SlideShare a Scribd company logo
1 of 7
V & H ZEGO Steel Fixer
Available in two configurations
• V (Vertical Green unit ) For slab work without bending over
• H (Horizontal Blue unit) For walls, columns beams and slab work
Features
• Simple one handed operation withre-chargeable batteries.
• Supplied with 2 batteries and high speed 240volt charger
• Hard plastic carry case
• Comes with 10 coils of wire 1mm dia (electric gal)
• Ties 2 wraps of 1mm wire
• Interchangable optionalJAWS 32, 51 and 64mm
• JAWS close around reinforcement
• Easy to train unskilled workers
• Only weighs 3.62 kg
Uses
• Suitable for many applications:
• Precast panels, pits, pipes, culverts and general concreting
• Tie mesh or reinforcement bar
• Foundations slabs and footings
• Piers, columns and walls
• Swimming pools, watertanks, retaining walls, fences
• Civil works road and bridge construction
Applications
• Fastening Reinforcing Bar (rebar tyeing)
• Fastening Steel Mesh
• Hi-Rise-Rebar Tieing
Remarks
• TIES TOTAL OF BAR up to 32mm hence standard = 2 x N16
• Optional extras Jaws to tie 51mm or 64mm
Contact Us
ZEGO Pty Ltd
GPO Box 4774
Sydney
New South Wales
Australia 2001
www.zego.com.au

More Related Content

What's hot

What's hot (19)

Post tensioning in building structures
Post tensioning in building structuresPost tensioning in building structures
Post tensioning in building structures
 
Post Tensioning Review Session for Installers
Post Tensioning Review Session for InstallersPost Tensioning Review Session for Installers
Post Tensioning Review Session for Installers
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed Concrete
 
rapid walls- modular construction technology
rapid walls- modular construction technologyrapid walls- modular construction technology
rapid walls- modular construction technology
 
A Post Tension Primer
A Post Tension PrimerA Post Tension Primer
A Post Tension Primer
 
Poles July 09
Poles July 09Poles July 09
Poles July 09
 
Presentation1
Presentation1Presentation1
Presentation1
 
Post Tension
Post TensionPost Tension
Post Tension
 
Post tension tendon
Post tension tendonPost tension tendon
Post tension tendon
 
Post Tensioning
Post TensioningPost Tensioning
Post Tensioning
 
Rmd Australia corporate presentation
Rmd Australia corporate presentationRmd Australia corporate presentation
Rmd Australia corporate presentation
 
Prestressed
PrestressedPrestressed
Prestressed
 
Facades applications using LATICRETE materials
Facades applications   using LATICRETE materialsFacades applications   using LATICRETE materials
Facades applications using LATICRETE materials
 
What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioning
 
Maintenance Aspects and Services in Architectural Planning
Maintenance Aspects and Services in Architectural PlanningMaintenance Aspects and Services in Architectural Planning
Maintenance Aspects and Services in Architectural Planning
 
Signature bridge ppt2
Signature bridge ppt2Signature bridge ppt2
Signature bridge ppt2
 
signature bridge short presentation
signature bridge short presentationsignature bridge short presentation
signature bridge short presentation
 
Mega prefab post tension catalog
Mega prefab post tension catalog Mega prefab post tension catalog
Mega prefab post tension catalog
 
Case study on signature bridge ppt (1)
Case study on signature bridge ppt (1)Case study on signature bridge ppt (1)
Case study on signature bridge ppt (1)
 

Similar to V & H ZEGO Steel Fixer

Zego h or v steel fixers
Zego h or v steel fixersZego h or v steel fixers
Zego h or v steel fixers
simonjohn2
 
Zego h or v steel fixers
Zego h or v steel fixersZego h or v steel fixers
Zego h or v steel fixers
simonjohn2
 
Zego 2039 steel fixer
Zego 2039 steel fixerZego 2039 steel fixer
Zego 2039 steel fixer
simonjohn2
 
Zego 2039 steel fixer
Zego 2039 steel fixerZego 2039 steel fixer
Zego 2039 steel fixer
simonjohn2
 
Zego 2065 steel fixer
Zego 2065 steel fixerZego 2065 steel fixer
Zego 2065 steel fixer
simonjohn2
 

Similar to V & H ZEGO Steel Fixer (20)

Zego h or v steel fixers
Zego h or v steel fixersZego h or v steel fixers
Zego h or v steel fixers
 
Zego h or v steel fixers
Zego h or v steel fixersZego h or v steel fixers
Zego h or v steel fixers
 
Zego 2039 steel fixer
Zego 2039 steel fixerZego 2039 steel fixer
Zego 2039 steel fixer
 
Special structure
Special structureSpecial structure
Special structure
 
Electrical Installation in Buildings
Electrical Installation in BuildingsElectrical Installation in Buildings
Electrical Installation in Buildings
 
Design of RCC slab two way continuous supported
Design of RCC slab two way continuous supportedDesign of RCC slab two way continuous supported
Design of RCC slab two way continuous supported
 
Cable anchoring and grouting for cable tensioning
Cable anchoring and grouting for cable tensioningCable anchoring and grouting for cable tensioning
Cable anchoring and grouting for cable tensioning
 
Lecture 4_CIE 551- Part 1 (1).pdf
Lecture 4_CIE 551- Part 1 (1).pdfLecture 4_CIE 551- Part 1 (1).pdf
Lecture 4_CIE 551- Part 1 (1).pdf
 
Prestressed Concrete Basics
Prestressed Concrete BasicsPrestressed Concrete Basics
Prestressed Concrete Basics
 
post tension slabs in residential building
post tension slabs in residential buildingpost tension slabs in residential building
post tension slabs in residential building
 
Electrical Wiring.pdf
Electrical Wiring.pdfElectrical Wiring.pdf
Electrical Wiring.pdf
 
Zego 2039 steel fixer
Zego 2039 steel fixerZego 2039 steel fixer
Zego 2039 steel fixer
 
materials of sewer
materials of sewermaterials of sewer
materials of sewer
 
CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls
 
Materials of sewer
Materials of sewerMaterials of sewer
Materials of sewer
 
Floor and slabs
Floor and slabsFloor and slabs
Floor and slabs
 
Zego 2065 steel fixer
Zego 2065 steel fixerZego 2065 steel fixer
Zego 2065 steel fixer
 
Rope Drive
Rope DriveRope Drive
Rope Drive
 
pipes.pptx
pipes.pptxpipes.pptx
pipes.pptx
 
Steel arches and cerchar test
Steel arches and cerchar testSteel arches and cerchar test
Steel arches and cerchar test
 

Recently uploaded

2024_Rupantara Jogare Namajapa II Nishitharanjan
2024_Rupantara Jogare Namajapa II Nishitharanjan2024_Rupantara Jogare Namajapa II Nishitharanjan
2024_Rupantara Jogare Namajapa II Nishitharanjan
Nishitharanjan Rout
 
☎️Contact +27791653574. 💊💊for the availability of Abortion Pills in Windhoek...
☎️Contact +27791653574. 💊💊for the availability of Abortion Pills in  Windhoek...☎️Contact +27791653574. 💊💊for the availability of Abortion Pills in  Windhoek...
☎️Contact +27791653574. 💊💊for the availability of Abortion Pills in Windhoek...
mikehavy0
 

Recently uploaded (9)

_What are the Latest Trends in Interior Home Design for 2024.pdf
_What are the Latest Trends in Interior Home Design for 2024.pdf_What are the Latest Trends in Interior Home Design for 2024.pdf
_What are the Latest Trends in Interior Home Design for 2024.pdf
 
Lesotho history, Basotho languages, Basotho mode of transport
Lesotho history, Basotho languages, Basotho mode of transportLesotho history, Basotho languages, Basotho mode of transport
Lesotho history, Basotho languages, Basotho mode of transport
 
Deloitte Gen Z Millennial Survey 2024_India_Full length report_.pdf
Deloitte Gen Z Millennial Survey 2024_India_Full length report_.pdfDeloitte Gen Z Millennial Survey 2024_India_Full length report_.pdf
Deloitte Gen Z Millennial Survey 2024_India_Full length report_.pdf
 
2024_Rupantara Jogare Namajapa II Nishitharanjan
2024_Rupantara Jogare Namajapa II Nishitharanjan2024_Rupantara Jogare Namajapa II Nishitharanjan
2024_Rupantara Jogare Namajapa II Nishitharanjan
 
Tokyo Presentation Final (Release -2024-).pptx
Tokyo Presentation Final (Release -2024-).pptxTokyo Presentation Final (Release -2024-).pptx
Tokyo Presentation Final (Release -2024-).pptx
 
A case study on customer satisfaction towards First cry products.
A case study on customer satisfaction towards First cry products.A case study on customer satisfaction towards First cry products.
A case study on customer satisfaction towards First cry products.
 
Navigating Hypnotherapy Training: 7 Essential Considerations
Navigating Hypnotherapy Training: 7 Essential ConsiderationsNavigating Hypnotherapy Training: 7 Essential Considerations
Navigating Hypnotherapy Training: 7 Essential Considerations
 
☎️Contact +27791653574. 💊💊for the availability of Abortion Pills in Windhoek...
☎️Contact +27791653574. 💊💊for the availability of Abortion Pills in  Windhoek...☎️Contact +27791653574. 💊💊for the availability of Abortion Pills in  Windhoek...
☎️Contact +27791653574. 💊💊for the availability of Abortion Pills in Windhoek...
 
PRINCESS OF DESIRE: MISADVENTURES OF A YOUNG GIRL
PRINCESS OF DESIRE:  MISADVENTURES OF A YOUNG GIRLPRINCESS OF DESIRE:  MISADVENTURES OF A YOUNG GIRL
PRINCESS OF DESIRE: MISADVENTURES OF A YOUNG GIRL
 

V & H ZEGO Steel Fixer

  • 1. V & H ZEGO Steel Fixer
  • 2. Available in two configurations • V (Vertical Green unit ) For slab work without bending over • H (Horizontal Blue unit) For walls, columns beams and slab work
  • 3. Features • Simple one handed operation withre-chargeable batteries. • Supplied with 2 batteries and high speed 240volt charger • Hard plastic carry case • Comes with 10 coils of wire 1mm dia (electric gal) • Ties 2 wraps of 1mm wire • Interchangable optionalJAWS 32, 51 and 64mm • JAWS close around reinforcement • Easy to train unskilled workers • Only weighs 3.62 kg
  • 4. Uses • Suitable for many applications: • Precast panels, pits, pipes, culverts and general concreting • Tie mesh or reinforcement bar • Foundations slabs and footings • Piers, columns and walls • Swimming pools, watertanks, retaining walls, fences • Civil works road and bridge construction
  • 5. Applications • Fastening Reinforcing Bar (rebar tyeing) • Fastening Steel Mesh • Hi-Rise-Rebar Tieing
  • 6. Remarks • TIES TOTAL OF BAR up to 32mm hence standard = 2 x N16 • Optional extras Jaws to tie 51mm or 64mm
  • 7. Contact Us ZEGO Pty Ltd GPO Box 4774 Sydney New South Wales Australia 2001 www.zego.com.au