SlideShare a Scribd company logo
Work History2008 – current
Outside PlantOperator(10/2008 – current)
• Monitorsand operatesthe tertiarycoolingsystemsof the nuclearinstallation.
• Ensuresparametersmonitoredare correctforthe plantstatusand appliesthe processfor
corrective actionsshouldtheybe outof specification.
• Tertiarycoolingplantstart-upsandshutdownsincollaborationwiththe control room, as
well asmitigatingsystemtrips.
• Extensive pump/valve operation
NuclearAuxilliaryPlantOperator(10/2009 – current)
• Monitorsand operatesthe nuclearreactorauxiliarycoolingandproductionsystemsof the
nuclearinstallation.
• Ensuresparametersmonitoredare correctforthe plantstatus andappliesthe processfor
corrective actionsshouldtheybe outof specification.
• Nuclearauxiliaryplantstart-upsandshutdownsinthe radiological controlledzone,in
collaborationwiththe control roomaswell asmitigatingsystemtrips
• Extensive pump/valve operation
Turbine Hall PlantOperator(11/2011 – current)
• Monitorsand operatesthe auxiliariesaswell assystemsdirectlyaffectingelectrical output
of the mainsteamdriventurbine
• Ensuresparametersmonitoredare correctforthe plantstatus andappliesthe processfor
corrective actionsshouldtheybe outof specification.
• Turbine auxiliarysystemstart-upsandshutdownincollaborationwiththe control room, as
well asmitigatingsystemtrips
• Extensive pump/valve operation
Principle NuclearPlantOperator(07/2011 – current)
• Solelyresponsible forall PermittoWork applicationstoOperatingDepartment.
• Preparation,implementationandrevocationof permits(PTWauthorization)
• Assistswithonjob trainingandcoachingfor nuclearplantoperators
Control RoomOperator– Waste TreatmentPlant(11/2012 – current)
• SupervisesNuclearPlantOperatorsinsidethe radiological controlledzones
• Remote operationof valves,pumpsandtestingof nuclearsafetysystemsfromthe control
room.
• Monitoringparametersandadjustingsystemflowsasrequiredbythe productionplan
• Startingup of evaporators,degassers,ventilationsystemsaswell ascoolingsystems
remotelyfromthe control room.
Skillsand Attributes
• ORHVS-OperatingRegulationsforHighVoltage Systems
• PSR-PlantSafetyRegulations( PermitToWorkSystemAuthorization)
• FirstAid-Level3
• HazardousMaterialsHandling
• ConfinedSpace Rescue
• AdvancedFire Fighting
• Fire TeamLeader
• Safe operation,rackinginandout of 380V ac, as well as6.6 kV breakers
• Assistengineering,chemistryandmaintenance departmentsinrootcause analysis.

More Related Content

Similar to Work History 2008

Extrusion Thermoforming Line
Extrusion Thermoforming LineExtrusion Thermoforming Line
Extrusion Thermoforming Line
Lyle F Eveleigh
 
Description of Enefit-280 technology
Description of Enefit-280 technologyDescription of Enefit-280 technology
Description of Enefit-280 technology
Hanno Luukas
 
Unit 1-2-a
Unit 1-2-aUnit 1-2-a
Unit 1-2-a
srichakra kripa
 
Seismic qualification of equipment by testing-Bhavsar
Seismic qualification of equipment by testing-Bhavsar Seismic qualification of equipment by testing-Bhavsar
Seismic qualification of equipment by testing-Bhavsar
ProSIM R & D Pvt. Ltd.
 
lemirandacv
lemirandacvlemirandacv
Appraisal ppt ankur
Appraisal ppt ankurAppraisal ppt ankur
Appraisal ppt ankur
Ankur Mishra
 
MOTORISED VALVE ACTUATORS_SANTHIRAJ001.pptx
MOTORISED VALVE ACTUATORS_SANTHIRAJ001.pptxMOTORISED VALVE ACTUATORS_SANTHIRAJ001.pptx
MOTORISED VALVE ACTUATORS_SANTHIRAJ001.pptx
KBR-AMCDE
 
Lab 6 measurement of yield point of drilling mud sample using viscometer.
Lab 6 measurement of yield point of drilling mud sample using viscometer.Lab 6 measurement of yield point of drilling mud sample using viscometer.
Lab 6 measurement of yield point of drilling mud sample using viscometer.
Awais Qureshi
 
TA-2015 GE Frame-V Field Instrumentation Overhaul
TA-2015 GE Frame-V Field Instrumentation OverhaulTA-2015 GE Frame-V Field Instrumentation Overhaul
TA-2015 GE Frame-V Field Instrumentation Overhaul
Muhammad Asad Ullah
 
Fault diagnosis & fault tolerance in wind turbines
Fault diagnosis & fault tolerance in wind turbinesFault diagnosis & fault tolerance in wind turbines
Fault diagnosis & fault tolerance in wind turbines
Nitin Goyal
 
A vibration presentation
A vibration presentation A vibration presentation
A vibration presentation
SisayKetema2
 
Condition monitoring of rotating electrical machines
Condition monitoring of rotating electrical machinesCondition monitoring of rotating electrical machines
Condition monitoring of rotating electrical machines
Ankit Basera
 
Sankar resume
Sankar  resumeSankar  resume
Sankar resume
pothuraju sankar
 
steam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdfsteam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdf
chintanraval24
 
Condition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaCondition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performa
Udhayakumar Venkataraman
 
CV khaleeq
CV khaleeqCV khaleeq
CV khaleeq
KHALEEQ AHMAD
 
Paper presentation1
Paper presentation1Paper presentation1
Paper presentation1
fathimaruzila
 
R1_Project - QC Safety System
R1_Project - QC Safety SystemR1_Project - QC Safety System
R1_Project - QC Safety System
Bhupendra Meher
 
Barton dynamic modeling and simulations
Barton dynamic modeling and simulationsBarton dynamic modeling and simulations
Barton dynamic modeling and simulations
isiktu
 
Engine Kaveri
Engine KaveriEngine Kaveri
Engine Kaveri
drdo012345
 

Similar to Work History 2008 (20)

Extrusion Thermoforming Line
Extrusion Thermoforming LineExtrusion Thermoforming Line
Extrusion Thermoforming Line
 
Description of Enefit-280 technology
Description of Enefit-280 technologyDescription of Enefit-280 technology
Description of Enefit-280 technology
 
Unit 1-2-a
Unit 1-2-aUnit 1-2-a
Unit 1-2-a
 
Seismic qualification of equipment by testing-Bhavsar
Seismic qualification of equipment by testing-Bhavsar Seismic qualification of equipment by testing-Bhavsar
Seismic qualification of equipment by testing-Bhavsar
 
lemirandacv
lemirandacvlemirandacv
lemirandacv
 
Appraisal ppt ankur
Appraisal ppt ankurAppraisal ppt ankur
Appraisal ppt ankur
 
MOTORISED VALVE ACTUATORS_SANTHIRAJ001.pptx
MOTORISED VALVE ACTUATORS_SANTHIRAJ001.pptxMOTORISED VALVE ACTUATORS_SANTHIRAJ001.pptx
MOTORISED VALVE ACTUATORS_SANTHIRAJ001.pptx
 
Lab 6 measurement of yield point of drilling mud sample using viscometer.
Lab 6 measurement of yield point of drilling mud sample using viscometer.Lab 6 measurement of yield point of drilling mud sample using viscometer.
Lab 6 measurement of yield point of drilling mud sample using viscometer.
 
TA-2015 GE Frame-V Field Instrumentation Overhaul
TA-2015 GE Frame-V Field Instrumentation OverhaulTA-2015 GE Frame-V Field Instrumentation Overhaul
TA-2015 GE Frame-V Field Instrumentation Overhaul
 
Fault diagnosis & fault tolerance in wind turbines
Fault diagnosis & fault tolerance in wind turbinesFault diagnosis & fault tolerance in wind turbines
Fault diagnosis & fault tolerance in wind turbines
 
A vibration presentation
A vibration presentation A vibration presentation
A vibration presentation
 
Condition monitoring of rotating electrical machines
Condition monitoring of rotating electrical machinesCondition monitoring of rotating electrical machines
Condition monitoring of rotating electrical machines
 
Sankar resume
Sankar  resumeSankar  resume
Sankar resume
 
steam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdfsteam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdf
 
Condition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performaCondition monitoring of_steam_turbines_by_performa
Condition monitoring of_steam_turbines_by_performa
 
CV khaleeq
CV khaleeqCV khaleeq
CV khaleeq
 
Paper presentation1
Paper presentation1Paper presentation1
Paper presentation1
 
R1_Project - QC Safety System
R1_Project - QC Safety SystemR1_Project - QC Safety System
R1_Project - QC Safety System
 
Barton dynamic modeling and simulations
Barton dynamic modeling and simulationsBarton dynamic modeling and simulations
Barton dynamic modeling and simulations
 
Engine Kaveri
Engine KaveriEngine Kaveri
Engine Kaveri
 

Work History 2008

  • 1. Work History2008 – current Outside PlantOperator(10/2008 – current) • Monitorsand operatesthe tertiarycoolingsystemsof the nuclearinstallation. • Ensuresparametersmonitoredare correctforthe plantstatusand appliesthe processfor corrective actionsshouldtheybe outof specification. • Tertiarycoolingplantstart-upsandshutdownsincollaborationwiththe control room, as well asmitigatingsystemtrips. • Extensive pump/valve operation NuclearAuxilliaryPlantOperator(10/2009 – current) • Monitorsand operatesthe nuclearreactorauxiliarycoolingandproductionsystemsof the nuclearinstallation. • Ensuresparametersmonitoredare correctforthe plantstatus andappliesthe processfor corrective actionsshouldtheybe outof specification. • Nuclearauxiliaryplantstart-upsandshutdownsinthe radiological controlledzone,in collaborationwiththe control roomaswell asmitigatingsystemtrips • Extensive pump/valve operation Turbine Hall PlantOperator(11/2011 – current) • Monitorsand operatesthe auxiliariesaswell assystemsdirectlyaffectingelectrical output of the mainsteamdriventurbine • Ensuresparametersmonitoredare correctforthe plantstatus andappliesthe processfor corrective actionsshouldtheybe outof specification. • Turbine auxiliarysystemstart-upsandshutdownincollaborationwiththe control room, as well asmitigatingsystemtrips • Extensive pump/valve operation Principle NuclearPlantOperator(07/2011 – current) • Solelyresponsible forall PermittoWork applicationstoOperatingDepartment. • Preparation,implementationandrevocationof permits(PTWauthorization) • Assistswithonjob trainingandcoachingfor nuclearplantoperators
  • 2. Control RoomOperator– Waste TreatmentPlant(11/2012 – current) • SupervisesNuclearPlantOperatorsinsidethe radiological controlledzones • Remote operationof valves,pumpsandtestingof nuclearsafetysystemsfromthe control room. • Monitoringparametersandadjustingsystemflowsasrequiredbythe productionplan • Startingup of evaporators,degassers,ventilationsystemsaswell ascoolingsystems remotelyfromthe control room. Skillsand Attributes • ORHVS-OperatingRegulationsforHighVoltage Systems • PSR-PlantSafetyRegulations( PermitToWorkSystemAuthorization) • FirstAid-Level3 • HazardousMaterialsHandling • ConfinedSpace Rescue • AdvancedFire Fighting • Fire TeamLeader • Safe operation,rackinginandout of 380V ac, as well as6.6 kV breakers • Assistengineering,chemistryandmaintenance departmentsinrootcause analysis.