VALUATION REPORT
FOR
MR/M/s. etc
OF
RESIDENTIAL – FLAT/COMMERCIAL OFFICE/INDUSTRIAL LAND BUILDING
etc.
AT
FLAT NO.,TH FLOOR,'' WING OF BUILDING NO.1,
(W),MUMBAI – 400067.
BY
,
Architects, Planners, Valuers.
2
VALUATION REPORT
Purpose – Submission to Bank Ltd.
Ref. No.: 17/05049/YES Date:
Branch Name Mumbai Type of case
Valuer’s Name Date of visit
Visiting Engg Name Time of visit
Case Ref. No Date of report
Person contacted for property inspection with contact
details
Client Name & Contact No.
BASIC DETAILS
1 Applicants Name ABC
Name of
Owners
ABC
2 Type of property Residential Flat Current usage Residential Flat
3
Address of property /
Site Address
Address as per
documents
4
Has the valuer done valuation of this property before? If yes, for
whom & when.
No
SORROUNDING AND LOCALITY DETAILS
5 Location
Zoning as per Master Plan /
Development plan
Residential
Class of locality (High / Middle Class /
Lower / Negative)
Middle Class
Site (Developed / under-developed) Developed
Proximity from civic amenities / public
transport
1 Km
Nearest Railway Station
Nearest Bus Stop
6 Nearest Landmark
7
Distance from City
Centre
NA
8 Condition and width of approach road : - Good,9 Mt Wide Road
3
PROPERTY DETAILS
9
Brief description of the
property
The subject property is a flat in a S + P + 18 Floor RCC building
known as FULL ADDRESS The surrounding area is
commercial cum residential area. THE DATE OF
AGREEMENT ________,THE PROPERTY IS
FREEHOLD/LEASEHOLD ETC.BEARING CTS NO______
BUILDING HAS _____NO FLOORS,THE BUILDING IS
PREENGINEERED /RCC CONSTRUCTION THE PROPERTY
IS SITITATED _____FLOORS FLAT/SHOP/ROW HOSUE
ETC. FLAT NUMBER THE CARPET AREA/BUILTUP AREA
OF THE FLAT,THE PROPERTY HAS ELECTRIC
CONCEALED,FLOORING FINISHESWIRTE DOWN ETC.
THE AGE OF BUILDING,YEARS OF
CONSTRUCTION,NEAR BY LANDMARKThe market rate in
this area is in range of between Rs. to per Sq ft of BUA.
The rate which is considered for the valuation is Rs. per
Sq.ft of BUA
10 Internal visit done Yes
11 Occupant
Vacant/Occupied
Name of Occupant
Relation with
applicant
Self / Tenant / any other
12 Building details
Property Demarcated Yes / No
Property Identified
through
Residential
Type of structure RCC / Load Bearing
Land/Plot Area NA
No of Blocks/Wings 2 Wings A & B
No of Units per floor 6 Nos per Wing
No. of Floors 18 Floors
No. of Lifts 2 Nos
Amenities -
13 Unit details
Located on Floor No. 8th Floor
No. of rooms / Unit
configuration
2 B.H.K
Remarks on view
from property
14
Present condition of the
property:
Exterior Building in good condition.
Interior Fair condition, well maintained
15 Age of the property 20 Years Residual life 35 Years
4
16 Boundaries North South East West
Actual on site Lobby Open Space Open Space
As per Title document - - - -
Boundaries matching with Sale Deed (Yes / No) -
SANCTION PLAN APPROVAL & OTHER DOCUMENTS DETAILS
17 Sanctioned plans details -
18
Construction
permission /
Commencement
Certificate / OC / BCC
Occupation Certificate
Commencement Certificate:
19 Ownership type Freehold
20
Property documents
verified (Any others)
NA
21
Is the property within
Municipal Limits
MCGM
22
Permissible usage as
per
sanctioned/approved
plan
-
23
Setbacks
As per
plan
As per
Bye- Laws
Actual at
site
Extra
Coverage
deviation
as per
Plan
Extra
Coverage
deviation
as per bye-
laws
Front NA NA 6 M - -
Side 1 (Right NA NA 4.5 M - -
Side2 (Left) NA NA 4.5 M - -
Rear NA NA 6 M - -
Deviations if any
24 Demolition Risk High / Medium / Low / Nil.
25 VALUATION
Area Details
As per Agreement /
Sale Deed
Sft Carpet / BUA /
SBUA
As per Plan Sft Carpet / BUA
As per Measurement Sft Carpet / BUA
A
1
Land + Construction Method (Applicable for Villa / Bunglow / Row House /
Industrial)
Description Area in Sft Rate per Sft Value in Rs.
5
Land area NA
Construction area
(Const rate as per
present condition of the
property)
Value of Land + Construction in Rs. (A1)
A
2
Comparison Method
Built up Area Loading in % -
Saleable area - Rate per Sft 12,500/- Sq.Ft
Value of property as per comparison method (A2)
B Value of Amenities if applicable
a) No of car parks Rate per car parking Value of car park
2 Nos
b) Other charges in Rs. (Lump Sum) -
Total Amenities charges (B) -
Total Fair Market Value of the property: - A1 or
A2 + B
Rs.
Forced Sale Value / Distress Value Rs.
Ready Reckoner rate / Circle rate Rs.
Approx. Rentals in case of 100% complete
property
Rs.
Insurance value / Re-construction cost Rs.
26 Market Comparable
a
)
Property Details
Value Rs.
Date of
Transaction
-
b) Property Details
Value Rs.
Date of
Transaction
-
27 Stage of Construction
Details of stage of
construction
NA
%age Progress - %age Reco -
28 Remarks
Negative Remarks Positive Remarks
Nil Flat is in good condition.
6
29 Latitude: Longitude:
Location Sketch: Attached (GOOGLE EARTH)
Property Sketch: Please refer Annexure I (AUTOCAD/HAND SKETCH)
Property Photographs: Minimum 4 photographs (2 external and 2 internal)
Declaration:
I/We hereby declare that:
1. Our representative physically inspected the property.
2. We have no direct/indirect interest in the property valued.
3. Report is prepared based on the information furnished to us or documents submitted or
shown to us by the client.
4. The fair market value indicated in the report is an opinion of the value prevailing on the
date of the said report and is based on market feedback on values of similar properties.
5. The client is free to obtain other independent opinions on the same. The fair market value of
such properties/localities may increase or decrease depending on the future market
conditions and scenarios.
6. This report does not certify of confirm any ownership or title of the property that has been
valued. The ownership papers/sale deeds may please be verified at your end to ascertain
the right title & area.
7. The services provided by ________________ to the Client will be limited to their use. The
Report should not be used for any other purpose.
8. The Report will reflect matters, as they currently exist. Changes may materially affect the
information contained in the Report.
9. It should be noted that report would be based upon the facts and evidence available at the
date of assessment. Periodical review of the same may be required. Changes in socio-
economic, economic policy and political conditions could result in a substantially different
situation than those presented at the stated effective date ___________assumes no
responsibility for changes in such external conditions.
10. We do not possess legal expertise and hence recommend you to take opinion of legal expert
in order to ensure that there are no elements, restriction or charges contained which are
likely to have detrimental effect upon the value or marketability of property.
11. In the preparation of the Report, we have relied on the following information:
a. Information provided to us by the client and its affiliates and subsidiaries and third
parties;
b. Other relevant information provided to us by the Client and its affiliates and
subsidiaries at request;
7
c. Other relevant information available to us or publicly available.
For M/s.______________
B.Arch.
Architects, Planner, Govt. Regd. Valuer.
Date:
Place: Mumbai
Stamps & Signature
Property
Builtup Area
(Sqft)
RR Rate
(Rs/ per Sq
mt)
Formula rr
rate -
construction
cost X
depreciation
RR Value (Rs.)
builtup
area/10.764 X
rr rate
RR Value Say
Rs.
Flat 596 119200 66,00,074 66,00,000
Value As per Market Rate
Property
Builtup Area
( in Sqft)
Market rate
(Rs/ per Sq.ft.)
Amount (Rs.)
area X market
rate
Dep (Rs.) Age/
Life 20/55
area x
construction
cost x residual
value 0.9 x
age/life
FMV (Rs.)
amount -
depreciation
Say FMV
RSV
(5% less)
DSV ( 15% less
than FMV)
Flat 596 12500 74,50,000 2,92,582 71,57,418 71,57,000
Car Parking 3,00,000
74,57,000
ANNEXURE II
63,38,45070,84,150
Value As per RR Rate
M/s.
The RR Rate for flat is Rs. 1,24,700/- per Sq.mt. Cost of construction is taking for valuation of Rs. 27,500/- per Sq.mt. for RCC structure. Depreciation
is taking 20% on Cost of construction based on age of building as per the RR guideline rules.
Address

More Related Content

What's hot

Professional practice for students of Architcture
Professional practice  for students of ArchitctureProfessional practice  for students of Architcture
Professional practice for students of Architcture
JIT KUMAR GUPTA
 
REPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONREPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTION
Rising Sher
 
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
L&W BUILDING SOLUTIONS PVT. LMT.
 
Apartment building construction project report
Apartment building construction project reportApartment building construction project report
Apartment building construction project report
Hiska Chishi
 
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
AN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTIONAN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTION
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTIONAbhishek Singh
 
Specifications, reports and tenders
Specifications, reports and tendersSpecifications, reports and tenders
Specifications, reports and tenders
gayu pandian
 
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGAmritpal Singh
 
Contract and Arbitration
Contract and ArbitrationContract and Arbitration
Contract and Arbitration
JIT KUMAR GUPTA
 
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
Shrikant Kate
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineering
Kailash Chander
 
Construction of residential building
Construction of residential buildingConstruction of residential building
Construction of residential building
Sumit Singh
 
Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.
JAPJEETSINGH13
 
Valuation(1)
Valuation(1)Valuation(1)
Valuation(1)
jagadish108
 
Valuation
ValuationValuation
Valuation
kajol panchal
 
Construction site report
Construction site reportConstruction site report
Construction site report
Ravi Kant Sahu
 
professional practice and valuation topic of ppt:-valuation
professional practice and valuation topic of ppt:-valuationprofessional practice and valuation topic of ppt:-valuation
professional practice and valuation topic of ppt:-valuation
tirath prajapati
 
Building by laws
Building  by lawsBuilding  by laws
Building by laws
Sameer Thaiyam
 
Residential building construction ppt
Residential building construction pptResidential building construction ppt
Residential building construction ppt
Being Deepak
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contracts
srinivas2036
 

What's hot (20)

Professional practice for students of Architcture
Professional practice  for students of ArchitctureProfessional practice  for students of Architcture
Professional practice for students of Architcture
 
REPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTIONREPORTS ON BUILDING CONSTRUCTION
REPORTS ON BUILDING CONSTRUCTION
 
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
CIVIL ENGINEERING INTERNSHIP FULL REPORT ON BUILDING CONSTRUCTION
 
Apartment building construction project report
Apartment building construction project reportApartment building construction project report
Apartment building construction project report
 
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
AN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTIONAN INTERNSHIP  REPORT  ON  RESIDENTIAL  BUILDING  CONSTRUCTION
AN INTERNSHIP REPORT ON RESIDENTIAL BUILDING CONSTRUCTION
 
Specifications, reports and tenders
Specifications, reports and tendersSpecifications, reports and tenders
Specifications, reports and tenders
 
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
 
Contract and Arbitration
Contract and ArbitrationContract and Arbitration
Contract and Arbitration
 
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
Labour Laws and Financial Aspects of Construction Project _ Unit 3 _ Construc...
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineering
 
Construction of residential building
Construction of residential buildingConstruction of residential building
Construction of residential building
 
Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.Industrial Training report Civil Engineering.
Industrial Training report Civil Engineering.
 
Valuation(1)
Valuation(1)Valuation(1)
Valuation(1)
 
Valuation
ValuationValuation
Valuation
 
Construction site report
Construction site reportConstruction site report
Construction site report
 
professional practice and valuation topic of ppt:-valuation
professional practice and valuation topic of ppt:-valuationprofessional practice and valuation topic of ppt:-valuation
professional practice and valuation topic of ppt:-valuation
 
Building by laws
Building  by lawsBuilding  by laws
Building by laws
 
TENDER DOCUMENT
TENDER DOCUMENTTENDER DOCUMENT
TENDER DOCUMENT
 
Residential building construction ppt
Residential building construction pptResidential building construction ppt
Residential building construction ppt
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contracts
 

Similar to Valuation Format

AssrAnswrRealPropPetn
AssrAnswrRealPropPetnAssrAnswrRealPropPetn
AssrAnswrRealPropPetntaxman taxman
 
STUDY OF VALUATION OF RESIDENTIAL PROPERTY – A CASE STUDY OF PUNE CITY
STUDY OF VALUATION OF RESIDENTIAL PROPERTY – A CASE STUDY OF PUNE CITYSTUDY OF VALUATION OF RESIDENTIAL PROPERTY – A CASE STUDY OF PUNE CITY
STUDY OF VALUATION OF RESIDENTIAL PROPERTY – A CASE STUDY OF PUNE CITY
IRJET Journal
 
ALTA Land Title Survey
ALTA Land Title Survey ALTA Land Title Survey
ALTA Land Title Survey
Smith-Roberts National Survey
 
Thd garden - 2 BHK Flat in Bhiwadi
Thd garden - 2 BHK Flat in BhiwadiThd garden - 2 BHK Flat in Bhiwadi
Thd garden - 2 BHK Flat in Bhiwadi
Trehan Home Developers Pvt. Ltd.
 
Appraisal Project Report
Appraisal Project ReportAppraisal Project Report
Appraisal Project ReportKayla Murphy
 
How to Package a Loan Request for Construction, Rehab, and Commercial Loans
How to Package a Loan Request for Construction, Rehab, and Commercial LoansHow to Package a Loan Request for Construction, Rehab, and Commercial Loans
How to Package a Loan Request for Construction, Rehab, and Commercial Loans
Beau Eckstein
 
MRERA by VRK2019.pptx
MRERA by VRK2019.pptxMRERA by VRK2019.pptx
MRERA by VRK2019.pptx
VivekKasar5
 
Mapsko royale ville resale 8287494393
Mapsko royale ville resale 8287494393Mapsko royale ville resale 8287494393
Mapsko royale ville resale 8287494393
Real Estate
 
Real Estate Bill
Real Estate BillReal Estate Bill
Real Estate BillNeha Sethi
 
Case Analysis Report
Case Analysis ReportCase Analysis Report
Case Analysis ReportAshish Sarkar
 
About Demand and supply of real estate By Nino joseph Mihilli
About Demand and supply of real estate By Nino joseph MihilliAbout Demand and supply of real estate By Nino joseph Mihilli
About Demand and supply of real estate By Nino joseph Mihilli
NinoJosephMihilli12
 
Real Estate Entrepreneur
Real Estate EntrepreneurReal Estate Entrepreneur
Real Estate Entrepreneur
Rahul Hankare
 
Impact of RERA on consumer buying behaviour summer project complete(1)
Impact of RERA on consumer buying behaviour summer project complete(1)Impact of RERA on consumer buying behaviour summer project complete(1)
Impact of RERA on consumer buying behaviour summer project complete(1)
Ajay Singh
 
Demand and supply of real estate industry in
Demand and supply of real estate industry inDemand and supply of real estate industry in
Demand and supply of real estate industry in
Sandhiya Ramesh
 
Raising Canes in Prime Interstate 10 On/Off Ramp Location
Raising Canes in Prime Interstate 10 On/Off Ramp LocationRaising Canes in Prime Interstate 10 On/Off Ramp Location
Raising Canes in Prime Interstate 10 On/Off Ramp Location
Kevin Boeve
 
Understanding viability
Understanding viabilityUnderstanding viability
Understanding viability
PAS_Team
 
Property investment and evaluation
Property investment and evaluationProperty investment and evaluation
Property investment and evaluation
Service_supportAssignment
 
Chapter 13 ( valuation)
Chapter 13 ( valuation)Chapter 13 ( valuation)
Chapter 13 ( valuation)
umes manandhar
 
Professional practise question bank
Professional practise question bankProfessional practise question bank
Professional practise question bank
Anupama Krishnan
 

Similar to Valuation Format (20)

AssrAnswrRealPropPetn
AssrAnswrRealPropPetnAssrAnswrRealPropPetn
AssrAnswrRealPropPetn
 
STUDY OF VALUATION OF RESIDENTIAL PROPERTY – A CASE STUDY OF PUNE CITY
STUDY OF VALUATION OF RESIDENTIAL PROPERTY – A CASE STUDY OF PUNE CITYSTUDY OF VALUATION OF RESIDENTIAL PROPERTY – A CASE STUDY OF PUNE CITY
STUDY OF VALUATION OF RESIDENTIAL PROPERTY – A CASE STUDY OF PUNE CITY
 
ALTA Land Title Survey
ALTA Land Title Survey ALTA Land Title Survey
ALTA Land Title Survey
 
Thd garden - 2 BHK Flat in Bhiwadi
Thd garden - 2 BHK Flat in BhiwadiThd garden - 2 BHK Flat in Bhiwadi
Thd garden - 2 BHK Flat in Bhiwadi
 
Appraisal Project Report
Appraisal Project ReportAppraisal Project Report
Appraisal Project Report
 
How to Package a Loan Request for Construction, Rehab, and Commercial Loans
How to Package a Loan Request for Construction, Rehab, and Commercial LoansHow to Package a Loan Request for Construction, Rehab, and Commercial Loans
How to Package a Loan Request for Construction, Rehab, and Commercial Loans
 
MRERA by VRK2019.pptx
MRERA by VRK2019.pptxMRERA by VRK2019.pptx
MRERA by VRK2019.pptx
 
Mapsko royale ville resale 8287494393
Mapsko royale ville resale 8287494393Mapsko royale ville resale 8287494393
Mapsko royale ville resale 8287494393
 
Real Estate Bill
Real Estate BillReal Estate Bill
Real Estate Bill
 
Case Analysis Report
Case Analysis ReportCase Analysis Report
Case Analysis Report
 
About Demand and supply of real estate By Nino joseph Mihilli
About Demand and supply of real estate By Nino joseph MihilliAbout Demand and supply of real estate By Nino joseph Mihilli
About Demand and supply of real estate By Nino joseph Mihilli
 
Real Estate Entrepreneur
Real Estate EntrepreneurReal Estate Entrepreneur
Real Estate Entrepreneur
 
Impact of RERA on consumer buying behaviour summer project complete(1)
Impact of RERA on consumer buying behaviour summer project complete(1)Impact of RERA on consumer buying behaviour summer project complete(1)
Impact of RERA on consumer buying behaviour summer project complete(1)
 
Demand and supply of real estate industry in
Demand and supply of real estate industry inDemand and supply of real estate industry in
Demand and supply of real estate industry in
 
Raising Canes in Prime Interstate 10 On/Off Ramp Location
Raising Canes in Prime Interstate 10 On/Off Ramp LocationRaising Canes in Prime Interstate 10 On/Off Ramp Location
Raising Canes in Prime Interstate 10 On/Off Ramp Location
 
Understanding viability
Understanding viabilityUnderstanding viability
Understanding viability
 
Valuation
ValuationValuation
Valuation
 
Property investment and evaluation
Property investment and evaluationProperty investment and evaluation
Property investment and evaluation
 
Chapter 13 ( valuation)
Chapter 13 ( valuation)Chapter 13 ( valuation)
Chapter 13 ( valuation)
 
Professional practise question bank
Professional practise question bankProfessional practise question bank
Professional practise question bank
 

More from Rohit Digra

Master of Architecture Thesis Healthcare Project management "A Structure Appr...
Master of Architecture Thesis Healthcare Project management "A Structure Appr...Master of Architecture Thesis Healthcare Project management "A Structure Appr...
Master of Architecture Thesis Healthcare Project management "A Structure Appr...
Rohit Digra
 
Feasibility Report Format
Feasibility Report FormatFeasibility Report Format
Feasibility Report Format
Rohit Digra
 
Birth date mistake format
Birth date mistake formatBirth date mistake format
Birth date mistake format
Rohit Digra
 
5 FORCE ANALYSIS OF THE CEMENT INDUSTRY IN INDIA
5 FORCE ANALYSIS OF THE  CEMENT INDUSTRY IN INDIA5 FORCE ANALYSIS OF THE  CEMENT INDUSTRY IN INDIA
5 FORCE ANALYSIS OF THE CEMENT INDUSTRY IN INDIA
Rohit Digra
 
Customer value proposition
Customer value propositionCustomer value proposition
Customer value proposition
Rohit Digra
 
multimodal transport
multimodal transportmultimodal transport
multimodal transport
Rohit Digra
 
Registration council of architecture
Registration council of architectureRegistration council of architecture
Registration council of architecture
Rohit Digra
 
Architecture Thesis Recreation center
Architecture Thesis Recreation centerArchitecture Thesis Recreation center
Architecture Thesis Recreation center
Rohit Digra
 
Presentation paint
Presentation paintPresentation paint
Presentation paint
Rohit Digra
 
Landscape notes
Landscape notesLandscape notes
Landscape notes
Rohit Digra
 
Interior thesis on recording studio
Interior thesis on recording studioInterior thesis on recording studio
Interior thesis on recording studio
Rohit Digra
 
Green interiors
Green interiorsGreen interiors
Green interiors
Rohit Digra
 
Future furniture
Future furnitureFuture furniture
Future furniture
Rohit Digra
 
First year architecture humanities
First year architecture humanitiesFirst year architecture humanities
First year architecture humanities
Rohit Digra
 
Fifth year report bc
Fifth year report bcFifth year report bc
Fifth year report bc
Rohit Digra
 
Building by laws format
Building by laws formatBuilding by laws format
Building by laws format
Rohit Digra
 
Affidavit for name mistake/misprint in result or any other document
Affidavit for name mistake/misprint in result or any other documentAffidavit for name mistake/misprint in result or any other document
Affidavit for name mistake/misprint in result or any other document
Rohit Digra
 

More from Rohit Digra (17)

Master of Architecture Thesis Healthcare Project management "A Structure Appr...
Master of Architecture Thesis Healthcare Project management "A Structure Appr...Master of Architecture Thesis Healthcare Project management "A Structure Appr...
Master of Architecture Thesis Healthcare Project management "A Structure Appr...
 
Feasibility Report Format
Feasibility Report FormatFeasibility Report Format
Feasibility Report Format
 
Birth date mistake format
Birth date mistake formatBirth date mistake format
Birth date mistake format
 
5 FORCE ANALYSIS OF THE CEMENT INDUSTRY IN INDIA
5 FORCE ANALYSIS OF THE  CEMENT INDUSTRY IN INDIA5 FORCE ANALYSIS OF THE  CEMENT INDUSTRY IN INDIA
5 FORCE ANALYSIS OF THE CEMENT INDUSTRY IN INDIA
 
Customer value proposition
Customer value propositionCustomer value proposition
Customer value proposition
 
multimodal transport
multimodal transportmultimodal transport
multimodal transport
 
Registration council of architecture
Registration council of architectureRegistration council of architecture
Registration council of architecture
 
Architecture Thesis Recreation center
Architecture Thesis Recreation centerArchitecture Thesis Recreation center
Architecture Thesis Recreation center
 
Presentation paint
Presentation paintPresentation paint
Presentation paint
 
Landscape notes
Landscape notesLandscape notes
Landscape notes
 
Interior thesis on recording studio
Interior thesis on recording studioInterior thesis on recording studio
Interior thesis on recording studio
 
Green interiors
Green interiorsGreen interiors
Green interiors
 
Future furniture
Future furnitureFuture furniture
Future furniture
 
First year architecture humanities
First year architecture humanitiesFirst year architecture humanities
First year architecture humanities
 
Fifth year report bc
Fifth year report bcFifth year report bc
Fifth year report bc
 
Building by laws format
Building by laws formatBuilding by laws format
Building by laws format
 
Affidavit for name mistake/misprint in result or any other document
Affidavit for name mistake/misprint in result or any other documentAffidavit for name mistake/misprint in result or any other document
Affidavit for name mistake/misprint in result or any other document
 

Recently uploaded

Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
Atul Kumar Singh
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
DhatriParmar
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
Nguyen Thanh Tu Collection
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
JosvitaDsouza2
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
DeeptiGupta154
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
Pavel ( NSTU)
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
joachimlavalley1
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
kaushalkr1407
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
Delapenabediema
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
TechSoup
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
EugeneSaldivar
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
beazzy04
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
GeoBlogs
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 

Recently uploaded (20)

Guidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th SemesterGuidance_and_Counselling.pdf B.Ed. 4th Semester
Guidance_and_Counselling.pdf B.Ed. 4th Semester
 
The Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptxThe Accursed House by Émile Gaboriau.pptx
The Accursed House by Émile Gaboriau.pptx
 
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
BÀI TẬP BỔ TRỢ TIẾNG ANH GLOBAL SUCCESS LỚP 3 - CẢ NĂM (CÓ FILE NGHE VÀ ĐÁP Á...
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
Synthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptxSynthetic Fiber Construction in lab .pptx
Synthetic Fiber Construction in lab .pptx
 
Additional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdfAdditional Benefits for Employee Website.pdf
Additional Benefits for Employee Website.pdf
 
The Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdfThe Roman Empire A Historical Colossus.pdf
The Roman Empire A Historical Colossus.pdf
 
The Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official PublicationThe Challenger.pdf DNHS Official Publication
The Challenger.pdf DNHS Official Publication
 
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup   New Member Orientation and Q&A (May 2024).pdfWelcome to TechSoup   New Member Orientation and Q&A (May 2024).pdf
Welcome to TechSoup New Member Orientation and Q&A (May 2024).pdf
 
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...TESDA TM1 REVIEWER  FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
TESDA TM1 REVIEWER FOR NATIONAL ASSESSMENT WRITTEN AND ORAL QUESTIONS WITH A...
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345Sha'Carri Richardson Presentation 202345
Sha'Carri Richardson Presentation 202345
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
Chapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptxChapter 3 - Islamic Banking Products and Services.pptx
Chapter 3 - Islamic Banking Products and Services.pptx
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 

Valuation Format

  • 1. VALUATION REPORT FOR MR/M/s. etc OF RESIDENTIAL – FLAT/COMMERCIAL OFFICE/INDUSTRIAL LAND BUILDING etc. AT FLAT NO.,TH FLOOR,'' WING OF BUILDING NO.1, (W),MUMBAI – 400067. BY , Architects, Planners, Valuers.
  • 2. 2 VALUATION REPORT Purpose – Submission to Bank Ltd. Ref. No.: 17/05049/YES Date: Branch Name Mumbai Type of case Valuer’s Name Date of visit Visiting Engg Name Time of visit Case Ref. No Date of report Person contacted for property inspection with contact details Client Name & Contact No. BASIC DETAILS 1 Applicants Name ABC Name of Owners ABC 2 Type of property Residential Flat Current usage Residential Flat 3 Address of property / Site Address Address as per documents 4 Has the valuer done valuation of this property before? If yes, for whom & when. No SORROUNDING AND LOCALITY DETAILS 5 Location Zoning as per Master Plan / Development plan Residential Class of locality (High / Middle Class / Lower / Negative) Middle Class Site (Developed / under-developed) Developed Proximity from civic amenities / public transport 1 Km Nearest Railway Station Nearest Bus Stop 6 Nearest Landmark 7 Distance from City Centre NA 8 Condition and width of approach road : - Good,9 Mt Wide Road
  • 3. 3 PROPERTY DETAILS 9 Brief description of the property The subject property is a flat in a S + P + 18 Floor RCC building known as FULL ADDRESS The surrounding area is commercial cum residential area. THE DATE OF AGREEMENT ________,THE PROPERTY IS FREEHOLD/LEASEHOLD ETC.BEARING CTS NO______ BUILDING HAS _____NO FLOORS,THE BUILDING IS PREENGINEERED /RCC CONSTRUCTION THE PROPERTY IS SITITATED _____FLOORS FLAT/SHOP/ROW HOSUE ETC. FLAT NUMBER THE CARPET AREA/BUILTUP AREA OF THE FLAT,THE PROPERTY HAS ELECTRIC CONCEALED,FLOORING FINISHESWIRTE DOWN ETC. THE AGE OF BUILDING,YEARS OF CONSTRUCTION,NEAR BY LANDMARKThe market rate in this area is in range of between Rs. to per Sq ft of BUA. The rate which is considered for the valuation is Rs. per Sq.ft of BUA 10 Internal visit done Yes 11 Occupant Vacant/Occupied Name of Occupant Relation with applicant Self / Tenant / any other 12 Building details Property Demarcated Yes / No Property Identified through Residential Type of structure RCC / Load Bearing Land/Plot Area NA No of Blocks/Wings 2 Wings A & B No of Units per floor 6 Nos per Wing No. of Floors 18 Floors No. of Lifts 2 Nos Amenities - 13 Unit details Located on Floor No. 8th Floor No. of rooms / Unit configuration 2 B.H.K Remarks on view from property 14 Present condition of the property: Exterior Building in good condition. Interior Fair condition, well maintained 15 Age of the property 20 Years Residual life 35 Years
  • 4. 4 16 Boundaries North South East West Actual on site Lobby Open Space Open Space As per Title document - - - - Boundaries matching with Sale Deed (Yes / No) - SANCTION PLAN APPROVAL & OTHER DOCUMENTS DETAILS 17 Sanctioned plans details - 18 Construction permission / Commencement Certificate / OC / BCC Occupation Certificate Commencement Certificate: 19 Ownership type Freehold 20 Property documents verified (Any others) NA 21 Is the property within Municipal Limits MCGM 22 Permissible usage as per sanctioned/approved plan - 23 Setbacks As per plan As per Bye- Laws Actual at site Extra Coverage deviation as per Plan Extra Coverage deviation as per bye- laws Front NA NA 6 M - - Side 1 (Right NA NA 4.5 M - - Side2 (Left) NA NA 4.5 M - - Rear NA NA 6 M - - Deviations if any 24 Demolition Risk High / Medium / Low / Nil. 25 VALUATION Area Details As per Agreement / Sale Deed Sft Carpet / BUA / SBUA As per Plan Sft Carpet / BUA As per Measurement Sft Carpet / BUA A 1 Land + Construction Method (Applicable for Villa / Bunglow / Row House / Industrial) Description Area in Sft Rate per Sft Value in Rs.
  • 5. 5 Land area NA Construction area (Const rate as per present condition of the property) Value of Land + Construction in Rs. (A1) A 2 Comparison Method Built up Area Loading in % - Saleable area - Rate per Sft 12,500/- Sq.Ft Value of property as per comparison method (A2) B Value of Amenities if applicable a) No of car parks Rate per car parking Value of car park 2 Nos b) Other charges in Rs. (Lump Sum) - Total Amenities charges (B) - Total Fair Market Value of the property: - A1 or A2 + B Rs. Forced Sale Value / Distress Value Rs. Ready Reckoner rate / Circle rate Rs. Approx. Rentals in case of 100% complete property Rs. Insurance value / Re-construction cost Rs. 26 Market Comparable a ) Property Details Value Rs. Date of Transaction - b) Property Details Value Rs. Date of Transaction - 27 Stage of Construction Details of stage of construction NA %age Progress - %age Reco - 28 Remarks Negative Remarks Positive Remarks Nil Flat is in good condition.
  • 6. 6 29 Latitude: Longitude: Location Sketch: Attached (GOOGLE EARTH) Property Sketch: Please refer Annexure I (AUTOCAD/HAND SKETCH) Property Photographs: Minimum 4 photographs (2 external and 2 internal) Declaration: I/We hereby declare that: 1. Our representative physically inspected the property. 2. We have no direct/indirect interest in the property valued. 3. Report is prepared based on the information furnished to us or documents submitted or shown to us by the client. 4. The fair market value indicated in the report is an opinion of the value prevailing on the date of the said report and is based on market feedback on values of similar properties. 5. The client is free to obtain other independent opinions on the same. The fair market value of such properties/localities may increase or decrease depending on the future market conditions and scenarios. 6. This report does not certify of confirm any ownership or title of the property that has been valued. The ownership papers/sale deeds may please be verified at your end to ascertain the right title & area. 7. The services provided by ________________ to the Client will be limited to their use. The Report should not be used for any other purpose. 8. The Report will reflect matters, as they currently exist. Changes may materially affect the information contained in the Report. 9. It should be noted that report would be based upon the facts and evidence available at the date of assessment. Periodical review of the same may be required. Changes in socio- economic, economic policy and political conditions could result in a substantially different situation than those presented at the stated effective date ___________assumes no responsibility for changes in such external conditions. 10. We do not possess legal expertise and hence recommend you to take opinion of legal expert in order to ensure that there are no elements, restriction or charges contained which are likely to have detrimental effect upon the value or marketability of property. 11. In the preparation of the Report, we have relied on the following information: a. Information provided to us by the client and its affiliates and subsidiaries and third parties; b. Other relevant information provided to us by the Client and its affiliates and subsidiaries at request;
  • 7. 7 c. Other relevant information available to us or publicly available. For M/s.______________ B.Arch. Architects, Planner, Govt. Regd. Valuer. Date: Place: Mumbai Stamps & Signature
  • 8. Property Builtup Area (Sqft) RR Rate (Rs/ per Sq mt) Formula rr rate - construction cost X depreciation RR Value (Rs.) builtup area/10.764 X rr rate RR Value Say Rs. Flat 596 119200 66,00,074 66,00,000 Value As per Market Rate Property Builtup Area ( in Sqft) Market rate (Rs/ per Sq.ft.) Amount (Rs.) area X market rate Dep (Rs.) Age/ Life 20/55 area x construction cost x residual value 0.9 x age/life FMV (Rs.) amount - depreciation Say FMV RSV (5% less) DSV ( 15% less than FMV) Flat 596 12500 74,50,000 2,92,582 71,57,418 71,57,000 Car Parking 3,00,000 74,57,000 ANNEXURE II 63,38,45070,84,150 Value As per RR Rate M/s. The RR Rate for flat is Rs. 1,24,700/- per Sq.mt. Cost of construction is taking for valuation of Rs. 27,500/- per Sq.mt. for RCC structure. Depreciation is taking 20% on Cost of construction based on age of building as per the RR guideline rules. Address