SlideShare a Scribd company logo
WHY HARMONICS IS
UNWANTED ??
CONTACT US FOR POWER QUALITY AUDIT /
HARMONICS AUDIT
+91-8800671509 / sales@felidaesystems.com
www.felidaesystems.in
HARMONICS:
IT SURFACED AS A BUZZWORD IN THE EARLY 1980S, MAKING MANY PEOPLE
RECONSIDER THE EFFECTIVENESS OF THEIR BUILDING'S WIRING SYSTEM.
YET, MANY STILL VIEW THE CONCEPT AS A RELATIVELY NEW PHENOMENON.
THE ASSOCIATED PROBLEMS EXISTED IN THE ELECTRICAL WORLD WAY BACK WHEN
TRANSISTOR TUBES WERE FIRST USED IN THE 1930S.
ASIDE FROM GROUNDING, MANY DEEM HARMONICS AS ONE OF THE GREATEST CONCERNS
FOR THE POWER QUALITY INDUSTRY TODAY.
WE DEFINE HARMONICS AS VOLTAGES OR CURRENTS AT FREQUENCIES THAT ARE A MULTIPLE
OF THE FUNDAMENTAL FREQUENCY. IN MOST SYSTEMS, THE FUNDAMENTAL FREQUENCY IS 50
HZ SYSTEMS, THE HARMONIC ORDER IS 100 HZ, 150 HZ, 200 HZ, ETC.)
WE USUALLY SPECIFY THESE ORDERS BY THEIR HARMONIC NUMBER OR MULTIPLE OF THE
FUNDAMENTAL FREQUENCY.
FOR EXAMPLE, A HARMONIC WITH A FREQUENCY OF 150 HZ IS KNOWN AS THE THIRD
HARMONIC (50X3 = 150).
UP UNTIL 1980, ALL LOADS WERE KNOWN AS LINEAR. THIS MEANS IF THE VOLTAGE INPUT TO A
PIECE OF EQUIPMENT IS A SINE WAVE, THE RESULTANT CURRENT WAVEFORM GENERATED BY
THE LOAD IS ALSO A SINE WAVE.
IN 1981, MANUFACTURERS OF ELECTRONIC HARDWARE CONVERTED TO AN EFFICIENT TYPE OF
INTERNAL POWER SUPPLY KNOWN AS A SWITCH-MODE POWER SUPPLY (SMPS).
THE SMPS CONVERTS THE APPLIED VOLTAGE SINE WAVE TO A DISTORTED CURRENT
WAVEFORM THAT RESEMBLES ALTERNATING CURRENT PULSES; OBVIOUSLY, THE LOAD
DOESN'T EXHIBIT A CONSTANT IMPEDANCE THROUGHOUT THE APPLIED AC VOLTAGE
WAVEFORM.
THERE ARE TWO MAIN AFFECTS OF HARMONIC CURRENTS ON A DISTRIBUTION SYSTEM.
THE FIRST IS THAT HARMONIC CURRENTS ADD TO THE RMS VALUE OF THE FUNDAMENTAL.
THIS ADDITIONAL CURRENT WILL INCREASE LOSSES IN WIRE, BUS BARS, TRANSFORMERS AND
POWER FACTOR CORRECTION CAPACITORS USED IN THE DISTRIBUTION SYSTEM.
A TYPICAL VALUE FOR THE ADDITIONAL RMS LOSS WOULD BE 3% IF
SKIN EFFECT AND CORE LOSSES COULD BE IGNORED. UNFORTUNATELY, THEY CANNOT BE
IGNORED.
THE SECOND AFFECT IS THE ADDITIONAL HEATING CAUSED BY EACH OF THE HARMONIC
CURRENTS. TRANSFORMERS, CAPACITORS, CIRCUIT BREAKERS, WIRES AND BUS BARS MUST BE
DESIGNED TO HANDLE THE HIGHER FREQUENCY CURRENTS.
IF THESE COMPONENTS ARE NOT CORRECTLY SIZED FOR THE HARMONIC CURRENTS, THE
HARMONIC CURRENTS CAN CAUSE ADDITIONAL HEATING IN THOSE COMPONENTS.
THIS HEATING CAN RESULT IN PREMATURE COMPONENT FAILURE AND THE POSSIBILITY OF FIRE.
IN MODERN ELECTRICAL SYSTEMS, POWER ELECTRONICS ARE USED TO CONTROL THE
CIRCUITS. THESE POWER ELECTRONICS INCLUDING VFDS, UPSS ETC. NEEDS DC POWER TO
OPERATE WHILE THE UTILITY SUPPLY IS A 3-PHASE AC SUPPLY. THESE APPLIANCES ARE NON-
LINEAR IN THE WAY THEY DRAW CURRENT THROUGH THE MAINS ELECTRICITY SUPPLY.
THE VARIABLE FREQUENCY DRIVES AND UPS SYSTEMS ARE A MAJOR SOURCE OF HARMONICS
BEING INJECTED INTO THE ELECTRICAL SYSTEM AND WITHOUT PROPER PROTECTION, THESE
HARMONICS CAN AFFECT OTHER PARTS OF THE PLANT AND EVEN THE GRID.
UPS SYSTEMS CONVERT THE INCOMING AC TO A DC SIGNAL TO CHARGE BATTERIES IN THE
EVENT OF A POWER OUTAGE – THE DC COMPONENT IS A VERY HIGH FREQUENCY SIGNALAND
IT INTERFERES WITH THE NEAR PERFECT AC POWER SUPPLIES (MOST OF THE DISTORTION IN
THE MODERN POWER NETWORK IS CUSTOMER GENERATED).
Normal Wave due to linear loads
Distorted Wave due to presence of
non linear loads like VFDs etc or
rather say due to presence of
Harmonics
THE PRESENCE OF HARMONICS REDUCES THE LIFE OF EQUIPMENT.
IT IS POSSIBLE THAT THE INVESTMENT THAT YOU MADE IN YOUR MOTORS & DRIVES WILL NOT BE
REALISED IF THEY ARE DAMAGED AND NEED REPLACING BEFORE THEIR EXPECTED LIFE SPAN.
THIS CAN BE VERY EXPENSIVE. HARMONICS CAUSE THINGS TO RUN HOT, WHICH CAUSE STRESS ON
THE CABLES AND EQUIPMENT
IN THE LONG TERM, THIS DEGRADES AN ELECTRICAL SYSTEM. THE PRESENCE OF HARMONICS
WILLALSO MEAN THAT ALTHOUGH YOU WILL GET BILLED FOR THE POWER THAT YOU ARE
SUPPLIED, A LARGE PERCENTAGE OF THAT POWER MAY BE UNUSABLE
HARMONIC DISTORTION CAN CAUSE POOR POWER FACTOR, TRANSFORMER AND
DISTRIBUTION EQUIPMENT OVERHEATING, RANDOM BREAKER TRIPPING, OR EVEN SENSITIVE
EQUIPMENT FAILURE.
SINCE HARMONICS AFFECT THE OVERALL POWER DISTRIBUTION SYSTEM, THE POWER
UTILITY MAY EVEN LEVY HEAVY FINES WHEN A FACILITY IS AFFECTING THE UTILITIES’
ABILITY TO EFFICIENTLY SUPPLY POWER TO ALL OF ITS CUSTOMERS.
PRESENCE OF HARMONICS IN ELECTRICAL CIRCUIT CAN CAUSE HEAVY DAMAGE
ONE OF THE MAJOR CAUSES OF SHORT CIRCUITS IS HARMONICS
IT ALSO LEADS TO HIGH ENERGY LOSSES.
THOROUGH ANALYSIS OF POWER QUALITY IS IMPORTANT
DETECT THE LEVEL OF HARMONICS IN YOUR ELECTRICAL SYSTEM
MINIMISE IT’S PRESENCE AS MUCH POSSIBLE
DON’T DELAY FOR THE LAST HOUR
STITCH IN TIME SAVES NINE
GO FOR HARMONICS LEVELANALYSIS
OF YOUR ELECTRICAL SYSTEM
CONTACT US…..
BEE CERTIFIED ACCREDITED ENERGY AUDITORS
BEE CERTIFIED ENERGY AUDITORS
BEE CERTIFIED ENERGY MANAGERS
RETIRED INDUSTRIAL EXPERTS FROM
BHEL,SAIL,HZL,DVC
YOUNG DYNAMIC ENERGY PROFESSIONALS
GOOD SUPPORTING STAFF
FELIDAE SYSTEMS
www.felidaesystems.in
sales@felidaesystems.com
+91-8800671509
CONTACT US FOR HARMONICS AUDIT OF YOUR ELECTRICAL SYSTEM
+91-8800671509 / sales@felidaesystems.com
www.felidaesystems.in

More Related Content

What's hot

Harmonics and mitigation techniques
Harmonics and mitigation techniquesHarmonics and mitigation techniques
Harmonics and mitigation techniques
rifat maryum
 
Harmonics
HarmonicsHarmonics
Harmonics
_fahad_shaikh
 
Power Quality
Power QualityPower Quality
Power Quality
kunwartouseef
 
Vivek harmonics
Vivek harmonicsVivek harmonics
Vivek harmonics
vivek01031992
 
Introduction to Power Quality
Introduction to Power Quality Introduction to Power Quality
Introduction to Power Quality
Piyush Tandel
 
Power Quality
Power QualityPower Quality
Power Quality
P K Agarwal
 
Power quality issues & solutions in electrical system-felidae systems
Power quality issues & solutions in electrical system-felidae systemsPower quality issues & solutions in electrical system-felidae systems
Power quality issues & solutions in electrical system-felidae systems
FELIDAE SYSTEMS
 
Ppt
PptPpt
Analysis of harmonic at different level on distribution system ,its effect a...
Analysis of harmonic at different level on distribution system ,its effect  a...Analysis of harmonic at different level on distribution system ,its effect  a...
Analysis of harmonic at different level on distribution system ,its effect a...
Anuj Arora
 
Harmonic analysis procedure
Harmonic analysis procedureHarmonic analysis procedure
Harmonic analysis procedure
srini09
 
Switching Transient Problem with Loads
Switching Transient Problem with LoadsSwitching Transient Problem with Loads
Switching Transient Problem with Loads
Noralina A.
 
electrical transients in power system
electrical transients in power systemelectrical transients in power system
electrical transients in power system
Vinayaka Shetty
 
Voltage sag
Voltage sagVoltage sag
Voltage sag
AJAL A J
 
Power quality 1341013148
Power quality 1341013148Power quality 1341013148
Power quality 1341013148
Pradosh Dhal
 
Power quality
Power qualityPower quality
Power quality
Karansinh Parmar
 
Harmonics: Causes and Effects
Harmonics: Causes and EffectsHarmonics: Causes and Effects
Harmonics: Causes and Effects
Leonardo ENERGY
 
Analysis of generated harmonics due to transformer load on power system using
Analysis of generated harmonics due to transformer load on power system usingAnalysis of generated harmonics due to transformer load on power system using
Analysis of generated harmonics due to transformer load on power system using
IAEME Publication
 
Product: Power Factor & Harmonics: StacoSine: MGE filter presentation
Product: Power Factor & Harmonics: StacoSine: MGE filter presentationProduct: Power Factor & Harmonics: StacoSine: MGE filter presentation
Product: Power Factor & Harmonics: StacoSine: MGE filter presentation
Staco Energy
 
Harmonics
HarmonicsHarmonics
Harmonics
Kartik Mali
 
Power Quality Basics_Complex Compatibility_Aclara
Power Quality Basics_Complex Compatibility_AclaraPower Quality Basics_Complex Compatibility_Aclara
Power Quality Basics_Complex Compatibility_Aclara
Aclara
 

What's hot (20)

Harmonics and mitigation techniques
Harmonics and mitigation techniquesHarmonics and mitigation techniques
Harmonics and mitigation techniques
 
Harmonics
HarmonicsHarmonics
Harmonics
 
Power Quality
Power QualityPower Quality
Power Quality
 
Vivek harmonics
Vivek harmonicsVivek harmonics
Vivek harmonics
 
Introduction to Power Quality
Introduction to Power Quality Introduction to Power Quality
Introduction to Power Quality
 
Power Quality
Power QualityPower Quality
Power Quality
 
Power quality issues & solutions in electrical system-felidae systems
Power quality issues & solutions in electrical system-felidae systemsPower quality issues & solutions in electrical system-felidae systems
Power quality issues & solutions in electrical system-felidae systems
 
Ppt
PptPpt
Ppt
 
Analysis of harmonic at different level on distribution system ,its effect a...
Analysis of harmonic at different level on distribution system ,its effect  a...Analysis of harmonic at different level on distribution system ,its effect  a...
Analysis of harmonic at different level on distribution system ,its effect a...
 
Harmonic analysis procedure
Harmonic analysis procedureHarmonic analysis procedure
Harmonic analysis procedure
 
Switching Transient Problem with Loads
Switching Transient Problem with LoadsSwitching Transient Problem with Loads
Switching Transient Problem with Loads
 
electrical transients in power system
electrical transients in power systemelectrical transients in power system
electrical transients in power system
 
Voltage sag
Voltage sagVoltage sag
Voltage sag
 
Power quality 1341013148
Power quality 1341013148Power quality 1341013148
Power quality 1341013148
 
Power quality
Power qualityPower quality
Power quality
 
Harmonics: Causes and Effects
Harmonics: Causes and EffectsHarmonics: Causes and Effects
Harmonics: Causes and Effects
 
Analysis of generated harmonics due to transformer load on power system using
Analysis of generated harmonics due to transformer load on power system usingAnalysis of generated harmonics due to transformer load on power system using
Analysis of generated harmonics due to transformer load on power system using
 
Product: Power Factor & Harmonics: StacoSine: MGE filter presentation
Product: Power Factor & Harmonics: StacoSine: MGE filter presentationProduct: Power Factor & Harmonics: StacoSine: MGE filter presentation
Product: Power Factor & Harmonics: StacoSine: MGE filter presentation
 
Harmonics
HarmonicsHarmonics
Harmonics
 
Power Quality Basics_Complex Compatibility_Aclara
Power Quality Basics_Complex Compatibility_AclaraPower Quality Basics_Complex Compatibility_Aclara
Power Quality Basics_Complex Compatibility_Aclara
 

Viewers also liked

كتاب - التمديدات الكهربائية - د. جيلانى
كتاب - التمديدات الكهربائية - د. جيلانىكتاب - التمديدات الكهربائية - د. جيلانى
كتاب - التمديدات الكهربائية - د. جيلانىhanthalah
 
_____
   _____   _____
_____
yeksdech
 
Sabah elmasarawy power quality harmonics
Sabah elmasarawy   power quality harmonicsSabah elmasarawy   power quality harmonics
Sabah elmasarawy power quality harmonicssarah7887
 
المرجع فى التركيبات والتصميمات الكهربية د.محمود جيلانى (Www.fb.com electric...
المرجع فى التركيبات والتصميمات الكهربية   د.محمود جيلانى (Www.fb.com electric...المرجع فى التركيبات والتصميمات الكهربية   د.محمود جيلانى (Www.fb.com electric...
المرجع فى التركيبات والتصميمات الكهربية د.محمود جيلانى (Www.fb.com electric...Mahmoud Wanis
 
جودة القدرة Power quality
جودة القدرة Power qualityجودة القدرة Power quality
جودة القدرة Power quality
Dr. Munthear Alqaderi
 
Active Filter (Low Pass)
Active Filter (Low Pass)Active Filter (Low Pass)
Active Filter (Low Pass)
Saravanan Sukumaran
 
Filters
FiltersFilters
UX, ethnography and possibilities: for Libraries, Museums and Archives
UX, ethnography and possibilities: for Libraries, Museums and ArchivesUX, ethnography and possibilities: for Libraries, Museums and Archives
UX, ethnography and possibilities: for Libraries, Museums and Archives
Ned Potter
 

Viewers also liked (8)

كتاب - التمديدات الكهربائية - د. جيلانى
كتاب - التمديدات الكهربائية - د. جيلانىكتاب - التمديدات الكهربائية - د. جيلانى
كتاب - التمديدات الكهربائية - د. جيلانى
 
_____
   _____   _____
_____
 
Sabah elmasarawy power quality harmonics
Sabah elmasarawy   power quality harmonicsSabah elmasarawy   power quality harmonics
Sabah elmasarawy power quality harmonics
 
المرجع فى التركيبات والتصميمات الكهربية د.محمود جيلانى (Www.fb.com electric...
المرجع فى التركيبات والتصميمات الكهربية   د.محمود جيلانى (Www.fb.com electric...المرجع فى التركيبات والتصميمات الكهربية   د.محمود جيلانى (Www.fb.com electric...
المرجع فى التركيبات والتصميمات الكهربية د.محمود جيلانى (Www.fb.com electric...
 
جودة القدرة Power quality
جودة القدرة Power qualityجودة القدرة Power quality
جودة القدرة Power quality
 
Active Filter (Low Pass)
Active Filter (Low Pass)Active Filter (Low Pass)
Active Filter (Low Pass)
 
Filters
FiltersFilters
Filters
 
UX, ethnography and possibilities: for Libraries, Museums and Archives
UX, ethnography and possibilities: for Libraries, Museums and ArchivesUX, ethnography and possibilities: for Libraries, Museums and Archives
UX, ethnography and possibilities: for Libraries, Museums and Archives
 

Similar to WHY HARMONICS IS UNWANTED ?

Effects of Harmonics on Customer Equipment
Effects of Harmonics on Customer Equipment Effects of Harmonics on Customer Equipment
Effects of Harmonics on Customer Equipment
TESCO - The Eastern Specialty Company
 
Ppt on introduction to power quality
Ppt on introduction to power qualityPpt on introduction to power quality
Ppt on introduction to power quality
Shivani Mishra
 
An Overview of Harmonic Sources in Power System
An Overview of Harmonic Sources in Power SystemAn Overview of Harmonic Sources in Power System
An Overview of Harmonic Sources in Power System
IOSR Journals
 
Harmonics
HarmonicsHarmonics
Harmonics
Fahad Shaikh
 
Harmonics in pv
Harmonics in pvHarmonics in pv
Harmonics in pv
ANINDYA BIKASH DE
 
WHY POWER QUALITY AUDIT IS IMPORTANT ???
WHY POWER QUALITY AUDIT IS IMPORTANT ???WHY POWER QUALITY AUDIT IS IMPORTANT ???
WHY POWER QUALITY AUDIT IS IMPORTANT ???
chandan sudip
 
Inspection of voltage sags and voltage swells incident in power quality probl...
Inspection of voltage sags and voltage swells incident in power quality probl...Inspection of voltage sags and voltage swells incident in power quality probl...
Inspection of voltage sags and voltage swells incident in power quality probl...
IRJET Journal
 
Multi – Grounding in the Distribution System.pptx
Multi – Grounding in the Distribution System.pptxMulti – Grounding in the Distribution System.pptx
Multi – Grounding in the Distribution System.pptx
MarlonAgustin3
 
High voltage grounding methods
High voltage grounding methods High voltage grounding methods
High voltage grounding methods
Adnan Khan
 
Sources of over voltages power quality.pptx
Sources of over voltages power quality.pptxSources of over voltages power quality.pptx
Sources of over voltages power quality.pptx
ViniHema
 
Electrical fundamentals terms
Electrical fundamentals termsElectrical fundamentals terms
Electrical fundamentals terms
Rajneesh Budania
 
Electrical fundamentals terms
Electrical fundamentals termsElectrical fundamentals terms
Electrical fundamentals terms
Rajneesh Budania
 
Hormonics impact and_mitigation
Hormonics impact and_mitigationHormonics impact and_mitigation
Hormonics impact and_mitigation
Panneerselvam Rathinam
 
Different Types of Power Problems
Different Types of Power ProblemsDifferent Types of Power Problems
Different Types of Power Problems
Chintan Patel
 
s.pdf
s.pdfs.pdf
s.pdf
epaysokhan
 
POWER QUALITY ISSUES & SOLUTIONS - FELIDAE SYSTEMS
POWER QUALITY ISSUES & SOLUTIONS - FELIDAE SYSTEMSPOWER QUALITY ISSUES & SOLUTIONS - FELIDAE SYSTEMS
POWER QUALITY ISSUES & SOLUTIONS - FELIDAE SYSTEMS
FELIDAE SYSTEMS
 
Describe the foration of corona and discus thr factorz which affect corona loss
Describe the foration of corona and discus thr factorz  which affect corona lossDescribe the foration of corona and discus thr factorz  which affect corona loss
Describe the foration of corona and discus thr factorz which affect corona loss
Engr Nazeer Jasser
 
An introduction to FACTS
An introduction to FACTSAn introduction to FACTS
An introduction to FACTS
Ayyarao T S L V
 
Accurate Power Conversion Measurements on High Power Motor Drives
Accurate Power Conversion Measurements on High Power Motor DrivesAccurate Power Conversion Measurements on High Power Motor Drives
Accurate Power Conversion Measurements on High Power Motor Drives
GMW Associates
 
An introduction to FACTS Technology
An introduction to FACTS TechnologyAn introduction to FACTS Technology
An introduction to FACTS Technology
Ayyarao T S L V
 

Similar to WHY HARMONICS IS UNWANTED ? (20)

Effects of Harmonics on Customer Equipment
Effects of Harmonics on Customer Equipment Effects of Harmonics on Customer Equipment
Effects of Harmonics on Customer Equipment
 
Ppt on introduction to power quality
Ppt on introduction to power qualityPpt on introduction to power quality
Ppt on introduction to power quality
 
An Overview of Harmonic Sources in Power System
An Overview of Harmonic Sources in Power SystemAn Overview of Harmonic Sources in Power System
An Overview of Harmonic Sources in Power System
 
Harmonics
HarmonicsHarmonics
Harmonics
 
Harmonics in pv
Harmonics in pvHarmonics in pv
Harmonics in pv
 
WHY POWER QUALITY AUDIT IS IMPORTANT ???
WHY POWER QUALITY AUDIT IS IMPORTANT ???WHY POWER QUALITY AUDIT IS IMPORTANT ???
WHY POWER QUALITY AUDIT IS IMPORTANT ???
 
Inspection of voltage sags and voltage swells incident in power quality probl...
Inspection of voltage sags and voltage swells incident in power quality probl...Inspection of voltage sags and voltage swells incident in power quality probl...
Inspection of voltage sags and voltage swells incident in power quality probl...
 
Multi – Grounding in the Distribution System.pptx
Multi – Grounding in the Distribution System.pptxMulti – Grounding in the Distribution System.pptx
Multi – Grounding in the Distribution System.pptx
 
High voltage grounding methods
High voltage grounding methods High voltage grounding methods
High voltage grounding methods
 
Sources of over voltages power quality.pptx
Sources of over voltages power quality.pptxSources of over voltages power quality.pptx
Sources of over voltages power quality.pptx
 
Electrical fundamentals terms
Electrical fundamentals termsElectrical fundamentals terms
Electrical fundamentals terms
 
Electrical fundamentals terms
Electrical fundamentals termsElectrical fundamentals terms
Electrical fundamentals terms
 
Hormonics impact and_mitigation
Hormonics impact and_mitigationHormonics impact and_mitigation
Hormonics impact and_mitigation
 
Different Types of Power Problems
Different Types of Power ProblemsDifferent Types of Power Problems
Different Types of Power Problems
 
s.pdf
s.pdfs.pdf
s.pdf
 
POWER QUALITY ISSUES & SOLUTIONS - FELIDAE SYSTEMS
POWER QUALITY ISSUES & SOLUTIONS - FELIDAE SYSTEMSPOWER QUALITY ISSUES & SOLUTIONS - FELIDAE SYSTEMS
POWER QUALITY ISSUES & SOLUTIONS - FELIDAE SYSTEMS
 
Describe the foration of corona and discus thr factorz which affect corona loss
Describe the foration of corona and discus thr factorz  which affect corona lossDescribe the foration of corona and discus thr factorz  which affect corona loss
Describe the foration of corona and discus thr factorz which affect corona loss
 
An introduction to FACTS
An introduction to FACTSAn introduction to FACTS
An introduction to FACTS
 
Accurate Power Conversion Measurements on High Power Motor Drives
Accurate Power Conversion Measurements on High Power Motor DrivesAccurate Power Conversion Measurements on High Power Motor Drives
Accurate Power Conversion Measurements on High Power Motor Drives
 
An introduction to FACTS Technology
An introduction to FACTS TechnologyAn introduction to FACTS Technology
An introduction to FACTS Technology
 

Recently uploaded

[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
Jason Yip
 
"Choosing proper type of scaling", Olena Syrota
"Choosing proper type of scaling", Olena Syrota"Choosing proper type of scaling", Olena Syrota
"Choosing proper type of scaling", Olena Syrota
Fwdays
 
GraphRAG for LifeSciences Hands-On with the Clinical Knowledge Graph
GraphRAG for LifeSciences Hands-On with the Clinical Knowledge GraphGraphRAG for LifeSciences Hands-On with the Clinical Knowledge Graph
GraphRAG for LifeSciences Hands-On with the Clinical Knowledge Graph
Neo4j
 
Christine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptxChristine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptx
christinelarrosa
 
Christine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptxChristine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptx
christinelarrosa
 
What is an RPA CoE? Session 1 – CoE Vision
What is an RPA CoE?  Session 1 – CoE VisionWhat is an RPA CoE?  Session 1 – CoE Vision
What is an RPA CoE? Session 1 – CoE Vision
DianaGray10
 
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeckPoznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
FilipTomaszewski5
 
GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)
Javier Junquera
 
Must Know Postgres Extension for DBA and Developer during Migration
Must Know Postgres Extension for DBA and Developer during MigrationMust Know Postgres Extension for DBA and Developer during Migration
Must Know Postgres Extension for DBA and Developer during Migration
Mydbops
 
"NATO Hackathon Winner: AI-Powered Drug Search", Taras Kloba
"NATO Hackathon Winner: AI-Powered Drug Search",  Taras Kloba"NATO Hackathon Winner: AI-Powered Drug Search",  Taras Kloba
"NATO Hackathon Winner: AI-Powered Drug Search", Taras Kloba
Fwdays
 
Lee Barnes - Path to Becoming an Effective Test Automation Engineer.pdf
Lee Barnes - Path to Becoming an Effective Test Automation Engineer.pdfLee Barnes - Path to Becoming an Effective Test Automation Engineer.pdf
Lee Barnes - Path to Becoming an Effective Test Automation Engineer.pdf
leebarnesutopia
 
Apps Break Data
Apps Break DataApps Break Data
Apps Break Data
Ivo Velitchkov
 
What is an RPA CoE? Session 2 – CoE Roles
What is an RPA CoE?  Session 2 – CoE RolesWhat is an RPA CoE?  Session 2 – CoE Roles
What is an RPA CoE? Session 2 – CoE Roles
DianaGray10
 
Principle of conventional tomography-Bibash Shahi ppt..pptx
Principle of conventional tomography-Bibash Shahi ppt..pptxPrinciple of conventional tomography-Bibash Shahi ppt..pptx
Principle of conventional tomography-Bibash Shahi ppt..pptx
BibashShahi
 
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
DanBrown980551
 
AWS Certified Solutions Architect Associate (SAA-C03)
AWS Certified Solutions Architect Associate (SAA-C03)AWS Certified Solutions Architect Associate (SAA-C03)
AWS Certified Solutions Architect Associate (SAA-C03)
HarpalGohil4
 
Discover the Unseen: Tailored Recommendation of Unwatched Content
Discover the Unseen: Tailored Recommendation of Unwatched ContentDiscover the Unseen: Tailored Recommendation of Unwatched Content
Discover the Unseen: Tailored Recommendation of Unwatched Content
ScyllaDB
 
Containers & AI - Beauty and the Beast!?!
Containers & AI - Beauty and the Beast!?!Containers & AI - Beauty and the Beast!?!
Containers & AI - Beauty and the Beast!?!
Tobias Schneck
 
"Frontline Battles with DDoS: Best practices and Lessons Learned", Igor Ivaniuk
"Frontline Battles with DDoS: Best practices and Lessons Learned",  Igor Ivaniuk"Frontline Battles with DDoS: Best practices and Lessons Learned",  Igor Ivaniuk
"Frontline Battles with DDoS: Best practices and Lessons Learned", Igor Ivaniuk
Fwdays
 
PRODUCT LISTING OPTIMIZATION PRESENTATION.pptx
PRODUCT LISTING OPTIMIZATION PRESENTATION.pptxPRODUCT LISTING OPTIMIZATION PRESENTATION.pptx
PRODUCT LISTING OPTIMIZATION PRESENTATION.pptx
christinelarrosa
 

Recently uploaded (20)

[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
[OReilly Superstream] Occupy the Space: A grassroots guide to engineering (an...
 
"Choosing proper type of scaling", Olena Syrota
"Choosing proper type of scaling", Olena Syrota"Choosing proper type of scaling", Olena Syrota
"Choosing proper type of scaling", Olena Syrota
 
GraphRAG for LifeSciences Hands-On with the Clinical Knowledge Graph
GraphRAG for LifeSciences Hands-On with the Clinical Knowledge GraphGraphRAG for LifeSciences Hands-On with the Clinical Knowledge Graph
GraphRAG for LifeSciences Hands-On with the Clinical Knowledge Graph
 
Christine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptxChristine's Supplier Sourcing Presentaion.pptx
Christine's Supplier Sourcing Presentaion.pptx
 
Christine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptxChristine's Product Research Presentation.pptx
Christine's Product Research Presentation.pptx
 
What is an RPA CoE? Session 1 – CoE Vision
What is an RPA CoE?  Session 1 – CoE VisionWhat is an RPA CoE?  Session 1 – CoE Vision
What is an RPA CoE? Session 1 – CoE Vision
 
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeckPoznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
Poznań ACE event - 19.06.2024 Team 24 Wrapup slidedeck
 
GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)GNSS spoofing via SDR (Criptored Talks 2024)
GNSS spoofing via SDR (Criptored Talks 2024)
 
Must Know Postgres Extension for DBA and Developer during Migration
Must Know Postgres Extension for DBA and Developer during MigrationMust Know Postgres Extension for DBA and Developer during Migration
Must Know Postgres Extension for DBA and Developer during Migration
 
"NATO Hackathon Winner: AI-Powered Drug Search", Taras Kloba
"NATO Hackathon Winner: AI-Powered Drug Search",  Taras Kloba"NATO Hackathon Winner: AI-Powered Drug Search",  Taras Kloba
"NATO Hackathon Winner: AI-Powered Drug Search", Taras Kloba
 
Lee Barnes - Path to Becoming an Effective Test Automation Engineer.pdf
Lee Barnes - Path to Becoming an Effective Test Automation Engineer.pdfLee Barnes - Path to Becoming an Effective Test Automation Engineer.pdf
Lee Barnes - Path to Becoming an Effective Test Automation Engineer.pdf
 
Apps Break Data
Apps Break DataApps Break Data
Apps Break Data
 
What is an RPA CoE? Session 2 – CoE Roles
What is an RPA CoE?  Session 2 – CoE RolesWhat is an RPA CoE?  Session 2 – CoE Roles
What is an RPA CoE? Session 2 – CoE Roles
 
Principle of conventional tomography-Bibash Shahi ppt..pptx
Principle of conventional tomography-Bibash Shahi ppt..pptxPrinciple of conventional tomography-Bibash Shahi ppt..pptx
Principle of conventional tomography-Bibash Shahi ppt..pptx
 
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
LF Energy Webinar: Carbon Data Specifications: Mechanisms to Improve Data Acc...
 
AWS Certified Solutions Architect Associate (SAA-C03)
AWS Certified Solutions Architect Associate (SAA-C03)AWS Certified Solutions Architect Associate (SAA-C03)
AWS Certified Solutions Architect Associate (SAA-C03)
 
Discover the Unseen: Tailored Recommendation of Unwatched Content
Discover the Unseen: Tailored Recommendation of Unwatched ContentDiscover the Unseen: Tailored Recommendation of Unwatched Content
Discover the Unseen: Tailored Recommendation of Unwatched Content
 
Containers & AI - Beauty and the Beast!?!
Containers & AI - Beauty and the Beast!?!Containers & AI - Beauty and the Beast!?!
Containers & AI - Beauty and the Beast!?!
 
"Frontline Battles with DDoS: Best practices and Lessons Learned", Igor Ivaniuk
"Frontline Battles with DDoS: Best practices and Lessons Learned",  Igor Ivaniuk"Frontline Battles with DDoS: Best practices and Lessons Learned",  Igor Ivaniuk
"Frontline Battles with DDoS: Best practices and Lessons Learned", Igor Ivaniuk
 
PRODUCT LISTING OPTIMIZATION PRESENTATION.pptx
PRODUCT LISTING OPTIMIZATION PRESENTATION.pptxPRODUCT LISTING OPTIMIZATION PRESENTATION.pptx
PRODUCT LISTING OPTIMIZATION PRESENTATION.pptx
 

WHY HARMONICS IS UNWANTED ?

  • 1. WHY HARMONICS IS UNWANTED ?? CONTACT US FOR POWER QUALITY AUDIT / HARMONICS AUDIT +91-8800671509 / sales@felidaesystems.com www.felidaesystems.in
  • 2. HARMONICS: IT SURFACED AS A BUZZWORD IN THE EARLY 1980S, MAKING MANY PEOPLE RECONSIDER THE EFFECTIVENESS OF THEIR BUILDING'S WIRING SYSTEM. YET, MANY STILL VIEW THE CONCEPT AS A RELATIVELY NEW PHENOMENON.
  • 3. THE ASSOCIATED PROBLEMS EXISTED IN THE ELECTRICAL WORLD WAY BACK WHEN TRANSISTOR TUBES WERE FIRST USED IN THE 1930S. ASIDE FROM GROUNDING, MANY DEEM HARMONICS AS ONE OF THE GREATEST CONCERNS FOR THE POWER QUALITY INDUSTRY TODAY.
  • 4. WE DEFINE HARMONICS AS VOLTAGES OR CURRENTS AT FREQUENCIES THAT ARE A MULTIPLE OF THE FUNDAMENTAL FREQUENCY. IN MOST SYSTEMS, THE FUNDAMENTAL FREQUENCY IS 50 HZ SYSTEMS, THE HARMONIC ORDER IS 100 HZ, 150 HZ, 200 HZ, ETC.)
  • 5. WE USUALLY SPECIFY THESE ORDERS BY THEIR HARMONIC NUMBER OR MULTIPLE OF THE FUNDAMENTAL FREQUENCY. FOR EXAMPLE, A HARMONIC WITH A FREQUENCY OF 150 HZ IS KNOWN AS THE THIRD HARMONIC (50X3 = 150).
  • 6. UP UNTIL 1980, ALL LOADS WERE KNOWN AS LINEAR. THIS MEANS IF THE VOLTAGE INPUT TO A PIECE OF EQUIPMENT IS A SINE WAVE, THE RESULTANT CURRENT WAVEFORM GENERATED BY THE LOAD IS ALSO A SINE WAVE.
  • 7. IN 1981, MANUFACTURERS OF ELECTRONIC HARDWARE CONVERTED TO AN EFFICIENT TYPE OF INTERNAL POWER SUPPLY KNOWN AS A SWITCH-MODE POWER SUPPLY (SMPS). THE SMPS CONVERTS THE APPLIED VOLTAGE SINE WAVE TO A DISTORTED CURRENT WAVEFORM THAT RESEMBLES ALTERNATING CURRENT PULSES; OBVIOUSLY, THE LOAD DOESN'T EXHIBIT A CONSTANT IMPEDANCE THROUGHOUT THE APPLIED AC VOLTAGE WAVEFORM.
  • 8. THERE ARE TWO MAIN AFFECTS OF HARMONIC CURRENTS ON A DISTRIBUTION SYSTEM. THE FIRST IS THAT HARMONIC CURRENTS ADD TO THE RMS VALUE OF THE FUNDAMENTAL. THIS ADDITIONAL CURRENT WILL INCREASE LOSSES IN WIRE, BUS BARS, TRANSFORMERS AND POWER FACTOR CORRECTION CAPACITORS USED IN THE DISTRIBUTION SYSTEM. A TYPICAL VALUE FOR THE ADDITIONAL RMS LOSS WOULD BE 3% IF SKIN EFFECT AND CORE LOSSES COULD BE IGNORED. UNFORTUNATELY, THEY CANNOT BE IGNORED.
  • 9. THE SECOND AFFECT IS THE ADDITIONAL HEATING CAUSED BY EACH OF THE HARMONIC CURRENTS. TRANSFORMERS, CAPACITORS, CIRCUIT BREAKERS, WIRES AND BUS BARS MUST BE DESIGNED TO HANDLE THE HIGHER FREQUENCY CURRENTS. IF THESE COMPONENTS ARE NOT CORRECTLY SIZED FOR THE HARMONIC CURRENTS, THE HARMONIC CURRENTS CAN CAUSE ADDITIONAL HEATING IN THOSE COMPONENTS. THIS HEATING CAN RESULT IN PREMATURE COMPONENT FAILURE AND THE POSSIBILITY OF FIRE.
  • 10. IN MODERN ELECTRICAL SYSTEMS, POWER ELECTRONICS ARE USED TO CONTROL THE CIRCUITS. THESE POWER ELECTRONICS INCLUDING VFDS, UPSS ETC. NEEDS DC POWER TO OPERATE WHILE THE UTILITY SUPPLY IS A 3-PHASE AC SUPPLY. THESE APPLIANCES ARE NON- LINEAR IN THE WAY THEY DRAW CURRENT THROUGH THE MAINS ELECTRICITY SUPPLY. THE VARIABLE FREQUENCY DRIVES AND UPS SYSTEMS ARE A MAJOR SOURCE OF HARMONICS BEING INJECTED INTO THE ELECTRICAL SYSTEM AND WITHOUT PROPER PROTECTION, THESE HARMONICS CAN AFFECT OTHER PARTS OF THE PLANT AND EVEN THE GRID. UPS SYSTEMS CONVERT THE INCOMING AC TO A DC SIGNAL TO CHARGE BATTERIES IN THE EVENT OF A POWER OUTAGE – THE DC COMPONENT IS A VERY HIGH FREQUENCY SIGNALAND IT INTERFERES WITH THE NEAR PERFECT AC POWER SUPPLIES (MOST OF THE DISTORTION IN THE MODERN POWER NETWORK IS CUSTOMER GENERATED).
  • 11. Normal Wave due to linear loads Distorted Wave due to presence of non linear loads like VFDs etc or rather say due to presence of Harmonics
  • 12. THE PRESENCE OF HARMONICS REDUCES THE LIFE OF EQUIPMENT. IT IS POSSIBLE THAT THE INVESTMENT THAT YOU MADE IN YOUR MOTORS & DRIVES WILL NOT BE REALISED IF THEY ARE DAMAGED AND NEED REPLACING BEFORE THEIR EXPECTED LIFE SPAN. THIS CAN BE VERY EXPENSIVE. HARMONICS CAUSE THINGS TO RUN HOT, WHICH CAUSE STRESS ON THE CABLES AND EQUIPMENT
  • 13. IN THE LONG TERM, THIS DEGRADES AN ELECTRICAL SYSTEM. THE PRESENCE OF HARMONICS WILLALSO MEAN THAT ALTHOUGH YOU WILL GET BILLED FOR THE POWER THAT YOU ARE SUPPLIED, A LARGE PERCENTAGE OF THAT POWER MAY BE UNUSABLE
  • 14. HARMONIC DISTORTION CAN CAUSE POOR POWER FACTOR, TRANSFORMER AND DISTRIBUTION EQUIPMENT OVERHEATING, RANDOM BREAKER TRIPPING, OR EVEN SENSITIVE EQUIPMENT FAILURE.
  • 15. SINCE HARMONICS AFFECT THE OVERALL POWER DISTRIBUTION SYSTEM, THE POWER UTILITY MAY EVEN LEVY HEAVY FINES WHEN A FACILITY IS AFFECTING THE UTILITIES’ ABILITY TO EFFICIENTLY SUPPLY POWER TO ALL OF ITS CUSTOMERS.
  • 16. PRESENCE OF HARMONICS IN ELECTRICAL CIRCUIT CAN CAUSE HEAVY DAMAGE ONE OF THE MAJOR CAUSES OF SHORT CIRCUITS IS HARMONICS IT ALSO LEADS TO HIGH ENERGY LOSSES.
  • 17. THOROUGH ANALYSIS OF POWER QUALITY IS IMPORTANT DETECT THE LEVEL OF HARMONICS IN YOUR ELECTRICAL SYSTEM MINIMISE IT’S PRESENCE AS MUCH POSSIBLE DON’T DELAY FOR THE LAST HOUR STITCH IN TIME SAVES NINE
  • 18. GO FOR HARMONICS LEVELANALYSIS OF YOUR ELECTRICAL SYSTEM
  • 19. CONTACT US….. BEE CERTIFIED ACCREDITED ENERGY AUDITORS BEE CERTIFIED ENERGY AUDITORS BEE CERTIFIED ENERGY MANAGERS RETIRED INDUSTRIAL EXPERTS FROM BHEL,SAIL,HZL,DVC YOUNG DYNAMIC ENERGY PROFESSIONALS GOOD SUPPORTING STAFF
  • 21. CONTACT US FOR HARMONICS AUDIT OF YOUR ELECTRICAL SYSTEM +91-8800671509 / sales@felidaesystems.com www.felidaesystems.in