1. P E R S O N A L D A T A
Sujit BASU Address ‐ INDIA| Sujit Basu | C/O Late Satyen Mitra
RAJA RAMCHAND GHAT ROAD | PANIHATI | KOLKATA
WEST BENGAL | 700 114 | INDIA
Mobile Phone: Riyadh KSA + 966 59 604 1842
India +91 8900183379 & 8900183064 |Home Phone: +91 33
2553 1984 | Email ID – sujitbasuss @yahoo.com
Skype ID - sujitbasuss
Permanent Address – 31 New Road (A.H.Mitra Road) | Post –
Krishnagar | Dist. – Nadia | W.B | Pin No - 741101
Name: Sujit Basu
Date of Birth :
18-09-1960
Home Town:
Krishnagar, District Nadia, State West Bengal, India
School Education: Ramkrishna Mission Vidyapith, Vivekananda Nagar Purulia, West
Bengal, India Under West Bengal Council Of Secondary Education.
College Education: Birla Institute of Technology College Kolkata & Completed Licentiate in
Mechanical Engineering (4 Years Course / 1980-1984 Batch) in the
Year 1984
Additional Professional
Qualifications:
ASNT LEVEL – II (RT, DPT & MPT) from Qtech Institute of NDT & Welding
Technology institute affiliated by American Society of Nondestructive
Testing.
Family information: Married, Wife is a home maker. Son has completed B.Tech in Electrical
Engineering & Presently pursuing M.Tech in Power Electronics &
Machine Drives from National Institute Of Technology Durgapur, (NIT
Durgapur), WB. India.
Hobbies: Reading, Cooking, Long drives, Travelling, Listening to music especially
Rabindranath Tagore’s Songs
Profile: -
Summary Profile: Mechanical Engineer with 29 years of work experience in the field of
Mechanical, Electrical, Instrumentation in Power plants including Gas & Steam Turbine. Boiler and
Balance of plants.
Rotary & Static Equipment In TG Island Viz
Installation and Maintenance of Gas Turbines, Steam Turbines and its Auxiliaries like Boiler Feed
Pump, CEP, Vacuum Pump, Lube & Control oil Pump, Ejector, LP&HP Heater, Flash Box, Condenser,
Compressors. EOT Crane.
Structures & Components Of Boiler/HRSG Island Viz.
Pressure and Non Pressure parts, Boiler Structure, Valves, Damper, Ducts, Damper, Rotary
Equipment.
HP & LP Piping – Boiler, HRSG, Steam Turbine & Water Steam Cycle piping & Turbine internal
piping.
NDT Viz - Evaluation of X-Ray and Stress Reliving of Piping Joints.
Petro Chemical Field
Erection, Testing and Commissioning of Gas Compressor, Piping, EOT Cranes in the field of
Petro-Chemicals.
2. P E R S O N A L D A T A
Present Position / Location:-
Presently working with General Electric Company Noida office as a Lead Installation Leadership
Specialist (M&E) GE Power & Water/ Gas power System in the Middle East region & Presently Posted
GE/Alstom PP12 CCPP Project Riyadh Site Kingdom of Saudi Arabia as a Site Manager
/ Lead Technical Field Adviser & involved lead the team in Supervision, Inspection of STG, HRSG
Erection and Commissioning work & give a Technical support to End Customer, Client & Erection
Contractors. Coordination with Alstom Engineering team and Customer any Engineering related
issue, Material issue, Commissioning issue & daily routine & administrative work of Site Manager.
Previous Employment / Assignment:-
A – Thermal Power Plant Projects:-
1 - Jan 1986 to Jun 1987 1x120MW Thermal Power Project, GEB, Sikka, Gujarat / HBB(BBC) as an
Erection Engineer Steam Turbine & Static & Rotary Equipment of TG island.
2 - Jun 1990 to Aug 1991 2x70MW Lignite based Thermal Power Project , GEB, Kutch, Gujarat, India
/ ABB as a Turbine Lead Erection Engineer & Assistant Site In charge
3 - Sep 1991 to Sep 1995 2x500MW Talcher Super Thermal Power Project, NTPC, Orissa, India /
ABB as a Store Manager & Lead Erection Engineer Piping & Static & Rotary
equipment.
4 - July 1996 to June 1998 Erection of 2x70 M.W. Hindalco Thermal Power Project Site, Renusagar,
UP, India. / ABB as Lead Engineer Steam Turbine, Piping and Static & Rotary
equipment.
5 - July 1998 to Nov 1998 Reliance Petrochemical Project Site, Jamnagar, Gujarat, India. / ABB as a
Site Manager.
6 - Dec 1998 to March 2000 Refurbishment Project of 4x110MW Steam turbine and Coal Fire Boiler at
Panipat Thermal Power Plant, Haryana, India / ABB as an Assistant Site Manger
& Boiler Manager
7 - Jan 2003 to Nov 2004 Over hauling of BBC make Steam Turbine Captive Power Plant in India. /
Alstom in different Captive Power Plant in India as a Lead Service Engineer.
8- February 2013 to September
2014
Alstom EPC Contract 36 MW 300TPH Boiler, Thermal Power Project
Bokaro Power Supply Company, India as Construction Manager Mechanical
and involved in TG and its Static & auxiliary Rotary equipment overhauling and
Erection, WSC Piping Erection work
B – Combined Cycle Power Plant Projects (CCPP):-
1 - Aug 1987 to May 1990 425MW CCPP Project, NTPC, Anta, Rajasthan, India. / ABB as an Erection
Engineer and Commissioning Engineer Gas Turbine GT13D2
2 - Oct 1995 to June 1996 235MW CCPP, GVK Industries Ltd. Rajamundri, India, / ABB as a Store
Manager involved in Store Management and Custom Clearance of project
material, Insurance formalities.
3 - April 2000 to Sep 2000 C- Inspection of GT 13 D Gas Turbines (CCPP) 2 Units of 90 MW. Paka
Power Station, Tarenganu State, Malaysia / Alstom as a Maintenance Engineer.
4 - Dec 2000 to Jan 2002 Erection of 3x270 MW CCPP GT 24 Gas Turbines Lake Road Power
Generation Project Site, PG&E Danielson, CT 06241, USA / Alstom as a Lead
TFA Gas Turbine
5 - Feb 2002 to Dec 2002 Erection of 4x270 MW CCPP, GT 24 Gas Turbines, La-Paloma
Generating Plant Project Site, 1760W Skyline Road, McKitrick, California,
USA , as a Technical Field Advisor Gas Turbine & Maintenance Manager
6 - Dec 2004 to March 2006 3X160MW CCPP Project, (GT13E2) Okpai Power Plant at Nigeria, / Alstom
as a PTW & TOP and BOP Commissioning Engineer.
7 - April 2006 to May 2007 480 MW CCPP Project, GVK Gautami Power Plant,(GT13E2) Samalkot, AP,
India, / Alstom as a TOP Engineer and Trunkey Manager BOP
8 - June 2007 to Feb 2011 1000 MW CC Power Project SOHAR Aluminum Power Plant at Oman,
(GT13E2) / Alstom as a Lead Engineer, Construction Manager, Warranty
Engineer for erection & commissioning TG & WSC Piping , BOP, HRSG & TG &
Aux Static & Rotary equipment including BOP packages
3. P E R S O N A L D A T A
9 - September 2011 to Feb
2012
Worked Alstom Dubai Branch as a Tender Manager M&E Erection _ Middle
East region for CCPP Tendering
10 - September 2012 to Nov
2012
Alstom EPC Contract 400 M.W Add-On Project Az Zour (CCPP), Kuwait
Site – Erection of 5 No’s HRSG & 2 No’s Steam Turbine as a TFA HRSG
11 – November 2014 to 29th
June 2016
GE-Alstom PP12 CCPP 2050 MW Project Riyadh, Kingdom of Saudi
Arabia as a Technical Field Adviser HRSG (TFA) & Deputy lead TFA
12 – 30th
June 2016 Onwards Working as Site Manager / Lead TFA GE-Alstom PP12 2050 MW
CCPP Project Riyadh Saudi Arabia in HRSG & STG area.
Training information Summary:
Training/Course title Organization Date
Welding Inspector Course ABB Aug 1997
Project Management ABB June 2003
EHS Intermediate Level from RRC,
U.K
Alstom July 2005
EHS Elevator Level 3 from RRC, U.K Alstom Aug 2009
Project Risk & Opportunity
Management.
Alstom University, Delhi, India Dec 2010
NEBOSH – Alstom International EHS
Passport
Nebosh (The National Examination
Board in Occupational Safety &
Health)
7th
Oct 2013
E-learning High Risk activity Course Alstom University, UK 16th
January 2015
OTHER INFORMATION
Nationality: Indian
Marital Status: Married
Sex: Male
Private Address: 31 New Road, P.O – Krishnagar, Dist – Nadia, West
Bengal, Pin No - 741101
Passport No.: Z 2542423
Date of
Issue:
26-06-2014 Place of
Issue:
KOLKATA Expiration
Date:
25-06-2024
Date of Birth & Place: 18/09/1960 - HOWRAH
Name of Employer: General Electric Company
Address of Employer: General Electric Company
1st
Floor, Tech buleword | Plot No 6 | Sector 127 |
Noida | Uttar Pradesh – 201 301 | India
Date of Employment: 17-08-1987
Mother Tongue & Foreign Languages: Bengali / English
Current Emolument (Salary package) Approximate 37 Lakes INR Yearly + Other Facility like
family insurance, PF/Gratuity, Family Medical
Insurance, Full Furnished Camp accommodation with
Free Food, Transportation, Every 3month Air tickets to
home town with 15 days paid holiday
Expected CTC Negotiable + Other Facility indicated above & Family
Status
Notice Period 3 Month or 3 month Salary to be paid to GE
My Next Challenges: - To go the extra mile. Face new Engineering Challenges and Problems, and to
beat it! To learn and grow from it, and teach others as well, showing the way how to overcome the problem