VOL 4, No 60 (2020)
Sciences of Europe
(Praha, Czech Republic)
ISSN 3162-2364
The journal is registered and published in Czech Republic.
Articles in all spheres of sciences are published in the journal.
Journal is published in Czech, English, Polish, Russian, Chinese, German and French.
Articles are accepted each month.
Frequency: 24 issues per year.
Format - A4
All articles are reviewed
Free access to the electronic version of journal
All manuscripts are peer reviewed by experts in the respective field. Authors of the manuscripts bear responsibil-
ity for their content, credibility and reliability.
Editorial board doesn’t expect the manuscripts’ authors to always agree with its opinion.
Chief editor: Petr Bohacek
Managing editor: Michal Hudecek
• Jiří Pospíšil (Organic and Medicinal Chemistry) Zentiva
• Jaroslav Fähnrich (Organic Chemistry) Institute of Organic Chemistry and Biochemistry
Academy of Sciences of the Czech Republic
• Smirnova Oksana K., Doctor of Pedagogical Sciences, Professor, Department of History
(Moscow, Russia);
• Rasa Boháček – Ph.D. člen Česká zemědělská univerzita v Praze
• Naumov Jaroslav S., MD, Ph.D., assistant professor of history of medicine and the social
sciences and humanities. (Kiev, Ukraine)
• Viktor Pour – Ph.D. člen Univerzita Pardubice
• Petrenko Svyatoslav, PhD in geography, lecturer in social and economic geography.
(Kharkov, Ukraine)
• Karel Schwaninger – Ph.D. člen Vysoká škola báňská – Technická univerzita Ostrava
• Kozachenko Artem Leonidovich, Doctor of Pedagogical Sciences, Professor, Department
of History (Moscow, Russia);
• Václav Pittner -Ph.D. člen Technická univerzita v Liberci
• Dudnik Oleg Arturovich, Doctor of Physical and Mathematical Sciences, Professor, De-
partment of Physical and Mathematical management methods. (Chernivtsi, Ukraine)
• Konovalov Artem Nikolaevich, Doctor of Psychology, Professor, Chair of General Psy-
chology and Pedagogy. (Minsk, Belarus)
«Sciences of Europe» -
Editorial office: Křižíkova 384/101 Karlín, 186 00 Praha
E-mail: info@european-science.org
Web: www.european-science.org
CONTENT
ECONOMIC SCIENCES
Andreeva N., Gavrichenko E.
STRUCTURAL CHANGES IN EDUCATIONAL
INSTITUTIONS AS A BASIS FOR THE USE OF LABOR
RESOURCES IN THE CONTEXT OF DIGITALIZATION OF
THE COUNTRY .............................................................3
Andresian I.
THE ROLE AND PLACE OF MEGAPROJECTS IN
FORMATION THE REGION'S INFRASTRUCTURE ..........8
Skliarenko О., Androsiuk G.,
Kyiak Iu., Ponomarenko V.,
Kovalchuk I., Herasov S., Rizhikh V.
INNOVATIVE DEVELOPMENT OF UKRAINE'S
ECONOMY .................................................................10
Burilina M.
JUSTIFICATION FOR THE CONSTRUCTION OF MODELS
OF SPREAD OF THE VIRUS POSTRANSTVENNYH THE
EXAMPLE OF A PANDEMIC 2020...............................14
Gasumov E.
FORMATION OF A STRATEGY OF INNOVATIVE
DEVELOPMENT OF THE GAS INDUSTRY OF
AZERBAIJAN BASED ON ANALYSIS OF INFLUENCING
FACTORS....................................................................18
Pryadko S., Zyuban V., Babayants D.
UTILITARIAN ANALYSIS OF BUSINESS
COMMUNICATION IN THE PROCESS OF PROVIDING
COMPANY SERVICES..................................................25
Makazan E., Rossinskaya L.
MAIN PREREQUISITES FOR THE DEVELOPMENT OF A
LOGISTIC APPROACH TO MANAGEMENT OF
ENGINEERING ENTERPRISES OF UKRAINE.................28
Mineeva V., Syrlybaeva V.
ENSURING CORPORATE RESPONSIBILITY IN THE
DIGITAL ECONOMY....................................................36
Shalashna A.
BUDGET AS AN TOOL OF ECONOMIC DEVELOPMENT
...................................................................................39
JURIDICAL SCIENCES
Knysh V., Maruk T.
PROBLEMS OF CODIFICATION OF MEDICAL
LEGISLATION OF UKRAINE.........................................44
PEDAGOGICAL SCIENCES
Aleksandrova E., Barbasheva S.
MODERN EDUCATIONAL TECHNOLOGIES IN THE
TEACHING FOREIGN LANGUAGES TO POSTGRADUATE
STUDENTS .................................................................48
Chuprakova N.
ANXIETY IN CHILDREN AND ADOLESCENTS:
SOLUTIONS TO THE PROBLEM ..................................51
Sciences of Europe # 60, (2020) 3
ECONOMIC SCIENCES
СТРУКТУРНЫЕ СДВИГИ В ОБРАЗОВАТЕЛЬНЫХ УЧРЕЖДЕНИЯХ КАК ОСНОВА
ИСПОЛЬЗОВАНИЯ ТРУДОВЫХ РЕСУРСОВ В УСЛОВИЯХ ЦИФРОВИЗАЦИИ СТРАНЫ
Андреева Н.В.
доктор экономических наук, профессор,
профессор кафедры «Экономики инноваций и финансы»,
ФГБОУ ВО «Владимирский государственный университет имени Александра Григорьевича и Нико-
лая Григорьевича Столетовых», ВлГУ
Гавриченко Е.В.
кандидат экономических наук,
доцент кафедры «Экономики инноваций и финансы»,
ФГБОУ ВО «Владимирский государственный университет имени Александра Григорьевича и Нико-
лая Григорьевича Столетовых»
STRUCTURAL CHANGES IN EDUCATIONAL INSTITUTIONS AS A BASIS FOR THE USE OF
LABOR RESOURCES IN THE CONTEXT OF DIGITALIZATION OF THE COUNTRY
Andreeva N.
Doctor of Economic Sciences, professor,
Professor of the Department of innovation Economics and Finance, doctor of Economics
FGBOU VO «Vladimirskij gosudarstvennyj universitet imeni Aleksandra Grigor'evicha i Nikolaya
Grigor'evicha Stoletovyh», VlGU
Gavrichenko E.
associate Professor of the Department of innovation Economics and Finance, Ph. D. in Economics
FGBOU VO «Vladimirskij gosudarstvennyj universitet imeni Aleksandra Grigor'evicha i Nikolaya
Grigor'evicha Stoletovyh», VlGU
DOI: 10.24412/3162-2364-2020-60-4-3-8
АННОТАЦИЯ
Цель работы. В статье рассматривается развитие сферы услуг высшего образования под влиянием
цифровой трансформации. Обосновывается необходимость роста объемов рынка онлайн – образования и
обострение конкуренции между участниками.
Метод или методология проведение работы. Проведен статистический анализ изменений проис-
шедших в сфере услуг высшего образования. Обосновывается необходимость и целесообразность в повы-
шении компетенций собственных кадров и формирование таких подходов, к подготовке трудовых ресур-
сов, которые обладают востребованными компетенциями на рынке труда.
Результаты. Выявлены тенденции определяющие дальнейшее развитие услуг высшего образования.
Авторы разработали модель взаимодействия между участниками рынка образовательных услуг. Данная
модель предусматривает взаимовыгодное сотрудничество с предприятиями – партнерами и позволяет осу-
ществлять вузам качественную подготовку кадров. Данный подход по закреплению у обучающихся прак-
тических навыков при прохождении всех видов практик обеспечивает формирование востребованных ком-
петенций на рынке труда; формирует более тесное взаимовыгодное сотрудничество между вузом и бизнес
– структурами. А использование онлайн – форматов в обучении для основного образовательного учрежде-
ния и дополнительного образования в сочетании с цифровой трансформацией повысит качество обучения
и привлечет дополнительный контингент обучающихся как источника привлечения средств, усилит
имидж вуза, его рейтинговые показатели и повысит инвестиционную привлекательность региона. Сделан-
ные предложения обеспечат повышение цифровых компетенций сотрудников вуза, создадут условия для
работы с большими массивами данных и обеспечат условия государству для дополнительного финанси-
рования пилотных проектов в области цифровых технологий, будут способствовать внедрению цифровых
инноваций и повышению цифровой культуры сотрудников и обучающихся.
Область применения результатов. Результаты проведенного исследования могут быть применены
при прогнозировании структурных изменений в сфере услуг высшего образования и позволяют повысить
качество обучения.
Выводы. Делается вывод, что приоритетным в развитии сферы услуг высшего образования является
переход на онлайн – образование, что повысит привлекательность вузов, а также инвестиционные возмож-
ности регионов и уровень цифровой грамотности общества.
ABSTRACT
Objective of the study. The article examines the development of the sector of higher education services under
the impact of digital transformation. The necessity of market volume increase of online education services and the
intensification of competition between the participants are substantiated.
4 Sciences of Europe # 60, (2020)
Method or methodology of the research. The statistical analysis of changes taken place in the sphere of
higher education services is conducted. The necessity and feasibility of improving the competencies of internal
personnel and the formation of such approaches to the preparation of labor force that have solicited labor market
competencies are substantiated.
Results of the research. The trends determining the further development of the market of higher education
services are identified. The model of interaction in the market of education services elaborated by the authors
allows universities to provide a quality training for students through mutually beneficial cooperation with partner
enterprises to consolidate students' practical skills when they are going through the full range of internships; pro-
vides the formation of the necessary labor market competencies; builds a closer mutually beneficial cooperation
between university and business entities. Whereas the usage of online learning formats by an educational institu-
tion of additional education combined with digital transformation would enhance the quality of education and
attract an extra pool of students as a source of fund-raising, improve the image of a university, its rating indicators
and increase the investment attractiveness of the region. The given suggestions would provide an improvement of
digital competencies of university employees, work with large amounts of data and establish conditions for the
government for additional funding for pilot projects in the field of digital technologies, contribute to the imple-
mentation of digital innovations and improvement of the digital culture of employees and students.
Areas of application of the results. The results of the conducted research may be applied in predicting struc-
tural changes in the sphere of higher education services.
Conclusions. It is concluded that the priority in the development of the sector of higher education services is
the transition to online education that would enhance the attractiveness of universities as well as investment op-
portunities of the regions and the level of digital transformation of the society.
Ключевые слова: рынок услуг, проблемы высшего образования, трудовые ресурсы, цифровая транс-
формация, онлайн – образование.
Keywords: service market, problems of higher education, labor force, digital transformation, online educa-
tion.
В статье рассматриваются изменения в разви-
тии сферы услуг высшего образования под влия-
нием цифровой трансформации. Обосновывается
необходимость роста объемов услуг онлайн-обра-
зования и привлекательности учебного заведения
расположенного на данной территории. Приво-
дятся доводы в необходимости и целесообразности
повышения компетенций собственных кадров и
формирование таких подходов к трудовым ресур-
сам, которые обладают востребованными компе-
тенциями на рынке труда. Потенциал образователь-
ной организации реализуется в определенных сфе-
рах деятельности. Обосновывается необходимость
и целесообразность в формировании системы взаи-
модействия между предпринимательскими струк-
турами и образовательными учреждениями. Рас-
сматривается возможность разработки механизмов
в повышении компетенций собственных кадров и
возможность в формировании механизмов, кото-
рые повысят престиж и значимость учебного заве-
дения. Выявлена связь между потенциалом выс-
шего учебного заведения и его дополнительным
финансированием. Предлагается в качестве прио-
ритета развития переход на электронное образова-
ние, онлайн– обучение, что повысит финансовые
возможности вузов, инвестиционную привлека-
тельность региона и уровень цифровой трансфор-
мации общества.
Ключевые слова: рынок услуг, проблемы выс-
шего образования, трудовые ресурсы, цифровая
трансформация, онлайн – образование.
Введение. В условиях мирового экономиче-
ского кризиса и пандемии важное значение приоб-
ретает развитие рынка труда и использование тру-
довых ресурсов, которые должны соответствовать
современным потребностям экономики при пере-
ходе к цифровизации в Российской Федерации. Так,
зарубежные авторы отмечают, что трансформация
связана с применением цифровых технологий и яв-
ляется стратегическим приоритетом в развитии
бизнеса. [1,2,3]. Эти изменения затронут и трудо-
вые ресурсы, которые должны быть подготовлены
к происходящим структурным сдвигам. В этих
условиях учреждения высшего образования вы-
нуждены изменять сложившиеся систему образова-
ния и искать новые подходы соответствующие тре-
бованиям цифрой экономики. Структурные сдвиги
в экономике способствовали изменению взаимо-
действия образовательных учреждений с хозяй-
ствующими субъектами, которые выставляют опре-
деленные требования к уровню подготовки трудо-
вых ресурсов. Поэтому возникает необходимость в
формировании системы взаимодействия между
предпринимательскими структурами (заказчиком)
и образовательными учреждениями. Цифровизация
экономики поднимает проблему качества подго-
товки кадров определенной квалификации облада-
ющих необходимыми компетенциями на другой
уровень.
Методы исследования. Проведенный стати-
стический анализ изменений происшедших в сфере
услуг высшего образования обосновывается на
необходимости и целесообразности в повышении
компетенций собственных кадров и формирование
таких подходов, к подготовке трудовых ресурсов,
которые обладают востребованными компетенци-
ями в условиях цифровой трансформации.
Одной из приоритетных задач при трансфор-
мации общества, в связи с переходом к цифровиза-
ции экономики является подготовка трудовых ре-
сурсов соответствующих веяниям времени. Сле-
дует отметить, что государство принимает важные
решения для укрепления экономики страны и каче-
Sciences of Europe # 60, (2020) 5
ственного изменения состава трудовых ресур-
сов.[4,5].Так, разработанная программа «Цифровая
экономика» включает подпрограмму «Кадры для
цифровой экономики», в которой уделяется внима-
ние вопросам внедрения цифры во все виды дея-
тельности, обеспечив при этом цифровую грамот-
ность населения посредством подготовки и пере-
подготовки кадров через платформу онлайн-
образования.
Проведенные исследования по анализу чис-
ленности трудовых ресурсов по возрастным груп-
пам в период с 2016г по 2019 г. лиц трудоспособ-
ного возраста свидетельствуют о том, что возраст-
ная группа от 15- 29 лет сократилась на 15,5 %, доля
лиц от 30-49 лет увеличилась на 4,4 %, группа лиц
50-54 лет сократилась на 13,7 %, а доля лиц старше
55 лет увеличилась на 9,5 %. [6]. В целом 27 % тру-
доспособного занятого населения составляют лица
от 50 лет и старше, которым требуется постоянно
повышать свой уровень компетенций, осваивая но-
вые цифровые технологии без отрыва от основной
деятельности. Менее 20% молодого населения в
возрасте 15-29 лет требуется качественное образо-
вание в образовательных учреждениях, чтобы со-
хранить востребованность на рынке труда. И более
50% трудоспособного занятого населения регу-
лярно необходимо повышать свою квалификацию
для конкуренции среди трудовых кадров.
Наметившиеся структурные сдвиги в эконо-
мике страны привели к снижению численности сту-
дентов, сокращению числа образовательных орга-
низаций и структурным сдвигам ввиду изменения
спроса на эти услуги.
На основании проведенного анализа показате-
лей развития рынка образовательных услуг можно
отметить снижение объемов финансирования на
11,5% и объема рынка услуг высшего образования
на 7%, а численности студентов – почти на 238 тыс.
чел. или на 5,4% [7,8,9,10].
Проводившееся анкетирование руководителей
компаний из 20 стран мира [11] анализ данных ко-
торых был представлен в докладе на Международ-
ном экономическом форуме, который состоялся в
2018 году, подтвердил необходимость и целесооб-
разность повышения квалификации сотрудников
или переподготовки трудовых ресурсов.
Учреждения высшего образования смогут осу-
ществлять успешную деятельность, обеспечивая
способность удовлетворять потребностям заказчи-
ков образовательных услуг, создавая и предостав-
ляя широкий перечень и доступность образователь-
ных программ, как базового образования, так и до-
полнительного на платной основе.
Задача деятельности образовательных учре-
ждений высшего образования (вузов) предполагает
изучение взаимодействия участников рынка обра-
зовательных услуг и формирование взаимовыгод-
ного механизма, что определяется методическим
инструментарием и дает оценку показателям дея-
тельности вузов, формирующих их рейтинг.
Несмотря на значительное число исследований
и публикаций по этой теме в настоящее время от-
сутствует единый методический инструментарий
по оценки и повышению деятельности учреждений
высшего образования на рынке образовательных
услуг.
Проведя анализ, существующих методических
подходов к обоснованию рейтинговых показателей,
авторами было выявлено, большое их разнообразие
по критериям оценки вузов [12, 13, 14, 15, 16].
Например, агентство RAEX использует для оценки
рейтингов только 3 показателя и выявляет 100 луч-
ших вузов, а американский журнал U.S. News &
World Report представил рейтинг лучших вузов
мира, в который вошли 1678 университетов из 86
стран, в том числе 19 представителей российской
высшей школы, оценка производилась по 13 инди-
каторам.
Обобщая критерии оценки вузов, предлагаем
выделить следующие наиболее значимые с точки
зрения авторов, а именно: качество образования,
организацию непрерывного образования (дополни-
тельного образования), имидж вузов (бренд, узна-
ваемость и т.д.).
Поскольку, учебные учреждения взаимодей-
ствуют с заказчиками (бизнес – партнерами, домо-
хозяйствами, Центрами занятости населения, и
т.д.), которые выступают в качестве хозяйствую-
щих субъектов для удовлетворения собственных
потребностей в трудовых ресурсах, то они заинте-
ресованы во взаимодействии с образовательными
учреждениями, предоставляющими образователь-
ные услуги на рынке труда, по вопросам повыше-
ния компетенций собственных кадров и, получении
новых кадров с востребованными компетенциями
на рынке труда. Кроме этого на такое взаимодей-
ствие оказывают существенное влияние государ-
ственные структуры в лице Министерства науки и
высшего образования, которое диктует правила
предоставления образовательных услуг и контро-
лирует образовательную деятельность, и обще-
ственные институты, формирующие рейтинги кон-
курентоспособности учебных учреждений. При
этом каждый из участников обладает определен-
ными функциями. Так,
Государственные структуры:
− реализуют образовательный процесс в со-
ответствии с его стратегией развития, устанавли-
вают объемы предоставления образовательных
услуг по всем направлениям подготовки и формам
обучения;
− преследует цель повышения конкуренто-
способности национальной системы образования,
соответствующей международному уровню
(рейтинг вузов);
− инициирует развитие науки и образования,
за счет вовлечения научных, профессорско-препо-
давательских и студенческих коллективов для уча-
стия в грантах, научных конкурсах, программах ин-
новационной деятельности и т.д.;
− устанавливает законодательно нормы и
правила ведения образовательной деятельности
высшего образования, для повышения качества
услуг при овладении необходимыми компетенци-
ями, введение единых новых стандартов для
направлений подготовки по высшему образованию
6 Sciences of Europe # 60, (2020)
с ориентацией на работодателя и профессиональ-
ные стандарты;
− проводит мониторинг деятельности учре-
ждений высшего образования.
В свою очередь Бизнес - структуры (предпри-
ятия, предприятие-партнер) при взаимодействии с
государственными органами на федеральном и ре-
гиональном уровнях и образовательными учрежде-
ниями, проводят мониторинг выпускников (обу-
чившихся) для возможного трудоустройства их по
профилю подготовки, а также проверяют их про-
фессиональные компетенции, полученные в вузах,
и влияют на рейтинговую оценку вузов страны. Ра-
ботодатели запрашивают на рынке труда специали-
стов необходимой квалификации с определенным
набором компетенций, что дает возможность обра-
зовательным учреждениям конкурировать друг с
другом и способствует повышению качества обра-
зования.
Домашние хозяйства, в лице потенциальных
студентов (обучающиеся) определяют спрос на
объем образовательных услуг, который формиру-
ется и определяет требования к качеству образова-
ния и уровню профессиональных компетенций, на
основе получения будущей профессии в конкрет-
ном образовательном учреждении.
Общественные институты, обеспечивают
взаимосвязь между потребностью в кадрах у рабо-
тодателей (бизнес - структур), общества и деятель-
ностью образовательных учреждений, посредством
независимых рейтинговых оценок, которые способ-
ствуют дальнейшему развитию образовательных
учреждений и повышению их конкурентоспособно-
сти. Образовательные учреждения при взаимодей-
ствии с внешней средой формируют цели и задачи
по предоставлению образовательных услуг, требу-
емых для современной экономики, привлекая заказ-
чиков для участия в формулировании профессио-
нальных компетенций по направлениям подго-
товки, реализуемые с помощью внутренних
ресурсов учреждений.
При развитии цифровизации в РФ возникает
потребность в создании онлайн - курсов и исполь-
зовании их при обучении. В условиях пандемии эти
курсы позволят обеспечить необходимый уровень
подготовки обучающихся, а обучающиеся в отда-
ленных регионах получат доступ к электронным
курсам, которые подготовлены учеными ведущих
университетов страны. Это позволит преподавате-
лям совершенствоваться в процессе подготовки
этих курсов, иметь возможность постоянно коррек-
тировать их содержание с учетом особенностей об-
разовательных программ используя мировой опыт
и новейшие разработки, а обучающиеся получают
доступ к онлайн – курсам и возможность самосо-
вершенствования и развития.
В последнее время наблюдается в России уве-
личение рынка дополнительного образования.
Спрос связан с тем, что в связи с цифровизацией
страны основное образование не соответствует за-
просам рынка труда и это потребовало обеспечить
возросшую потребность в повышении квалифика-
ции для сотрудников ряда хозяйствующих субъек-
тов вузами посредством онлайн–обучения, позво-
ляющее слушателям обучаться без отрыва от ра-
боты и места жительства.
Результаты. На основании вышеизложен-
ного можно предложить в качестве приоритета раз-
вития частичный переход на электронное онлайн–
образование, ускоренно внедрять авторские про-
граммы по переподготовки обучающихся, форми-
ровать цифровую образовательную среду, повы-
сить уровень взаимодействия между заинтересо-
ванными сторонами, что обеспечит
привлекательность вузов и их рейтинг, уровень вза-
имодействия обеспечит инвестиционную привлека-
тельность регионов, а так же, поднимет уровень
цифровой грамотности в Российской Федерации.
В условиях цифровой трансформации это
обеспечит более высокий уровень взаимодействия
между участниками рынка образовательных услуг.
Взаимодействие участников рынка образователь-
ных услуг, составленных авторами, представлено
на рисунке 1.
*ОП – образовательный процесс
Рисунок 1. Схема взаимодействия участников рынка образовательных услуг
Sciences of Europe # 60, (2020) 7
Рассматривая деятельность образовательного
учреждения высшего образования (рисунок 1) ав-
торы считают, что посредством взаимодействия
ИПК (Института повышения квалификации), дей-
ствующего в вузе, можно сформировать дополни-
тельный поток обучающихся за счет вовлечения в
образовательный процесс Предприятия-партнера.
С одной стороны, Предприятие-партнер для вуза
выступит базой практик при предоставлении вузом
ВО, а с другой стороны вуз предоставит Предприя-
тию-партнеру программы повышения квалифика-
ции или переподготовки собственных кадров по его
заказу. Таким образом, вуз и Предприятие–партнер
предоставят друг другу взаимовыгодные услуги.
ИПК при вузе предоставляет различные программы
дополнительного обучения и переподготовки для
всех хозяйствующих субъектов на платной основе,
а для Предприятия-партнера оплата компенсиру-
ется обеспечением практических навыков студен-
тов вуза в рамках практик предусмотренных учеб-
ным процессом.
При внедрении цифровых технологий в обуче-
ние рынок труда обеспечивается кадрами соответ-
ствующего уровня, при регулярном дополнитель-
ном образовании. Поскольку цифровизация затра-
гивает как сферу производства, так и сферу услуг,
то ряд профессий могут совсем исчезнуть и по-
явятся новые, которые будут востребованы в усло-
виях цифровой трансформации общества. Прогноз-
ная потребность в трудовых ресурсах, которой
необходимо дополнительное профессиональное об-
разование по переподготовки или повышению ква-
лификации представлена на рисунке 2. .
Рисунок 2. Прогнозная потребность в трудовых ресурсах, требующей дополнительной подготовки.
Более половины работающего населения нуж-
дается в дополнительном образовании для повыше-
ния своей квалификации и освоения новых компе-
тенций. По оценкам экспертов «WorldSkills Рос-
сия», к 2030 году дисбаланс кадров составит более
1,4 млрд. человек, а потери, связанные с несоответ-
ствием квалификации работников требованиям
рынка труда могут превысить 5 трилл. долла-
ров[17], которые затронут все возрастные группы
населения и тех, кто уже получил образование.
Выводы. Таким образом, предложенная авто-
рами модель взаимодействия на рынке образова-
тельных услуг, позволяет обеспечить качественную
подготовку обучающихся на базе предприятия–
партнера по закреплению практических навыков
при прохождении всех видов практик; позволит
сформировать компетенции по подготовке трудо-
вых ресурсов востребованных на рынке труда;
обеспечить более тесное сотрудничество между ву-
зом и бизнес–структурой, что будет способствовать
обеспечению взаимовыгодных интересов. Такое
долгосрочное сотрудничество позволит улучшить
качество обучения примерно на 15% по классиче-
ским формам, и будет способствовать быстрому
трудоустройству выпускников по профилю полу-
ченного образования.
Использование онлайн–форматов обучения
для высшего образования и дополнительного в со-
четании с цифровой трансформацией способствует
повышению качества обучения, привлечению до-
полнительного контингента обучающихся как ис-
точника привлечения финансовых средств, усилит
имидж вуза и как следствие улучшатся рейтинго-
вые показатели вуза, и повысится инвестиционная
привлекательность региона. Рост объема услуг до-
полнительного образования с использованием он-
лайн–обучения составит 10-20% в год.
Успешная деятельность вузов за счет цифро-
вых компетенций сотрудников, возможности ра-
боты с большим массивом данных; становится бо-
лее привлекательным для государства и позволит
создать дополнительное финансирование; обеспе-
чит создание пилотных проектов в области цифро-
вых технологий; вызовет стимулы к внедрению
цифровых инноваций и повышению цифровой
культуры сотрудников и обучающихся.
Литература
1.Ferrera J.J., Fermandes C.L. (2019). To be оr not
to be diqital that is the question: Firm innovation and
performance .[Электронный ресурс]//Journal of
Bisnes Research. Vol.101. - pp.583-590. - URL:
13%
46%
12%
10%
9%
10%
0%
10%
20%
30%
40%
50%
60%
Требуется дополнительное
образование
Не требуется дополнительное
образование
в течении 1 месяца в течении 1-3 месяцев
в течении 3-6 месяцев в течении 6-12 месяцев
в течении 1 года
8 Sciences of Europe # 60, (2020)
https//ideas.repec.org/a/eee/ibrese/v101y2019ic583-
590.html(дата обращения:27.12.2019).
2. Galindo-Martin. M.A., Castano-Martinez.
M.S., & Mendez-Picazo. M.T. (2019). Digital transfor-
mation. digital dividends and entepreneurship: A quan-
titative analysis[Электронный ресурс]//journal of Bi-
siness Research.Vol. 101.- pp.522-527.-
URL:https//ideas.repec.org/a/eee/jbrese/v101y2019icp
522-527.html (дата обращения:06.01.2020).
3. Warner. K.S., & Waqer. M. (2019). Buldinq dy-
namic capabilities for diqital transformation: An
onqoinq process of strateqic renewal[Электронный
ресурс]//Lonq Ranqe Planninq.Vol.52(3).-pp.326-
349.- URL:https//www.napier.ac.uk/research-and-
innovation/research-search/outputs/bildinq-dynamic-
capabilities-for-diqital transformation-an-onqoinq-pro-
cess-of-strateqic (дата обращения:09.01.2020).
4. Указ Президента РФ от 07.05.2018№204
(ред.от 19.07.2018)»О национальных целях и стра-
тегических задачах развития Российской Федера-
ции на период до 2024 года»[Электронный ресурс].
URL:
https:www.consultant.ru/document/cons_dos_LAW_2
97432/ (дата обращения 16.12.2019).
5. Паспорт национальной программы ”Цифро-
вая экономика Российской Федерации» [Электрон-
ный ресурс]. URL:
https://static.goverment.ru/media/files/urKHmOgTPP
nzJlaKw3M5cNLo6gczMkPF.pdf (дата обраще-
ния03.01.2020).
6. Государственная стати-
стика:URL:https://nangs.org/analytics/rosstat-
rabochaya-sila-zanyatost-i-bezrabotitsa-v-rossii-
onlajn-rar-docx.
7. Исследование российского рынка онлайн-
образования[Электронный ресурс].-
URL:https://edmarket.digital/ pdf (дата обращения
04.10.2020).
8. Пекер И.Ю. Рынок высшего образования в
России: привлекательность и тенденции развития
[Электронный ресурс] // Международный журнал
гуманитарных и естественных наук.- 2018.-№8. -
С.160-164.- URL:
https://cyberleninka.ru/article/n/rynok-vysshego-
obrazovaniya-v-rossii-privlekatelnost-i-tendenstsii-
razvitiya(дата обращения10.09.2020).
9. Астратова Г.В.Проблемы и тенденции раз-
вития рынка услуг высшего образования в России
[Электронный ресурс] // Дискуссия. - 2016.-
№9(72). – С.16-25. - URL:
https://cyberleninka.ru/article/n/problemy-i-tendentsii-
razvitiya-rynka-uslug-vysshego-obrazovaniya-v-rossii
(дата обращения 27.12.2019).
10. Образование в цифрах. Краткий статисти-
ческий сборник. [Электронный ресурс].-
URL:https:www.hse.ru/data/2018/06/29/1153062641/
obr2018.pdf (дата обращения 14.12.2019).
11. The Future of Jobs Report 2018, Междуна-
родный экономический фо-
рум.https://www.weforum.org/reports/the-future-of-
jobs-report-2018.
12. Национальный рейтинг университетов Ин-
терфакс 2020
https://academia.interfax.ru/ru/ratings/?page=1&rating
=1&year=2020.
13. Университеты для будущей элиты: 100 луч-
ших российских вузов по версии Forbes—2020
Ирина Казьмина Forbes Staff ОБЩЕСТВО
23.06.2020 https://www.forbes.ru/ob-
shchestvo/403369-universitety-dlya-budushchey-elity-
100-luchshih-rossiyskih-vuzov-po-versii-forbes.
14. ТОП-100 ВУЗов России 2020. -
https://postupi.info/rating.
15. Названы лучшие вузы по версии рейтинга
U.S. News Best Global Universities. -
https://postupi.online/journal/reyting-vuzov/nazvany-
luchshie-vuzy-po-versii-reytinga-u-s-news-best-
global-universities.
16. https://postupi.online/journal/reyting-
vuzov/top-10-luchshikh-vuzov-rossii-po-versii-repu-
tatsionnogo-reytinga-rur.
THE ROLE AND PLACE OF MEGAPROJECTS IN FORMATION THE REGION'S
INFRASTRUCTURE
Andresian I.
master's
student
University of Rome Tor Vergata
DOI: 10.24412/3162-2364-2020-60-4-8-10
ABSTRACT
The modernisation of Sochi’s transportation system ahead of the Games included constructing more than
360km of roads, 321km of railroad tracks and 22 tunnels. The legacy of transportation department in the city of
Sochi involves innovative approaches to traffic management. In preparing for the Games, the city analysed the
best world practices to put together a logistical management system, the Transportation Logistic Centre, that suf-
ficiently improves the efficiency of complex, reduces the need for vehicles and heightens the quality of public
transport services. In so doing, it enabled to optimise traffic management during the Games and the number of
vehicles used. Transport in the city of Sochi has undergone decades worth of modernisation in the space of two to
three years. It will have a hugely positive impact on the lives of Sochi citizens for generations to come. Moreover,
the attractiveness of the city has increased due to significant investments in infrastructure and active promotion of
the city.
Sciences of Europe # 60, (2020) 9
The total investment in the winter Games amounted to about 1.5 trillion rubles. Most of the funds were spent
on infrastructure development.
Keywords: infrastructure, real estate, Olympic Games, road management, road industry, transportation, de-
velopment, agency, quality.
The 2014 winter Olympics were the culmination
of Russia's recent history at the beginning of the 21st
century. The country's leading industries emerged from
the crisis and provided a boost to the country's economy
and improved its investment attractiveness in the inter-
national arena.
It is a great honor and responsibility to host the
main sporting event on the planet. This is why Russian
road builders have gathered all the accumulated poten-
tial and best international experience in the field of road
management in recent decades to prepare the infra-
structure for the Olympic games in Sochi.
In preparation for the Games, large-scale work
was carried out in the city and surrounding areas to re-
pair and modernize the transport system, and new high-
ways, interchanges, and railway lines were put into op-
eration. As a result, Sochi received more than 360 km
of roads and bridges.
In addition to roads, railway workers made a sig-
nificant contribution to the Olympics. A combined road
and railway infrastructure was built in a mountain clus-
ter, almost 50 kilometers long.
In General, railway workers probably served the
most during the Olympics – almost four million people.
And thanks to the created infrastructure, eight transfer
complexes, and the modern Adler railway station, this
became possible. But not only in Sochi itself, the ca-
pacity at the entrances to Sochi from Tuapse was in-
creased almost one and a half times. And now, during
the peak holiday period, 75 pairs of passenger trains a
day can come to Sochi with tourists.
The main gate for visitors to the city is the inter-
national airport, which was reconstructed in prepara-
tion for the Games. It accepts flights from all major cit-
ies in Russia, as well as from major cities in Europe and
Asia.
During the busiest days, the airport provided 575
take-off and landing operations per day with its new
runways. And the interval between takeoff and landing
was less than two minutes during peak hours.
For several years, Sochi turned into a giant con-
struction site, not only for sports, but also for roads. In
a single city, a Titanic amount of work had to be done
— to build an infrastructure from scratch, the scale of
which initially seemed simply fantastic. After all, in ad-
dition to stadiums and ice palaces, trampolines and
hockey arenas, it is necessary to have a modern effi-
cient transport and logistics system of highways to host
the Olympics.
As a result, the XXII winter Olympic games went
down in history as the fastest: participants and guests
of the Olympiad appreciated the advantages of the
transport system, which allowed them to get from one
sports facility to another in a matter of minutes. This
was made possible thanks to the work of the Federal
road Agency, the quintessence of which was the "mag-
nificent ten" of new road objects. The huge amount of
work, the use of innovative methods and technologies,
as well as the incredible speed of construction of ob-
jects and their high quality made Rosavtodor pay atten-
tion to the Olympic projects of road builders and ex-
perts from all over the world.
Ten Olympic road facilities are a symbol and log-
ical outcome of the ten-year history of the Federal road
Agency of Russia, which was formed in March 2004.
New highways and transport interchanges have become
not only effective logistics solutions, but also unique
works of art by leading designers and engineers.
New road facilities are rightfully a symbol of Rus-
sia's success and the progress of its road industry. Now
these huge technical resources and advanced technolo-
gies will be used on highways throughout our country.
Thus, in the coming years, there are prerequisites
for the fact that the "Olympic experience" of road build-
ers will come to every region of the country and give
motorists the best roads that meet the highest interna-
tional standards of quality and safety.
Sochi today is the most promising region in terms
of investment in resort real estate. At the beginning of
2007, experts already said that the cost of housing in
the city increased by an average of 20-40% over the
year. According to other estimates, prices for primary
housing in Sochi increased by 100%. [1]
Sochi's popularity is also growing due to the con-
stant mentions of the city in the press, holding various
forums, congresses and international meetings there.
The city becomes a kind of brand, and the more famous
the brand , the higher its value.
After the Olympics, the resort became a place of
an active influx of tourists, followed by investors.The
attractiveness of the city has increased due to signifi-
cant investments in infrastructure and active promotion
of the city.
Housing prices in Sochi began to grow rapidly as
soon as there was talk about the Olympics. We can say
that square meters have risen in price in advance, and
the rapid rise in prices has already taken place. Now
Sochi has almost caught up with Moscow in terms of
comparable real estate and most likely will not bypass
the capital.
Sochi real estate could have been badly shaken in
price if the city lost the competition. However, the vic-
tory of Sochi in the competition for the venue of the
2014 winter Olympics allowed the increased prices to
be fixed at a high level.
The total investment in the winter Games
amounted to about 1.5 trillion rubles. Most of the funds
were spent on infrastructure development. Sochi also
proved to be a difficult site in terms of geological con-
ditions, which required complex engineering solutions,
which led to a rise in the cost of many construction pro-
jects.
This is not to forget that, in addition to new infra-
structure, any Olympic construction leads to the devel-
10 Sciences of Europe # 60, (2020)
opment of the tourism industry and promote employ-
ment growth and improve the socio-economic perfor-
mance of the region.
References
1. The price of Sochi real estate aspire to Moscow.
- URL: https://www.vedomosti.ru/re-
alty/blogs/2020/07/02/833850-stolichnie-tseni-yu-
zhnii-kolorit
2. Andreev, A.V. Regional economy: textbook for
universities/A.V. Andreev. - St. Petersburg: Piter,
2018. - 464 p.
3. Yanin, A. N. Regional economy and manage-
ment / A. N. Yanin. - M.: Prospect, 2016. - 248 p.
ІННОВАЦІЙНИЙ РОЗВИТОК ЕКОНОМІКИ УКРАЇНИ
Скляренко О.О.
науковий співробітник Інституту фізики напівпровідників ім. В.Є. Лашкарьова НАН України, м.
Київ
Андросюк Г.М.
науковий співробітник Інституту фізики напівпровідників ім. В.Є. Лашкарьова НАН України, м.
Київ
Кияк Ю.П.
науковий співробітник Інституту фізики напівпровідників ім. В.Є. Лашкарьова НАН України, м.
Київ
Пономаренко В.В.
науковий співробітник Інституту фізики напівпровідників ім. В.Є. Лашкарьова НАН України, м.
Київ
Ковальчук І.В.
магістрантка кафедри міжнародної економіки факультету менеджменту та маркетингу Націо-
нального технічного університету України “Київський політехнічний інститут імені Ігоря Сікорсь-
кого”, м. Київ
Герасьов С.Ю.
головний спеціаліст Секретаріату Кабінету Міністрів України, м. Київ
Рижих В.М.
науковий співробітник Центрального науково-дослідного інституту озброєння та військової тех-
ніки Збройних Сил України, м. Київ
INNOVATIVE DEVELOPMENT OF UKRAINE'S ECONOMY
Skliarenko О.
researcher of V. Lashkaryov Institute of Semiconductor Physics NAS of Ukraine, Kyiv
Androsiuk G.
researcher of V. Lashkaryov Institute of Semiconductor Physics NAS of Ukraine, Kyiv
Kyiak Iu.
researcher of V. Lashkaryov Institute of Semiconductor Physics NAS of Ukraine, Kyiv
Ponomarenko V.
researcher of V. Lashkaryov Institute of Semiconductor Physics NAS of Ukraine, Kyiv
Kovalchuk I.
Master's student of the Department of International Economics, Faculty of Management and Marketing,
National Technical University of Ukraine "Igor Sikorsky Kyiv Polytechnic Institute", Kyiv
Herasov S.
Chief Specialist of the Secretariat of the Cabinet of Ministers of Ukraine
Rizhikh V.
researcher of Central Research Institute of Armaments and Military Equipment of the Armed Forces of
Ukraine
DOI: 10.24412/3162-2364-2020-60-4-10-13
АНОТАЦІЯ
В статті розглянуті основні проблеми створення інноваційного середовища в Україні. Однією з важ-
ливих проблем на шляху інноваційного розвитку є створення сполучної ланки між авторами інновацій та
інвесторами. В статті пропонується створення віртуального офісу трансферу технологій для вирішення
цієї проблеми.
Sciences of Europe # 60, (2020) 11
ABSTRACT
The main problems of creating an innovative environment in Ukraine are considered in the article. One of the
important problems on the way of innovative development is the creation of a link between the authors of innova-
tions and investors. The article proposes to create a virtual technology transfer office to solve this problem.
Ключові слова: інновація, трансфер технологій, інвестиції.
Keywords: innovations, transfer technology, investments.
Постановка проблеми. Соціально-еко-
номічний розвиток країн світу, їх економічне і
політичне становище та еквівалентно-ефективна
участь в світовому зовнішньоекономічному обміні
на світовій арені, добробут і можливості власної ре-
алізації, проживаючого в них населення, визнача-
ються в значній мірі конкурентоспроможністю їх
національних економік.
Формування права інтелектуальної власності є
наслідком розвитку технологічного укладу суспіль-
ства [1]. Зараз найбільший прибуток приносить
інтелектуальна праця людини: саме її знання, інте-
лекті творчість створюють найвищу додану
вартість. Отож, підготовка наукових кадрів та ро-
звиток творчого інтелекту людини є основою інно-
ваційного розвитку суспільства.
Новий етап реформування промисловості
України характеризується впровадженням
інноваційної моделі розвитку економіки за рахунок
розвитку людського капіталу, науки, високих
технологій та ефективного впровадження
результатів науково-дослідних робіт.
Успішна комерціалізація досягнень науки,що
втілені в об'єкти права інтелектуальної власності,
можлива лише при прямій взаємодії наукових ін-
ституцій і ринку за безпосередньою участю дер-
жави. Визначальною особливістю передачі резуль-
татів наукових досліджень для їхнього освоєння є
створення і розвиток комерційних форм взаємодії
науки і виробництва за посередництва неприбутко-
вих інституцій, в створені яких безпосередню
участь повинна приймати держава.
Аналіз попередніх публікацій. Питанню ко-
мерціалізації результатів науково-технічної діяль-
ності та трансферу технологій присвячено багато
наукових робіт вітчизняних вчених, державою ро-
зроблені та створені правові засади регулювання
цієї сфери [2-16], але на жаль не вистачає узгодже-
них та сформульованих концептуальних засад для
чіткого поєднання сучасних інформаційних техно-
логій з системою трансферу технологій.
Саме цьому важливому та актуальному пи-
танню присвячена дана стаття, мета її – про-
аналізувати і запропонувати в стислій, зрозумілій
формі шляхи поєднання інформаційних технологій
з процесом комерціалізації результатів науково-
технічної діяльності та просування їх на внутрішні
та зовнішні ринки, їх вплив на сталий розвиток еко-
номіки України.
Оскільки економіка України досі має низький
рейтинг по конкурентно-спроможності та
освоєнню високих технологій, виникає гостра по-
треба в стимулюванні інноваційної діяльності та
оперативному поширені інформації про перспек-
тивні розробки, в першу чергу, в галузі нанотехно-
логій. Нанотехнології в усьому світі виступають
рушійною силою глобального наукового прогресу
в усіх сферах життя без винятку і покликані
вирішувати найбільш актуальні проблеми, які
раніше були не під силу людству: медицина - ство-
рення наноконтейнерів для прицільної доставки
ліків до уражених органів і нановипромінювачів
для знищення злоякісних пухлин; екологія –
стабілізація екологічної обстановки за допомогою
створення безвідходного виробництва; сільське
господарство – створення молекулярних роботів,
які зможуть виробляти їжу; енергетика - створення
нових типів фотопоглинаючих плівок, світлодіодів,
штучного пального;оборона – критичні технології у
сфері виробництва озброєння та військової техніки.
Однією з важливих задач роботи на ринку
нанотехнологій є швидке розповсюдження інфор-
мації про інноваційні розробки та їхнє застосу-
вання. Інтенсивні дослідження і розробки в галузі
нанотехнологій і наноматеріалів в розвинених
країнах супроводжуються розвитком сервісних по-
слуг для більш тісного зв’язку їх творців з бізнес-
структурами і представниками виробничої сфери,
медицини, екології і т.д. Зокрема, в США, Велико-
британії, Німеччини, Російській Федерації уже
створені віртуальні офіси та відповідні бізнес-пор-
тали, на яких розміщені як довідкові дані, так і опе-
ративна інформація про розробки з нанотехнологій
та наноматеріалів. Тому зараз в Україні існує
невідкладна потреба у створенні національних ре-
сурсів які б забезпечували процес трансферу техно-
логій, а саме: маркетингове, консалтингове, пра-
вове та інформаційне супроводження. Це дозволить
оперативно розміщувати інформацію (рекламу) про
існуючі розробки та вивчати попит на нові техно-
логії, забезпечуючи при цьому оперативний пошук
інвесторів та аналіз потреб ринку.
Нажаль, подібні сервіси недостатньо розвинені
в Україні. Для вирішення вищезгаданих потреб
нами та представниками інших установ НАН
України було розроблене технічне рішення щодо
створення електронного віртуального офісутранс-
феру технологій. Воно було захищене патентом на
корисну модель[17]. Для впровадження технічного
рішення було створено:
1. Інтернет - офіс трансферу технологій, що
об’єднуватиме та координуватиме діяльність
фахівців відділів трансферу з різних установ НАН
України для просування розробок, здійснених за
кошти Державної програми «Нанотехнології та
наноматеріали».
2. Інтернет - портал «Нанотехнології та нано-
матеріали», в якому розміщується інформація про
дослідження і розробки, здійснені при виконанні
Державної цільової науково-технічної програми
«Нанотехнології та наноматеріали».
12 Sciences of Europe # 60, (2020)
Це не створює додаткові відділи трансферу те-
хнологій як окремі структурні одиниці, а об’єднує
існуючі відділи та спеціалістів в структурі НАН Ук-
раїни на Інтернет - площадці, а саме - Інтернет-
офісі трансферу технологій. Залучення фахівців рі-
зних установ НАН України, що мають знання у різ-
них галузях науки та досвід їхнього впровадження
у промисловість,дозволило охопити основні нау-
кові напрями цієї програми. Спеціалісти з відділів
трансферу технологій в on-line режимі обміню-
ються інформацією, практичними порадами, вдос-
коналюють свою кваліфікацію, не залишаючи при
цьому власного робочого місця.
Використовуючи можливості даного порталу,
можна розміщувати інформацію про розробки, які
пов’язані з науково-технічними проектами за дер-
жавним замовленням. Це дозволило здійснювати
оперативний моніторинг комерційної привабливо-
сті та рівня науково-технічних розробок. Вищена-
ведене може стати інструментом для забезпечення
створення сприятливого середовища для комерціа-
лізації науково-технічних розробок, підвищення
інноваційної культури. В подальшому планується
тісна співпраця з Європейською мережею транс-
феру технологій.
В розвинених країнах цейвид діяльностівже не но-
вий, а на теренах України він тільки починає набирати
оберти.
Успіх підприємницької діяльності в науково-
технічній сфері значною мірою визначається пов-
нотою і якістю інформації, доступної його учасни-
кам (розробникам, підприємцям, органам влади,
потенційним партнерам як по просуванню проектів
на ринок, так і по їхній реалізації, потенційним ін-
весторам як в Україні, так і за кордоном). Але часто
доступна інвесторам інформація уривчаста і не до-
зволяє зробити обґрунтований вибір об'єкту інвес-
тування. Учасникам інвестиційного процесу необ-
хідний оптимальний обсяг інформації, пов'язаної з
розробкою, для того, щоб кожен учасник мав на-
году ухвалити обґрунтоване рішення за проектом.
Додаткового значення для економіки створю-
ваний Інтернет – портал може набути за рахунок
організації його комунікаційта взаємодії з Аген-
цією оборонних технологій (робоча назва), утво-
рення якого на кшталт DARPA (Міноборони США)
є у планах реформування оборонно-промислового
комплексу, наголошених Міністерством з питань
стратегічних галузей промисловості. Спільна діяль-
ність з впровадження передових (ключових, крити-
чних) технологій у суб‘єктах оборонно-промисло-
вого комплексу всіх форм власності сприятиме ви-
веденню національного виробника озброєнь на
новий технологічний уклад.
Перспективна ініціатива Українського інсти-
туту науково-технічної експертизи та інформації та
Київської торгово-промислової палати з організації
біржі бізнес-контакт, що започаткована у 2018 р.
для зустрічей послів іноземних держав з українсь-
кими розробниками інновацій.
Раніше єдиним обмеженням була відсутність
інтернет-доступу, але мобільний і супутниковийІн-
тернет практично знімають всі територіальні обме-
ження. Інтернет – портал стає найбільш доступним
комунікативним засобом [18].
Для вирішення проблем розвитку наукоємної
промисловості існує декілька підходів. Один з них
- це визначення пріоритетних напрямків науково-
технічних досліджень, концентрація на них ресур-
сів і підвищення мотивації колективів учених, роз-
робників і інноваційних структур, орієнтованих ви-
нятково на ринок високих технологій і відповідної
продукції. Як результат - стає можливим не тільки
створення ринків новітніх конкурентноспромож-
них товарів і послуг, а і ринків новітніх технологій.
Такий підхід обумовлений не лише необхідністю
прискорення виробництва новітніх товарів та пос-
луг, але і більш глибокими тенденціями скорочення
всього життєвого циклу продукції та послуг. Труд-
нощі реалізації такого шляху пов'язані, насамперед,
з використанням інноваційних технологій менедж-
менту, які раніше не існували. Тобто, прискореного
розвитку наукоємної промисловості можна домог-
тися тільки на інноваційному шляху розвитку, який
крім інвестицій потребує створення нових ринко-
вих інститутів і механізмів.
З урахуванням глобалізації технологічних ри-
нків, правові механізми охорони інтелектуальної
власності багатьох держав в значній мірі відпрацьо-
вані, в тому числі і в Україні. Але ефективні правові
механізми доведення наукових результатів до про-
мислової продукції в Україні відсутні, що є стриму-
ючим фактором розвитку наукоємного промисло-
вого виробництва.
І тому в такій ситуаціі виникає гостра потреба
у використанні доступних, дешевих джерел, таких
як глобальна мережа Інтернет, яка не потребує до-
даткових вкладень та практично доступна для всіх
верств населення.
Обраний інноваційний шлях розвитку України
підтверджується тим, що Державне підприємство
«Укрпатент» в останні роки був підпорядкований
Міністерству економічного розвитку України.
Висновки
На думку авторів, необхідно активізувати та
поєднати механізми генерування й поширення нау-
ково-технічної інформації для прискорення іннова-
ційного розвитку економіки України. При цьому
важливо дотримуватися принципу захисту прав ін-
телектуальної власності. При ефективному викори-
станні Інтернет - портал може трансформуватися в
технологічного Інтернет брокера, стати з’єднуваль-
ною ланкою між науковцем та бізнесменом, фінан-
совими установами, промисловцями. Головне за-
вдання науковця створювати новації та їх ефекти-
вна передача структурам, які займаються їхньою
реалізацією.
Визначальною особливістю передачі результа-
тів наукових досліджень для їхнього освоєння є
створення та подальший розвиток комерційних
форм взаємодії науки і виробництва за посередниц-
тва неприбуткових інституцій, створених держа-
вою.
Sciences of Europe # 60, (2020) 13
В процесі пошуку потенційних інвесторів
необхідно передбачити весь спектр можливих про-
позицій, а також оцінити характер і можливу вели-
чину отримання від них інвестицій.
Особливий акцент повинен бути зроблений на
обміні науково-технічною інформацією про власні
національні розробки. Інакше кажучи, потрібне
створення високорозвиненої системи горизонталь-
них інформаційних зв'язків між підприємствами,
науково-дослідними організаціями, державою та її
відомствами.
На думку авторів, необхідно вирішити зав-
дання оптимального сполучення механізму гене-
рування й механізму поширення науково-технічної
інформації.
Комерціалізація результатів науково-тех-
нічних проектів буде більш успішною, вагомою та
значимою для сталого розвитку економіки, коли
підтримка держави буде мати концептуальний, ста-
лий та узгоджений характер, з меншими бюрокра-
тичними перепонами, що в свою чергу зробить цей
вид діяльності більш відкритим та привабливим для
інвестора. Держава повинна збільшити асиг-
нування на вітчизняну науку,безумовно, рефор-
мувавши останню. З кожним роком розрив між ро-
звиненими та мало розвиненими країнамидосягає
критичної відмітки в сфері науково-технічної
діяльності і наша держава має великі шанси зали-
шитись лише сировинною плямою на карті світу.
Література
1. Економіка інтелектуальної власності : нау-
ково-методичні матеріали для підготовки докто-
рантів, аспірантів і магістрів за напрямом «Інтелек-
туальна власність» / Л. С. Шевченко, О. А. Гри-
ценко, Т. М. Камінська та ін. ; за ред. д-ра екон.
наук, проф. Л. С. Шевченко. – Х. : Право, 2015. –
120 с.
2. Закон України «Про державне регулю-
вання діяльності у сфері трансферу технологій» від
14.09.2006 № 143-V.
3. Постанови Кабінету Міністрів України:
– від 26.06.2007 № 861 «Про затвердження
Порядку проведення державної акредитації фізич-
них та юридичних осіб на право провадження посе-
редницької діяльності у сфері трансферу техно-
логій»;
– від 01.08.2007 № 995 «Деякі питання ре-
алізації Закону України «Про державне регулю-
вання діяльності у сфері трансферу технологій»;
– від 04.06.2008 № 520 «Про затвердження
мінімальних ставок винагороди авторам технологій
і особам, які здійснюють їх трансфер»;
– від 04.11.2009 № 1178 «Про внесення змін
до постанови Кабінету Міністрів України від 26
червня 2007 р. № 861».
4. Розпорядження Кабінету Міністрів
України: від 06.02.2008 № 252-р «Про передачу
МОН повноважень на затвердження порядку ве-
дення Державного реєстру договорів про трансфер
технологій».
5. Розпорядження Кабінету Міністрів
України: від 30.08.2017 № 600-р «Деякі питання ро-
звитку критичних технологій у сфері виробництва
озброєння та військової техніки».
6. Розпорядження Кабінету Міністрів
України: від 14.06.2017 № 398-р «Про схвалення
Основних напрямів розвитку озброєння та військо-
вої техніки на довгостроковий період».
7. Геєць В.М., Семиноженко В.П. Інноваційні
перспективи України. —Харків: Константа, 2006.
— 272 с.
8. Федулова Л. І. Технологічний розвиток
економіки України. – Київ.: Ін-т економіки та про-
гнозування, 2006. – 627 с.
9. Біла книга. Інтелектуальна власність в ін-
новаційній економіці України / Т. О. Андрощук, В.
О. Дем’яненко, І. Б. Жиляєв, Л. В. Сахарова, В. І.
Полохало, С. В. Таран (упорядкування). – Київ.:
Парламентське вид-во, 2008. – 448 с.
10. Шпак А. Передача технологій в Україні:
ситуація і проблеми// Інтелектуальна власність. –
2000. – №6-7.
11. Михайлушкин А.И., Шимко П.Д., Между-
народная экономика. - М.: Высшая школа, 2002. –
250 с.
12. Чумаченко Б. Международный трансфер
технологий: опит американских корпорацій // Про-
блеми теории и практики управления. — 1999. —
№2. http://www.ptpu.ru
13. Верхюлст Г. Международная торговля тех-
нологиями—лицензирование ноу-хау и промыш-
ленные секреты, http://www.wipo.int
14. Сервантес М. Университетское патентова-
ние: Как университеты и государственные исследо-
вательские организации используют свою интел-
лектуальную собственность для поощрения иссле-
дований и стимулирования новаторських
предприятий, http://www.wipo.int
15. Дагаев А. Передача технологий как інстру-
мент государственной инновационной политики //
Проблемы, теории и практики управления. — 1999.
— №5.
16. Лисенко В.С., Скляренко О.О., Соловйов
В.П. Фінансови інститути у сфері інноваційної
діяльності // Проблеми науки. – 2004. - №9.
17. Патент України №62271 на корисну мо-
дель,Україна, МПК G06F 15/173(2006.01). Спосіб ство-
рення електронного центру віртуального офісу (вірту-
альних офісів)трансферу технологій/Фесенко О.М.,Ти-
щенко В.В., Маслов В.П., Скляренко О.О., Рагуля А.В.,
Луговська Г.Г., Андросюк Г.М., Кияк Ю.П., заявка
u201015936 від 29.12.2010., опубл.25.08.2011, Бюл.№16.
18. http://corpsite.ru/Encyclopedia/CorpPortal/Po
rtalDdefinition.aspx
14 Sciences of Europe # 60, (2020)
ОБОСНОВАНИЕ ПОСТРОЕНИЕ ПОСТРАНСТВЕННЫХ МОДЕЛЕЙ РАСПРОСТРАНЕНИЯ
ВИРУСА НА ПРИМЕРЕ ПАНДЕМИИ 2020 ГОДА
Бурилина М.А.
Государственный академический университет гуманитарных наук,
старший преподаватель кафедры математической экономики
JUSTIFICATION FOR THE CONSTRUCTION OF MODELS OF SPREAD OF THE VIRUS
POSTRANSTVENNYH THE EXAMPLE OF A PANDEMIC 2020
Burilina M.
Research Scholar State Academic Humanities University,
Senior Lecturer at the Department of Mathematical Economics
DOI: 10.24412/3162-2364-2020-60-4-14-18
АННОТАЦИЯ
В работе рассматривается блок математической вычислимой имитационной модели, посвященный
построению модели распространения вируса на территории города Москвы, помимо этого анализируется
применение метода Монте-Карло для подсчета эффективности от действий правительства, направленных
на сдерживание перемещения населения в период активного роста заболевших и распространение вируса.
ABSTRACT
The paper considers a block of a mathematical computable simulation model dedicated to the construction of
a model of the spread of the virus in the territory of the city of Moscow, in addition, the application of the Monte
Carlo method for calculating the effectiveness of government actions aimed at curbing population movements
during the period of active growth of cases and the spread of the virus is analyzed.
Ключевые слова: вычислимая имитационная модель, метод Монте-Карло, вероятностные модели,
распространение вируса, пандемия.
Keywords: computable simulation model, Monte Carlo method, probabilistic models, virus spread, pan-
demic.
В работе [1] авторы с помощью подхода мак-
симального правдоподобия и эмпирического рас-
пределения определили, что блокировки, введен-
ные правительством Китая, предотвратили 70,5%
случаев, когда зараженные люди должны были вы-
ехать за пределы материкового Китая. Кроме того,
во время первых трех с половиной недель внедре-
ния ограничения на поездки, снизилась дневная
норма вывоза на 81,3% в среднем. Используя моде-
лирование методом Монте-Карло, авторы подсчи-
тали, что около 64% экспортированных случаев
были в бессимптомном состоянии. Авторы также
обнаружили, что провинцию Хубэй снизили ско-
рость распространения болезней на 81% и предот-
вращено 71% случаев к 15 февраля 2020 года, по
сравнению с отсутствием ограничения. Таким об-
разом, меры пограничного контроля вряд ли будут
сдерживать вспышку, ограничения по путеше-
ствиям в китайскую но, вероятно, могут задержать
дальнейший импорт коронавируса. По итогу по-
строения модели, авторы получили следующие гра-
фики (рисунок 1). На этом графике А обозначено
как менялись симптомы у путешественников во
время вспышки «2019-nCov» в течении 28 дней по-
сле путешествия, получили эти результаты, с помо-
щью опроса страны у самих путешественников. На
графике B (рисунок 1) обозначена общая вероят-
ность вывоза хотя бы одного случая заболевания.
Графики D и E (рисунок 1) показывают, как повли-
яло закрытие границ между регионами на ограни-
чение путешествий и передвижений в провинцию
Хубэй и из нее на количество заражений.
Sciences of Europe # 60, (2020) 15
Рисунок 1. График сравнения заболеваемости с учетом ограничений по передвижению населения [1].
Далее рассмотрим работу [2], в ней автор мо-
делирует распространение коронавируса на при-
мере города Ереван, с помощью языка программи-
рования Python. Работа была написана до глобаль-
ного распространения вируса по всему миру, и
автор рассматривает, какие меры стоило бы пред-
принять для минимизации ущерба от вируса отно-
сительно населения и экономики. Автор поставил
целью не создать тщательно откалиброванную мо-
дель распространения, а показать общие принципы
построения вероятности (формула 1). В данном мо-
делировании время будет дискретной переменной,
поскольку состояние системы моделируется на
ежедневной основе. В полностью восприимчивой
популяции в точке j в момент времени t вспышка
произойдет с вероятностью:
tjt
tjtk
t
kjktjt
y
yxmS
jth
,
,,,,
1
))exp(1(
),(


+
−−
= 
(1),
где:
t - скорость передачи инфекции в день t;
t
kjm , - отражает мобильность от местоположе-
ния k к местоположению j;
tkx , и tjy , - доля инфицированных и воспри-
имчивых популяций в день t в местоположении k и
местоположении j соответственно;
k
tk
tk
N
I
x
,
, = ;
j
tj
tj
N
S
y
,
, = , где kN и jN - раз-
меры популяции в местоположениях k и j.
Чтобы определить, как инфекция передается
одним человеком, автор взял базовое репродуктив-
ное число R0 в диапазоне от 1,4 до 4 (официальные
данные на момент написания статьи). Автор рас-
сматривал самый худший вариант, поэтому R0 в
данном исследовании равняется 4. Динамика мо-
дели определяется следующими отношениями:
tjtjtj
k
t
kjj
k tktk
t
kjtj
j
tjtjtj
tjtj
k
t
kjj
k tktk
t
kjtj
j
tjtjtj
tjkj
IRR
mN
xmS
N
IS
II
mN
xmS
N
IS
SS
,,1,
,
,,,,,,,
,1,
,
,,,,,,,
,1,



+=
+
++=
+
−−=
+
+
+




(2),
где:
tk, - (случайная) скорость передачи вируса в
точке k в день t;
 - коэффициент, обозначающий отношение
использования людьми общественного транспорта
к личному автомобилю;
При самом моделировании автор получил за-
висимости, представленные на графике 2.
16 Sciences of Europe # 60, (2020)
Рисунок 2. Моделирование распространения коронавируса в г. Ереван [2].
Видно, что пик эпидемии приходится на пе-
риод с 16 по 20 день, когда инфицированная группа
значительно меньше (~ 45%) и выздоравливает
вдвое больше (~ 20%). К концу эпидемии доля вос-
приимчивых людей также вдвое больше (~ 24%
против ~ 12%), что означает, что больше людей из-
бежали болезни. Оказалось, что введение карди-
нальных мер по временному снижению городской
мобильности (локдаун) оказывает большое влияние
на динамику распространения болезней.
В работе [3] авторы используют простран-
ственные эконометрические характеристики для
моделирования ежедневных показателей инфици-
рования COVID-19 в разных странах. Используя
последние достижения в области Байесовской про-
странственной эконометрии, уделяется особое вни-
мание зависящей от времени важности альтерна-
тивных структур пространственных связей, таких
как число стыковочных рейсов, отношения в меж-
дународной торговле и общие границы. Гибкая
настройка модели позволяет исследовать интенсив-
ность и тип пространственных переливных струк-
тур с течением времени. Результаты показывают за-
метные пространственные механизмы распростра-
нения на ранних стадиях вируса с
международными связями полетов в качестве ос-
новного канала передачи. На более поздних этапах,
наша модель показывает резкое падение интенсив-
ности пространственных побочных эффектов из-за
национальных запретов на поездки, указывая на то,
что ограничения на поездки привели к сокращению
межстрановых побочных эффектов.
В данной статье авторы используют динамиче-
скую модель с пространственной авторегрессией
(SAR), в частности, внимание сосредоточено на не-
стационарных структурах пространственной зави-
симости во время распространения вируса, кото-
рый авторы стремятся смоделировать для N стран
за T дней. Модель SAR можно написать следую-
щим образом:
tttttt yyqWy  +++= −1)( (3),
где:
ty - вектор N x 1 инфекций, характерных для
страны в момент времени t (t=1,…,T);
tt yqW )( - пространственное отставание;
 - тенденции, характерные для страны;
t - вектор инноваций, считается нормальным
с нулевым средним и
2
 ;
Дискретный параметр временного варианта
tq  {1, ..., P} управляет выбором пространствен-
ной весовой матрицы из P альтернатив и должен
быть оценен. Такая спецификация позволяет гибко
проследить природу глобальных пространственных
перемен во времени. Байесовские методы оценки
позволяют эффективно работать с такими гибкими
характеристиками смеси пространственных весо-
вых матриц. Авторы переформулировали модель
SAR (см. формулу 3) до вида:
)())(( 1
1
ttttt yqWIy  ++−= −
−
(4)
Пространственные вторичные эффекты отра-
жены ниже и имеют вид:


=
−
=− 0
1
)())(( r
r
t
r
ttt qWqWI 
(5)
Матрица определяется параметром простран-
ственной аторегрессии t , таким образом, предла-
гаемая авторами модель позволяет различать
внутри и межрегиональные процессы передачи ин-
фекции. Поскольку инфекции, передающиеся из
страны в страну, являются неотрицательными дан-
ными, можно утверждать, что пространственная
Sciences of Europe # 60, (2020) 17
эконометрическая спецификация данных подсчета
может быть более подходящей. Поэтому в качестве
эталонной модели авторы также применяют попу-
лярную альтернативу в пространственной эконо-
метрической литературе, предложенную Фишером
и др, используя байесовскую структуру Пуассона с
явной пространственной авторегрессионной струк-
турой:
)exp(
)(~
1 ttt
tt
vy
y
++= − 

(6),
где:
)( t - Распределение Пуассона;
t - вектор t человек Пуассоновского про-
цесса;
tv - вектор, фиксирующий случайные эф-
фекты, характерные для определенной страны;
Применив перечисленные выше модели, ав-
торы, получили следующий результат, отраженный
на рисунке 3.
Рисунок 3. Структура пространственной связи [3].
Таким образом, ежедневные оценки простран-
ственной зависимости подтверждают, что первона-
чально пространственные побочные эффекты иг-
рали ключевую и статистически значимую роль в
передаче вируса: в конце февраля только 4 страны
в выборке (из ЕС это была Италия) ввели приоста-
новку передвижения населения, и это имеет боль-
шое значение. После 15 марта 2020 года, когда
большинство европейских стран начали вводить ка-
рантинную политику и закрытие авиасообщения,
закрыли свои пограничные переходы и сократили
авиаперелеты, пространственная автокорреляция
становится незначительной. Однако, в середине
марта пространственный параметр авторегрессии
даже становится негативным на довольно короткий
период. Одним из объяснений краткосрочной отри-
цательной степени пространственной автокорреля-
ции может быть то, что некоторые страны приме-
няют особенно жесткие запреты на поездки в реги-
оны с высоким уровнем инфицирования, чтобы
уменьшить передачу вируса в своей стране, что
приводит к различиям (отрицательная простран-
ственная автокорреляция) среди пространственных
единиц. К 24 марта, когда более 3,5 миллиардов че-
ловек жили в той или иной форме карантина, про-
странственные побочные эффекты стали незначи-
тельными. Пространственная зависимость заметно
уменьшилась после введения ограничения на путе-
шествия в большинстве стран и оставалась незна-
чительной в последующие месяцы. В целом, авторы
обнаружили, что пространственная зависимость за-
метно уменьшилась с течением времени, поскольку
страны решили ввести региональные и глобальные
ограничения на передвижение в виде закрытия гра-
ниц, приостановки борьбы и даже полной блоки-
ровки. Кроме того, авиасообщение играло особенно
важную роль на ранних стадиях распространения
вируса, что свидетельствует о том, что прекраще-
ние авиасообщения действительно было важной
мерой в смягчении последствий ранней передачи
вируса.
В работе [4] представлены результаты эконо-
метрического исследования квадратичной экспо-
ненциальной функции суточной численности зара-
женных коронавирусом людей в Москве во времен-
ных промежутках, начинающихся 12 марта и
оканчивающихся в конце апреля 2020 г:
Yt = eat2+bt+c
(7),
где
Yt-количество зараженных коронавирусом жи-
телей Москвы за сутки t,
t-время (сутки),
e-основание натурального логарифма.
18 Sciences of Europe # 60, (2020)
Рисунок 4. Фактические и прогнозные на период 15 апреля – 29 июня 2020 г.
На рисунке 4 отражены расчетные значения
согласно работе [4], то есть значения суточной чис-
ленности зараженных коронавирусом жителей
Москвы, исследованной во временном промежутке
12 марта – 14 апреля. Автор берет данные для рас-
чета, сдвигая пик заражений, но при этом каждый
расчет подтверждает спад распространения вируса
ближе к середине и концу июня.
Литература
1. Chad R. Wells, Pratha Sah, Seyed M. Mogha-
das, Abhishek Pandey, Affan Shoukat, Yaning Wang,
Zheng Wang, Lauren A. Meyers, Burton H. Singer, and
Alison P. Galvani. Impact of international travel and
border control measures on the global spread of the
novel 2019 coronavirus outbreak [Electronic source]. –
URL: https://www.pnas.org/con-
tent/pnas/early/2020/03/12/2002616117.full.pdf
2. Gevorg Yeghikyan [Electronic source]. –
URL: https://towardsdatascience.com/modelling-the-
coronavirus-epidemic-spreading-in-a-city-with-py-
thon-babd14d82fa2 Режим доступа 25 ноября 2020.
3. Krisztin, T., Piribauer, P. & Wögerer, M. The
spatial econometrics of the coronavirus pandemic. Lett
Spat Resour Sci 13, 209–218 (2020).
https://doi.org/10.1007/s12076-020-00254-1
4. А.А. Афанасьев Эконометрическое про-
гнозирование суточной численности зараженных
Уханьским коронавирусом жителей г. Москвы за
период с марта по июль 2020 г. [Электронный ре-
сурс] https://istina.msu.ru/conferences/presenta-
tions/297636272/ Режим доступа 20 ноября 2020.
ФОРМИРОВАНИЕ СТРАТЕГИИ ИННОВАЦИОННОГО РАЗВИТИЯ ГАЗОВОЙ ОТРАСЛИ
АЗЕРБАЙДЖАНА НА ОСНОВЕ АНАЛИЗА ВЛИЯЮЩИХ ФАКТОРОВ
Гасумов Э.Р.
докторант Азербайджанского технического университета, Баку
FORMATION OF A STRATEGY OF INNOVATIVE DEVELOPMENT OF THE GAS INDUSTRY OF
AZERBAIJAN BASED ON ANALYSIS OF INFLUENCING FACTORS
Gasumov E.
doctoral student of the Azerbaijan Technical University, Baku
DOI: 10.24412/3162-2364-2020-60-4-18-24
ABSTRACT
The article deals with the formation of a strategy for the innovative development of the gas industry in Azer-
baijan based on the analysis of influencing factors. The features of the state innovation policy of the gas industry
containing a set of measures aimed at enhancing innovation, increasing efficiency and widespread use of its results
in order to accelerate the socio-economic development of the industry are stated. The main stages and directions
Sciences of Europe # 60, (2020) 19
of the state innovation policy in the gas industry are presented. The main directions and tasks of the gas industry
are systematized on the example of the development of gas condensate fields in the framework of the implemen-
tation of the innovation policy.
АННОТАЦИЯ
В статье рассмотрены вопросы по формированию стратегии инновационного развития газовой от-
расли Азербайджана на основе анализа влияющих факторов. Изложены особенности государственной ин-
новационной политики газовой отрасли содержащей комплекс мер, направленных на активизацию инно-
вационной деятельности, повышение эффективности и широкое использование ее результатов в целях
ускорения социально-экономического развития отрасли. Приведены основные этапы и направления госу-
дарственной инновационной политики в газовой отрасли. Систематизированы основные направления и
задачи газовой отрасли на примере разработки газоконденсатных месторождений в рамках реализа-
ции инновационной политики.
Ключевые слова: стратегия, инновационная деятельность, газовая отрасль, эффективность, научно-
техническая развития, углеводородов.
Keywords: strategy, innovation, gas industry, efficiency, scientific and technological development, hydro-
carbons.
Введение. Нынешняя состояние мировой эко-
номики показывает, что страны, в которых развита
инновационная деятельность, получают значитель-
ное конкурентное преимущество, которое проявля-
ется производимые ими продукциях и оказываемых
интеллектуальных услугах, пользуются высоким
спросом в тех странах, где инновации развиты
слабо и специализируются на производстве сырье-
вых ресурсов.
В современном Азербайджане, который явля-
ется динамично развивающейся страной, повышен-
ное внимание уделяется развитию инновационной
деятельности (ИД). Инновационная политика, про-
водимая азербайджанским государством, подразу-
мевает создание необходимых условий для произ-
водства, распространения и внедрения новых зна-
ний и технологий. Одна из важнейших черт,
характеризующих развитие национальной эконо-
мики в современный период, - рационализация ИД
в отраслях экономики. Нефтегазовая отрасль (и ее
ядро SOCAR) является одним из основных секторов
народного хозяйство Азербайджана, и эффектив-
ность управления инновациями в данной отрасли
определяет ИД целом в стране. Государственная
нефтяная компания Азербайджанской Республики
(ГНКАР, SOCAR) осуществляет все работы по
нефтегазовому сектору в Азербайджане. Это тра-
диционная для международного нефтегазового
мира, если на территории страны имеются место-
рождения углеводородов (УВ) с запасами, позволя-
ющими осуществлять экспорт, то эта отрасль кон-
тролируется государством [1-3]. В связи чем, иссле-
дования вопроса о формировании стратегии
инновационного развития газовой отрасли Азер-
байджана на основе анализа влияющих факторов
является актуальной темой.
Государственная инновационная политика
(ГИП) является комплекс мер, направленных на ак-
тивизацию инновационной деятельности (ИД), по-
вышение эффективности и широкое использование
ее результатов в целях ускорения социально-эконо-
мического развития страны и полного удовлетворе-
ния общественных потребностей. ГИП включает
три этапа:
- разработка научно обоснованных концепций
на развитие ИД на основе анализа состояния инно-
вационного потенциала;
- определение основных направлений государ-
ственной поддержки инноваций;
- реализация практических действий по реали-
зации поставленных целей, направленных на повы-
шение инновационной активности.
Методы исследования: общенаучные (син-
тез, дедукция, индукция, обобщение, наблюдение,
прогнозирование, научная абстракция, статистиче-
ский анализ, логический), а также приемы группи-
ровки, классификации и экспертной оценки.
Результаты исследований и их обсуждения.
У инновационной политики есть две стороны:
стратегическая и тактическая. Стратегия ГИП фор-
мируется на основе долгосрочных концепций соци-
ально-экономического и социально-политического
развития страны. Выбор стратегии инновационной
политики предполагает определение основных
направлений государственного регулирования ИД
и принятие методов развития и использования
научного потенциала, постановку основных целей
инновационного развития в соответствии с соци-
ально-экономическими целями. Тактика включает
определение текущих целей и конкретных дей-
ствий, которые обеспечивают достижение этих це-
лей с максимальной эффективностью. Тактические
средства - финансирование научно-исследователь-
ских и опытно-конструкторских работ (НИОКР),
материально-техническое и информационное обес-
печение, подбор персонала, а также создание пра-
вовых и организационных условий для реализации
мероприятий по инновационному развитию [4 - 6].
Эффективность ГИП, методы ее формирова-
ния и основные направления поддержки инноваций
в определенной степени находят отражение в
научно-техническом (НТ) лидерстве. Это проявля-
ется в международном масштабе: расширение экс-
порта результатов НТ информации (лицензии, па-
тенты и др.), Увеличение экспорта готовых иннова-
ций, оказание бесплатной НТ инновационной
помощи другим странам. НТ руководство является
доказательством правильности выбранного страте-
гического курса и тактических действий по форми-
рованию и реализации ГИП. НТ лидерство является
20 Sciences of Europe # 60, (2020)
следствие правильного выбора направлений иссле-
дований (применения выборочных и фронтальных
методов). Правильный выбор должен привести к
лидерству в тех сферах, где есть приоритет в разви-
тии.
ГИП в основном направлен на создание благо-
приятных экономических, организационных, пра-
вовых, информационных и социально-психологи-
ческих условий для реализации инновационных
процессов [7, 8]. Эти условия и разнообразие мето-
дов формирования инновационной политики опре-
деляют основные направления государственной
поддержки инноваций. Основные направления
ГИП в нефтегазовой отрасли включают:
- содействие развитию НИОКР (фундамен-
тальных, поисковых, прикладных), прежде всего по
перспективным направлениям;
- кадровое обеспечение ИД;
- поддерживать разработку различных про-
грамм, направленных на повышение инновацион-
ной активности;
- формирование государственного заказа в
виде контрактов на инновационные разработки,
обеспечивающих первоначальный спрос на многие
инновации, которые затем широко распространя-
ются на рынке (внутреннем и внешнем);
- использование фискальных и иных инстру-
ментов государственного регулирования, формиру-
ющих стимулирующие эффекты внешней среды,
определяющие необходимость и эффективность
инновационных решений;
- участие государства как посредника в органи-
зации эффективного взаимодействия и стимулиро-
вания сотрудничества в области инновационных
разработок между различными секторами науки и
газовой отрасли;
- координация ИД в отрасли;
- создание правовой базы для инноваций;
- регулирование международных отношений в
сфере инновационных процессов.
Последние два направления важны с точки зре-
ния степени участия государства в поддержке ин-
новаций. Ведь правовое регулирование инноваци-
онных процессов - исключительная прерогатива
государства, и регулирование международных от-
ношений в сфере инновационных процессов также
в основном осуществляется государством.
Формы государственного регулирования меж-
дународных отношений в сфере инноваций разно-
образны, некоторые из них важны для газовой от-
расли:
- продвижение иностранных инновационных
инвестиций;
- разумный выбор наиболее перспективных и
приоритетных направлений сотрудничества;
- таможенное регулирование и экспортный
контроль инновационных разработок (технологий,
продуктов, рецептов);
- поддержка международных контактов (свя-
зей) малого инновационного бизнеса;
- финансирование многосторонних (двусто-
ронних) международных инновационных проектов;
- применение специальных налоговых и кре-
дитных льгот для стран (или компаний), участвую-
щих в совместных инновационных проектах и раз-
работках;
- внедрение международных стандартов и
норм в стране.
Форма государственного регулирования ИД в
нефтегазовой отрасли, также предусматривает: гос-
ударственные программы расширения НТ сотруд-
ничество зарубежными государствами; участие в
работе международных организаций, в той или
иной степени занимающихся вопросами иннова-
ций; присоединение к международным соглаше-
ниям; создание специальных законодательных ак-
тов и норм, регулирующих международные инно-
вационные отношения; участие в международных
патентно-лицензионных операциях и др.
Нефтегазовая промышленность является ос-
новной в экономике Азербайджана, и значительная
часть доходов государственного бюджета форми-
руется за счет экспорта углеводородов. Решение
государственных, внутренних экономических, со-
циальных и политических проблем зависит от пра-
вильного анализа деятельности предприятий топ-
ливно-энергетического комплекса (ТЭК) и опреде-
ления внешнеэкономических перспектив их
развития [9, 10]. Для создания рациональной стра-
тегии развития и возможных вариантов совершен-
ствования газовой отрасли Азербайджана необхо-
димо изучить ее структурные преобразования, про-
анализировать перспективы развития и
внешнеэкономической деятельности. Перспективы
развития внутреннего и внешнего газового рынка
Азербайджана во многом определяются государ-
ственной - газотранспортной (республиканской и
международной) системой и экономическим поло-
жением стратегических отраслей экономики, в том
числе газового комплекса страны, а также проводи-
мыми реформами в организационной, финансово-
экономической, технологической, социальной
сфере в национальной экономике. Основная цель
этих изменений - адаптироваться к изменившимся
условиям окружающей среды и повысить эффек-
тивность газовой промышленности. Газовая от-
расль является ключевым в экономике Азербай-
джана, поэтому анализ деятельности и определение
внешнеэкономических перспектив развития этого
комплекса необходимы для успешного решения
ряда государственных задач. Важно использовать
комплексный подход при оценке конкретных меж-
дународных газовых проектов, учитывая важное
внешнеэкономическое значение экспорта газа для
Азербайджана. Реализация вышеуказанных дей-
ствий невозможна без присутствия ГИП, так как га-
зовая промышленность в Азербайджане является
государственным сектором, а инновационная поли-
тика формируется Правительством республики.
Основные этапы государственной инновационной
политики [1-3]
I этап. Разработка научно обоснованных кон-
цепций развития инновационной деятельности -
осуществляется на основе анализа состояния инно-
вационного потенциала отрасли.
Sciences of Europe # 60, (2020) 21
II этап. Определение основных направлений
государственной и корпоративной поддержки ин-
новаций в отрасли.
III этап. Реализация практических действий по
реализации поставленных задач, направленных на
повышение инновационной активности отрасли.
ГИП содержит цель и задачи, в которых опре-
делены принципы ее реализации. Важнейшее из
них является опора на отечественный научный по-
тенциал. Инновационная политика предусматри-
вает свободу научного творчества, последователь-
ную демократизацию научной сферы, открытость и
прозрачность в формировании и реализации, при
этом необходимо стимулировать развитие фунда-
ментальных научных исследований, сохранять и
развивать ведущие отраслевые научные организа-
ции, создавая условия для здоровой конкуренции в
области науки, технологий и технологий. Основы
инновационной политики закладываются путем
принятия комплекса законодательных актов, адек-
ватных реальной экономической, социальной и по-
литической ситуации в стране. Они определяют
субъекты и объекты управления, их права, обязан-
ности и ответственность. Задачи государственной
инновационной политики предусматривает:
- обеспечение согласованной деятельности
государственных органов и нефтегазовой отрасли,
экономических и научных организаций по осу-
ществлению структурной перестройки экономики;
- обеспечение эффективного использования
научно-технического потенциала для стабилизации
развития экономики по основным направлениям,
определяющим стратегию, темпы и пропорции раз-
вития национальной экономики и ее структурную
сбалансированность;
- защита научного потенциала и обеспечение
«прорывных» исследований;
- углубление специализации и повышение
надежности кооперации государственного произ-
водства и высоких технологий;
- перенос центра тяжести экономических ре-
форм и стимулов в сферу инноваций, повышение
инвестиционной и инновационной активности.
Стратегия государственной инновационной
политики формируется на основе долгосрочных
концепций социально-экономического и соци-
ально-политического развития страны. Выбор стра-
тегии инновационной политики предполагает опре-
деление основных направлений государственного
регулирования инновационной деятельности и при-
нятие методов развития и использования научного
потенциала, постановку основных целей инноваци-
онного развития в соответствии с общими соци-
ально-экономическими целями. Тактика включает
определение текущих целей и конкретных дей-
ствий, которые обеспечивают достижение этих це-
лей с максимальной эффективностью. Тактические
средства - финансирование НИОКР, конструктор-
ских и технологических разработок, материально-
техническое и информационное обеспечение, под-
бор персонала, создание правовых и организацион-
ных условий для реализации мероприятий иннова-
ционного развития [2-4, 8]. Основные направления
государственной инновационной политики в газо-
вой отрасли предоставлены в таблице 1[3].
Таблица 1
Главные направления государственной инновационной политики в газовой отрасли
Главные направления государственной инновационной политики
Аккумулирование средств на научные исследования и инновации в газовой отрасли
Координация инновационной деятельности
Стимулирование инноваций, конкуренции в данной сфере, страхование инновационных рис-
ков, введение государственных санкций за выпуск устаревшей продукции
Создание правовой базы инновационных процессов, особенно системы защиты авторских прав
новаторов и охраны интеллектуальной собственности
Кадровое обеспечение инновационной деятельности в газовой отрасли
Формирование научно-инновационной инфраструктуры
Институциональное обеспечение инновационных процессов в газовой отрасли
Обеспечение социальной и экологической направленности инноваций в газовой отрасли
Повышение общественного статуса инновационной деятельности
Отраслевое регулирование инновационных процессов
Регулирование международных аспектов инновационных процессов
Возможны два варианта государственного воз-
действия на научную и инновационную деятель-
ность: прямой и косвенный.
Прямое - бюджетное финансирование научной
сферы, охватывает содержательную сторону ИД
(выбор приоритетов, заключение государственных
контрактов, формирование госзаказа, субсидирова-
ние) и предоставление гарантий частным банкам.
Косвенные методы встроены в рыночный ме-
ханизм, который сам по себе обладает уникаль-
ными возможностями для выявления и удовлетво-
рения потребностей в исследованиях и разработ-
ках. Суть косвенного регулирования заключается в
создании общего благоприятного инновационного
климата, поощрении организаций, ориентирован-
ных на инновации, и принятии мер по созданию вы-
сокого социального статуса в общественном мне-
нии и престижа образования и науки. Однако в этом
варианте государство не контролирует конкретные
научные проекты.
В мировой практике применяется следую-
щие формы налогового регулирования: сниже-
ние ставки налога на прибыль инновационных
предприятий; снижение размера налоговых пла-
тежей при увеличении затрат на инновации;
22 Sciences of Europe # 60, (2020)
предоставление «налоговых каникул» на при-
быль от инновационной деятельности на не-
сколько лет; уменьшение налогооблагаемой
прибыли на стоимость научного оборудования;
ускоренная амортизация основного производ-
ственного фонда инновационного предприятия
и др.
Одним из наиболее эффективных государ-
ственных подходов стимулирования инноваци-
онных процессов является предоставление нало-
говых льгот. Азербайджан может предоставить
ряд налоговых льгот в газовой отрасли для раз-
вития НТ и ИД (таблица 2).
Таблица 2
Льготы по налогообложению в газовой отрасли для развития НТ и ИД
№ п/п Льготы по налогообложению субъектов научно-технической и инновационной деятельности
1
Инвестиционный налоговый кредит - предоставление отсрочки налоговых платежей с после-
дующей поэтапной уплатой суммы кредитов и начисленных процентов. Инвестиционный
налоговый кредит может быть предоставлен по налогу на прибыль организаций при наличии
следующих оснований
- проведение научно-исследовательских и опытно-конструкторских работ либо технического
перевооружения производства, в том числе для создания рабочих мест для инвалидов и защиты
окружающей среды от загрязнения промышленными отходами
- осуществление внедренческой и инновационной деятельности, в том числе создание новых и
совершенствование применяемых технологий, создание новых видов сырья
- выполнение особо важного заказа по социально-экономическому развитию региона или
предоставление особо важных услуг населению
2
Льготы по налогу на добавленную стоимость, освобождения от уплаты: выполнение НИОКР
за счет средств бюджета, а также средств фонда фундаментальных исследований.
3 Льготы по земельному налогу предусмотрены для научно-исследовательских учреждений
4 Уменьшение налогооблагаемой базы на суммы затрат, связанных с изобретательством
Обеспечение государственного регулирова-
ния ИД должно сочетаться с эффективным
функционированием конкурентного механизма
в инновационной сфере. В то же время концен-
трация государственных ресурсов на создании и
распространении базовых инноваций, обеспечи-
вающих прогрессивные структурные изменения
в экономике, является одним из основных прин-
ципов.
Государственная политика предусматри-
вает создание условий для развития рыночных
отношений в сфере инноваций, пресечение не-
добросовестной конкуренции и обеспечение
благоприятного инвестиционного климата при
осуществлении ИД.
Производственный потенциал многих раз-
вивающихся стран сосредоточен на начальных
этапах воспроизводственного цикла - в ресурсо-
добывающих и частично обрабатывающих от-
раслях. В то время как развитые страны обла-
дают избыточными производственными мощно-
стями в обрабатывающей промышленности и
производстве конечной продукции, значитель-
ная часть которых идет на экспорт, развивающи-
еся страны экспортируют первичные ресурсы,
энергоресурсы и продукты их переработки, им-
портируя при этом конечную продукцию обра-
батывающей и добывающей промышленности.
Однако некоторые промышленно развитые
страны имеют достаточно развитую добываю-
щую промышленность, а ряд развивающихся
стран имеют вполне современные технологии в
обрабатывающей промышленности и производ-
стве конечной продукции [4-6, 10].
Азербайджан, благодаря успешной конъ-
юнктуре мировых рынков сырья, смог присоеди-
ниться к глобальному инновационному про-
цессу и обеспечить увеличение темпов иннова-
ций в социальной, духовной, экономической и
политической сферах. И самое главное, с прихо-
дом на руководящие должности нового поколе-
ния людей уровень «страха перед нововведени-
ями» значительно снизился. В отличие от мно-
гих стран, Азербайджан имеет очень
значительные производственные мощности в
нефтегазовом секторе. Преимущество в техно-
логической сфере - важнейший фактор обеспе-
чения национальной безопасности страны и раз-
витие НТ и ИД.
Только качественно новый ТЭК может удо-
влетворить потребности модернизации и роста -
финансово устойчивый, рентабельный и дина-
мично развивающийся, соответствующий эколо-
гическим стандартам, оснащенный передовыми
технологиями и высококвалифицированным
персоналом. Учитывая, что целью энергетиче-
ской политики является максимально эффектив-
ное использование природных топливно-энерге-
тических ресурсов и потенциала энергетиче-
ского сектора для экономического роста и
повышения качества жизни населения страны,
необходимо внедрять инновационные подходы с
участием государства. В этой связи энергетиче-
ская стратегия государства становится опреде-
ляющей в ТЭК.
Снижение удельных затрат на производство
и использование энергоресурсов за счет рацио-
нализации их потребления, использования энер-
госберегающих технологий и оборудования, а
также снижения потерь при производстве, пере-
работке, транспортировке и реализации топ-
ливно-энергетических продуктов - приоритеты
Sciences of Europe # 60, (2020) 23
газовой отрасли. Органы государственной вла-
сти создают условия для повышения финансо-
вой устойчивости и эффективности использова-
ния потенциала ТЭК, повышения производи-
тельности труда. Особое место в энергетической
политике страны занимает минимизация техно-
генного воздействия энергетики на окружаю-
щую среду за счет использования экономиче-
ских стимулов, совершенствования структуры
производства, внедрения новых технологий про-
изводства, переработки, транспортировки, реа-
лизации и потребления продукции.
Наблюдается тенденция к дальнейшему
увеличению доли природного газа в структуре
азербайджанского экспорта. Динамика спроса
на топливно-энергетические ресурсы и УВ
внутри страны обусловлена темпами роста
национальной экономики и ее удельной энерго-
емкостью, а также ценами на энергоносители.
Состояние мирового экономического и энерге-
тического рынка, степень интеграции в мировое
энергетическое пространство, устойчивое осво-
ение минеральных ресурсов является определя-
ющим фактором в энергетическом секторе [5-7].
Энергетическая безопасность является важ-
нейший компонент национальной безопасности
государство. Обеспечение национальной без-
опасности - одна из главных задач энергетиче-
ской политики. Энергетическая безопасность
отражает состояние защиты страны, ее граждан,
общества, государства и экономики от угроз
надежному снабжению топливом и энергией.
Эти угрозы определяются как внешними (геопо-
литическими, макроэкономическими и конъ-
юнктурными) факторами, так и реальным состо-
янием и функционированием энергетического
сектора страны [4, 5].
Вопросы, связанные с реализацией прав
собственности в управлении газовой отраслью,
имеют решающее значение для формирования и
успешной реализации ГТП. Это связано с рядом
обстоятельств, каждое из которых является до-
статочным для того, чтобы государство выбрало
собственные полномочия как инструмент регу-
лирования газовой экономики страны [4 - 6].
Снижение
себестоимости
добываемого газа
Повышение
экологичности
разработки
месторождений УВ
Основными целевыми
ориентирами разработки
Программы
инновационного
развития являются
Экономия
энергетических ресурсов
Повышение
производительности
труда
Улучшение
потребительских качеств
оказываемых услуг
(при реализации газа)
Рисунок 1
Основные целевые ориентиры разработки программы инновационного развития газовой отрасли
Эффективное развитие энергетического
сектора Азербайджана возможно только при ре-
ализации активной государственной и корпора-
тивной политики, включая внедрение организа-
ционных и технологических новшеств [2, 3]. На
рисунке 1 систематизированы основные направ-
ления и задачи газовой отрасли на примере раз-
работки газоконденсатных месторождений
(ГКМ).
Заключение.
Программа инновационного развития газовой
отрасли - это документ долгосрочного планирова-
ния и управления, интегрированный в систему
стратегического планирования развития компании
и сформированный на десятилетний период. Он
должна содержать комплекс взаимосвязанных мер,
направленных на разработку и внедрение новых
технологий, инновационных продуктов и услуг, со-
ответствующих мировому уровню, а также на со-
здание благоприятных условий для развития ИД,
как в газовой отрасли, так и в смежных отраслях
промышленности производство в Азербайджане.
Программа является основным инструментом по-
вышения технологического уровня газового ком-
плекса с целью сохранения позиций в мировом
энергетическом бизнесе. Основные элементы дол-
госрочной программы государственной политики в
газовой отрасли является:
24 Sciences of Europe # 60, (2020)
- усовершенствование недропользования и
налогообложения с целью создания условий и сти-
мулов для увеличения добычи и освоения новых
ГКМ, в том числе малых и средних, эксплуатации
месторождений на поздних стадиях разработки и с
трудноизвлекаемыми запасами газа;
- обеспечение благоприятного режима для раз-
вития газовой отрасли путем создания условий для
реализации производственного и инвестиционного
потенциала всех субъектов газового рынка;
- максимизировать выгоды от экспорта газа и
уменьшить потенциальные потери экспортной вы-
ручки от перехода на спотовую торговлю газом в
Европе за счет сохранения единого канала экспорта
природного газа и заключения долгосрочных кон-
трактов;
- государственная поддержка взаимовыгодных
долгосрочных контрактов на импорт природного
газа, позволяющих сэкономить собственные ре-
сурсы и повысить надежность обеспечения азер-
байджанских и зарубежных потребителей УВ;
- совершенствование форм организации и уча-
стия государства в управлении газовой отраслью,
максимальное регулирование мер государствен-
ного регулирования и повышение их эффективно-
сти;
- формирование и развитие газового рынка на
основе создания равных условий для всех произво-
дителей и потребителей газа.
Оценка ожидаемых результатов программы
характеризуется следующими положениями:
предусматривает снижение удельной энергоемко-
сти ВВП и соответствующее повышение энергоэф-
фективности экономики; наиболее эффективным
способом будет обеспечение внутренних энергети-
ческих потребностей страны в первичных топ-
ливно-энергетических ресурсах; предусматривает
умеренный рост душевых расходов на топливно-
энергетическое обеспечение населения при более
быстром росте доходов населения; экспорт энерго-
ресурсов может увеличиться, что отвечает требова-
ниям стабильности платежного баланса страны,
укреплению ее экономического положения и влия-
ния.
Постепенное формирование энергетического
рынка с развитием соответствующей инфраструк-
туры позволит осуществить постепенную рациона-
лизацию топливно-энергетического баланса, само-
финансирование производственной и инвестицион-
ной деятельности газовой отрасли страны.
Литература
1. Добрина Л.Р. Перспективы развития газо-
вой отрасли Азербайджанской республики в усло-
виях глобализации. -М.: Интернет-журнал «Науко-
ведение». 2014. Вып. 5(24):173-173.
https://elib.pstu.ru.
2. Innovative Risk Management for Geological
and Technical (Technological). /Gasumov E.R.,
Gasumov R.A. // SOCAR Proceedings. -Baku. -2020. -
№2(2020) 008-016. -Р.8-16.
3. Гасумов Э.Р. Оценка и анализ риска инве-
стиционных вложений при разработке газовых ме-
сторождений. //Евразийский союз ученых (ЕСУ).
М.: -2020. - № 2(71). Част 5. -С. 30-34.
4. Государственная инновационная политика
и ее организационный механизм. http://oplib.ru.
5. Государственное регулирование и стиму-
лирование инновационной деятельности. Формиро-
вание Государственной инновационной политики и
ее основные направления. -М.: 2015-04-20. 3503.
https://studopedia.ru. https://studref.com.
6. Мухамедьяров А. М. Инновационный ме-
неджмент: учебное пособие. -М.:
https://econ.wikireading.ru.
7. Применение инновационных решений при
проектировании объектов нефтегазодобычи. / Гасу-
мов Р.А., Гасумов Э.Р. // Территория Нефтегаз. -М.:
ВНИИОЭНГ. -2017. -№ 4. -С.78-83.
8. Внедрение инноваций при освоении место-
рождений углеводородов./ Гасумов Р.А., Гасумов
Э.Р. // Естественные и технические науки. –М.: -
2019. - №6(132). –С. 100-105.
9. Гасумов Э.Р. Оценка эффективности внед-
рения инноваций при разработке газовых место-
рождений. // Монография: –Ставрополь: Издатель-
ство. - Изд. «Дизайн-студия Б», -2020. -552 с.; ил.
10. Gasumov E.R. Improving the efficiency of gas
cjndensate feld development through the use of innova-
tions. //Wschodnioeuropejskie Czasopismo Naukowe
(East European Scientific Journal). -Poland. 2019. -
№9(49), -Р.31-40.
11. Gasumov E.R. Technical and economic as-
pects of the development of the gas industry in Azer-
baijan. //Wschodnioeuropejskie Naukowe (East Euro-
pean Scientific Journal). -Poland. 2020. №10(62), Part.
4. – P.25-28.
Sciences of Europe # 60, (2020) 25
UTILITARIAN ANALYSIS OF BUSINESS COMMUNICATION IN THE PROCESS OF PROVIDING
COMPANY SERVICES
Pryadko S.
Candidate of Economic Sciences
Belgorod State University, Russia
Zyuban V.
Belgorod State University, Russia
Babayants D.
Belgorod State University, Russia
DOI: 10.24412/3162-2364-2020-60-4-25-28
ABSTRACT
The article presents the results of the study of the effectiveness of business communication in the process of
providing services by the company. Using the example of a specific situation that occurred at United Airlines in
2017, we conducted a utilitarian analysis of the behavior of stakeholders from the standpoint of business law and
business ethics. The hypothesis of the study was the assumption that violation of business ethics in the process of
resolving conflicts has an adverse impact on the company’s image in the long term. The utilitarian analysis has
been used as a research method. As the result of the study, recommendations have been formulated for resolving
the conflict situation.
Keywords: business ethics, utilitarian analysis, business communication, business conflict, company image.
The comparison of business law and business eth-
ics on a contrast gives some people the impression that
there is nothing important in business ethics. The costly
penalties of illegal conduct compared to the uncertain
consequences of unethical conduct support a common
illusion that business ethics is much less important than
law for business people. However, in one perspective,
ethics is hardly less important than law, and in the other
perspective it is even more important, more fundamen-
tal than law. This research paper intends to prove why
all people involved in business processes must place
ethical and legal rules ahead of profits.
There is no need to prove the fact that ethical be-
havior and corporate social responsibility can bring sig-
nificant benefits to a business. It can contribute to at-
tract more customers and employees who would like to
work in the organization, increase productivity and re-
duce costs, attract investors and keep the company's
share price high, thereby protecting business from take-
over. In opposition with these benefits, an unethical be-
havior or lack of social responsibility can damage a
company's reputation and that is what this research pa-
per about. It is interesting to see how ethical scandals
and dilemmas can deeply hurt the look of a corporation,
which can make employees and consumers get a bad
taste in their mouth about the morals of the company.
Nowadays a positive corporate image is crucial to
survive in competition and maintain the position on the
market. Besides, the way a company reacts to ethical
scandals and dilemmas that happen on a small level
tells a lot about its core practices and values. It is valu-
able to learn from business scandals to understand what
to avoid or watch out in a company when it comes to
business ethics. On this topic in a 2015 article, Vadas-
treanu, Maier & Maier write:
In other studies (Strobel, 2010; Fassin, 2000) re-
lated to the business ethic the authors consider that
business ethics includes the ensuring that the highest
legal and moral standards are respected in relationships
with people from the business community. This in-
cludes the most important person in the business: a cli-
ent. Short-term profit compared with the cost of losing
a customer is deadly for your business in the long-term
perspective. Ethics refers to an individual's moral judg-
ments about right and wrong. Decisions taken in an or-
ganization can be taken by individuals or groups, but
everyone is influenced by culture and circumstances.
The decision to behave ethically is a question of moral-
ity and people must decide how they are going to act
[1].
The purpose behind this paper is to reflect on the
situation where management and employees have acted
in an improper and unethical manner, and to examine
moral values that ought to have been addressed in
working through this situation. The paper illustrates
difficulties associated with deciding which activities
are legal, which are ethical, and which are neither.
The object of the research is the United Airlines
Company. The subject of the research is a conflict situ-
ation that occurred in the company in 2017.
The information base of the research is the publi-
cations of the databases such as ScienceDirect, Spring-
erLink, Google Scholar, and the analysis of YouTube
video footage.
As the method of research, a utilitarian analysis
has been used. To assess the situation that took place in
the famous American air company we applied the the-
ory of utilitarianism, one of the normative ethical theo-
ries. Its idea states that an action is morally right if it
results in the greatest amount of good for the greatest
amount of people affected by the action. Utilitarianism
puts at the center of moral decision a variable that is
very commonly used in economics as a parameter that
measures the economic value of actions: ’utility’. Re-
gardless of whether one accept that utility really is
quantifiable, it comes as no surprise to find that utilitar-
ian analysis is highly compatible with the quantitative,
mathematical methodology of economics. So, in ana-
lyzing two possible options in a single business deci-
sion, a certain utility can be assigned to each action and
each person involved, and the action with the highest
26 Sciences of Europe # 60, (2020)
aggregate utility can be determined to be morally cor-
rect [2].
Analysis of the situation. When seats on a plane
are overbooked, airlines look for volunteers who want
to give up their seats in exchange for money, but what
if no one wants to get off? United Airlines tries to solve
the problem by "raffling off" those who cannot take the
flight. But if the passengers refuse, then they are forci-
bly removed, which is what happened to Mr. David Dao
Duy Anh.
Several videos posted on the internet show a pas-
senger being dragged off his seat onto the floor by se-
curity guards for refusing to get off the plane and then
seen with blood on his face. The action earned the air-
line harsh criticism and, in a statement, issued on its
website, the company's executive director, Oscar
Muñoz, was forced to offer a public apology although
in a letter sent to staff through the company's internal
email, leaked to the U.S. media, the official defended
that employees in Chicago "followed established pro-
cedures for dealing with situations like this.
What makes the actions of the company unethical
in the handling this situation? During this event United
Express committed under our point different actions
that might be considered unethical.
The first one that triggered this whole situation
was that the company sold more tickets than it could
really sell. United Express oversold the tickets for
Flight 3411 and after the passengers were seated on the
plane and while the plane was still at the gate, the
United Gate agent announced that four passengers
would have to be removed, to accommodate four staff
members they had to cover an unmanned flight at an-
other location.
The second action we could name would be to
warn passengers a few minutes before take-off that 4 of
them have to leave the plane without leaving them any
room for maneuver even when they have already
checked in their belongings inside the plane.
Violence should never be used in situations like
this. That is why we believe that the way they arrested
David Dao was the most unethical action United Ex-
press ever committed. Jayse D. Anspach, a Twitter user
who shared one of the videos, explained that United
Airlines asked for "four volunteers" to give up their
seats and give them to employees of the same airline
who had to work Monday from their destination. "No-
body volunteered, so United chose for us," Anspach
said.
The airline chose four people. One of them, ac-
cording to press reports, is a doctor who refused to
leave the plane. The airline chose four people. One of
them, according to news reports, is a doctor who re-
fused to leave the plane. According to the witness, the
doctor needed to work at the hospital the next day, so
he refused. And after refusing to get off, the doctor
clung to his seat, while guards struggled with him to get
him off the plane. The videos show how the passenger
is even dragged down the aisle. "Ten minutes later, the
doctor ran back inside the plane with a bloody face,"
Anspach said.
Finally, the way a company of this size handles
and resolves the situation once the events have occurred
leaves much to be desired, since it did not take long for
them to apologize to the victim, but through an internal
mail that was leaked from Oscar Muñoz (CEO of the
company) it was possible to know that what he really
thought was that the security personnel followed the
procedures established to deal with situations like this,
in addition to his own assurance that David Dao had
behaved in a belligerent and disruptive manner when
none of this can be seen in the different videos recorded
by the other passengers.
Applying theory to this situation, the most appro-
priate one would be the one developed in a study which
defines customer satisfaction as "a psychological state
resulting from a purchase and consumption process"
[3]. In this case it is obvious that the trust placed by the
passengers was violated by choosing this airline since
these events caused the dissatisfaction of all the passen-
gers on the flight.
Utilitarian analysis. All our actions have conse-
quences, positive or negative. It would be logical to
suppose that unethical behavior leads to negative con-
sequences since it is always associated with some evil
and harm. So, it means that if people want to act ac-
cording to the morality they just need to think ahead
about their actions and consequences of these actions.
However, it is not easy to predict every event or detail
that might happen as the result of a certain action, in
natural sciences this idea is reflected in the theory of
“the butterfly effect” which states that small things can
have non-linear impacts on a complex system. Business
sphere is not an exclusion in this regard, even not sig-
nificant from the first sight wrong action of one of the
business members can become a real headache for the
whole organization and bring it a lot of damage. The
United Airlines case proves it very well.
To conduct utilitarian analysis for the United Air-
lines case we have looked at all main actors involved
and analyzed their potential utility in terms of ‘pleas-
ure’ and ‘pain’ involved in different courses of action,
say either dragging the passenger off the flight or let-
ting him stay.
Sciences of Europe # 60, (2020) 27
Table 1.
The results of a utilitarian analysis of the behavior of conflict stakeholders
Drag off the flight Let the passenger stay
Pleasure Pain Pleasure Pain
David
Dao
-Get injures
-Miss the flight and meeting
with a patient
-Be on time and
have a meeting
with a patient
United
Airlines
-Act legally
-Lose the trust of the publics
-Destroy the well-built repu-
tation, long-term relation-
ships and brand loyalty
-Falling of the company’s
share prices
-Be judged on the social me-
dia
-All passengers
are satisfied
-Headquarters miss
the flight
Security
officers
-Follow the instruc-
tions and policies
-Be fired due to hurting the
passenger
-Save the job
-Refuse to follow in-
structions and policies
Custom-
ers
-Get compensation
equal to the cost of
the tickets
-Be disappointed in the com-
pany
-Refuse from the company
services henceforth
-Cut the United credit cards
-Feel justice
After analyzing all the bad and good effects for the
sides involved, it is relatively easy to identify that the
greatest utility is the morally right decision. On the con-
trary, the consequences of unethical actions show that
harm was brought to everyone: the passenger got in-
jured, the company ruined its reputation, security offic-
ers lost their job. Of course, utilitarian analysis has its
disadvantages, it might be subjective or difficult for as-
signing all costs and benefits on the deep level, but even
such a simple balance sheet gives an impression about
importance of correct and ethical behavior not only
among senior management but among average execu-
tives as well.
Solving the situation in a better way: what should
United have done instead?
United’s response to the whole situation is close to
a textbook example of what not to do. Let us look again
at the immediate response to the controversy. In his first
response the CEO of the company apologised only for
“having to re-accommodate” passengers. The Wash-
ington Post ran an article that about sums up the re-
sponse to this statement: “‘Re-accommodate’? United
ridiculed for corporate speak response to passenger
dragging.”
Some have argued that United’s response to the
controversy was just as bad as the incident itself. We
will not argue over the economics of air travel and
whether overbooking is ethical, but here we hope to an-
swer the question of what mistakes United made in their
communication, so that they can be learnt from.
First let us consider a similarly botched response,
and how that compares to that of United. In 2015,
Nestlé experienced a PR crisis in India as a result of too
high levels of lead in their noodles, which severely
damaged its reputation there.
What did they do wrong in their communication?
At first, they pointed out how the levels of lead in their
product were within regulatory limits. In other words,
they pointed out that factually they were correct. This
did not go over well. The CEO later reflected that “This
is a case where you can be so right and yet so wrong,
we were right on factual arguments and yet so wrong
on arguing. It’s not a matter of being right. It’s a matter
of engaging the right way and finding a solution.”
The initial arrogant response is what exacerbated
the controversy for Nestlé, and as is clear, has done the
same for United. Much like the example, United re-
sponded with arrogance, defensiveness in claiming to
be well within their rights to do as they have, and com-
plete lack of empathy.
A study in 1995 has looked at what the best re-
sponses are to accusations of unethical behaviour, in it
was found that of the options of no response, denial,
excuse, justification or concession, the concession was
the most effective option [4]. Note that this does not
necessarily mean an apology, but any accommodating
strategy will be effective [5].
In United’s case, the real controversy is not only
their tone-deaf response but also the events with the
passenger. What should have been done instead?
United should have responded with responsibility, hu-
manity, and most of all an apology. They should have
conceded that they made mistakes, instead of defending
their right to do what they did.
Conclusion
As a conclusion we will say that the events that
occurred on flight 3411 were ultimately unpleasant for
all parties involved: company, security, David Dao and
the rest of the passengers.
On the one hand, the company's image was dam-
aged by having to publicly apologize to the CEO and
on the other hand, its market value fell by approxi-
mately 250 million dollars. On the side of the security
personnel, the person responsible for the damages
caused to David Dao was fired and he sued the Chicago
Department of Aviation and its director arguing that he
was not sufficiently trained to use force. Even if Mr.
Dao did not use force, he still lost his flight and was
involved in numerous lawsuits and news stories about
his private life.
28 Sciences of Europe # 60, (2020)
Finally, the passengers had to suffer the tension of
having been one of them who left the plane as it could
have been anyone by means of the aforementioned
draw and they had to witness everything that happened
with David Dao.
References
1. Vadastreanu, A., Maier, D., & Maier, A.
(2015). Is the Success Possible in Compliance with
Ethics and Deontology in Business. Procedia.
Economics and finance, 26, 1068-1073. Retrieved from
https://www-sciencedirect-
com.nlhhg.idm.oclc.org/science/article/pii/S22125671
15009314
2. Crane, A., & Matten, D. (2007). Business
Ethics: Managing Corporate Citizenship and
Sustainability in the Age of Globalization. Retrieved
from
https://academic.microsoft.com/paper/1606962002
3. Lavado, A., & Millán, A. (1998). La teoría de
los dos factores en la satisfacción del cliente.
Investigaciones Europeas de Dirección y Economía de
la Empresa, 4(1), 53-80. Retrieved from
https://idus.us.es/bitstream/handle/11441/78838/la_teo
ria_de_los_dos_factores_en_la satisfaccion.pdf
4. Bradford, J., & Garrett, D. (1995). The
effectiveness of corporate communicative responses to
accusations of unethical behavior. Journal of Business
Ethics, 14(11), 875-892. Retrieved from
https://academic.microsoft.com/paper/1984144713
5. Coombs, W., & Holladay, S. (2008).
Comparing apology to equivalent crisis response
strategies: Clarifying apology's role and value in crisis
communication. Public Relations Review, 34(3), 252-
257. Retrieved from
https://academic.microsoft.com/paper/2078785246
ОСНОВНІ ПЕРЕДУМОВИ РОЗВИТКУ ЛОГІСТИЧНОГО ПІДХОДУ ДО УПРАВЛІННЯ
ПІДПРИЄМСТВАМИ МАШИНОБУДУВАННЯ УКРАЇНИ
Маказан Є.В.
к.э.н., доцент,
доцент кафедры Менеджмента и Бизнес администрирования,
Запорожский национальный университет
Россинська Л.В.
аспірант
кафедры Менеджмента и Бизнес администрирования,
Запорізький Національний Університет
MAIN PREREQUISITES FOR THE DEVELOPMENT OF A LOGISTIC APPROACH TO
MANAGEMENT OF ENGINEERING ENTERPRISES OF UKRAINE
Makazan E.
Department of Business Administration and Management of Foreign Economic Activity, PhD, Associate
Professor,
Zaporizhzhya national university
Rossinskaya L.
graduate student,
Department of Business Administration and
Management of Foreign Economic Activity,
Zaporizhzhia National University
DOI: 10.24412/3162-2364-2020-60-4-28-36
АНОТАЦІЯ
Досліджено основні передумови розвитку логістичного підходу до управління підприємствами маши-
нобудування України, в т.ч. динаміку обсягу реалізованої продукції машинобудування, територіальну
структуру українського імпорту машинобудівної продукції. На основі дослідження динаміки фінансових
результатів українських машинобудівних підприємств розраховано тренди розвитку найбільш вагомих га-
лузей машинобудування. Встановлено основні фактори зовнішнього середовища, які мають вплив на ро-
звиток української машинобудівної галузі. Обґрунтовано необхідність впровадження логістичного під-
ходу до управління машинобудівними підприємствами та сформульовані завдання для подальшої ро-
зробки практичних рекомендацій.
ABSTRACT
It was investigated the basic prerequisites for the development of a logistic approach to the management of
the machine-building enterprises of Ukraine, including: dynamics of the volume of sold mechanical engineering
products, territorial structure of Ukrainian imports of mechanical engineering products. The trends of development
of the most important branches of machine-building have been calculated on the basis of the study of the dynamics
of financial results of Ukrainian machine-building enterprises. The main environmental factors that influence the
development of the Ukrainian machine-building industry are identified. The necessity of introducing a logistic
Sciences of Europe # 60, (2020) 29
approach to the management of machine-building enterprises is substantiated and the tasks for further development
of practical recommendations are formulated.
Ключові слова: машинобудування, логістика, логістичний підхід, логістичне управління, ефек-
тивність управління.
Keywords: machine-building, logistics, logistic approach, logistics management, management efficiency.
Formulation of the problem. In the second dec-
ade of the 21st century, Ukrainian enterprises were in a
rather difficult situation. Changing foreign economic
policy of the country towards the European integration
of the Ukrainian economy has certainly opened up new
opportunities for Ukrainian manufacturers, making
both new markets and new technologies more accessi-
ble. At the same time, the active integration of Ukraine
into the world economy has greatly increased the man-
ifestations of globalization, which has exacerbated a
competition not only in the external but also in the in-
ternal markets, and has increased the requirements for
the efficiency of management of machine-building en-
terprises. Ukrainian machine-building enterprises have
been faced with the need to improve the efficiency of
management and to implement the latest management
approaches in order to increase competitiveness and
provide conditions for further sustainable development.
One of the most promising modern approaches to the
management of machine-building enterprises, both sci-
entist and practitioner, consider the logistic approach,
which is widely used by world leaders of mechanical
engineering from Japan, Germany, the USA and others.
Thus, the problem of using a logistic approach in the
management of Ukrainian machine-building enter-
prises is updatedв in the current conditions, and the de-
velopment of practical recommendations on its imple-
mentation should be considered as an important line of
development of Ukrainian scientific thought.
Analysis of recent research and publications.
The analysis of theoretical sources showed that the re-
cent theoretical and methodological issues of flow
management attract considerable attention of Ukrainian
scientists, including M.M. Bon, N.S. Brohun,
R.S.Gamanko, O.V.Komelina, I. Koblyanska, E.
Mishenin, I.M. Palchyk and others.
The scientific work of I.M. Palchyk [6] is very
timely, according to the author, which focuses on un-
derstanding the theoretical and methodological aspect
of logistics management of the enterprise. The author
presents the chronological sequence of the develop-
ment of logistics as a field of knowledge, analyzes var-
ious approaches to understanding the categories of "lo-
gistics" and "management", and proposes the author's
definition of "logistics management" as a process or ac-
tivity.
The publication of E.Mishenin and I.Koblyanska
[7] arouses a considerable interest. It deals with the is-
sues of logistical management of industrial production
in the context of the development of a “green” economy
in Ukraine, which explores the mechanisms of logisti-
cal management that take into account the environmen-
tal aspects of industrial production development. It re-
veals the substantive basis of environmentally oriented
logistical management, principles and mechanisms for
its implementation.
However, taking into account previous research, it
should be noted that most of the scientific papers con-
sider mainly theoretical and methodological aspects of
logistics management, so they need to clarify the ques-
tion of the analysis of prerequisites for the development
of logistics management of machine-building enter-
prises in the current realities of the Ukrainian economy.
The purpose of the article. The purpose of this
article is to analyze the prerequisites for the develop-
ment of logistical management of machine-building en-
terprises in the existing realities of the Ukrainian econ-
omy.
Presenting main material. The machine-building
complex is historically one of the most important in-
dustrial complexes in Ukraine, providing almost one
third of the gross value added of the national industry
[2]. In 2017, the Ukrainian machine-building complex
integrated 20 specialized industries, concentrating
more than 15% of the value of fixed assets and 6% of
the circulating assets of Ukrainian industrial enter-
prises, and providing 6.5% of industrial production. In
terms of the number of employees, the machine-build-
ing complex is the leader of the Ukrainian industry, be-
cause it employs 346,000 people, working at 4483 en-
terprises [3].
At the same time, the share of machine-building in
the structure of Ukrainian manufacturing industry at the
time of the research was much lower than in most de-
veloped countries in the world (Fig. 1).
30 Sciences of Europe # 60, (2020)
Figure 1 - A part of the machine-building in the structure of the recycled industry in some world counties.
As you can see, the share of the machine-building
in the structure of Ukrainian manufacturing industry
(10.2%) barely exceeds 10%, while in most economi-
cally developed countries this share is higher than a
quarter, and in Hungary, Germany and Japan it is much
more than a third (41,4%, 42,8% and 42,2% respec-
tively) [2].
Among the main characteristics of the develop-
ment of the Ukrainian machine-building complex,
modern researchers point out significant losses of pro-
duction and personnel potential; more than a twofold
reduction in the share of engineering products in total
industrial production; increase of production cost; re-
duction of activity in innovation and investment activ-
ity etc [3].
The influence of a number of negative environ-
mental factors has led to a significant decrease in the
sales of engineering products in recent years, both in
the domestic and foreign markets [3] (Fig. 2).
Figure 2 - Dynamics of sales of machine-building products in 2002 – 2017 years.
0,00
50,00
100,00
150,00
200,00
250,00
300,00
350,00
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
% to the previous year % up to 2000
Sciences of Europe # 60, (2020) 31
As can be seen from Fig. 2, in 2002-2007 the vol-
ume of sales of machine-building products in Ukraine
gradually increased. At the same time, the growth of the
volume of machine-building production was occurring
at a rate almost twice higher than the rate of growth of
the total volume of industrial production (an average
annual growth rate of sold machine-building products
for 2002-2007 amounted to 15,6% against an average
annual growth rate of industrial production in general
that was equal to 7,35%). At that time, the volumes of
participation of the machine-building industry of
Ukraine in the international division of labor also un-
derwent significant changes, as during this period there
was an increase of exports of machine-building prod-
ucts in 3.6 times and imports in 5.8 times [2]. The in-
crease in the volume of production of machine-building
products was caused not by a general increase in both
domestic and foreign demand (mainly CIS countries)
due to the increase in world prices and demand for raw
materials, as well as an increase in the availability of
credit resources, which significantly revitalized the in-
vestment activity of industrial consumers of industrial
products production.
The industry activity in 2008-2009 was negatively
impacted by the effects of the financial and economic
crisis, due to the impact of machine-building produc-
tion in 2009 that decreased almost twice (by 47.5%
from the level of 2008). A reduction of world prices for
raw materials and products of the metallurgical indus-
try had a significant negative impact on the dynamics
of production of machine-building products in Ukraine,
which significantly reduced the investment attractive-
ness of the metallurgical, mining and chemical indus-
tries, which are the main consumers of machine-build-
ing products. One of the results of the financial and eco-
nomic global crisis was a significant deterioration in the
conditions for credit obtaining, which had a double
negative effect on the development of the engineering
industry, limiting the availability of credit for both di-
rectly machine-building enterprises and for major in-
dustrial consumers of engineering products.
An insignificant period of growth of machine-
building production in 2010-2012 was interrupted by
the double negative impact of foreign policy and inter-
nal political crisis, which resulted in a decrease in the
volume of production of machine-building products as
a result of the breaking of traditional foreign markets
for a number of industries, as well as through the break-
down of technological links with enterprises that re-
main in the uncontrolled territories. The increase in out-
put in 2016-2017 is mainly due to the revival of some
segments of the domestic market, such as the produc-
tion of dual-use and defense goods (Table 1).
Table 1 - Structure of machine-building produc-
tion of Ukraine in section of economic activity catego-
ries for 2011-2016. [2]An insignificant period of
growth of machine-building production in 2010-2012
was interrupted by the double negative impact of for-
eign policy and internal political crisis, which resulted
in a decrease in the volume of production of machine-
building products as a result of the breaking of tradi-
tional foreign markets for a number of industries, as
well as through the breakdown of technological links
with enterprises that remain in the uncontrolled territo-
ries. The increase in output in 2016-2017 is mainly due
to the revival of some segments of the domestic market,
such as the production of dual-use and defense goods
(Table 1).
Table 1
Structure of machine-building production of Ukraine in section of economic activity categories for 2011-2016.
[2]
Indicators 2011 2012 2013 2014 2015 2016
2016 to
2011,%
Mechanical engineering, except repair and installa-
tion of machinery and equipment
100,00 100,00 100,00 100,00 100,00 100,00 87,16
Manufacture of computers, electronic and optical
products
8,80 5,58 6,51 7,98 7,61 8,28 82,04
Manufacture of electronic components and boards 3,94 0,40 0,38 0,47 0,40 0,53 11,65
Manufacture of communication equipment 0,54 0,87 0,46 0,71 1,40 н.д. 222,24*
Manufacture of measuring, research and navigation
instruments and equipment; watch production
1,89 2,12 2,49 3,38 3,32 4,34 151,59
Manufacture of electrical equipment 12,99 15,89 19,06 20,61 20,86 20,84 138,69
Manufacture of electric motors, generators and
transformers
2,26 5,63 6,38 5,25 4,35 5,02 166,36
Manufacture of batteries and accumulators 1,89 1,36 1,55 1,51 1,53 1,68 70,09
Manufacture of wires, cables and wiring accessories 3,13 2,81 3,47 4,53 5,10 5,64 140,70
Manufacture of machinery and equipment not clas-
sified elsewhere
28,83 26,95 30,80 32,89 36,44 38,22 109,16
Manufacture of general-purpose machinery and
equipment
9,34 9,17 11,13 11,73 14,20 14,00 131,26
Manufacture of machinery and equipment for agri-
culture and forestry
3,62 3,17 3,13 4,05 5,46 6,60 130,47
Manufacture of machinery and equipment for met-
allurgy
1,72 1,68 2,12 2,50 2,35 2,99 117,82
Manufacture of machinery for food, beverage and
tobacco processing
0,69 0,55 0,92 0,98 1,34 1,50 168,17
32 Sciences of Europe # 60, (2020)
Manufacture of motor vehicles, trailers and semi-
trailers
8,47 9,03 9,33 11,65 11,83 13,19 120,70
Manufacture of motor vehicles 5,38 5,83 5,24 4,88 3,63 4,20 58,24
Manufacture of components, parts and accessories
for motor vehicles
2,61 2,68 3,52 5,47 7,18 7,77 237,96
Manufacture of other transport equipment 40,92 42,55 34,30 26,87 23,26 19,47 49,10
Construction of ships and boats 0,82 0,95 1,86 0,47 0,71 н.д. 43,30*
Manufacture of railway locomotives and rolling
stock
33,00 32,89 21,61 11,30 6,05 6,33 15,83
Production of air and spacecraft, related equipment 6,84 7,96 9,50 12,73 14,00 н.д. 142,07*
Production of military vehicles 0,17 0,59 1,14 2,18 2,26 н.д. 957,19*
* level of 2015 to 2011, %
As you can see, the share of precision engineering
in the structure of Ukrainian industry is rather insignif-
icant. Manufacture of computers, electronic and optical
products in the structure of the Ukrainian machine-
building industry is in ranges from 5.58% in 2012 to
8.8% in 2011). The increase in production in the indus-
try in recent years, that occurred mainly by communi-
cations, research and navigation equipment, did not
make it possible to reach even 2011 level due to the
sharp decline in the production of electronic compo-
nents and boards in 2012, and every significant de-
crease in the production of household purpose.
Production of equipment for the energy industry
has also been increasing recently. Unfortunately, it
should be noted that the highest growth rates are pro-
vided by enterprises that produce certain types of cable
and conductor products for foreign car makers. Despite
the positive effects of growth in production and export
of engineering products, it should be noted that these
enterprises are not competitive in the full sense, since
the activities of most of these enterprises are the result
of the transfer of some labor-intensive technological
operations or processes in low-cost regions resources.
The increase in the production of machinery and
equipment, not classified elsewhere, was due to the in-
crease in the production of machinery and equipment
of general and special purpose, including equipment
and mechanisms for agriculture and the food industry.
In the automotive industry, steady growth is ob-
served only in the group of motor vehicles, trailers and
semi-trailers, although knots, parts and accessories for
the repair and maintenance of motor vehicles remain
the basis for this growth. The production of buses, cars
and trucks, which declined ten times after the crisis of
2009, has not been restored and is characterized by
small quantities. Manufacture of other transport equip-
ment has declined rapidly enough in recent years, and
has declined by 51% since the beginning of 2017 [3].
Production in the wagon-building industry decreased
by 50 times: in 2015, the wagon-building industry of
Ukraine produced 1,054 wagons, compared with 53
thousand in 2011, with the activity of a number of
wagon-building enterprises being supported mainly
due to the repair of previously produced cars [8 ]. The
output of the manufacture of military vehicles has only
increased at times at the expense of domestic demand.
In general, the production of defense goods is es-
timated by experts at UAH 50 billion, where the largest
entity in the defense industrial complex (Ukrobo-
ronprom) has actively increased production in recent
years, reaching USD 600 million in 2015.
One of the important factors in increasing the pro-
duction of defense complex products was the program
of import substitution of more than 900 units of Russian
components of the air defense facilities of the Armed
Forces of Ukraine and components for aircraft con-
struction, which involved about 300 domestic machine-
building enterprises.
In general, the largest increase in the domestic de-
fense market in 2015-2017 was due to:
- development, production and maintenance of un-
manned aerial vehicles;
- development and production of high-precision
lesions;
- development and production of aircraft engines,
military vehicles;
- development and production of armored vehi-
cles;
- naval shipbuilding, including through the re-
newal of the Corvette program [2].
Significant structural changes in domestic engi-
neering are also a consequence of the growing export
orientation and significant import dependence on high-
tech products related to the low technological level of
domestic industrial production, including mechanical
engineering. The basic data for the analysis of the dy-
namics of formation and use of market resources of ma-
chine-building products are given in Table 2.
Sciences of Europe # 60, (2020) 33
Table 2
Formation and use of marketable resources of mechanical engineering products, mln. USA dollars [2]
Indicator 2011 2012 2013 2014 2015 2016
Production 16734 17957 14676 8575 5276 4553
% by 2011 107,3 87,7 51,2 31,5 27,2
Domestic consumption 24885 27136 23526 13255 8979 11647
% by 2011 109,0 94,5 53,3 36,1 46,8
Export 11895 13286 10615 7361 4779 4339
% to production 71,1 74,0 72,3 85,8 90,6 95,3
Imports 20046 22465 19466 12042 8481 11433
% to production 119,8 125,1 132,6 140,4 160,7 251,1
% to consumption 80,6 82,8 82,7 90,8 94,5 98,2
Balance -8151 -9179 -8851 -4681 -3702 -7094
Export import coverage ratio 0,59 0,59 0,55 0,61 0,56 0,38
The data in Table 2.2 indicate the rapid growth of
export products in the structure of production of the
Ukrainian machine-building complex. The share of the
export declined slightly only in 2013, but since 2014 it
has started to grow again, with a much higher rate,
reaching 95.3% of total production in 2016.
In addition, Table 2.2 shows that in recent years
there has been a steady increase in imports of mechan-
ical engineering products, with rapid growth observed
in 2014, after which the growth rate slowed slightly.
Despite the slowdown in the growth rate of imports, in
2016 its share reached 98.2% of the total consumption
of products of the machine-building complex (USD
11.4 billion).
In terms of product structure, the main segments
of the Ukrainian import of mechanical engineering
products are:
- high-tech machine-building products, repre-
sented by finished products, as well as parts and com-
ponents;
- cars and other motor vehicles;
- electrical apparatus for switching or protecting
electrical circuits;
- fittings isolated for electric machines;
- tractors;
- machines are agricultural, garden or forestry;
- motor vehicle parts and accessories;
- cocks, valves, gates and similar pipeline equip-
ment.
The territorial structure of Ukrainian imports of
machine-building products is presented in Fig. 3.
Figure 3 - Territorial structure of Ukrainian imports of machine-building products
The largest importing countries of machine-build-
ing products in the Ukrainian market are considered
Germany, Poland, Italy, Czech Republic, France, etc.
It should be noted that the needs of the Ukrainian
market for high-tech products, which at the time of the
survey were satisfied by imports, significantly reduce
the competitiveness of the domestic machine-building
complex due to both increased foreign economic and
foreign policy risks for direct consumers of products
and aggravation of the domestic market for domestic
15
44,1
31,4
9,5
CIS EU Asia Others
34 Sciences of Europe # 60, (2020)
manufacturers. In other words, the significant import-
dependence of the Ukrainian machine-building market
for Ukrainian manufacturers means the need for a fierce
competition with well-known transnational corpora-
tions, not only in foreign markets, but also for the do-
mestic consumer, which in a quite large number of
cases is almost impossible due to the incomparability
of competition struggle, marketing budgets and tech-
nology. In these conditions, it is becoming difficult for
machine-building enterprises of Ukraine to ensure ef-
fective development, which is reflected in the results of
financial and economic activity of enterprises: in 2016,
a large part of industrial enterprises of Ukraine was un-
profitable (Table 3).
Table 3
Analysis of financial results of Ukrainian enterprises by industrial activity categories[4]
Activity category
Financial result before taxation
(balance), UAH billion.
Enterprises that
had losses (in % to
total quantity)
2012 г. 2013 г. 2014 г. 2015 г. 2016 г. 2015 г. 2016 г.
Industry including: 21,4 13,7 -166,4 -181,4 4,7 27,1 34,3
Machine-building 13,3 5,5 -20,5 -12,7 -0,1 25,9 29,3
Production of motor vehicles 9,1 3 -10,6 -6,5 -0,5 30,3 30,2
Production of electric equipment 1,6 0,8 -4,4 -4,1 -0,4 26,4 31,4
The dynamics of financial results of Ukrainian
machine-building enterprises by individual categories
of industrial activity is presented graphically in Fig. 4.
Figure 4 - Dynamics of financial results of Ukrainian machine-building enterprises
As you can see, the decline in the profitability of
the engineering industry began in 2013 (by UAH 7.8
billion relative to the results of 2012), which is primar-
ily the result of the internal political crisis, which exac-
erbated in the fall of 2013. However, this decrease
peaked in 2014, when the financial result of machine-
building enterprises of Ukraine decreased by UAH 26
billion. (472.72%), and by the end of 2014 the losses
reached UAH 20.5 billion. The sharp fall in the profit-
ability of machine-building enterprises is explained,
first of all, by the further exacerbation of the internal
political crisis (in the first quarter of 2014) and the
emergence of a negative influence of a number of for-
eign-policy factors (in the second quarter of 2014),
which led not only to the physical loss of a number of
machine-building enterprises of the Crimea and the
Donbass and the breakdown of established economic
relationship and a significant deterioration of sectoral
cooperation, but also to the actual loss of part of the
traditional markets, especially for energy, aviation and
some other industries. A sharp negative change in ex-
change rates in the second half of 2014 also had a neg-
ative impact on financial results.
And although the decline in profitability of enter-
prises managed to stop already next year, in 2015, when
the increase of financial results of activity of enterprises
amounted to UAH 7.8 billion, it was not possible to re-
store the profitability of machine-building enterprises
of industry as of 2016, since the profit indicator for end
of 2016 remained negative (minus UAH 0.1 billion).
y = -4,5x + 10,6
R² = 0,2712
y = -2,87x + 7,51
R² = 0,3423
y = -0,89x + 1,37
R² = 0,2549
-40,00
-30,00
-20,00
-10,00
0,00
10,00
20,00
2012 2013 2014 2015 2016
Mechanical Engineering
Manufacture of motor vehicles
Manufacture of electrical equipment
Linear (Mechanical Engineering)
Linear (Manufacture of motor vehicles)
Linear (Manufacture of electrical equipment)
Sciences of Europe # 60, (2020) 35
The linear trend of financial performance of the enter-
prises of the machine-building industry, which is de-
scribed by the equation y = -4,5x + 10,6, has a descend-
ing slope, which indicates that the negative trends re-
main in the financial results of the activity.
The results of the financial activities of certain
branches of the Ukrainian machine-building industry
correspond to the main tendencies of the dynamics of
the financial results of the Ukrainian machine-building
enterprises of the machine-building complex. The de-
cline in profitability of motor vehicle and electrical
equipment manufacturers began in 2013 (by UAH 6.1
billion and UAH 0.8 billion, respectively). For each of
the above sectors, a peak decrease in profitability was
recorded in 2014: by (UAH 13.6 billion (453.33%) for
motor vehicle manufacturing enterprises and by UAH
5.20 billion (650%) for electrical equipment manufac-
turing companies. Profitability recovery also began the
following year, when the profitability of motor vehicle
enterprises increased by UAH 4.1 billion and of enter-
prises in the production of electrical equipment by
UAH 0.3 billion. None of the sectors under study
reached positive results by the end of 2016: losses of
motor vehicle enterprises amounted to UAH 0.5 billion
and losses of electric equipment manufacturers to UAH
0.4 billion. Linear trends in financial results (y = -2.87x
+ 7 , 51) for the enterprises of motor vehicles produc-
tion and (y = -0,89x + 1,37) for the enterprises of elec-
trical equipment production) also have a descending
slope, which indicates that the negative trends are main-
tained in the development of the enterprises of the in-
dustry.
As can be seen from Table 2.3, a considerable part
of Ukrainian machine-building enterprises in the reali-
ties of the modern economy were on the brink of ex-
tinction, as 29.3% of machine-building enterprises de-
clared losses as a result of financial activity in 2016,
including 31.4% of the enterprises for the production of
electrical equipment and 30.2% of the enterprises of
motor vehicles production [4].
The author of the study considers that the main
factors that have caused the negative tendencies in the
development of the Ukrainian machine building are the
integrated effects of a number of political, foreign pol-
icy and foreign economic factors, first of all: the politi-
cal crisis of 2013-2014; the breakdown of internal co-
operation relationships due to the influence of foreign
policy factors in 2014; loss of a number of enterprises
due to the influence of foreign policy factors in 2014;
loss of traditional markets; sharp changes in exchange
rates and more.
Conclusions and suggestions. As a result of the
analysis of the prerequisites for the development of a
logistic approach at the Ukrainian machine-building
enterprises, it was found that at the time of the research,
Ukrainian machine-building enterprises found them-
selves in a rather difficult situation, due to the complex
influence of a number of political, foreign and eco-
nomic factors. The breakdown of internal cooperation
relationships, sharp changes in exchange rates and the
loss of traditional markets by many enterprises led to a
sharp decline in financial performance of machine-
building enterprises in 2014 and increased import de-
pendency and export orientation of machine-building
production. The linear trends of financial results calcu-
lated by the author point to negative tendencies in the
development of enterprises.
According to the author, in these conditions the ef-
fective activity of machine-building enterprises in the
realities of the modern Ukrainian economy can be en-
sured only through technological modernization of en-
terprises, and first of all - updating of management
technologies, introduction of new, highly effective ap-
proaches to management activity. The author considers
the most effective approach to management a logistical
approach, one of the significant advantages of which is
the possibility of step-by-step implementation, which
in the conditions of loss of a considerable part of ma-
chine-building enterprises significantly increases the
reach of management technology for practical imple-
mentation at Ukrainian enterprises of machine-build-
ing. However, taking into account the significant dif-
ferences between the logistically and classical approach
that is historically commoner in Ukraine, for successful
implementation of the logistic approach in the manage-
ment system of a machine-building enterprise it is nec-
essary to take into account a number of additional fac-
tors, such as technological compliance of the enterprise
to the implementation of logistical approach, enterprise
opportunities for investment in management technolo-
gies etc., which requires further elaboration of practical
implementation issues of logistic approach in manage-
ment of machine-building enterprises by Ukrainian sci-
entists.
References
1. Брохун Н.С. Поняття логістики як
інструмента управління підприємством / Н.С.
Брохун, М.М. Бонь // Проблеми теорії та
методології бухгалтерського обліку, контролю і
аналізу - Вип. 3 (27). - 2013. - с.19 - 34.
2. Гахович Н.Г., Завгородня М.Ю.
Машинобудування України: ретроспектива та
перспективи // Економічний вісник університету:
зб. наук. праць учених та аспірантів. – Переяслав-
Хмельницький, ДВНЗ «Переяслав-Хмельницький
державний педагогічний університет імені
Григорія Сковороди», 2017.– Вип. 34(1). – С. 37-47
3. Державна служба статистики України
[Електронний ресурс] – режим доступу:
http://www.ukrstat.gov.ua
4. Дикань В. Л. Глобализационные процессы
в экономике Украины / В. Л. Дикань, А.В. Кузуб //
Вісник економіки транспорту і промисловості –
2017. - № 58. – С.9-18 «Переяслав-Хмельницький
державний педагогічний університет імені Гри-
горія Сковороди», 2017.– Вип. 34(1). – С. 37-47
5. Комеліна О.В. Логістичне управління
збутовою діяльністю підприємства:
концептуальний підхід / О.В.Комеліна,
Р.С.Гаманко // Економіка і суспільство - №13 - 2017
- с.518 - 524
6. Мішенін Є. Логістичне управління
промисловим виробництвом у контексті розвитку
36 Sciences of Europe # 60, (2020)
«зеленої» економіки в Україні / Є. Мішенін, І.
Коблянська // Економiст - №1 - 2012 - с.8-12
7. Пальчик І. М. Логістичне управління
підприємством – теоретико-методичний аспект / І.
М. Пальчик // Ефективна економіка - № 10 - 2014.
[Електронний ресурс] – режим доступу:
http://www.economy.nayka.com.ua/?op=1&z=3442
8. Украина станет первой страной, добро-
вольно отказавшейся от промышленности. Деинду-
стриализация в цифрах и фактах [Электронный ре-
сурс]. - Режим доступа:
http://nk.org.ua/ekonomika/ukraina-stanet-pervoy-
stranoy-dobrovolno-otkazavsheysya-ot-promyishlen-
nosti-deindustrializatsiya-v-tsifrah-i-faktah-62904
ОБЕСПЕЧЕНИЕ КОРПОРАТИВНОЙ ОТВЕТСТВЕННОСТИ В УСЛОВИЯХ ЦИФРОВОЙ
ЭКОНОМИКИ
Минеева В.М.
к.э.н., доцент
Сырлыбаева В.Р.
Студентка группы СЭБ-17
ФГБОУ ВО «Уфимский государственный нефтяной технический университет» (УГНТУ)
ENSURING CORPORATE RESPONSIBILITY IN THE DIGITAL ECONOMY
Mineeva V.
k.e.s., associate Professor
Syrlybaeva V.
Student
Of the "Ufa state oil technical University" (Ufa state petroleum technological University)
DOI: 10.24412/3162-2364-2020-60-4-36-38
АННОТАЦИЯ
В статье рассматривается обеспечение корпоративной ответственности в условиях цифровой эконо-
мики, в частности ее новые условия в работе, новые формы бизнеса и изменения в конкурентной борьбе.
ABSTRACT
The article discusses ensuring corporate responsibility in the digital economy, in particular, its new working
conditions, new forms of business and changes in the competitive struggle.
Ключевые слова: экономика, цифровизация, управление, бизнес, общество.
Keywords: economy, digitalization, management, business, society.
Цифровая экономика давно вошла в повсе-
дневную жизнь человека, а также заполонила все
сферы производства и услуг. В связи с этим в по-
следнее время общественность проявляет повы-
шенное внимание к проблематике социальной от-
ветственности. Выдвигаются новые требования в
этой области в связи с активным распространением
новых технологий.
Концепция термина корпоративной социаль-
ной ответственности крайне неоднозначна и вызы-
вает многочисленные споры в отношении трак-
товки термина, а также и в отношении решения
важнейших задач бизнеса в этой сфере.
Корпоративная социальная ответственность
(КСО) - выполнение организациями социальных
обязательств, подписываемых законом, и готов-
ность неукоснительно нести соответствующие обя-
зательные расходы.
Во-вторых, КСО — это готовность добро-
вольно нести необязательные расходы на социаль-
ные нужды сверх пределов, установленных налого-
вым, трудовым, экологическим и иным законода-
тельством, исходя не из требований закона, а по
моральным, этическим соображениям.
В крупных компаниях и корпорациях в России
бизнес строиться по определенным внутренним
правилам - это называется корпоративное управле-
ние.
Корпоративное управление - система взаимо-
отношений между менеджерами компании и ее вла-
дельцами по вопросам обеспечения эффективности
ее деятельности и защите интересов владельцев, а
также других заинтересованных сторон.
Большинство предприятий в двухтысячных го-
дах приняли решение начать следовать кодексам
корпоративного управления. Для компаний было
крайне важно стремится к соблюдению междуна-
родных стандартов. Они делали все возможное для
привлечения иностранных инвесторов, защищая их
права. Постепенно этот вопрос перестал быть акту-
альным. Не все компании смогли поддерживать
необходимость ведения бизнеса прозрачными ме-
тодами.
Спустя время тема корпоративного управле-
ния снова начала набирать обороты в новой форме.
Компании начали серьезно пересматривать струк-
туру ведения бизнеса. Рынок растет и меняется,
конкуренция становится все больше и больше, а
компании стоят на месте. Экономика не должна
стоять на месте, а для этого организациям нужно
активно вливаться в современные тенденции разви-
тия человечества. В таком случае мы сразу подра-
зумеваем цифровую экономику, которая начинала
менять наше сознание в 90 - х годах. Она создавала
инструменты для эффективного ведения бизнеса, а
Sciences of Europe # 60, (2020) 37
также влияла на различные аспекты человеческой
жизни.
Некая цифровизация оказала колоссальное
влияние на определенные сферы:
• стратегии и способы организации ведения
бизнеса, его стратегии по маркетингу;
• ресурсное обеспечение бизнеса;
• все издержки организации;
• сетевой эффект.
Цифровизация повлекла за собой ряд измене-
ний в работе организаций и предприятий.
Отношения с клиентами, способы и стратегии.
Цифровые технологии и искусственный интеллект
позволяют компании углублять их отношения с
клиентами, позволяют лучше понимать их желания
и проблемы.
Проблемы, которые волнуют клиента, стано-
вятся главным источником прибыли компании.
Цифровая экономика способствует налаживанию
индивидуального общения с клиентом. В практику
вводятся такие понятия как вовлеченность, задачи
и сопереживание клиенту. Ценность клиентского
опыта возрастает, что тоже приносит часть при-
были компании.
Новые условия в работе с покупателями. Мас-
штабные результаты в науке и в экономике дают
широкое применение искусственного интеллекта:
от программного обеспечения для открытия новых
лекарственных средств до алгоритмов, выявляю-
щих наши культурные интересы и прогнозирую-
щих наше поведение. Многие подобные схемы
строятся на основе информационных следов, кото-
рые покупатели оставляют в цифровом поле,
например, находясь в социальных сетях, просмат-
ривая сайты компаний или иную информацию.
Изменения в конкурентной борьбе. При пере-
ходе к цифровой экономике происходят изменения
в условиях конкуренции. Например, конкуренты
могут стать партнерами, объединяясь на базе циф-
ровых платформ и совместного использования. В
то же время появляется противоположное явление
– конкурентный подрыв. Это неожиданное появле-
ние конкурентных преимуществ у новичка, напри-
мер, за счет стартапа или доступа к глобальным
цифровым платформам для проведения исследова-
ний, развития, маркетинга, быстрых продаж и дис-
трибуции. Такие компании обгоняют авторитетных
старожилов по скорости, стоимости и качеству до-
ставки товара или услуги. Еще один источник кон-
курентного подрыва, который дают цифровые тех-
нологии, – способность пересекать границы отрас-
лей. Это дает возможность на межотраслевом
уровне использовать клиентские базы, инфраструк-
туру и технологии. Можно представить, как повы-
шается эффективность компании, как резко сокра-
щаются издержки. Примером может служить внед-
рение телекоммуникационных компаний в отрасли
транспорта и здравоохранения. Размер компании
также может стать конкурентным преимуществом
при условии эффективности. Все это – сдвиги со
стороны предложения. На подрыв конкурентов в
бизнесе также могут влиять изменения со стороны
рыночного спроса. Цифровые технологии создают
прозрачность, новые модели потребительского по-
ведения на основе доступа к мобильным сетям и
данным. В ответ компании адаптируют методы раз-
работки, маркетинга и поставки, вынуждены созда-
вать новые продукты и услуги.
После четвертой промышленной революции
произошел сдвиг от простого распространения ин-
формационной технологии к более сложной инно-
вации на основе сочетания различных технологий
новыми способами. В результате компании меняют
формы и методы бизнеса, получая возможность со-
здавать стоимость в новых сегментах рынка либо
находить новые центры создания стоимости в
своих прежних отраслях. Таким образом, конку-
рентный подрыв как со стороны спроса, так и со
стороны предложения заставляет компании посто-
янно быть инновационными, т.е. постоянно пере-
страиваться и меняться.
Новые условия в работе с покупателями. Про-
рывные результаты в науке и в экономике дает ши-
рокое применение искусственного интеллекта: от
программного обеспечения для открытия новых ле-
карственных средств до алгоритмов, выявляющих
наши культурные интересы и прогнозирующих
наше поведение. Многие подобные схемы строятся
на основе информационных следов, которые поку-
патели оставляют в цифровом поле, например,
находясь в социальных сетях, просматривая сайты
компаний или иную информацию. В частности, уже
используются, такие приложения, как, например,
Siri (от компании Apple) к мощной подсистеме ис-
кусственного интеллекта (AI Field). Обрабатывая
индивидуальную информацию о пользователях
сайтов, они выполняют роль интеллектуальных
консультантов, формируя «окружающий разум».
Это интеллектуальная цифровая интерактивная
среда, которая окружает пользователя автоматизи-
рованными личными консультантами. Электрон-
ные устройства изучают и прогнозируют потребно-
сти, помогают сделать выбор и реализовать его,
формируя личную экосистему человека.
Новые формы бизнеса. Новая форма сотрудни-
чества бизнеса в цифровой экономике – коллабора-
тивные инновации. Ее возникновение связано с
быстрым появлением инноваций и их дизруптив-
ным воздействием. Например, компании может не
хватать финансов и знаний различных тонкостей
ведений бизнеса. Все уто имеет другая компания,
но в свою очередь этой компании не хватает циф-
ровой грамотности и новыков в работе с клиентами.
Тогда предприятия объединяют свои ресурсы, сов-
местно реализуя инновационные проекты. Интегра-
ция возможностей способствует созданию новой
ценности. Яркий пример – сотрудничество про-
мышленного гиганта Siemens, который ежегодно
вкладывает в научно-исследовательские и опытно-
конструкторские разработки по четыре миллиарда
американских долларов, и молодой инновационной
компании Ayasdi. Профиль последней – самообуча-
ющиеся машины, фирма создана в Стэндфорде в
2008 г. В итоге Siemen получил возможность гене-
рировать идеи на основе обработки больших дан-
ных, а Ayasdi – тестировать их на практике и одно-
временно присутствовать на рынке, используя воз-
можности маститого партнера. Производными от
такого сотрудничества являются новые формы биз-
неса на основе совместного пользования, совмест-
ного хранения и т.д. Например, объединения для
совместного использования автотранспорта города.
38 Sciences of Europe # 60, (2020)
Объединяются предприятия из различных отраслей
промышленности для совместного обслуживания
клиентов (интегрированного обслуживания). Такие
ассоциации через многостороннее сотрудничество
интегрируют мир офиса и мир онлайн-бизнеса. Для
получения прибыли от применения цифровых тех-
нологий компаниям приходится кардинально ме-
нять свои операционные модели, быть весьма мо-
бильными. Новой операционной моделью, практи-
кующей совместное использование, является
платформа. Платформенный метод начал приме-
няться во время третьей промышленной револю-
ции. Он основан на сетевом эффекте при переходе
в цифровое пространство. С началом четвертой
промышленной революции появились глобальные
платформы, тесно связанные с физическим миром.
Стратегии платформ одновременно и дизруптивны,
и экономически эффективны. Исследования Масса-
чусетского университета показали, что из 30 миро-
вых брендов с наибольшей суммарной рыночной
стоимостью в 14 самых крупных применяли плат-
форменные стратегии. Хорошим примером сочета-
ния платформы и маркетинговой стратегии высо-
кой ориентации на клиента является Amazon, пре-
вратившаяся из книжного магазина в розничный
конгломерат, ежегодно приносящий 100 млрд.
долл. прибыли. Фирма активно использует сетевые
эффекты, обеспечивая через цифровые магазины
доступ к миллионам различных книг и музыкаль-
ных произведений. Глубокое понимание клиент-
ских предпочтений и достижение высокой лояльно-
сти клиентов позволяет работать одновременно в
нескольких секторах. В получении доходов акцент
смещается с продажи продукта на продажу услуги
с его использованием и доступ к потребителям
практически в глобальном масштабе.
Деловая среда в цифровом сообществе. В циф-
ровой экономике развивается новая организацион-
ная структура бизнеса – система цепочки блоков
(блокчейн). Сильная ее сторона – децентрализован-
ность, благодаря которой платежи перемещаются в
глобальном пространстве мгновенно и прозрачно.
Поэтому не нужно открывать множество офисов и
создавать юридические лица со всеми присущими
им административными издержками. Блокчейн
позволяет строить дешевую бизнес-структуру с не-
большим количеством внутренних специалистов.
Остальных может быть десятки тысяч, рассредото-
ченных по всему миру. Например, в глобальном
агентстве IMG – 60 сотрудников и немного людей,
продающих рекламу. За Россию отвечает всего
один человек, и этого достаточно. Принцип гло-
бальной децентрализации ускоряет стирание гра-
ниц между странами, и с распространением блок-
чейна прогнозируется появление большого количе-
ства мультинациональных компаний. Такова новая
организационная структура бизнеса, присущая
цифровой экономике. В последней деловая среда
меняется во многом благодаря блокчейну, уходя в
цифровые коды и облачные вычисления. Помимо
подмены функции банков и традиционных финан-
совых организаций, освобождая проекты от при-
вязки к ставке рефинансирования, блокчейн в буду-
щем сможет заменить суды, юристов, вместо дого-
воров реализуя трудовое право.
Иными словами, децентрализованная глобаль-
ная компания существует вне страновой юрисдик-
ции. Для бизнеса это большая экономия на внутри-
фирменных трансакциях, зато для государства –
проблема с налогообложением и регулированием.
Впрочем, правовое регулирование осуществляет
сам блокчейн. Смарт-контракт и стоит на страже
порядка. Помимо этого возможно существование
облачного арбитража: программа сама выбирает
присяжных заседателей из блокчейн-сообщества.
Они изучают документацию и содержание кон-
фликта. Заблокированная спорная сумма в зависи-
мости от вердикта либо остается на счету компа-
нии, либо переводится на счет сотрудника. Таким
образом, переходя в цифровое пространство, мно-
гие учреждения, в том числе и суды, меняют свою
организационную форму. Проблемы разрешаются
быстро и на высоком экспертном уровне. Электрон-
ный код не подвержен ни взяточничеству, ни лоб-
бированию. Режим прав собственности становится
прозрачным и гарантированным при прочих рав-
ных условиях. Специалисты совершенствуют за-
щиту от киберпреступности. Однако эта задача сей-
час стоит перед государствами всего мира и должна
решаться на глобальном уровне. Блокчейн поможет
и в этой области. Итак, деловая среда будет совер-
шенствоваться при переходе компаний на цифро-
вые технологии ведения бизнеса и соединении их с
производством. Их использование и распростране-
ние облегчает работу, прежде всего снижая тран-
сакционные издержки. А значит, создаются допол-
нительные источники прибыли и конкурентные
преимущества.
Литература
1. Арбатов, А.А. Экономическая безопасность
России: Общий курс: учебник / В.К. Сенчагов, А.А.
Арбатов, А.А. Ведев; Под ред. В.К. Сенчагова. —
М.: БИНОМ. ЛЗ, 2018.
2. Доценко Д.В. Экономическая безопасность:
методологические аспекты и составляющие / Д.В.
Доценко // Аудит и финансовый анализ. - 2011.-№4.
3. Кузнецова, Е.И. Экономическая безопас-
ность и конкурентоспособность. Формирование
экономической стратегии государства. Моногра-
фия. Гриф УМЦ «Профессиональный учебник».
Гриф НИИ образования и науки. / Е.И. Кузнецова.
— М.: ЮНИТИ, 2017.
4. Минеева В.М., Орлова Н.В., Галиуллина
Г.Ф., Султанова Л.М. Теоретический аспект моде-
лирования и развития предпринимательской дея-
тельности среднего и малого бизнеса в условиях
цифровой экономики. В сборнике: Европейский
научный форум студентов и учащихся. сборник
статей Международной научно-практической кон-
ференции. Петрозаводск, 2020. С. 18-27.
5. Минеева В.М., Рахматуллина Д.Р. Оценка
предпринимательского риска в условиях электрон-
ной экономики. В сборнике: Наука сегодня: теория
и практика. Сборник научных статей VI Междуна-
родной научно-практической конференции. 2019.
С. 141-143.
6. Минеева В.М., Кусмаева А.М. Факторы,
обеспечивающие конкурентоспособность предпри-
нимательских структур в среде электронной эконо-
мики. В сборнике: Наука сегодня: теория и прак-
тика. Сборник научных статей VI Международной
научно-практической конференции. 2019. С. 146-148.
Sciences of Europe # 60, (2020) 39
БЮДЖЕТ ЯК ІНСТРУМЕНТ ЕКОНОМІЧНОГО РОЗВИТКУ
Шалашна А.О.
аспірант кафедри фінансів,
Київський національний торговельно-економічний університет
BUDGET AS AN TOOL OF ECONOMIC DEVELOPMENT
Shalashna A.
Kyiv National University of Trade and Economics,
postgraduate student of the Department of Finance
DOI: 10.24412/3162-2364-2020-60-4-39-43
АНОТАЦІЯ
У статті розкрито сутність бюджету як інструменту економічного розвитку. Визначено, що інститу-
ційний підхід передбачає розгляд бюджетної політики як динамічної системи, що постійно вдоско-
налюється відповідно до основних макроекономічних завдань. Створення відповідних інституційних умов
для формування та реалізації ефективної бюджетної політики потребує використання адаптивної системи
бюджетного регулювання, що сприятиме досягненню збалансованого та стійкого соціально-економічного
розвитку країни. Ефективність формування та реалізації бюджетної політики визначається рівнем ро-
звитку фінансово-бюджетних інститутів спрямованих на забезпечення економічного зростання країни та
добробуту громадян. Показано, що від якості прогнозування і планування бюджетних показників залежить
стійкість державних фінансів. Для подальшого розвитку бюджетного прогнозування доцільно враховувати су-
купність динамічних взаємозв’язків між складовими бюджетної архітектоніки. Розвинуто підходи до підви-
щення ефективності і результативності використання бюджетних коштів при реалізації стратегічних зав-
дань соціально-економічного розвитку країни.
ABSTRACT
The article reveals the essence of the budget as a tool for economic development. It is determined that the
institutional approach involves the consideration of fiscal policy as a dynamic system that is constantly improving
in accordance with the main macroeconomic objectives. Creating appropriate institutional conditions for the for-
mation and implementation of effective budget policy requires the use of an adaptive system of budget regulation,
which will contribute to the achievement of balanced and sustainable socio-economic development of the country.
The effectiveness of the formation and implementation of budget policy is determined by the level of development
of financial and budgetary institutions aimed at ensuring economic growth and welfare of citizens. It is shown that
the stability of public finances depends on the quality of forecasting and planning of budget indicators. For further
development of budget forecasting, it is advisable to take into account the set of dynamic relationships between
the components of budget architecture. Approaches to increase the efficiency and effectiveness of budget funds in
the implementation of strategic objectives of socio-economic development of the country.
Ключові слова: бюджет, бюджетна система, бюджетні відносини, бюджетна політика, бюджетний
механізм, економічний розвиток.
Keywords: budget, budget system, budget relations, budget policy, budget mechanism, economic develop-
ment.
Постановка проблеми. Бюджет відіграє ва-
гому роль у системі державного регулювання
соціально-економічного розвитку країни. Ефек-
тивність формування та реалізації бюджетної
політики визначається рівнем розвитку фінансово-
бюджетних інститутів спрямованих на забезпе-
чення економічного зростання країни та добробуту
громадян. Циклічність та динамічність еко-
номічних процесів зумовлює необхідність адапта-
ції складових бюджетної політики до змін фінан-
сово-економічних умов. У зв’язку з цим важливо
своєчасно і виважено оцінити вплив екзогенних та
ендогенних факторів на інституційні засади бюджет-
ного простору. Бюджет має бути взаємоузгодженим із
стратегічними цілями економічних перетворень,
спрямовуватись на створення належних умов для
поглиблення взаємодії держави і суспільства,
підвищення рівня і якості життя населення. В умо-
вах інституційних перетворень економіки результа-
тивність та дієвість бюджетної політики є важли-
вим інструментом впливу на ефективність макрое-
кономічного регулювання, економічне зростання з
врахуванням необхідності забезпечення динамічної
збалансованості та стійкості системи управління
державними фінансами.
Аналіз останніх досліджень і публікацій. Се-
ред вагомих наукових досліджень зарубіжних вче-
них у сфері розвитку бюджетних відносин можна
назвати праці Дж. М. Кейнса, П. Кругмана,
В.Нордхауса, А. Парето, Дж. Сакса, П.Самуель-
сона, Дж. Стігліца, В. Танзі. Питання формування
бюджетної політики досліджуються у працях віт-
чизняних вчених: Т.Канєвої [1,4], С.Качули [6],
Л.Лисяк, В.Макогон [2,5], М.Пасічного[1,4], О.Са-
мошкіної [3], В.Федосова, І.Чугунова [1-6] та ін-
ших.
40 Sciences of Europe # 60, (2020)
Метою статті є розкриття сутності бюджету
як інструменту економічного розвитку.
Виклад основного матеріалу. Бюджет є еко-
номічною категорію, що уособлює відносини, які
виникають у процесі цілеспрямованого впливу дер-
жави на суспільне відтворення. З метою посилення
впливу бюджетної системи на соціально-еко-
номічний розвиток країни потрібно вживати за-
ходи, спрямовані на підвищення рівня збалансова-
ності бюджету, ефективності використання бюд-
жетних коштів, удосконалення міжбюджетних
відносин, забезпечення якісного виконання бюд-
жетів усіх рівнів, здійснення дієвого державного
фінансового контролю. Бюджетна система є адап-
тивним механізмом у системі регулювання еко-
номіки, спрямованим на забезпечення адекватності
заходів внутрішнім і зовнішнім змінам економіч-
ного середовища з метою економічного розвитку
країни. Від ступеня оптимізації обсягів і структури
дохідної та видаткової частин бюджету залежить
рівень економічного зростання. Бюджетний ме-
ханізм повинен забезпечувати втілення бюджет-
ного регулювання, відображати певну спрямо-
ваність бюджетних відносин на вирішення еко-
номічних і соціальних завдань на конкретному
етапі розвитку країни. Економічна сутність бюд-
жетної політики в якості інструменту регулювання
економічного розвитку полягає у використанні
бюджетної архітектоніки, яка визначається опти-
мальними співвідношеннями структури бюджету
для впливу на динаміку економічного зростання.
Основними передумовами досягнення якісного
рівня здійснення державного регулювання є вива-
женість підходів при формуванні бюджетних ви-
датків, що сприятимуть реалізації основних пріори-
тетів соціально-економічного розвитку країни.
Важливим є планування бюджетних програм та
суспільних послуг, які відповідають встановленим
пріоритетам держави, є найбільш ефективними та
дієвими, спроможними забезпечувати економічну
стійкість у довгостроковій перспективі.
Питання формування бюджету відіграють ва-
гому роль у досягненні поставлених завдань
соціально-економічного розвитку країни, вико-
нанні державою відповідних суспільних функцій.
Фінансування соціальної інфраструктури пози-
тивно впливає на збереження та прискорення ро-
звитку людського капіталу, підвищення якості
соціального захисту малозабезпечених верств насе-
лення, освіти, медичних послуг. Бюджетна
політика як вагомий інструмент системи держав-
ного регулювання економіки має спиратися на дов-
гострокову програму економічного та соціального
розвитку країни. Упорядкування регулюючих цілей
бюджетної політики, дозволяє досягти відповід-
ного збалансування процесу перерозподілу фінан-
сових ресурсів у суспільстві, рівня задоволення сус-
пільних потреб. Необхідним є забезпечення пере-
творення бюджетного механізму в дієвий засіб
реалізації соціально-економічної стратегії, підви-
щення ефективності використання бюджетних
коштів. На даному етапі розвитку бюджетної си-
стеми як складової державних фінансів важливим є
використання обґрунтованих методів бюджетного
планування з метою покращення результативності
використання бюджетних коштів, надання держав-
них послуг, спрямованих на отримання якісного
суспільного результату [1].
Необхідність забезпечення цілеспрямованого
впливу на темпи економічного зростання вимагає
формування відповідного якісного рівня системи
бюджетного регулювання, яка ґрунтується на су-
купності бюджетних інструментів, удосконалення
інституційних засад фінансово-економічних пере-
творень. Інституційні засади бюджетної політики
ґрунтуються на інтеграції складових фінансового
механізму у сфері формування доходів бюджету,
планування видатків бюджету, міжбюджетних
відносин, управління державним боргом, виходячи
із циклічності економічного розвитку, стану дер-
жавних фінансів, що сприяє підвищенню дієвості
бюджетного механізму як вагомого інструменту
розвитку соціально-економічних відносин суспіль-
ства.
Бюджетна політика має адаптивно реагувати на
економічну циклічність при необхідності утримання
індикативних значень дефіциту бюджету та
державного боргу. Підвищення ефективності
бюджетних видатків потребує узгодження цілей
бюджетних програм з пріоритетами соціально-
економічного розвитку країни, використання дієвих
форм державної фінансової підтримки. Особливого
значення набувають питання запровадження системи
середньострокового та стратегічного бюджетного
планування. З метою забезпечення послідовності, си-
стемності та ефективності бюджетної політики важ-
ливим є формування довгострокової бюджетної стра-
тегії із визначенням результативних показників ре-
алізації її основних напрямів. В умовах обмеженості
фінансових ресурсів вагомим завданням реалізації
бюджетної політики є концентрація фінансування на
пріоритетних напрямах соціально-економічного ро-
звитку країни, обґрунтування ієрархії цілей, завдань
та принципів бюджетної політики, узгодження фінан-
сових можливостей бюджету щодо реалізації даних
цілей в межах бюджетних періодів. Доцільним є по-
глиблення взаємозв’язку річного та перспективного
бюджетного планування. В сучасних умовах, при ро-
зробці перспективних напрямів бюджетної політики
необхідним є врахування здійснення переорієнтації
економіки на переважно ендогенні чинники еко-
номічного зростання. Важливим є впровадження се-
редньострокового індикативного планування в діяль-
ність головних розпорядників бюджетних коштів.
Перспективне планування бюджету є одним із
необхідних інструментів державного регулювання
соціально-економічного розвитку країни, переду-
мовою підвищення керованості бюджетного про-
цесу, впливу бюджету на досягнення цілей та зав-
дань розвитку національної економіки. При фор-
муванні бюджету держава виходить із розуміння
необхідності забезпечення фінансування стра-
тегічних довгострокових програм економічного ро-
звитку, фінансування важливих бюджетних про-
грам. Від якості прогнозування і планування бюджет-
них показників залежить фінансова стійкість
Sciences of Europe # 60, (2020) 41
державних фінансів. Для подальшого розвитку бюд-
жетного прогнозування доцільно враховувати сукуп-
ність динамічних взаємозв’язків між складовими
бюджетної архітектоніки [2].
Дослідження досвіду формування бюджету в
країнах із розвинутою та трансформаційною еко-
номікою, дозволило виявити основні тенденції у
проведенні перетворень системи бюджетного пла-
нування протягом останніх років. Достатнього
впровадження набули програмно-цільовий метод
планування бюджету, у тому числі у середньостро-
ковій перспективі, система оцінювання бюджетних
програм, що включають відповідні результативні
показники. Планування та виконання бюджету ба-
зується на підвищенні результативності бюджетних
видатків та оцінюється такими показниками, як
якість державних послуг та їх вплив на соціально-
економічний розвиток країни. Значні зміни відбу-
лися у системі державного фінансового контролю
шляхом удосконалення та оновлення його прин-
ципів, форм та методів, розвитку відомчого фінан-
сового контролю та аудиту. Більшість країн світу
протягом останніх років дотримуються політики
жорсткої економії бюджетних коштів, бюджетної
дисципліни, прозорості бюджету, що сприяє змен-
шенню боргових зобов’язань, дефіциту бюджету.
Низка країн використовують дієві механізми інте-
грації коротко-, середньо- і довгострокового бюд-
жетного планування. Основні параметри податко-
вої, бюджетної і боргової політики необхідно базу-
вати на орієнтирах, розроблених у системі
довгострокового планування, які повинні ак-
туалізуватися з урахуванням фактичних умов ро-
звитку економіки, можливого уточнення пріоритет-
них економічних завдань з врахуванням змін
зовнішнього середовища. Сучасний досвід за-
рубіжних країн щодо застосування бюджетної стра-
тегії ґрунтується на необхідності здійснення се-
редньострокового бюджетного прогнозування і
планування під час підготовки щорічного бюджету.
Визначеною тенденцією сучасного досвіду за-
рубіжних країн є системне удосконалення бюджет-
ного процесу, у тому числі подальше впровадження
програмних методів складання бюджету,
оцінювання результативності бюджетних програм,
що сприятиме посиленню ефективності викори-
стання бюджетних коштів через встановлення
взаємозв’язку між затратами та досягнутими ре-
зультативними показниками. У країнах із розвину-
тою економікою відбувається удосконалення си-
стеми державного фінансового контролю, у тому
числі внутрішнього контролю та аудиту ефектив-
ності використання бюджетних коштів. Більшість
країн світу протягом останніх років дотримуються
політики жорсткої економії бюджетних коштів,
бюджетної дисципліни, прозорості бюджету, що
сприяє зменшенню боргових зобов’язань, дефіциту
бюджету. Низка провідних країн використовують
дієві механізми інтеграції коротко-, середньо- і дов-
гострокового бюджетного планування [4].
Дієвість планування видатків бюджету, як
одна із важливих складових системи управління
бюджетом, має суттєве значення в питаннях забез-
печення стабільності фінансової системи країни,
стійкого економічного зростання. У системі голов-
ного розпорядника бюджетних коштів на стадії
планування видатків дозволить підвищити рівень
ефективності бюджетних програм підготовка стра-
тегічних планів їх діяльності, оптимальна струк-
тура бюджетних програм у межах граничних сум
середньострокового бюджету, деталізація завдань
та напрямів бюджетних видатків з розмежуванням
на видатки споживання та видатки розвитку, вста-
новлення чіткого взаємозв’язку між запланованими
обсягами коштів бюджету і очікуваними результа-
тами. Сприятиме посиленню ефективності викори-
стання бюджетних коштів розвиток системи дер-
жавного фінансового контролю, у тому числі
аудиту бюджетних програм, дотримання фінан-
сово-бюджетної дисципліни, раціональне викори-
стання ресурсів бюджету, зменшення втрат бюд-
жету шляхом недопущення утворення дебіторської
та кредиторської заборгованості. Важливим є
здійснення підвищення рівня дієвості та прозорості
механізмів публічних закупівель. З урахуванням
економічних тенденцій, системний підхід до оцінки
ефективності видатків бюджету має передбачати
виокремлення критеріїв економічної та соціальної
ефективності на стадіях формування і виконання
бюджетної програми. Вагоме значення посідають
питання розвитку механізмів попереднього держав-
ного фінансового аудиту, оперативного аналізу і
контролю бюджетних програм з метою адаптив-
ності змін рівня їх фінансового забезпечення. До-
цільним є удосконалення підходів до формування
державних цільових та бюджетних програм, відоб-
раження в даних програмах індикативних показ-
ників соціально-економічного розвитку країни, що
має посилити щільність зв’язку основних пара-
метрів бюджетних програм і пріоритетів державної
економічної політики.
Видатки бюджету є ефективним інструментом
державного регулювання соціально-економічних
процесів у країні, оскільки обґрунтовують напрями
використання бюджетних коштів з урахуванням
цілей і пріоритетів суспільного розвитку. Важли-
вим є забезпечення раціонального розподілу обме-
жених бюджетних ресурсів між напрямами суспіль-
ного розвитку шляхом забезпечення відповідності
обсягу і структури видаткової частини бюджету
визначеним стратегічним пріоритетам розвитку
країни з урахуванням динаміки соціально-еко-
номічних процесів. Підвищення ефективності і ре-
зультативності використання бюджетних коштів
при реалізації стратегічних завдань соціально-еко-
номічного розвитку країни потребують удоскона-
лення системи формування видатків бюджету шля-
хом наукового обґрунтування системи бюджетного
регулювання у сфері видатків та перспективного
прогнозування і планування видаткової частини
бюджету. Спрямованість бюджетної політики на
отримання конкретних суспільно вагомих резуль-
татів передбачає удосконалення системи оцінки ре-
зультативності використання бюджетних коштів з
метою зміщення акцентів від управління бюджет-
ними ресурсами до управління бюджетними ре-
42 Sciences of Europe # 60, (2020)
зультатами, що сприятиме перетворенню бюджет-
них видатків у дієвий інструмент розвитку суспіль-
них відносин [3].
Рівень результативності виконання бюджет-
них програм відображає ефективність діяльності
головних розпорядників бюджетних коштів, якість
виконання стратегічних планів їх діяльності, що ма-
ють узгоджуватися із національними програмами
економічного розвитку, основними напрямами
бюджетної політики та значним чином впливає на
стан соціально-економічного розвитку країни. Від
якості планування бюджетних показників залежить
фінансова стійкість системи державних фінансів.
Доцільним є актуалізація стратегії управління
внутрішнім та зовнішнім державним боргом, фор-
мування річних планів заходів щодо його оп-
тимізації у розрізі кварталів з метою зменшення
пікових навантажень на державний бюджет. Необ-
хідним є подальший розвиток методологічних під-
ходів щодо формування бюджетних та державних
цільових програм, відображення в даних програмах
індикативних показників та індикаторів стра-
тегічних документів соціально-економічного ро-
звитку країни, що має посилити рівень кореляції
програм і пріоритетів державної політики. Важли-
вим є визначення граничних обсягів фінансування
довгострокових програм економічного спря-
мування за рахунок бюджетних коштів. При підго-
товці програми важливо визначити показники
ефективності та якості її виконання. Доцільність ре-
алізації бюджетної програми має ґрунтуватись на
основі кінцевих цілей, передбачених планами
діяльності головного розпорядника коштів.
Ступінь дієвості планування бюджетних асиг-
нувань на виконання цільових загальнодержавних
та місцевих програм залежить від своєчасності
моніторингу та оцінки ефективності даних про-
грам.
Досягнення сталого соціально-економічних
розвитку країни потребує виваженого регулювання
не лише обсягу, а і структури видаткової частини
бюджету з метою забезпечення оптимального
розподілу бюджетних коштів між різними напря-
мами суспільної діяльності. Основним завданням
державної політики у сфері видатків бюджету є оп-
тимізація та економія їх обсягу з одночасним підви-
щенням ефективності і результативності їх викори-
стання з метою забезпечення достатньо високої
якості державних послуг в умовах обмеженості
бюджетних ресурсів. Формування обсягу і струк-
тури бюджетних видатків повинно розпочинатися з
ретельного аналізу динаміки соціально-демо-
графічних і економічних процесів у країні з метою
визначення фази їх циклічного розвитку, тенденцій
динаміки фактичних показників видаткової ча-
стини бюджету у попередніх періодах, виявлення
особливостей взаємного впливу обсягу і структури
видатків бюджету та показників соціально-еко-
номічного розвитку країни. На підставі зазначеного
аналізу повинно відбуватися прогнозування і пла-
нування показників видаткової частини бюджету, а
також моделювання їх впливу на показники
соціально-економічного розвитку країни у се-
редньо- та довгостроковій перспективі. Прогно-
зування і планування видатків бюджету має підля-
гати інституційним обмеженням відповідно до
етапу соціально-економічного розвитку країни
щодо обсягу і особливостей структури видаткової
частини бюджету, рівня дефіциту бюджету у
взаємозв’язку з показниками державного боргу,
співвідношення поточних і капітальних видатків
бюджету, інвестиційної складової бюджету [5].
Бюджетні призначення мають сприяти
розв’язанню пріоритетних завдань, забезпечувати
заходи, спрямовані на розвиток основних галузей
економіки, фінансувати реалізацію комплексних
економічних та соціальних програм. Бюджетна
політика має бути спрямованою на створення умов
для модернізації інноваційної інфраструктури еко-
номіки. Враховуючи необхідність зміцнення люд-
ського капіталу, важливим є упорядкування ме-
ханізмів фінансування галузей соціальної сфери, у
тому числі закладів медичної та освітньої галузі.
Доцільним є систематизація пріоритетів соціаль-
ного розвитку, удосконалення методологічних за-
сад формування відповідних цільових програм. За
умов обмеженого доступу до залучення державних
запозичень на зовнішніх ринках фінансового
капіталу було збільшено обсяги запозичень шляхом
розміщення облігацій внутрішньої державної по-
зики. Вагомого значення набуває розвиток первин-
ного ринку державних боргових паперів, що потре-
бує реалізації комплексних заходів у сфері досяг-
нення фінансової стабільності. Удосконалення
бюджетного процесу сприяє підвищенню рівня
бюджетної результативності та адаптивності бюд-
жетного планування до сучасних соціально-еко-
номічних умов. Важливим є підвищення рівня
якості розробки та реалізації державних цільових
програм, що надасть змогу посилити дієвість
впливу бюджетних механізмів на економічні та
соціальні процеси. Необхідним є мінімізація кіль-
кості програм, які не відносяться до функцій голов-
ного розпорядника бюджетних коштів, удоскона-
лення порядку їх звітування про виконання планів
діяльності на середньостроковий період. При фор-
муванні видаткової частини бюджету слід викори-
стовувати інструменти моніторингу та оцінки ефек-
тивності відповідних видатків бюджету. На основі
одержаних результатів оцінювання будуть
здійснюватися коригування бюджетних програм та
прийматися рішення щодо виділення бюджетних
коштів у наступних за плановим періодах. Доціль-
ним є упорядкування переліку результативних по-
казників для учасників бюджетного процесу, онов-
лення критеріїв виконання бюджетних програм [6].
Для розробки і реалізації збалансованого бюд-
жетного регулювання пріоритети бюджетної
політики повинні визначатися виходячи з цикліч-
ності економічного розвитку, стану державних
фінансів та запасу стійкості бюджетної системи, на
кожному етапі економічного розвитку існує необ-
хідність обґрунтування та запровадження
відповідних важелів бюджетного механізму. Се-
редньострокове бюджетне планування є необ-
хідною умовою підвищення керованості та якості
процесу бюджетного планування, посилення
впливу бюджетного регулювання на соціально-еко-
номічний розвиток країни. Для стимулювання еко-
номічного зростання необхідним є використання
дефіциту бюджету з метою збільшення видаткової
частини бюджету, внутрішнього попиту з
врахуванням співвідношення державного боргу,
видатків бюджету на обслуговування державного
Sciences of Europe # 60, (2020) 43
боргу до валового внутрішнього продукту. Від
якості планування бюджетних показників залежить
фінансова стійкість системи державних фінансів.
Доцільним є актуалізація стратегії управління
внутрішнім та зовнішнім державним боргом, фор-
мування річних планів заходів щодо його оп-
тимізації у розрізі кварталів з метою зменшення
пікових навантажень на державний бюджет.
Здійснення ефективної бюджетної політики
займає вагоме місце у процесі регулювання еко-
номічного розвитку країни. Розвиток суспільства
зумовлює необхідність відповідних інституційних
змін у взаємовідносинах між учасниками бюджет-
ного процесу та підвищення ефективності бюджет-
ної політики у системі державного регулювання
економіки. Від якості та своєчасності прийняття
рішень щодо управління державними фінансами за-
лежить збалансованість бюджетної системи та ре-
зультативність бюджетного регулювання. Важли-
вим є визначення економічної сутності та напрямів
бюджетної політики як інструменту зростання еко-
номіки, запровадження дієвих бюджетних ме-
ханізмів у системі інституційного середовища сус-
пільства, підвищення результативності програмно-
цільового методу планування видатків бюджету як
складової державного регулювання економіки.
Перспективне прогнозування та планування бюд-
жету впливає на обґрунтованість показників
соціально-економічного розвитку країни. Основні
напрями бюджетної політики визначають
відповідні обсяги та структуру видатків бюджету.
Фінансові ресурси бюджету впливають на еко-
номічне зростання, структурні перетворення у еко-
номіці, підвищення якісного рівня соціального за-
хисту населення.
Для посилення бюджетної результативності
важливим є упорядкування бюджетних програм, у
тому числі складання головними розпорядниками
бюджетних коштів планів діяльності відповідно до
середньострокових пріоритетів. Доцільним є вияв-
лення найбільш дієвих, ефективних та таких бюд-
жетних програм, що у достатній мірі відповідають
функціям, основним завданням розпорядника бюд-
жетних коштів, розробка та затвердження обґрун-
тованих паспортів цих програм, складання звітів та
проведення оцінки ефективності їх виконання, по-
силення державного фінансового контролю та
аудиту за управлінням бюджетними коштами.
Висновки. Бюджет є одним з дієвих інстру-
ментів забезпечення макроекономічної стабілізації
та подальшої активізації економічного зростання.
Використання інструментів та важелів бюджетної
політики щодо підтримки системних перетворень
фінансової складової суспільного розвитку має
здійснюватися з урахуванням впливу сукупності
економічних, інституційних та соціальних фак-
торів. Результативність бюджетного регулювання
залежить від рівня наукової обґрунтованості його
ролі в розвитку суспільних відносин, моделі
соціально-економічного розвитку держави. В умо-
вах економічних перетворень доцільним є пошук
оптимального співвідношення між макроеко-
номічними показниками та часткою валового
внутрішнього продукту, що перерозподіляється че-
рез бюджетну систему, ступеню її децентралізації
та підвищення якісного рівня розвитку бюджетних
інститутів. Виходячи із мети та завдань стратегії
поступального розвитку економіки, пов’язаної з
підвищенням рівня ефективності її ендогенної
складової, необхідним є удосконалення інститу-
ційного середовища бюджетної політики. Розвиток
системи фінансового регулювання соціально-еко-
номічної динаміки зумовлює необхідність
відповідних структурних змін взаємовідносин між
учасниками бюджетного процесу. Належний рівень
обґрунтованості рішень щодо формування основ-
них показників функціонування бюджетної си-
стеми у сфері доходів, видатків бюджету, міжбюд-
жетних відносин, дефіциту бюджету і державного
боргу сприяє підвищенню дієвості регуляторного
механізму бюджетної політики. З метою покра-
щання якісного рівня інституційного забезпечення
бюджетної політики необхідним в процесі її фор-
мування є реалізація принципів єдності, компле-
ментарності, системності, ефективності. Доцільним
є удосконалення системи планування і моніторингу
ефективності бюджетних видатків за допомогою
якісних і кількісних індикаторів, підвищення рівня
середньострокового бюджетного планування, до-
тримання принципу прозорості та підзвітності ор-
ганів державного управління громадськості. На-
явність середньострокового бюджетного пла-
нування, довгострокового бюджетного
прогнозування є основою дієвої бюджетної
політики та досягнення достатнього рівня бюджет-
ної ефективності.
Література
1. Бюджетно-податкова політика у системі
регулювання економіки: монографія / І.Я. Чугунов,
Т.В.Канєва, М.Д.Пасічний та ін.; за заг. ред. І.Я. Чу-
гунова. К.: Глобус-Пресс, 2018. 354 с.
2. Чугунов І.Я., Макогон В.Д. Бюджетна стра-
тегія в умовах економічних перетворень //Вісник
КНТЕУ. 2018. № 5. С.5–18.
3. Чугунов І.Я., Самошкіна О.А. Видатки
бюджету в системі державного регулювання
соціально-економічного розвитку країни //Вісник
КНТЕУ. 2019. № 2. С.103–121.
4. Budget policy of social development. Chu-
gunovI.,KanevaT.,Pasichnyi M. and other. General
editorship Chugunov I. Scientific Route. Tallinn,
Estonia. 2018. 348 p.
5. Chugunov I., Makohon V. Fiscal strategy as
an instrument of economic growth. Baltic Journal of
Economic Studies. 2019.Vol.5 No.3. pp.213-217.
6. Chugunov I., Kachula S. State financial policy
as a component of socialeconomic development of so-
ciety. The potential of modern science. volume 2. Sci-
emcee Publishing.London, United Kingdom. 2019. pp.
29-44.
44 Sciences of Europe # 60, (2020)
JURIDICAL SCIENCES
ПРОБЛЕМИ КОДИФІКАЦІЇ МЕДИЧНОГО ЗАКОНОДАВСТВА УКРАЇНИ
Книш В.В.
доктор юридичних наук, доцент, професор кафедри
конституційного, адміністративного та міжнародного права
Навчально-наукового Юридичного інституту
Прикарпатського національного університету імені Василя Стефаника,
Івано-Франківськ, Україна
Марук Т.С.
студентка 3-го курсу Навчально-наукового Юридичного інституту
Прикарпатського національного університету імені Василя Стефаника,
Івано-Франківськ, Україна
PROBLEMS OF CODIFICATION OF MEDICAL LEGISLATION OF UKRAINE
Knysh V.
Vasyl Stefanyk Precarpathian National University,
Educational and Scientific Law Institute, Doctor of Law, Associate Professor,
Professor of the Department of constitutional, administrative and international Law
Ivano-Frankivsk, Ukraine
Maruk T.
Vasyl Stefanyk Precarpathian National University,
Educational and Scientific Law Institute, student, 3-th year
Ivano-Frankivsk, Ukraine
DOI: 10.24412/3162-2364-2020-60-4-44-47
АНОТАЦІЯ
У статті досліджено проблеми розвитку та подальшої кодифікації медичного законодавства України.
Результатом такої кодифікації має стати прийняття нового Медичного кодексу України.
На думку авторів, елементами нового Медичного кодексу України мають стати наступні елементи:
закони, що забезпечують безпечні умови життя й праці людини; закони профілактичної спрямованості;
закони, що захищають права громадян на охорону здоров'я й визначають їхню відповідальність за своє
здоров'я; закони, що визначають права й відповідальність медичних працівників; закони, що регламенту-
ють діяльність національної системи охорони здоров'я; закони, що регламентують фінансування системи
охорони здоров'я; закони, що регламентують окремі види медичної діяльності.
ABSTRACT
The article examines the problems of development and further codification of medical legislation of Ukraine.
The result of such codification should be the adoption of a new Medical Code of Ukraine.
According to the authors, the elements of the new Medical Code of Ukraine should be the following elements:
laws that ensure safe living and working conditions; laws of preventive orientation; laws that protect the rights of
citizens to health care and determine their responsibility for their health; laws defining the rights and responsibil-
ities of health professionals; laws regulating the activities of the national health care system; laws regulating the
financing of the health care system; laws governing certain types of medical activities.
Ключові слова: здоров’я, охорона здоров’я, законодавство, законодавство про охорону здоров’я,
медичне законодавство, кодифікація, кодекс, медичний кодекс, Медичний кодекс України.
Keywords: health, health care, legislation, health care legislation, medical legislation, codification, code,
medical code, Medical Code of Ukraine.
At the present stage, during the economic and so-
cial changes caused by the transition from a socialist
system to a socially regulated market economy, there is
the emergence of new types of social relations that re-
quire legal regulation and their study. This applies in
particular to health relations. To do this, our govern-
ment faces the task of creating a separate complex
branch of medical law, and scientists - the development
of medical jurisprudence as a separate branch of legal
science.
Despite significant positive changes and progress
in the development and adoption of new laws, regula-
tions and in updating existing legislation on health care,
we still say that the regulatory framework in the field
of health care is not yet fully consistent with modern
needs, has gaps and shortcomings in legal regulation.
The current legislation of Ukraine on health care, both
general and special, is not able to take into account the
peculiarities of relations in this area, does not have the
necessary conceptual apparatus that would consolidate
the factual and legal views of participants in health
Sciences of Europe # 60, (2020) 45
care, and note ignorance general practitioners in medi-
cine, which complicates their role in resolving "medical
cases".
The theoretical basis of the scientific work was
scientific research on issues related to the development
of Ukrainian legislation in the field of health, was the
subject of a number of scientists - representatives of
various branches of law, as well as specialists in public
administration and health care.
The purpose of this article is to study the concept,
features and system of medical law, to determine the
administrative and legal regulation in the field of health
care, prerequisites for the development and implemen-
tation of the Medical Code as one of the tools for im-
plementing public health policy. Regulation and corre-
lation with international experience in administrative
and legal support of the right to health care.
In accordance with this goal of the study, the fol-
lowing tasks of the article are set: to reveal the con-
cepts, features and system of the right to health care; to
characterize the administrative legislation in the field of
health care in Ukraine as an object of codification in
terms of administrative and legal regulation of relations
in this area; to find out the essence of codification in the
field of health care in Ukraine, to highlight its main
properties that determine its specific nature; to reveal
the specifics and features of codification in the field of
health care in Ukraine as the most perfect, effective
type of systematization in this area; to characterize the
main modern sectorial and institutional models of do-
mestic and foreign codified acts governing relations in
the field of health care, to outline trends in design and
codification studies to determine the content and possi-
ble structure of basic codification acts in the field of
health care, and to identify priorities appropriate codi-
fication of administrative legislation in the field of
health care in Ukraine; conducting an administrative
and legal analysis of the world experience in imple-
menting reforms of the national health care system.
Separation of legal acts regulating one specific is-
sue, terms of adoption, validity, agencies that adopted
them, changes and additions that are constantly made
and often the lack of necessary documents on the
ground significantly complicate the work of managers,
legislators and executors of legal acts.
To overcome this, they have long sought to sys-
tematize a single document into a single whole (to con-
solidate, incorporate, and codify legal acts). Systemati-
zation of legal acts is carried out by publishing thematic
collections (collections) of full texts of legal docu-
ments, publications of legal acts in official bulletins in
chronological and thematic order, compiling codes or
codes of legislative acts, creating automated databases
of full texts of legal and technical information.
The most promising way to systematize legal acts
is to create a set of laws and a code of laws. A set of
laws is normative acts or collections of legislation con-
solidated into one edition and arranged in a systematic,
chronological or other order. The Code is a law that
provides full systemic regulation of a particular area of
public relations [1, p. 59-61].
The object of systematization - modern regulatory
framework of health care of Ukraine - includes more
than 1200 current regulatory documents of different le-
gal status (laws of Ukraine, decrees of the President of
Ukraine, resolutions of the Cabinet of Ministers of
Ukraine, resolutions and orders of the Ministry of
Health of Ukraine, resolutions and orders of others de-
partments). These legal acts as annexes include more
than 1000 instructions, provisions, and methodical doc-
uments regulating all types of professional activity of
branch.
In Ukraine, one legislative act (law) in the field of
health care has an average of about 200 by-laws. In this
regard, we should agree that until now our legal acts are
not state, but mostly departmental. Departmental regu-
lations are necessary for full and detailed legal regula-
tion of the industry, but the problem is what kind of re-
lationship they should regulate. If we are talking about
special, medical issues (the procedure for carrying out
a procedure, the use of a particular method of preven-
tion, diagnosis and treatment), then here they are quite
appropriate. But if professional medical activities affect
the rights of citizens (patients), then these relations
should be determined exclusively by law. The practice
of issuing sectorial orders, instructions, regulations,
which correct the rights of citizens established by law
or violate their interests, cannot be considered normal,
especially since most departmental legal acts in the
field of health care have never been published in the
open press and, therefore, almost no one knows.
A number of legal acts are not registered with the
Ministry of Justice of Ukraine and are not published
properly, so in non-departmental disputes or in the case
of lawsuits, the existing database of legal acts may be
considered legally insufficient and challenged in court.
The formation and development of legal medicine
in Ukraine implies the need to strengthen, first of all,
the direct regulatory role of laws in the health care sys-
tem with the replacement of administrative and legal
norms by civil law. In other words, medical, diagnostic,
preventive and rehabilitative medical care should be
regulated not only by sectorial instructions, standards
and norms, but also by legislative documents that are
binding on all citizens, health care organizations and
government agencies, regardless of their departmental
affiliation.
It should be borne in mind that in the development
of sectorial bylaws at the state level in regional centres
and regions are adopted on their basis their administra-
tive documents, which can not only make some dis-
crepancies in legal acts, but also increase their number
at the regional level. The introduction of laws of direct
action into legal practice will solve the problem of sec-
torial and territorial regulations.
In recent years, normative activity in the field of
health care has been carried out quite actively, but an-
nually about 25% of documents lose their legal force,
which indicates the unstable nature of reforms in health
care.
The total volume of legal acts regulating activities
in the field of medicine and included in the Unified
State Register of Legal Acts of Ukraine today is much
smaller than in other countries, which is due not only to
the presence of significant gaps in the legal field, but
46 Sciences of Europe # 60, (2020)
also with the fact that the Unified State Register of Le-
gal Acts of Ukraine does not include a significant part
of interdepartmental legal acts regulating professional
activities in health care, but have not passed the exam-
ination in the Ministry of Justice of Ukraine. These doc-
uments are not maintained in an active state (the main
document is not made the following changes and addi-
tions, as is done in the centre of legal information).
In general, Ukraine has created a legal basis for the
implementation of the constitutional right of citizens to
health care and medical care. Of course, there are some
shortcomings and gaps. The most significant disad-
vantage of the adopted legal acts is that they are not al-
ways conceptually sustained, insufficiently developed
mechanisms for their provision and implementation of
the declared legal norms. Legislation in the field of
health care is not essentially a law of direct action, but
contains a significant number of references to all the
same internal regulations and regulations.
The key point of the process of creating a national
system of legislative regulation in the field of health
care is the development of the concept of development
and improvement of the legal framework of Ukraine in
the field of health care, which includes the need to ad-
dress the following tasks: expanding the legal field.
Provision of medical care, the transition to a direct reg-
ulatory role of laws in the health care system and the
formation of legal awareness in health professionals
and the public. In Ukraine, there is a need to adopt a
number of laws on compulsory health insurance, pro-
tection of patients and health workers' rights, profes-
sional liability insurance of health workers, trade un-
ions and associations in health care, private health care
organizations, informatization of the health care system
health.
Thus, the regulatory framework in the field of
health care in Ukraine has certain shortcomings:
1) sectorial laws of Ukraine are not laws of direct
action, as they do not prescribe real mechanisms of
their implementation. It is implied that this will be done
in bylaws, but in practice various explanations, infor-
mation letters, which are not legal acts at all, are often
used;
2) the variety and set of legal acts of different lev-
els, devoted to one issue, but not always interpreted in
the same way. In addition, the unavailability of all of
them in connection significantly complicates the regu-
latory management of the industry, makes it contradic-
tory;
3) distortions are often allowed in the by-laws
when unfolding the provisions of the law, as a result
there are discrepancies;
4) a large number of legal acts does not allow to
see behind this set of legal gaps and contradictions;
5) the absence of sectorial legislation and depart-
mental sectorial acts on the ground, the adoption of lo-
cal acts and regulations, which often expand and distort
sectorial legislation, significantly complicates the man-
agement of the industry;
6) the absence of a single consolidated legislative
act in the field of health care (some health care issues
are regulated by law, others - decrees of the President
of Ukraine, third - government decrees, fourth - decrees
and orders of the Ministry of Health register of legal
acts, five are unpublished orders of the Ministry of
Health of Ukraine), available not only to health care
managers, health workers, but also to the population,
complicates the provision of medical care within the
evidence and legal medicine.
These problems are solved by the development
and adoption of laws of direct action, which in the first
stage can be systematized in a set of laws on health
care, including legislation that already exists and needs
to be developed and adopted. In particular, the set of
laws on health care should include the following blocks
of laws:
1) laws that ensure safe living and working condi-
tions;
2) laws of preventive orientation;
3) laws that protect the rights of citizens to health
care and determine their responsibility for their health;
4) laws that determine the rights and responsibili-
ties of medical workers;
5) laws regulating the activities of the national
health care system;
6) laws regulating the financing of the health care
system;
7) laws governing certain types of medical activi-
ties.
The most promising way to systematize the legis-
lation is to create the Medical Code of Ukraine, as cod-
ification, as the most perfect and complex systematiza-
tion of legal acts, is aimed at radical qualitative regula-
tion of legislation, ensuring its coherence and
compactness. Currently, codes of laws on public health
are being developed in Russia, Belarus, and Kazakh-
stan.
At the same time, a distinction should be made be-
tween the Medical Code and the Code of Laws on Pub-
lic Health.
The Medical Code reflects medical law, which is
a complex branch of law and includes a set of legal
norms governing public relations in the field of medical
activities. In turn, medical activity should be under-
stood as a comprehensive system that includes the or-
ganization of medical care, its direct provision in the
framework of diagnostic, therapeutic and preventive
measures, as well as quality control of medical services
provided [2, p. 21-22]. Medical law is a system of legal
norms that regulate qualitatively unique social rela-
tions, the content of which is the impact on physical and
mental health through medical means, which is carried
out by health professionals [3, p. 116-121].
In accordance with the general principles of rule-
making practice, the Medical Code should consist of
general and special parts and include all applicable in-
dustry laws; laws that should be developed to address
gaps in the legal field; a certain part of departmental
acts, which should be transformed into legislation. The
Code should be a law of direct action, systematized by
areas of activity in the field of health care and public
health, which will eliminate duplication, contradictions
and ambiguities, legal gaps in legislation, increase the
availability and ease of use of health legislation.
In the coming years, it is necessary to develop and
adopt separate basic laws from each bloc - laws that
Sciences of Europe # 60, (2020) 47
constitute the basic structure of the future code and thus
the final concept of the development of sectorial legis-
lation in the country.
Development of the Code of Laws on Public
Health and the Medical Code will help improve health
care management, improve the quality of health care,
protect the rights and responsibilities of patients and
health professionals, will form medical legislation in
the form of a single and integrated system of direct leg-
islation, available not only to the heads of health care
organizations, but also to all health professionals and
the public.
References
1. Часнойть Р.А., Шарабчиев Ю.Т., Дудина
Т.В. Обоснование необходимости кодифицирова-
ния законодательных актов Республики Беларусь в
сфере здравоохранения и разработки кодекса зако-
нов об охране здоровья граждан // Медицинские но-
вости. 2007. №11. С. 59-61.
2. Стеценко С. Г., Стеценко В. Ю., Сенюта И.
Я. Медичне право України: Підручник / За заг. ред.
д.ю.н., проф. С.Г. Стеценка. К.: Всеукраїнська
асоціація видавців «Правова єдність», 2008. 507 с.
3. Болотіна Н. Б. Медичне право в системі
права України // Право України. 1999. № 1. С. 116–
121.
48 Sciences of Europe # 60, (2020)
PEDAGOGICAL SCIENCES
MODERN EDUCATIONAL TECHNOLOGIES IN THE TEACHING FOREIGN LANGUAGES TO
POSTGRADUATE STUDENTS
Aleksandrova E.
Samara State Medical University,
candidate of pedagogical sciences, associate professor of the department of foreign languages and Latin,
Samara
Barbasheva S.
Samara State Medical University,
candidate of pedagogical sciences, associate professor of the department of foreign languages and Latin,
Samara
DOI: 10.24412/3162-2364-2020-60-4-48-51
ABSTRACT
This article is devoted to the specifics of teaching a foreign language using modern educational technologies
at the postgraduate stage. The learning of a foreign language at this stage is considered to be a condition for the
professional and personal development of a specialist. The scientific novelty of the study is the analyzing the
possibility of introducing element-by-element several educational technologies in a different level language skills
group.
Keywords: modern educational technologies, postgraduates students, non-linguistic university, qualifying
English examination for postgraduate degree, specifics of a foreign language teaching.
Introduction
Higher education and postgraduate vocational ed-
ucation in Russia is given by universities, institutes or
academies. Since 2008, there has been a massive tran-
sition to the two-level education system model “Bach-
elor’s degree program and Master’s degree program”.
However, in some universities a single-level system
with “Specialist’s degree” has been preserved. Success-
ful completion of a Master's or Specialist’s degree is
not the final stage of education. Russian universities of-
fer a wide range of postgraduate programs in various
fields. The postgraduate training program is focused on
development of scientific thinking based on profes-
sional skills, the ability to realize creative potential and
additional knowledge in the specialty.
The aim of this paper is to analyze the potential
for using modern educational technologies in the teach-
ing foreign languages to postgraduate students in order
to improve the quality of their education.
The present research was conducted to find solu-
tions to the following problems:
- to identify difficulties in the a foreign language
teaching for postgraduate students;
- to show the role of modern educational technol-
ogies in a foreign language teaching at the postgraduate
stage;
- to reveal the potential ways to improve the qual-
ity of postgraduate students education in order to pre-
pare them to pass the qualifying English examination
for postgraduate degree successfully.
Postgraduate studies are carried out in full-time
and part-time form, on a budget or commercial basis.
Unlike students studying according to the curriculum,
each postgraduate student personally plans his/her
study, which is based on independent scientific re-
search. During postgraduate studies a postgraduate stu-
dent is required to fulfill an individual plan, to pass can-
didate examinations in the History and Philosophy of
Science, in a Foreign Language and in the Special Field
to complete the thesis and to submit it to the department
for obtaining an appropriate finding. Thus, we can see
that a foreign language is one of the three compulsory
candidate exams, this subject is also required for pass-
ing on admission to postgraduate study.
Teaching a foreign language has become a social
order of society, an integral part of higher education
and essential component for effective future specialist’s
work. In this regard, there have been occurred several
changes in the requirements for the foreign language
education system, for its main components. The devel-
opment system of language training for the postgradu-
ate stage at a non-linguistic university leads to an im-
proving in the competitiveness of postgraduates and
their professional training while increasing the level of
accessibility, popularity and democracy of the Russian
postgraduate education system in the global postgradu-
ate education system.
Data collection and the study samples
The relevance of the study is due to the fact that
the problem of using modern educational technologies
in the postgraduate students has not been fully studied.
The authors carefully reviewed the articles, textbooks,
monographs devoted to the use of modern technologies
in the foreign language teaching and the problems of
postgraduate students teaching. It should be noted that
several research works were conducted concerning the
characteristics of the most famous modern educational
technologies, recommendations for their study and use,
the methodology for their application [1]; intercultural
approach and didactic features in a foreign language
teaching to students at non-linguistic universities [2];
contemporary problems of postgraduate students teach-
ing at a non-linguistic university [3].
We believe that a detailed study of these problems
and the proposed ways to their solution will help to take
a closer look at the problem of introduction modern ed-
ucational technologies into the process of language
training for postgraduate students, as well as to prepare
Sciences of Europe # 60, (2020) 49
them for passing English examination for postgraduate
degree more successfully with the possibility of its us-
ing in their professional activities.
The modern educational technologies can be pre-
sented as the following: problem-based learning, devel-
opmental learning, research methods in teaching, game
methods, information and communication technologies
[4].
The main aim of foreign languages teaching at the
first stage of postgraduate study is the formation of a
specialist’s foreign language communicative compe-
tence that allows him/her to the use a foreign language
as the means of professional, intercultural, interper-
sonal, business communication. The use of the above
mentioned methods during the lesson promotes the de-
velopment of postgraduate students’ skills to deal with
additional professional literature, fosters curiosity, im-
proves creative abilities and expresses individual capa-
bilities [5].
Methods of analysis
We used purposive studying particular groups of
the first year postgraduate students sampling at Samara
State Medical University. The postgraduate students
were divided into two parts: control group (training in
traditional methods) and experimental group (training
with modern educational technologies). In the second
(experimental) group a great number of exercises as
well as reference schemes, collages, booklets, educa-
tional films, video lectures in a foreign language with
subtitles were used to help the postgraduate students to
overcome the language barrier in different situations.
One of the main serious problems we usually run
into is a low level of English, which can also be con-
nected with a reduction of academic hours and the num-
ber of terms for teaching foreign languages during the
study at the university.
The authors believe that using modern educational
technologies which are, on the one hand, aimed at an
individual approach, and on the other hand, at optimiz-
ing the independent work of postgraduate students can
contribute to a successful solution of the problem.
It is of the first importance to ensure the speech
activity of each postgraduate student during the study.
The use of modern educational technologies allows the
teacher to organize the educational process more pro-
ductive, efficient, interesting, and to make it more in-
formative.
In the research process, we applied the following
methods: a dialectical trend analysis and contradictions
in the use of modern educational technologies in the ed-
ucational process, empirical methods (questioning,
testing, overt observation, expert evaluation), a peda-
gogical experiment, a qualitative analysis of the results
of the experiment, statistical methods for processing the
results.
Data analysis and research results
At the initial stage postgraduate students of both
groups were asked to take a questionnaire and evaluate
their readiness to develop a “Language portfolio” on a
10-point scale.
The Council of Europe developed the “European
Language Portfolio” (ELP), which was piloted in vari-
ous countries in 1998 - 2000. Based on the provisions
of the Sorbonne Declaration and the Bologna Conven-
tion, the project “Language Portfolio in Multinational
and Multicultural Europe” is aimed to ensure the conti-
nuity of the language education in different institutions
and stages [6].
Such technologies and the presence of a portfolio
are considered to be the means of creating a personal
portrait based on the personal characteristics, which its
owner evaluates and reflects in this document. In many
European and Russian universities the compilation of
the language portfolio is a compulsory part of the cur-
riculum for foreign languages teaching. Its presence en-
sures compliance with the principle of academic mobil-
ity, and most importantly, provides the post graduate
student with materials for successful independent sci-
entific communication in the future [7].
According to the language training tasks and fun-
damentals for postgraduate students in Russia, it is nec-
essary to compile the Language Learning Portfolio
(LLP), which includes the following sections:
1. Language passport (personal information about
the owner, the number of languages a person speaks,
language level, etc.)
2. Language biography, level of proficiency in
each type of speech activity, assessment, targets, ways
to achieve it, dynamics.
3. Profile (language papers, for example, transla-
tions into a foreign language of articles and abstracts,,
resumes, essays, reviews, presentation at conferences,
documents reflecting achievements in language learn-
ing, etc.).
When compiling the Language Learning Portfolio
in the experimental group, we combined traditional
teaching methods such as reading literature, talking
with the lecturer, translating and rendering articles with
modern information and communication technologies.
It was done the average score at the initial and final
stage of all the post graduate students taken part in the
survey. We can state the fact that having initially the
same level of training for both groups at initial stage, at
the final stage the experimental group had shown better
readiness for the LLP preparation.
We believe that the another way showing results
in the preparing for qualifying English examination for
postgraduate degree with using of modern educational
technologies is to introduce problem projective study
that help to improve language skills, to assess the level
of postgraduate students’ readiness for business and ac-
ademic communication, to create an occasion for
knowledge and experiences exchange of postgraduate
students on different topics. A problem projective study
which is called Conference for Postgraduate Students
“The Vital Problems of Medical Science and Research”
takes place every year at the Samara State Medical Uni-
versity.
Basic requirements for using the project method
are the following:
- the presence of a significant research and crea-
tive problem, requiring integrated knowledge, research
to solve it;
- practical and/or theoretical significance of the
proposed outcomes;
50 Sciences of Europe # 60, (2020)
- independent (individual, group) students' activi-
ties in the classroom or out-of-lesson;
- structuring of the project content (indicating
phased results and the casting);
- the use of research methods (determination of the
problem, research tasks, hypothesizing their solutions,
discussing research methods, finalizing results, analyz-
ing the data obtained, summarizing, adjusting and mak-
ing conclusions).
The main aim of this study is to prepare postgrad-
uate students for participating in international confer-
ences, making reports and presentations in a foreign
language, taking part in discussions on relevant profes-
sional topics. And, thereby, this experience increases
their international competitiveness and academic mo-
bility.
A problem projective study requires careful prep-
aration, and also involves the use of knowledge, skills,
abilities, acquired during the training period [8]. The
realization of this project is carried out in three stages,
which have independent content and their specific edu-
cational tasks which the totality ensures the achieve-
ment of a common aim.
The first stage is preparation for the conference,
which includes [9]:
- mastery of speech skills for scientific discussion
in a foreign language, the use of accepted academic cli-
ches (The subject of my academic paper / my presenta-
tion is ..., I've divided my presentation into ... parts/sec-
tions ..., The subject can be looked at under the follow-
ing headings ..., I'd like to draw your attention to the
next slide ..., This leads/brings me to the next point
which is ... etc.);
- preparation reports and presentations by post-
graduate students in English on the subject of disserta-
tion;
- election of the chairman and members of the pre-
sidium;
- publishing the conference program;
- distribution of invitations for scientific supervi-
sors and university leaders.
The second stage is the conference. Each post-
graduate student makes his presentation, after that par-
ticipants and guests of the conference ask questions to
speakers and make comments. Such a polylogue in-
cludes several communicative tasks and communica-
tive intents at once: request and receive information,
discuss reports, express opinion, doubt, consent, disa-
greement, etc. The conference is headed by the chair-
man.
The third stage is the final one: summing up the
conference, discussion the reports, making a decision.
Based on our own experience, as well as the expe-
rience of colleagues, we can state that problem projec-
tive study is impossible without using modern educa-
tional technologies. The authors made an attempt to
systematize the use of modern pedagogical educational
technologies for teaching postgraduate students. As-
sessing the results of the matrix, we can see that the use
of modern educational technologies at the initial stage
in the control group is not compulsory. The lecturer
sometimes resorts to use them, but some of the technol-
ogies are not applied in the educational process, and
therefore the language skills development of postgrad-
uate students is not always at the high level, which is
proved by data on the final results of both groups. Hav-
ing analyzed the results, we can state that the qualimet-
ric parameter in the educational process with using
modern educational technologies increased almost 2
times compared to the traditional methods of training.
Conclusion
Our study examined the use of modern educational
technologies in a foreign language teaching for the
postgraduate students at a non-linguistic (Samara State
Medical) university.
According to the requirements for the preparation
and training of postgraduate students, we come to a
conclusion that business and academic communication
skills at the postgraduate stage are to include: the ability
to read professional skilled correspondence; write re-
ports, protocols, business letters and faxes; make phone
calls; participate in discussions, symposia, conferences;
chair the meeting; negotiate with foreign colleagues;
make presentations in the foreign language, etc.
Summing up the results, we can state that our ex-
perience of using modern educational technologies to
prepare for passing English examination for postgradu-
ate degree is an essential component in the training at
postgraduate stage and, as well as possible, it contrib-
utes to the development of communicative competence
and skills of postgraduate students. Modern educational
technologies serve as an organic tool for the develop-
ment of learning communications in the logic of the
personal dimension of postgraduate training and justify
their use in teaching a foreign language at the postgrad-
uate stage in a non-linguistic university.
References
1. Selevko, G. K. (2005). Encyclopedia of edu-
cational technologies. - Moscow: Public education,
556p.
2. Dikova, E. S. (2009). New approaches to de-
termining of linguistic training objective in non-lin-
guistic university. Bulletin of the Buryat State Univer-
sity, 15, P.163–167.
3. Buyanova, G.V & Kinderknecht, A.S. &
Popova, T.V. & Peunova, E.V. (2017). Teaching a for-
eign language in a non-linguistic university postgradu-
ate course: topical issues: monograph. Perm: CPI "Pro-
crasty", 188р.
4. Zaitsev, V. S. (2012). Modern pedagogical
technologies: textbook in 2 books, book 1. Chelya-
binsk: CHSPU, 411p.
5. Aleksandrova E.V., Barbascheva S.S. (2020).
The quality improvement of a foreign language teach-
ing for postgraduate students at a non-linguistic univer-
sity with modern educational technologies application
// Modern Problems of Science and Education. Surgery,
vol.4. URL: http://www.science-education.ru/ru/arti-
cle/view?id=29945 (accessed on 02.12.2020).
6. Barbasheva, S. S. & Rozhkova, T.V. (2016).
Training in business communication as part of the im-
plementation of communicative competence at the
post-graduate stage of medical University. Actual prob-
lems of linguistics, translation studies and pedagogy, 1
(3), P.23-30.
Sciences of Europe # 60, (2020) 51
7. Aziattseva, T. V. (2015). Didactic peculiari-
ties of teaching foreign languages to the students of
non-linguistic departments. Prepodavatel XXI vek, 3
vol.1, P162-169.
8. Aleksandrova, E.V. (2015). Philosophical un-
derstanding of the informatization trends in the modern
educational space. Philosophy of education, 5 (62),
P.26-34.
9. Barbasheva, S. S. (2007). Teaching of busi-
ness English of a tourist specialization with in-depth
language acquisition in high school: diss. kand. ped.
sci. Moscow: Moscow State University for the Human-
ities.
ТРЕВОЖНОСТЬ У ДЕТЕЙ И ПОДРОСТКОВ: ПУТИ РЕШЕНИЯ ПРОБЛЕМЫ
Чупракова Н.Н.
старший преподаватель
кафедры «Юридическая психология и право»
факультета «Юридическая психология» ФГБОУ ВО МГППУ,
Москва, Россия
ANXIETY IN CHILDREN AND ADOLESCENTS: SOLUTIONS TO THE PROBLEM
Chuprakova N.
senior lecturer
in "Legal psychology and law",
faculty of "Legal psychology" of the Moscow State University of Psychology and Education (MSUPE),
Moscow, Russia
DOI: 10.24412/3162-2364-2020-60-4-51-55
АННОТАЦИЯ
Данная работа посвящена рассмотрению вопросов, анализирующих проблему тревожности детей и
подростков в аспекте их безопасного устойчивого развития. Локус контроль, психологическая устойчи-
вость, самооценка и настроение рассматриваются как факторы управления психическими состояниями и
как основа безопасного устойчивого развития. Предлагаются пути решения данной проблемы, а именно:
рассматривается некоторая пошаговая модель оказания помощи детям и подросткам в преодолении тре-
вожности. При этом образовательная среда рассматривается как условие обеспечения безопасного устой-
чивого развития. Предлагается модель устойчивого безопасного развития школьника на основе профилак-
тики тревожных состояний, обучения навыкам бесконфликтного общения и поиска личностного ресурса
и индивидуального стиля преодоления.
ABSTRACT
This work focuses on issues that analyse the anxiety of children and adolescents with regard to their safe
sustainable development. Locus control, psychological resilience, self-esteem and mood are considered as factors
in managing mental states and as the basis for safe sustainable development. Ways of solving this problem are
suggested, namely: some step-by-step model of helping children and teenagers to overcome anxiety is considered.
In this case, the educational environment is considered as a condition for ensuring safe sustainable development.
The model of sustainable safe development of schoolchildren based on the prevention of anxiety states, teaching
the skills of conflict-free communication and the search for personal resources and individual style of overcoming
is proposed.
Ключевые слова: тревожность, безопасное устойчивое развитие, психологическая устойчивость,
профилактика тревожных состояний, индивидуальный стиль преодоления.
Keywords: anxiety, safe sustainable development, psychological stability, prevention of anxiety states, indi-
vidual style of overcoming.
В современных условиях, обеспечение без-
опасности жизнедеятельности ребенка и взрослого,
становится все сложнее и сложнее. В связи с уча-
стившимися террористическими угрозами и появ-
лением качественно новых природных катаклизмов
и экологических катастроф, человечеству прихо-
дится серьезно задуматься о развитии цивилизации
в целом. По мнению ученых (Б.Е. Большаков, П.Г.
Кузнецов, Н.Н. Моисеев, А.Д. Урсул и т. д.) новая
философия выживания и безопасности должна со-
единять в одно целое развитие и обеспечение без-
опасности, то есть обеспечивать безопасность через
устойчивое развитие. Ориентируясь на основной
принцип устойчивого развития – принцип справед-
ливости (в различных аспектах: экономическом, со-
циальном, политическом, экологическом и т.д.),
можно сказать, что устойчивое развитие – это спра-
52 Sciences of Europe # 60, (2020)
ведливое, а значит и безопасное развитие, обеспе-
чивающее выживание и длительное развитие обще-
ства.1
Если мы хотим сохранить землю для будущих
поколений, то лучший способ это сделать, начинать
формировать личность ребенка в условиях безопас-
ного устойчивого развития А это требует выра-
ботки новых научных подходов, соответствующих
современным требованиям и предполагаемым пер-
спективам развития человечества. В современной
науке и практике такие подходы существуют. В
этом отношении интерес для нашего внимания мо-
жет представлять один из таких подходов, каким
является экологическая модель развития человека.
«Сегодня, возможно, самой влиятельной моделью
развития»- как утверждает Г. Крайг, «стала модель
экологических систем, предложенная американ-
ским психологом Ури Бронфенбреннером»
(Sociocultural Risk: Dangers of Competences J. Gar-
barino, 1982). Развитие человека, согласно этой мо-
дели – это динамический процесс, идущий в двух
направлениях.2
С одной стороны, человек сам ре-
конструирует свою жизненную среду, а с другой –
испытывает воздействие со стороны элементов
этой среды. Одним из таких элементов является по-
вышенный тревожный социальный фон общества в
связи с высоким уровнем стрессогенности нашей
жизни. Как следствие этого воздействия - повышен-
ная тревожность у детей и подростков.
Высокая стрессогенность нашей жизни нега-
тивным образом влияет на психическое состояние
большинства людей сегодня. Дети и взрослые вы-
нуждены пребывать в постоянной психической
напряженности, раздражительности, у многих это
вызывает депрессии, психосоматические болезни,
нарушение сна, хронический стресс. В современ-
ных условиях политической и экономической не-
стабильности с каждым годом увеличивается коли-
чество людей, которые болезненно реагируют на
стресс, и кого он легко может перевести из стабиль-
ного состояния в кризисное. Источником опасности
может быть все живое и неживое, естественные
процессы и явления, техногенная среда и действия
людей. Влиянию опасности может подвергаться
как человек, так и природная среда, материальные
ценности.
По сведениям международной федерации об-
ществ Красного креста и Красного полумесяца с
каждым годом растет количество природных ката-
строф примерно на 20%. Землетрясения, цунами,
пожары, наводнения рушат целые города. В начале
2019 года Управление ООН представило отчет с
данными о количестве людей, которые погибли в
результате стихийных бедствий за предыдущий
год. В 2018 году природные катаклизмы унесли
жизни 10 300 человек, 60 млн. человек получили ра-
нения или материальный ущерб. За последние 20
лет стихийные бедствия стали причиной смерти 1,3
1
Урсул А.Д. Становление ноосферного интеллекта
и опережающее образование // Синергетика и обра-
зование. – М., 1997. Учебное пособие. М.: Гарда-
рики, 2004. С. 361–362.
млн человек. И с каждым годом стихийные бед-
ствия становятся все более глобальными, а послед-
ствия все более масштабными. При этом негатив-
ное воздействие на человека не ограничивается
только естественными опасностями.
Современный мир и тревога, к сожалению
стали, особенно в последнее время, синонимами и
плотно вошли в наше сознание. Стрессовые ситуа-
ции наполняют нашу повседневную жизнь на ра-
боте и дома, что в свою очередь усиливают тревож-
ное состояние. Тревожимся за себя, за свое здоро-
вье и здоровье детей, за возможность потерять
работу и средства существования. Тревожность в
отношениях с партнером, тревога за возможные из-
мены. Страх потерять родителей, любимых. Страх
агрессии, нападения, войны, стихийных бедствий
[2]. В последнее время страх заражения вирусами,
от которых не существует вакцин и многое другое.
Страхи и тревоги - полноправные жители мегапо-
лисов и маркеры современного бытия. Безусловно
на тревожный фон в социуме влияют и доступность
информационных цифровых технологий. Повы-
шенные психофизические и интеллектуальные
нагрузки в образовательных учреждениях с одной
стороны предопределены эволюцией развития че-
ловечества и еще больше требуют отдачи и вклю-
ченности, но насколько подготовлены современные
дети к таким психоэмоциональным и интеллекту-
альным нагрузкам [3]. Насколько детская психика
способна выдерживать и дальше этот тревожный
социальный фон и психоэмоциональное неблагопо-
лучие значимых для детей взрослых.
Когда тревожность становится проблемой, ка-
чество жизни заметно снижается. Как распознать,
когда тревога становится естественным состоянием
и начинает вмешиваться в нашу повседневную
жизнь. Как с ней справляться, какую помощь воз-
можно и необходимо оказывать детям и подрост-
кам, когда обращаться к специалистам и каким? На
сегодня данная проблема настолько актуальна, что
многие в своих исследованиях пытаются ответить
на поставленные вопросы [4]. Но, когда мы сталки-
ваемся с этой проблемой в реальной жизни у себя,
у детей, то еще более становимся тревожными, уяз-
вимыми. растерянными, неустойчивыми.
В данной статье автором предлагаются пути
решения данной проблемы, а именно: рассматрива-
ется некоторая пошаговая модель оказания помощи
детям и подросткам в преодолении тревожности.
Прежде всего это информирование. Уметь
распознавать признаки тревожности и знать фак-
торы, способствующие снижению тревожности у
детей и подростков, это первый шаг в противостоя-
нии с ней и ее преодолении, а соответственно и шаг
к обеспечению безопасного устойчивого развития
детей.
Так что же такое тревожность, тревога, тре-
вожное состояние?
2
Урсул А.Д. Путь в ноосферу (Концепция выжива-
ния и устойчивого развития цивилизации). М.: Луч,
1993.
Sciences of Europe # 60, (2020) 53
В теоретических исследованиях (Ч.Д. Спил-
бергер, Ю.Л. Ханин) принято выделять тревогу
двух видов. Тревогу как личностную черту, которая
определяет готовность к тревожным реакциям, и
проявляется в неуверенности в будущем, и акту-
альную тревогу, которая входит в структуру психи-
ческого состояния в данный конкретный момент
[1].
Как правило, состояние тревоги возникает в
ситуациях неопределенности, когда возможная
угроза жизнедеятельности или самооценки субъ-
екта не явно выражена и не определена во времени,
в поступках или действиях и ее не возможно преду-
гадать или предсказать. Когда тревога пережива-
ется как неопределенное беспокойство, то это по-
буждает субъекта (ребенка) проявлять активность в
поведении и более целенаправленные действия, та-
ким образом помогая быстрее адаптироваться. Если
тревога не соответствует ситуации (сильно завы-
шена и продолжительна по времени), то это начи-
нает работать как дезадаптация, и может привести
к поведенческим и психическим нарушениям. Что
же делать, можно ли как- то помочь ребенку справ-
ляться со своим тревожным состоянием и быстрее
адаптироваться к постоянно меняющимся школь-
ным условиям (увеличение учебной нагрузки, пере-
ход из одного школьного звена в другое, смена дет-
ского коллектива, новые преподаватели, новые
учебные предметы и многое другое).
Предсказуемость внешних событий, возмож-
ность подготовки к ним и их контролирования, зна-
чительно снижает уровень тревоги и тревожного
состояния. Также на уменьшение отрицательного
влияния тревожного состояния на жизнедеятель-
ность ребенка влияют его волевые качества. «Про-
явление волевых качеств (силы воли) – это, прежде
всего, переключение сознания и волевого контроля
с переживания неблагоприятного состояния на ре-
гуляцию деятельности (на ее продолжение, подачу
внутренней команды к началу деятельности, к со-
хранению качества деятельности)» (Е.П. Ильин)
[1]. Также не стоит забывать и про индивидуальные
особенности нервной системы и личности в целом.
Дети и подростки со слабым типом нервной си-
стемы более подвержены неблагоприятному воз-
действию стрессогенных факторов в сторону уве-
личения тревоги и наоборот, с сильным типом
нервной системы менее подвержены влиянию тех
же неблагоприятных стрессогенных факторов. Та-
ким образом, мы обозначили некоторые факторы,
уменьшающие возможное неблагоприятное воз-
действие стресса на психическое состояние инди-
вида (ребенка), Но к сожалению сегодня нередко
можно встретить детей с незрелой волевой сферой
и слабым типом нервной системой, что заведомо их
определяет в группу риска с повышенным уровнем
тревожности, а значит мы не можем говорить об их
безопасном устойчивом развитии.
Следующим шагом в преодолении тревожно-
сти у детей и подростков будет диагностика и са-
модиагностика. Своевременное обращение к спе-
циалисту, получение консультативной и диагности-
ческой помощи в определении актуального
психического состояния, поможет определить,
насколько тревога и тревожное состояние детей и
подростков является критическим и требует психо-
логического или медикаментозного вмешательства.
Информирование, в свою очередь, позволит само-
стоятельно провести первичную самодиагностику,
что и может в дальнейшем быть поводом обраще-
ния к специалисту.
Своевременная помощь специалистов – тре-
тий шаг по преодолению тревожного состояния и
дезадаптивного поведения. Консультирование,
психокоррекционная и медикаментозная помощь,
при необходимости лечение. При этом, важным
направлением психологической помощи по сниже-
нию уровня тревожности у детей и подростков яв-
ляется развитие у них некоторых свойств личности,
такие как локус контроль, психологическая устой-
чивость, самооценка и доминирующее настроение.
Предполагается, что данные свойства влияют на
психическое состояние и могут управлять тревогой
и тревожным состоянием индивида. Локус кон-
троль определяет, насколько человек может кон-
тролировать окружающую обстановку и влиять на
нее (Д. Роттер). Считается, что с низкой самооцен-
кой люди менее способны адекватно оценивать
свои возможности в трудных ситуациях, они
склонны занижать свои способности к действиям в
стрессовых ситуациях и соответственно изна-
чально прибегают к стратегиям избегания или без-
действия [1]. Несмотря на то, что в психологиче-
ской литературе природа настроения рассматрива-
ется разными исследователями по разному, (С.Л.
Рубинштейн, П.М Якобсон, К.К. Платонов), боль-
шинство рассматривают настроение как общее эмо-
циональное состояние, которое в течении опреде-
ленного времени окрашивает переживания и дея-
тельность человека и таким образом может влиять
на их психическое состояние. Считается, что жиз-
нерадостные люди более устойчивы, способны со-
хранять контроль и критичность в сложных ситуа-
циях.
Таким образом, развивая определенные свой-
ства личности у детей и подростков (локус кон-
троль, психологическая устойчивость, само-
оценка) и создавая определенное эмоциональное
состояние/настроение, мы можем способствовать
изменению их психического состояния и снижению
уровня тревоги, тем самым обеспечивая их безопас-
ное устойчивое развитие.
Методы и стратегии, позволяющие справ-
ляться с тревогой и беспокойством в специально со-
зданных условиях – это обучение приемам саморе-
гуляции, выработка определенных навыков поведе-
ния в возможных стрессовых ситуациях [5;7],
развитие психологической устойчивости через пре-
одоление условно опасной ситуации в специально
созданной игровой ситуации [8;9], повышение уве-
ренности в себе и самопринятие.
Четвертым и не менее важным шагом по сни-
жению тревоги и обеспечению безопасного устой-
чивого развития детей и подростков будет самопо-
мощь: использование навыков саморегуляции и ре-
лаксации для восстановления
54 Sciences of Europe # 60, (2020)
психоэмоционального состояния, поиск личност-
ного ресурса преодоления последствий стрессоген-
ных факторов. Для этого важно обучить детей и
подростков различным способам совладания с тре-
вогой и тревожным состоянием (упражнения на ды-
хание, на саморегуляцию, на релаксацию). И в этом
случае образовательная среда и все участники об-
разовательного пространства (педагоги, психологи,
родители, старшие подростки) могут взять на себя
данную задачу по оказанию помощи себе и другим
в преодолении тревожности. Старших подростков
можно заинтересовать тем, что запустить, так попу-
лярный сегодня в среде молодежи, flash mob: «По-
моги себе и другу» и т. д. Научить правильно ды-
шать, запускать «спящие» механизмы саморегуля-
ции, распределять и дозировать время для занятий
и отдыха, обучить навыкам бесконфликтного обще-
ния (конфликтное общение часто является допол-
нительным стрессогеном и причиной повышения
тревоги). Все эти приемы в комплексе и есть тот
путь решения проблемы по преодолению тревож-
ности, и путь к безопасному устойчивому разви-
тию.
Еще одним способом совладания со стрессом,
тревогой и тревожным состоянием и наиболее оп-
тимальным, на наш взгляд, является личностный
ресурс или индивидуальный стиль преодоления.
Следуя многомерной модели внутренней
устойчивости BASIC PH, (кратко изложенной и
представленной Израильским профессором Мули
Лаад) [6;8], каждый человек обладает врожденным
индивидуальным стилем преодоления последствий
и отрицательного влияния стресса на человека и его
жизнедеятельность. Организм человека, наша пси-
хика и сознание обладает природным свойством са-
мосохранения и восстановления при чрезмерных
интеллектуальных и психофизических нагрузках и
вредоносных воздействиях стрессогенных факто-
ров. Часто эта способность находится в «спящем»
состоянии, или мы ничего об этом свойстве и спо-
собности своего организма не знаем и не исполь-
зуем ее. Важно распознать этот индивидуальный
стиль и пользоваться в ситуациях стресса и надви-
гающейся, накрывающей вас тревоги. Чтобы опре-
делить свой индивидуальный стиль преодоления,
достаточно вспомнить или понаблюдать за собой,
что вы предпринимаете и как себя ведете в ситуа-
ции беспокойства и повышенной тревоги, в ситуа-
ции неопределенности или после ситуации, окра-
шенной отрицательными эмоциями (конфликт,
ссора). Необходимо обратить внимание, что проис-
ходит с вами в этот момент: ваша рука тянется к хо-
лодильнику или вы спешите в спортзал или на бе-
говую дорожку. Вы скорее хотите поделиться своей
историей и переживаниями с подругой или близ-
кими, или вам хочется мысленно обратиться и пе-
ренестись в то комфортное безопасное для вас ме-
сто, где все так, как вам хочется. Такой способ вос-
становления и личностного ресурса и есть ваш
индивидуальный стиль преодоления стрессовой си-
туации и способ совладания с тревогой. Таких спо-
собов может быть не один и если вы заранее будете
знать об этом, то в нужный момент, когда вам ста-
новится тревожно, беспокойно, вы можете восполь-
зоваться своим способом и снять таким образом
напряжение, излишнее возбуждение и тревогу.
Подводя итоги нашему теоретическому ис-
следованию тревожности у детей и подростков в
аспекте их безопасного устойчивого развития, хо-
телось бы еще раз подчеркнуть следующее:
Одним из элементов, влияющих на безопасное
устойчивое развитие является повышенный тре-
вожный социальный фон общества в связи с высо-
ким уровнем стрессогенности нашей жизни и как
следствие этого воздействия - повышенная тревож-
ность у детей и подростков.
Пути решения проблемы тревоги и тревожного
состояния детей и подростков - это некоторая по-
шаговая модель оказания помощи в преодолении
тревожности: информирование, диагностика и са-
модиагностика, помощь специалистов, самопо-
мощь.
Предсказуемость внешних событий и возмож-
ность подготовки к ним и их контролирования, про-
явление волевых качеств (переключение сознания и
волевого контроля с переживания неблагоприят-
ного состояния на регуляцию деятельности), а
также индивидуальные особенности нервной си-
стемы и личности в целом, необходимо учитывать
как факторы, уменьшающие возможное неблаго-
приятное воздействие стресса на психическое со-
стояние индивида (ребенка/подростка).
Локус контроль, психологическую устойчи-
вость, самооценку и настроение можно рассматри-
вать, как факторы управления психическими состо-
яниями и как основу безопасного устойчивого раз-
вития.
Образовательная среда может быть как усло-
вие обеспечения безопасного устойчивого разви-
тия, а профилактика тревожных состояний, обуче-
ние навыкам бесконфликтного общения и поиск
личностного ресурса и индивидуального стиля пре-
одоления, как модель устойчивого безопасного раз-
вития школьника.
Литература
1. Карвасарский Б.Д. Клиническая психология:
учебник/ под ред Б.Д. Карвасарского, -СПб; Питер,
2002 – 960 с. (Серия «Национальная медицинская
библиотека»)
2. Ремеева А.Ф. Колотова Ю.З. Специфика
страхов детей из неблагополучных семей и их кор-
рекция [Электронный ресурс] // Психология и
право 2012. №1,2. URL: http://psyjour-
nals.ru/psyandlaw (дата обращения: 28.04.2020).
3. Ремеева А.Ф. Пальчиков И.А. Особенности
иррациональных установок девиантных подрост-
ков [Электронный ресурс] // Психология и право
2013. №2. С. 66-76
URL:http://psyjournals.ru/psyandlaw (дата обраще-
ния: 28.04.2020).
4. Соловьева С.Л. Тревога и тревожность: тео-
рия и практика [Электронный ресурс] // Медицин-
ская психология в России: электрон. науч. журн. –
Sciences of Europe # 60, (2020) 55
2012. – N 6 (17). – URL: http://medpsy.ru (дата обра-
щения: 28.04.2020).
5. Теплова А.Б., Чернушевич В.А. Ресурсы
народной игры как социокультурного средства про-
филактики девиантного поведения // Культурно-ис-
торическая психология. 2017. Том 13. № 3. С. 51–
59. doi:10.17759/chp.2017130307
6. Чернов С.А., Чернова О.В. Модель систем-
ной развивающей психолого-педагогической по-
мощи подросткам // Современные проблемы науки
и образования. – 2016. – № 3.; URL:
http://www.science-
education.ru/ru/article/view?id=24571 (дата обраще-
ния:17.03.2020).
7. Чернушевич В.А., Куприянова Е.А., Бобры-
шова Е.И. Народная игровая культура как средство
формирования норм общения в детском возрасте
[Электронный ресурс] // Психология и право. 2016.
Том 6. № 2. С. 93–106.
doi:10.17759/psylaw.2016060207 (дата обращения:
28.04.2020).
8. Чупракова Н.Н. Игровая технология преодо-
ления как профилактика социальных рисков с це-
лью обеспечения безопасного развития детей и под-
ростков в современных условиях»/ Коченовские
чтения «Психология и право в современной Рос-
сии». Сборник тезисов участников Всероссийской
конференции по юридической психологии с между-
народным участием. М.: МГППУ, 2018. 345 с.
http://conf.childpsy.ru/the_kochenov_conference
(дата обращения: 28.04.2020).
9. Чупракова Н.Н. Играя, преодолеваем! Тех-
нология преодоления или как не стать жертвой и
уметь противостоять насилию (профилактика наси-
лия в образовательной среде) // Основные вопросы
теории и практики педагогики и психологии. –
Омск: ИЦРОН, 2016. С. 192-193. [Электронный ре-
сурс]. – https://elibrary.ru/item.asp?id=26078707&
(дата обращения: 28.04.2020).
VOL 4, No 60 (2020)
Sciences of Europe
(Praha, Czech Republic)
ISSN 3162-2364
The journal is registered and published in Czech Republic.
Articles in all spheres of sciences are published in the journal.
Journal is published in Czech, English, Polish, Russian, Chinese, German and French.
Articles are accepted each month.
Frequency: 24 issues per year.
Format - A4
All articles are reviewed
Free access to the electronic version of journal
All manuscripts are peer reviewed by experts in the respective field. Authors of the manuscripts bear responsibil-
ity for their content, credibility and reliability.
Editorial board doesn’t expect the manuscripts’ authors to always agree with its opinion.
Chief editor: Petr Bohacek
Managing editor: Michal Hudecek
• Jiří Pospíšil (Organic and Medicinal Chemistry) Zentiva
• Jaroslav Fähnrich (Organic Chemistry) Institute of Organic Chemistry and Biochemistry
Academy of Sciences of the Czech Republic
• Smirnova Oksana K., Doctor of Pedagogical Sciences, Professor, Department of History
(Moscow, Russia);
• Rasa Boháček – Ph.D. člen Česká zemědělská univerzita v Praze
• Naumov Jaroslav S., MD, Ph.D., assistant professor of history of medicine and the social
sciences and humanities. (Kiev, Ukraine)
• Viktor Pour – Ph.D. člen Univerzita Pardubice
• Petrenko Svyatoslav, PhD in geography, lecturer in social and economic geography.
(Kharkov, Ukraine)
• Karel Schwaninger – Ph.D. člen Vysoká škola báňská – Technická univerzita Ostrava
• Kozachenko Artem Leonidovich, Doctor of Pedagogical Sciences, Professor, Department
of History (Moscow, Russia);
• Václav Pittner -Ph.D. člen Technická univerzita v Liberci
• Dudnik Oleg Arturovich, Doctor of Physical and Mathematical Sciences, Professor, De-
partment of Physical and Mathematical management methods. (Chernivtsi, Ukraine)
• Konovalov Artem Nikolaevich, Doctor of Psychology, Professor, Chair of General Psy-
chology and Pedagogy. (Minsk, Belarus)
«Sciences of Europe» -
Editorial office: Křižíkova 384/101 Karlín, 186 00 Praha
E-mail: info@european-science.org
Web: www.european-science.org

VOL 4, No 60 (2020)

  • 1.
    VOL 4, No60 (2020) Sciences of Europe (Praha, Czech Republic) ISSN 3162-2364 The journal is registered and published in Czech Republic. Articles in all spheres of sciences are published in the journal. Journal is published in Czech, English, Polish, Russian, Chinese, German and French. Articles are accepted each month. Frequency: 24 issues per year. Format - A4 All articles are reviewed Free access to the electronic version of journal All manuscripts are peer reviewed by experts in the respective field. Authors of the manuscripts bear responsibil- ity for their content, credibility and reliability. Editorial board doesn’t expect the manuscripts’ authors to always agree with its opinion. Chief editor: Petr Bohacek Managing editor: Michal Hudecek • Jiří Pospíšil (Organic and Medicinal Chemistry) Zentiva • Jaroslav Fähnrich (Organic Chemistry) Institute of Organic Chemistry and Biochemistry Academy of Sciences of the Czech Republic • Smirnova Oksana K., Doctor of Pedagogical Sciences, Professor, Department of History (Moscow, Russia); • Rasa Boháček – Ph.D. člen Česká zemědělská univerzita v Praze • Naumov Jaroslav S., MD, Ph.D., assistant professor of history of medicine and the social sciences and humanities. (Kiev, Ukraine) • Viktor Pour – Ph.D. člen Univerzita Pardubice • Petrenko Svyatoslav, PhD in geography, lecturer in social and economic geography. (Kharkov, Ukraine) • Karel Schwaninger – Ph.D. člen Vysoká škola báňská – Technická univerzita Ostrava • Kozachenko Artem Leonidovich, Doctor of Pedagogical Sciences, Professor, Department of History (Moscow, Russia); • Václav Pittner -Ph.D. člen Technická univerzita v Liberci • Dudnik Oleg Arturovich, Doctor of Physical and Mathematical Sciences, Professor, De- partment of Physical and Mathematical management methods. (Chernivtsi, Ukraine) • Konovalov Artem Nikolaevich, Doctor of Psychology, Professor, Chair of General Psy- chology and Pedagogy. (Minsk, Belarus) «Sciences of Europe» - Editorial office: Křižíkova 384/101 Karlín, 186 00 Praha E-mail: info@european-science.org Web: www.european-science.org
  • 2.
    CONTENT ECONOMIC SCIENCES Andreeva N.,Gavrichenko E. STRUCTURAL CHANGES IN EDUCATIONAL INSTITUTIONS AS A BASIS FOR THE USE OF LABOR RESOURCES IN THE CONTEXT OF DIGITALIZATION OF THE COUNTRY .............................................................3 Andresian I. THE ROLE AND PLACE OF MEGAPROJECTS IN FORMATION THE REGION'S INFRASTRUCTURE ..........8 Skliarenko О., Androsiuk G., Kyiak Iu., Ponomarenko V., Kovalchuk I., Herasov S., Rizhikh V. INNOVATIVE DEVELOPMENT OF UKRAINE'S ECONOMY .................................................................10 Burilina M. JUSTIFICATION FOR THE CONSTRUCTION OF MODELS OF SPREAD OF THE VIRUS POSTRANSTVENNYH THE EXAMPLE OF A PANDEMIC 2020...............................14 Gasumov E. FORMATION OF A STRATEGY OF INNOVATIVE DEVELOPMENT OF THE GAS INDUSTRY OF AZERBAIJAN BASED ON ANALYSIS OF INFLUENCING FACTORS....................................................................18 Pryadko S., Zyuban V., Babayants D. UTILITARIAN ANALYSIS OF BUSINESS COMMUNICATION IN THE PROCESS OF PROVIDING COMPANY SERVICES..................................................25 Makazan E., Rossinskaya L. MAIN PREREQUISITES FOR THE DEVELOPMENT OF A LOGISTIC APPROACH TO MANAGEMENT OF ENGINEERING ENTERPRISES OF UKRAINE.................28 Mineeva V., Syrlybaeva V. ENSURING CORPORATE RESPONSIBILITY IN THE DIGITAL ECONOMY....................................................36 Shalashna A. BUDGET AS AN TOOL OF ECONOMIC DEVELOPMENT ...................................................................................39 JURIDICAL SCIENCES Knysh V., Maruk T. PROBLEMS OF CODIFICATION OF MEDICAL LEGISLATION OF UKRAINE.........................................44 PEDAGOGICAL SCIENCES Aleksandrova E., Barbasheva S. MODERN EDUCATIONAL TECHNOLOGIES IN THE TEACHING FOREIGN LANGUAGES TO POSTGRADUATE STUDENTS .................................................................48 Chuprakova N. ANXIETY IN CHILDREN AND ADOLESCENTS: SOLUTIONS TO THE PROBLEM ..................................51
  • 3.
    Sciences of Europe# 60, (2020) 3 ECONOMIC SCIENCES СТРУКТУРНЫЕ СДВИГИ В ОБРАЗОВАТЕЛЬНЫХ УЧРЕЖДЕНИЯХ КАК ОСНОВА ИСПОЛЬЗОВАНИЯ ТРУДОВЫХ РЕСУРСОВ В УСЛОВИЯХ ЦИФРОВИЗАЦИИ СТРАНЫ Андреева Н.В. доктор экономических наук, профессор, профессор кафедры «Экономики инноваций и финансы», ФГБОУ ВО «Владимирский государственный университет имени Александра Григорьевича и Нико- лая Григорьевича Столетовых», ВлГУ Гавриченко Е.В. кандидат экономических наук, доцент кафедры «Экономики инноваций и финансы», ФГБОУ ВО «Владимирский государственный университет имени Александра Григорьевича и Нико- лая Григорьевича Столетовых» STRUCTURAL CHANGES IN EDUCATIONAL INSTITUTIONS AS A BASIS FOR THE USE OF LABOR RESOURCES IN THE CONTEXT OF DIGITALIZATION OF THE COUNTRY Andreeva N. Doctor of Economic Sciences, professor, Professor of the Department of innovation Economics and Finance, doctor of Economics FGBOU VO «Vladimirskij gosudarstvennyj universitet imeni Aleksandra Grigor'evicha i Nikolaya Grigor'evicha Stoletovyh», VlGU Gavrichenko E. associate Professor of the Department of innovation Economics and Finance, Ph. D. in Economics FGBOU VO «Vladimirskij gosudarstvennyj universitet imeni Aleksandra Grigor'evicha i Nikolaya Grigor'evicha Stoletovyh», VlGU DOI: 10.24412/3162-2364-2020-60-4-3-8 АННОТАЦИЯ Цель работы. В статье рассматривается развитие сферы услуг высшего образования под влиянием цифровой трансформации. Обосновывается необходимость роста объемов рынка онлайн – образования и обострение конкуренции между участниками. Метод или методология проведение работы. Проведен статистический анализ изменений проис- шедших в сфере услуг высшего образования. Обосновывается необходимость и целесообразность в повы- шении компетенций собственных кадров и формирование таких подходов, к подготовке трудовых ресур- сов, которые обладают востребованными компетенциями на рынке труда. Результаты. Выявлены тенденции определяющие дальнейшее развитие услуг высшего образования. Авторы разработали модель взаимодействия между участниками рынка образовательных услуг. Данная модель предусматривает взаимовыгодное сотрудничество с предприятиями – партнерами и позволяет осу- ществлять вузам качественную подготовку кадров. Данный подход по закреплению у обучающихся прак- тических навыков при прохождении всех видов практик обеспечивает формирование востребованных ком- петенций на рынке труда; формирует более тесное взаимовыгодное сотрудничество между вузом и бизнес – структурами. А использование онлайн – форматов в обучении для основного образовательного учрежде- ния и дополнительного образования в сочетании с цифровой трансформацией повысит качество обучения и привлечет дополнительный контингент обучающихся как источника привлечения средств, усилит имидж вуза, его рейтинговые показатели и повысит инвестиционную привлекательность региона. Сделан- ные предложения обеспечат повышение цифровых компетенций сотрудников вуза, создадут условия для работы с большими массивами данных и обеспечат условия государству для дополнительного финанси- рования пилотных проектов в области цифровых технологий, будут способствовать внедрению цифровых инноваций и повышению цифровой культуры сотрудников и обучающихся. Область применения результатов. Результаты проведенного исследования могут быть применены при прогнозировании структурных изменений в сфере услуг высшего образования и позволяют повысить качество обучения. Выводы. Делается вывод, что приоритетным в развитии сферы услуг высшего образования является переход на онлайн – образование, что повысит привлекательность вузов, а также инвестиционные возмож- ности регионов и уровень цифровой грамотности общества. ABSTRACT Objective of the study. The article examines the development of the sector of higher education services under the impact of digital transformation. The necessity of market volume increase of online education services and the intensification of competition between the participants are substantiated.
  • 4.
    4 Sciences ofEurope # 60, (2020) Method or methodology of the research. The statistical analysis of changes taken place in the sphere of higher education services is conducted. The necessity and feasibility of improving the competencies of internal personnel and the formation of such approaches to the preparation of labor force that have solicited labor market competencies are substantiated. Results of the research. The trends determining the further development of the market of higher education services are identified. The model of interaction in the market of education services elaborated by the authors allows universities to provide a quality training for students through mutually beneficial cooperation with partner enterprises to consolidate students' practical skills when they are going through the full range of internships; pro- vides the formation of the necessary labor market competencies; builds a closer mutually beneficial cooperation between university and business entities. Whereas the usage of online learning formats by an educational institu- tion of additional education combined with digital transformation would enhance the quality of education and attract an extra pool of students as a source of fund-raising, improve the image of a university, its rating indicators and increase the investment attractiveness of the region. The given suggestions would provide an improvement of digital competencies of university employees, work with large amounts of data and establish conditions for the government for additional funding for pilot projects in the field of digital technologies, contribute to the imple- mentation of digital innovations and improvement of the digital culture of employees and students. Areas of application of the results. The results of the conducted research may be applied in predicting struc- tural changes in the sphere of higher education services. Conclusions. It is concluded that the priority in the development of the sector of higher education services is the transition to online education that would enhance the attractiveness of universities as well as investment op- portunities of the regions and the level of digital transformation of the society. Ключевые слова: рынок услуг, проблемы высшего образования, трудовые ресурсы, цифровая транс- формация, онлайн – образование. Keywords: service market, problems of higher education, labor force, digital transformation, online educa- tion. В статье рассматриваются изменения в разви- тии сферы услуг высшего образования под влия- нием цифровой трансформации. Обосновывается необходимость роста объемов услуг онлайн-обра- зования и привлекательности учебного заведения расположенного на данной территории. Приво- дятся доводы в необходимости и целесообразности повышения компетенций собственных кадров и формирование таких подходов к трудовым ресур- сам, которые обладают востребованными компе- тенциями на рынке труда. Потенциал образователь- ной организации реализуется в определенных сфе- рах деятельности. Обосновывается необходимость и целесообразность в формировании системы взаи- модействия между предпринимательскими струк- турами и образовательными учреждениями. Рас- сматривается возможность разработки механизмов в повышении компетенций собственных кадров и возможность в формировании механизмов, кото- рые повысят престиж и значимость учебного заве- дения. Выявлена связь между потенциалом выс- шего учебного заведения и его дополнительным финансированием. Предлагается в качестве прио- ритета развития переход на электронное образова- ние, онлайн– обучение, что повысит финансовые возможности вузов, инвестиционную привлека- тельность региона и уровень цифровой трансфор- мации общества. Ключевые слова: рынок услуг, проблемы выс- шего образования, трудовые ресурсы, цифровая трансформация, онлайн – образование. Введение. В условиях мирового экономиче- ского кризиса и пандемии важное значение приоб- ретает развитие рынка труда и использование тру- довых ресурсов, которые должны соответствовать современным потребностям экономики при пере- ходе к цифровизации в Российской Федерации. Так, зарубежные авторы отмечают, что трансформация связана с применением цифровых технологий и яв- ляется стратегическим приоритетом в развитии бизнеса. [1,2,3]. Эти изменения затронут и трудо- вые ресурсы, которые должны быть подготовлены к происходящим структурным сдвигам. В этих условиях учреждения высшего образования вы- нуждены изменять сложившиеся систему образова- ния и искать новые подходы соответствующие тре- бованиям цифрой экономики. Структурные сдвиги в экономике способствовали изменению взаимо- действия образовательных учреждений с хозяй- ствующими субъектами, которые выставляют опре- деленные требования к уровню подготовки трудо- вых ресурсов. Поэтому возникает необходимость в формировании системы взаимодействия между предпринимательскими структурами (заказчиком) и образовательными учреждениями. Цифровизация экономики поднимает проблему качества подго- товки кадров определенной квалификации облада- ющих необходимыми компетенциями на другой уровень. Методы исследования. Проведенный стати- стический анализ изменений происшедших в сфере услуг высшего образования обосновывается на необходимости и целесообразности в повышении компетенций собственных кадров и формирование таких подходов, к подготовке трудовых ресурсов, которые обладают востребованными компетенци- ями в условиях цифровой трансформации. Одной из приоритетных задач при трансфор- мации общества, в связи с переходом к цифровиза- ции экономики является подготовка трудовых ре- сурсов соответствующих веяниям времени. Сле- дует отметить, что государство принимает важные решения для укрепления экономики страны и каче-
  • 5.
    Sciences of Europe# 60, (2020) 5 ственного изменения состава трудовых ресур- сов.[4,5].Так, разработанная программа «Цифровая экономика» включает подпрограмму «Кадры для цифровой экономики», в которой уделяется внима- ние вопросам внедрения цифры во все виды дея- тельности, обеспечив при этом цифровую грамот- ность населения посредством подготовки и пере- подготовки кадров через платформу онлайн- образования. Проведенные исследования по анализу чис- ленности трудовых ресурсов по возрастным груп- пам в период с 2016г по 2019 г. лиц трудоспособ- ного возраста свидетельствуют о том, что возраст- ная группа от 15- 29 лет сократилась на 15,5 %, доля лиц от 30-49 лет увеличилась на 4,4 %, группа лиц 50-54 лет сократилась на 13,7 %, а доля лиц старше 55 лет увеличилась на 9,5 %. [6]. В целом 27 % тру- доспособного занятого населения составляют лица от 50 лет и старше, которым требуется постоянно повышать свой уровень компетенций, осваивая но- вые цифровые технологии без отрыва от основной деятельности. Менее 20% молодого населения в возрасте 15-29 лет требуется качественное образо- вание в образовательных учреждениях, чтобы со- хранить востребованность на рынке труда. И более 50% трудоспособного занятого населения регу- лярно необходимо повышать свою квалификацию для конкуренции среди трудовых кадров. Наметившиеся структурные сдвиги в эконо- мике страны привели к снижению численности сту- дентов, сокращению числа образовательных орга- низаций и структурным сдвигам ввиду изменения спроса на эти услуги. На основании проведенного анализа показате- лей развития рынка образовательных услуг можно отметить снижение объемов финансирования на 11,5% и объема рынка услуг высшего образования на 7%, а численности студентов – почти на 238 тыс. чел. или на 5,4% [7,8,9,10]. Проводившееся анкетирование руководителей компаний из 20 стран мира [11] анализ данных ко- торых был представлен в докладе на Международ- ном экономическом форуме, который состоялся в 2018 году, подтвердил необходимость и целесооб- разность повышения квалификации сотрудников или переподготовки трудовых ресурсов. Учреждения высшего образования смогут осу- ществлять успешную деятельность, обеспечивая способность удовлетворять потребностям заказчи- ков образовательных услуг, создавая и предостав- ляя широкий перечень и доступность образователь- ных программ, как базового образования, так и до- полнительного на платной основе. Задача деятельности образовательных учре- ждений высшего образования (вузов) предполагает изучение взаимодействия участников рынка обра- зовательных услуг и формирование взаимовыгод- ного механизма, что определяется методическим инструментарием и дает оценку показателям дея- тельности вузов, формирующих их рейтинг. Несмотря на значительное число исследований и публикаций по этой теме в настоящее время от- сутствует единый методический инструментарий по оценки и повышению деятельности учреждений высшего образования на рынке образовательных услуг. Проведя анализ, существующих методических подходов к обоснованию рейтинговых показателей, авторами было выявлено, большое их разнообразие по критериям оценки вузов [12, 13, 14, 15, 16]. Например, агентство RAEX использует для оценки рейтингов только 3 показателя и выявляет 100 луч- ших вузов, а американский журнал U.S. News & World Report представил рейтинг лучших вузов мира, в который вошли 1678 университетов из 86 стран, в том числе 19 представителей российской высшей школы, оценка производилась по 13 инди- каторам. Обобщая критерии оценки вузов, предлагаем выделить следующие наиболее значимые с точки зрения авторов, а именно: качество образования, организацию непрерывного образования (дополни- тельного образования), имидж вузов (бренд, узна- ваемость и т.д.). Поскольку, учебные учреждения взаимодей- ствуют с заказчиками (бизнес – партнерами, домо- хозяйствами, Центрами занятости населения, и т.д.), которые выступают в качестве хозяйствую- щих субъектов для удовлетворения собственных потребностей в трудовых ресурсах, то они заинте- ресованы во взаимодействии с образовательными учреждениями, предоставляющими образователь- ные услуги на рынке труда, по вопросам повыше- ния компетенций собственных кадров и, получении новых кадров с востребованными компетенциями на рынке труда. Кроме этого на такое взаимодей- ствие оказывают существенное влияние государ- ственные структуры в лице Министерства науки и высшего образования, которое диктует правила предоставления образовательных услуг и контро- лирует образовательную деятельность, и обще- ственные институты, формирующие рейтинги кон- курентоспособности учебных учреждений. При этом каждый из участников обладает определен- ными функциями. Так, Государственные структуры: − реализуют образовательный процесс в со- ответствии с его стратегией развития, устанавли- вают объемы предоставления образовательных услуг по всем направлениям подготовки и формам обучения; − преследует цель повышения конкуренто- способности национальной системы образования, соответствующей международному уровню (рейтинг вузов); − инициирует развитие науки и образования, за счет вовлечения научных, профессорско-препо- давательских и студенческих коллективов для уча- стия в грантах, научных конкурсах, программах ин- новационной деятельности и т.д.; − устанавливает законодательно нормы и правила ведения образовательной деятельности высшего образования, для повышения качества услуг при овладении необходимыми компетенци- ями, введение единых новых стандартов для направлений подготовки по высшему образованию
  • 6.
    6 Sciences ofEurope # 60, (2020) с ориентацией на работодателя и профессиональ- ные стандарты; − проводит мониторинг деятельности учре- ждений высшего образования. В свою очередь Бизнес - структуры (предпри- ятия, предприятие-партнер) при взаимодействии с государственными органами на федеральном и ре- гиональном уровнях и образовательными учрежде- ниями, проводят мониторинг выпускников (обу- чившихся) для возможного трудоустройства их по профилю подготовки, а также проверяют их про- фессиональные компетенции, полученные в вузах, и влияют на рейтинговую оценку вузов страны. Ра- ботодатели запрашивают на рынке труда специали- стов необходимой квалификации с определенным набором компетенций, что дает возможность обра- зовательным учреждениям конкурировать друг с другом и способствует повышению качества обра- зования. Домашние хозяйства, в лице потенциальных студентов (обучающиеся) определяют спрос на объем образовательных услуг, который формиру- ется и определяет требования к качеству образова- ния и уровню профессиональных компетенций, на основе получения будущей профессии в конкрет- ном образовательном учреждении. Общественные институты, обеспечивают взаимосвязь между потребностью в кадрах у рабо- тодателей (бизнес - структур), общества и деятель- ностью образовательных учреждений, посредством независимых рейтинговых оценок, которые способ- ствуют дальнейшему развитию образовательных учреждений и повышению их конкурентоспособно- сти. Образовательные учреждения при взаимодей- ствии с внешней средой формируют цели и задачи по предоставлению образовательных услуг, требу- емых для современной экономики, привлекая заказ- чиков для участия в формулировании профессио- нальных компетенций по направлениям подго- товки, реализуемые с помощью внутренних ресурсов учреждений. При развитии цифровизации в РФ возникает потребность в создании онлайн - курсов и исполь- зовании их при обучении. В условиях пандемии эти курсы позволят обеспечить необходимый уровень подготовки обучающихся, а обучающиеся в отда- ленных регионах получат доступ к электронным курсам, которые подготовлены учеными ведущих университетов страны. Это позволит преподавате- лям совершенствоваться в процессе подготовки этих курсов, иметь возможность постоянно коррек- тировать их содержание с учетом особенностей об- разовательных программ используя мировой опыт и новейшие разработки, а обучающиеся получают доступ к онлайн – курсам и возможность самосо- вершенствования и развития. В последнее время наблюдается в России уве- личение рынка дополнительного образования. Спрос связан с тем, что в связи с цифровизацией страны основное образование не соответствует за- просам рынка труда и это потребовало обеспечить возросшую потребность в повышении квалифика- ции для сотрудников ряда хозяйствующих субъек- тов вузами посредством онлайн–обучения, позво- ляющее слушателям обучаться без отрыва от ра- боты и места жительства. Результаты. На основании вышеизложен- ного можно предложить в качестве приоритета раз- вития частичный переход на электронное онлайн– образование, ускоренно внедрять авторские про- граммы по переподготовки обучающихся, форми- ровать цифровую образовательную среду, повы- сить уровень взаимодействия между заинтересо- ванными сторонами, что обеспечит привлекательность вузов и их рейтинг, уровень вза- имодействия обеспечит инвестиционную привлека- тельность регионов, а так же, поднимет уровень цифровой грамотности в Российской Федерации. В условиях цифровой трансформации это обеспечит более высокий уровень взаимодействия между участниками рынка образовательных услуг. Взаимодействие участников рынка образователь- ных услуг, составленных авторами, представлено на рисунке 1. *ОП – образовательный процесс Рисунок 1. Схема взаимодействия участников рынка образовательных услуг
  • 7.
    Sciences of Europe# 60, (2020) 7 Рассматривая деятельность образовательного учреждения высшего образования (рисунок 1) ав- торы считают, что посредством взаимодействия ИПК (Института повышения квалификации), дей- ствующего в вузе, можно сформировать дополни- тельный поток обучающихся за счет вовлечения в образовательный процесс Предприятия-партнера. С одной стороны, Предприятие-партнер для вуза выступит базой практик при предоставлении вузом ВО, а с другой стороны вуз предоставит Предприя- тию-партнеру программы повышения квалифика- ции или переподготовки собственных кадров по его заказу. Таким образом, вуз и Предприятие–партнер предоставят друг другу взаимовыгодные услуги. ИПК при вузе предоставляет различные программы дополнительного обучения и переподготовки для всех хозяйствующих субъектов на платной основе, а для Предприятия-партнера оплата компенсиру- ется обеспечением практических навыков студен- тов вуза в рамках практик предусмотренных учеб- ным процессом. При внедрении цифровых технологий в обуче- ние рынок труда обеспечивается кадрами соответ- ствующего уровня, при регулярном дополнитель- ном образовании. Поскольку цифровизация затра- гивает как сферу производства, так и сферу услуг, то ряд профессий могут совсем исчезнуть и по- явятся новые, которые будут востребованы в усло- виях цифровой трансформации общества. Прогноз- ная потребность в трудовых ресурсах, которой необходимо дополнительное профессиональное об- разование по переподготовки или повышению ква- лификации представлена на рисунке 2. . Рисунок 2. Прогнозная потребность в трудовых ресурсах, требующей дополнительной подготовки. Более половины работающего населения нуж- дается в дополнительном образовании для повыше- ния своей квалификации и освоения новых компе- тенций. По оценкам экспертов «WorldSkills Рос- сия», к 2030 году дисбаланс кадров составит более 1,4 млрд. человек, а потери, связанные с несоответ- ствием квалификации работников требованиям рынка труда могут превысить 5 трилл. долла- ров[17], которые затронут все возрастные группы населения и тех, кто уже получил образование. Выводы. Таким образом, предложенная авто- рами модель взаимодействия на рынке образова- тельных услуг, позволяет обеспечить качественную подготовку обучающихся на базе предприятия– партнера по закреплению практических навыков при прохождении всех видов практик; позволит сформировать компетенции по подготовке трудо- вых ресурсов востребованных на рынке труда; обеспечить более тесное сотрудничество между ву- зом и бизнес–структурой, что будет способствовать обеспечению взаимовыгодных интересов. Такое долгосрочное сотрудничество позволит улучшить качество обучения примерно на 15% по классиче- ским формам, и будет способствовать быстрому трудоустройству выпускников по профилю полу- ченного образования. Использование онлайн–форматов обучения для высшего образования и дополнительного в со- четании с цифровой трансформацией способствует повышению качества обучения, привлечению до- полнительного контингента обучающихся как ис- точника привлечения финансовых средств, усилит имидж вуза и как следствие улучшатся рейтинго- вые показатели вуза, и повысится инвестиционная привлекательность региона. Рост объема услуг до- полнительного образования с использованием он- лайн–обучения составит 10-20% в год. Успешная деятельность вузов за счет цифро- вых компетенций сотрудников, возможности ра- боты с большим массивом данных; становится бо- лее привлекательным для государства и позволит создать дополнительное финансирование; обеспе- чит создание пилотных проектов в области цифро- вых технологий; вызовет стимулы к внедрению цифровых инноваций и повышению цифровой культуры сотрудников и обучающихся. Литература 1.Ferrera J.J., Fermandes C.L. (2019). To be оr not to be diqital that is the question: Firm innovation and performance .[Электронный ресурс]//Journal of Bisnes Research. Vol.101. - pp.583-590. - URL: 13% 46% 12% 10% 9% 10% 0% 10% 20% 30% 40% 50% 60% Требуется дополнительное образование Не требуется дополнительное образование в течении 1 месяца в течении 1-3 месяцев в течении 3-6 месяцев в течении 6-12 месяцев в течении 1 года
  • 8.
    8 Sciences ofEurope # 60, (2020) https//ideas.repec.org/a/eee/ibrese/v101y2019ic583- 590.html(дата обращения:27.12.2019). 2. Galindo-Martin. M.A., Castano-Martinez. M.S., & Mendez-Picazo. M.T. (2019). Digital transfor- mation. digital dividends and entepreneurship: A quan- titative analysis[Электронный ресурс]//journal of Bi- siness Research.Vol. 101.- pp.522-527.- URL:https//ideas.repec.org/a/eee/jbrese/v101y2019icp 522-527.html (дата обращения:06.01.2020). 3. Warner. K.S., & Waqer. M. (2019). Buldinq dy- namic capabilities for diqital transformation: An onqoinq process of strateqic renewal[Электронный ресурс]//Lonq Ranqe Planninq.Vol.52(3).-pp.326- 349.- URL:https//www.napier.ac.uk/research-and- innovation/research-search/outputs/bildinq-dynamic- capabilities-for-diqital transformation-an-onqoinq-pro- cess-of-strateqic (дата обращения:09.01.2020). 4. Указ Президента РФ от 07.05.2018№204 (ред.от 19.07.2018)»О национальных целях и стра- тегических задачах развития Российской Федера- ции на период до 2024 года»[Электронный ресурс]. URL: https:www.consultant.ru/document/cons_dos_LAW_2 97432/ (дата обращения 16.12.2019). 5. Паспорт национальной программы ”Цифро- вая экономика Российской Федерации» [Электрон- ный ресурс]. URL: https://static.goverment.ru/media/files/urKHmOgTPP nzJlaKw3M5cNLo6gczMkPF.pdf (дата обраще- ния03.01.2020). 6. Государственная стати- стика:URL:https://nangs.org/analytics/rosstat- rabochaya-sila-zanyatost-i-bezrabotitsa-v-rossii- onlajn-rar-docx. 7. Исследование российского рынка онлайн- образования[Электронный ресурс].- URL:https://edmarket.digital/ pdf (дата обращения 04.10.2020). 8. Пекер И.Ю. Рынок высшего образования в России: привлекательность и тенденции развития [Электронный ресурс] // Международный журнал гуманитарных и естественных наук.- 2018.-№8. - С.160-164.- URL: https://cyberleninka.ru/article/n/rynok-vysshego- obrazovaniya-v-rossii-privlekatelnost-i-tendenstsii- razvitiya(дата обращения10.09.2020). 9. Астратова Г.В.Проблемы и тенденции раз- вития рынка услуг высшего образования в России [Электронный ресурс] // Дискуссия. - 2016.- №9(72). – С.16-25. - URL: https://cyberleninka.ru/article/n/problemy-i-tendentsii- razvitiya-rynka-uslug-vysshego-obrazovaniya-v-rossii (дата обращения 27.12.2019). 10. Образование в цифрах. Краткий статисти- ческий сборник. [Электронный ресурс].- URL:https:www.hse.ru/data/2018/06/29/1153062641/ obr2018.pdf (дата обращения 14.12.2019). 11. The Future of Jobs Report 2018, Междуна- родный экономический фо- рум.https://www.weforum.org/reports/the-future-of- jobs-report-2018. 12. Национальный рейтинг университетов Ин- терфакс 2020 https://academia.interfax.ru/ru/ratings/?page=1&rating =1&year=2020. 13. Университеты для будущей элиты: 100 луч- ших российских вузов по версии Forbes—2020 Ирина Казьмина Forbes Staff ОБЩЕСТВО 23.06.2020 https://www.forbes.ru/ob- shchestvo/403369-universitety-dlya-budushchey-elity- 100-luchshih-rossiyskih-vuzov-po-versii-forbes. 14. ТОП-100 ВУЗов России 2020. - https://postupi.info/rating. 15. Названы лучшие вузы по версии рейтинга U.S. News Best Global Universities. - https://postupi.online/journal/reyting-vuzov/nazvany- luchshie-vuzy-po-versii-reytinga-u-s-news-best- global-universities. 16. https://postupi.online/journal/reyting- vuzov/top-10-luchshikh-vuzov-rossii-po-versii-repu- tatsionnogo-reytinga-rur. THE ROLE AND PLACE OF MEGAPROJECTS IN FORMATION THE REGION'S INFRASTRUCTURE Andresian I. master's student University of Rome Tor Vergata DOI: 10.24412/3162-2364-2020-60-4-8-10 ABSTRACT The modernisation of Sochi’s transportation system ahead of the Games included constructing more than 360km of roads, 321km of railroad tracks and 22 tunnels. The legacy of transportation department in the city of Sochi involves innovative approaches to traffic management. In preparing for the Games, the city analysed the best world practices to put together a logistical management system, the Transportation Logistic Centre, that suf- ficiently improves the efficiency of complex, reduces the need for vehicles and heightens the quality of public transport services. In so doing, it enabled to optimise traffic management during the Games and the number of vehicles used. Transport in the city of Sochi has undergone decades worth of modernisation in the space of two to three years. It will have a hugely positive impact on the lives of Sochi citizens for generations to come. Moreover, the attractiveness of the city has increased due to significant investments in infrastructure and active promotion of the city.
  • 9.
    Sciences of Europe# 60, (2020) 9 The total investment in the winter Games amounted to about 1.5 trillion rubles. Most of the funds were spent on infrastructure development. Keywords: infrastructure, real estate, Olympic Games, road management, road industry, transportation, de- velopment, agency, quality. The 2014 winter Olympics were the culmination of Russia's recent history at the beginning of the 21st century. The country's leading industries emerged from the crisis and provided a boost to the country's economy and improved its investment attractiveness in the inter- national arena. It is a great honor and responsibility to host the main sporting event on the planet. This is why Russian road builders have gathered all the accumulated poten- tial and best international experience in the field of road management in recent decades to prepare the infra- structure for the Olympic games in Sochi. In preparation for the Games, large-scale work was carried out in the city and surrounding areas to re- pair and modernize the transport system, and new high- ways, interchanges, and railway lines were put into op- eration. As a result, Sochi received more than 360 km of roads and bridges. In addition to roads, railway workers made a sig- nificant contribution to the Olympics. A combined road and railway infrastructure was built in a mountain clus- ter, almost 50 kilometers long. In General, railway workers probably served the most during the Olympics – almost four million people. And thanks to the created infrastructure, eight transfer complexes, and the modern Adler railway station, this became possible. But not only in Sochi itself, the ca- pacity at the entrances to Sochi from Tuapse was in- creased almost one and a half times. And now, during the peak holiday period, 75 pairs of passenger trains a day can come to Sochi with tourists. The main gate for visitors to the city is the inter- national airport, which was reconstructed in prepara- tion for the Games. It accepts flights from all major cit- ies in Russia, as well as from major cities in Europe and Asia. During the busiest days, the airport provided 575 take-off and landing operations per day with its new runways. And the interval between takeoff and landing was less than two minutes during peak hours. For several years, Sochi turned into a giant con- struction site, not only for sports, but also for roads. In a single city, a Titanic amount of work had to be done — to build an infrastructure from scratch, the scale of which initially seemed simply fantastic. After all, in ad- dition to stadiums and ice palaces, trampolines and hockey arenas, it is necessary to have a modern effi- cient transport and logistics system of highways to host the Olympics. As a result, the XXII winter Olympic games went down in history as the fastest: participants and guests of the Olympiad appreciated the advantages of the transport system, which allowed them to get from one sports facility to another in a matter of minutes. This was made possible thanks to the work of the Federal road Agency, the quintessence of which was the "mag- nificent ten" of new road objects. The huge amount of work, the use of innovative methods and technologies, as well as the incredible speed of construction of ob- jects and their high quality made Rosavtodor pay atten- tion to the Olympic projects of road builders and ex- perts from all over the world. Ten Olympic road facilities are a symbol and log- ical outcome of the ten-year history of the Federal road Agency of Russia, which was formed in March 2004. New highways and transport interchanges have become not only effective logistics solutions, but also unique works of art by leading designers and engineers. New road facilities are rightfully a symbol of Rus- sia's success and the progress of its road industry. Now these huge technical resources and advanced technolo- gies will be used on highways throughout our country. Thus, in the coming years, there are prerequisites for the fact that the "Olympic experience" of road build- ers will come to every region of the country and give motorists the best roads that meet the highest interna- tional standards of quality and safety. Sochi today is the most promising region in terms of investment in resort real estate. At the beginning of 2007, experts already said that the cost of housing in the city increased by an average of 20-40% over the year. According to other estimates, prices for primary housing in Sochi increased by 100%. [1] Sochi's popularity is also growing due to the con- stant mentions of the city in the press, holding various forums, congresses and international meetings there. The city becomes a kind of brand, and the more famous the brand , the higher its value. After the Olympics, the resort became a place of an active influx of tourists, followed by investors.The attractiveness of the city has increased due to signifi- cant investments in infrastructure and active promotion of the city. Housing prices in Sochi began to grow rapidly as soon as there was talk about the Olympics. We can say that square meters have risen in price in advance, and the rapid rise in prices has already taken place. Now Sochi has almost caught up with Moscow in terms of comparable real estate and most likely will not bypass the capital. Sochi real estate could have been badly shaken in price if the city lost the competition. However, the vic- tory of Sochi in the competition for the venue of the 2014 winter Olympics allowed the increased prices to be fixed at a high level. The total investment in the winter Games amounted to about 1.5 trillion rubles. Most of the funds were spent on infrastructure development. Sochi also proved to be a difficult site in terms of geological con- ditions, which required complex engineering solutions, which led to a rise in the cost of many construction pro- jects. This is not to forget that, in addition to new infra- structure, any Olympic construction leads to the devel-
  • 10.
    10 Sciences ofEurope # 60, (2020) opment of the tourism industry and promote employ- ment growth and improve the socio-economic perfor- mance of the region. References 1. The price of Sochi real estate aspire to Moscow. - URL: https://www.vedomosti.ru/re- alty/blogs/2020/07/02/833850-stolichnie-tseni-yu- zhnii-kolorit 2. Andreev, A.V. Regional economy: textbook for universities/A.V. Andreev. - St. Petersburg: Piter, 2018. - 464 p. 3. Yanin, A. N. Regional economy and manage- ment / A. N. Yanin. - M.: Prospect, 2016. - 248 p. ІННОВАЦІЙНИЙ РОЗВИТОК ЕКОНОМІКИ УКРАЇНИ Скляренко О.О. науковий співробітник Інституту фізики напівпровідників ім. В.Є. Лашкарьова НАН України, м. Київ Андросюк Г.М. науковий співробітник Інституту фізики напівпровідників ім. В.Є. Лашкарьова НАН України, м. Київ Кияк Ю.П. науковий співробітник Інституту фізики напівпровідників ім. В.Є. Лашкарьова НАН України, м. Київ Пономаренко В.В. науковий співробітник Інституту фізики напівпровідників ім. В.Є. Лашкарьова НАН України, м. Київ Ковальчук І.В. магістрантка кафедри міжнародної економіки факультету менеджменту та маркетингу Націо- нального технічного університету України “Київський політехнічний інститут імені Ігоря Сікорсь- кого”, м. Київ Герасьов С.Ю. головний спеціаліст Секретаріату Кабінету Міністрів України, м. Київ Рижих В.М. науковий співробітник Центрального науково-дослідного інституту озброєння та військової тех- ніки Збройних Сил України, м. Київ INNOVATIVE DEVELOPMENT OF UKRAINE'S ECONOMY Skliarenko О. researcher of V. Lashkaryov Institute of Semiconductor Physics NAS of Ukraine, Kyiv Androsiuk G. researcher of V. Lashkaryov Institute of Semiconductor Physics NAS of Ukraine, Kyiv Kyiak Iu. researcher of V. Lashkaryov Institute of Semiconductor Physics NAS of Ukraine, Kyiv Ponomarenko V. researcher of V. Lashkaryov Institute of Semiconductor Physics NAS of Ukraine, Kyiv Kovalchuk I. Master's student of the Department of International Economics, Faculty of Management and Marketing, National Technical University of Ukraine "Igor Sikorsky Kyiv Polytechnic Institute", Kyiv Herasov S. Chief Specialist of the Secretariat of the Cabinet of Ministers of Ukraine Rizhikh V. researcher of Central Research Institute of Armaments and Military Equipment of the Armed Forces of Ukraine DOI: 10.24412/3162-2364-2020-60-4-10-13 АНОТАЦІЯ В статті розглянуті основні проблеми створення інноваційного середовища в Україні. Однією з важ- ливих проблем на шляху інноваційного розвитку є створення сполучної ланки між авторами інновацій та інвесторами. В статті пропонується створення віртуального офісу трансферу технологій для вирішення цієї проблеми.
  • 11.
    Sciences of Europe# 60, (2020) 11 ABSTRACT The main problems of creating an innovative environment in Ukraine are considered in the article. One of the important problems on the way of innovative development is the creation of a link between the authors of innova- tions and investors. The article proposes to create a virtual technology transfer office to solve this problem. Ключові слова: інновація, трансфер технологій, інвестиції. Keywords: innovations, transfer technology, investments. Постановка проблеми. Соціально-еко- номічний розвиток країн світу, їх економічне і політичне становище та еквівалентно-ефективна участь в світовому зовнішньоекономічному обміні на світовій арені, добробут і можливості власної ре- алізації, проживаючого в них населення, визнача- ються в значній мірі конкурентоспроможністю їх національних економік. Формування права інтелектуальної власності є наслідком розвитку технологічного укладу суспіль- ства [1]. Зараз найбільший прибуток приносить інтелектуальна праця людини: саме її знання, інте- лекті творчість створюють найвищу додану вартість. Отож, підготовка наукових кадрів та ро- звиток творчого інтелекту людини є основою інно- ваційного розвитку суспільства. Новий етап реформування промисловості України характеризується впровадженням інноваційної моделі розвитку економіки за рахунок розвитку людського капіталу, науки, високих технологій та ефективного впровадження результатів науково-дослідних робіт. Успішна комерціалізація досягнень науки,що втілені в об'єкти права інтелектуальної власності, можлива лише при прямій взаємодії наукових ін- ституцій і ринку за безпосередньою участю дер- жави. Визначальною особливістю передачі резуль- татів наукових досліджень для їхнього освоєння є створення і розвиток комерційних форм взаємодії науки і виробництва за посередництва неприбутко- вих інституцій, в створені яких безпосередню участь повинна приймати держава. Аналіз попередніх публікацій. Питанню ко- мерціалізації результатів науково-технічної діяль- ності та трансферу технологій присвячено багато наукових робіт вітчизняних вчених, державою ро- зроблені та створені правові засади регулювання цієї сфери [2-16], але на жаль не вистачає узгодже- них та сформульованих концептуальних засад для чіткого поєднання сучасних інформаційних техно- логій з системою трансферу технологій. Саме цьому важливому та актуальному пи- танню присвячена дана стаття, мета її – про- аналізувати і запропонувати в стислій, зрозумілій формі шляхи поєднання інформаційних технологій з процесом комерціалізації результатів науково- технічної діяльності та просування їх на внутрішні та зовнішні ринки, їх вплив на сталий розвиток еко- номіки України. Оскільки економіка України досі має низький рейтинг по конкурентно-спроможності та освоєнню високих технологій, виникає гостра по- треба в стимулюванні інноваційної діяльності та оперативному поширені інформації про перспек- тивні розробки, в першу чергу, в галузі нанотехно- логій. Нанотехнології в усьому світі виступають рушійною силою глобального наукового прогресу в усіх сферах життя без винятку і покликані вирішувати найбільш актуальні проблеми, які раніше були не під силу людству: медицина - ство- рення наноконтейнерів для прицільної доставки ліків до уражених органів і нановипромінювачів для знищення злоякісних пухлин; екологія – стабілізація екологічної обстановки за допомогою створення безвідходного виробництва; сільське господарство – створення молекулярних роботів, які зможуть виробляти їжу; енергетика - створення нових типів фотопоглинаючих плівок, світлодіодів, штучного пального;оборона – критичні технології у сфері виробництва озброєння та військової техніки. Однією з важливих задач роботи на ринку нанотехнологій є швидке розповсюдження інфор- мації про інноваційні розробки та їхнє застосу- вання. Інтенсивні дослідження і розробки в галузі нанотехнологій і наноматеріалів в розвинених країнах супроводжуються розвитком сервісних по- слуг для більш тісного зв’язку їх творців з бізнес- структурами і представниками виробничої сфери, медицини, екології і т.д. Зокрема, в США, Велико- британії, Німеччини, Російській Федерації уже створені віртуальні офіси та відповідні бізнес-пор- тали, на яких розміщені як довідкові дані, так і опе- ративна інформація про розробки з нанотехнологій та наноматеріалів. Тому зараз в Україні існує невідкладна потреба у створенні національних ре- сурсів які б забезпечували процес трансферу техно- логій, а саме: маркетингове, консалтингове, пра- вове та інформаційне супроводження. Це дозволить оперативно розміщувати інформацію (рекламу) про існуючі розробки та вивчати попит на нові техно- логії, забезпечуючи при цьому оперативний пошук інвесторів та аналіз потреб ринку. Нажаль, подібні сервіси недостатньо розвинені в Україні. Для вирішення вищезгаданих потреб нами та представниками інших установ НАН України було розроблене технічне рішення щодо створення електронного віртуального офісутранс- феру технологій. Воно було захищене патентом на корисну модель[17]. Для впровадження технічного рішення було створено: 1. Інтернет - офіс трансферу технологій, що об’єднуватиме та координуватиме діяльність фахівців відділів трансферу з різних установ НАН України для просування розробок, здійснених за кошти Державної програми «Нанотехнології та наноматеріали». 2. Інтернет - портал «Нанотехнології та нано- матеріали», в якому розміщується інформація про дослідження і розробки, здійснені при виконанні Державної цільової науково-технічної програми «Нанотехнології та наноматеріали».
  • 12.
    12 Sciences ofEurope # 60, (2020) Це не створює додаткові відділи трансферу те- хнологій як окремі структурні одиниці, а об’єднує існуючі відділи та спеціалістів в структурі НАН Ук- раїни на Інтернет - площадці, а саме - Інтернет- офісі трансферу технологій. Залучення фахівців рі- зних установ НАН України, що мають знання у різ- них галузях науки та досвід їхнього впровадження у промисловість,дозволило охопити основні нау- кові напрями цієї програми. Спеціалісти з відділів трансферу технологій в on-line режимі обміню- ються інформацією, практичними порадами, вдос- коналюють свою кваліфікацію, не залишаючи при цьому власного робочого місця. Використовуючи можливості даного порталу, можна розміщувати інформацію про розробки, які пов’язані з науково-технічними проектами за дер- жавним замовленням. Це дозволило здійснювати оперативний моніторинг комерційної привабливо- сті та рівня науково-технічних розробок. Вищена- ведене може стати інструментом для забезпечення створення сприятливого середовища для комерціа- лізації науково-технічних розробок, підвищення інноваційної культури. В подальшому планується тісна співпраця з Європейською мережею транс- феру технологій. В розвинених країнах цейвид діяльностівже не но- вий, а на теренах України він тільки починає набирати оберти. Успіх підприємницької діяльності в науково- технічній сфері значною мірою визначається пов- нотою і якістю інформації, доступної його учасни- кам (розробникам, підприємцям, органам влади, потенційним партнерам як по просуванню проектів на ринок, так і по їхній реалізації, потенційним ін- весторам як в Україні, так і за кордоном). Але часто доступна інвесторам інформація уривчаста і не до- зволяє зробити обґрунтований вибір об'єкту інвес- тування. Учасникам інвестиційного процесу необ- хідний оптимальний обсяг інформації, пов'язаної з розробкою, для того, щоб кожен учасник мав на- году ухвалити обґрунтоване рішення за проектом. Додаткового значення для економіки створю- ваний Інтернет – портал може набути за рахунок організації його комунікаційта взаємодії з Аген- цією оборонних технологій (робоча назва), утво- рення якого на кшталт DARPA (Міноборони США) є у планах реформування оборонно-промислового комплексу, наголошених Міністерством з питань стратегічних галузей промисловості. Спільна діяль- ність з впровадження передових (ключових, крити- чних) технологій у суб‘єктах оборонно-промисло- вого комплексу всіх форм власності сприятиме ви- веденню національного виробника озброєнь на новий технологічний уклад. Перспективна ініціатива Українського інсти- туту науково-технічної експертизи та інформації та Київської торгово-промислової палати з організації біржі бізнес-контакт, що започаткована у 2018 р. для зустрічей послів іноземних держав з українсь- кими розробниками інновацій. Раніше єдиним обмеженням була відсутність інтернет-доступу, але мобільний і супутниковийІн- тернет практично знімають всі територіальні обме- ження. Інтернет – портал стає найбільш доступним комунікативним засобом [18]. Для вирішення проблем розвитку наукоємної промисловості існує декілька підходів. Один з них - це визначення пріоритетних напрямків науково- технічних досліджень, концентрація на них ресур- сів і підвищення мотивації колективів учених, роз- робників і інноваційних структур, орієнтованих ви- нятково на ринок високих технологій і відповідної продукції. Як результат - стає можливим не тільки створення ринків новітніх конкурентноспромож- них товарів і послуг, а і ринків новітніх технологій. Такий підхід обумовлений не лише необхідністю прискорення виробництва новітніх товарів та пос- луг, але і більш глибокими тенденціями скорочення всього життєвого циклу продукції та послуг. Труд- нощі реалізації такого шляху пов'язані, насамперед, з використанням інноваційних технологій менедж- менту, які раніше не існували. Тобто, прискореного розвитку наукоємної промисловості можна домог- тися тільки на інноваційному шляху розвитку, який крім інвестицій потребує створення нових ринко- вих інститутів і механізмів. З урахуванням глобалізації технологічних ри- нків, правові механізми охорони інтелектуальної власності багатьох держав в значній мірі відпрацьо- вані, в тому числі і в Україні. Але ефективні правові механізми доведення наукових результатів до про- мислової продукції в Україні відсутні, що є стриму- ючим фактором розвитку наукоємного промисло- вого виробництва. І тому в такій ситуаціі виникає гостра потреба у використанні доступних, дешевих джерел, таких як глобальна мережа Інтернет, яка не потребує до- даткових вкладень та практично доступна для всіх верств населення. Обраний інноваційний шлях розвитку України підтверджується тим, що Державне підприємство «Укрпатент» в останні роки був підпорядкований Міністерству економічного розвитку України. Висновки На думку авторів, необхідно активізувати та поєднати механізми генерування й поширення нау- ково-технічної інформації для прискорення іннова- ційного розвитку економіки України. При цьому важливо дотримуватися принципу захисту прав ін- телектуальної власності. При ефективному викори- станні Інтернет - портал може трансформуватися в технологічного Інтернет брокера, стати з’єднуваль- ною ланкою між науковцем та бізнесменом, фінан- совими установами, промисловцями. Головне за- вдання науковця створювати новації та їх ефекти- вна передача структурам, які займаються їхньою реалізацією. Визначальною особливістю передачі результа- тів наукових досліджень для їхнього освоєння є створення та подальший розвиток комерційних форм взаємодії науки і виробництва за посередниц- тва неприбуткових інституцій, створених держа- вою.
  • 13.
    Sciences of Europe# 60, (2020) 13 В процесі пошуку потенційних інвесторів необхідно передбачити весь спектр можливих про- позицій, а також оцінити характер і можливу вели- чину отримання від них інвестицій. Особливий акцент повинен бути зроблений на обміні науково-технічною інформацією про власні національні розробки. Інакше кажучи, потрібне створення високорозвиненої системи горизонталь- них інформаційних зв'язків між підприємствами, науково-дослідними організаціями, державою та її відомствами. На думку авторів, необхідно вирішити зав- дання оптимального сполучення механізму гене- рування й механізму поширення науково-технічної інформації. Комерціалізація результатів науково-тех- нічних проектів буде більш успішною, вагомою та значимою для сталого розвитку економіки, коли підтримка держави буде мати концептуальний, ста- лий та узгоджений характер, з меншими бюрокра- тичними перепонами, що в свою чергу зробить цей вид діяльності більш відкритим та привабливим для інвестора. Держава повинна збільшити асиг- нування на вітчизняну науку,безумовно, рефор- мувавши останню. З кожним роком розрив між ро- звиненими та мало розвиненими країнамидосягає критичної відмітки в сфері науково-технічної діяльності і наша держава має великі шанси зали- шитись лише сировинною плямою на карті світу. Література 1. Економіка інтелектуальної власності : нау- ково-методичні матеріали для підготовки докто- рантів, аспірантів і магістрів за напрямом «Інтелек- туальна власність» / Л. С. Шевченко, О. А. Гри- ценко, Т. М. Камінська та ін. ; за ред. д-ра екон. наук, проф. Л. С. Шевченко. – Х. : Право, 2015. – 120 с. 2. Закон України «Про державне регулю- вання діяльності у сфері трансферу технологій» від 14.09.2006 № 143-V. 3. Постанови Кабінету Міністрів України: – від 26.06.2007 № 861 «Про затвердження Порядку проведення державної акредитації фізич- них та юридичних осіб на право провадження посе- редницької діяльності у сфері трансферу техно- логій»; – від 01.08.2007 № 995 «Деякі питання ре- алізації Закону України «Про державне регулю- вання діяльності у сфері трансферу технологій»; – від 04.06.2008 № 520 «Про затвердження мінімальних ставок винагороди авторам технологій і особам, які здійснюють їх трансфер»; – від 04.11.2009 № 1178 «Про внесення змін до постанови Кабінету Міністрів України від 26 червня 2007 р. № 861». 4. Розпорядження Кабінету Міністрів України: від 06.02.2008 № 252-р «Про передачу МОН повноважень на затвердження порядку ве- дення Державного реєстру договорів про трансфер технологій». 5. Розпорядження Кабінету Міністрів України: від 30.08.2017 № 600-р «Деякі питання ро- звитку критичних технологій у сфері виробництва озброєння та військової техніки». 6. Розпорядження Кабінету Міністрів України: від 14.06.2017 № 398-р «Про схвалення Основних напрямів розвитку озброєння та військо- вої техніки на довгостроковий період». 7. Геєць В.М., Семиноженко В.П. Інноваційні перспективи України. —Харків: Константа, 2006. — 272 с. 8. Федулова Л. І. Технологічний розвиток економіки України. – Київ.: Ін-т економіки та про- гнозування, 2006. – 627 с. 9. Біла книга. Інтелектуальна власність в ін- новаційній економіці України / Т. О. Андрощук, В. О. Дем’яненко, І. Б. Жиляєв, Л. В. Сахарова, В. І. Полохало, С. В. Таран (упорядкування). – Київ.: Парламентське вид-во, 2008. – 448 с. 10. Шпак А. Передача технологій в Україні: ситуація і проблеми// Інтелектуальна власність. – 2000. – №6-7. 11. Михайлушкин А.И., Шимко П.Д., Между- народная экономика. - М.: Высшая школа, 2002. – 250 с. 12. Чумаченко Б. Международный трансфер технологий: опит американских корпорацій // Про- блеми теории и практики управления. — 1999. — №2. http://www.ptpu.ru 13. Верхюлст Г. Международная торговля тех- нологиями—лицензирование ноу-хау и промыш- ленные секреты, http://www.wipo.int 14. Сервантес М. Университетское патентова- ние: Как университеты и государственные исследо- вательские организации используют свою интел- лектуальную собственность для поощрения иссле- дований и стимулирования новаторських предприятий, http://www.wipo.int 15. Дагаев А. Передача технологий как інстру- мент государственной инновационной политики // Проблемы, теории и практики управления. — 1999. — №5. 16. Лисенко В.С., Скляренко О.О., Соловйов В.П. Фінансови інститути у сфері інноваційної діяльності // Проблеми науки. – 2004. - №9. 17. Патент України №62271 на корисну мо- дель,Україна, МПК G06F 15/173(2006.01). Спосіб ство- рення електронного центру віртуального офісу (вірту- альних офісів)трансферу технологій/Фесенко О.М.,Ти- щенко В.В., Маслов В.П., Скляренко О.О., Рагуля А.В., Луговська Г.Г., Андросюк Г.М., Кияк Ю.П., заявка u201015936 від 29.12.2010., опубл.25.08.2011, Бюл.№16. 18. http://corpsite.ru/Encyclopedia/CorpPortal/Po rtalDdefinition.aspx
  • 14.
    14 Sciences ofEurope # 60, (2020) ОБОСНОВАНИЕ ПОСТРОЕНИЕ ПОСТРАНСТВЕННЫХ МОДЕЛЕЙ РАСПРОСТРАНЕНИЯ ВИРУСА НА ПРИМЕРЕ ПАНДЕМИИ 2020 ГОДА Бурилина М.А. Государственный академический университет гуманитарных наук, старший преподаватель кафедры математической экономики JUSTIFICATION FOR THE CONSTRUCTION OF MODELS OF SPREAD OF THE VIRUS POSTRANSTVENNYH THE EXAMPLE OF A PANDEMIC 2020 Burilina M. Research Scholar State Academic Humanities University, Senior Lecturer at the Department of Mathematical Economics DOI: 10.24412/3162-2364-2020-60-4-14-18 АННОТАЦИЯ В работе рассматривается блок математической вычислимой имитационной модели, посвященный построению модели распространения вируса на территории города Москвы, помимо этого анализируется применение метода Монте-Карло для подсчета эффективности от действий правительства, направленных на сдерживание перемещения населения в период активного роста заболевших и распространение вируса. ABSTRACT The paper considers a block of a mathematical computable simulation model dedicated to the construction of a model of the spread of the virus in the territory of the city of Moscow, in addition, the application of the Monte Carlo method for calculating the effectiveness of government actions aimed at curbing population movements during the period of active growth of cases and the spread of the virus is analyzed. Ключевые слова: вычислимая имитационная модель, метод Монте-Карло, вероятностные модели, распространение вируса, пандемия. Keywords: computable simulation model, Monte Carlo method, probabilistic models, virus spread, pan- demic. В работе [1] авторы с помощью подхода мак- симального правдоподобия и эмпирического рас- пределения определили, что блокировки, введен- ные правительством Китая, предотвратили 70,5% случаев, когда зараженные люди должны были вы- ехать за пределы материкового Китая. Кроме того, во время первых трех с половиной недель внедре- ния ограничения на поездки, снизилась дневная норма вывоза на 81,3% в среднем. Используя моде- лирование методом Монте-Карло, авторы подсчи- тали, что около 64% экспортированных случаев были в бессимптомном состоянии. Авторы также обнаружили, что провинцию Хубэй снизили ско- рость распространения болезней на 81% и предот- вращено 71% случаев к 15 февраля 2020 года, по сравнению с отсутствием ограничения. Таким об- разом, меры пограничного контроля вряд ли будут сдерживать вспышку, ограничения по путеше- ствиям в китайскую но, вероятно, могут задержать дальнейший импорт коронавируса. По итогу по- строения модели, авторы получили следующие гра- фики (рисунок 1). На этом графике А обозначено как менялись симптомы у путешественников во время вспышки «2019-nCov» в течении 28 дней по- сле путешествия, получили эти результаты, с помо- щью опроса страны у самих путешественников. На графике B (рисунок 1) обозначена общая вероят- ность вывоза хотя бы одного случая заболевания. Графики D и E (рисунок 1) показывают, как повли- яло закрытие границ между регионами на ограни- чение путешествий и передвижений в провинцию Хубэй и из нее на количество заражений.
  • 15.
    Sciences of Europe# 60, (2020) 15 Рисунок 1. График сравнения заболеваемости с учетом ограничений по передвижению населения [1]. Далее рассмотрим работу [2], в ней автор мо- делирует распространение коронавируса на при- мере города Ереван, с помощью языка программи- рования Python. Работа была написана до глобаль- ного распространения вируса по всему миру, и автор рассматривает, какие меры стоило бы пред- принять для минимизации ущерба от вируса отно- сительно населения и экономики. Автор поставил целью не создать тщательно откалиброванную мо- дель распространения, а показать общие принципы построения вероятности (формула 1). В данном мо- делировании время будет дискретной переменной, поскольку состояние системы моделируется на ежедневной основе. В полностью восприимчивой популяции в точке j в момент времени t вспышка произойдет с вероятностью: tjt tjtk t kjktjt y yxmS jth , ,,,, 1 ))exp(1( ),(   + −− =  (1), где: t - скорость передачи инфекции в день t; t kjm , - отражает мобильность от местоположе- ния k к местоположению j; tkx , и tjy , - доля инфицированных и воспри- имчивых популяций в день t в местоположении k и местоположении j соответственно; k tk tk N I x , , = ; j tj tj N S y , , = , где kN и jN - раз- меры популяции в местоположениях k и j. Чтобы определить, как инфекция передается одним человеком, автор взял базовое репродуктив- ное число R0 в диапазоне от 1,4 до 4 (официальные данные на момент написания статьи). Автор рас- сматривал самый худший вариант, поэтому R0 в данном исследовании равняется 4. Динамика мо- дели определяется следующими отношениями: tjtjtj k t kjj k tktk t kjtj j tjtjtj tjtj k t kjj k tktk t kjtj j tjtjtj tjkj IRR mN xmS N IS II mN xmS N IS SS ,,1, , ,,,,,,, ,1, , ,,,,,,, ,1,    += + ++= + −−= + + +     (2), где: tk, - (случайная) скорость передачи вируса в точке k в день t;  - коэффициент, обозначающий отношение использования людьми общественного транспорта к личному автомобилю; При самом моделировании автор получил за- висимости, представленные на графике 2.
  • 16.
    16 Sciences ofEurope # 60, (2020) Рисунок 2. Моделирование распространения коронавируса в г. Ереван [2]. Видно, что пик эпидемии приходится на пе- риод с 16 по 20 день, когда инфицированная группа значительно меньше (~ 45%) и выздоравливает вдвое больше (~ 20%). К концу эпидемии доля вос- приимчивых людей также вдвое больше (~ 24% против ~ 12%), что означает, что больше людей из- бежали болезни. Оказалось, что введение карди- нальных мер по временному снижению городской мобильности (локдаун) оказывает большое влияние на динамику распространения болезней. В работе [3] авторы используют простран- ственные эконометрические характеристики для моделирования ежедневных показателей инфици- рования COVID-19 в разных странах. Используя последние достижения в области Байесовской про- странственной эконометрии, уделяется особое вни- мание зависящей от времени важности альтерна- тивных структур пространственных связей, таких как число стыковочных рейсов, отношения в меж- дународной торговле и общие границы. Гибкая настройка модели позволяет исследовать интенсив- ность и тип пространственных переливных струк- тур с течением времени. Результаты показывают за- метные пространственные механизмы распростра- нения на ранних стадиях вируса с международными связями полетов в качестве ос- новного канала передачи. На более поздних этапах, наша модель показывает резкое падение интенсив- ности пространственных побочных эффектов из-за национальных запретов на поездки, указывая на то, что ограничения на поездки привели к сокращению межстрановых побочных эффектов. В данной статье авторы используют динамиче- скую модель с пространственной авторегрессией (SAR), в частности, внимание сосредоточено на не- стационарных структурах пространственной зави- симости во время распространения вируса, кото- рый авторы стремятся смоделировать для N стран за T дней. Модель SAR можно написать следую- щим образом: tttttt yyqWy  +++= −1)( (3), где: ty - вектор N x 1 инфекций, характерных для страны в момент времени t (t=1,…,T); tt yqW )( - пространственное отставание;  - тенденции, характерные для страны; t - вектор инноваций, считается нормальным с нулевым средним и 2  ; Дискретный параметр временного варианта tq  {1, ..., P} управляет выбором пространствен- ной весовой матрицы из P альтернатив и должен быть оценен. Такая спецификация позволяет гибко проследить природу глобальных пространственных перемен во времени. Байесовские методы оценки позволяют эффективно работать с такими гибкими характеристиками смеси пространственных весо- вых матриц. Авторы переформулировали модель SAR (см. формулу 3) до вида: )())(( 1 1 ttttt yqWIy  ++−= − − (4) Пространственные вторичные эффекты отра- жены ниже и имеют вид:   = − =− 0 1 )())(( r r t r ttt qWqWI  (5) Матрица определяется параметром простран- ственной аторегрессии t , таким образом, предла- гаемая авторами модель позволяет различать внутри и межрегиональные процессы передачи ин- фекции. Поскольку инфекции, передающиеся из страны в страну, являются неотрицательными дан- ными, можно утверждать, что пространственная
  • 17.
    Sciences of Europe# 60, (2020) 17 эконометрическая спецификация данных подсчета может быть более подходящей. Поэтому в качестве эталонной модели авторы также применяют попу- лярную альтернативу в пространственной эконо- метрической литературе, предложенную Фишером и др, используя байесовскую структуру Пуассона с явной пространственной авторегрессионной струк- турой: )exp( )(~ 1 ttt tt vy y ++= −   (6), где: )( t - Распределение Пуассона; t - вектор t человек Пуассоновского про- цесса; tv - вектор, фиксирующий случайные эф- фекты, характерные для определенной страны; Применив перечисленные выше модели, ав- торы, получили следующий результат, отраженный на рисунке 3. Рисунок 3. Структура пространственной связи [3]. Таким образом, ежедневные оценки простран- ственной зависимости подтверждают, что первона- чально пространственные побочные эффекты иг- рали ключевую и статистически значимую роль в передаче вируса: в конце февраля только 4 страны в выборке (из ЕС это была Италия) ввели приоста- новку передвижения населения, и это имеет боль- шое значение. После 15 марта 2020 года, когда большинство европейских стран начали вводить ка- рантинную политику и закрытие авиасообщения, закрыли свои пограничные переходы и сократили авиаперелеты, пространственная автокорреляция становится незначительной. Однако, в середине марта пространственный параметр авторегрессии даже становится негативным на довольно короткий период. Одним из объяснений краткосрочной отри- цательной степени пространственной автокорреля- ции может быть то, что некоторые страны приме- няют особенно жесткие запреты на поездки в реги- оны с высоким уровнем инфицирования, чтобы уменьшить передачу вируса в своей стране, что приводит к различиям (отрицательная простран- ственная автокорреляция) среди пространственных единиц. К 24 марта, когда более 3,5 миллиардов че- ловек жили в той или иной форме карантина, про- странственные побочные эффекты стали незначи- тельными. Пространственная зависимость заметно уменьшилась после введения ограничения на путе- шествия в большинстве стран и оставалась незна- чительной в последующие месяцы. В целом, авторы обнаружили, что пространственная зависимость за- метно уменьшилась с течением времени, поскольку страны решили ввести региональные и глобальные ограничения на передвижение в виде закрытия гра- ниц, приостановки борьбы и даже полной блоки- ровки. Кроме того, авиасообщение играло особенно важную роль на ранних стадиях распространения вируса, что свидетельствует о том, что прекраще- ние авиасообщения действительно было важной мерой в смягчении последствий ранней передачи вируса. В работе [4] представлены результаты эконо- метрического исследования квадратичной экспо- ненциальной функции суточной численности зара- женных коронавирусом людей в Москве во времен- ных промежутках, начинающихся 12 марта и оканчивающихся в конце апреля 2020 г: Yt = eat2+bt+c (7), где Yt-количество зараженных коронавирусом жи- телей Москвы за сутки t, t-время (сутки), e-основание натурального логарифма.
  • 18.
    18 Sciences ofEurope # 60, (2020) Рисунок 4. Фактические и прогнозные на период 15 апреля – 29 июня 2020 г. На рисунке 4 отражены расчетные значения согласно работе [4], то есть значения суточной чис- ленности зараженных коронавирусом жителей Москвы, исследованной во временном промежутке 12 марта – 14 апреля. Автор берет данные для рас- чета, сдвигая пик заражений, но при этом каждый расчет подтверждает спад распространения вируса ближе к середине и концу июня. Литература 1. Chad R. Wells, Pratha Sah, Seyed M. Mogha- das, Abhishek Pandey, Affan Shoukat, Yaning Wang, Zheng Wang, Lauren A. Meyers, Burton H. Singer, and Alison P. Galvani. Impact of international travel and border control measures on the global spread of the novel 2019 coronavirus outbreak [Electronic source]. – URL: https://www.pnas.org/con- tent/pnas/early/2020/03/12/2002616117.full.pdf 2. Gevorg Yeghikyan [Electronic source]. – URL: https://towardsdatascience.com/modelling-the- coronavirus-epidemic-spreading-in-a-city-with-py- thon-babd14d82fa2 Режим доступа 25 ноября 2020. 3. Krisztin, T., Piribauer, P. & Wögerer, M. The spatial econometrics of the coronavirus pandemic. Lett Spat Resour Sci 13, 209–218 (2020). https://doi.org/10.1007/s12076-020-00254-1 4. А.А. Афанасьев Эконометрическое про- гнозирование суточной численности зараженных Уханьским коронавирусом жителей г. Москвы за период с марта по июль 2020 г. [Электронный ре- сурс] https://istina.msu.ru/conferences/presenta- tions/297636272/ Режим доступа 20 ноября 2020. ФОРМИРОВАНИЕ СТРАТЕГИИ ИННОВАЦИОННОГО РАЗВИТИЯ ГАЗОВОЙ ОТРАСЛИ АЗЕРБАЙДЖАНА НА ОСНОВЕ АНАЛИЗА ВЛИЯЮЩИХ ФАКТОРОВ Гасумов Э.Р. докторант Азербайджанского технического университета, Баку FORMATION OF A STRATEGY OF INNOVATIVE DEVELOPMENT OF THE GAS INDUSTRY OF AZERBAIJAN BASED ON ANALYSIS OF INFLUENCING FACTORS Gasumov E. doctoral student of the Azerbaijan Technical University, Baku DOI: 10.24412/3162-2364-2020-60-4-18-24 ABSTRACT The article deals with the formation of a strategy for the innovative development of the gas industry in Azer- baijan based on the analysis of influencing factors. The features of the state innovation policy of the gas industry containing a set of measures aimed at enhancing innovation, increasing efficiency and widespread use of its results in order to accelerate the socio-economic development of the industry are stated. The main stages and directions
  • 19.
    Sciences of Europe# 60, (2020) 19 of the state innovation policy in the gas industry are presented. The main directions and tasks of the gas industry are systematized on the example of the development of gas condensate fields in the framework of the implemen- tation of the innovation policy. АННОТАЦИЯ В статье рассмотрены вопросы по формированию стратегии инновационного развития газовой от- расли Азербайджана на основе анализа влияющих факторов. Изложены особенности государственной ин- новационной политики газовой отрасли содержащей комплекс мер, направленных на активизацию инно- вационной деятельности, повышение эффективности и широкое использование ее результатов в целях ускорения социально-экономического развития отрасли. Приведены основные этапы и направления госу- дарственной инновационной политики в газовой отрасли. Систематизированы основные направления и задачи газовой отрасли на примере разработки газоконденсатных месторождений в рамках реализа- ции инновационной политики. Ключевые слова: стратегия, инновационная деятельность, газовая отрасль, эффективность, научно- техническая развития, углеводородов. Keywords: strategy, innovation, gas industry, efficiency, scientific and technological development, hydro- carbons. Введение. Нынешняя состояние мировой эко- номики показывает, что страны, в которых развита инновационная деятельность, получают значитель- ное конкурентное преимущество, которое проявля- ется производимые ими продукциях и оказываемых интеллектуальных услугах, пользуются высоким спросом в тех странах, где инновации развиты слабо и специализируются на производстве сырье- вых ресурсов. В современном Азербайджане, который явля- ется динамично развивающейся страной, повышен- ное внимание уделяется развитию инновационной деятельности (ИД). Инновационная политика, про- водимая азербайджанским государством, подразу- мевает создание необходимых условий для произ- водства, распространения и внедрения новых зна- ний и технологий. Одна из важнейших черт, характеризующих развитие национальной эконо- мики в современный период, - рационализация ИД в отраслях экономики. Нефтегазовая отрасль (и ее ядро SOCAR) является одним из основных секторов народного хозяйство Азербайджана, и эффектив- ность управления инновациями в данной отрасли определяет ИД целом в стране. Государственная нефтяная компания Азербайджанской Республики (ГНКАР, SOCAR) осуществляет все работы по нефтегазовому сектору в Азербайджане. Это тра- диционная для международного нефтегазового мира, если на территории страны имеются место- рождения углеводородов (УВ) с запасами, позволя- ющими осуществлять экспорт, то эта отрасль кон- тролируется государством [1-3]. В связи чем, иссле- дования вопроса о формировании стратегии инновационного развития газовой отрасли Азер- байджана на основе анализа влияющих факторов является актуальной темой. Государственная инновационная политика (ГИП) является комплекс мер, направленных на ак- тивизацию инновационной деятельности (ИД), по- вышение эффективности и широкое использование ее результатов в целях ускорения социально-эконо- мического развития страны и полного удовлетворе- ния общественных потребностей. ГИП включает три этапа: - разработка научно обоснованных концепций на развитие ИД на основе анализа состояния инно- вационного потенциала; - определение основных направлений государ- ственной поддержки инноваций; - реализация практических действий по реали- зации поставленных целей, направленных на повы- шение инновационной активности. Методы исследования: общенаучные (син- тез, дедукция, индукция, обобщение, наблюдение, прогнозирование, научная абстракция, статистиче- ский анализ, логический), а также приемы группи- ровки, классификации и экспертной оценки. Результаты исследований и их обсуждения. У инновационной политики есть две стороны: стратегическая и тактическая. Стратегия ГИП фор- мируется на основе долгосрочных концепций соци- ально-экономического и социально-политического развития страны. Выбор стратегии инновационной политики предполагает определение основных направлений государственного регулирования ИД и принятие методов развития и использования научного потенциала, постановку основных целей инновационного развития в соответствии с соци- ально-экономическими целями. Тактика включает определение текущих целей и конкретных дей- ствий, которые обеспечивают достижение этих це- лей с максимальной эффективностью. Тактические средства - финансирование научно-исследователь- ских и опытно-конструкторских работ (НИОКР), материально-техническое и информационное обес- печение, подбор персонала, а также создание пра- вовых и организационных условий для реализации мероприятий по инновационному развитию [4 - 6]. Эффективность ГИП, методы ее формирова- ния и основные направления поддержки инноваций в определенной степени находят отражение в научно-техническом (НТ) лидерстве. Это проявля- ется в международном масштабе: расширение экс- порта результатов НТ информации (лицензии, па- тенты и др.), Увеличение экспорта готовых иннова- ций, оказание бесплатной НТ инновационной помощи другим странам. НТ руководство является доказательством правильности выбранного страте- гического курса и тактических действий по форми- рованию и реализации ГИП. НТ лидерство является
  • 20.
    20 Sciences ofEurope # 60, (2020) следствие правильного выбора направлений иссле- дований (применения выборочных и фронтальных методов). Правильный выбор должен привести к лидерству в тех сферах, где есть приоритет в разви- тии. ГИП в основном направлен на создание благо- приятных экономических, организационных, пра- вовых, информационных и социально-психологи- ческих условий для реализации инновационных процессов [7, 8]. Эти условия и разнообразие мето- дов формирования инновационной политики опре- деляют основные направления государственной поддержки инноваций. Основные направления ГИП в нефтегазовой отрасли включают: - содействие развитию НИОКР (фундамен- тальных, поисковых, прикладных), прежде всего по перспективным направлениям; - кадровое обеспечение ИД; - поддерживать разработку различных про- грамм, направленных на повышение инновацион- ной активности; - формирование государственного заказа в виде контрактов на инновационные разработки, обеспечивающих первоначальный спрос на многие инновации, которые затем широко распространя- ются на рынке (внутреннем и внешнем); - использование фискальных и иных инстру- ментов государственного регулирования, формиру- ющих стимулирующие эффекты внешней среды, определяющие необходимость и эффективность инновационных решений; - участие государства как посредника в органи- зации эффективного взаимодействия и стимулиро- вания сотрудничества в области инновационных разработок между различными секторами науки и газовой отрасли; - координация ИД в отрасли; - создание правовой базы для инноваций; - регулирование международных отношений в сфере инновационных процессов. Последние два направления важны с точки зре- ния степени участия государства в поддержке ин- новаций. Ведь правовое регулирование инноваци- онных процессов - исключительная прерогатива государства, и регулирование международных от- ношений в сфере инновационных процессов также в основном осуществляется государством. Формы государственного регулирования меж- дународных отношений в сфере инноваций разно- образны, некоторые из них важны для газовой от- расли: - продвижение иностранных инновационных инвестиций; - разумный выбор наиболее перспективных и приоритетных направлений сотрудничества; - таможенное регулирование и экспортный контроль инновационных разработок (технологий, продуктов, рецептов); - поддержка международных контактов (свя- зей) малого инновационного бизнеса; - финансирование многосторонних (двусто- ронних) международных инновационных проектов; - применение специальных налоговых и кре- дитных льгот для стран (или компаний), участвую- щих в совместных инновационных проектах и раз- работках; - внедрение международных стандартов и норм в стране. Форма государственного регулирования ИД в нефтегазовой отрасли, также предусматривает: гос- ударственные программы расширения НТ сотруд- ничество зарубежными государствами; участие в работе международных организаций, в той или иной степени занимающихся вопросами иннова- ций; присоединение к международным соглаше- ниям; создание специальных законодательных ак- тов и норм, регулирующих международные инно- вационные отношения; участие в международных патентно-лицензионных операциях и др. Нефтегазовая промышленность является ос- новной в экономике Азербайджана, и значительная часть доходов государственного бюджета форми- руется за счет экспорта углеводородов. Решение государственных, внутренних экономических, со- циальных и политических проблем зависит от пра- вильного анализа деятельности предприятий топ- ливно-энергетического комплекса (ТЭК) и опреде- ления внешнеэкономических перспектив их развития [9, 10]. Для создания рациональной стра- тегии развития и возможных вариантов совершен- ствования газовой отрасли Азербайджана необхо- димо изучить ее структурные преобразования, про- анализировать перспективы развития и внешнеэкономической деятельности. Перспективы развития внутреннего и внешнего газового рынка Азербайджана во многом определяются государ- ственной - газотранспортной (республиканской и международной) системой и экономическим поло- жением стратегических отраслей экономики, в том числе газового комплекса страны, а также проводи- мыми реформами в организационной, финансово- экономической, технологической, социальной сфере в национальной экономике. Основная цель этих изменений - адаптироваться к изменившимся условиям окружающей среды и повысить эффек- тивность газовой промышленности. Газовая от- расль является ключевым в экономике Азербай- джана, поэтому анализ деятельности и определение внешнеэкономических перспектив развития этого комплекса необходимы для успешного решения ряда государственных задач. Важно использовать комплексный подход при оценке конкретных меж- дународных газовых проектов, учитывая важное внешнеэкономическое значение экспорта газа для Азербайджана. Реализация вышеуказанных дей- ствий невозможна без присутствия ГИП, так как га- зовая промышленность в Азербайджане является государственным сектором, а инновационная поли- тика формируется Правительством республики. Основные этапы государственной инновационной политики [1-3] I этап. Разработка научно обоснованных кон- цепций развития инновационной деятельности - осуществляется на основе анализа состояния инно- вационного потенциала отрасли.
  • 21.
    Sciences of Europe# 60, (2020) 21 II этап. Определение основных направлений государственной и корпоративной поддержки ин- новаций в отрасли. III этап. Реализация практических действий по реализации поставленных задач, направленных на повышение инновационной активности отрасли. ГИП содержит цель и задачи, в которых опре- делены принципы ее реализации. Важнейшее из них является опора на отечественный научный по- тенциал. Инновационная политика предусматри- вает свободу научного творчества, последователь- ную демократизацию научной сферы, открытость и прозрачность в формировании и реализации, при этом необходимо стимулировать развитие фунда- ментальных научных исследований, сохранять и развивать ведущие отраслевые научные организа- ции, создавая условия для здоровой конкуренции в области науки, технологий и технологий. Основы инновационной политики закладываются путем принятия комплекса законодательных актов, адек- ватных реальной экономической, социальной и по- литической ситуации в стране. Они определяют субъекты и объекты управления, их права, обязан- ности и ответственность. Задачи государственной инновационной политики предусматривает: - обеспечение согласованной деятельности государственных органов и нефтегазовой отрасли, экономических и научных организаций по осу- ществлению структурной перестройки экономики; - обеспечение эффективного использования научно-технического потенциала для стабилизации развития экономики по основным направлениям, определяющим стратегию, темпы и пропорции раз- вития национальной экономики и ее структурную сбалансированность; - защита научного потенциала и обеспечение «прорывных» исследований; - углубление специализации и повышение надежности кооперации государственного произ- водства и высоких технологий; - перенос центра тяжести экономических ре- форм и стимулов в сферу инноваций, повышение инвестиционной и инновационной активности. Стратегия государственной инновационной политики формируется на основе долгосрочных концепций социально-экономического и соци- ально-политического развития страны. Выбор стра- тегии инновационной политики предполагает опре- деление основных направлений государственного регулирования инновационной деятельности и при- нятие методов развития и использования научного потенциала, постановку основных целей инноваци- онного развития в соответствии с общими соци- ально-экономическими целями. Тактика включает определение текущих целей и конкретных дей- ствий, которые обеспечивают достижение этих це- лей с максимальной эффективностью. Тактические средства - финансирование НИОКР, конструктор- ских и технологических разработок, материально- техническое и информационное обеспечение, под- бор персонала, создание правовых и организацион- ных условий для реализации мероприятий иннова- ционного развития [2-4, 8]. Основные направления государственной инновационной политики в газо- вой отрасли предоставлены в таблице 1[3]. Таблица 1 Главные направления государственной инновационной политики в газовой отрасли Главные направления государственной инновационной политики Аккумулирование средств на научные исследования и инновации в газовой отрасли Координация инновационной деятельности Стимулирование инноваций, конкуренции в данной сфере, страхование инновационных рис- ков, введение государственных санкций за выпуск устаревшей продукции Создание правовой базы инновационных процессов, особенно системы защиты авторских прав новаторов и охраны интеллектуальной собственности Кадровое обеспечение инновационной деятельности в газовой отрасли Формирование научно-инновационной инфраструктуры Институциональное обеспечение инновационных процессов в газовой отрасли Обеспечение социальной и экологической направленности инноваций в газовой отрасли Повышение общественного статуса инновационной деятельности Отраслевое регулирование инновационных процессов Регулирование международных аспектов инновационных процессов Возможны два варианта государственного воз- действия на научную и инновационную деятель- ность: прямой и косвенный. Прямое - бюджетное финансирование научной сферы, охватывает содержательную сторону ИД (выбор приоритетов, заключение государственных контрактов, формирование госзаказа, субсидирова- ние) и предоставление гарантий частным банкам. Косвенные методы встроены в рыночный ме- ханизм, который сам по себе обладает уникаль- ными возможностями для выявления и удовлетво- рения потребностей в исследованиях и разработ- ках. Суть косвенного регулирования заключается в создании общего благоприятного инновационного климата, поощрении организаций, ориентирован- ных на инновации, и принятии мер по созданию вы- сокого социального статуса в общественном мне- нии и престижа образования и науки. Однако в этом варианте государство не контролирует конкретные научные проекты. В мировой практике применяется следую- щие формы налогового регулирования: сниже- ние ставки налога на прибыль инновационных предприятий; снижение размера налоговых пла- тежей при увеличении затрат на инновации;
  • 22.
    22 Sciences ofEurope # 60, (2020) предоставление «налоговых каникул» на при- быль от инновационной деятельности на не- сколько лет; уменьшение налогооблагаемой прибыли на стоимость научного оборудования; ускоренная амортизация основного производ- ственного фонда инновационного предприятия и др. Одним из наиболее эффективных государ- ственных подходов стимулирования инноваци- онных процессов является предоставление нало- говых льгот. Азербайджан может предоставить ряд налоговых льгот в газовой отрасли для раз- вития НТ и ИД (таблица 2). Таблица 2 Льготы по налогообложению в газовой отрасли для развития НТ и ИД № п/п Льготы по налогообложению субъектов научно-технической и инновационной деятельности 1 Инвестиционный налоговый кредит - предоставление отсрочки налоговых платежей с после- дующей поэтапной уплатой суммы кредитов и начисленных процентов. Инвестиционный налоговый кредит может быть предоставлен по налогу на прибыль организаций при наличии следующих оснований - проведение научно-исследовательских и опытно-конструкторских работ либо технического перевооружения производства, в том числе для создания рабочих мест для инвалидов и защиты окружающей среды от загрязнения промышленными отходами - осуществление внедренческой и инновационной деятельности, в том числе создание новых и совершенствование применяемых технологий, создание новых видов сырья - выполнение особо важного заказа по социально-экономическому развитию региона или предоставление особо важных услуг населению 2 Льготы по налогу на добавленную стоимость, освобождения от уплаты: выполнение НИОКР за счет средств бюджета, а также средств фонда фундаментальных исследований. 3 Льготы по земельному налогу предусмотрены для научно-исследовательских учреждений 4 Уменьшение налогооблагаемой базы на суммы затрат, связанных с изобретательством Обеспечение государственного регулирова- ния ИД должно сочетаться с эффективным функционированием конкурентного механизма в инновационной сфере. В то же время концен- трация государственных ресурсов на создании и распространении базовых инноваций, обеспечи- вающих прогрессивные структурные изменения в экономике, является одним из основных прин- ципов. Государственная политика предусматри- вает создание условий для развития рыночных отношений в сфере инноваций, пресечение не- добросовестной конкуренции и обеспечение благоприятного инвестиционного климата при осуществлении ИД. Производственный потенциал многих раз- вивающихся стран сосредоточен на начальных этапах воспроизводственного цикла - в ресурсо- добывающих и частично обрабатывающих от- раслях. В то время как развитые страны обла- дают избыточными производственными мощно- стями в обрабатывающей промышленности и производстве конечной продукции, значитель- ная часть которых идет на экспорт, развивающи- еся страны экспортируют первичные ресурсы, энергоресурсы и продукты их переработки, им- портируя при этом конечную продукцию обра- батывающей и добывающей промышленности. Однако некоторые промышленно развитые страны имеют достаточно развитую добываю- щую промышленность, а ряд развивающихся стран имеют вполне современные технологии в обрабатывающей промышленности и производ- стве конечной продукции [4-6, 10]. Азербайджан, благодаря успешной конъ- юнктуре мировых рынков сырья, смог присоеди- ниться к глобальному инновационному про- цессу и обеспечить увеличение темпов иннова- ций в социальной, духовной, экономической и политической сферах. И самое главное, с прихо- дом на руководящие должности нового поколе- ния людей уровень «страха перед нововведени- ями» значительно снизился. В отличие от мно- гих стран, Азербайджан имеет очень значительные производственные мощности в нефтегазовом секторе. Преимущество в техно- логической сфере - важнейший фактор обеспе- чения национальной безопасности страны и раз- витие НТ и ИД. Только качественно новый ТЭК может удо- влетворить потребности модернизации и роста - финансово устойчивый, рентабельный и дина- мично развивающийся, соответствующий эколо- гическим стандартам, оснащенный передовыми технологиями и высококвалифицированным персоналом. Учитывая, что целью энергетиче- ской политики является максимально эффектив- ное использование природных топливно-энерге- тических ресурсов и потенциала энергетиче- ского сектора для экономического роста и повышения качества жизни населения страны, необходимо внедрять инновационные подходы с участием государства. В этой связи энергетиче- ская стратегия государства становится опреде- ляющей в ТЭК. Снижение удельных затрат на производство и использование энергоресурсов за счет рацио- нализации их потребления, использования энер- госберегающих технологий и оборудования, а также снижения потерь при производстве, пере- работке, транспортировке и реализации топ- ливно-энергетических продуктов - приоритеты
  • 23.
    Sciences of Europe# 60, (2020) 23 газовой отрасли. Органы государственной вла- сти создают условия для повышения финансо- вой устойчивости и эффективности использова- ния потенциала ТЭК, повышения производи- тельности труда. Особое место в энергетической политике страны занимает минимизация техно- генного воздействия энергетики на окружаю- щую среду за счет использования экономиче- ских стимулов, совершенствования структуры производства, внедрения новых технологий про- изводства, переработки, транспортировки, реа- лизации и потребления продукции. Наблюдается тенденция к дальнейшему увеличению доли природного газа в структуре азербайджанского экспорта. Динамика спроса на топливно-энергетические ресурсы и УВ внутри страны обусловлена темпами роста национальной экономики и ее удельной энерго- емкостью, а также ценами на энергоносители. Состояние мирового экономического и энерге- тического рынка, степень интеграции в мировое энергетическое пространство, устойчивое осво- ение минеральных ресурсов является определя- ющим фактором в энергетическом секторе [5-7]. Энергетическая безопасность является важ- нейший компонент национальной безопасности государство. Обеспечение национальной без- опасности - одна из главных задач энергетиче- ской политики. Энергетическая безопасность отражает состояние защиты страны, ее граждан, общества, государства и экономики от угроз надежному снабжению топливом и энергией. Эти угрозы определяются как внешними (геопо- литическими, макроэкономическими и конъ- юнктурными) факторами, так и реальным состо- янием и функционированием энергетического сектора страны [4, 5]. Вопросы, связанные с реализацией прав собственности в управлении газовой отраслью, имеют решающее значение для формирования и успешной реализации ГТП. Это связано с рядом обстоятельств, каждое из которых является до- статочным для того, чтобы государство выбрало собственные полномочия как инструмент регу- лирования газовой экономики страны [4 - 6]. Снижение себестоимости добываемого газа Повышение экологичности разработки месторождений УВ Основными целевыми ориентирами разработки Программы инновационного развития являются Экономия энергетических ресурсов Повышение производительности труда Улучшение потребительских качеств оказываемых услуг (при реализации газа) Рисунок 1 Основные целевые ориентиры разработки программы инновационного развития газовой отрасли Эффективное развитие энергетического сектора Азербайджана возможно только при ре- ализации активной государственной и корпора- тивной политики, включая внедрение организа- ционных и технологических новшеств [2, 3]. На рисунке 1 систематизированы основные направ- ления и задачи газовой отрасли на примере раз- работки газоконденсатных месторождений (ГКМ). Заключение. Программа инновационного развития газовой отрасли - это документ долгосрочного планирова- ния и управления, интегрированный в систему стратегического планирования развития компании и сформированный на десятилетний период. Он должна содержать комплекс взаимосвязанных мер, направленных на разработку и внедрение новых технологий, инновационных продуктов и услуг, со- ответствующих мировому уровню, а также на со- здание благоприятных условий для развития ИД, как в газовой отрасли, так и в смежных отраслях промышленности производство в Азербайджане. Программа является основным инструментом по- вышения технологического уровня газового ком- плекса с целью сохранения позиций в мировом энергетическом бизнесе. Основные элементы дол- госрочной программы государственной политики в газовой отрасли является:
  • 24.
    24 Sciences ofEurope # 60, (2020) - усовершенствование недропользования и налогообложения с целью создания условий и сти- мулов для увеличения добычи и освоения новых ГКМ, в том числе малых и средних, эксплуатации месторождений на поздних стадиях разработки и с трудноизвлекаемыми запасами газа; - обеспечение благоприятного режима для раз- вития газовой отрасли путем создания условий для реализации производственного и инвестиционного потенциала всех субъектов газового рынка; - максимизировать выгоды от экспорта газа и уменьшить потенциальные потери экспортной вы- ручки от перехода на спотовую торговлю газом в Европе за счет сохранения единого канала экспорта природного газа и заключения долгосрочных кон- трактов; - государственная поддержка взаимовыгодных долгосрочных контрактов на импорт природного газа, позволяющих сэкономить собственные ре- сурсы и повысить надежность обеспечения азер- байджанских и зарубежных потребителей УВ; - совершенствование форм организации и уча- стия государства в управлении газовой отраслью, максимальное регулирование мер государствен- ного регулирования и повышение их эффективно- сти; - формирование и развитие газового рынка на основе создания равных условий для всех произво- дителей и потребителей газа. Оценка ожидаемых результатов программы характеризуется следующими положениями: предусматривает снижение удельной энергоемко- сти ВВП и соответствующее повышение энергоэф- фективности экономики; наиболее эффективным способом будет обеспечение внутренних энергети- ческих потребностей страны в первичных топ- ливно-энергетических ресурсах; предусматривает умеренный рост душевых расходов на топливно- энергетическое обеспечение населения при более быстром росте доходов населения; экспорт энерго- ресурсов может увеличиться, что отвечает требова- ниям стабильности платежного баланса страны, укреплению ее экономического положения и влия- ния. Постепенное формирование энергетического рынка с развитием соответствующей инфраструк- туры позволит осуществить постепенную рациона- лизацию топливно-энергетического баланса, само- финансирование производственной и инвестицион- ной деятельности газовой отрасли страны. Литература 1. Добрина Л.Р. Перспективы развития газо- вой отрасли Азербайджанской республики в усло- виях глобализации. -М.: Интернет-журнал «Науко- ведение». 2014. Вып. 5(24):173-173. https://elib.pstu.ru. 2. Innovative Risk Management for Geological and Technical (Technological). /Gasumov E.R., Gasumov R.A. // SOCAR Proceedings. -Baku. -2020. - №2(2020) 008-016. -Р.8-16. 3. Гасумов Э.Р. Оценка и анализ риска инве- стиционных вложений при разработке газовых ме- сторождений. //Евразийский союз ученых (ЕСУ). М.: -2020. - № 2(71). Част 5. -С. 30-34. 4. Государственная инновационная политика и ее организационный механизм. http://oplib.ru. 5. Государственное регулирование и стиму- лирование инновационной деятельности. Формиро- вание Государственной инновационной политики и ее основные направления. -М.: 2015-04-20. 3503. https://studopedia.ru. https://studref.com. 6. Мухамедьяров А. М. Инновационный ме- неджмент: учебное пособие. -М.: https://econ.wikireading.ru. 7. Применение инновационных решений при проектировании объектов нефтегазодобычи. / Гасу- мов Р.А., Гасумов Э.Р. // Территория Нефтегаз. -М.: ВНИИОЭНГ. -2017. -№ 4. -С.78-83. 8. Внедрение инноваций при освоении место- рождений углеводородов./ Гасумов Р.А., Гасумов Э.Р. // Естественные и технические науки. –М.: - 2019. - №6(132). –С. 100-105. 9. Гасумов Э.Р. Оценка эффективности внед- рения инноваций при разработке газовых место- рождений. // Монография: –Ставрополь: Издатель- ство. - Изд. «Дизайн-студия Б», -2020. -552 с.; ил. 10. Gasumov E.R. Improving the efficiency of gas cjndensate feld development through the use of innova- tions. //Wschodnioeuropejskie Czasopismo Naukowe (East European Scientific Journal). -Poland. 2019. - №9(49), -Р.31-40. 11. Gasumov E.R. Technical and economic as- pects of the development of the gas industry in Azer- baijan. //Wschodnioeuropejskie Naukowe (East Euro- pean Scientific Journal). -Poland. 2020. №10(62), Part. 4. – P.25-28.
  • 25.
    Sciences of Europe# 60, (2020) 25 UTILITARIAN ANALYSIS OF BUSINESS COMMUNICATION IN THE PROCESS OF PROVIDING COMPANY SERVICES Pryadko S. Candidate of Economic Sciences Belgorod State University, Russia Zyuban V. Belgorod State University, Russia Babayants D. Belgorod State University, Russia DOI: 10.24412/3162-2364-2020-60-4-25-28 ABSTRACT The article presents the results of the study of the effectiveness of business communication in the process of providing services by the company. Using the example of a specific situation that occurred at United Airlines in 2017, we conducted a utilitarian analysis of the behavior of stakeholders from the standpoint of business law and business ethics. The hypothesis of the study was the assumption that violation of business ethics in the process of resolving conflicts has an adverse impact on the company’s image in the long term. The utilitarian analysis has been used as a research method. As the result of the study, recommendations have been formulated for resolving the conflict situation. Keywords: business ethics, utilitarian analysis, business communication, business conflict, company image. The comparison of business law and business eth- ics on a contrast gives some people the impression that there is nothing important in business ethics. The costly penalties of illegal conduct compared to the uncertain consequences of unethical conduct support a common illusion that business ethics is much less important than law for business people. However, in one perspective, ethics is hardly less important than law, and in the other perspective it is even more important, more fundamen- tal than law. This research paper intends to prove why all people involved in business processes must place ethical and legal rules ahead of profits. There is no need to prove the fact that ethical be- havior and corporate social responsibility can bring sig- nificant benefits to a business. It can contribute to at- tract more customers and employees who would like to work in the organization, increase productivity and re- duce costs, attract investors and keep the company's share price high, thereby protecting business from take- over. In opposition with these benefits, an unethical be- havior or lack of social responsibility can damage a company's reputation and that is what this research pa- per about. It is interesting to see how ethical scandals and dilemmas can deeply hurt the look of a corporation, which can make employees and consumers get a bad taste in their mouth about the morals of the company. Nowadays a positive corporate image is crucial to survive in competition and maintain the position on the market. Besides, the way a company reacts to ethical scandals and dilemmas that happen on a small level tells a lot about its core practices and values. It is valu- able to learn from business scandals to understand what to avoid or watch out in a company when it comes to business ethics. On this topic in a 2015 article, Vadas- treanu, Maier & Maier write: In other studies (Strobel, 2010; Fassin, 2000) re- lated to the business ethic the authors consider that business ethics includes the ensuring that the highest legal and moral standards are respected in relationships with people from the business community. This in- cludes the most important person in the business: a cli- ent. Short-term profit compared with the cost of losing a customer is deadly for your business in the long-term perspective. Ethics refers to an individual's moral judg- ments about right and wrong. Decisions taken in an or- ganization can be taken by individuals or groups, but everyone is influenced by culture and circumstances. The decision to behave ethically is a question of moral- ity and people must decide how they are going to act [1]. The purpose behind this paper is to reflect on the situation where management and employees have acted in an improper and unethical manner, and to examine moral values that ought to have been addressed in working through this situation. The paper illustrates difficulties associated with deciding which activities are legal, which are ethical, and which are neither. The object of the research is the United Airlines Company. The subject of the research is a conflict situ- ation that occurred in the company in 2017. The information base of the research is the publi- cations of the databases such as ScienceDirect, Spring- erLink, Google Scholar, and the analysis of YouTube video footage. As the method of research, a utilitarian analysis has been used. To assess the situation that took place in the famous American air company we applied the the- ory of utilitarianism, one of the normative ethical theo- ries. Its idea states that an action is morally right if it results in the greatest amount of good for the greatest amount of people affected by the action. Utilitarianism puts at the center of moral decision a variable that is very commonly used in economics as a parameter that measures the economic value of actions: ’utility’. Re- gardless of whether one accept that utility really is quantifiable, it comes as no surprise to find that utilitar- ian analysis is highly compatible with the quantitative, mathematical methodology of economics. So, in ana- lyzing two possible options in a single business deci- sion, a certain utility can be assigned to each action and each person involved, and the action with the highest
  • 26.
    26 Sciences ofEurope # 60, (2020) aggregate utility can be determined to be morally cor- rect [2]. Analysis of the situation. When seats on a plane are overbooked, airlines look for volunteers who want to give up their seats in exchange for money, but what if no one wants to get off? United Airlines tries to solve the problem by "raffling off" those who cannot take the flight. But if the passengers refuse, then they are forci- bly removed, which is what happened to Mr. David Dao Duy Anh. Several videos posted on the internet show a pas- senger being dragged off his seat onto the floor by se- curity guards for refusing to get off the plane and then seen with blood on his face. The action earned the air- line harsh criticism and, in a statement, issued on its website, the company's executive director, Oscar Muñoz, was forced to offer a public apology although in a letter sent to staff through the company's internal email, leaked to the U.S. media, the official defended that employees in Chicago "followed established pro- cedures for dealing with situations like this. What makes the actions of the company unethical in the handling this situation? During this event United Express committed under our point different actions that might be considered unethical. The first one that triggered this whole situation was that the company sold more tickets than it could really sell. United Express oversold the tickets for Flight 3411 and after the passengers were seated on the plane and while the plane was still at the gate, the United Gate agent announced that four passengers would have to be removed, to accommodate four staff members they had to cover an unmanned flight at an- other location. The second action we could name would be to warn passengers a few minutes before take-off that 4 of them have to leave the plane without leaving them any room for maneuver even when they have already checked in their belongings inside the plane. Violence should never be used in situations like this. That is why we believe that the way they arrested David Dao was the most unethical action United Ex- press ever committed. Jayse D. Anspach, a Twitter user who shared one of the videos, explained that United Airlines asked for "four volunteers" to give up their seats and give them to employees of the same airline who had to work Monday from their destination. "No- body volunteered, so United chose for us," Anspach said. The airline chose four people. One of them, ac- cording to press reports, is a doctor who refused to leave the plane. The airline chose four people. One of them, according to news reports, is a doctor who re- fused to leave the plane. According to the witness, the doctor needed to work at the hospital the next day, so he refused. And after refusing to get off, the doctor clung to his seat, while guards struggled with him to get him off the plane. The videos show how the passenger is even dragged down the aisle. "Ten minutes later, the doctor ran back inside the plane with a bloody face," Anspach said. Finally, the way a company of this size handles and resolves the situation once the events have occurred leaves much to be desired, since it did not take long for them to apologize to the victim, but through an internal mail that was leaked from Oscar Muñoz (CEO of the company) it was possible to know that what he really thought was that the security personnel followed the procedures established to deal with situations like this, in addition to his own assurance that David Dao had behaved in a belligerent and disruptive manner when none of this can be seen in the different videos recorded by the other passengers. Applying theory to this situation, the most appro- priate one would be the one developed in a study which defines customer satisfaction as "a psychological state resulting from a purchase and consumption process" [3]. In this case it is obvious that the trust placed by the passengers was violated by choosing this airline since these events caused the dissatisfaction of all the passen- gers on the flight. Utilitarian analysis. All our actions have conse- quences, positive or negative. It would be logical to suppose that unethical behavior leads to negative con- sequences since it is always associated with some evil and harm. So, it means that if people want to act ac- cording to the morality they just need to think ahead about their actions and consequences of these actions. However, it is not easy to predict every event or detail that might happen as the result of a certain action, in natural sciences this idea is reflected in the theory of “the butterfly effect” which states that small things can have non-linear impacts on a complex system. Business sphere is not an exclusion in this regard, even not sig- nificant from the first sight wrong action of one of the business members can become a real headache for the whole organization and bring it a lot of damage. The United Airlines case proves it very well. To conduct utilitarian analysis for the United Air- lines case we have looked at all main actors involved and analyzed their potential utility in terms of ‘pleas- ure’ and ‘pain’ involved in different courses of action, say either dragging the passenger off the flight or let- ting him stay.
  • 27.
    Sciences of Europe# 60, (2020) 27 Table 1. The results of a utilitarian analysis of the behavior of conflict stakeholders Drag off the flight Let the passenger stay Pleasure Pain Pleasure Pain David Dao -Get injures -Miss the flight and meeting with a patient -Be on time and have a meeting with a patient United Airlines -Act legally -Lose the trust of the publics -Destroy the well-built repu- tation, long-term relation- ships and brand loyalty -Falling of the company’s share prices -Be judged on the social me- dia -All passengers are satisfied -Headquarters miss the flight Security officers -Follow the instruc- tions and policies -Be fired due to hurting the passenger -Save the job -Refuse to follow in- structions and policies Custom- ers -Get compensation equal to the cost of the tickets -Be disappointed in the com- pany -Refuse from the company services henceforth -Cut the United credit cards -Feel justice After analyzing all the bad and good effects for the sides involved, it is relatively easy to identify that the greatest utility is the morally right decision. On the con- trary, the consequences of unethical actions show that harm was brought to everyone: the passenger got in- jured, the company ruined its reputation, security offic- ers lost their job. Of course, utilitarian analysis has its disadvantages, it might be subjective or difficult for as- signing all costs and benefits on the deep level, but even such a simple balance sheet gives an impression about importance of correct and ethical behavior not only among senior management but among average execu- tives as well. Solving the situation in a better way: what should United have done instead? United’s response to the whole situation is close to a textbook example of what not to do. Let us look again at the immediate response to the controversy. In his first response the CEO of the company apologised only for “having to re-accommodate” passengers. The Wash- ington Post ran an article that about sums up the re- sponse to this statement: “‘Re-accommodate’? United ridiculed for corporate speak response to passenger dragging.” Some have argued that United’s response to the controversy was just as bad as the incident itself. We will not argue over the economics of air travel and whether overbooking is ethical, but here we hope to an- swer the question of what mistakes United made in their communication, so that they can be learnt from. First let us consider a similarly botched response, and how that compares to that of United. In 2015, Nestlé experienced a PR crisis in India as a result of too high levels of lead in their noodles, which severely damaged its reputation there. What did they do wrong in their communication? At first, they pointed out how the levels of lead in their product were within regulatory limits. In other words, they pointed out that factually they were correct. This did not go over well. The CEO later reflected that “This is a case where you can be so right and yet so wrong, we were right on factual arguments and yet so wrong on arguing. It’s not a matter of being right. It’s a matter of engaging the right way and finding a solution.” The initial arrogant response is what exacerbated the controversy for Nestlé, and as is clear, has done the same for United. Much like the example, United re- sponded with arrogance, defensiveness in claiming to be well within their rights to do as they have, and com- plete lack of empathy. A study in 1995 has looked at what the best re- sponses are to accusations of unethical behaviour, in it was found that of the options of no response, denial, excuse, justification or concession, the concession was the most effective option [4]. Note that this does not necessarily mean an apology, but any accommodating strategy will be effective [5]. In United’s case, the real controversy is not only their tone-deaf response but also the events with the passenger. What should have been done instead? United should have responded with responsibility, hu- manity, and most of all an apology. They should have conceded that they made mistakes, instead of defending their right to do what they did. Conclusion As a conclusion we will say that the events that occurred on flight 3411 were ultimately unpleasant for all parties involved: company, security, David Dao and the rest of the passengers. On the one hand, the company's image was dam- aged by having to publicly apologize to the CEO and on the other hand, its market value fell by approxi- mately 250 million dollars. On the side of the security personnel, the person responsible for the damages caused to David Dao was fired and he sued the Chicago Department of Aviation and its director arguing that he was not sufficiently trained to use force. Even if Mr. Dao did not use force, he still lost his flight and was involved in numerous lawsuits and news stories about his private life.
  • 28.
    28 Sciences ofEurope # 60, (2020) Finally, the passengers had to suffer the tension of having been one of them who left the plane as it could have been anyone by means of the aforementioned draw and they had to witness everything that happened with David Dao. References 1. Vadastreanu, A., Maier, D., & Maier, A. (2015). Is the Success Possible in Compliance with Ethics and Deontology in Business. Procedia. Economics and finance, 26, 1068-1073. Retrieved from https://www-sciencedirect- com.nlhhg.idm.oclc.org/science/article/pii/S22125671 15009314 2. Crane, A., & Matten, D. (2007). Business Ethics: Managing Corporate Citizenship and Sustainability in the Age of Globalization. Retrieved from https://academic.microsoft.com/paper/1606962002 3. Lavado, A., & Millán, A. (1998). La teoría de los dos factores en la satisfacción del cliente. Investigaciones Europeas de Dirección y Economía de la Empresa, 4(1), 53-80. Retrieved from https://idus.us.es/bitstream/handle/11441/78838/la_teo ria_de_los_dos_factores_en_la satisfaccion.pdf 4. Bradford, J., & Garrett, D. (1995). The effectiveness of corporate communicative responses to accusations of unethical behavior. Journal of Business Ethics, 14(11), 875-892. Retrieved from https://academic.microsoft.com/paper/1984144713 5. Coombs, W., & Holladay, S. (2008). Comparing apology to equivalent crisis response strategies: Clarifying apology's role and value in crisis communication. Public Relations Review, 34(3), 252- 257. Retrieved from https://academic.microsoft.com/paper/2078785246 ОСНОВНІ ПЕРЕДУМОВИ РОЗВИТКУ ЛОГІСТИЧНОГО ПІДХОДУ ДО УПРАВЛІННЯ ПІДПРИЄМСТВАМИ МАШИНОБУДУВАННЯ УКРАЇНИ Маказан Є.В. к.э.н., доцент, доцент кафедры Менеджмента и Бизнес администрирования, Запорожский национальный университет Россинська Л.В. аспірант кафедры Менеджмента и Бизнес администрирования, Запорізький Національний Університет MAIN PREREQUISITES FOR THE DEVELOPMENT OF A LOGISTIC APPROACH TO MANAGEMENT OF ENGINEERING ENTERPRISES OF UKRAINE Makazan E. Department of Business Administration and Management of Foreign Economic Activity, PhD, Associate Professor, Zaporizhzhya national university Rossinskaya L. graduate student, Department of Business Administration and Management of Foreign Economic Activity, Zaporizhzhia National University DOI: 10.24412/3162-2364-2020-60-4-28-36 АНОТАЦІЯ Досліджено основні передумови розвитку логістичного підходу до управління підприємствами маши- нобудування України, в т.ч. динаміку обсягу реалізованої продукції машинобудування, територіальну структуру українського імпорту машинобудівної продукції. На основі дослідження динаміки фінансових результатів українських машинобудівних підприємств розраховано тренди розвитку найбільш вагомих га- лузей машинобудування. Встановлено основні фактори зовнішнього середовища, які мають вплив на ро- звиток української машинобудівної галузі. Обґрунтовано необхідність впровадження логістичного під- ходу до управління машинобудівними підприємствами та сформульовані завдання для подальшої ро- зробки практичних рекомендацій. ABSTRACT It was investigated the basic prerequisites for the development of a logistic approach to the management of the machine-building enterprises of Ukraine, including: dynamics of the volume of sold mechanical engineering products, territorial structure of Ukrainian imports of mechanical engineering products. The trends of development of the most important branches of machine-building have been calculated on the basis of the study of the dynamics of financial results of Ukrainian machine-building enterprises. The main environmental factors that influence the development of the Ukrainian machine-building industry are identified. The necessity of introducing a logistic
  • 29.
    Sciences of Europe# 60, (2020) 29 approach to the management of machine-building enterprises is substantiated and the tasks for further development of practical recommendations are formulated. Ключові слова: машинобудування, логістика, логістичний підхід, логістичне управління, ефек- тивність управління. Keywords: machine-building, logistics, logistic approach, logistics management, management efficiency. Formulation of the problem. In the second dec- ade of the 21st century, Ukrainian enterprises were in a rather difficult situation. Changing foreign economic policy of the country towards the European integration of the Ukrainian economy has certainly opened up new opportunities for Ukrainian manufacturers, making both new markets and new technologies more accessi- ble. At the same time, the active integration of Ukraine into the world economy has greatly increased the man- ifestations of globalization, which has exacerbated a competition not only in the external but also in the in- ternal markets, and has increased the requirements for the efficiency of management of machine-building en- terprises. Ukrainian machine-building enterprises have been faced with the need to improve the efficiency of management and to implement the latest management approaches in order to increase competitiveness and provide conditions for further sustainable development. One of the most promising modern approaches to the management of machine-building enterprises, both sci- entist and practitioner, consider the logistic approach, which is widely used by world leaders of mechanical engineering from Japan, Germany, the USA and others. Thus, the problem of using a logistic approach in the management of Ukrainian machine-building enter- prises is updatedв in the current conditions, and the de- velopment of practical recommendations on its imple- mentation should be considered as an important line of development of Ukrainian scientific thought. Analysis of recent research and publications. The analysis of theoretical sources showed that the re- cent theoretical and methodological issues of flow management attract considerable attention of Ukrainian scientists, including M.M. Bon, N.S. Brohun, R.S.Gamanko, O.V.Komelina, I. Koblyanska, E. Mishenin, I.M. Palchyk and others. The scientific work of I.M. Palchyk [6] is very timely, according to the author, which focuses on un- derstanding the theoretical and methodological aspect of logistics management of the enterprise. The author presents the chronological sequence of the develop- ment of logistics as a field of knowledge, analyzes var- ious approaches to understanding the categories of "lo- gistics" and "management", and proposes the author's definition of "logistics management" as a process or ac- tivity. The publication of E.Mishenin and I.Koblyanska [7] arouses a considerable interest. It deals with the is- sues of logistical management of industrial production in the context of the development of a “green” economy in Ukraine, which explores the mechanisms of logisti- cal management that take into account the environmen- tal aspects of industrial production development. It re- veals the substantive basis of environmentally oriented logistical management, principles and mechanisms for its implementation. However, taking into account previous research, it should be noted that most of the scientific papers con- sider mainly theoretical and methodological aspects of logistics management, so they need to clarify the ques- tion of the analysis of prerequisites for the development of logistics management of machine-building enter- prises in the current realities of the Ukrainian economy. The purpose of the article. The purpose of this article is to analyze the prerequisites for the develop- ment of logistical management of machine-building en- terprises in the existing realities of the Ukrainian econ- omy. Presenting main material. The machine-building complex is historically one of the most important in- dustrial complexes in Ukraine, providing almost one third of the gross value added of the national industry [2]. In 2017, the Ukrainian machine-building complex integrated 20 specialized industries, concentrating more than 15% of the value of fixed assets and 6% of the circulating assets of Ukrainian industrial enter- prises, and providing 6.5% of industrial production. In terms of the number of employees, the machine-build- ing complex is the leader of the Ukrainian industry, be- cause it employs 346,000 people, working at 4483 en- terprises [3]. At the same time, the share of machine-building in the structure of Ukrainian manufacturing industry at the time of the research was much lower than in most de- veloped countries in the world (Fig. 1).
  • 30.
    30 Sciences ofEurope # 60, (2020) Figure 1 - A part of the machine-building in the structure of the recycled industry in some world counties. As you can see, the share of the machine-building in the structure of Ukrainian manufacturing industry (10.2%) barely exceeds 10%, while in most economi- cally developed countries this share is higher than a quarter, and in Hungary, Germany and Japan it is much more than a third (41,4%, 42,8% and 42,2% respec- tively) [2]. Among the main characteristics of the develop- ment of the Ukrainian machine-building complex, modern researchers point out significant losses of pro- duction and personnel potential; more than a twofold reduction in the share of engineering products in total industrial production; increase of production cost; re- duction of activity in innovation and investment activ- ity etc [3]. The influence of a number of negative environ- mental factors has led to a significant decrease in the sales of engineering products in recent years, both in the domestic and foreign markets [3] (Fig. 2). Figure 2 - Dynamics of sales of machine-building products in 2002 – 2017 years. 0,00 50,00 100,00 150,00 200,00 250,00 300,00 350,00 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 % to the previous year % up to 2000
  • 31.
    Sciences of Europe# 60, (2020) 31 As can be seen from Fig. 2, in 2002-2007 the vol- ume of sales of machine-building products in Ukraine gradually increased. At the same time, the growth of the volume of machine-building production was occurring at a rate almost twice higher than the rate of growth of the total volume of industrial production (an average annual growth rate of sold machine-building products for 2002-2007 amounted to 15,6% against an average annual growth rate of industrial production in general that was equal to 7,35%). At that time, the volumes of participation of the machine-building industry of Ukraine in the international division of labor also un- derwent significant changes, as during this period there was an increase of exports of machine-building prod- ucts in 3.6 times and imports in 5.8 times [2]. The in- crease in the volume of production of machine-building products was caused not by a general increase in both domestic and foreign demand (mainly CIS countries) due to the increase in world prices and demand for raw materials, as well as an increase in the availability of credit resources, which significantly revitalized the in- vestment activity of industrial consumers of industrial products production. The industry activity in 2008-2009 was negatively impacted by the effects of the financial and economic crisis, due to the impact of machine-building produc- tion in 2009 that decreased almost twice (by 47.5% from the level of 2008). A reduction of world prices for raw materials and products of the metallurgical indus- try had a significant negative impact on the dynamics of production of machine-building products in Ukraine, which significantly reduced the investment attractive- ness of the metallurgical, mining and chemical indus- tries, which are the main consumers of machine-build- ing products. One of the results of the financial and eco- nomic global crisis was a significant deterioration in the conditions for credit obtaining, which had a double negative effect on the development of the engineering industry, limiting the availability of credit for both di- rectly machine-building enterprises and for major in- dustrial consumers of engineering products. An insignificant period of growth of machine- building production in 2010-2012 was interrupted by the double negative impact of foreign policy and inter- nal political crisis, which resulted in a decrease in the volume of production of machine-building products as a result of the breaking of traditional foreign markets for a number of industries, as well as through the break- down of technological links with enterprises that re- main in the uncontrolled territories. The increase in out- put in 2016-2017 is mainly due to the revival of some segments of the domestic market, such as the produc- tion of dual-use and defense goods (Table 1). Table 1 - Structure of machine-building produc- tion of Ukraine in section of economic activity catego- ries for 2011-2016. [2]An insignificant period of growth of machine-building production in 2010-2012 was interrupted by the double negative impact of for- eign policy and internal political crisis, which resulted in a decrease in the volume of production of machine- building products as a result of the breaking of tradi- tional foreign markets for a number of industries, as well as through the breakdown of technological links with enterprises that remain in the uncontrolled territo- ries. The increase in output in 2016-2017 is mainly due to the revival of some segments of the domestic market, such as the production of dual-use and defense goods (Table 1). Table 1 Structure of machine-building production of Ukraine in section of economic activity categories for 2011-2016. [2] Indicators 2011 2012 2013 2014 2015 2016 2016 to 2011,% Mechanical engineering, except repair and installa- tion of machinery and equipment 100,00 100,00 100,00 100,00 100,00 100,00 87,16 Manufacture of computers, electronic and optical products 8,80 5,58 6,51 7,98 7,61 8,28 82,04 Manufacture of electronic components and boards 3,94 0,40 0,38 0,47 0,40 0,53 11,65 Manufacture of communication equipment 0,54 0,87 0,46 0,71 1,40 н.д. 222,24* Manufacture of measuring, research and navigation instruments and equipment; watch production 1,89 2,12 2,49 3,38 3,32 4,34 151,59 Manufacture of electrical equipment 12,99 15,89 19,06 20,61 20,86 20,84 138,69 Manufacture of electric motors, generators and transformers 2,26 5,63 6,38 5,25 4,35 5,02 166,36 Manufacture of batteries and accumulators 1,89 1,36 1,55 1,51 1,53 1,68 70,09 Manufacture of wires, cables and wiring accessories 3,13 2,81 3,47 4,53 5,10 5,64 140,70 Manufacture of machinery and equipment not clas- sified elsewhere 28,83 26,95 30,80 32,89 36,44 38,22 109,16 Manufacture of general-purpose machinery and equipment 9,34 9,17 11,13 11,73 14,20 14,00 131,26 Manufacture of machinery and equipment for agri- culture and forestry 3,62 3,17 3,13 4,05 5,46 6,60 130,47 Manufacture of machinery and equipment for met- allurgy 1,72 1,68 2,12 2,50 2,35 2,99 117,82 Manufacture of machinery for food, beverage and tobacco processing 0,69 0,55 0,92 0,98 1,34 1,50 168,17
  • 32.
    32 Sciences ofEurope # 60, (2020) Manufacture of motor vehicles, trailers and semi- trailers 8,47 9,03 9,33 11,65 11,83 13,19 120,70 Manufacture of motor vehicles 5,38 5,83 5,24 4,88 3,63 4,20 58,24 Manufacture of components, parts and accessories for motor vehicles 2,61 2,68 3,52 5,47 7,18 7,77 237,96 Manufacture of other transport equipment 40,92 42,55 34,30 26,87 23,26 19,47 49,10 Construction of ships and boats 0,82 0,95 1,86 0,47 0,71 н.д. 43,30* Manufacture of railway locomotives and rolling stock 33,00 32,89 21,61 11,30 6,05 6,33 15,83 Production of air and spacecraft, related equipment 6,84 7,96 9,50 12,73 14,00 н.д. 142,07* Production of military vehicles 0,17 0,59 1,14 2,18 2,26 н.д. 957,19* * level of 2015 to 2011, % As you can see, the share of precision engineering in the structure of Ukrainian industry is rather insignif- icant. Manufacture of computers, electronic and optical products in the structure of the Ukrainian machine- building industry is in ranges from 5.58% in 2012 to 8.8% in 2011). The increase in production in the indus- try in recent years, that occurred mainly by communi- cations, research and navigation equipment, did not make it possible to reach even 2011 level due to the sharp decline in the production of electronic compo- nents and boards in 2012, and every significant de- crease in the production of household purpose. Production of equipment for the energy industry has also been increasing recently. Unfortunately, it should be noted that the highest growth rates are pro- vided by enterprises that produce certain types of cable and conductor products for foreign car makers. Despite the positive effects of growth in production and export of engineering products, it should be noted that these enterprises are not competitive in the full sense, since the activities of most of these enterprises are the result of the transfer of some labor-intensive technological operations or processes in low-cost regions resources. The increase in the production of machinery and equipment, not classified elsewhere, was due to the in- crease in the production of machinery and equipment of general and special purpose, including equipment and mechanisms for agriculture and the food industry. In the automotive industry, steady growth is ob- served only in the group of motor vehicles, trailers and semi-trailers, although knots, parts and accessories for the repair and maintenance of motor vehicles remain the basis for this growth. The production of buses, cars and trucks, which declined ten times after the crisis of 2009, has not been restored and is characterized by small quantities. Manufacture of other transport equip- ment has declined rapidly enough in recent years, and has declined by 51% since the beginning of 2017 [3]. Production in the wagon-building industry decreased by 50 times: in 2015, the wagon-building industry of Ukraine produced 1,054 wagons, compared with 53 thousand in 2011, with the activity of a number of wagon-building enterprises being supported mainly due to the repair of previously produced cars [8 ]. The output of the manufacture of military vehicles has only increased at times at the expense of domestic demand. In general, the production of defense goods is es- timated by experts at UAH 50 billion, where the largest entity in the defense industrial complex (Ukrobo- ronprom) has actively increased production in recent years, reaching USD 600 million in 2015. One of the important factors in increasing the pro- duction of defense complex products was the program of import substitution of more than 900 units of Russian components of the air defense facilities of the Armed Forces of Ukraine and components for aircraft con- struction, which involved about 300 domestic machine- building enterprises. In general, the largest increase in the domestic de- fense market in 2015-2017 was due to: - development, production and maintenance of un- manned aerial vehicles; - development and production of high-precision lesions; - development and production of aircraft engines, military vehicles; - development and production of armored vehi- cles; - naval shipbuilding, including through the re- newal of the Corvette program [2]. Significant structural changes in domestic engi- neering are also a consequence of the growing export orientation and significant import dependence on high- tech products related to the low technological level of domestic industrial production, including mechanical engineering. The basic data for the analysis of the dy- namics of formation and use of market resources of ma- chine-building products are given in Table 2.
  • 33.
    Sciences of Europe# 60, (2020) 33 Table 2 Formation and use of marketable resources of mechanical engineering products, mln. USA dollars [2] Indicator 2011 2012 2013 2014 2015 2016 Production 16734 17957 14676 8575 5276 4553 % by 2011 107,3 87,7 51,2 31,5 27,2 Domestic consumption 24885 27136 23526 13255 8979 11647 % by 2011 109,0 94,5 53,3 36,1 46,8 Export 11895 13286 10615 7361 4779 4339 % to production 71,1 74,0 72,3 85,8 90,6 95,3 Imports 20046 22465 19466 12042 8481 11433 % to production 119,8 125,1 132,6 140,4 160,7 251,1 % to consumption 80,6 82,8 82,7 90,8 94,5 98,2 Balance -8151 -9179 -8851 -4681 -3702 -7094 Export import coverage ratio 0,59 0,59 0,55 0,61 0,56 0,38 The data in Table 2.2 indicate the rapid growth of export products in the structure of production of the Ukrainian machine-building complex. The share of the export declined slightly only in 2013, but since 2014 it has started to grow again, with a much higher rate, reaching 95.3% of total production in 2016. In addition, Table 2.2 shows that in recent years there has been a steady increase in imports of mechan- ical engineering products, with rapid growth observed in 2014, after which the growth rate slowed slightly. Despite the slowdown in the growth rate of imports, in 2016 its share reached 98.2% of the total consumption of products of the machine-building complex (USD 11.4 billion). In terms of product structure, the main segments of the Ukrainian import of mechanical engineering products are: - high-tech machine-building products, repre- sented by finished products, as well as parts and com- ponents; - cars and other motor vehicles; - electrical apparatus for switching or protecting electrical circuits; - fittings isolated for electric machines; - tractors; - machines are agricultural, garden or forestry; - motor vehicle parts and accessories; - cocks, valves, gates and similar pipeline equip- ment. The territorial structure of Ukrainian imports of machine-building products is presented in Fig. 3. Figure 3 - Territorial structure of Ukrainian imports of machine-building products The largest importing countries of machine-build- ing products in the Ukrainian market are considered Germany, Poland, Italy, Czech Republic, France, etc. It should be noted that the needs of the Ukrainian market for high-tech products, which at the time of the survey were satisfied by imports, significantly reduce the competitiveness of the domestic machine-building complex due to both increased foreign economic and foreign policy risks for direct consumers of products and aggravation of the domestic market for domestic 15 44,1 31,4 9,5 CIS EU Asia Others
  • 34.
    34 Sciences ofEurope # 60, (2020) manufacturers. In other words, the significant import- dependence of the Ukrainian machine-building market for Ukrainian manufacturers means the need for a fierce competition with well-known transnational corpora- tions, not only in foreign markets, but also for the do- mestic consumer, which in a quite large number of cases is almost impossible due to the incomparability of competition struggle, marketing budgets and tech- nology. In these conditions, it is becoming difficult for machine-building enterprises of Ukraine to ensure ef- fective development, which is reflected in the results of financial and economic activity of enterprises: in 2016, a large part of industrial enterprises of Ukraine was un- profitable (Table 3). Table 3 Analysis of financial results of Ukrainian enterprises by industrial activity categories[4] Activity category Financial result before taxation (balance), UAH billion. Enterprises that had losses (in % to total quantity) 2012 г. 2013 г. 2014 г. 2015 г. 2016 г. 2015 г. 2016 г. Industry including: 21,4 13,7 -166,4 -181,4 4,7 27,1 34,3 Machine-building 13,3 5,5 -20,5 -12,7 -0,1 25,9 29,3 Production of motor vehicles 9,1 3 -10,6 -6,5 -0,5 30,3 30,2 Production of electric equipment 1,6 0,8 -4,4 -4,1 -0,4 26,4 31,4 The dynamics of financial results of Ukrainian machine-building enterprises by individual categories of industrial activity is presented graphically in Fig. 4. Figure 4 - Dynamics of financial results of Ukrainian machine-building enterprises As you can see, the decline in the profitability of the engineering industry began in 2013 (by UAH 7.8 billion relative to the results of 2012), which is primar- ily the result of the internal political crisis, which exac- erbated in the fall of 2013. However, this decrease peaked in 2014, when the financial result of machine- building enterprises of Ukraine decreased by UAH 26 billion. (472.72%), and by the end of 2014 the losses reached UAH 20.5 billion. The sharp fall in the profit- ability of machine-building enterprises is explained, first of all, by the further exacerbation of the internal political crisis (in the first quarter of 2014) and the emergence of a negative influence of a number of for- eign-policy factors (in the second quarter of 2014), which led not only to the physical loss of a number of machine-building enterprises of the Crimea and the Donbass and the breakdown of established economic relationship and a significant deterioration of sectoral cooperation, but also to the actual loss of part of the traditional markets, especially for energy, aviation and some other industries. A sharp negative change in ex- change rates in the second half of 2014 also had a neg- ative impact on financial results. And although the decline in profitability of enter- prises managed to stop already next year, in 2015, when the increase of financial results of activity of enterprises amounted to UAH 7.8 billion, it was not possible to re- store the profitability of machine-building enterprises of industry as of 2016, since the profit indicator for end of 2016 remained negative (minus UAH 0.1 billion). y = -4,5x + 10,6 R² = 0,2712 y = -2,87x + 7,51 R² = 0,3423 y = -0,89x + 1,37 R² = 0,2549 -40,00 -30,00 -20,00 -10,00 0,00 10,00 20,00 2012 2013 2014 2015 2016 Mechanical Engineering Manufacture of motor vehicles Manufacture of electrical equipment Linear (Mechanical Engineering) Linear (Manufacture of motor vehicles) Linear (Manufacture of electrical equipment)
  • 35.
    Sciences of Europe# 60, (2020) 35 The linear trend of financial performance of the enter- prises of the machine-building industry, which is de- scribed by the equation y = -4,5x + 10,6, has a descend- ing slope, which indicates that the negative trends re- main in the financial results of the activity. The results of the financial activities of certain branches of the Ukrainian machine-building industry correspond to the main tendencies of the dynamics of the financial results of the Ukrainian machine-building enterprises of the machine-building complex. The de- cline in profitability of motor vehicle and electrical equipment manufacturers began in 2013 (by UAH 6.1 billion and UAH 0.8 billion, respectively). For each of the above sectors, a peak decrease in profitability was recorded in 2014: by (UAH 13.6 billion (453.33%) for motor vehicle manufacturing enterprises and by UAH 5.20 billion (650%) for electrical equipment manufac- turing companies. Profitability recovery also began the following year, when the profitability of motor vehicle enterprises increased by UAH 4.1 billion and of enter- prises in the production of electrical equipment by UAH 0.3 billion. None of the sectors under study reached positive results by the end of 2016: losses of motor vehicle enterprises amounted to UAH 0.5 billion and losses of electric equipment manufacturers to UAH 0.4 billion. Linear trends in financial results (y = -2.87x + 7 , 51) for the enterprises of motor vehicles produc- tion and (y = -0,89x + 1,37) for the enterprises of elec- trical equipment production) also have a descending slope, which indicates that the negative trends are main- tained in the development of the enterprises of the in- dustry. As can be seen from Table 2.3, a considerable part of Ukrainian machine-building enterprises in the reali- ties of the modern economy were on the brink of ex- tinction, as 29.3% of machine-building enterprises de- clared losses as a result of financial activity in 2016, including 31.4% of the enterprises for the production of electrical equipment and 30.2% of the enterprises of motor vehicles production [4]. The author of the study considers that the main factors that have caused the negative tendencies in the development of the Ukrainian machine building are the integrated effects of a number of political, foreign pol- icy and foreign economic factors, first of all: the politi- cal crisis of 2013-2014; the breakdown of internal co- operation relationships due to the influence of foreign policy factors in 2014; loss of a number of enterprises due to the influence of foreign policy factors in 2014; loss of traditional markets; sharp changes in exchange rates and more. Conclusions and suggestions. As a result of the analysis of the prerequisites for the development of a logistic approach at the Ukrainian machine-building enterprises, it was found that at the time of the research, Ukrainian machine-building enterprises found them- selves in a rather difficult situation, due to the complex influence of a number of political, foreign and eco- nomic factors. The breakdown of internal cooperation relationships, sharp changes in exchange rates and the loss of traditional markets by many enterprises led to a sharp decline in financial performance of machine- building enterprises in 2014 and increased import de- pendency and export orientation of machine-building production. The linear trends of financial results calcu- lated by the author point to negative tendencies in the development of enterprises. According to the author, in these conditions the ef- fective activity of machine-building enterprises in the realities of the modern Ukrainian economy can be en- sured only through technological modernization of en- terprises, and first of all - updating of management technologies, introduction of new, highly effective ap- proaches to management activity. The author considers the most effective approach to management a logistical approach, one of the significant advantages of which is the possibility of step-by-step implementation, which in the conditions of loss of a considerable part of ma- chine-building enterprises significantly increases the reach of management technology for practical imple- mentation at Ukrainian enterprises of machine-build- ing. However, taking into account the significant dif- ferences between the logistically and classical approach that is historically commoner in Ukraine, for successful implementation of the logistic approach in the manage- ment system of a machine-building enterprise it is nec- essary to take into account a number of additional fac- tors, such as technological compliance of the enterprise to the implementation of logistical approach, enterprise opportunities for investment in management technolo- gies etc., which requires further elaboration of practical implementation issues of logistic approach in manage- ment of machine-building enterprises by Ukrainian sci- entists. References 1. Брохун Н.С. Поняття логістики як інструмента управління підприємством / Н.С. Брохун, М.М. Бонь // Проблеми теорії та методології бухгалтерського обліку, контролю і аналізу - Вип. 3 (27). - 2013. - с.19 - 34. 2. Гахович Н.Г., Завгородня М.Ю. Машинобудування України: ретроспектива та перспективи // Економічний вісник університету: зб. наук. праць учених та аспірантів. – Переяслав- Хмельницький, ДВНЗ «Переяслав-Хмельницький державний педагогічний університет імені Григорія Сковороди», 2017.– Вип. 34(1). – С. 37-47 3. Державна служба статистики України [Електронний ресурс] – режим доступу: http://www.ukrstat.gov.ua 4. Дикань В. Л. Глобализационные процессы в экономике Украины / В. Л. Дикань, А.В. Кузуб // Вісник економіки транспорту і промисловості – 2017. - № 58. – С.9-18 «Переяслав-Хмельницький державний педагогічний університет імені Гри- горія Сковороди», 2017.– Вип. 34(1). – С. 37-47 5. Комеліна О.В. Логістичне управління збутовою діяльністю підприємства: концептуальний підхід / О.В.Комеліна, Р.С.Гаманко // Економіка і суспільство - №13 - 2017 - с.518 - 524 6. Мішенін Є. Логістичне управління промисловим виробництвом у контексті розвитку
  • 36.
    36 Sciences ofEurope # 60, (2020) «зеленої» економіки в Україні / Є. Мішенін, І. Коблянська // Економiст - №1 - 2012 - с.8-12 7. Пальчик І. М. Логістичне управління підприємством – теоретико-методичний аспект / І. М. Пальчик // Ефективна економіка - № 10 - 2014. [Електронний ресурс] – режим доступу: http://www.economy.nayka.com.ua/?op=1&z=3442 8. Украина станет первой страной, добро- вольно отказавшейся от промышленности. Деинду- стриализация в цифрах и фактах [Электронный ре- сурс]. - Режим доступа: http://nk.org.ua/ekonomika/ukraina-stanet-pervoy- stranoy-dobrovolno-otkazavsheysya-ot-promyishlen- nosti-deindustrializatsiya-v-tsifrah-i-faktah-62904 ОБЕСПЕЧЕНИЕ КОРПОРАТИВНОЙ ОТВЕТСТВЕННОСТИ В УСЛОВИЯХ ЦИФРОВОЙ ЭКОНОМИКИ Минеева В.М. к.э.н., доцент Сырлыбаева В.Р. Студентка группы СЭБ-17 ФГБОУ ВО «Уфимский государственный нефтяной технический университет» (УГНТУ) ENSURING CORPORATE RESPONSIBILITY IN THE DIGITAL ECONOMY Mineeva V. k.e.s., associate Professor Syrlybaeva V. Student Of the "Ufa state oil technical University" (Ufa state petroleum technological University) DOI: 10.24412/3162-2364-2020-60-4-36-38 АННОТАЦИЯ В статье рассматривается обеспечение корпоративной ответственности в условиях цифровой эконо- мики, в частности ее новые условия в работе, новые формы бизнеса и изменения в конкурентной борьбе. ABSTRACT The article discusses ensuring corporate responsibility in the digital economy, in particular, its new working conditions, new forms of business and changes in the competitive struggle. Ключевые слова: экономика, цифровизация, управление, бизнес, общество. Keywords: economy, digitalization, management, business, society. Цифровая экономика давно вошла в повсе- дневную жизнь человека, а также заполонила все сферы производства и услуг. В связи с этим в по- следнее время общественность проявляет повы- шенное внимание к проблематике социальной от- ветственности. Выдвигаются новые требования в этой области в связи с активным распространением новых технологий. Концепция термина корпоративной социаль- ной ответственности крайне неоднозначна и вызы- вает многочисленные споры в отношении трак- товки термина, а также и в отношении решения важнейших задач бизнеса в этой сфере. Корпоративная социальная ответственность (КСО) - выполнение организациями социальных обязательств, подписываемых законом, и готов- ность неукоснительно нести соответствующие обя- зательные расходы. Во-вторых, КСО — это готовность добро- вольно нести необязательные расходы на социаль- ные нужды сверх пределов, установленных налого- вым, трудовым, экологическим и иным законода- тельством, исходя не из требований закона, а по моральным, этическим соображениям. В крупных компаниях и корпорациях в России бизнес строиться по определенным внутренним правилам - это называется корпоративное управле- ние. Корпоративное управление - система взаимо- отношений между менеджерами компании и ее вла- дельцами по вопросам обеспечения эффективности ее деятельности и защите интересов владельцев, а также других заинтересованных сторон. Большинство предприятий в двухтысячных го- дах приняли решение начать следовать кодексам корпоративного управления. Для компаний было крайне важно стремится к соблюдению междуна- родных стандартов. Они делали все возможное для привлечения иностранных инвесторов, защищая их права. Постепенно этот вопрос перестал быть акту- альным. Не все компании смогли поддерживать необходимость ведения бизнеса прозрачными ме- тодами. Спустя время тема корпоративного управле- ния снова начала набирать обороты в новой форме. Компании начали серьезно пересматривать струк- туру ведения бизнеса. Рынок растет и меняется, конкуренция становится все больше и больше, а компании стоят на месте. Экономика не должна стоять на месте, а для этого организациям нужно активно вливаться в современные тенденции разви- тия человечества. В таком случае мы сразу подра- зумеваем цифровую экономику, которая начинала менять наше сознание в 90 - х годах. Она создавала инструменты для эффективного ведения бизнеса, а
  • 37.
    Sciences of Europe# 60, (2020) 37 также влияла на различные аспекты человеческой жизни. Некая цифровизация оказала колоссальное влияние на определенные сферы: • стратегии и способы организации ведения бизнеса, его стратегии по маркетингу; • ресурсное обеспечение бизнеса; • все издержки организации; • сетевой эффект. Цифровизация повлекла за собой ряд измене- ний в работе организаций и предприятий. Отношения с клиентами, способы и стратегии. Цифровые технологии и искусственный интеллект позволяют компании углублять их отношения с клиентами, позволяют лучше понимать их желания и проблемы. Проблемы, которые волнуют клиента, стано- вятся главным источником прибыли компании. Цифровая экономика способствует налаживанию индивидуального общения с клиентом. В практику вводятся такие понятия как вовлеченность, задачи и сопереживание клиенту. Ценность клиентского опыта возрастает, что тоже приносит часть при- были компании. Новые условия в работе с покупателями. Мас- штабные результаты в науке и в экономике дают широкое применение искусственного интеллекта: от программного обеспечения для открытия новых лекарственных средств до алгоритмов, выявляю- щих наши культурные интересы и прогнозирую- щих наше поведение. Многие подобные схемы строятся на основе информационных следов, кото- рые покупатели оставляют в цифровом поле, например, находясь в социальных сетях, просмат- ривая сайты компаний или иную информацию. Изменения в конкурентной борьбе. При пере- ходе к цифровой экономике происходят изменения в условиях конкуренции. Например, конкуренты могут стать партнерами, объединяясь на базе циф- ровых платформ и совместного использования. В то же время появляется противоположное явление – конкурентный подрыв. Это неожиданное появле- ние конкурентных преимуществ у новичка, напри- мер, за счет стартапа или доступа к глобальным цифровым платформам для проведения исследова- ний, развития, маркетинга, быстрых продаж и дис- трибуции. Такие компании обгоняют авторитетных старожилов по скорости, стоимости и качеству до- ставки товара или услуги. Еще один источник кон- курентного подрыва, который дают цифровые тех- нологии, – способность пересекать границы отрас- лей. Это дает возможность на межотраслевом уровне использовать клиентские базы, инфраструк- туру и технологии. Можно представить, как повы- шается эффективность компании, как резко сокра- щаются издержки. Примером может служить внед- рение телекоммуникационных компаний в отрасли транспорта и здравоохранения. Размер компании также может стать конкурентным преимуществом при условии эффективности. Все это – сдвиги со стороны предложения. На подрыв конкурентов в бизнесе также могут влиять изменения со стороны рыночного спроса. Цифровые технологии создают прозрачность, новые модели потребительского по- ведения на основе доступа к мобильным сетям и данным. В ответ компании адаптируют методы раз- работки, маркетинга и поставки, вынуждены созда- вать новые продукты и услуги. После четвертой промышленной революции произошел сдвиг от простого распространения ин- формационной технологии к более сложной инно- вации на основе сочетания различных технологий новыми способами. В результате компании меняют формы и методы бизнеса, получая возможность со- здавать стоимость в новых сегментах рынка либо находить новые центры создания стоимости в своих прежних отраслях. Таким образом, конку- рентный подрыв как со стороны спроса, так и со стороны предложения заставляет компании посто- янно быть инновационными, т.е. постоянно пере- страиваться и меняться. Новые условия в работе с покупателями. Про- рывные результаты в науке и в экономике дает ши- рокое применение искусственного интеллекта: от программного обеспечения для открытия новых ле- карственных средств до алгоритмов, выявляющих наши культурные интересы и прогнозирующих наше поведение. Многие подобные схемы строятся на основе информационных следов, которые поку- патели оставляют в цифровом поле, например, находясь в социальных сетях, просматривая сайты компаний или иную информацию. В частности, уже используются, такие приложения, как, например, Siri (от компании Apple) к мощной подсистеме ис- кусственного интеллекта (AI Field). Обрабатывая индивидуальную информацию о пользователях сайтов, они выполняют роль интеллектуальных консультантов, формируя «окружающий разум». Это интеллектуальная цифровая интерактивная среда, которая окружает пользователя автоматизи- рованными личными консультантами. Электрон- ные устройства изучают и прогнозируют потребно- сти, помогают сделать выбор и реализовать его, формируя личную экосистему человека. Новые формы бизнеса. Новая форма сотрудни- чества бизнеса в цифровой экономике – коллабора- тивные инновации. Ее возникновение связано с быстрым появлением инноваций и их дизруптив- ным воздействием. Например, компании может не хватать финансов и знаний различных тонкостей ведений бизнеса. Все уто имеет другая компания, но в свою очередь этой компании не хватает циф- ровой грамотности и новыков в работе с клиентами. Тогда предприятия объединяют свои ресурсы, сов- местно реализуя инновационные проекты. Интегра- ция возможностей способствует созданию новой ценности. Яркий пример – сотрудничество про- мышленного гиганта Siemens, который ежегодно вкладывает в научно-исследовательские и опытно- конструкторские разработки по четыре миллиарда американских долларов, и молодой инновационной компании Ayasdi. Профиль последней – самообуча- ющиеся машины, фирма создана в Стэндфорде в 2008 г. В итоге Siemen получил возможность гене- рировать идеи на основе обработки больших дан- ных, а Ayasdi – тестировать их на практике и одно- временно присутствовать на рынке, используя воз- можности маститого партнера. Производными от такого сотрудничества являются новые формы биз- неса на основе совместного пользования, совмест- ного хранения и т.д. Например, объединения для совместного использования автотранспорта города.
  • 38.
    38 Sciences ofEurope # 60, (2020) Объединяются предприятия из различных отраслей промышленности для совместного обслуживания клиентов (интегрированного обслуживания). Такие ассоциации через многостороннее сотрудничество интегрируют мир офиса и мир онлайн-бизнеса. Для получения прибыли от применения цифровых тех- нологий компаниям приходится кардинально ме- нять свои операционные модели, быть весьма мо- бильными. Новой операционной моделью, практи- кующей совместное использование, является платформа. Платформенный метод начал приме- няться во время третьей промышленной револю- ции. Он основан на сетевом эффекте при переходе в цифровое пространство. С началом четвертой промышленной революции появились глобальные платформы, тесно связанные с физическим миром. Стратегии платформ одновременно и дизруптивны, и экономически эффективны. Исследования Масса- чусетского университета показали, что из 30 миро- вых брендов с наибольшей суммарной рыночной стоимостью в 14 самых крупных применяли плат- форменные стратегии. Хорошим примером сочета- ния платформы и маркетинговой стратегии высо- кой ориентации на клиента является Amazon, пре- вратившаяся из книжного магазина в розничный конгломерат, ежегодно приносящий 100 млрд. долл. прибыли. Фирма активно использует сетевые эффекты, обеспечивая через цифровые магазины доступ к миллионам различных книг и музыкаль- ных произведений. Глубокое понимание клиент- ских предпочтений и достижение высокой лояльно- сти клиентов позволяет работать одновременно в нескольких секторах. В получении доходов акцент смещается с продажи продукта на продажу услуги с его использованием и доступ к потребителям практически в глобальном масштабе. Деловая среда в цифровом сообществе. В циф- ровой экономике развивается новая организацион- ная структура бизнеса – система цепочки блоков (блокчейн). Сильная ее сторона – децентрализован- ность, благодаря которой платежи перемещаются в глобальном пространстве мгновенно и прозрачно. Поэтому не нужно открывать множество офисов и создавать юридические лица со всеми присущими им административными издержками. Блокчейн позволяет строить дешевую бизнес-структуру с не- большим количеством внутренних специалистов. Остальных может быть десятки тысяч, рассредото- ченных по всему миру. Например, в глобальном агентстве IMG – 60 сотрудников и немного людей, продающих рекламу. За Россию отвечает всего один человек, и этого достаточно. Принцип гло- бальной децентрализации ускоряет стирание гра- ниц между странами, и с распространением блок- чейна прогнозируется появление большого количе- ства мультинациональных компаний. Такова новая организационная структура бизнеса, присущая цифровой экономике. В последней деловая среда меняется во многом благодаря блокчейну, уходя в цифровые коды и облачные вычисления. Помимо подмены функции банков и традиционных финан- совых организаций, освобождая проекты от при- вязки к ставке рефинансирования, блокчейн в буду- щем сможет заменить суды, юристов, вместо дого- воров реализуя трудовое право. Иными словами, децентрализованная глобаль- ная компания существует вне страновой юрисдик- ции. Для бизнеса это большая экономия на внутри- фирменных трансакциях, зато для государства – проблема с налогообложением и регулированием. Впрочем, правовое регулирование осуществляет сам блокчейн. Смарт-контракт и стоит на страже порядка. Помимо этого возможно существование облачного арбитража: программа сама выбирает присяжных заседателей из блокчейн-сообщества. Они изучают документацию и содержание кон- фликта. Заблокированная спорная сумма в зависи- мости от вердикта либо остается на счету компа- нии, либо переводится на счет сотрудника. Таким образом, переходя в цифровое пространство, мно- гие учреждения, в том числе и суды, меняют свою организационную форму. Проблемы разрешаются быстро и на высоком экспертном уровне. Электрон- ный код не подвержен ни взяточничеству, ни лоб- бированию. Режим прав собственности становится прозрачным и гарантированным при прочих рав- ных условиях. Специалисты совершенствуют за- щиту от киберпреступности. Однако эта задача сей- час стоит перед государствами всего мира и должна решаться на глобальном уровне. Блокчейн поможет и в этой области. Итак, деловая среда будет совер- шенствоваться при переходе компаний на цифро- вые технологии ведения бизнеса и соединении их с производством. Их использование и распростране- ние облегчает работу, прежде всего снижая тран- сакционные издержки. А значит, создаются допол- нительные источники прибыли и конкурентные преимущества. Литература 1. Арбатов, А.А. Экономическая безопасность России: Общий курс: учебник / В.К. Сенчагов, А.А. Арбатов, А.А. Ведев; Под ред. В.К. Сенчагова. — М.: БИНОМ. ЛЗ, 2018. 2. Доценко Д.В. Экономическая безопасность: методологические аспекты и составляющие / Д.В. Доценко // Аудит и финансовый анализ. - 2011.-№4. 3. Кузнецова, Е.И. Экономическая безопас- ность и конкурентоспособность. Формирование экономической стратегии государства. Моногра- фия. Гриф УМЦ «Профессиональный учебник». Гриф НИИ образования и науки. / Е.И. Кузнецова. — М.: ЮНИТИ, 2017. 4. Минеева В.М., Орлова Н.В., Галиуллина Г.Ф., Султанова Л.М. Теоретический аспект моде- лирования и развития предпринимательской дея- тельности среднего и малого бизнеса в условиях цифровой экономики. В сборнике: Европейский научный форум студентов и учащихся. сборник статей Международной научно-практической кон- ференции. Петрозаводск, 2020. С. 18-27. 5. Минеева В.М., Рахматуллина Д.Р. Оценка предпринимательского риска в условиях электрон- ной экономики. В сборнике: Наука сегодня: теория и практика. Сборник научных статей VI Междуна- родной научно-практической конференции. 2019. С. 141-143. 6. Минеева В.М., Кусмаева А.М. Факторы, обеспечивающие конкурентоспособность предпри- нимательских структур в среде электронной эконо- мики. В сборнике: Наука сегодня: теория и прак- тика. Сборник научных статей VI Международной научно-практической конференции. 2019. С. 146-148.
  • 39.
    Sciences of Europe# 60, (2020) 39 БЮДЖЕТ ЯК ІНСТРУМЕНТ ЕКОНОМІЧНОГО РОЗВИТКУ Шалашна А.О. аспірант кафедри фінансів, Київський національний торговельно-економічний університет BUDGET AS AN TOOL OF ECONOMIC DEVELOPMENT Shalashna A. Kyiv National University of Trade and Economics, postgraduate student of the Department of Finance DOI: 10.24412/3162-2364-2020-60-4-39-43 АНОТАЦІЯ У статті розкрито сутність бюджету як інструменту економічного розвитку. Визначено, що інститу- ційний підхід передбачає розгляд бюджетної політики як динамічної системи, що постійно вдоско- налюється відповідно до основних макроекономічних завдань. Створення відповідних інституційних умов для формування та реалізації ефективної бюджетної політики потребує використання адаптивної системи бюджетного регулювання, що сприятиме досягненню збалансованого та стійкого соціально-економічного розвитку країни. Ефективність формування та реалізації бюджетної політики визначається рівнем ро- звитку фінансово-бюджетних інститутів спрямованих на забезпечення економічного зростання країни та добробуту громадян. Показано, що від якості прогнозування і планування бюджетних показників залежить стійкість державних фінансів. Для подальшого розвитку бюджетного прогнозування доцільно враховувати су- купність динамічних взаємозв’язків між складовими бюджетної архітектоніки. Розвинуто підходи до підви- щення ефективності і результативності використання бюджетних коштів при реалізації стратегічних зав- дань соціально-економічного розвитку країни. ABSTRACT The article reveals the essence of the budget as a tool for economic development. It is determined that the institutional approach involves the consideration of fiscal policy as a dynamic system that is constantly improving in accordance with the main macroeconomic objectives. Creating appropriate institutional conditions for the for- mation and implementation of effective budget policy requires the use of an adaptive system of budget regulation, which will contribute to the achievement of balanced and sustainable socio-economic development of the country. The effectiveness of the formation and implementation of budget policy is determined by the level of development of financial and budgetary institutions aimed at ensuring economic growth and welfare of citizens. It is shown that the stability of public finances depends on the quality of forecasting and planning of budget indicators. For further development of budget forecasting, it is advisable to take into account the set of dynamic relationships between the components of budget architecture. Approaches to increase the efficiency and effectiveness of budget funds in the implementation of strategic objectives of socio-economic development of the country. Ключові слова: бюджет, бюджетна система, бюджетні відносини, бюджетна політика, бюджетний механізм, економічний розвиток. Keywords: budget, budget system, budget relations, budget policy, budget mechanism, economic develop- ment. Постановка проблеми. Бюджет відіграє ва- гому роль у системі державного регулювання соціально-економічного розвитку країни. Ефек- тивність формування та реалізації бюджетної політики визначається рівнем розвитку фінансово- бюджетних інститутів спрямованих на забезпе- чення економічного зростання країни та добробуту громадян. Циклічність та динамічність еко- номічних процесів зумовлює необхідність адапта- ції складових бюджетної політики до змін фінан- сово-економічних умов. У зв’язку з цим важливо своєчасно і виважено оцінити вплив екзогенних та ендогенних факторів на інституційні засади бюджет- ного простору. Бюджет має бути взаємоузгодженим із стратегічними цілями економічних перетворень, спрямовуватись на створення належних умов для поглиблення взаємодії держави і суспільства, підвищення рівня і якості життя населення. В умо- вах інституційних перетворень економіки результа- тивність та дієвість бюджетної політики є важли- вим інструментом впливу на ефективність макрое- кономічного регулювання, економічне зростання з врахуванням необхідності забезпечення динамічної збалансованості та стійкості системи управління державними фінансами. Аналіз останніх досліджень і публікацій. Се- ред вагомих наукових досліджень зарубіжних вче- них у сфері розвитку бюджетних відносин можна назвати праці Дж. М. Кейнса, П. Кругмана, В.Нордхауса, А. Парето, Дж. Сакса, П.Самуель- сона, Дж. Стігліца, В. Танзі. Питання формування бюджетної політики досліджуються у працях віт- чизняних вчених: Т.Канєвої [1,4], С.Качули [6], Л.Лисяк, В.Макогон [2,5], М.Пасічного[1,4], О.Са- мошкіної [3], В.Федосова, І.Чугунова [1-6] та ін- ших.
  • 40.
    40 Sciences ofEurope # 60, (2020) Метою статті є розкриття сутності бюджету як інструменту економічного розвитку. Виклад основного матеріалу. Бюджет є еко- номічною категорію, що уособлює відносини, які виникають у процесі цілеспрямованого впливу дер- жави на суспільне відтворення. З метою посилення впливу бюджетної системи на соціально-еко- номічний розвиток країни потрібно вживати за- ходи, спрямовані на підвищення рівня збалансова- ності бюджету, ефективності використання бюд- жетних коштів, удосконалення міжбюджетних відносин, забезпечення якісного виконання бюд- жетів усіх рівнів, здійснення дієвого державного фінансового контролю. Бюджетна система є адап- тивним механізмом у системі регулювання еко- номіки, спрямованим на забезпечення адекватності заходів внутрішнім і зовнішнім змінам економіч- ного середовища з метою економічного розвитку країни. Від ступеня оптимізації обсягів і структури дохідної та видаткової частин бюджету залежить рівень економічного зростання. Бюджетний ме- ханізм повинен забезпечувати втілення бюджет- ного регулювання, відображати певну спрямо- ваність бюджетних відносин на вирішення еко- номічних і соціальних завдань на конкретному етапі розвитку країни. Економічна сутність бюд- жетної політики в якості інструменту регулювання економічного розвитку полягає у використанні бюджетної архітектоніки, яка визначається опти- мальними співвідношеннями структури бюджету для впливу на динаміку економічного зростання. Основними передумовами досягнення якісного рівня здійснення державного регулювання є вива- женість підходів при формуванні бюджетних ви- датків, що сприятимуть реалізації основних пріори- тетів соціально-економічного розвитку країни. Важливим є планування бюджетних програм та суспільних послуг, які відповідають встановленим пріоритетам держави, є найбільш ефективними та дієвими, спроможними забезпечувати економічну стійкість у довгостроковій перспективі. Питання формування бюджету відіграють ва- гому роль у досягненні поставлених завдань соціально-економічного розвитку країни, вико- нанні державою відповідних суспільних функцій. Фінансування соціальної інфраструктури пози- тивно впливає на збереження та прискорення ро- звитку людського капіталу, підвищення якості соціального захисту малозабезпечених верств насе- лення, освіти, медичних послуг. Бюджетна політика як вагомий інструмент системи держав- ного регулювання економіки має спиратися на дов- гострокову програму економічного та соціального розвитку країни. Упорядкування регулюючих цілей бюджетної політики, дозволяє досягти відповід- ного збалансування процесу перерозподілу фінан- сових ресурсів у суспільстві, рівня задоволення сус- пільних потреб. Необхідним є забезпечення пере- творення бюджетного механізму в дієвий засіб реалізації соціально-економічної стратегії, підви- щення ефективності використання бюджетних коштів. На даному етапі розвитку бюджетної си- стеми як складової державних фінансів важливим є використання обґрунтованих методів бюджетного планування з метою покращення результативності використання бюджетних коштів, надання держав- них послуг, спрямованих на отримання якісного суспільного результату [1]. Необхідність забезпечення цілеспрямованого впливу на темпи економічного зростання вимагає формування відповідного якісного рівня системи бюджетного регулювання, яка ґрунтується на су- купності бюджетних інструментів, удосконалення інституційних засад фінансово-економічних пере- творень. Інституційні засади бюджетної політики ґрунтуються на інтеграції складових фінансового механізму у сфері формування доходів бюджету, планування видатків бюджету, міжбюджетних відносин, управління державним боргом, виходячи із циклічності економічного розвитку, стану дер- жавних фінансів, що сприяє підвищенню дієвості бюджетного механізму як вагомого інструменту розвитку соціально-економічних відносин суспіль- ства. Бюджетна політика має адаптивно реагувати на економічну циклічність при необхідності утримання індикативних значень дефіциту бюджету та державного боргу. Підвищення ефективності бюджетних видатків потребує узгодження цілей бюджетних програм з пріоритетами соціально- економічного розвитку країни, використання дієвих форм державної фінансової підтримки. Особливого значення набувають питання запровадження системи середньострокового та стратегічного бюджетного планування. З метою забезпечення послідовності, си- стемності та ефективності бюджетної політики важ- ливим є формування довгострокової бюджетної стра- тегії із визначенням результативних показників ре- алізації її основних напрямів. В умовах обмеженості фінансових ресурсів вагомим завданням реалізації бюджетної політики є концентрація фінансування на пріоритетних напрямах соціально-економічного ро- звитку країни, обґрунтування ієрархії цілей, завдань та принципів бюджетної політики, узгодження фінан- сових можливостей бюджету щодо реалізації даних цілей в межах бюджетних періодів. Доцільним є по- глиблення взаємозв’язку річного та перспективного бюджетного планування. В сучасних умовах, при ро- зробці перспективних напрямів бюджетної політики необхідним є врахування здійснення переорієнтації економіки на переважно ендогенні чинники еко- номічного зростання. Важливим є впровадження се- редньострокового індикативного планування в діяль- ність головних розпорядників бюджетних коштів. Перспективне планування бюджету є одним із необхідних інструментів державного регулювання соціально-економічного розвитку країни, переду- мовою підвищення керованості бюджетного про- цесу, впливу бюджету на досягнення цілей та зав- дань розвитку національної економіки. При фор- муванні бюджету держава виходить із розуміння необхідності забезпечення фінансування стра- тегічних довгострокових програм економічного ро- звитку, фінансування важливих бюджетних про- грам. Від якості прогнозування і планування бюджет- них показників залежить фінансова стійкість
  • 41.
    Sciences of Europe# 60, (2020) 41 державних фінансів. Для подальшого розвитку бюд- жетного прогнозування доцільно враховувати сукуп- ність динамічних взаємозв’язків між складовими бюджетної архітектоніки [2]. Дослідження досвіду формування бюджету в країнах із розвинутою та трансформаційною еко- номікою, дозволило виявити основні тенденції у проведенні перетворень системи бюджетного пла- нування протягом останніх років. Достатнього впровадження набули програмно-цільовий метод планування бюджету, у тому числі у середньостро- ковій перспективі, система оцінювання бюджетних програм, що включають відповідні результативні показники. Планування та виконання бюджету ба- зується на підвищенні результативності бюджетних видатків та оцінюється такими показниками, як якість державних послуг та їх вплив на соціально- економічний розвиток країни. Значні зміни відбу- лися у системі державного фінансового контролю шляхом удосконалення та оновлення його прин- ципів, форм та методів, розвитку відомчого фінан- сового контролю та аудиту. Більшість країн світу протягом останніх років дотримуються політики жорсткої економії бюджетних коштів, бюджетної дисципліни, прозорості бюджету, що сприяє змен- шенню боргових зобов’язань, дефіциту бюджету. Низка країн використовують дієві механізми інте- грації коротко-, середньо- і довгострокового бюд- жетного планування. Основні параметри податко- вої, бюджетної і боргової політики необхідно базу- вати на орієнтирах, розроблених у системі довгострокового планування, які повинні ак- туалізуватися з урахуванням фактичних умов ро- звитку економіки, можливого уточнення пріоритет- них економічних завдань з врахуванням змін зовнішнього середовища. Сучасний досвід за- рубіжних країн щодо застосування бюджетної стра- тегії ґрунтується на необхідності здійснення се- редньострокового бюджетного прогнозування і планування під час підготовки щорічного бюджету. Визначеною тенденцією сучасного досвіду за- рубіжних країн є системне удосконалення бюджет- ного процесу, у тому числі подальше впровадження програмних методів складання бюджету, оцінювання результативності бюджетних програм, що сприятиме посиленню ефективності викори- стання бюджетних коштів через встановлення взаємозв’язку між затратами та досягнутими ре- зультативними показниками. У країнах із розвину- тою економікою відбувається удосконалення си- стеми державного фінансового контролю, у тому числі внутрішнього контролю та аудиту ефектив- ності використання бюджетних коштів. Більшість країн світу протягом останніх років дотримуються політики жорсткої економії бюджетних коштів, бюджетної дисципліни, прозорості бюджету, що сприяє зменшенню боргових зобов’язань, дефіциту бюджету. Низка провідних країн використовують дієві механізми інтеграції коротко-, середньо- і дов- гострокового бюджетного планування [4]. Дієвість планування видатків бюджету, як одна із важливих складових системи управління бюджетом, має суттєве значення в питаннях забез- печення стабільності фінансової системи країни, стійкого економічного зростання. У системі голов- ного розпорядника бюджетних коштів на стадії планування видатків дозволить підвищити рівень ефективності бюджетних програм підготовка стра- тегічних планів їх діяльності, оптимальна струк- тура бюджетних програм у межах граничних сум середньострокового бюджету, деталізація завдань та напрямів бюджетних видатків з розмежуванням на видатки споживання та видатки розвитку, вста- новлення чіткого взаємозв’язку між запланованими обсягами коштів бюджету і очікуваними результа- тами. Сприятиме посиленню ефективності викори- стання бюджетних коштів розвиток системи дер- жавного фінансового контролю, у тому числі аудиту бюджетних програм, дотримання фінан- сово-бюджетної дисципліни, раціональне викори- стання ресурсів бюджету, зменшення втрат бюд- жету шляхом недопущення утворення дебіторської та кредиторської заборгованості. Важливим є здійснення підвищення рівня дієвості та прозорості механізмів публічних закупівель. З урахуванням економічних тенденцій, системний підхід до оцінки ефективності видатків бюджету має передбачати виокремлення критеріїв економічної та соціальної ефективності на стадіях формування і виконання бюджетної програми. Вагоме значення посідають питання розвитку механізмів попереднього держав- ного фінансового аудиту, оперативного аналізу і контролю бюджетних програм з метою адаптив- ності змін рівня їх фінансового забезпечення. До- цільним є удосконалення підходів до формування державних цільових та бюджетних програм, відоб- раження в даних програмах індикативних показ- ників соціально-економічного розвитку країни, що має посилити щільність зв’язку основних пара- метрів бюджетних програм і пріоритетів державної економічної політики. Видатки бюджету є ефективним інструментом державного регулювання соціально-економічних процесів у країні, оскільки обґрунтовують напрями використання бюджетних коштів з урахуванням цілей і пріоритетів суспільного розвитку. Важли- вим є забезпечення раціонального розподілу обме- жених бюджетних ресурсів між напрямами суспіль- ного розвитку шляхом забезпечення відповідності обсягу і структури видаткової частини бюджету визначеним стратегічним пріоритетам розвитку країни з урахуванням динаміки соціально-еко- номічних процесів. Підвищення ефективності і ре- зультативності використання бюджетних коштів при реалізації стратегічних завдань соціально-еко- номічного розвитку країни потребують удоскона- лення системи формування видатків бюджету шля- хом наукового обґрунтування системи бюджетного регулювання у сфері видатків та перспективного прогнозування і планування видаткової частини бюджету. Спрямованість бюджетної політики на отримання конкретних суспільно вагомих резуль- татів передбачає удосконалення системи оцінки ре- зультативності використання бюджетних коштів з метою зміщення акцентів від управління бюджет- ними ресурсами до управління бюджетними ре-
  • 42.
    42 Sciences ofEurope # 60, (2020) зультатами, що сприятиме перетворенню бюджет- них видатків у дієвий інструмент розвитку суспіль- них відносин [3]. Рівень результативності виконання бюджет- них програм відображає ефективність діяльності головних розпорядників бюджетних коштів, якість виконання стратегічних планів їх діяльності, що ма- ють узгоджуватися із національними програмами економічного розвитку, основними напрямами бюджетної політики та значним чином впливає на стан соціально-економічного розвитку країни. Від якості планування бюджетних показників залежить фінансова стійкість системи державних фінансів. Доцільним є актуалізація стратегії управління внутрішнім та зовнішнім державним боргом, фор- мування річних планів заходів щодо його оп- тимізації у розрізі кварталів з метою зменшення пікових навантажень на державний бюджет. Необ- хідним є подальший розвиток методологічних під- ходів щодо формування бюджетних та державних цільових програм, відображення в даних програмах індикативних показників та індикаторів стра- тегічних документів соціально-економічного ро- звитку країни, що має посилити рівень кореляції програм і пріоритетів державної політики. Важли- вим є визначення граничних обсягів фінансування довгострокових програм економічного спря- мування за рахунок бюджетних коштів. При підго- товці програми важливо визначити показники ефективності та якості її виконання. Доцільність ре- алізації бюджетної програми має ґрунтуватись на основі кінцевих цілей, передбачених планами діяльності головного розпорядника коштів. Ступінь дієвості планування бюджетних асиг- нувань на виконання цільових загальнодержавних та місцевих програм залежить від своєчасності моніторингу та оцінки ефективності даних про- грам. Досягнення сталого соціально-економічних розвитку країни потребує виваженого регулювання не лише обсягу, а і структури видаткової частини бюджету з метою забезпечення оптимального розподілу бюджетних коштів між різними напря- мами суспільної діяльності. Основним завданням державної політики у сфері видатків бюджету є оп- тимізація та економія їх обсягу з одночасним підви- щенням ефективності і результативності їх викори- стання з метою забезпечення достатньо високої якості державних послуг в умовах обмеженості бюджетних ресурсів. Формування обсягу і струк- тури бюджетних видатків повинно розпочинатися з ретельного аналізу динаміки соціально-демо- графічних і економічних процесів у країні з метою визначення фази їх циклічного розвитку, тенденцій динаміки фактичних показників видаткової ча- стини бюджету у попередніх періодах, виявлення особливостей взаємного впливу обсягу і структури видатків бюджету та показників соціально-еко- номічного розвитку країни. На підставі зазначеного аналізу повинно відбуватися прогнозування і пла- нування показників видаткової частини бюджету, а також моделювання їх впливу на показники соціально-економічного розвитку країни у се- редньо- та довгостроковій перспективі. Прогно- зування і планування видатків бюджету має підля- гати інституційним обмеженням відповідно до етапу соціально-економічного розвитку країни щодо обсягу і особливостей структури видаткової частини бюджету, рівня дефіциту бюджету у взаємозв’язку з показниками державного боргу, співвідношення поточних і капітальних видатків бюджету, інвестиційної складової бюджету [5]. Бюджетні призначення мають сприяти розв’язанню пріоритетних завдань, забезпечувати заходи, спрямовані на розвиток основних галузей економіки, фінансувати реалізацію комплексних економічних та соціальних програм. Бюджетна політика має бути спрямованою на створення умов для модернізації інноваційної інфраструктури еко- номіки. Враховуючи необхідність зміцнення люд- ського капіталу, важливим є упорядкування ме- ханізмів фінансування галузей соціальної сфери, у тому числі закладів медичної та освітньої галузі. Доцільним є систематизація пріоритетів соціаль- ного розвитку, удосконалення методологічних за- сад формування відповідних цільових програм. За умов обмеженого доступу до залучення державних запозичень на зовнішніх ринках фінансового капіталу було збільшено обсяги запозичень шляхом розміщення облігацій внутрішньої державної по- зики. Вагомого значення набуває розвиток первин- ного ринку державних боргових паперів, що потре- бує реалізації комплексних заходів у сфері досяг- нення фінансової стабільності. Удосконалення бюджетного процесу сприяє підвищенню рівня бюджетної результативності та адаптивності бюд- жетного планування до сучасних соціально-еко- номічних умов. Важливим є підвищення рівня якості розробки та реалізації державних цільових програм, що надасть змогу посилити дієвість впливу бюджетних механізмів на економічні та соціальні процеси. Необхідним є мінімізація кіль- кості програм, які не відносяться до функцій голов- ного розпорядника бюджетних коштів, удоскона- лення порядку їх звітування про виконання планів діяльності на середньостроковий період. При фор- муванні видаткової частини бюджету слід викори- стовувати інструменти моніторингу та оцінки ефек- тивності відповідних видатків бюджету. На основі одержаних результатів оцінювання будуть здійснюватися коригування бюджетних програм та прийматися рішення щодо виділення бюджетних коштів у наступних за плановим періодах. Доціль- ним є упорядкування переліку результативних по- казників для учасників бюджетного процесу, онов- лення критеріїв виконання бюджетних програм [6]. Для розробки і реалізації збалансованого бюд- жетного регулювання пріоритети бюджетної політики повинні визначатися виходячи з цикліч- ності економічного розвитку, стану державних фінансів та запасу стійкості бюджетної системи, на кожному етапі економічного розвитку існує необ- хідність обґрунтування та запровадження відповідних важелів бюджетного механізму. Се- редньострокове бюджетне планування є необ- хідною умовою підвищення керованості та якості процесу бюджетного планування, посилення впливу бюджетного регулювання на соціально-еко- номічний розвиток країни. Для стимулювання еко- номічного зростання необхідним є використання дефіциту бюджету з метою збільшення видаткової частини бюджету, внутрішнього попиту з врахуванням співвідношення державного боргу, видатків бюджету на обслуговування державного
  • 43.
    Sciences of Europe# 60, (2020) 43 боргу до валового внутрішнього продукту. Від якості планування бюджетних показників залежить фінансова стійкість системи державних фінансів. Доцільним є актуалізація стратегії управління внутрішнім та зовнішнім державним боргом, фор- мування річних планів заходів щодо його оп- тимізації у розрізі кварталів з метою зменшення пікових навантажень на державний бюджет. Здійснення ефективної бюджетної політики займає вагоме місце у процесі регулювання еко- номічного розвитку країни. Розвиток суспільства зумовлює необхідність відповідних інституційних змін у взаємовідносинах між учасниками бюджет- ного процесу та підвищення ефективності бюджет- ної політики у системі державного регулювання економіки. Від якості та своєчасності прийняття рішень щодо управління державними фінансами за- лежить збалансованість бюджетної системи та ре- зультативність бюджетного регулювання. Важли- вим є визначення економічної сутності та напрямів бюджетної політики як інструменту зростання еко- номіки, запровадження дієвих бюджетних ме- ханізмів у системі інституційного середовища сус- пільства, підвищення результативності програмно- цільового методу планування видатків бюджету як складової державного регулювання економіки. Перспективне прогнозування та планування бюд- жету впливає на обґрунтованість показників соціально-економічного розвитку країни. Основні напрями бюджетної політики визначають відповідні обсяги та структуру видатків бюджету. Фінансові ресурси бюджету впливають на еко- номічне зростання, структурні перетворення у еко- номіці, підвищення якісного рівня соціального за- хисту населення. Для посилення бюджетної результативності важливим є упорядкування бюджетних програм, у тому числі складання головними розпорядниками бюджетних коштів планів діяльності відповідно до середньострокових пріоритетів. Доцільним є вияв- лення найбільш дієвих, ефективних та таких бюд- жетних програм, що у достатній мірі відповідають функціям, основним завданням розпорядника бюд- жетних коштів, розробка та затвердження обґрун- тованих паспортів цих програм, складання звітів та проведення оцінки ефективності їх виконання, по- силення державного фінансового контролю та аудиту за управлінням бюджетними коштами. Висновки. Бюджет є одним з дієвих інстру- ментів забезпечення макроекономічної стабілізації та подальшої активізації економічного зростання. Використання інструментів та важелів бюджетної політики щодо підтримки системних перетворень фінансової складової суспільного розвитку має здійснюватися з урахуванням впливу сукупності економічних, інституційних та соціальних фак- торів. Результативність бюджетного регулювання залежить від рівня наукової обґрунтованості його ролі в розвитку суспільних відносин, моделі соціально-економічного розвитку держави. В умо- вах економічних перетворень доцільним є пошук оптимального співвідношення між макроеко- номічними показниками та часткою валового внутрішнього продукту, що перерозподіляється че- рез бюджетну систему, ступеню її децентралізації та підвищення якісного рівня розвитку бюджетних інститутів. Виходячи із мети та завдань стратегії поступального розвитку економіки, пов’язаної з підвищенням рівня ефективності її ендогенної складової, необхідним є удосконалення інститу- ційного середовища бюджетної політики. Розвиток системи фінансового регулювання соціально-еко- номічної динаміки зумовлює необхідність відповідних структурних змін взаємовідносин між учасниками бюджетного процесу. Належний рівень обґрунтованості рішень щодо формування основ- них показників функціонування бюджетної си- стеми у сфері доходів, видатків бюджету, міжбюд- жетних відносин, дефіциту бюджету і державного боргу сприяє підвищенню дієвості регуляторного механізму бюджетної політики. З метою покра- щання якісного рівня інституційного забезпечення бюджетної політики необхідним в процесі її фор- мування є реалізація принципів єдності, компле- ментарності, системності, ефективності. Доцільним є удосконалення системи планування і моніторингу ефективності бюджетних видатків за допомогою якісних і кількісних індикаторів, підвищення рівня середньострокового бюджетного планування, до- тримання принципу прозорості та підзвітності ор- ганів державного управління громадськості. На- явність середньострокового бюджетного пла- нування, довгострокового бюджетного прогнозування є основою дієвої бюджетної політики та досягнення достатнього рівня бюджет- ної ефективності. Література 1. Бюджетно-податкова політика у системі регулювання економіки: монографія / І.Я. Чугунов, Т.В.Канєва, М.Д.Пасічний та ін.; за заг. ред. І.Я. Чу- гунова. К.: Глобус-Пресс, 2018. 354 с. 2. Чугунов І.Я., Макогон В.Д. Бюджетна стра- тегія в умовах економічних перетворень //Вісник КНТЕУ. 2018. № 5. С.5–18. 3. Чугунов І.Я., Самошкіна О.А. Видатки бюджету в системі державного регулювання соціально-економічного розвитку країни //Вісник КНТЕУ. 2019. № 2. С.103–121. 4. Budget policy of social development. Chu- gunovI.,KanevaT.,Pasichnyi M. and other. General editorship Chugunov I. Scientific Route. Tallinn, Estonia. 2018. 348 p. 5. Chugunov I., Makohon V. Fiscal strategy as an instrument of economic growth. Baltic Journal of Economic Studies. 2019.Vol.5 No.3. pp.213-217. 6. Chugunov I., Kachula S. State financial policy as a component of socialeconomic development of so- ciety. The potential of modern science. volume 2. Sci- emcee Publishing.London, United Kingdom. 2019. pp. 29-44.
  • 44.
    44 Sciences ofEurope # 60, (2020) JURIDICAL SCIENCES ПРОБЛЕМИ КОДИФІКАЦІЇ МЕДИЧНОГО ЗАКОНОДАВСТВА УКРАЇНИ Книш В.В. доктор юридичних наук, доцент, професор кафедри конституційного, адміністративного та міжнародного права Навчально-наукового Юридичного інституту Прикарпатського національного університету імені Василя Стефаника, Івано-Франківськ, Україна Марук Т.С. студентка 3-го курсу Навчально-наукового Юридичного інституту Прикарпатського національного університету імені Василя Стефаника, Івано-Франківськ, Україна PROBLEMS OF CODIFICATION OF MEDICAL LEGISLATION OF UKRAINE Knysh V. Vasyl Stefanyk Precarpathian National University, Educational and Scientific Law Institute, Doctor of Law, Associate Professor, Professor of the Department of constitutional, administrative and international Law Ivano-Frankivsk, Ukraine Maruk T. Vasyl Stefanyk Precarpathian National University, Educational and Scientific Law Institute, student, 3-th year Ivano-Frankivsk, Ukraine DOI: 10.24412/3162-2364-2020-60-4-44-47 АНОТАЦІЯ У статті досліджено проблеми розвитку та подальшої кодифікації медичного законодавства України. Результатом такої кодифікації має стати прийняття нового Медичного кодексу України. На думку авторів, елементами нового Медичного кодексу України мають стати наступні елементи: закони, що забезпечують безпечні умови життя й праці людини; закони профілактичної спрямованості; закони, що захищають права громадян на охорону здоров'я й визначають їхню відповідальність за своє здоров'я; закони, що визначають права й відповідальність медичних працівників; закони, що регламенту- ють діяльність національної системи охорони здоров'я; закони, що регламентують фінансування системи охорони здоров'я; закони, що регламентують окремі види медичної діяльності. ABSTRACT The article examines the problems of development and further codification of medical legislation of Ukraine. The result of such codification should be the adoption of a new Medical Code of Ukraine. According to the authors, the elements of the new Medical Code of Ukraine should be the following elements: laws that ensure safe living and working conditions; laws of preventive orientation; laws that protect the rights of citizens to health care and determine their responsibility for their health; laws defining the rights and responsibil- ities of health professionals; laws regulating the activities of the national health care system; laws regulating the financing of the health care system; laws governing certain types of medical activities. Ключові слова: здоров’я, охорона здоров’я, законодавство, законодавство про охорону здоров’я, медичне законодавство, кодифікація, кодекс, медичний кодекс, Медичний кодекс України. Keywords: health, health care, legislation, health care legislation, medical legislation, codification, code, medical code, Medical Code of Ukraine. At the present stage, during the economic and so- cial changes caused by the transition from a socialist system to a socially regulated market economy, there is the emergence of new types of social relations that re- quire legal regulation and their study. This applies in particular to health relations. To do this, our govern- ment faces the task of creating a separate complex branch of medical law, and scientists - the development of medical jurisprudence as a separate branch of legal science. Despite significant positive changes and progress in the development and adoption of new laws, regula- tions and in updating existing legislation on health care, we still say that the regulatory framework in the field of health care is not yet fully consistent with modern needs, has gaps and shortcomings in legal regulation. The current legislation of Ukraine on health care, both general and special, is not able to take into account the peculiarities of relations in this area, does not have the necessary conceptual apparatus that would consolidate the factual and legal views of participants in health
  • 45.
    Sciences of Europe# 60, (2020) 45 care, and note ignorance general practitioners in medi- cine, which complicates their role in resolving "medical cases". The theoretical basis of the scientific work was scientific research on issues related to the development of Ukrainian legislation in the field of health, was the subject of a number of scientists - representatives of various branches of law, as well as specialists in public administration and health care. The purpose of this article is to study the concept, features and system of medical law, to determine the administrative and legal regulation in the field of health care, prerequisites for the development and implemen- tation of the Medical Code as one of the tools for im- plementing public health policy. Regulation and corre- lation with international experience in administrative and legal support of the right to health care. In accordance with this goal of the study, the fol- lowing tasks of the article are set: to reveal the con- cepts, features and system of the right to health care; to characterize the administrative legislation in the field of health care in Ukraine as an object of codification in terms of administrative and legal regulation of relations in this area; to find out the essence of codification in the field of health care in Ukraine, to highlight its main properties that determine its specific nature; to reveal the specifics and features of codification in the field of health care in Ukraine as the most perfect, effective type of systematization in this area; to characterize the main modern sectorial and institutional models of do- mestic and foreign codified acts governing relations in the field of health care, to outline trends in design and codification studies to determine the content and possi- ble structure of basic codification acts in the field of health care, and to identify priorities appropriate codi- fication of administrative legislation in the field of health care in Ukraine; conducting an administrative and legal analysis of the world experience in imple- menting reforms of the national health care system. Separation of legal acts regulating one specific is- sue, terms of adoption, validity, agencies that adopted them, changes and additions that are constantly made and often the lack of necessary documents on the ground significantly complicate the work of managers, legislators and executors of legal acts. To overcome this, they have long sought to sys- tematize a single document into a single whole (to con- solidate, incorporate, and codify legal acts). Systemati- zation of legal acts is carried out by publishing thematic collections (collections) of full texts of legal docu- ments, publications of legal acts in official bulletins in chronological and thematic order, compiling codes or codes of legislative acts, creating automated databases of full texts of legal and technical information. The most promising way to systematize legal acts is to create a set of laws and a code of laws. A set of laws is normative acts or collections of legislation con- solidated into one edition and arranged in a systematic, chronological or other order. The Code is a law that provides full systemic regulation of a particular area of public relations [1, p. 59-61]. The object of systematization - modern regulatory framework of health care of Ukraine - includes more than 1200 current regulatory documents of different le- gal status (laws of Ukraine, decrees of the President of Ukraine, resolutions of the Cabinet of Ministers of Ukraine, resolutions and orders of the Ministry of Health of Ukraine, resolutions and orders of others de- partments). These legal acts as annexes include more than 1000 instructions, provisions, and methodical doc- uments regulating all types of professional activity of branch. In Ukraine, one legislative act (law) in the field of health care has an average of about 200 by-laws. In this regard, we should agree that until now our legal acts are not state, but mostly departmental. Departmental regu- lations are necessary for full and detailed legal regula- tion of the industry, but the problem is what kind of re- lationship they should regulate. If we are talking about special, medical issues (the procedure for carrying out a procedure, the use of a particular method of preven- tion, diagnosis and treatment), then here they are quite appropriate. But if professional medical activities affect the rights of citizens (patients), then these relations should be determined exclusively by law. The practice of issuing sectorial orders, instructions, regulations, which correct the rights of citizens established by law or violate their interests, cannot be considered normal, especially since most departmental legal acts in the field of health care have never been published in the open press and, therefore, almost no one knows. A number of legal acts are not registered with the Ministry of Justice of Ukraine and are not published properly, so in non-departmental disputes or in the case of lawsuits, the existing database of legal acts may be considered legally insufficient and challenged in court. The formation and development of legal medicine in Ukraine implies the need to strengthen, first of all, the direct regulatory role of laws in the health care sys- tem with the replacement of administrative and legal norms by civil law. In other words, medical, diagnostic, preventive and rehabilitative medical care should be regulated not only by sectorial instructions, standards and norms, but also by legislative documents that are binding on all citizens, health care organizations and government agencies, regardless of their departmental affiliation. It should be borne in mind that in the development of sectorial bylaws at the state level in regional centres and regions are adopted on their basis their administra- tive documents, which can not only make some dis- crepancies in legal acts, but also increase their number at the regional level. The introduction of laws of direct action into legal practice will solve the problem of sec- torial and territorial regulations. In recent years, normative activity in the field of health care has been carried out quite actively, but an- nually about 25% of documents lose their legal force, which indicates the unstable nature of reforms in health care. The total volume of legal acts regulating activities in the field of medicine and included in the Unified State Register of Legal Acts of Ukraine today is much smaller than in other countries, which is due not only to the presence of significant gaps in the legal field, but
  • 46.
    46 Sciences ofEurope # 60, (2020) also with the fact that the Unified State Register of Le- gal Acts of Ukraine does not include a significant part of interdepartmental legal acts regulating professional activities in health care, but have not passed the exam- ination in the Ministry of Justice of Ukraine. These doc- uments are not maintained in an active state (the main document is not made the following changes and addi- tions, as is done in the centre of legal information). In general, Ukraine has created a legal basis for the implementation of the constitutional right of citizens to health care and medical care. Of course, there are some shortcomings and gaps. The most significant disad- vantage of the adopted legal acts is that they are not al- ways conceptually sustained, insufficiently developed mechanisms for their provision and implementation of the declared legal norms. Legislation in the field of health care is not essentially a law of direct action, but contains a significant number of references to all the same internal regulations and regulations. The key point of the process of creating a national system of legislative regulation in the field of health care is the development of the concept of development and improvement of the legal framework of Ukraine in the field of health care, which includes the need to ad- dress the following tasks: expanding the legal field. Provision of medical care, the transition to a direct reg- ulatory role of laws in the health care system and the formation of legal awareness in health professionals and the public. In Ukraine, there is a need to adopt a number of laws on compulsory health insurance, pro- tection of patients and health workers' rights, profes- sional liability insurance of health workers, trade un- ions and associations in health care, private health care organizations, informatization of the health care system health. Thus, the regulatory framework in the field of health care in Ukraine has certain shortcomings: 1) sectorial laws of Ukraine are not laws of direct action, as they do not prescribe real mechanisms of their implementation. It is implied that this will be done in bylaws, but in practice various explanations, infor- mation letters, which are not legal acts at all, are often used; 2) the variety and set of legal acts of different lev- els, devoted to one issue, but not always interpreted in the same way. In addition, the unavailability of all of them in connection significantly complicates the regu- latory management of the industry, makes it contradic- tory; 3) distortions are often allowed in the by-laws when unfolding the provisions of the law, as a result there are discrepancies; 4) a large number of legal acts does not allow to see behind this set of legal gaps and contradictions; 5) the absence of sectorial legislation and depart- mental sectorial acts on the ground, the adoption of lo- cal acts and regulations, which often expand and distort sectorial legislation, significantly complicates the man- agement of the industry; 6) the absence of a single consolidated legislative act in the field of health care (some health care issues are regulated by law, others - decrees of the President of Ukraine, third - government decrees, fourth - decrees and orders of the Ministry of Health register of legal acts, five are unpublished orders of the Ministry of Health of Ukraine), available not only to health care managers, health workers, but also to the population, complicates the provision of medical care within the evidence and legal medicine. These problems are solved by the development and adoption of laws of direct action, which in the first stage can be systematized in a set of laws on health care, including legislation that already exists and needs to be developed and adopted. In particular, the set of laws on health care should include the following blocks of laws: 1) laws that ensure safe living and working condi- tions; 2) laws of preventive orientation; 3) laws that protect the rights of citizens to health care and determine their responsibility for their health; 4) laws that determine the rights and responsibili- ties of medical workers; 5) laws regulating the activities of the national health care system; 6) laws regulating the financing of the health care system; 7) laws governing certain types of medical activi- ties. The most promising way to systematize the legis- lation is to create the Medical Code of Ukraine, as cod- ification, as the most perfect and complex systematiza- tion of legal acts, is aimed at radical qualitative regula- tion of legislation, ensuring its coherence and compactness. Currently, codes of laws on public health are being developed in Russia, Belarus, and Kazakh- stan. At the same time, a distinction should be made be- tween the Medical Code and the Code of Laws on Pub- lic Health. The Medical Code reflects medical law, which is a complex branch of law and includes a set of legal norms governing public relations in the field of medical activities. In turn, medical activity should be under- stood as a comprehensive system that includes the or- ganization of medical care, its direct provision in the framework of diagnostic, therapeutic and preventive measures, as well as quality control of medical services provided [2, p. 21-22]. Medical law is a system of legal norms that regulate qualitatively unique social rela- tions, the content of which is the impact on physical and mental health through medical means, which is carried out by health professionals [3, p. 116-121]. In accordance with the general principles of rule- making practice, the Medical Code should consist of general and special parts and include all applicable in- dustry laws; laws that should be developed to address gaps in the legal field; a certain part of departmental acts, which should be transformed into legislation. The Code should be a law of direct action, systematized by areas of activity in the field of health care and public health, which will eliminate duplication, contradictions and ambiguities, legal gaps in legislation, increase the availability and ease of use of health legislation. In the coming years, it is necessary to develop and adopt separate basic laws from each bloc - laws that
  • 47.
    Sciences of Europe# 60, (2020) 47 constitute the basic structure of the future code and thus the final concept of the development of sectorial legis- lation in the country. Development of the Code of Laws on Public Health and the Medical Code will help improve health care management, improve the quality of health care, protect the rights and responsibilities of patients and health professionals, will form medical legislation in the form of a single and integrated system of direct leg- islation, available not only to the heads of health care organizations, but also to all health professionals and the public. References 1. Часнойть Р.А., Шарабчиев Ю.Т., Дудина Т.В. Обоснование необходимости кодифицирова- ния законодательных актов Республики Беларусь в сфере здравоохранения и разработки кодекса зако- нов об охране здоровья граждан // Медицинские но- вости. 2007. №11. С. 59-61. 2. Стеценко С. Г., Стеценко В. Ю., Сенюта И. Я. Медичне право України: Підручник / За заг. ред. д.ю.н., проф. С.Г. Стеценка. К.: Всеукраїнська асоціація видавців «Правова єдність», 2008. 507 с. 3. Болотіна Н. Б. Медичне право в системі права України // Право України. 1999. № 1. С. 116– 121.
  • 48.
    48 Sciences ofEurope # 60, (2020) PEDAGOGICAL SCIENCES MODERN EDUCATIONAL TECHNOLOGIES IN THE TEACHING FOREIGN LANGUAGES TO POSTGRADUATE STUDENTS Aleksandrova E. Samara State Medical University, candidate of pedagogical sciences, associate professor of the department of foreign languages and Latin, Samara Barbasheva S. Samara State Medical University, candidate of pedagogical sciences, associate professor of the department of foreign languages and Latin, Samara DOI: 10.24412/3162-2364-2020-60-4-48-51 ABSTRACT This article is devoted to the specifics of teaching a foreign language using modern educational technologies at the postgraduate stage. The learning of a foreign language at this stage is considered to be a condition for the professional and personal development of a specialist. The scientific novelty of the study is the analyzing the possibility of introducing element-by-element several educational technologies in a different level language skills group. Keywords: modern educational technologies, postgraduates students, non-linguistic university, qualifying English examination for postgraduate degree, specifics of a foreign language teaching. Introduction Higher education and postgraduate vocational ed- ucation in Russia is given by universities, institutes or academies. Since 2008, there has been a massive tran- sition to the two-level education system model “Bach- elor’s degree program and Master’s degree program”. However, in some universities a single-level system with “Specialist’s degree” has been preserved. Success- ful completion of a Master's or Specialist’s degree is not the final stage of education. Russian universities of- fer a wide range of postgraduate programs in various fields. The postgraduate training program is focused on development of scientific thinking based on profes- sional skills, the ability to realize creative potential and additional knowledge in the specialty. The aim of this paper is to analyze the potential for using modern educational technologies in the teach- ing foreign languages to postgraduate students in order to improve the quality of their education. The present research was conducted to find solu- tions to the following problems: - to identify difficulties in the a foreign language teaching for postgraduate students; - to show the role of modern educational technol- ogies in a foreign language teaching at the postgraduate stage; - to reveal the potential ways to improve the qual- ity of postgraduate students education in order to pre- pare them to pass the qualifying English examination for postgraduate degree successfully. Postgraduate studies are carried out in full-time and part-time form, on a budget or commercial basis. Unlike students studying according to the curriculum, each postgraduate student personally plans his/her study, which is based on independent scientific re- search. During postgraduate studies a postgraduate stu- dent is required to fulfill an individual plan, to pass can- didate examinations in the History and Philosophy of Science, in a Foreign Language and in the Special Field to complete the thesis and to submit it to the department for obtaining an appropriate finding. Thus, we can see that a foreign language is one of the three compulsory candidate exams, this subject is also required for pass- ing on admission to postgraduate study. Teaching a foreign language has become a social order of society, an integral part of higher education and essential component for effective future specialist’s work. In this regard, there have been occurred several changes in the requirements for the foreign language education system, for its main components. The devel- opment system of language training for the postgradu- ate stage at a non-linguistic university leads to an im- proving in the competitiveness of postgraduates and their professional training while increasing the level of accessibility, popularity and democracy of the Russian postgraduate education system in the global postgradu- ate education system. Data collection and the study samples The relevance of the study is due to the fact that the problem of using modern educational technologies in the postgraduate students has not been fully studied. The authors carefully reviewed the articles, textbooks, monographs devoted to the use of modern technologies in the foreign language teaching and the problems of postgraduate students teaching. It should be noted that several research works were conducted concerning the characteristics of the most famous modern educational technologies, recommendations for their study and use, the methodology for their application [1]; intercultural approach and didactic features in a foreign language teaching to students at non-linguistic universities [2]; contemporary problems of postgraduate students teach- ing at a non-linguistic university [3]. We believe that a detailed study of these problems and the proposed ways to their solution will help to take a closer look at the problem of introduction modern ed- ucational technologies into the process of language training for postgraduate students, as well as to prepare
  • 49.
    Sciences of Europe# 60, (2020) 49 them for passing English examination for postgraduate degree more successfully with the possibility of its us- ing in their professional activities. The modern educational technologies can be pre- sented as the following: problem-based learning, devel- opmental learning, research methods in teaching, game methods, information and communication technologies [4]. The main aim of foreign languages teaching at the first stage of postgraduate study is the formation of a specialist’s foreign language communicative compe- tence that allows him/her to the use a foreign language as the means of professional, intercultural, interper- sonal, business communication. The use of the above mentioned methods during the lesson promotes the de- velopment of postgraduate students’ skills to deal with additional professional literature, fosters curiosity, im- proves creative abilities and expresses individual capa- bilities [5]. Methods of analysis We used purposive studying particular groups of the first year postgraduate students sampling at Samara State Medical University. The postgraduate students were divided into two parts: control group (training in traditional methods) and experimental group (training with modern educational technologies). In the second (experimental) group a great number of exercises as well as reference schemes, collages, booklets, educa- tional films, video lectures in a foreign language with subtitles were used to help the postgraduate students to overcome the language barrier in different situations. One of the main serious problems we usually run into is a low level of English, which can also be con- nected with a reduction of academic hours and the num- ber of terms for teaching foreign languages during the study at the university. The authors believe that using modern educational technologies which are, on the one hand, aimed at an individual approach, and on the other hand, at optimiz- ing the independent work of postgraduate students can contribute to a successful solution of the problem. It is of the first importance to ensure the speech activity of each postgraduate student during the study. The use of modern educational technologies allows the teacher to organize the educational process more pro- ductive, efficient, interesting, and to make it more in- formative. In the research process, we applied the following methods: a dialectical trend analysis and contradictions in the use of modern educational technologies in the ed- ucational process, empirical methods (questioning, testing, overt observation, expert evaluation), a peda- gogical experiment, a qualitative analysis of the results of the experiment, statistical methods for processing the results. Data analysis and research results At the initial stage postgraduate students of both groups were asked to take a questionnaire and evaluate their readiness to develop a “Language portfolio” on a 10-point scale. The Council of Europe developed the “European Language Portfolio” (ELP), which was piloted in vari- ous countries in 1998 - 2000. Based on the provisions of the Sorbonne Declaration and the Bologna Conven- tion, the project “Language Portfolio in Multinational and Multicultural Europe” is aimed to ensure the conti- nuity of the language education in different institutions and stages [6]. Such technologies and the presence of a portfolio are considered to be the means of creating a personal portrait based on the personal characteristics, which its owner evaluates and reflects in this document. In many European and Russian universities the compilation of the language portfolio is a compulsory part of the cur- riculum for foreign languages teaching. Its presence en- sures compliance with the principle of academic mobil- ity, and most importantly, provides the post graduate student with materials for successful independent sci- entific communication in the future [7]. According to the language training tasks and fun- damentals for postgraduate students in Russia, it is nec- essary to compile the Language Learning Portfolio (LLP), which includes the following sections: 1. Language passport (personal information about the owner, the number of languages a person speaks, language level, etc.) 2. Language biography, level of proficiency in each type of speech activity, assessment, targets, ways to achieve it, dynamics. 3. Profile (language papers, for example, transla- tions into a foreign language of articles and abstracts,, resumes, essays, reviews, presentation at conferences, documents reflecting achievements in language learn- ing, etc.). When compiling the Language Learning Portfolio in the experimental group, we combined traditional teaching methods such as reading literature, talking with the lecturer, translating and rendering articles with modern information and communication technologies. It was done the average score at the initial and final stage of all the post graduate students taken part in the survey. We can state the fact that having initially the same level of training for both groups at initial stage, at the final stage the experimental group had shown better readiness for the LLP preparation. We believe that the another way showing results in the preparing for qualifying English examination for postgraduate degree with using of modern educational technologies is to introduce problem projective study that help to improve language skills, to assess the level of postgraduate students’ readiness for business and ac- ademic communication, to create an occasion for knowledge and experiences exchange of postgraduate students on different topics. A problem projective study which is called Conference for Postgraduate Students “The Vital Problems of Medical Science and Research” takes place every year at the Samara State Medical Uni- versity. Basic requirements for using the project method are the following: - the presence of a significant research and crea- tive problem, requiring integrated knowledge, research to solve it; - practical and/or theoretical significance of the proposed outcomes;
  • 50.
    50 Sciences ofEurope # 60, (2020) - independent (individual, group) students' activi- ties in the classroom or out-of-lesson; - structuring of the project content (indicating phased results and the casting); - the use of research methods (determination of the problem, research tasks, hypothesizing their solutions, discussing research methods, finalizing results, analyz- ing the data obtained, summarizing, adjusting and mak- ing conclusions). The main aim of this study is to prepare postgrad- uate students for participating in international confer- ences, making reports and presentations in a foreign language, taking part in discussions on relevant profes- sional topics. And, thereby, this experience increases their international competitiveness and academic mo- bility. A problem projective study requires careful prep- aration, and also involves the use of knowledge, skills, abilities, acquired during the training period [8]. The realization of this project is carried out in three stages, which have independent content and their specific edu- cational tasks which the totality ensures the achieve- ment of a common aim. The first stage is preparation for the conference, which includes [9]: - mastery of speech skills for scientific discussion in a foreign language, the use of accepted academic cli- ches (The subject of my academic paper / my presenta- tion is ..., I've divided my presentation into ... parts/sec- tions ..., The subject can be looked at under the follow- ing headings ..., I'd like to draw your attention to the next slide ..., This leads/brings me to the next point which is ... etc.); - preparation reports and presentations by post- graduate students in English on the subject of disserta- tion; - election of the chairman and members of the pre- sidium; - publishing the conference program; - distribution of invitations for scientific supervi- sors and university leaders. The second stage is the conference. Each post- graduate student makes his presentation, after that par- ticipants and guests of the conference ask questions to speakers and make comments. Such a polylogue in- cludes several communicative tasks and communica- tive intents at once: request and receive information, discuss reports, express opinion, doubt, consent, disa- greement, etc. The conference is headed by the chair- man. The third stage is the final one: summing up the conference, discussion the reports, making a decision. Based on our own experience, as well as the expe- rience of colleagues, we can state that problem projec- tive study is impossible without using modern educa- tional technologies. The authors made an attempt to systematize the use of modern pedagogical educational technologies for teaching postgraduate students. As- sessing the results of the matrix, we can see that the use of modern educational technologies at the initial stage in the control group is not compulsory. The lecturer sometimes resorts to use them, but some of the technol- ogies are not applied in the educational process, and therefore the language skills development of postgrad- uate students is not always at the high level, which is proved by data on the final results of both groups. Hav- ing analyzed the results, we can state that the qualimet- ric parameter in the educational process with using modern educational technologies increased almost 2 times compared to the traditional methods of training. Conclusion Our study examined the use of modern educational technologies in a foreign language teaching for the postgraduate students at a non-linguistic (Samara State Medical) university. According to the requirements for the preparation and training of postgraduate students, we come to a conclusion that business and academic communication skills at the postgraduate stage are to include: the ability to read professional skilled correspondence; write re- ports, protocols, business letters and faxes; make phone calls; participate in discussions, symposia, conferences; chair the meeting; negotiate with foreign colleagues; make presentations in the foreign language, etc. Summing up the results, we can state that our ex- perience of using modern educational technologies to prepare for passing English examination for postgradu- ate degree is an essential component in the training at postgraduate stage and, as well as possible, it contrib- utes to the development of communicative competence and skills of postgraduate students. Modern educational technologies serve as an organic tool for the develop- ment of learning communications in the logic of the personal dimension of postgraduate training and justify their use in teaching a foreign language at the postgrad- uate stage in a non-linguistic university. References 1. Selevko, G. K. (2005). Encyclopedia of edu- cational technologies. - Moscow: Public education, 556p. 2. Dikova, E. S. (2009). New approaches to de- termining of linguistic training objective in non-lin- guistic university. Bulletin of the Buryat State Univer- sity, 15, P.163–167. 3. Buyanova, G.V & Kinderknecht, A.S. & Popova, T.V. & Peunova, E.V. (2017). Teaching a for- eign language in a non-linguistic university postgradu- ate course: topical issues: monograph. Perm: CPI "Pro- crasty", 188р. 4. Zaitsev, V. S. (2012). Modern pedagogical technologies: textbook in 2 books, book 1. Chelya- binsk: CHSPU, 411p. 5. Aleksandrova E.V., Barbascheva S.S. (2020). The quality improvement of a foreign language teach- ing for postgraduate students at a non-linguistic univer- sity with modern educational technologies application // Modern Problems of Science and Education. Surgery, vol.4. URL: http://www.science-education.ru/ru/arti- cle/view?id=29945 (accessed on 02.12.2020). 6. Barbasheva, S. S. & Rozhkova, T.V. (2016). Training in business communication as part of the im- plementation of communicative competence at the post-graduate stage of medical University. Actual prob- lems of linguistics, translation studies and pedagogy, 1 (3), P.23-30.
  • 51.
    Sciences of Europe# 60, (2020) 51 7. Aziattseva, T. V. (2015). Didactic peculiari- ties of teaching foreign languages to the students of non-linguistic departments. Prepodavatel XXI vek, 3 vol.1, P162-169. 8. Aleksandrova, E.V. (2015). Philosophical un- derstanding of the informatization trends in the modern educational space. Philosophy of education, 5 (62), P.26-34. 9. Barbasheva, S. S. (2007). Teaching of busi- ness English of a tourist specialization with in-depth language acquisition in high school: diss. kand. ped. sci. Moscow: Moscow State University for the Human- ities. ТРЕВОЖНОСТЬ У ДЕТЕЙ И ПОДРОСТКОВ: ПУТИ РЕШЕНИЯ ПРОБЛЕМЫ Чупракова Н.Н. старший преподаватель кафедры «Юридическая психология и право» факультета «Юридическая психология» ФГБОУ ВО МГППУ, Москва, Россия ANXIETY IN CHILDREN AND ADOLESCENTS: SOLUTIONS TO THE PROBLEM Chuprakova N. senior lecturer in "Legal psychology and law", faculty of "Legal psychology" of the Moscow State University of Psychology and Education (MSUPE), Moscow, Russia DOI: 10.24412/3162-2364-2020-60-4-51-55 АННОТАЦИЯ Данная работа посвящена рассмотрению вопросов, анализирующих проблему тревожности детей и подростков в аспекте их безопасного устойчивого развития. Локус контроль, психологическая устойчи- вость, самооценка и настроение рассматриваются как факторы управления психическими состояниями и как основа безопасного устойчивого развития. Предлагаются пути решения данной проблемы, а именно: рассматривается некоторая пошаговая модель оказания помощи детям и подросткам в преодолении тре- вожности. При этом образовательная среда рассматривается как условие обеспечения безопасного устой- чивого развития. Предлагается модель устойчивого безопасного развития школьника на основе профилак- тики тревожных состояний, обучения навыкам бесконфликтного общения и поиска личностного ресурса и индивидуального стиля преодоления. ABSTRACT This work focuses on issues that analyse the anxiety of children and adolescents with regard to their safe sustainable development. Locus control, psychological resilience, self-esteem and mood are considered as factors in managing mental states and as the basis for safe sustainable development. Ways of solving this problem are suggested, namely: some step-by-step model of helping children and teenagers to overcome anxiety is considered. In this case, the educational environment is considered as a condition for ensuring safe sustainable development. The model of sustainable safe development of schoolchildren based on the prevention of anxiety states, teaching the skills of conflict-free communication and the search for personal resources and individual style of overcoming is proposed. Ключевые слова: тревожность, безопасное устойчивое развитие, психологическая устойчивость, профилактика тревожных состояний, индивидуальный стиль преодоления. Keywords: anxiety, safe sustainable development, psychological stability, prevention of anxiety states, indi- vidual style of overcoming. В современных условиях, обеспечение без- опасности жизнедеятельности ребенка и взрослого, становится все сложнее и сложнее. В связи с уча- стившимися террористическими угрозами и появ- лением качественно новых природных катаклизмов и экологических катастроф, человечеству прихо- дится серьезно задуматься о развитии цивилизации в целом. По мнению ученых (Б.Е. Большаков, П.Г. Кузнецов, Н.Н. Моисеев, А.Д. Урсул и т. д.) новая философия выживания и безопасности должна со- единять в одно целое развитие и обеспечение без- опасности, то есть обеспечивать безопасность через устойчивое развитие. Ориентируясь на основной принцип устойчивого развития – принцип справед- ливости (в различных аспектах: экономическом, со- циальном, политическом, экологическом и т.д.), можно сказать, что устойчивое развитие – это спра-
  • 52.
    52 Sciences ofEurope # 60, (2020) ведливое, а значит и безопасное развитие, обеспе- чивающее выживание и длительное развитие обще- ства.1 Если мы хотим сохранить землю для будущих поколений, то лучший способ это сделать, начинать формировать личность ребенка в условиях безопас- ного устойчивого развития А это требует выра- ботки новых научных подходов, соответствующих современным требованиям и предполагаемым пер- спективам развития человечества. В современной науке и практике такие подходы существуют. В этом отношении интерес для нашего внимания мо- жет представлять один из таких подходов, каким является экологическая модель развития человека. «Сегодня, возможно, самой влиятельной моделью развития»- как утверждает Г. Крайг, «стала модель экологических систем, предложенная американ- ским психологом Ури Бронфенбреннером» (Sociocultural Risk: Dangers of Competences J. Gar- barino, 1982). Развитие человека, согласно этой мо- дели – это динамический процесс, идущий в двух направлениях.2 С одной стороны, человек сам ре- конструирует свою жизненную среду, а с другой – испытывает воздействие со стороны элементов этой среды. Одним из таких элементов является по- вышенный тревожный социальный фон общества в связи с высоким уровнем стрессогенности нашей жизни. Как следствие этого воздействия - повышен- ная тревожность у детей и подростков. Высокая стрессогенность нашей жизни нега- тивным образом влияет на психическое состояние большинства людей сегодня. Дети и взрослые вы- нуждены пребывать в постоянной психической напряженности, раздражительности, у многих это вызывает депрессии, психосоматические болезни, нарушение сна, хронический стресс. В современ- ных условиях политической и экономической не- стабильности с каждым годом увеличивается коли- чество людей, которые болезненно реагируют на стресс, и кого он легко может перевести из стабиль- ного состояния в кризисное. Источником опасности может быть все живое и неживое, естественные процессы и явления, техногенная среда и действия людей. Влиянию опасности может подвергаться как человек, так и природная среда, материальные ценности. По сведениям международной федерации об- ществ Красного креста и Красного полумесяца с каждым годом растет количество природных ката- строф примерно на 20%. Землетрясения, цунами, пожары, наводнения рушат целые города. В начале 2019 года Управление ООН представило отчет с данными о количестве людей, которые погибли в результате стихийных бедствий за предыдущий год. В 2018 году природные катаклизмы унесли жизни 10 300 человек, 60 млн. человек получили ра- нения или материальный ущерб. За последние 20 лет стихийные бедствия стали причиной смерти 1,3 1 Урсул А.Д. Становление ноосферного интеллекта и опережающее образование // Синергетика и обра- зование. – М., 1997. Учебное пособие. М.: Гарда- рики, 2004. С. 361–362. млн человек. И с каждым годом стихийные бед- ствия становятся все более глобальными, а послед- ствия все более масштабными. При этом негатив- ное воздействие на человека не ограничивается только естественными опасностями. Современный мир и тревога, к сожалению стали, особенно в последнее время, синонимами и плотно вошли в наше сознание. Стрессовые ситуа- ции наполняют нашу повседневную жизнь на ра- боте и дома, что в свою очередь усиливают тревож- ное состояние. Тревожимся за себя, за свое здоро- вье и здоровье детей, за возможность потерять работу и средства существования. Тревожность в отношениях с партнером, тревога за возможные из- мены. Страх потерять родителей, любимых. Страх агрессии, нападения, войны, стихийных бедствий [2]. В последнее время страх заражения вирусами, от которых не существует вакцин и многое другое. Страхи и тревоги - полноправные жители мегапо- лисов и маркеры современного бытия. Безусловно на тревожный фон в социуме влияют и доступность информационных цифровых технологий. Повы- шенные психофизические и интеллектуальные нагрузки в образовательных учреждениях с одной стороны предопределены эволюцией развития че- ловечества и еще больше требуют отдачи и вклю- ченности, но насколько подготовлены современные дети к таким психоэмоциональным и интеллекту- альным нагрузкам [3]. Насколько детская психика способна выдерживать и дальше этот тревожный социальный фон и психоэмоциональное неблагопо- лучие значимых для детей взрослых. Когда тревожность становится проблемой, ка- чество жизни заметно снижается. Как распознать, когда тревога становится естественным состоянием и начинает вмешиваться в нашу повседневную жизнь. Как с ней справляться, какую помощь воз- можно и необходимо оказывать детям и подрост- кам, когда обращаться к специалистам и каким? На сегодня данная проблема настолько актуальна, что многие в своих исследованиях пытаются ответить на поставленные вопросы [4]. Но, когда мы сталки- ваемся с этой проблемой в реальной жизни у себя, у детей, то еще более становимся тревожными, уяз- вимыми. растерянными, неустойчивыми. В данной статье автором предлагаются пути решения данной проблемы, а именно: рассматрива- ется некоторая пошаговая модель оказания помощи детям и подросткам в преодолении тревожности. Прежде всего это информирование. Уметь распознавать признаки тревожности и знать фак- торы, способствующие снижению тревожности у детей и подростков, это первый шаг в противостоя- нии с ней и ее преодолении, а соответственно и шаг к обеспечению безопасного устойчивого развития детей. Так что же такое тревожность, тревога, тре- вожное состояние? 2 Урсул А.Д. Путь в ноосферу (Концепция выжива- ния и устойчивого развития цивилизации). М.: Луч, 1993.
  • 53.
    Sciences of Europe# 60, (2020) 53 В теоретических исследованиях (Ч.Д. Спил- бергер, Ю.Л. Ханин) принято выделять тревогу двух видов. Тревогу как личностную черту, которая определяет готовность к тревожным реакциям, и проявляется в неуверенности в будущем, и акту- альную тревогу, которая входит в структуру психи- ческого состояния в данный конкретный момент [1]. Как правило, состояние тревоги возникает в ситуациях неопределенности, когда возможная угроза жизнедеятельности или самооценки субъ- екта не явно выражена и не определена во времени, в поступках или действиях и ее не возможно преду- гадать или предсказать. Когда тревога пережива- ется как неопределенное беспокойство, то это по- буждает субъекта (ребенка) проявлять активность в поведении и более целенаправленные действия, та- ким образом помогая быстрее адаптироваться. Если тревога не соответствует ситуации (сильно завы- шена и продолжительна по времени), то это начи- нает работать как дезадаптация, и может привести к поведенческим и психическим нарушениям. Что же делать, можно ли как- то помочь ребенку справ- ляться со своим тревожным состоянием и быстрее адаптироваться к постоянно меняющимся школь- ным условиям (увеличение учебной нагрузки, пере- ход из одного школьного звена в другое, смена дет- ского коллектива, новые преподаватели, новые учебные предметы и многое другое). Предсказуемость внешних событий, возмож- ность подготовки к ним и их контролирования, зна- чительно снижает уровень тревоги и тревожного состояния. Также на уменьшение отрицательного влияния тревожного состояния на жизнедеятель- ность ребенка влияют его волевые качества. «Про- явление волевых качеств (силы воли) – это, прежде всего, переключение сознания и волевого контроля с переживания неблагоприятного состояния на ре- гуляцию деятельности (на ее продолжение, подачу внутренней команды к началу деятельности, к со- хранению качества деятельности)» (Е.П. Ильин) [1]. Также не стоит забывать и про индивидуальные особенности нервной системы и личности в целом. Дети и подростки со слабым типом нервной си- стемы более подвержены неблагоприятному воз- действию стрессогенных факторов в сторону уве- личения тревоги и наоборот, с сильным типом нервной системы менее подвержены влиянию тех же неблагоприятных стрессогенных факторов. Та- ким образом, мы обозначили некоторые факторы, уменьшающие возможное неблагоприятное воз- действие стресса на психическое состояние инди- вида (ребенка), Но к сожалению сегодня нередко можно встретить детей с незрелой волевой сферой и слабым типом нервной системой, что заведомо их определяет в группу риска с повышенным уровнем тревожности, а значит мы не можем говорить об их безопасном устойчивом развитии. Следующим шагом в преодолении тревожно- сти у детей и подростков будет диагностика и са- модиагностика. Своевременное обращение к спе- циалисту, получение консультативной и диагности- ческой помощи в определении актуального психического состояния, поможет определить, насколько тревога и тревожное состояние детей и подростков является критическим и требует психо- логического или медикаментозного вмешательства. Информирование, в свою очередь, позволит само- стоятельно провести первичную самодиагностику, что и может в дальнейшем быть поводом обраще- ния к специалисту. Своевременная помощь специалистов – тре- тий шаг по преодолению тревожного состояния и дезадаптивного поведения. Консультирование, психокоррекционная и медикаментозная помощь, при необходимости лечение. При этом, важным направлением психологической помощи по сниже- нию уровня тревожности у детей и подростков яв- ляется развитие у них некоторых свойств личности, такие как локус контроль, психологическая устой- чивость, самооценка и доминирующее настроение. Предполагается, что данные свойства влияют на психическое состояние и могут управлять тревогой и тревожным состоянием индивида. Локус кон- троль определяет, насколько человек может кон- тролировать окружающую обстановку и влиять на нее (Д. Роттер). Считается, что с низкой самооцен- кой люди менее способны адекватно оценивать свои возможности в трудных ситуациях, они склонны занижать свои способности к действиям в стрессовых ситуациях и соответственно изна- чально прибегают к стратегиям избегания или без- действия [1]. Несмотря на то, что в психологиче- ской литературе природа настроения рассматрива- ется разными исследователями по разному, (С.Л. Рубинштейн, П.М Якобсон, К.К. Платонов), боль- шинство рассматривают настроение как общее эмо- циональное состояние, которое в течении опреде- ленного времени окрашивает переживания и дея- тельность человека и таким образом может влиять на их психическое состояние. Считается, что жиз- нерадостные люди более устойчивы, способны со- хранять контроль и критичность в сложных ситуа- циях. Таким образом, развивая определенные свой- ства личности у детей и подростков (локус кон- троль, психологическая устойчивость, само- оценка) и создавая определенное эмоциональное состояние/настроение, мы можем способствовать изменению их психического состояния и снижению уровня тревоги, тем самым обеспечивая их безопас- ное устойчивое развитие. Методы и стратегии, позволяющие справ- ляться с тревогой и беспокойством в специально со- зданных условиях – это обучение приемам саморе- гуляции, выработка определенных навыков поведе- ния в возможных стрессовых ситуациях [5;7], развитие психологической устойчивости через пре- одоление условно опасной ситуации в специально созданной игровой ситуации [8;9], повышение уве- ренности в себе и самопринятие. Четвертым и не менее важным шагом по сни- жению тревоги и обеспечению безопасного устой- чивого развития детей и подростков будет самопо- мощь: использование навыков саморегуляции и ре- лаксации для восстановления
  • 54.
    54 Sciences ofEurope # 60, (2020) психоэмоционального состояния, поиск личност- ного ресурса преодоления последствий стрессоген- ных факторов. Для этого важно обучить детей и подростков различным способам совладания с тре- вогой и тревожным состоянием (упражнения на ды- хание, на саморегуляцию, на релаксацию). И в этом случае образовательная среда и все участники об- разовательного пространства (педагоги, психологи, родители, старшие подростки) могут взять на себя данную задачу по оказанию помощи себе и другим в преодолении тревожности. Старших подростков можно заинтересовать тем, что запустить, так попу- лярный сегодня в среде молодежи, flash mob: «По- моги себе и другу» и т. д. Научить правильно ды- шать, запускать «спящие» механизмы саморегуля- ции, распределять и дозировать время для занятий и отдыха, обучить навыкам бесконфликтного обще- ния (конфликтное общение часто является допол- нительным стрессогеном и причиной повышения тревоги). Все эти приемы в комплексе и есть тот путь решения проблемы по преодолению тревож- ности, и путь к безопасному устойчивому разви- тию. Еще одним способом совладания со стрессом, тревогой и тревожным состоянием и наиболее оп- тимальным, на наш взгляд, является личностный ресурс или индивидуальный стиль преодоления. Следуя многомерной модели внутренней устойчивости BASIC PH, (кратко изложенной и представленной Израильским профессором Мули Лаад) [6;8], каждый человек обладает врожденным индивидуальным стилем преодоления последствий и отрицательного влияния стресса на человека и его жизнедеятельность. Организм человека, наша пси- хика и сознание обладает природным свойством са- мосохранения и восстановления при чрезмерных интеллектуальных и психофизических нагрузках и вредоносных воздействиях стрессогенных факто- ров. Часто эта способность находится в «спящем» состоянии, или мы ничего об этом свойстве и спо- собности своего организма не знаем и не исполь- зуем ее. Важно распознать этот индивидуальный стиль и пользоваться в ситуациях стресса и надви- гающейся, накрывающей вас тревоги. Чтобы опре- делить свой индивидуальный стиль преодоления, достаточно вспомнить или понаблюдать за собой, что вы предпринимаете и как себя ведете в ситуа- ции беспокойства и повышенной тревоги, в ситуа- ции неопределенности или после ситуации, окра- шенной отрицательными эмоциями (конфликт, ссора). Необходимо обратить внимание, что проис- ходит с вами в этот момент: ваша рука тянется к хо- лодильнику или вы спешите в спортзал или на бе- говую дорожку. Вы скорее хотите поделиться своей историей и переживаниями с подругой или близ- кими, или вам хочется мысленно обратиться и пе- ренестись в то комфортное безопасное для вас ме- сто, где все так, как вам хочется. Такой способ вос- становления и личностного ресурса и есть ваш индивидуальный стиль преодоления стрессовой си- туации и способ совладания с тревогой. Таких спо- собов может быть не один и если вы заранее будете знать об этом, то в нужный момент, когда вам ста- новится тревожно, беспокойно, вы можете восполь- зоваться своим способом и снять таким образом напряжение, излишнее возбуждение и тревогу. Подводя итоги нашему теоретическому ис- следованию тревожности у детей и подростков в аспекте их безопасного устойчивого развития, хо- телось бы еще раз подчеркнуть следующее: Одним из элементов, влияющих на безопасное устойчивое развитие является повышенный тре- вожный социальный фон общества в связи с высо- ким уровнем стрессогенности нашей жизни и как следствие этого воздействия - повышенная тревож- ность у детей и подростков. Пути решения проблемы тревоги и тревожного состояния детей и подростков - это некоторая по- шаговая модель оказания помощи в преодолении тревожности: информирование, диагностика и са- модиагностика, помощь специалистов, самопо- мощь. Предсказуемость внешних событий и возмож- ность подготовки к ним и их контролирования, про- явление волевых качеств (переключение сознания и волевого контроля с переживания неблагоприят- ного состояния на регуляцию деятельности), а также индивидуальные особенности нервной си- стемы и личности в целом, необходимо учитывать как факторы, уменьшающие возможное неблаго- приятное воздействие стресса на психическое со- стояние индивида (ребенка/подростка). Локус контроль, психологическую устойчи- вость, самооценку и настроение можно рассматри- вать, как факторы управления психическими состо- яниями и как основу безопасного устойчивого раз- вития. Образовательная среда может быть как усло- вие обеспечения безопасного устойчивого разви- тия, а профилактика тревожных состояний, обуче- ние навыкам бесконфликтного общения и поиск личностного ресурса и индивидуального стиля пре- одоления, как модель устойчивого безопасного раз- вития школьника. Литература 1. Карвасарский Б.Д. Клиническая психология: учебник/ под ред Б.Д. Карвасарского, -СПб; Питер, 2002 – 960 с. (Серия «Национальная медицинская библиотека») 2. Ремеева А.Ф. Колотова Ю.З. Специфика страхов детей из неблагополучных семей и их кор- рекция [Электронный ресурс] // Психология и право 2012. №1,2. URL: http://psyjour- nals.ru/psyandlaw (дата обращения: 28.04.2020). 3. Ремеева А.Ф. Пальчиков И.А. Особенности иррациональных установок девиантных подрост- ков [Электронный ресурс] // Психология и право 2013. №2. С. 66-76 URL:http://psyjournals.ru/psyandlaw (дата обраще- ния: 28.04.2020). 4. Соловьева С.Л. Тревога и тревожность: тео- рия и практика [Электронный ресурс] // Медицин- ская психология в России: электрон. науч. журн. –
  • 55.
    Sciences of Europe# 60, (2020) 55 2012. – N 6 (17). – URL: http://medpsy.ru (дата обра- щения: 28.04.2020). 5. Теплова А.Б., Чернушевич В.А. Ресурсы народной игры как социокультурного средства про- филактики девиантного поведения // Культурно-ис- торическая психология. 2017. Том 13. № 3. С. 51– 59. doi:10.17759/chp.2017130307 6. Чернов С.А., Чернова О.В. Модель систем- ной развивающей психолого-педагогической по- мощи подросткам // Современные проблемы науки и образования. – 2016. – № 3.; URL: http://www.science- education.ru/ru/article/view?id=24571 (дата обраще- ния:17.03.2020). 7. Чернушевич В.А., Куприянова Е.А., Бобры- шова Е.И. Народная игровая культура как средство формирования норм общения в детском возрасте [Электронный ресурс] // Психология и право. 2016. Том 6. № 2. С. 93–106. doi:10.17759/psylaw.2016060207 (дата обращения: 28.04.2020). 8. Чупракова Н.Н. Игровая технология преодо- ления как профилактика социальных рисков с це- лью обеспечения безопасного развития детей и под- ростков в современных условиях»/ Коченовские чтения «Психология и право в современной Рос- сии». Сборник тезисов участников Всероссийской конференции по юридической психологии с между- народным участием. М.: МГППУ, 2018. 345 с. http://conf.childpsy.ru/the_kochenov_conference (дата обращения: 28.04.2020). 9. Чупракова Н.Н. Играя, преодолеваем! Тех- нология преодоления или как не стать жертвой и уметь противостоять насилию (профилактика наси- лия в образовательной среде) // Основные вопросы теории и практики педагогики и психологии. – Омск: ИЦРОН, 2016. С. 192-193. [Электронный ре- сурс]. – https://elibrary.ru/item.asp?id=26078707& (дата обращения: 28.04.2020).
  • 56.
    VOL 4, No60 (2020) Sciences of Europe (Praha, Czech Republic) ISSN 3162-2364 The journal is registered and published in Czech Republic. Articles in all spheres of sciences are published in the journal. Journal is published in Czech, English, Polish, Russian, Chinese, German and French. Articles are accepted each month. Frequency: 24 issues per year. Format - A4 All articles are reviewed Free access to the electronic version of journal All manuscripts are peer reviewed by experts in the respective field. Authors of the manuscripts bear responsibil- ity for their content, credibility and reliability. Editorial board doesn’t expect the manuscripts’ authors to always agree with its opinion. Chief editor: Petr Bohacek Managing editor: Michal Hudecek • Jiří Pospíšil (Organic and Medicinal Chemistry) Zentiva • Jaroslav Fähnrich (Organic Chemistry) Institute of Organic Chemistry and Biochemistry Academy of Sciences of the Czech Republic • Smirnova Oksana K., Doctor of Pedagogical Sciences, Professor, Department of History (Moscow, Russia); • Rasa Boháček – Ph.D. člen Česká zemědělská univerzita v Praze • Naumov Jaroslav S., MD, Ph.D., assistant professor of history of medicine and the social sciences and humanities. (Kiev, Ukraine) • Viktor Pour – Ph.D. člen Univerzita Pardubice • Petrenko Svyatoslav, PhD in geography, lecturer in social and economic geography. (Kharkov, Ukraine) • Karel Schwaninger – Ph.D. člen Vysoká škola báňská – Technická univerzita Ostrava • Kozachenko Artem Leonidovich, Doctor of Pedagogical Sciences, Professor, Department of History (Moscow, Russia); • Václav Pittner -Ph.D. člen Technická univerzita v Liberci • Dudnik Oleg Arturovich, Doctor of Physical and Mathematical Sciences, Professor, De- partment of Physical and Mathematical management methods. (Chernivtsi, Ukraine) • Konovalov Artem Nikolaevich, Doctor of Psychology, Professor, Chair of General Psy- chology and Pedagogy. (Minsk, Belarus) «Sciences of Europe» - Editorial office: Křižíkova 384/101 Karlín, 186 00 Praha E-mail: info@european-science.org Web: www.european-science.org