BIM (Building Information Modeling) is a 3D modeling method that allows AEC professionals to plan, design, construct, and manage buildings and infrastructure more efficiently. The BIM model contains information about all aspects of the building like walls, doors, and floors, and can be used for design development, construction documentation, and facility operations. The BIM process involves planning with existing data, conceptual and detailed design, construction using BIM specifications, and operating the completed building using its BIM data. As the construction industry in India is booming due to economic growth, demand for BIM skills is increasing, leading to the development of specialist roles like BIM managers, modelers, and technicians. Training in BIM software