2. HISTORY
1974 Incorporated in Genoa, Italy
1985 Started PROJECT division
2004 Aprile USA incorporated
2004 Opened in China
2004+ Opened project offices in:
2
• United Kingdom
• UAE
• Singapore
• Kazakhstan
• Brazil
• Chile
• Argentina
• Houston
4. 4
APRILE USA INC.
HEAD OFFICE
1370 Broadway, Suite 1400
New York, NY 10018
Tel. +1 212 273 9700
APRILE USA INC
San Francisco Bay Branch
220 4th Street, Ste 101
Oakland, CA 94607
Ph. +1 510 922.8843
APRILE USA INC
Houston Branch
11000 Richmond Ave. Suite 650
Houston, TX 77042
Ph. +1 713 782 4800
5. APRILE
PROJECTS
HOUSTON
• Booking
• Coordination
• Consolidation
• Packing
• Port captaincy
5
Houston is the busiest port in the
United States in terms of foreign
tonnage, second-busiest in the United
States in terms of overall tonnage, and
thirteenth-busiest in the world. More
than 220 million tons of cargo moved
through the Port of Houston in 2009.
Located in Houston, Aprile Projects
USA is perfectly positioned to monitor
shipments to and from the USA.
6. LOGISTICS
MANAGEMENT
• Planning
• Organization
• Communication
• Control
• Reporting
6
At Aprile Projects we recognize that
the key to successful project shipping is
good management.
Our project management strategy is
based upon detailed planning,
coordinated organization, strict
control and accurate reporting.
7. SPECIALIZED
CARGO
HANDLING
• Expertise
• Experience
• Engineering
• Care
• Safety
7
Throughout the Aprile organization we
have staff with the expertise and
experience to handle cargo of all types
and sizes.
Our in-house engineering support
enables us to offer cost-effective and
safe solutions.
8. CONSULTING
• Surveying
• Feasibility
• Cost analysis
• Reporting
8
Competence in the project logistics
arena means more than just shipping.
We understand that thorough analysis is
necessary to evaluate both the
feasibility and cost of moving project
material.
The Aprile team is fully experienced in
undertaking comprehensive logistics
surveys and issuing detailed and
practical reports.
10. STATUS
REPORTING
Timely
Accurate
Online
Complete
Customized
10
The real-time knowledge of when material will
arrive is one of the keys to a successful project.
Through Aprile’s online tracking system, our
project clients
have access to
accurate and
complete status
information.
Our system can be customized to fit the
specific requirements of any project.
11. HSES
• Health
• Safety
• Environment
• Security
• Monitoring
• Reporting
11
The Aprile Projects HSES Manual is
comprehensive in nature yet specific in its
expectations.
Through the use of our relevant processes and
procedures we are firmly committed to
maintain an industry leading TRIR.
Aprile Projects understands that industry
leading performance in the HSES arena truly
requires a “top down” approach and open
communication between all involved to ensure
success in meeting our goals.
13. 13
GROUP PROJECT
EXPERIENCE
2004/5 6,000 FT Y Power Station EUROPE, USA THAILAND
2007 /8 7 ,000 FT NK1 Project - Job No. 20012 ITALY , N. EUROPE, USA ALGERIA
2010/11 8,000 FT ELMERK Project - Oil & Gas treatment ITALY , N. EUROPE ALGERIA
2010/11 8,000 FT MLE ( Menzel Ledjmet) Project ITALY , N. EUROPE ALGERIA
2010/11 8,000 FT HBK - Oil & Gas treatment ITALY , N. EUROPE ALGERIA
2007 1,800 FT Y early Contract (Breakbulk and Cntrs) CANADA, USA ARGENTINA
ALSTOM 2006 6,600 FT + 140 TEU Petkim Petrokimya Holding A.S. ITALY , N. EUROPE, ASIA TURKEY
2005/7 4,500 FT 185T Sonelgaz Poste Blindé (Sub-Station) ITALY ALGERIA
2005/8 10000 FT Mazar Hydro-electric Project ITALY , N. EUROPE ECUADOR
2006/8 8,000 FT + 100 TEU Shuaibah Water and Electricity Co. ITALY , CHINA SAUDI ARABIA
2009 3,500 FT Y Structures INDIA QATAR
2009 5,000 FT CEPC El Tebbin Power Plant, Egypt ITALY EGY PT
2009/10 9,000 FT 145T Kashar Plant (Sub - Station) ITALY ALBANIA
2009/10 8,000 FT 226T El Atf/Sidi Krir Natural Gas Power Plants ITALY EGY PT
2010 2,100 FT + 600 TEU Abu Kir Plant ITALY EGY PT
2011/12 40,000 FT 230T 6 OTTOBRE PROJ - 4 Gas Power Plants ITALY EGY PT
2010/12 4,000 TEU Lybian Railways Project ITALY LIBY A
BUSI POWER 2006/8 2500 FT Kingston Highway ARGENTINA JAMAICA
2006/8 3000 FT Roads Construction Contract ARGENTINA ECUADOR
2009 2000 FT 6 Passenger Boarding Bridges CHINA MOROCCO
LURGI / LPL 2003/4 80,000 FT 386 T Methanex 4 (local content) WORLDWIDE CHILE
PROJECT ORIGIN(S) DESTINATION
CARTELLONE
CONSTRUCTION
ABB PROCESS
VOLUME H/LCLIENT YEAR
ANSALDO
14. 14
DANIELI 2004/6 15,000 FT + 600 TEU Y Hot Strip Mill (Dammam) WORLDWIDE SAUDI ARABIA
2005/6 5,000 FT + 7 00 TEU Y Hot Strip Mill (Unicoil) WORLDWIDE SAUDI ARABIA
2006/7 7 ,000 FT + 400 TEU 17 0T Steel Mill Complex (Vyksa) ITALY , CHINA, THAILAND RUSSIA
2006/8 40,000 FT + 3,000 TEU 400T GHC Mussafah (Complete Steel Plant) WORLDWIDE UAE
2007 3,7 00 FT + 60 TEU 7 0T JSC Seversky Tube Works, Polevskoe ITALY , N EUROPE, ASIA RUSSIA
2008 5,000 FT 65T Rolling Mill THAILAND, S. KOREA FRANCE
2009 8,000 FT Rolling Mill THAILAND SY RIA
2008 10,000 FT Rolling Mill THAILAND, TURKEY , ITALY BRAZIL
2008 10,000 FT Rolling Mill ITALY , THAILAND RUSSIA
2009 4,000 FT Steel Mill S. KOREA, THAILAND ITALY
2009 20,000 FT Steel structures for industrial building ITALY , THAILAND KUWAIT
2009 10,000 FT 120T Steel Mill Complex Syria THAILAND, BRAZIL SIRY A
2009/10 1,000 TEU AL EZZ steel complex, Ain Sukha ITALY EGY PT
2009/10 110,000 FT + 2,100 TEU 450T GHC 2, Mussafah (Complete Steel Mill) WORLDWIDE UAE
2010 7 11 TEU Al Ezz Flat Steel - Ain Sukhna - Suez ITALY EGY PT
2010 80,000FT + 1,500 TEU 7 45T Al Ezz Steel Reactor UAE EGY PT
2010/11 7 0,000FT + 4,000 TEU 800T Suez Steel WORLDWIDE EGY PT
2010/11 100,000FT + 3,000 TEU 150T Hadeed steel rolling Mill WORLDWIDE SAUDI ARABIA
2010/11 20,000FT + 7 00 TEU 130T Raji Steel WORLDWIDE SAUDI ARABIA
2011 1,200FT + 300 TEU SITREL/ MG DO SUL ITALY , N. EUROPE, CHINA BRAZIL
VOLUME H/L PROJECT ORIGIN(S) DESTINATIONCLIENT YEAR
GROUP PROJECT
EXPERIENCE
15. 15
DOOSAN UK 2009/11 120,000FT + 1,600 TEU Pecam Coal Fired Power Plant CHINA, S. KOREA, EUROPE BRAZIL
ENI 2011 106,000 KG - Airfreight Drilling Equipment - Pemba Forest USA MOZAMBIQUE
FISIA ITAL 2006/7 40,000 FT Al Taweelah B Power & Desalination ITALY , TURKEY , S. KOREA UAE
FOSTER WHEELER 2008/9 3,200 FT + 41 TEU 121T Process gas boiler + spare parts ITALY , N. EUROPE RUSSIA
GHELLA-SELI 2007 4,590 FT + 50 TEU Return of Dismantled TBM COSTA RICA ITALY
HELPE GREECE 2009/10 8,000 FT 120T Helpe Refinery Project ITALY , EUROPE, CANADA GREECE
2007 15,000 FT Bakun Dam & Power Station ARGENTINA MALAY SIA, INDONESIA
2007 20,000 FT Macagua Power Station ARGENTINA VENEZUELA
2007 /08 6,500 FT 160T Boiler for Fujairah Power Plant ITALY UAE
2007 /08 8,500 FT 130T Boiler for Ras Abu Fontas Power Plant N. EUROPE, KOREA QATAR
2010/11 5,000 FT 120T PDO 4 unit Plan Qarn alam - Oman ITALY , ASIA OMAN
NUOVO PIGNONE 2006/7 3,500 FT Y Hassi Messaud (Gas Pumping Station) ITALY ALGERIA
ODEBRECHT 2007 10,000 FT 3rd Bridge over Orinoco River Project USA, CHINA VENEZUELA
2007 /8 2,600 FT + 210 TEU Hot Stoves Piombino Project CHINA ITALY
2009 80 TEU Hot Stoves to Vizak ITALY , RUSSIA, CHINA INDIA
PIZZAROTTI 2007 /10 5,000 FT Y Tunnel des Oudayas - Rabat Project ITALY MOROCCO
PSB PERFORADORA 2010/11 6,000 FT Plant CHILE EL SALVADOR
ROSETTI MARINO 2011 4,000 FT Asthart revamping project ITALY TUNISIA
2009/12 FRAME AGREEMENT WW vendors to Central & S America WORLDWIDE CENTRAL & S. AMERICA
2009/12 FRAME AGREEMENT WW to Korea, Japan, China, Sakhalin WORLDWIDE N.E. ASIA
SELEX 2010/13 2,000 TEU Libian Railways ITALY LIBY A
2008/9 191 TEU Spare parts + tools to Izhevsk CHINA RUSSIA
2009/10 500 TEU Spare parts + tools to Chennai CHINA, ITALY INDIA
2010 2,200 FT Machineris from Marghera to Fujairah ITALY UAE
2010/11 150 TEU XUA ANHUA Iron & Steel ITALY CHINA
DESTINATIONCLIENT YEAR VOLUME H/L PROJECT ORIGIN(S)
SAIPEM
SIEMENS
PAUL WURTH
ITALIA
IMPSA
NOOTER ERIKSSEN
GROUP PROJECT
EXPERIENCE
16. 16
SNAMPROGETTI 2006/8 40,000 FT + 250 TEU + AIR 500T NGL Recovery Plant, Hawiah - Aramco ITALY , N. EUROPE, ASIA SAUDI ARABIA
TAMSA 2010/11 3,000 FT + 1,000 TEU Machineries EUROPE, USA, CHINA MEXICO
TECHINT
ARGENTINA
2006/8 8,000 FT Khursaniyah Pipeline Project S. AMERICA, N. EUROPE SAUDI ARABIA
TECHNIP 2009/10 5,000 FT Midor Project ASIA, EUROPE, S. AFRICA EGY PT
TECNIMONT 2009/12 30,000 FT 300T Coal Fired Power Plant Pecem - Itaqui CHINA, S. KOREA, EUROPE BRAZIL
TECNOPALI 2010/11 6,500 FT Terna Lightpole CHINA ITALY
2009 3,556 FT Pipes from marina di Carrara to Pozzallo ITALY ITALY
1999/2010 20-40,000 FT PER Y EAR Pipes (breakbulk and cntrs) ex Italy ITALY WORLDWIDE
2010 6,050 FT Steel Pipes ITALY ALGERIA
2006/7 100 TEU Hylsa Mexico Project USA, ITALY MEXICO
2007 /8 8,000 FT + 60 TEU Eaf Furnace, Asha + Ishesk, Russia CHINA, ITALY RUSSIA
2008 3,000 FT + 140 TEU Celsa Armeringstaal - Consteel furnace USA, CHINA, ITALY NORWAY
2008 10,000 FT + 40 TEU Ilva Taranto continous ship unloader CHINA ITALY
2008/10 7 ,000 FT + 400 TEU Machinery to Magnitogorsk ITALY , INDIA, GERMANY RUSSIA
2009/10 1,87 0 FT Steel structures INDIA THAILAND
2010 600 TEU Refractory material to Magnitogorsk ITALY , GERMANY , INDIA RUSSIA
2011/12 7 00 TEU GERDAU PROJECT EUROPE, CHINA, INDIA BRAZIL
2009 Rolling cargo, containers, b/b Transfer UN equipment EUROPE, JAPAN SUDAN
2009 417 UN owned containers Transfer UN equipment ITALY SUDAN
2009/10 Rolling cargo, containers, b/b Transfer UN equipment N. EUROPE CHAD
VETRORESINA
ENGINIA SPA
2005 7 ,800 FT Y Power Plant - Tanjung Bin Project ITALY MALAY SIA
VOLUME H/L PROJECT ORIGIN(S)
UNITED NATIONS
TENOVA
TENARIS
(DALMINE)
CLIENT DESTINATIONYEAR
GROUP PROJECT
EXPERIENCE
17. MATERIAL: DRI REACTOR
WEIGHT: 777 T
DIMENSIONS: 50.0 x 12.0 x 12.0 m
PROJECTS
17
CLIENT: DANIELI
COUNTRY: EGYPT
PROJECT: AL EZZ STEEL PLANT
YEAR: 2010/11
TOTAL: 10,000 FT
18. CLIENT: TECNIMONT
PROJECT: PECEM + ITAQUI POWER PLANTS
COUNTRY: BRAZIL
YEAR: 2009/12
TOTAL: 250,000 FT
MATERIAL: GENERATOR
WEIGHT: 266 T
DIMENSIONS: 11.0 x 4.3 x 4.0 m
MATERIAL: STEAM DRUM
WEIGHT: 180 T
DIMENSIONS: 22.3 x 2.6 x 3.3 m
18
PROJECTS
19. CLIENT: ANSALDO
PROJECT: POWER
COUNTRY: EGYPT
YEAR: 2009/10
TOTAL: 8,000 FT
MATERIAL: TANK
WEIGHT: 150 T
19
PROJECTSCLIENT: FOSTER WHEELER
PROJECT: OIL + GAS PROCESSING
COUNTRY: RUSSIA
YEAR: 2008/9
TOTAL: 6,000 FT
MATERIAL: GENERATOR
WEIGHT: 220 T
DIMENSIONS: 7.4 x 4.9 x 4.0 m
20. CLIENT: ANSALDO T&D
PROJECT: KASHAR PWR PLANT
COUNTRY: ALBANIA
YEAR: 2009/10
TOTAL: 10,000 FT
CLIENT: HELLENIC
PROJECT: REFINERY
COUNTRY: GREECE
YEAR: 2009/10
TOTAL: 10,000 FT
20
PROJECTS
MATERIAL: TRANSFORMER
WEIGHT: 150 T
DIMENSIONS: 9.0 x 4.0 x 4.15 m
MATERIAL: HEAT EXCHANGER
WEIGHT: 160 tons
DIMENSIONS: 26,6 x 3,3 x 3,4 m