Welcome To:
2
Without Some Change
There Can Be No Improvement
“The definition of
insanity is doing the
same thing over and
over and expecting
different results.”
Albert Einstein
Advanced Production Improvement Process
Waste Elimination Tool Box
Quick Changeover
Standardized Work Batch Reduction Teams
Quality at Source
5S SystemVisual Plant Layout
POUS
Cellular/FlowPull/Kanban TPM
Continuous Improvement
Value
Stream
Mapping
Kinds of Wastes That We Can Reduce
or Eliminate
??????????????????
Design Raw Materials
Definition of Value Stream Map
Assembly Plants Distribution Customer
Parts Manufacturing
Value Stream Mapping
A Value Stream Map shows all elements (both value added and non-value added)
that occur to a given product from its inception through delivery to the customer.
Requirements
I Finally Got It.
Why Did It Take
30 Days?
A Value Stream Map Fundamental Example
Customer Places Order
Via Internet. 3 Minutes
Producer Processes Order.
Orders Material From
Supplier. 15 Minutes Value
Added Time. 2 Weeks Lead Time
Supplier Ships Material
2 Days In Transit Production. One Hour
Value Added Time.
10 Days In Queue/Wait
Time.
Inspection:
15 Minutes
Packaging, Handling,
Staging, Shipping.
10 Minutes Value Added Time.
2 Days In Queue/Wait Time.
Manufacturer Ships
Order.
2 Days In Transit Time
Customer Receives Order.
30 Days After Placing Order
Elapsed Time From Order To Delivery = 30 days
Value Added Time = Only 1 Hour, 25 Minutes
VALUE STREAM
PROCESS
Mid-Line
PROCESS
Floors
Finished
Product
Raw Material
(Frames, Lumber, Plumbing,
etc.
Value Stream Mapping
Typically we would examine the value stream from raw
materials to finished product at the Division level.
It is also possible to map non-production processes
using Value Stream Mapping such as the steps and time
from taking the order ...to the order sent to the mill room.
PROCESS
Final Finish
VALUE STREAM
PROCESS
Assemble
PROCESS
Cut
Parts
Finished
Product
Raw Material
Value Stream Mapping
We can also examine an off line area such as the Cabinet
Shop.
PROCESS
Send to
Production
Line
Install
On Line
PROCESS
A Value Stream Map Is Not A Spaghetti Diagram.....
(A “Sketti Diagram Just Tracks A Worker’s Movement)
Worker’s Movements
 Provide the means to see the material, process
and information flows.
 Support the prioritization of continuous
improvement activities at the value stream
 Help find ways to reduce or eliminate Waste;
Such as waiting around time and non-value
added processes.
Objectives of Value Stream Mapping
Value Stream Mapping
Map the Current State
The Process
Analyze the Current State
and
Design the Future State
Introduction to Value Stream Mapping
Tues. & Fri.
PC & L
MRP MSS
# times/day
Steel
Supplier
Steel
Pin
#pcs
# days
or shifts
I I
I
I
Stamping
Downtime
Changeover Time=4 hr
2 Shifts
TAKT =
2 Presses
Cycle Time =
Change
Over
Welding
Layout
Scrap/Rework
Downtime = 20%
Uptime
# Operators
Cycle Time =
Weekly Build Schedule
Daily Ship
Schedule
Finished Goods
Overtime =
# Shifts =
Assembly
DT, Scrap
Rework
WIP =
Cycle Time =
TAKT =
Changeover Time =
Layout
= 10%
Scrap
? days ? days ? days ? days
? days ? days ? days
Inventory Time
Processing Time
TPc/t = ?
TAKT =
WIP =
WIP = WIP =
Xpcs/month
Std. Pack Qty.
# shifts
Customer
Finished GoodsAssembly
Layout
Welding
6 x / Day
PC & L
Daily
Level Box
DA1
DA2
DA3
C/O Time =
CT =
TAKT Time
3 Shifts
DT =
Scrap =
Stamping
0 Overtime
2 Shifts
Max Size
# Material Handlers
C/O Time =
CT =
TAKT Time
3 Shifts
DT =
Scrap / Rework =
C/O Time =
CT =
TAKT Time
3 Shifts
DT =
Scrap / Rework=
Small Lot # Operators
Customer
X pcs/ month
Std Pack Qty
# Shifts
WIP =
WIP = WIP =
Steel Supplier
Inv.Time
Proc.Time
TPc/t = ?
? days ? days ? days ? days
? days ? days ? days
1ST 2ND 3RD 4TH 1ST 2ND 3RD 4TH
Establish TAKT & Flow in Tank Ass'y
Stamping Changeover Reduction
Reduce Stamping Buffer
Move Ass'y to Plant 10
Establish TAKT & Flow in Sender Ass'y
Pull To Sender Ass'y
Training
1999 2000
Activity
Map the Current State
The Process
Analyze the Current State
and
Design the Future State
Introduction to Value Stream Mapping
Tues. & Fri.
PC & L
MRP MSS
# times/day
Steel
Supplier
Steel
Pin
#pcs
# days
or shifts
I I
I
I
Stamping
Downtime
Changeover Time=4 hr
2 Shifts
TAKT =
2 Presses
Cycle Time =
Change
Over
Welding
Layout
Scrap/Rework
Downtime = 20%
Uptime
# Operators
Cycle Time =
Weekly Build Schedule
Daily Ship
Schedule
Finished Goods
Overtime =
# Shifts =
Assembly
DT, Scrap
Rework
WIP =
Cycle Time =
TAKT =
Changeover Time =
Layout
= 10%
Scrap
? days ? days ? days ? days
? days ? days ? days
Inventory Time
Processing Time
TPc/t = ?
TAKT =
WIP =
WIP = WIP =
Xpcs/month
Std. Pack Qty.
# shifts
Customer
Finished GoodsAssembly
Layout
Welding
6 x / Day
PC & L
Daily
Level Box
DA1
DA2
DA3
C/O Time =
CT =
TAKT Time
3 Shifts
DT =
Scrap =
Stamping
0 Overtime
2 Shifts
Max Size
# Material Handlers
C/O Time =
CT =
TAKT Time
3 Shifts
DT =
Scrap / Rework =
C/O Time =
CT =
TAKT Time
3 Shifts
DT =
Scrap / Rework=
Small Lot # Operators
Customer
X pcs/ month
Std Pack Qty
# Shifts
WIP =
WIP = WIP =
Steel Supplier
Inv.Time
Proc.Time
TPc/t = ?
? days ? days ? days ? days
? days ? days ? days
1ST 2ND 3RD 4TH 1ST 2ND 3RD 4TH
Establish TAKT & Flow in Tank Ass'y
Stamping Changeover Reduction
Reduce Stamping Buffer
Move Ass'y to Plant 10
Establish TAKT & Flow in Sender Ass'y
Pull To Sender Ass'y
Training
1999 2000
Activity
The bigger the
Issue, the more work
and details may be
needed.
For something more
straight forward. A
simplified version may
work just fine.
See YouTube video
on the portal.
Value Stream Mapping
Simplified.
Current State Map
The Steps
Form a Team & Collect Data
Understand Customer Demand
Map the Process Flow
Map the Material Flow
Map the Information Flow
Calculate Total Product Cycle Time
Detail Off-Line Activities
The Steps :
Step 1:
Step 2:
Step 3:
Step 4:
Step 5:
Step 6:
Step 7:
Select a cross-functional team
Select team members
who are familiar with
the product
Ensure that team
members are trained in the
use of VSM
Designate a V.S.M. Team Leader!
Current State
Step 1: Form a Team
Cross Functional
Team
Supervisor
Q.A.
Manager
Maintenance
Man
Production
Manager
Materials
Manager
Salesman
Receiver
While it is possible do to
Value Stream Mapping
by yourself. The best results
happen when a team is used.
Current State
Step 1: Form a Team
ME
Types of Attribute Data to Collect
 How Operations are
scheduled
 Demand rates
 Working hours and breaks
 Inventory Points (location
& size)
 Work-in-process
inventory
 Overtime per week
 Process cycle times
 Scrap
 Rework
 Downtime
Data Collection
Tailor the
data box for
your plant’s
needs.
The data
box should
be open
ended to
allow for
additional
stuff
Data Box
Data Collection
What is Takt Time?
Data Collection
Takt Time is the rate at which production should run to meet
customer demand
The idea is to synchronize the pace of
production to the pace of sales.
Your Operating Time per Shift
Customer Requirement per Shift
If Needed – Review The Standardized Work
“How To Module”
Production Control
(monthly/weekly forecasts)
Production history (day-to-day, month-to-month
variation)
Sales (product changes, new business, etc.)
Current State Map
Step 2: Understand Customer Demand
Customer
Demand/month:
Part A =
Part B =
Part C =
# of shifts =
Customer
Demand/month:
Part A =
Part B =
Part C =
# of shifts =
Current State Map
Inventory
Part A =
Part B =
Part C =
# of shifts =
ShippingAssemblyWeldingStamping
Takt =
C.T. =
D.T. =
FTQ = 90%
C/O Time =
Lot Size =
# of Shifts
WIP =
Takt =
C.T. =
D.T. = 20%
FTQ =
C/O Time =
Lot Size =
# of Shifts
WIP =
Takt =
C.T. =
D.T. =
FTQ =
C/O Time = 4 hrs.
Lot Size =
# of Shifts
WIP =
Changeover
Downtime FTQ
Step 3: Map The Process Flow
C.T = Cycle Time
DD.T. =
Down Time
FTQ =
Fist Time
Quality.
(Reliability
Rate)
C/O Time =
Change Over
Time
WIP = Work In Process
Step 4: Map the Material Flow
Customer
Demand/month:
Part A =
Part B =
Part C =
# of shifts =
Inventory
Part A =
Part B =
Part C =
# of shifts =
Shipping
AssemblyWeldingStamping
Takt =
C.T. =
D.T. =
FTQ = 90%
C/O Time =
Lot Size =
# of Shifts
WIP =
Takt =
C.T. =
D.T. = 20%
FTQ =
C/O Time =
Lot Size =
# of Shifts
WIP =
Takt =
C.T. =
D.T. =
FTQ =
C/O Time = 4 hrs.
Lot Size =
# of Shifts
WIP =
Changeover Downtime FTQ
Current State Map
2 x/
day
I
2 x/
week
Supplier
1,200 pcs
I
1,500 pcs
I
800 pcs
I
500 pcs
Customer
Demand/month:
Part A = 705 pcs.
Part B = 600 pcs.
Part C = 1650 pcs.
# of shifts =
Inventory
Part A = 750 pcs
Part B = 600 pcs
Part C = 1650 pcs
# of shifts =
ShippingAssemblyWeldingStamping
Takt =
C.T. =
D.T. =
FTQ = 90%
C/O Time =
Lot Size =
# of Shifts
WIP = 550 pcs.
Takt =
C.T. =
D.T. = 20%
FTQ =
C/O Time =
Lot Size =
# of Shifts
WIP = 60 pcs.
Takt =
C.T. =
D.T. =
FTQ =
C/O Time = 4 hrs.
Lot Size =
# of Shifts
WIP = 25 pcs.
Changeover Downtime FTQ
I I II
2 x/
day
2 x/
week
Supplier
1,200 pcs 1,500 pcs 800 pcs 500 pcs
PC & L
Weekly Build Schedule
Daily Ship Schedule
6 week rolling forecast
6 week rolling forecast
Weekly Order
Weekly Order
Current State Map
Step 5: Map the Information Flow
Step 6: Calculate Total Product Cycle Time
Customer
Demand/month:
Part A = 705 pcs.
Part B = 600 pcs.
Part C = 1650 pcs.
# of shifts =
Inventory
Part A = 750 pcs
Part B = 600 pcs
Part C = 1650 pcs
# of shifts =
ShippingAssemblyWeldingStamping
Takt =
C.T. =
D.T. =
FTQ = 90%
C/O Time =
Lot Size =
# of Shifts
WIP = 550 pcs.
Takt =
C.T. =
D.T. = 20%
FTQ =
C/O Time =
Lot Size =
# of Shifts
WIP = 60 pcs.
Takt =
C.T. =
D.T. =
FTQ =
C/O Time = 4 hrs.
Lot Size =
# of Shifts
WIP = 25 pcs.
Changeover Downtime FTQ
I I II
2 x/
day
2 x/
week
Supplier
1,200 pcs 1,500 pcs
800 pcs
500 pcs
PC & L
Weekly Build Schedule
Daily Ship Schedule
6 week rolling forecast
6 week rolling forecast
Weekly Order
Weekly Order
.27 days .17 days.4 days .5
days
1.0
days
.18 days
.02
days
.008
days
TPc/t = 2.5 days
Demand Chain Solutions
Step 7: Detail Off-Line Activities
Current State Map
 Show on the map using general icons
 Detail on another sheet using either reference
VSM and/or process flow-charting
I
Dies
Die Room
Receiving
Die Room
Shipping
(Remove from
Schedule
Board)
Die Bench
I
Dies
2 shifts12 shifts
Schedule Board
(Forecast)
Fork Truck
Press Room
A Representative Current State Value
Stream Map for a Family of Retainers at a
Bearings Manufacturing Company
 To define how the you will
operate in the future
 To serve as the blueprint for
implementation
Design Future State –
Purpose
Without it, the Current State Map was
nothing more than making wallpaper !
Demand Chain Solutions
A simple way to
approach the Future
State Map is to begin
by modifying the
Current State Map.
Future State Map
The Steps
Selected Set of
Value Stream Mapping Icons
Future State Map
Step 1:
Step 2:
Step 3:
Step 4:
Step 5:
Step 6:
Step 7:
The Steps
Validate Customer Demand
Draw the Future State Process Flow
Map the Future State Material Flow
Map the Future State Information Flow
Calculate Total Product Cycle Time
Detail Off-Line Activities
Outline A Plan & Implement It
Demand Chain Solutions
Original Condition Future Condition
Inj:
Molding
2
Sender
Ass’y
2
MSS
Ass’y
Plants
7
Stamping
10
Tank
Ass’y
4
Perform to TAKT & Pitch.
Produce to Order
Load Leveling and Pull
Zone Maintenance & Fast Response
Labels
Level
ABABA. . .
Staging
by Truck
card
by
card
(Pitch = 14 Units)
1ST 2ND 3RD 4TH 1ST 2ND 3RD 4TH
Establish TAKT & Flow in Tank Ass'y
Stamping Changeover Reduction
Reduce Stamping Buffer
Move Ass'y to Plant 10
Establish TAKT & Flow in Sender Ass'y
Pull To Sender Ass'y
Training
1999 2000
Activity
Inj:
Molding
2
Sender
Ass’y
2
MSS
Tank
Ass’yStamping
Fuel Pump
Ass’y
I
I
I
I
I
I
Ass’y
Plants
2
12
10 4
Cycle-Time Driven. Batches.
Change
Over
Change
Over
No Flow
Attendance
No Flow
Uptime
Item Current Target
Total product cycle time
Parts / Person Hour
Delivery Performance
Inventory (days)
Overtime
Uptime
METRICS
Future State Map
I Finally Got It.
Why Did It Take
30 Days?
Customer Places Order
Via Internet. 3 Minutes
Producer Processes Order.
Orders Material From
Supplier. 15 Minutes Value
Added Time. 2 Weeks Lead Time
Supplier Ships Material
2 Days In Transit Production. One Hour
Value Added Time.
10 Days In Queue/Wait
Time.
Inspection:
15 Minutes
Packaging, Handling,
Staging, Shipping.
10 Minutes Value Added Time.
2 Days In Queue/Wait Time.
Manufacturer Ships
Order.
2 Days In Transit Time
Customer Receives Order.
30 Days After Placing Order
Elapsed Time From Order To Delivery = 30 days
Value Added Time = Only 1 Hour, 25 Minutes
What Could We Do To Reduce The Non-Value Added Waste In This Value Stream?
I Finally Got It.
Why Did It Take
30 Days?
Customer Places Order
Via Internet. 3 Minutes
Producer Processes Order.
Material Comes From
Supplier That Keeps Stock In Near
By Warehouse 15 Minutes Value
Added Time. 2 Days Lead Time
Instead of 2 weeks
Supplier Ships Material
1 Day In Transit Instead
Of 2
Production. One Hour
Value Added Time.
10 Days In Queue/Wait
Time.
Inspection:
15 Minutes
Packaging, Handling,
Staging, Shipping.
10 Minutes Value Added Time.
2 Days In Queue/Wait Time.
Manufacturer Ships
Order.
2 Days In Transit Time
Customer Receives Order.
17 Days After Placing Order
Elapsed Time From Order To Delivery = From 30 to 17 days
Value Added Time = Only 1 Hour, 25 Minutes
Hmmm.....Maybe We Just Start With This & Revisit The Value Stream In 60 Days
I Finally Got It.
Why Did It Take
30 Days?
Customer Places Order
Via Internet. 3 Minutes
Reduce Lead Time
Supplier Ships Material
2 Days In Transit Reduce Queue/Wait Time
Make Inspection Part
Of The Production
Process
Reduce Queue/Wait TimeManufacturer Ships
Order.
2 Days In Transit Time
Customer Receives Order.
Less Than 30 Days After
Placing Order
Elapsed Time From Order To Delivery = ? days
Value Added Time = Only ? Hour, ? Minutes
Hmmm......Or Take A Bigger Bite And Maybe We Could......
Some Concluding Mapping Tips
Collect Current-State Information While Walking The Actual Pathways
Of Material, Product, and Information Flow.
Begin At The Yard/Final Dock and Work Upstream
Don’t Rely On Guesstimated Times. Use A Watch & Observe.
Whenever Possible; Map The Whole Value Stream Yourself
Always Draw By Hand In Pencil
??????????????????
Knowledge Check
Design Raw Materials
Definition of Value Stream Map
Assembly Plants Distribution Customer
Parts Manufacturing
Value Stream Mapping
A Value Stream Map shows all elements (both value added and non-value added)
that occur to a given product from its inception through delivery to the customer.
Requirements
Answer:
Question: So What Is The Goal Of Doing Value Stream Mapping?
Knowledge Check:
Question: So What Is The Goal Of Doing Value Stream Mapping?
Answer: To Reduce Or Eliminate Waste & In Particular ..Non-Value Added Stuff
Knowledge Check:
Kinds of Wastes That We Can Reduce
or Eliminate
Advanced Production Improvement Process
Waste Elimination Tool Box
Quick Changeover
Standardized Work Batch Reduction Teams
Quality at Source
5S SystemVisual Plant Layout
POUS
Cellular/FlowPull/Kanban TPM
Continuous Improvement
Value
Stream
Mapping
You Now Have All The Lean Tools In Your Tool Box!

Value stream mapping

  • 1.
  • 2.
    2 Without Some Change ThereCan Be No Improvement “The definition of insanity is doing the same thing over and over and expecting different results.” Albert Einstein
  • 3.
    Advanced Production ImprovementProcess Waste Elimination Tool Box Quick Changeover Standardized Work Batch Reduction Teams Quality at Source 5S SystemVisual Plant Layout POUS Cellular/FlowPull/Kanban TPM Continuous Improvement Value Stream Mapping
  • 4.
    Kinds of WastesThat We Can Reduce or Eliminate
  • 5.
  • 6.
    Design Raw Materials Definitionof Value Stream Map Assembly Plants Distribution Customer Parts Manufacturing Value Stream Mapping A Value Stream Map shows all elements (both value added and non-value added) that occur to a given product from its inception through delivery to the customer. Requirements
  • 7.
    I Finally GotIt. Why Did It Take 30 Days? A Value Stream Map Fundamental Example Customer Places Order Via Internet. 3 Minutes Producer Processes Order. Orders Material From Supplier. 15 Minutes Value Added Time. 2 Weeks Lead Time Supplier Ships Material 2 Days In Transit Production. One Hour Value Added Time. 10 Days In Queue/Wait Time. Inspection: 15 Minutes Packaging, Handling, Staging, Shipping. 10 Minutes Value Added Time. 2 Days In Queue/Wait Time. Manufacturer Ships Order. 2 Days In Transit Time Customer Receives Order. 30 Days After Placing Order Elapsed Time From Order To Delivery = 30 days Value Added Time = Only 1 Hour, 25 Minutes
  • 8.
    VALUE STREAM PROCESS Mid-Line PROCESS Floors Finished Product Raw Material (Frames,Lumber, Plumbing, etc. Value Stream Mapping Typically we would examine the value stream from raw materials to finished product at the Division level. It is also possible to map non-production processes using Value Stream Mapping such as the steps and time from taking the order ...to the order sent to the mill room. PROCESS Final Finish
  • 9.
    VALUE STREAM PROCESS Assemble PROCESS Cut Parts Finished Product Raw Material ValueStream Mapping We can also examine an off line area such as the Cabinet Shop. PROCESS Send to Production Line Install On Line PROCESS
  • 10.
    A Value StreamMap Is Not A Spaghetti Diagram..... (A “Sketti Diagram Just Tracks A Worker’s Movement)
  • 11.
  • 12.
     Provide themeans to see the material, process and information flows.  Support the prioritization of continuous improvement activities at the value stream  Help find ways to reduce or eliminate Waste; Such as waiting around time and non-value added processes. Objectives of Value Stream Mapping Value Stream Mapping
  • 13.
    Map the CurrentState The Process Analyze the Current State and Design the Future State Introduction to Value Stream Mapping Tues. & Fri. PC & L MRP MSS # times/day Steel Supplier Steel Pin #pcs # days or shifts I I I I Stamping Downtime Changeover Time=4 hr 2 Shifts TAKT = 2 Presses Cycle Time = Change Over Welding Layout Scrap/Rework Downtime = 20% Uptime # Operators Cycle Time = Weekly Build Schedule Daily Ship Schedule Finished Goods Overtime = # Shifts = Assembly DT, Scrap Rework WIP = Cycle Time = TAKT = Changeover Time = Layout = 10% Scrap ? days ? days ? days ? days ? days ? days ? days Inventory Time Processing Time TPc/t = ? TAKT = WIP = WIP = WIP = Xpcs/month Std. Pack Qty. # shifts Customer Finished GoodsAssembly Layout Welding 6 x / Day PC & L Daily Level Box DA1 DA2 DA3 C/O Time = CT = TAKT Time 3 Shifts DT = Scrap = Stamping 0 Overtime 2 Shifts Max Size # Material Handlers C/O Time = CT = TAKT Time 3 Shifts DT = Scrap / Rework = C/O Time = CT = TAKT Time 3 Shifts DT = Scrap / Rework= Small Lot # Operators Customer X pcs/ month Std Pack Qty # Shifts WIP = WIP = WIP = Steel Supplier Inv.Time Proc.Time TPc/t = ? ? days ? days ? days ? days ? days ? days ? days 1ST 2ND 3RD 4TH 1ST 2ND 3RD 4TH Establish TAKT & Flow in Tank Ass'y Stamping Changeover Reduction Reduce Stamping Buffer Move Ass'y to Plant 10 Establish TAKT & Flow in Sender Ass'y Pull To Sender Ass'y Training 1999 2000 Activity
  • 14.
    Map the CurrentState The Process Analyze the Current State and Design the Future State Introduction to Value Stream Mapping Tues. & Fri. PC & L MRP MSS # times/day Steel Supplier Steel Pin #pcs # days or shifts I I I I Stamping Downtime Changeover Time=4 hr 2 Shifts TAKT = 2 Presses Cycle Time = Change Over Welding Layout Scrap/Rework Downtime = 20% Uptime # Operators Cycle Time = Weekly Build Schedule Daily Ship Schedule Finished Goods Overtime = # Shifts = Assembly DT, Scrap Rework WIP = Cycle Time = TAKT = Changeover Time = Layout = 10% Scrap ? days ? days ? days ? days ? days ? days ? days Inventory Time Processing Time TPc/t = ? TAKT = WIP = WIP = WIP = Xpcs/month Std. Pack Qty. # shifts Customer Finished GoodsAssembly Layout Welding 6 x / Day PC & L Daily Level Box DA1 DA2 DA3 C/O Time = CT = TAKT Time 3 Shifts DT = Scrap = Stamping 0 Overtime 2 Shifts Max Size # Material Handlers C/O Time = CT = TAKT Time 3 Shifts DT = Scrap / Rework = C/O Time = CT = TAKT Time 3 Shifts DT = Scrap / Rework= Small Lot # Operators Customer X pcs/ month Std Pack Qty # Shifts WIP = WIP = WIP = Steel Supplier Inv.Time Proc.Time TPc/t = ? ? days ? days ? days ? days ? days ? days ? days 1ST 2ND 3RD 4TH 1ST 2ND 3RD 4TH Establish TAKT & Flow in Tank Ass'y Stamping Changeover Reduction Reduce Stamping Buffer Move Ass'y to Plant 10 Establish TAKT & Flow in Sender Ass'y Pull To Sender Ass'y Training 1999 2000 Activity The bigger the Issue, the more work and details may be needed. For something more straight forward. A simplified version may work just fine. See YouTube video on the portal. Value Stream Mapping Simplified.
  • 15.
    Current State Map TheSteps Form a Team & Collect Data Understand Customer Demand Map the Process Flow Map the Material Flow Map the Information Flow Calculate Total Product Cycle Time Detail Off-Line Activities The Steps : Step 1: Step 2: Step 3: Step 4: Step 5: Step 6: Step 7:
  • 16.
    Select a cross-functionalteam Select team members who are familiar with the product Ensure that team members are trained in the use of VSM Designate a V.S.M. Team Leader! Current State Step 1: Form a Team Cross Functional Team Supervisor Q.A. Manager Maintenance Man Production Manager Materials Manager Salesman Receiver
  • 17.
    While it ispossible do to Value Stream Mapping by yourself. The best results happen when a team is used. Current State Step 1: Form a Team ME
  • 18.
    Types of AttributeData to Collect  How Operations are scheduled  Demand rates  Working hours and breaks  Inventory Points (location & size)  Work-in-process inventory  Overtime per week  Process cycle times  Scrap  Rework  Downtime Data Collection
  • 19.
    Tailor the data boxfor your plant’s needs. The data box should be open ended to allow for additional stuff Data Box Data Collection
  • 20.
    What is TaktTime? Data Collection Takt Time is the rate at which production should run to meet customer demand The idea is to synchronize the pace of production to the pace of sales. Your Operating Time per Shift Customer Requirement per Shift If Needed – Review The Standardized Work “How To Module”
  • 21.
    Production Control (monthly/weekly forecasts) Productionhistory (day-to-day, month-to-month variation) Sales (product changes, new business, etc.) Current State Map Step 2: Understand Customer Demand Customer Demand/month: Part A = Part B = Part C = # of shifts =
  • 22.
    Customer Demand/month: Part A = PartB = Part C = # of shifts = Current State Map Inventory Part A = Part B = Part C = # of shifts = ShippingAssemblyWeldingStamping Takt = C.T. = D.T. = FTQ = 90% C/O Time = Lot Size = # of Shifts WIP = Takt = C.T. = D.T. = 20% FTQ = C/O Time = Lot Size = # of Shifts WIP = Takt = C.T. = D.T. = FTQ = C/O Time = 4 hrs. Lot Size = # of Shifts WIP = Changeover Downtime FTQ Step 3: Map The Process Flow C.T = Cycle Time DD.T. = Down Time FTQ = Fist Time Quality. (Reliability Rate) C/O Time = Change Over Time WIP = Work In Process
  • 23.
    Step 4: Mapthe Material Flow Customer Demand/month: Part A = Part B = Part C = # of shifts = Inventory Part A = Part B = Part C = # of shifts = Shipping AssemblyWeldingStamping Takt = C.T. = D.T. = FTQ = 90% C/O Time = Lot Size = # of Shifts WIP = Takt = C.T. = D.T. = 20% FTQ = C/O Time = Lot Size = # of Shifts WIP = Takt = C.T. = D.T. = FTQ = C/O Time = 4 hrs. Lot Size = # of Shifts WIP = Changeover Downtime FTQ Current State Map 2 x/ day I 2 x/ week Supplier 1,200 pcs I 1,500 pcs I 800 pcs I 500 pcs
  • 24.
    Customer Demand/month: Part A =705 pcs. Part B = 600 pcs. Part C = 1650 pcs. # of shifts = Inventory Part A = 750 pcs Part B = 600 pcs Part C = 1650 pcs # of shifts = ShippingAssemblyWeldingStamping Takt = C.T. = D.T. = FTQ = 90% C/O Time = Lot Size = # of Shifts WIP = 550 pcs. Takt = C.T. = D.T. = 20% FTQ = C/O Time = Lot Size = # of Shifts WIP = 60 pcs. Takt = C.T. = D.T. = FTQ = C/O Time = 4 hrs. Lot Size = # of Shifts WIP = 25 pcs. Changeover Downtime FTQ I I II 2 x/ day 2 x/ week Supplier 1,200 pcs 1,500 pcs 800 pcs 500 pcs PC & L Weekly Build Schedule Daily Ship Schedule 6 week rolling forecast 6 week rolling forecast Weekly Order Weekly Order Current State Map Step 5: Map the Information Flow
  • 25.
    Step 6: CalculateTotal Product Cycle Time Customer Demand/month: Part A = 705 pcs. Part B = 600 pcs. Part C = 1650 pcs. # of shifts = Inventory Part A = 750 pcs Part B = 600 pcs Part C = 1650 pcs # of shifts = ShippingAssemblyWeldingStamping Takt = C.T. = D.T. = FTQ = 90% C/O Time = Lot Size = # of Shifts WIP = 550 pcs. Takt = C.T. = D.T. = 20% FTQ = C/O Time = Lot Size = # of Shifts WIP = 60 pcs. Takt = C.T. = D.T. = FTQ = C/O Time = 4 hrs. Lot Size = # of Shifts WIP = 25 pcs. Changeover Downtime FTQ I I II 2 x/ day 2 x/ week Supplier 1,200 pcs 1,500 pcs 800 pcs 500 pcs PC & L Weekly Build Schedule Daily Ship Schedule 6 week rolling forecast 6 week rolling forecast Weekly Order Weekly Order .27 days .17 days.4 days .5 days 1.0 days .18 days .02 days .008 days TPc/t = 2.5 days
  • 26.
    Demand Chain Solutions Step7: Detail Off-Line Activities Current State Map  Show on the map using general icons  Detail on another sheet using either reference VSM and/or process flow-charting I Dies Die Room Receiving Die Room Shipping (Remove from Schedule Board) Die Bench I Dies 2 shifts12 shifts Schedule Board (Forecast) Fork Truck Press Room
  • 27.
    A Representative CurrentState Value Stream Map for a Family of Retainers at a Bearings Manufacturing Company
  • 28.
     To definehow the you will operate in the future  To serve as the blueprint for implementation Design Future State – Purpose Without it, the Current State Map was nothing more than making wallpaper !
  • 29.
    Demand Chain Solutions Asimple way to approach the Future State Map is to begin by modifying the Current State Map. Future State Map The Steps
  • 30.
    Selected Set of ValueStream Mapping Icons
  • 37.
    Future State Map Step1: Step 2: Step 3: Step 4: Step 5: Step 6: Step 7: The Steps Validate Customer Demand Draw the Future State Process Flow Map the Future State Material Flow Map the Future State Information Flow Calculate Total Product Cycle Time Detail Off-Line Activities Outline A Plan & Implement It
  • 38.
    Demand Chain Solutions OriginalCondition Future Condition Inj: Molding 2 Sender Ass’y 2 MSS Ass’y Plants 7 Stamping 10 Tank Ass’y 4 Perform to TAKT & Pitch. Produce to Order Load Leveling and Pull Zone Maintenance & Fast Response Labels Level ABABA. . . Staging by Truck card by card (Pitch = 14 Units) 1ST 2ND 3RD 4TH 1ST 2ND 3RD 4TH Establish TAKT & Flow in Tank Ass'y Stamping Changeover Reduction Reduce Stamping Buffer Move Ass'y to Plant 10 Establish TAKT & Flow in Sender Ass'y Pull To Sender Ass'y Training 1999 2000 Activity Inj: Molding 2 Sender Ass’y 2 MSS Tank Ass’yStamping Fuel Pump Ass’y I I I I I I Ass’y Plants 2 12 10 4 Cycle-Time Driven. Batches. Change Over Change Over No Flow Attendance No Flow Uptime Item Current Target Total product cycle time Parts / Person Hour Delivery Performance Inventory (days) Overtime Uptime METRICS Future State Map
  • 39.
    I Finally GotIt. Why Did It Take 30 Days? Customer Places Order Via Internet. 3 Minutes Producer Processes Order. Orders Material From Supplier. 15 Minutes Value Added Time. 2 Weeks Lead Time Supplier Ships Material 2 Days In Transit Production. One Hour Value Added Time. 10 Days In Queue/Wait Time. Inspection: 15 Minutes Packaging, Handling, Staging, Shipping. 10 Minutes Value Added Time. 2 Days In Queue/Wait Time. Manufacturer Ships Order. 2 Days In Transit Time Customer Receives Order. 30 Days After Placing Order Elapsed Time From Order To Delivery = 30 days Value Added Time = Only 1 Hour, 25 Minutes What Could We Do To Reduce The Non-Value Added Waste In This Value Stream?
  • 40.
    I Finally GotIt. Why Did It Take 30 Days? Customer Places Order Via Internet. 3 Minutes Producer Processes Order. Material Comes From Supplier That Keeps Stock In Near By Warehouse 15 Minutes Value Added Time. 2 Days Lead Time Instead of 2 weeks Supplier Ships Material 1 Day In Transit Instead Of 2 Production. One Hour Value Added Time. 10 Days In Queue/Wait Time. Inspection: 15 Minutes Packaging, Handling, Staging, Shipping. 10 Minutes Value Added Time. 2 Days In Queue/Wait Time. Manufacturer Ships Order. 2 Days In Transit Time Customer Receives Order. 17 Days After Placing Order Elapsed Time From Order To Delivery = From 30 to 17 days Value Added Time = Only 1 Hour, 25 Minutes Hmmm.....Maybe We Just Start With This & Revisit The Value Stream In 60 Days
  • 41.
    I Finally GotIt. Why Did It Take 30 Days? Customer Places Order Via Internet. 3 Minutes Reduce Lead Time Supplier Ships Material 2 Days In Transit Reduce Queue/Wait Time Make Inspection Part Of The Production Process Reduce Queue/Wait TimeManufacturer Ships Order. 2 Days In Transit Time Customer Receives Order. Less Than 30 Days After Placing Order Elapsed Time From Order To Delivery = ? days Value Added Time = Only ? Hour, ? Minutes Hmmm......Or Take A Bigger Bite And Maybe We Could......
  • 42.
    Some Concluding MappingTips Collect Current-State Information While Walking The Actual Pathways Of Material, Product, and Information Flow. Begin At The Yard/Final Dock and Work Upstream Don’t Rely On Guesstimated Times. Use A Watch & Observe. Whenever Possible; Map The Whole Value Stream Yourself Always Draw By Hand In Pencil
  • 43.
  • 44.
    Design Raw Materials Definitionof Value Stream Map Assembly Plants Distribution Customer Parts Manufacturing Value Stream Mapping A Value Stream Map shows all elements (both value added and non-value added) that occur to a given product from its inception through delivery to the customer. Requirements Answer:
  • 45.
    Question: So WhatIs The Goal Of Doing Value Stream Mapping? Knowledge Check:
  • 46.
    Question: So WhatIs The Goal Of Doing Value Stream Mapping? Answer: To Reduce Or Eliminate Waste & In Particular ..Non-Value Added Stuff Knowledge Check:
  • 47.
    Kinds of WastesThat We Can Reduce or Eliminate
  • 48.
    Advanced Production ImprovementProcess Waste Elimination Tool Box Quick Changeover Standardized Work Batch Reduction Teams Quality at Source 5S SystemVisual Plant Layout POUS Cellular/FlowPull/Kanban TPM Continuous Improvement Value Stream Mapping You Now Have All The Lean Tools In Your Tool Box!