3. Fig 3: Delivery of unit
Fig 4: Unloading and stacking of units on site
4. Fig 5.1: Alignment and placement of pods
Fig 5.2: Alignment and placement of pods
5. Fig 6: Roof structure over
Fig 7: Typical elevation
6. Facts and figures
• Site handover on 15 August 2013
• Completion February 2014
• 62 units; 27m2
per unit
• Maximum stack height on project: 4 storeys
• Three storeys stacked onto concrete transfer slab over parking basement
• Concrete walkways cast onto Bondek on structural steel cross beams
connected to pod frames
• Structural steel staircases
• Structural steel roof and gable end side cladding “clipped” onto pod frames
• All structural aspects – including pod frame designed by UWP Consulting