1. Waste Management Perspectives
in St.Petersburg
Denis Zavyalov
Head of the Development and Investment Projects Department
St.Petersburg City Improvement Committee
2. St.Petersburg
Key Facts:
Population – 5,028 million people
Area –1,439 km²
Area of industrial zones –
240 km²
Gross Regional Product 2012 –
US$ 67 billion
St.Petersburg:
Russia’s second largest city, industrial, scientific & culture centre
Supportive local authorities
Strong FDI – Toyota, General Motors, Ford, Nokian Tyres
Major tourist destination – “Venice of the North”
3. St.Petersburg Key Projects
«The Western High Speed Diameter Road»
Project description:
Whole length of the route: 46,6 km
Traffic capacity: up to 128 000 vehicle per day
Financing form: PPP
The Northern and Southern parts of the road have already
been finished till this moment. Only the Central part is
building now
«Pulkovo Airport Development Project»
Project description:
Passenger traffic capacity: up to 17 million per year
Financing form: PPP
Construction is completed and testing of airport operations
began on October 1, 2013
4. Waste Treatment Industry
in figures
St.Petersburg generates about 10 million m3
of MSW annually
Waste treatment plants treat about 15% of
total amount of waste
The rest 85% are disposed at the landfills
Forecast for 2020 is more than 12 million m3
(2 million tons) of MSW to be generated
5. Existing Infrastructure of the Waste
Treatment Industry
2 plants
«Yanino» and «Volkhonka»
Using technology: mechanical-biological treatment
Useful materials such as paper, plastic and metals are
recovered first through the mechanical separation stage.
The rest organic material goes through the composting
stage. The end product is CLO (Compost-like output).
2 landfill sites
«Novosyolki»
Capacity: 34 million tons (residual capacity in 2012 3,7 million tons)
«Novy Svet»
Capacity: 18 million tons (residual capacity in 2012 7 million tons)
6. Waste Collection System
St.Petersburg has 25 060 waste
collection sites including:
arranged collection sites (outside the
buildings and structures) – 8 951
collection sites with underground
containers – 271
collection systems (inside the
buildings and structures) – 15 838
7. Waste Management Perspectives
According to the «Regional target program for municipal and industrial waste
management in St.Petersburg in 2012-2020» the key directions of waste management
development are the following:
MSW treatment facilities construction
Hazardous and medical treatment facilities construction
Construction of modern landfill sites
Improving of the waste collection system
Establishing the efficient monitoring system
Development of the general scheme of the city sanitation
8. Modernization of the
Sorting Unit of the Plant «Yanino»
Technology: mechanical-biological treatment
Current stage: the design works are carrying out
Planning capacity after modernization: 250 000 tons per year
Planning commissioning date: end of 2014
9. Waste Treatment Plant
Investor: Helector S.A.–Aktor Concessions S.A.–Aktor S.A.
Capacity: 350 000 tons per year
Financing form: PPP
Technology:
- mechanical and optical separation
- biological treatment – biodrying
- residual fraction of the plant is not more than 20%
Current stage:
- tender procedure took place in 2009-2010
- due to Greek financial crisis the project was suspended and now is under negotiation
10. Medical Waste Management
Complex
Technology: the high temperature incineration system of all types
of medical waste with flue gas treatment
Current stage:
- expertise of the design documentation
- equipment ordered
Planning capacity: 5 000 tons per year
Planning commissioning date: July 2014
11. Reclamation of the landfill
«Novosyolki»
Technology: reclamation with active degassing process
Current stage: expertise of the design documentation
Planning commissioning date: 2017