Value engineering is a systematic process aimed at improving value through the analysis of functions. It seeks to maintain or improve performance while reducing total costs over the life cycle of a project. The value engineering process involves 8 steps: preparation, information, function analysis, speculation, evaluation, development, presentation, and implementation. It is not simply cost cutting but rather focuses on maintaining essential performance at the lowest possible cost through creativity and analysis of functions.