Between the Gravel and the Sea: Vital Role of the Willamette River for Chinoo...
Willamette Biological Opinion Implementation - US Army Corps
1. Willamette Biological Opinion
Implementation
December 12, 2012
Ian Chane
Acting Biological Opinion Implementation Program Manager
Portland District
US Army Corps of Engineers
BUILDING STRONG®
2. Detroit
Big Cliff
Green Peter
Foster
Willamette Project
13 multi-purpose
dams
Cougar
Blue River
Dexter
Fall Creek
Lookout Point
BUILDING STRONG®
Hills Creek
3. Authorized
purposes
Flood damage
reduction
Hydropower
Navigation
Irrigation
Fish & wildlife
Recreation
Water quality
Municipal & industrial
water supply
BUILDING STRONG®
4. Willamette Project Biological Opinions:
Consultation under the ESA
Federal Action Agencies prepare Biological Assessments (BA)
describing effects of actions on ESA-listed fish
NMFS and USFWS issue Biological Opinions (“BiOps”) that tell
Action Agencies how to reduce impacts
Two biological opinions (NMFS and USFWS) issued on July 11,
2008 after eight years of “ESA Consultation”
► Biological Opinions cover 15 years (through 2023)
Proposed Action Includes:
► Continued operation of 13-dam complex
► Continued maintenance of 42 miles of revetments
► Operation of hatchery program
BUILDING STRONG®
5. Willamette BiOp
Major Actions
Downstream Passage
Upstream Passage
Water Quality
Instream Flows/Ramp
Rates
Hatcheries
ESA-Listed Resident Fish
Species
Oregon chub bull trout
ESA-Listed Anadromous Fish Species
winter steelhead spring Chinook salmon BUILDING STRONG®
6. Willamette Action Team for Ecosystem Restoration (WATER)
Teams and Workgroups
Assesses feasibility,
Corps Manager’s Forum integrates, and
prioritizes actions and
Team/Process assesses
Assesses
biological benefits
WATER Team technical
Steering Team feasibility, designs
of actions
Configurations
Public Affairs Team Design Operations
Teams/PDTs Plan (COP)
Reservoir
Fish Passage &
Regulation
Hatchery Management
(FPHM)
Coordinates
modeling &
Other Work operational
feasibility
Groups Flow Management &
Water Quality
Habitat Tech Team
(HTT)
RM&E Team
BUILDING STRONG®
7. Columbia/Willamette Comparison
Mainstem Columbia Dams
• Operated primarily for hydropower, run-of-river; in series on mainstem
• Primarily migration concerns (adult/juvenile)
Willamette Basin Dams
• Operated primarily for flood
damage reduction (storage)
• High-head dams
• Located in tributaries
• All lifestages present
BUILDING STRONG®
8. Willamette BiOp Actions: A life-cycle approach
Evaluate Downstream Fish
Passage Improvements spawning
•Cougar habitat
•Lookout Point
•Detroit
Upstream fish passage
for adults via “trap-
and-haul”
•Cougar
•Minto
•Foster
•Dexter
•Fall Creek
•Adult Release Sites
Downstream Habitat
Improvements
•Flow
•Temperature
Research, Monitoring,
•Hatchery
and Evaluation
improvements
•Habitat Restoration
Projects BUILDING STRONG®
12. Adult Fish Facility Updates
Adult Fish Collection Facilities
► Cougar – SF McKenzie completed (3rd year)
► Minto – N. Santiam complete in spring 2013
► Foster – South Santiam under construction
► Dexter – Middle Fork Willamette in design phase
► Fall Creek – Fall Creek (MF Willamette) alternatives study phase
Adult Release Sites
► Improvements complete in 2013
BUILDING STRONG®
13. Downstream Passage Updates
McKenzie Subbasin
► RM&E on-going
► Drawdown operations 2012-2013
► Alternatives Assessment underway
Middle Fork Willamette Subbasin
► Fall Creek drawdown
► RM&E on-going
South Santiam Subbasin
► Foster fish weir operations
North Santiam Subbasin
► RM&E on-going
BUILDING STRONG®