  • 21.
    The Chair OfReniseneb On display in The Metropolitan Museum is the Chair of Reniseneb, which was constructed in 1450 B.C. in Egypt during the New Kingdom period. The Chair of Reniseneb is a wooden chair veneered with ebony, a heavy dark brown timber, and ivory, a hard creamy white substance. The chair is made up of small pieces of wood that is pieced together almost like a puzzle. Egyptian trees did not grow big or thick, therefore big panels of wood needed to be imported which was very expensive. Thus the Egyptian carpenters became really adapt in inlaid work made from small pieces of variously colored wood or other materials. In Ancient Eygypt, the higher ranked an individual was, the taller was the chair or furniture he sat on. The Chair of Reniseneb belonged to the scribe Renyseneb, therefor the chair sits higher on beaded blocks. The legs of the furniture were often carved in the form of animal legs or the hind parts of some animal such as the lion. Therefore, the foot of the Chair of Reniseneb is shaped as an animal paw and the legs of the chair are shaped similar to an animals leg. Both the legs and the feet are veneered with ebony, a heavy dark brown color. The Egyptians enjoyed having cushions which were often were stuffed with dried leaves or goose down, creating a plush seat. Therefore, the seat of the chair was restored to have a woven seat... Show more content on Helpwriting.net ... Furthermore, even with the disadvantage of their lack of trees, the Egyptians found a way around it to instead piecing together small pieces of wood. It goes to show that while most other parts of the world were still in the Stone Age, the Egyptians were way ahead of their time creating furnitures, building palaces, and writing on papyrus. The Egyptians were great artists of their time and their furniture remains as one of the few things that is left and that can be appreciated and
  • 22.
    Pure And SimpleDolly Parton Analysis Journalists from across the United States gathered together July 5 via conference call to interview Dolly Parton about her new album Pure and Simple and her international tour, also titled Pure and Simple, which will be coming to the UCCU Center in Orem July 26. Over 30 journalists who work for newspapers, magazines, and websites such as The New York Times, The Guardian, St. Louis Post, The Windsor Era, The Daily Herald and the UVU Review, assembled to have the opportunity to each ask Parton one question of their own choosing. The majority of questions asked were about her music and her sold out Pure and Simple tour, which will be coming to over 60 cities in the United States and Canada. In addition to her recent tour, Parton is releasing her 43rd studio album Pure and Simple which contains 12 songs that Parton wrote and produced herself. When asked about what this particular album, Parton explained that the title of the album is the essence of each song.... Show more content on Helpwriting.net ... Her hope for the new album is that people can find a song that they like and connect with. Along with that, Parton hopes that her tour, Pure and Simple, will be relatable. A journalist from the St. Louis post asked Parton if she tries to incorporate new songs, stories or other things into each stop along her tour. Parton stated that because she has performed countless shows and that this is her first tour in over 20 years, she does have new things that she wants to introduce into performances. Parton loves to enjoy each concert and to do this, she tries to add new moments in every time. Parton laughed as she admitted that she likes to crack jokes and make the audience laugh to keep them entertained. She also likes to include stories and gospel
  • 23.
    Reasons for thefailure of 1848- 1849 revolutions in... The revolutionaries in Italy had longstanding grievances, some were nationalists and some were liberals. Despite all having different ideas and aims they all resoundingly agreed that Italy needed change. The hopes of the various revolutionary groups had been raised by the election of Pope Pius and Charles Albert the King of Piedmont Sardinia. However, their hopes and resulting revolutions were crushed due to many concerning factors. A crushing factor of the failure of the revolutions was the trouncing of the Piedmontese army at both the battles of Novara and Custoza. These defeats were resounding as the Piedmontese army had no chance against the might of the super power that was the Austrian army. The Piedmontese army met the forces of ... Show more content on Helpwriting.net ... Radetsky s army was not just huge but well led, organised and well equipped. Under such authoritative and commanding leadership the Piedmontese army was soon defeated. Radetsky s army in addition also crushed the revolts in Venice and Tuscany (who had declared themselves as republics) and who had previously resisted Austrian siege warfare until February 1849. However, it was not just the power of Austria and it s army which contributed to the failures of the revolutions, but the revolutionaries also contributed to their own downfall. Despite wanting change in Italy, there were numerous divisions between the revolutionaries such as the liberals and nationalists having different aims and incompetence in the face of Austria. Such divisions not only affected morale but had physical impacts such as in the battle of Custoza where the Papal States and Naples withdrew their troops in favour of their own interests. Furthermore, the divisions between the revolutionaries were accentuated when the Roman Republic was declared in favour of the Pope being the leader of the Papal States. The previous Pope, Pius IX had fled to Naples after not being able to declare war on a fellow Catholic state and continued to work with a constitutional government until his flight from Rome. The republic was led by Mazzini who took care of all political issues and provided inspiration whilst Garibaldi was in charge of
  • 24.
    How Does VitaminD Improves The Plyometric Performance Research Question: Does Vitamin D improves the plyometric performance in young basketball athletes? Part 1 A fat soluble vitamin D is an essential vitamin which works as precursor steroid in biological and metabolic processes happening in human body (1). Deficiency of Vitamin D has shown a verity of adverse psychological, skeletal and muscular health issues (2). Vitamin D deficiency rate has been increased remarkably from year 1994 to 2004. There are many factors responsible for this like sun avoidance sunblock use which are mostly evident in athletes, and other factors like increase in obesity rates which causes sequestration of vitamin D (3). Deficiency of Vitamin D is linked with many musculoskeletal systems related health issues. ... Show more content on Helpwriting.net ... They came to conclusion that there is a significant co relationship between VO2max and 25(OH)D (9). Vitamin D has also exigent effect on immune system, and inflammatory modulation, and it is also essential for optimal muscle function, glucose metabolism, cardiovascular health and skeletal muscle performance (10). Part 3 Research has supported that maintained level of 25(OH)D in the range of 75 100 nmol/L and along with other essential nutrients intake in proper amount like vitamin K is a key step for recovery as well as performance (11). Supplemental vitamin D can improve recovery of force production following intense activities and can also hinder the increasing biomarker which causes muscle damage (12). After intense exercise, recovery in a peak isometric force can be enhanced by vitamin D supplementation. The increased recovery in this isometric peak force provides information that vitamin D is an essential modulating mechanism of weakness of muscle (12). All these studies prove an interesting theme that vitamin D have potential effect on human metabolism and biological process which can enhance multiple physiological benefits. Therefore, the purpose of present study was to test the hypothesis that does Vitamin D improve plyometric performance in young basketball athletes. 1.Dahlquist, D.T., Dieter, B.P., Koehle, M.S. (2015). Plausible ergogenic effects of vitamin D on athletic performance and recovery. Journal of the International Society of Sports Nutrition,
  • 25.
    Effective Use OfDramatic Irony In Shakespeare s Hamlet In his tragic play, Hamlet, William Shakespeare staunchly demonstrates how one s vehemence in a deathly scheme may lead to his/her own demise. Shakespeare uses tragedy to convey the madness that Hamlet progressively develops from his uncle s betrayal, dramatic irony to emphasize the corruption of King Claudius, and religious allusion to allow for better understanding of the betrayal between King Claudius and his brother. The main conflict of the play stems from King Claudius betrayal of his own brother. When Hamlet discovers that King Claudius killed his father, Hamlet makes it his priority to avenge for the death of the former king. The chain of events that unfold after Hamlet s discovery expresses the tragedy that Shakespeare utilizes. ... Show more content on Helpwriting.net ... One of these stories is the one about the two brothers, Cain and Abel. Cain was envious of God s favoring of Abel, so Cain murdered his own brother. The murder of King Hamlet, carried out by King Claudius, is an allusion to the story of Cain and Abel. Claudius is envious of King Hamlet s power. As a result, Claudius kills King Hamlet in order to reach his potential. This is revealed by the ghost of King Hamlet in Act 1, Scene 5: Now, Hamlet, hear: Tis given out that, sleeping in my orchard, A serpent stung me. So the whole ear of Denmark Is by a forgГ©d process of my death Rankly abused. But know, thou noble youth, The serpent that did sting thy father s life Now wears his crown (Shakespeare 111). Shakespeare s use of allusion to the story of Cain and Abel allows for better comparison of one betrayal to another, which emphasizes the importance of the
  • 26.
    What Is RacialFetishism From as early as the 1760 s, prostitution has been referred to by different names. French philosophers used the word fetichisme, which loosely translated to mean primitive religion. Later, according to Anne McClintock, Marx, in 1887, used the term commodity fetish which was believed to mean primitive magic to express the idea of an economic side to the fetish, thus claiming it to be an industry. McClintock goes on to explain that Freud evolved fetishismin to sexuality and finally into what is known as erotic perversions. Later, religion combined the term sexuality and money, therefore removing the primitive idea, making prostitutiona racial and sexual degeneration (McClintock, 1992). It is believed by certain scholars, however,... Show more content on Helpwriting.net ... For instance, according to Lucas, Mexican women were placed in to two sub groups: Spanish, would be referencing a good woman while Mexican would be referencing a bad woman and more likely to engage in prostitution. The same was true of other races like the Chinese who were considered depraved, and the Irish who were considered animalistic with a love for vicious excitement . Black, Native American and Mexican women were considered uncivilized and openly available to white men regardless of their personal preferences. This assumption was common among high ranking public officials, law enforcement as well as the civilian male. Being caught with a prostitute who happens to be a woman of color, was considered more the fault of the prostitute than on the man she was servicing (Lucas,
  • 27.
    Islam Through WesternEyes Analysis This type of primary source is a written document by Jonathan Lyons in which he describes Islam through western eyes. In Islam Through Western Eyes, Jonathan Lyons unloads Western propensities for contemplating Islam, directing a watchful examination of the West s great totalizing story crosswise over one thousand years of history. He watches the talk s destructive consequences for the sociologies, including human science, legislative issues, theory, religious philosophy, worldwide relations, security studies, and human rights grant. He takes after its influence on research, speeches, political system, and government approach, keeping the West from reacting viably to its most noteworthy twenty first century challenges: the ascent of Islamic power, the rise of religious savagery, and the growing pressure between built up social qualities and multicultural rights among Muslimforeigner populaces.... Show more content on Helpwriting.net ... Thoughts, dialects, subjects, issues crossing disciplines that all things considered, we tend to see as partitioned. An uncommonly fertile, social condition which created any semblance of Maimonides, an awesome Jewish medieval mastermind who in numerous regards is a Muslim, an Islamic scholar. Classifications for example, the law that Maimonides expounds on is basically not justifiable unless you comprehend Islamic law. In this way, it s likewise a flawlessly outlined book. Along these lines, I believe it s an exceptionally complex inquiry and I won t attempt to answer it enough. In any case, I will state that the circumstance varies drastically starting with one setting then onto the
  • 28.
    An Understanding OfGod And A New World Of Faith Faith, a word that has a different meaning to every individual that walks this Earth, cannot be so easily defined. Faith, when talking about it in the religious sense, makes it even that much harder to understand. Everyone believes in something, and each of those beliefs have an enormous effect on how they live their lives. Gerald O Collins, a Jesuit Priest, states that within the Christian faith, lies two components: Fides Quae and Fides Qua. Fides Quae is the faith which is believed, or the content of that faith. Fides Qua is the individuals own personal commitment to God. Throughout this paper I will demonstrate faith using The Compendium, and A New World of Faith to show how a good understanding of faith can reveal the truth from... Show more content on Helpwriting.net ... This statement simplified would essentially mean that in order to have faith you must be able to trust in God, even though we 2 cannot physically be in his presence on Earth. To elaborate, a faithful follower of christ must first have knowledge of the religion, agree to the terms, and then trust in that faith. Faith requires an individual to not only trust in God himself, but to also firmly believe the scriptures and teachings from within the Bible as well. Both this knowledge and trust is very crucial to the understanding and involvement with the Catholic faith. So many people simply agree with the teachings of the Bible, but do not fully trust in its meaning. For example, every Catholic understands that Jesus was nailed to the cross and died for our salvation, but they don t believe that in the harder times in life, that Jesus will come through on this promise for us. Being humble and opening oneself up to this idea of a loving faith relationship with God is what truly defines the term above all else. A good example of this concept from scripture would be from (John 3:16) For God so loved the world that he gave his one and only Son, that whoever believes in him shall not perish but have eternal life. This type of knowledge trust relationship we have with God is a type of rational faith, or fides et ratio. We must have strongly backed reasoning for what we
  • 29.
    Act 4 Scene1 in Much Ado About Nothing by William... Act 4 Scene 1 in Much Ado About Nothing by William Shakespeare The play is a comedy, which centres on two couples and their love affairs, although there are other subplots, which involve disguise and trickery. The scene itself focuses on the wedding of Claudio and Hero during which Claudio strongly rejects Hero. It is a dramatic scene where the tension of the audience is most raised during the play. This is due to the characters theatrical behaviorand language. It also opens new doors for other relationships to evolve such as Beatrice and Benedick, who overcome their hatred for each other and fall in love. In some ways this scene has its advantages and disadvantages. If this scene had not happened ... Show more content on Helpwriting.net ... Leonato s excuse for being too busy to listen because of the wedding is known as dramatic irony because something this important should make Leonato listen. Because of Leonato not wanting to listen to Dogberry, the audience are given the expectation that the wedding may not be a perfect affair. The part of the scene where Hero is rejected is very powerful. In many productions of this play the character of Claudio is made violent, this also happens in the production by Kenneth Brag , which we studied. Such ways as pushing Hero and shouting at her with abusive language of that time make Claudio s behavior vicious and shocking. Claudio rejects Hero in a very dreadful approach using various techniques of behaviour and body language. His behavior is strong and alarming, he shuffles her on her arms, almost shaking her and pushes her onto the ground in a disgusted manner. As well as his shocking behavior, Claudio also uses abusive language to bring out his feelings. Such examples of language that he uses are a rotten orange , that she is a bad thing, that she looks virtuous on the outside, but not on the inside. Another example of language that he uses is approved wanton , in those days known as a proven whore that she is not worth a lot, in fact very little. Throughout Claudio s behaviour he uses the
  • 30.
    The Program ForHomeless Veterans In January 2014, approximately 49,933 American veterans were homeless on a given night. This number represents approximately 11% of the entire homeless adult population in the United States. Of those homeless veterans, 64% were reported to be sleeping in an emergency shelter or transitional housing and 36% were living on the streets or other places not meant for human habitation. Today, the federal government has many programs targeted to end veteran s homelessness; however, the Department of Veterans Affairs (VA) currently has only one program offering a permanent supportive housing solution for homeless veterans the U.S. Department of Housing and Urban Development (HUD) and Department of Veterans Affairs (VA) Supportive Housing program (HUD VASH). With this program HUD provides eligible homeless veterans with a Section 8 Housing Choice Voucher (HCV), while the VA provides clinical case management and supportive services through its health care system. The purpose of this evaluation synthesis is to assess the HUD VASH program s effectiveness in targeting limited resources to the needs of homeless veterans today, as well as to provide specific policy recommendations so as to improve the overall taxpayer value of this program. Background Homelessness has always been a social problem in the United States; however, it only began to take precedence as an important policy problem to be solved by our nation s lawmakers in the 1970s and 1980s. Homeless veterans initially
  • 31.
    Research Paper OnNeverland Neverland is the land of childhood, immortality, and escapism. Neverland is the sanctuary for who we are. The place we can escape to in our own minds. Neverland is that place that holds all our childhood memories and fantasies. Peter Pan, the gatekeeper, keeping all evil from entering the home of Neverland. Lost Boys home of No Adults Allowed. Once you enter Neverland, you can never leave. It was Mitch s last year of school. He was a senior in highschool. The bell rang at the end of the last day of school and he walked out to his car with his two best friends Jake and Riley. As he slammed the door to his car his tinkerbell car ornament swung back and forth. We re going into college now Mitch, Get this childish stuff out of here man Jake says as he tosses the tinkerbell to the back of the car, Riley catching it. Oh c mon it s cute she says examining it. Mitch starts up the car and they pull out of the parking lot, taking one last look at the school they had so many memories at. The sun didn t rise in Neverland, instead it was very cloudy and dark out. Everyone in Neverland looked around panicked. Peter Pan met with Tinkerbell leaving the house walking to town square. What s happening ... Show more content on Helpwriting.net ... He saw the Stitch his sister had fell out and was laying in the floor. As he was about to take it to the rest of the boxes he hesitated, Looking at it. This was the last piece of his childhood he had, and he couldn t bring himself to get rid of it. He would give it to his sister when he saw her again as a gift, as she showed great interest in it. He went back in his car and headed straight to Raleigh. He would ve roomed with Jake but he got accepted at a college closer to home that he preferred. Walking into his new dorm room carrying a large stack of boxes he tripped at the entrance but someone caught the boxes before they fell. He was greeted with a hand to help him up. The name s Pete, You must be
  • 32.
    Norfolk State UniversityPersonal Statement Out of all of the skin care products in the world, your bathroom cabinet needs to be filled with products researched and designed by me. When I entered high school, I discovered my passion for selecting lip sticks, lip glosses, lotions, perfumes, and makeup foundations. You name it. After learning about the connections between the information in my chemistryclass and these items, a light bulb went off! I maintained an A average in chemistry throughout the whole year! Additionally, in 2014, I became a student in the Academy of Engineering and Technology, which also heightened my interests in chemistry. In a science fair at that academy, there was a chemistry course where we made colorful slime, and during that process, I learned that I get an adrenaline rush when I am mixing different chemicals together to see what the outcome is. Majoring in chemistry at Norfolk State University will definitely prepare me for a very successful future in chemistry! My ultimate goal is to conduct research and development for chemical cosmetics. I plan to obtain employment at the greatest companies in the world such as L OrГ©al and Avon. I am thoroughly excited to possess the opportunity to go to my top school of choice, Norfolk State University! They make sure that they thoroughly prepare ... Show more content on Helpwriting.net ... Being able to attend this university, knowing that I am surrounded by other future chemists would mean a lot to me. Norfolk State has a legacy of African Americans excelling academically, starting professional careers after immediately graduation, and simply, being successful. I would be honored, to continue the legacy of African Americans striving for excellence in at Norfolk State University. Achieving wonderful goals in all that I do has always been the top priority of my life. I will always be dedicated to nothing but excellence, and I am more than ready to share my ideas of chemistry with Norfolk State University. Go
  • 33.
    A brief overviewof the Harley-Davidson’s video is that... A brief overview of the Harley Davidson s video is that Harley Davidson, a brand with tremendous staying power. Their motorcycles have become part of an Americana. Truly, proprietors have a special bond with their motorcycle and a passionate relationship that has blossomed into a world largest company s sponsor owners club. In addition, the motorcyclegives you a pleasant feeling of freedom while on the road. Several people feel a boldness after getting on their Hog. In 1903 Harley Davidsons motor company was founded in Milwaukee, Wisconsin by three Davidson brothers and a friend, Bill Harley. They had an idea in a shed to create a better bike, and they put an engine on a bicycle and Harley Davidson was born. In 1911 they built their... Show more content on Helpwriting.net ... Harley Davidson has remained true to their brand and understands that they cannot be everything to everybody. In addition, the company have a brand that can work efficiently worldwide, and the brand is alike no matter where you are in the world. As a result, marketing the brand internationally has changed drastically over the years, and execution of communication of the brand may vary since each country represents the brand differently. The organization s marque is protected without adding a dictatorship. Moreover, the key to success in future is knowing who you are and sticking to it, understanding the customers bases, looking for market opportunities, and applying you brand properly. Harley Davidson offers attributes, such as clothing, shoes, and caps etc. for the shoppers who want to associate themselves to the brand. Consistency is the key for the business. Lastly, the brand will remain the same for over l00 years, but what has changed is various ways Harley Davidson can reach out and communicate with potential customers. The brand has sustain itself showing an unlimited strength and resilient while advertising is compelling. The best marketing vehicle they have is their passion riders. When the customers are riding on the roads, they express joy and pleasure of being a part of Harley Davidson s brand. The riders are the Harley Davidson brand; they have grown into
  • 34.
    Noox Vs RimadylEssay Novox versus Rimadyl Ostearthritis and operative procedures are the most common causes of pain among dogs. Statistics show that one out of five adult dogs suffer from this debilitating condition. Dog arthritis is brought by the deterioration of joints and cartilage resulting to limping gait, difficulty in engaging in activities, and decreased movements of the affected joint. Hence, the Animal Health Care Industry has introduced in the late 90 s, the medications to control the inflammation and pain in dogs. Aside from the conventional measures you can apply to provide comfort to your pet, you can ask your veterinarian to prescribe breakthrough pain medication. To ease pain from a surgery, doctors give pain medicines prior to the surgery. What is Rimadyl Rimadyl for dogs is one of the leading painkillers manufactured for canines. It belongs to the non steroidal anti inflammatory drug (NSAID) category for the treatment of pain and inflammation due to surgery or arthritis of dogs. The drug is available in chewable e and caplets form. Taking Rimadyl with other NSAID and corticosteroids is not advisable due to possible adverse reactions. In addition, dogs suffering from bleeding disorders, inflammatory bowel disease, liver disease and gastrointestinal ulcers cannot take Rimadyl due to ... Show more content on Helpwriting.net ... Generic drugs undergo extensive research and clinical trials to prove that their efficiency is comparable to other branded drugs. Drug authorities ensure that all generics such as Novox for dogs has met all the criteria to match the quality of other brands. Novox has the same mechanism of action and absorption rate of the active ingredient, Carprofen. Many veterinarians prefer to prescribe Novox over the leading brands because it is as potent, but at a reasonable price. Expensive cost of medicine can hinder proper dog care. Morever, the drug has lesser side
  • 35.
    Essay about EdnaSt. Vincent Millay Edna St. Vincent Millay Her career that spanned three decades and her work that ranges from lyrics to verse play and political commentary. Edna St. Vincent Millay is mostly known for her earlier works, such as Renascence , Few Figs Thistles, and Second April. Millay wrote about things such as mystical views on the universe, god, death, celebration of feminism, and free love. It s almost as if she was a writer from today and with that, I believe that she would be comfortable with today s free America. Edna St. Vincent Millay was born in Rockland, Maine on February 2, 1892. She was the first daughter of three girls; her parents, Cora Buzzelle Millay and Henry Tolman Millay. Millay s parents divorced in 1900 and her mother ... Show more content on Helpwriting.net ... At this time Millay and her sister Norma moved to Greenwich Village in New York where Millay tried to make a living in acting(Millay par. 5). In the Village, Millay found a new side of herself and was for women s rights and free love, which made living life to the absolute fullest. James Gray writes, For two decades of her ever rising popularity the twenties and thirties of the century she seemed to personify the spirit of time: it s exuberance, it s defiance of conversation, it s determination to discover and to declare a sharply defined identity (Gray;Press 5). It s was also often pointed out Millay s numerous love affairs as well as the all night parties and their customary drinking. She soon found out that this was not the easy life, for financially she, again was not doing well. Millay would find in today s America the people do experiment, not everyone, but sometimes that s the only way to find themselves. In Millay s case, these experiences helped her write some of her best poems and plays, because she wrote about reality. Also, it was rumored that Millay had encounters with the same sex and was criticized for her experiments, if that to be true; she would be pleased with today s America and how were fighting and trying to get used to the fact of free love . Millay returned to writing and stuck with it. She was a prolific writer with more than fifteen
  • 36.
    The Case OfThe Fbi Essay Former Rep. George Miller (D CA) was absolutely floored by Trump s shameless testimony. He said, In my 19 years here, I don t know that I ve heard more irresponsible testimony... Miller was irritated that Trump suggested that he had additional knowledge of the extent of organized crime beyond what the FBI, the IRS, the Treasury, and others have suggested (during the same hearing). In addition, Miller responded, You don t know this; you suspect this perhaps... Trump s accusations were in complete opposition to all of the credible authorities at that hearing. In fact, that same hearing featured written testimony from Jim Moody, the FBI s former Chief of the organized crime section. The FBI does not see a coordinated, concerted effort by organized crime families to raid the Indian gambling industry, wrote Moody. As legalized gaming spreads throughout the United States, we are seeing that those states with strong regulations and enforcement are not experiencing an influx of organized crime activity. Obviously, a cash heavy, multi billion dollar industry that is exempt from corporate federal taxes, such as the Indian casino industry, certainly has great potential for corruption. However, there aren t many documented cases of actual mafia involvement. It s the kind of issue that makes for juicy rumors, but there isn t much evidence to back it up. As time has passed, federal authorities have concluded that there is very little mafia involvement with Indian gaming. For
  • 37.
    Media Journal ACritical Analysis of The Daily Show with... The Daily Show pronounces itself as a fake news program, and it pulls its comedy and satire from current news reports, politicians, media companies, and often, features of the show itself. The show usually begins with an extended monologue from host, Jon Stewart, communicating new headlines and regularly includes discussions with several correspondents, who assume ridiculous or amusingly overstated takes on recent events against Stewart s straightforward character. The concluding segment contains a celebrity interview, with guests varying from authors and political figures to actors and musicians. Critics contend the show is a major source for news for the 18 to 34 year old age group because of their satire and sharp witted lampoon of ... Show more content on Helpwriting.net ... Newscasters current view of balance is to report both sides of an issue, despite the consequences. Straightforward news has descended into a wacky belief that replaces balance for accuracy and truth. Virtually every matter can be described as a debate between two conflicting sides, and the journalist is apprehensive of expressing that one side has it right, and the other side does not. It leaves the audience in the position of having to consider opposing factual assertions, often without enough info to properly choose that one side is clearly right, and the other side is striving to create doubt with propaganda. Interpretation An interpretation of the show reflects that many viewers consider Stewart a reputable, true journalist who provides a genuine take on current events. Many watchers obtain their news and opinions from his show. Comparing the show s news outline with that of the more conventional news media and investigating the listing of guests and segments, then placing the program into some kind of media framework shows the structures are quite similar. This leads to the audience giving credibility to the show as an authentic source for news. There are questions raised on how Stewart achieves this. What is Stewart accomplishing on his program, The Daily Show with Jon Stewart, which may affect people to believe him as a trustworthy commentator? How is the show comparable to, and unlike from, what people get from the mainstream media? The
  • 38.
    Kurt Rosenwinkel sCaipi, An Influential American Guitarist Influential American guitarist Kurt Rosenwinkel opted to radically change direction in Caipi, a Brazilian jazz fusion record whose concept and compositions had been worked on over the last ten years. Accompanying the virtuoso guitarist, who also sings and plays bass, keyboards, and percussion, are international artists of undeniable quality. The lineup includes the saxophonist Mark Turner, multi instrumentalist Pedro Martins, and intermittent appearances of violinist Frederika Krier, French horn player Chris Komer, baritone guitarist Alex Kozmidi, drummer Andi Haberl, rock/bluesguitarist Eric Clapton, and a quartet of vocalists. A myriad of colorful confetti covers the tropical landscapes described by the title track, where typical Brazilian rhythms fuse seamlessly with the straight ahead post bop style that the guitarist has been plunging in. On top of the highly colored acoustic voicings, the radiance of his effect drenched electric guitar sound is completely identifiable with previous works, even if applied to a new context. ... Show more content on Helpwriting.net ... The former is inundated with synth vibes, acquiring an R B feel that takes us back to the 80s. In turn, the latter is encircled by a Brazilian pop folk that combines many influences, from Gilberto Gil to Hermeto Pascoal. Rosenwinkel mesmerizes every time he expresses himself on the guitar. Summer Song is a breezy, ear catching piece that features singable melodies over an underground dream pop
  • 39.
    Woodstock Essay Woodstock Woodstock Woodstockwas a rock music festival that took place near Woodstock, New York in a town called Bethel. The festival took place over three days, August 15, 16, and 17, 1969. The original plan for Woodstock was an outdoor rock festival, three days of peace and music in the Catskill village of Woodstock. The festival was expected to attract 50,000 to 100,000 people. It was estimated that an unexpected 400,000 or more people attended. If it weren t for Woodstock, rock and roll wouldn t be where it is today. Woodstock became a symbol of the 1960s American counterculture and a milestone in the history of rock music. The original plan for Woodstock had been to build a recording studio in the town of Woodstock (Sandow, ... Show more content on Helpwriting.net ... They knew that they were all on our way to the same place to enjoy three days of peace and music. Had the festival lasted much longer, as many as one million youths might have made the trip to Bethel. What started off as a promotion for a music studio, ended up as one of the most significant political and sociological events of the age. The main attraction of the festival was an all star cast of top rock artists. Some of the greatest musicians of the 1960s performed, including singers Janis Joplin, Ravi Shankar, Arlo Guthrie, and Joan Baez as well as the bands The Stone; and Creedence Clearwater Revival (Sandow, 1). Singer Joe Cocker and guitar player Carlos Santana, up to then unknown, became overnight stars. Some performers who were scheduled to appear could not due to traffic problems. Jimi Hendrix ended the event with a freeform solo guitar performance of The Star Spangled Banner. The dictionary defines a hippie as one who doesn t conform to society s standards and advocates a liberal attitude and lifestyle. Most of the people at Woodstock were not hippies in the commonly accepted sense: a good half of them, at least, were high school or college students from middle class homes ( The Big Woodstock, 33 ). But at Woodstock they exhibited to the world many of the hippie values and life styles, from psychedelic clothing to spontaneous, unashamed nudity to open and casual sex, and also illicit drugs. Youthful imaginations were
  • 40.
    Green Blazer ShortStory The story Green Blazer brings order with representation of the foundation with build up the presentation and top of the story. The story has woven plot, the author has woven together every components and character to build up a story. In the story there is just a single peak zone, which demonstrates the falling and ascending of the activities. We can see that the story starts with the outline of the foundation, which incorporates the foundation of Raju, the place they are situated at, his family, his general publicand not to overlook the foundation of the green overcoat. In story the author demonstrates the way of life of towns, and the city circumstance. At the point when the story builds up the stories turn out to be more confounded and the argument emerges gradually. The author gradually shows the circumstance of the Raju, the motivation behind why Raju pick the calling, it is providing in the between of the presentation of story and the peak of the story. In this story the contention plot begins from paragraph 2 until the section 8, where Raju first pickpockets the wallet from the green blazer and again chooses to return it. The difficulty and conflict inside Raju creates from here, when he comes to realize that the balloon in that purse the motherless kid to remember green jacket. All through he likewise observe diverse Turing point inside the story. At the point when Raju choose to give the wallet back, the feeling he experiences when he came to realize that he didn t
  • 41.
    Farewell To ArmsWar Imagine a time that had no point, no further meaning to life beside sex and alcohol.In A Farewell to Arms by Ernest Hemingway, the main character Lt Henry is an ambulance driver for the Italian army. While he s in the war, he is blown up, loses his love, and loses his child. Ernest Hemingway shows the reader that life is nothing but a game. To begin, The Book Farewell to Arms shows that life is a game through the war. The Italians are fighting the Austrians and the Italians are losing and can t do anything about it. Lt. Henry asks the other soldiers, And the ones who would not make war? Can they stop it? (71). This a good quote because there is no point to this war because they don t know why they are fighting and can t do anything to... Show more content on Helpwriting.net ... There was a couple that s made up of Catherine Barkley and Frederic Henry who started dating on the front of the war. Lt. Henry states I wish we had some place we could go (31). Henry and Catherine were having sex in a slim alley way. Their relationship started mostly about sex. Which its like a game of life cause it started as henry wanted to have sex and he got it. Then there were Henry and Rinaldi who were best friends on the front Rinaldi was a doctor on the front. Lt. Henry said I m not drunk, Rinin, really (40).So, Lt. Henry and Rinaldi becoming closer friends but it s does not matter because they will most likely never see one another again.They are good friends but this shows that life is nothing more than a game. There is one more friendly relationship, of Catherine Barkley and Helen Ferguson. Ferguson is worried that Catherine and Lt. Henry wouldn t last even know they have a baby on the way. But Catherine assured Ferguson that We ll be married Fergy (248). There not going to have time to get married with Catherine dying and all. Them not being able to get married but them being in love shows how life is a game and the characters are being
  • 42.
    Old Imperialism InAfrica Throughout history, Africa and the Middle East have been colonized by many different countries around the world. Imperialism and colonialism have had great impacts on the occupied country, economically, socially, and culturally. Imperialism is a policy of growing a powerful country by extending its rule over foreign, weaker countries, often to gain influence in that country s politics and economy. Imperialism is often carried out to take advantage of resources in another country. During the Age of Imperialism , there were two different eras: Old Imperialism and New Imperialism. During the Old Imperialism Age, Europeans were seeking routes to Asia, and started to colonize in the Americas, Africa, and Asia. From the 1800s to the 1900s, it was ... Show more content on Helpwriting.net ... There are themes of Africa s past versus its present, economic problems in the new countries, corruption, and women s rights and roles in African society. African literature has many characteristics, such as appropriating colonial languages, colonial discourse, the history of Africa, decolonization struggles, and nationalism. Some major authors are Buchi Emecheta, who wrote Second Class Citizen, Bessie Head, who wrote A Question of Power, Ousmane SembГЁne, who wrote Xala, Ngugi wa Thiong o, who wrote A Grain of Wheat, Nuruddin Farah, who wrote Maps, and Wole Soyinka, who wrote A Play of
  • 43.
    Early Childhood DevelopmentIn The United States The first part in the life cycle of a butterfly is the egg. The small egg is placed on a leaf by the adult female butterfly. Like how the eggs genetics come from the adult butterfly, our ethnicity and heritage can affect our culture. In the article What Is Cultural Heritage? it states, Today, we find that heritage is not only manifested through tangible forms such as artefacts, buildings or landscapes but also through intangible forms. We get more than antiques from our ancestors we get our food, genetics, values, stories, traditions, and possibly religion. Like the caterpillar is placed on a leaf our heritage becomes the foundation of our culture. My ancestors were mainly English, Swedish, and German. I our household we have traditions... Show more content on Helpwriting.net ... Like caterpillars, as kids we absorb everything our parents tell us. The values, beliefs, and morals our parents teach us molds and sculpts our culture. in the article The Impact of Culture on Early Childhood Development in the United States by Damon Verial it states, The United States is a blending of many cultures that feature many stable and different subcultures. Where a child grows up and who her parents are will influence the cultural wisdom, or emphasis of certain values and skills, that are passed to her. A lot of what my parents have taught me culturally is through food. My father spent two years of his life in Switzer land and the South of France. My father has introduced a lot of French culture into our home. On Christmas Eve, we eat shrimp scampy rather than chicken or turkey, which is most common in the United States. On Sunday morning when we were little, our dad would make us omelets. For dinner, we have learned to like crepes, raklet, and fondue. My mom grew up in Idaho. Every meal has some form of potato and a side of salad; almost without fail. My parents raised us in the Church of Jesus Christ of Latter day Saints. In our church, we have a set of guidelines called the Word of Wisdom, which teaches us our bodies are sacred and we should watch what we put in them. For example, we do not drink alcohol or addictive beverages. My parents and their cultures have had momentous effects on my own culture. This however is not restricted just by foods. In positions on contradicting beliefs, I often find my views to mirror the ones of my parents. As I grow older I do not personally know to what extent my parents influence my culture and if my views will change or shift toward or away from what they are
  • 44.
    The Battle OfTechnology And Technology The Battle of Technology Within the 21st century, technology has become very advanced and even addictive for some individuals. With the rapid growth of technology, there has been a debate on if we are overusing technology in our lives. Some people see technology as a force that has escaped from human control while others feel that technology is continually improving the quality of life. In the past, mobile phones were only used as a means to communicate via phone call or text. Today, they are more than just a mere communication device. They are now considered to be an essential part of our everyday lives. Technology continues to advance day by day, and at the same time people are continuing to rely more and more on them. The negative effects of cellphone use are displayed through the reduction of human interaction, instant gratification, and human health issues. There have been significant advancements in the field of technology and science over the past several decades, for example the mobile phone, which was introduced in the mid 1980 s. Although, these developments offer many benefits, they bring upon many negative side effects as well. Consequently, the most important side effect to visit upon is the reduction of human interaction. We live in a world where communication through modern technology is more or so required than optional, from school to work, professor or boss, emailing, iMessaging, and social networking. Mobile phones are changing the way the humans
  • 45.
    Community s Reactionto the Fire in Yackandandah Forest in... Embers Campion Descents play Embers examines the connection between individuals and the community as they react to significant events. The communities residents reaction to the fire in yackandandah forest, The story of the Blue Duck hotel ... and the kangaroo and the story of danny and don ... and the horses. Campion uses a wide range of techniques such as repetition, Irony, alliteration and Imagery /onomatopoeia.This is also shown by quotes from Campion s interview by the abc on the 2003 Victorian bushfires. The connection of the community and individuals is shown by Campion in The Communities residents reaction to the fire in yackandandah forest. Skinny, Slippery Path (pg 41) is the use of alliteration by campion to show how dangerous the experience of a bushfire real is and the things they would have to overcome to be able to save themselves and others they cared about. Campion also uses Repetition Burn me hands because it doesn t work, it doesn t work like it does in the movies. (pg 41) this conveys that they done what they need/had to do to save the animals that the cared dearly as her plan did not work according to her plan. An additional example of this would be Then as that roar got closer you couldn t hear a thing (pg 42) this is alliteration, of the word roar which show that the fire was very loud and dangerous as it came closer to them in the mineshaft.This shows that no matter how dangerous the situation got the community would do there best to keep
  • 46.
    History Of TheMasons History of The Masons This paper is about who the Masons are and how they began. I will explain what exactly they do and how they have come to be now in society. This paper will also explain why they formed as a group in the first place and some common misconceptions of the group themselves. The Masons, or Freemasonry as it is most often referred to, is one of the world s first and oldest secular fraternal societies. It is also one of the largest (Roberts). In the Middle Ages, the term freemason was awarded to highly skilled stonemasons who were hired as free agents to build castles and cathedrals in England and Scotland. Because of the inherent danger of their work, stonemasons formed local organizations, called lodges, to take care of ... Show more content on Helpwriting.net ... Along with religion Freemasonry is also non political, and the discussion of politics at Masonic meetings is also forbidden. Another misconception is that to be a Freemason is to be in secrecy of your affiliation with the fraternity, when in fact the fraternity is not a secret society. Rich goes on to briefly say that membership in Masonry is not a secret and that all members are free to acknowledge their membership. There is no secret about any of Masonry s aims or principles (Rich). Rich goes on saying that there is essentially only in one sense the statement of secrecy true, for any social group or private business is indeed secret in the sense that its business meetings may be open only to its members. Although Masonry s constitutions and rules are available to the public, and meeting locations are clearly identifiable, like many similar organizations, some of Masonry s internal affairs, such as ceremonies, grips, and passwords, are regarded as private matters for members
  • 47.
    A Closer LookOn How Foreign Doctors Are Discriminated A Closer Look on how Foreign Doctors are discriminated A lot of people are bewildered why more foreign doctors are not invited to work in American workplaces. There is a severe discrimination and prejudice amongst anyone who is not an innate U.S. citizen. One of the main reasons why Americans are trying to push foreigners away is for the safety of their nation. Some Americans think that all foreigners are terrorists and are set out to destroy Americans but this is not true at all. In fact, statistics show that foreigners actually bring good to the nation. Brian Palmer, author of Slate magazine says, During the 1990s, a series of studies showed that graduates of foreign medical colleges performed slightly worse on exams than their U.S. trained colleagues, and program heads gave marginally better reviews to domestic physicians. By the turn of the century, however, that gap had disappeared. International graduates now score higher than U.S. educated doctors on many exams (Palmer). This was shocking to know that even though foreign doctors are doing better than domestic doctors, they are still mistreated. Mistreatment of doctors not only spans out nationwide but hits close to home as well. I know a person who had to endure this cruel experience. I truly care for her and she inspires me to be a doctorlike she is. For the sake of anonymity and spilling private personal information, I will call her Jane Doe and omit some details. A couple weeks ago, I interviewed her on
  • 48.
    Retake The DrivingTest Persuasive Essay Some people think that seniors should be required to retake the driving test because they think that with age comes decreased vision, hearing, and reaction time. This is certainly true to a certain extent because this occurs to different people at different speeds. I think that once a person reaches about 75 they should have annual appointments for vision and hearing tests, and if they don t do to well then they should be required to retake the drivingtest. Once people reach a certain age their health starts to degrade. It is more severe with some people than with others because it can faster to some people and slower to others. This severely affects a person s driving capabilities. You need to have keen vision to spot hazards on the road.
  • 49.
    Perpetua s DefianceOf The Young Christian Martyr Throughout the life of the young Christian martyr, Vibia Perpetua, she was placed under strict expectations based on her gender by the Roman society. Perpetua defied the expectations placed upon her since birth by converting to Christianity, yet she still showed ambivalence towards her role as a woman in the new community. This essay will analyze Perpetua s defiance of the gender expectations of both the Roman community and Christian church and the way Perpetua defined her own role as a womanin conflicting societies. In Perpetua s time, the Roman culture had strict views on gender and the role of a woman in society. Early Roman society families had a patriarchal structure meaning the father was the head of the family. The strongest tie within the family was that between a father and a daughter. Daughters were expected to [forge] political and social ties for fathers (Salisbury 6). A Roman daughter was favored the most; they received the best education overseen by their fathers. The purpose of a strong education was to pass on to their sons the values of Rome as well as help her to be a good mother in the future (Salisbury 7). A woman s purpose in the Roman culture was reproduction in order to continue lineage. In addition to strict family and social rules, Roman women joined cults with specific rituals for females to perform. A woman s role in Roman society was defined by cults...to preserve social order (Salisbury 12). Women joined a specific cult depending on the
  • 50.
    Mental Health Status MentalHealth is based on emotional, psychological, and social well being. These factors are based on social interactions, actions, and thoughts. There are various factors that can influence an individual s mental health such as biological factors, social exclusion, and inclusion, as well as societal pressures. However, someone s mental healthcan be compromised when they encounter physical abuse, sexual abuse, and depression. This can cause the individual to develop PTSD which generally cultivates after facing a traumatic situation such as a near death experience. Consequently, when proper care and resources aren t given to people in need they are unable to function to the best of their ability. Though, PTSD can be largely considered an issue... Show more content on Helpwriting.net ... Since this is an issue amongst children who have grown up in homes of neglect, programs for after schools should be integrated. Programs such as Big Brother/Big Sister have been instituted to help students who are in risk of facing judicial issues amongst other issues. However, there is challenges associated with creating these programs because of funding. In order to get additional funding for programs such as after schools they re needs to be enough money in the budget to pay the employer s, pay for necessary equipment, and other expenses. Generally, single income households and neglectful homes are usually lower income households; therefore, the program would have to be free or at a reduced price which can also pose as an issue. The importance of help for people in juvenile detention halls is very important and can be very dire. Programs and prevention programs need to be instituted for proper care to be given so that help can be received and so when the rejoin society they can be flourishing
  • 51.
    Diversity And LearningEnvironment Diversity was tragically scarce in my hometown. The unspoken common goal, seemingly, was to be the exact same as all the other students with regard to clothes, boots, and even designer lunch boxes. Many students acted, dressed, and even spoke differently at home, meaning diversity in the students existed, but was not accepted. Diversity carries little to no meaning without inclusivity. However, inclusivity brings meaning to diversity by ensuring a positive and consequently productive learning environment. I believe a diverse and inclusive learning environment is essential to a productive work environment because diverse ideas bring innovation. Repetitive contributions are hardly helpful when the information shared is neither new nor different
  • 52.
    Unit 8 C1Term Paper Question 3. Identify the constraints that are relevant to the system and its acquisition (conduct activities C1.1.2, C1.1.3, and C1.1.4). Briefly describe the impact of each constraint and how it would need to be taken into account throughout the design process. Assumptions Operators, workers and maintainers are considered constraints(Ryan, 2016). Logs will be provided for recording daily events; Safety (e.g. incident or near miss), Daily Incident (e.g. delays, lost time, late personnel/machinery), Environmental, Defect and medical.(Turner et al., 2007). SPST will be paying for the facilities. The budget allows for this, although if project cost problems occur, more funding will be requested from the Tasmania State Government. SPST Project Schedule allocates enough time for the project to reach completion, ... Show more content on Helpwriting.net ... They are supplement to business constraints in system development(Ryan, 2016). They include: Business environment (including economic availability and licensing whilst affecting component availability and proposed design). Conformance to laws and regulations (including frequency of operation, hazardous materials, disposal/recycling regulations and airworthiness regulations). Compliance with industry standards (including system engineering processes, design procedures, emission frequency levels, building codes and materials). Ethical considerations. Requirement for interoperability, interfacing with systems operating environment (including; capability, temperature, humidity, radiation and robustness). Capability of competitors. Human resources availability. Specific skill sets. Technologies and tools. (Ryan, 2016) Design
  • 53.
    Investigating The EffectOf Ligand On The TFT Properties... To investigate the effect of ligand on the TFT properties, we focused on the In2O3 NCs films cured at 150 В°C. Both the ligand molecules OA and BET were conserved on the NCs surface in the TFT devices at a curing temperature of 150 В°C. The TGA curves confirmed no weight loss at 150 В°C (Figure. 4). Moreover, the FTIR spectrum of the thin films cured at 150 В°C also supported the existence of the ligand molecules OA and BET with high intensity peaks of the alkyl group Csp3 H and carboxylate group COO (Figures 5(a) and 5(b)). Therefore, The Вµ increased after the ligand exchange process because of the decrease ligand length from OA (1.97 nm) to BET (0.48 nm). In the In2O3 NCs films cured at 150 В°C, the NCs are separated by insulating ligand OA... Show more content on Helpwriting.net ... Table 1. TFT characteristics of the In2O3 OA NCs and In2O3 BET NCs thin films annealed at different temperatures. The Вµ of In2O3 OA NC and In2O3 BET NC thin films increased by 2 4 orders of magnitude with increasing annealing temperatures from 150 В°C to 350 В°C, at which the OA or BET ligands decomposed as discussed in the TGA (Figure 4) and FTIR results (Figures 5(a) and 5(b)). Specially, the highest mobility obtained in this study are 4.1 cm2V 1s 1 for the In2O3 BET NC TFT annealed at 350 В°C. This can be explained by thermal decomposition of the organic ligands OA or BET on the NC surface, decreasing the d between the neighboring nanocrystals with increasing annealing temperatures [15]. This was further supported by investigating the crystalline domain sizes of the NCs from the XRD pattern of the thin films (in the supplementary information). The crystalline domain sizes were not significantly affected by the annealing temperature, indicating that the In2O3 NC thin films still consisted of an assembly of the single crystalline NCs [15]. Temperature dependence of In2O3 NC TFT devices To know the charge transport mechanism, the relationship between the mobility and temperature was investigated. The temperature dependence of the mobility takes the general form
  • 54.
    The Gas LadiesAnd Gentlemen Both S. A Novel About the Balkans by Slavenka Drakulic and This Way for the Gas, Ladies and Gentlemen by Tadeusz Borowski are novels that tell the tale of those who were victims of some of the worst crimes ever committed in human history. The main characters of each novel are subjected to terrible conditions but nevertheless both defeat the odds and survive. Survivors of such events often struggle to deal with their past. The authors of each noveldeal with this struggle in different ways through the characters. In her novel, Slavenka writes in a dynamic way about the women s rape camps established Bosnia during the Bosnian War in the early 1990 s. The main character of the book is a woman named S. who was a normal well respected school teacher. ... Show more content on Helpwriting.net ... face similarly deplorable conditions but they both still survive. This is only because they take a number of measures to ensure that they survived. Borowski saved food for himself even when he had enough that he could have spared. He did not give food to those who he knew were going to die because he knew it would just be a waste of food. Even though it may have not been the most kind way of doing things the choices he made were ones that helped him to survive his time in the camp. The only way that he survived was because others died. It is nearly impossible for one to survive such conditions and to help others. The only way he survived the camp was through an every man for himself mentality. After being liberated from the camp Borowski struggled with this survivor s guilt. Even though the novel is not an exact autobiography it is based on his life inside the camps. Just six years after being released from the camp Borowski committed suicide. Borowski opened a gas valve on July 1, 1951 (pg. 11) One can conclude from this suicide that the events from the camp and his own survivor s guilt most likely contributed to his tragic death. In a similar way S. used makeup to preserve herself. S. began wearing makeup in the camp as a way to gain power. When she was wearing makeup she almost had a power over the men that the other women did not have. The other women could not understand why she was wearing makeup but this was only because they did not that
  • 55.
    Identical Twins AndHow The Epigenomes Can Be Affected By... I feel stress is something that can overtake a person when an event or problem happens in their life that becomes difficult for them to handle. However according to Soomo (2014. Chapter one) we learned about the epigenetics of identical twins and how the epigenomes can become affected by environment, health and even stress. These things do change the epigenomes they just trigger signals that turn the epigenomes on and off, which in much later years of life can make identical twins become quite different from each other. According to Soomo (2014. chapter two) we learned about the sympathetic system and how if something alarms you like stress your sympathetic system will increase your heart rate, high pressure, raise your blood sugar (Soomo, 2014) Even prolong effect of stress can cause brain changes that may lend to anxiety, depression, and even addiction (Harvard Health Publishing, 2011). It also works together with the parasympathetic nervous system when stress lessens to create an opposite effect (Soomo,2014). Stress can also play a part in our intelligence. According to Soomo, (2014 chapter three) when someone who has high general intelligence has suffered from brain damage due to a tumor, their emotional intelligence can diminish. In Neuroscientist Antonio Damasio (1994) case of Elliott a successful businessman, he showed no emotion and no response to others feeling after the brain damage which, lead to job lost, bankruptcy, failed marriages, placed in the care of
  • 56.
    Analysis Of TheBook Zeitoun By Dave Eggers I am currently a Junior at Mills High School and I m also enrolled in the AP Language and Composition class. For our summer assignment, we were assigned to read Zeitoun by Dave Eggers, which recounts the story of a Muslim American man named Abdulrahman Zeitoun who remained in New Orleans during 2005 s deadly Hurricane Katrina. While trapped in the city, Zeitoun paddles in his canoe in the flooded streets aiding those who are in danger; however, Zeitoun is suddenly arrested under accusations of being affiliated with an Al Qaeda Terrorist Cell. Throughout the novel, Zeitoun is portrayed as a gentle and compassionate man who puts his own life on the line to save others. Through Zeitoun s actions he defies the harsh stereotypes that surround Muslim Americans following 9/11. While Zeitoun certainly redefines the views of the reader on Muslim Americans and portrays a real struggle for Muslims in our America today; would you still appreciate this story s message and meaning if I informed you that the real Abdulrahman Zeitoun was a man known for committing domestic violenceto his wife? Mr. Zeitoun has indeed abused his wife and has been under trial several times and was convicted of domestic violenceand later faced allegations of hiring attacks on his wife, Kathy. This controversy divided my class into two distinct advocates: some of my classmates support Zeitoun to be remain in the AP Language and Composition curriculum. While others, including myself, agree that by reading,
  • 57.
    Sense Of HorrorIn Macbeth How does Shakespeare create a sense of horror? Shakespeare creates a sense of horror when Macbeth realises that the dead will have their revenge, in act 3 scene 4 but Shakespeare creates a sense of horror earlier on in the play. In Macbeth, blood is a re occurring image of horror, as well as symbolising murder and guilt. In Act 3 scene 4, Macbeth becomes aware of the dead having their revenge. This is clear in the line it will have blood; they say, blood will have blood. Repetition of the word blood creates a sense of horror as it shows Macbeth s state of mind. In other words, all he can think of is murder and how it will lead to his own fate; it shows paranoia. Repetition the word blood also shows that Macbeth sees murder as his only option, he first killed Duncan and then ordered the murderers to kill Banquo, the third blood could symbolise Macbeth s own fate or it could symbolise Fleance having his revenge against Macbeth. In the following line stones have been known to move and trees to speak Shakespeare uses personification to create a sense of horror. The phrase stones have been known to move could symbolise the realisation that occurred after the deaths of Duncan and Banquo. This creates a sense of horror as Macbeth s mind is corrupted with his earlier murders, it could show Macbeth having no other choice but to commit to murder to continue his reign of being king. After this, Macbeth asks Lady Macbeth what is the night? with Lady Macbeth responding