Operations Manager
Luthardt Group
Albania
August 2011 to October 2011
(1 x Ansaldo V64.3A CCGT)
18
Area Operations Manager
Tihama Power
KSA
April 2010 to April 2011
(4 x GE-7FA Cogen cycle)
17
Production Manager (South)
PowerWater Corporation
Australia
November 2011 to February 2012
(various GT's, Dual fuel recip's, solar)
19
Production Manager (South)
PowerWater Corporation
Australia
May 2012 to present
(various GT's, Dual fuel recip's, solar)
21
Simulator Training Instructor
Yokogawa Australia
Bukkit Panggal Power Station
Brunei
March 2012 to April 2012
20
Shift Charge Engineer
Alstom Power Ltd
Hefei No.2 PRC
March 2001 to June 2001
(2 x 350MW Alstom ST)
10
Mechanical Fitter
Comalco
Yennora Australia
March 1989 to February 1989
3
Operations Shift Manager
Alstom Power Ltd
Manjung Malaysia
January 2003 to January 2004
(3 x Alstom 765MW ST)
12
Shift Operational Controller
Powergen International
Paiton II Indonesia
July 2001 to December 2002
(2 x 612MW Siemens ST)
11
Shift Charge Engineer
Siemens KWU
Paiton II Indonesia
December 1999 to December 2000
(2 x 612MW Siemens ST)
9
Operations Mentor
Power Generation Services MapTaPhut
Thailand
September 2007 to February 2009
(2 x 673 MW MHI Steam turbines)
15
Plant Performance Manager
Power Generation Services MapTaPhut
Thailand
March 2009 to March 2010
(2 x 673 MW MHI Steam turbines)
16
Mechanical Fitter Apprentice
Electricity Corporation of NZ
Huntly New Zealand
February 1984 to March 1988
1
Mechanical Fitter
Electricity Corporation of NZ
Huntly New Zealand
February 1989 to June 1991
2
Boiler Operator
Electricity Corporation of NZ
Huntly New Zealand
June 1991 to August 1997
6
Mechanical Fitter
Electricity Corporation of NZ
Te Awamutu New Zealand
March 1996 to August 1997
(1 x P&W FT-4C twinpac cogen plant)
5
Shift Charge Engineer
Transalta NZ Ltd
Taranaki CCP New Zealand
August 1997 to June 1998
(1 x Alstom GT-26 CCGT)
7
Shift Charge Engineer
Siemens KWU
Otahuhu New Zealand
June 1998 to December 1999
(1 x Siemens V94.3 CCGT)
8
Operator
Genesis Energy Limited
Huntly New Zealand
June 2005 to August 2006
(4 x 250MW Parsons ST; 1 x MHI M701
400MW CCGT; 1 x LM6000)
13
Training Instructor
Genesis Energy Limited
Huntly New Zealand
September 2006 to August 2007
(4 x 250MW Parsons ST; 1 x MHI M701
400MW CCGT; 1 x LM6000)
14
New Caledonia Koniambo Nickel
Commissioning Senior Operator/
Shift Manager
2 x BHEL CFB boilers and 135MW Siemens steam turbines, 2 x
RR Trent gas turbines
22
Paiton II
Huntly
Boiler Operator
Malaysia
Area Operations Manager
New Zealand
Training Instructor
New Zealand
Shift Charge Engineer
4 x 250MW Parsons ST with CE Canada p.f. boilers
Huntly
Australia
Australia
20
Paiton II
11
New Zealand
4 x 250MW Parsons ST with CE Canada p.f. boilers;
1 x MHI M701 400MW CCGT; 1 x LM6000
Shedgum and
Uthmaniyah
Various GT’s, Dual fuel recip’s, solar
Operations Shift Manager
Thailand
Brunei
Huntly
New Zealand
1 x Alstom GT-26 CCGT
1 x P&W FT-4C twinpac cogen plant
1 x Siemens V94.3 CCGT
1 x Ansaldo V64.3A CCGTOperations Manager
New Zealand
2 x 612MW Siemens ST with CE Canada boilers
Mechanical Fitter
Otahuhu
2 x 612MW Siemens ST with CE Canada boilers
Vlore CCGT
Mechanical Fitter
19
2 x 673 MW MHI Steam turbines and p.f. fired boilers
6
12
21
Bukit Panggal
Huntly
Huntly
4 x 250MW Parsons ST with CE Canada p.f. boilers
MapTaPhut
17
Taranaki CCP
4 x 250MW Parsons ST with CE Canada p.f. boilers
2 x 350MW Alstom ST
2
Operations Mentor
Saudi Arabia
New Zealand
People Republic of China
18
3 x Alstom 765MW ST with p.f. fired boilers
Shift Charge Engineer
4 x GE-7FA Cogen cycle
Mechanical Fitter Apprentice
Alice Springs, Yulara
and Tennant Creek
7
10
MapTaPhut
Mechanical Fitter
Production Manager Southern
Generation (Acting)
Training Instructor (Simulator)
Plant Performance Manager
Operator
New Zealand
Production Manager Southern
Generation
16
Shift Operational Controller
4 x 250MW Parsons ST with CE Canada p.f. boilers
1
Thailand
New Zealand
Shift Charge Engineer /
Commissioning Engineer
8
4
14
15
Indonesia
13
3
4 x 250MW Parsons ST with CE Canada p.f. boilers;
1 x MHI M701 400MW CCGT; 1 x LM6000
Yennora, Sydney
Albania
Aluminium rolling mills, extrusion presses and remelt furnaces
Hefei No.2
Indonesia
Various GT’s, Dual fuel recip’s, solar
9
Australia
New Zealand
5
Manjung
Huntly
2 x 673 MW MHI Steam turbines and p.f. fired boilers
Mechanical Fitter
Alice Springs, Yulara
and Tennant Creek
Te Awamutu
Shift Charge Engineer /
Commissioning Engineer
Plant detailsJob descriptionSiteCountry
Richard John Smith - Career highlights
Commissioning Senior Operator/Shift
Manager
Silcar – Koniambo
New Caledonia
April 2014 to May 2015
22

More Related Content

What's hot

500 MW SECI’s Government Rooftop Tender: Technical Bid Analysis
500	MW	SECI’s Government Rooftop Tender: Technical Bid Analysis500	MW	SECI’s Government Rooftop Tender: Technical Bid Analysis
500 MW SECI’s Government Rooftop Tender: Technical Bid AnalysisGensol Engineering Limited
 
Summer traininig-report ntpc anta content
Summer traininig-report ntpc anta contentSummer traininig-report ntpc anta content
Summer traininig-report ntpc anta contentnishant pareek
 
history of automobile
history of automobilehistory of automobile
history of automobileRajesh Kumar
 
Power generation through speed breaker
Power generation through speed breakerPower generation through speed breaker
Power generation through speed breakervaibhav patel
 
Ct & Port Cranes Psa 22 Jan07
Ct & Port Cranes Psa 22 Jan07Ct & Port Cranes Psa 22 Jan07
Ct & Port Cranes Psa 22 Jan07krishnan.R
 
Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...
Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...
Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...Sayanti Sanyal
 
Ct & Port Cranes Psa 22jan07
Ct & Port Cranes Psa 22jan07Ct & Port Cranes Psa 22jan07
Ct & Port Cranes Psa 22jan07krishnan.R
 
Experience certificate
Experience certificateExperience certificate
Experience certificateJashim Pd-2
 
Company profile updated on 11.03.2016
Company profile updated on 11.03.2016Company profile updated on 11.03.2016
Company profile updated on 11.03.2016Ulaga Nathan
 
Project Experience - deugro Kuwait
Project Experience - deugro KuwaitProject Experience - deugro Kuwait
Project Experience - deugro KuwaitMoiz Khan
 
Design of Stand-Alone Solar PV System
Design of Stand-Alone Solar PV SystemDesign of Stand-Alone Solar PV System
Design of Stand-Alone Solar PV Systemsangeetkhule
 
IRJET- Experimental Analysis of Vertical Axis Wind Turbine
IRJET- Experimental Analysis of Vertical Axis Wind TurbineIRJET- Experimental Analysis of Vertical Axis Wind Turbine
IRJET- Experimental Analysis of Vertical Axis Wind TurbineIRJET Journal
 

What's hot (17)

500 MW SECI’s Government Rooftop Tender: Technical Bid Analysis
500	MW	SECI’s Government Rooftop Tender: Technical Bid Analysis500	MW	SECI’s Government Rooftop Tender: Technical Bid Analysis
500 MW SECI’s Government Rooftop Tender: Technical Bid Analysis
 
Summer traininig-report ntpc anta content
Summer traininig-report ntpc anta contentSummer traininig-report ntpc anta content
Summer traininig-report ntpc anta content
 
S N Dube CV
S N Dube CVS N Dube CV
S N Dube CV
 
Rolls-Royce ReGenX Generator Invention Introduction
Rolls-Royce ReGenX Generator Invention IntroductionRolls-Royce ReGenX Generator Invention Introduction
Rolls-Royce ReGenX Generator Invention Introduction
 
history of automobile
history of automobilehistory of automobile
history of automobile
 
prakash_chand_5_ (2)
prakash_chand_5_ (2)prakash_chand_5_ (2)
prakash_chand_5_ (2)
 
Power generation through speed breaker
Power generation through speed breakerPower generation through speed breaker
Power generation through speed breaker
 
Ct & Port Cranes Psa 22 Jan07
Ct & Port Cranes Psa 22 Jan07Ct & Port Cranes Psa 22 Jan07
Ct & Port Cranes Psa 22 Jan07
 
Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...
Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...
Solar Energy Assessment Report for 100 kWp of Chandigarh, Punjab created by E...
 
Ct & Port Cranes Psa 22jan07
Ct & Port Cranes Psa 22jan07Ct & Port Cranes Psa 22jan07
Ct & Port Cranes Psa 22jan07
 
Experience certificate
Experience certificateExperience certificate
Experience certificate
 
CV Biswajit Majumdar
CV Biswajit MajumdarCV Biswajit Majumdar
CV Biswajit Majumdar
 
Company profile updated on 11.03.2016
Company profile updated on 11.03.2016Company profile updated on 11.03.2016
Company profile updated on 11.03.2016
 
Project Experience - deugro Kuwait
Project Experience - deugro KuwaitProject Experience - deugro Kuwait
Project Experience - deugro Kuwait
 
Page4 KK2
Page4 KK2Page4 KK2
Page4 KK2
 
Design of Stand-Alone Solar PV System
Design of Stand-Alone Solar PV SystemDesign of Stand-Alone Solar PV System
Design of Stand-Alone Solar PV System
 
IRJET- Experimental Analysis of Vertical Axis Wind Turbine
IRJET- Experimental Analysis of Vertical Axis Wind TurbineIRJET- Experimental Analysis of Vertical Axis Wind Turbine
IRJET- Experimental Analysis of Vertical Axis Wind Turbine
 

Similar to World map of power stations that I have worked in

Similar to World map of power stations that I have worked in (20)

new C.v.update_antonio2
new C.v.update_antonio2new C.v.update_antonio2
new C.v.update_antonio2
 
CV-Basu Sujit 6th July 2016
CV-Basu Sujit 6th July 2016CV-Basu Sujit 6th July 2016
CV-Basu Sujit 6th July 2016
 
CV Tulus Widianto Update
CV Tulus Widianto UpdateCV Tulus Widianto Update
CV Tulus Widianto Update
 
Company profile MAPS TG
Company profile MAPS TGCompany profile MAPS TG
Company profile MAPS TG
 
SHIP PHOTO
SHIP PHOTOSHIP PHOTO
SHIP PHOTO
 
MAPS TG
MAPS TGMAPS TG
MAPS TG
 
Report ntpc auraiya
Report ntpc auraiyaReport ntpc auraiya
Report ntpc auraiya
 
Projects Involved
Projects InvolvedProjects Involved
Projects Involved
 
CV
CVCV
CV
 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC Simhadri
 
Pt Sankyu Indonesia International
Pt Sankyu Indonesia InternationalPt Sankyu Indonesia International
Pt Sankyu Indonesia International
 
Resume Vinoth
Resume VinothResume Vinoth
Resume Vinoth
 
CV.HARIS SIREGAR
CV.HARIS SIREGARCV.HARIS SIREGAR
CV.HARIS SIREGAR
 
CV Mohamad Tarmimi latest (kapal)
CV Mohamad Tarmimi latest (kapal)CV Mohamad Tarmimi latest (kapal)
CV Mohamad Tarmimi latest (kapal)
 
thava
thavathava
thava
 
Ntpc report
Ntpc reportNtpc report
Ntpc report
 
Aprile Project Houston Powerpoint
Aprile Project Houston PowerpointAprile Project Houston Powerpoint
Aprile Project Houston Powerpoint
 
Resume of Selvapathy - Senior Rig Mechanic
Resume of Selvapathy - Senior Rig MechanicResume of Selvapathy - Senior Rig Mechanic
Resume of Selvapathy - Senior Rig Mechanic
 
A summer training report on NTPC
A summer training report on NTPCA summer training report on NTPC
A summer training report on NTPC
 
A summer traning report on ntpc
A summer traning report on ntpcA summer traning report on ntpc
A summer traning report on ntpc
 

More from Richard Smith

GenSync - User Guide
GenSync - User GuideGenSync - User Guide
GenSync - User GuideRichard Smith
 
Parallel Generation and MVars
Parallel Generation and MVarsParallel Generation and MVars
Parallel Generation and MVarsRichard Smith
 
Guide to Furnace Sootblowing
Guide to Furnace SootblowingGuide to Furnace Sootblowing
Guide to Furnace SootblowingRichard Smith
 
MapTaPhut - Unit 1 Boiler log sheet
MapTaPhut - Unit 1 Boiler log sheetMapTaPhut - Unit 1 Boiler log sheet
MapTaPhut - Unit 1 Boiler log sheetRichard Smith
 
Power Station Electrical Protection
Power Station Electrical ProtectionPower Station Electrical Protection
Power Station Electrical ProtectionRichard Smith
 
test paper - marking schedule
test paper - marking scheduletest paper - marking schedule
test paper - marking scheduleRichard Smith
 

More from Richard Smith (10)

User Guide - PID
User Guide - PIDUser Guide - PID
User Guide - PID
 
GenSync - User Guide
GenSync - User GuideGenSync - User Guide
GenSync - User Guide
 
Parallel Generation and MVars
Parallel Generation and MVarsParallel Generation and MVars
Parallel Generation and MVars
 
Guide to Furnace Sootblowing
Guide to Furnace SootblowingGuide to Furnace Sootblowing
Guide to Furnace Sootblowing
 
MapTaPhut - Unit 1 Boiler log sheet
MapTaPhut - Unit 1 Boiler log sheetMapTaPhut - Unit 1 Boiler log sheet
MapTaPhut - Unit 1 Boiler log sheet
 
Power Station Electrical Protection
Power Station Electrical ProtectionPower Station Electrical Protection
Power Station Electrical Protection
 
test paper - marking schedule
test paper - marking scheduletest paper - marking schedule
test paper - marking schedule
 
test paper
test papertest paper
test paper
 
Manjung Brochure
Manjung BrochureManjung Brochure
Manjung Brochure
 
Hefei No2 Brochure
Hefei No2 BrochureHefei No2 Brochure
Hefei No2 Brochure
 

World map of power stations that I have worked in

  • 1. 1 inch 755 mi / 1220 km 1 cm 297 mi / 480 km Operations Manager Luthardt Group Albania August 2011 to October 2011 (1 x Ansaldo V64.3A CCGT) 18 Area Operations Manager Tihama Power KSA April 2010 to April 2011 (4 x GE-7FA Cogen cycle) 17 Production Manager (South) PowerWater Corporation Australia November 2011 to February 2012 (various GT's, Dual fuel recip's, solar) 19 Production Manager (South) PowerWater Corporation Australia May 2012 to present (various GT's, Dual fuel recip's, solar) 21 Simulator Training Instructor Yokogawa Australia Bukkit Panggal Power Station Brunei March 2012 to April 2012 20 Shift Charge Engineer Alstom Power Ltd Hefei No.2 PRC March 2001 to June 2001 (2 x 350MW Alstom ST) 10 Mechanical Fitter Comalco Yennora Australia March 1989 to February 1989 3 Operations Shift Manager Alstom Power Ltd Manjung Malaysia January 2003 to January 2004 (3 x Alstom 765MW ST) 12 Shift Operational Controller Powergen International Paiton II Indonesia July 2001 to December 2002 (2 x 612MW Siemens ST) 11 Shift Charge Engineer Siemens KWU Paiton II Indonesia December 1999 to December 2000 (2 x 612MW Siemens ST) 9 Operations Mentor Power Generation Services MapTaPhut Thailand September 2007 to February 2009 (2 x 673 MW MHI Steam turbines) 15 Plant Performance Manager Power Generation Services MapTaPhut Thailand March 2009 to March 2010 (2 x 673 MW MHI Steam turbines) 16 Mechanical Fitter Apprentice Electricity Corporation of NZ Huntly New Zealand February 1984 to March 1988 1 Mechanical Fitter Electricity Corporation of NZ Huntly New Zealand February 1989 to June 1991 2 Boiler Operator Electricity Corporation of NZ Huntly New Zealand June 1991 to August 1997 6 Mechanical Fitter Electricity Corporation of NZ Te Awamutu New Zealand March 1996 to August 1997 (1 x P&W FT-4C twinpac cogen plant) 5 Shift Charge Engineer Transalta NZ Ltd Taranaki CCP New Zealand August 1997 to June 1998 (1 x Alstom GT-26 CCGT) 7 Shift Charge Engineer Siemens KWU Otahuhu New Zealand June 1998 to December 1999 (1 x Siemens V94.3 CCGT) 8 Operator Genesis Energy Limited Huntly New Zealand June 2005 to August 2006 (4 x 250MW Parsons ST; 1 x MHI M701 400MW CCGT; 1 x LM6000) 13 Training Instructor Genesis Energy Limited Huntly New Zealand September 2006 to August 2007 (4 x 250MW Parsons ST; 1 x MHI M701 400MW CCGT; 1 x LM6000) 14 New Caledonia Koniambo Nickel Commissioning Senior Operator/ Shift Manager 2 x BHEL CFB boilers and 135MW Siemens steam turbines, 2 x RR Trent gas turbines 22 Paiton II Huntly Boiler Operator Malaysia Area Operations Manager New Zealand Training Instructor New Zealand Shift Charge Engineer 4 x 250MW Parsons ST with CE Canada p.f. boilers Huntly Australia Australia 20 Paiton II 11 New Zealand 4 x 250MW Parsons ST with CE Canada p.f. boilers; 1 x MHI M701 400MW CCGT; 1 x LM6000 Shedgum and Uthmaniyah Various GT’s, Dual fuel recip’s, solar Operations Shift Manager Thailand Brunei Huntly New Zealand 1 x Alstom GT-26 CCGT 1 x P&W FT-4C twinpac cogen plant 1 x Siemens V94.3 CCGT 1 x Ansaldo V64.3A CCGTOperations Manager New Zealand 2 x 612MW Siemens ST with CE Canada boilers Mechanical Fitter Otahuhu 2 x 612MW Siemens ST with CE Canada boilers Vlore CCGT Mechanical Fitter 19 2 x 673 MW MHI Steam turbines and p.f. fired boilers 6 12 21 Bukit Panggal Huntly Huntly 4 x 250MW Parsons ST with CE Canada p.f. boilers MapTaPhut 17 Taranaki CCP 4 x 250MW Parsons ST with CE Canada p.f. boilers 2 x 350MW Alstom ST 2 Operations Mentor Saudi Arabia New Zealand People Republic of China 18 3 x Alstom 765MW ST with p.f. fired boilers Shift Charge Engineer 4 x GE-7FA Cogen cycle Mechanical Fitter Apprentice Alice Springs, Yulara and Tennant Creek 7 10 MapTaPhut Mechanical Fitter Production Manager Southern Generation (Acting) Training Instructor (Simulator) Plant Performance Manager Operator New Zealand Production Manager Southern Generation 16 Shift Operational Controller 4 x 250MW Parsons ST with CE Canada p.f. boilers 1 Thailand New Zealand Shift Charge Engineer / Commissioning Engineer 8 4 14 15 Indonesia 13 3 4 x 250MW Parsons ST with CE Canada p.f. boilers; 1 x MHI M701 400MW CCGT; 1 x LM6000 Yennora, Sydney Albania Aluminium rolling mills, extrusion presses and remelt furnaces Hefei No.2 Indonesia Various GT’s, Dual fuel recip’s, solar 9 Australia New Zealand 5 Manjung Huntly 2 x 673 MW MHI Steam turbines and p.f. fired boilers Mechanical Fitter Alice Springs, Yulara and Tennant Creek Te Awamutu Shift Charge Engineer / Commissioning Engineer Plant detailsJob descriptionSiteCountry Richard John Smith - Career highlights Commissioning Senior Operator/Shift Manager Silcar – Koniambo New Caledonia April 2014 to May 2015 22