Vol. XXV No. 1; January 1 st fortnight issue 2013   A DDP PUBLICATION   Pages: 44 (Excluding cover)              ` 50/-




                                                                                             travtalkindia.com
ddppl.com
JANUARY 1 ST FORTNIGHT ISSUE 2013   TRAVTALK   1




                                                                                                                                                               travtalkindia.com
ddppl.com




India ready with a new approach                                                                                                                                                                             Seaplanes
                                                                                                                                                                                                            to soar in
The new initiative includes developing world-class infrastructure and training manpower. It also                                                                                                            Indian skies
includes undertaking aggressive promotional and marketing activities…                                                                                                                                       With extensive
                                               the world-class infrastructure                                                                                                                               coastlines and
   T T B U R E AU                                                                           Our ministry has prepared a
                                               and manpower and undertak-
                                                                                                                                                                                                            numerous lakes
I   ncredible India has lined
    up a multi-pronged
    approach to aggressively
promote tourism in India, said
K Chiranjeevi, Minister for
                                               ing aggressive promotional
                                               and marketing activities. The
                                               recently launched phase two
                                               of Incredible India campaign
                                               indicates a paradigm shift
                                                                                            multi-pronged strategy to
                                                                                            increase India’s share in
                                                                                            World Tourist Arrivals
                                                                                                                                                                                                            in several parts
                                                                                                                                                                                                            of the country,
State for Tourism with                         with the focus now being on                                                                                                                                  Maritime Energy
Independent Charge to the                      consumers. The emphasis is                 wildlife, breath taking               “Tourism is now recog-
global audience that had gath-                 on the fact that international             mountains and vibrant          nised as the driver of the                                                         Heli Air Services
ered to witness the grand                      tourists can find their destina-           festivals. In fact, India      economic growth. It’s also
finale of the World Travel                     tion or product of desire in               bagged three prestigious       reckoned as the best tool to
                                                                                                                                                            K Chiranjeevi
                                                                                                                                                            Minister for State for Tourism
                                                                                                                                                                                                            (MEHAIR) plans
Awards in India.                               India,” said Chiranjeevi. India
                                               offers a wide variety of travel
                                                                                          World Travel Awards (WTA),
                                                                                          namely World’s Leading
                                                                                                                         promote sustainable develop-
                                                                                                                         ment and address the inclusive     turing, etc. Another unique
                                                                                                                                                                                                            to introduce sea-
      “Our ministry has pre-
pared a multi-pronged strate-
                                               attractions, which exhibit
                                               our traditional culture,
                                                                                          Destination- India, World’s
                                                                                          Leading Tourist Board-
                                                                                                                         growth concerns. Tourism has
                                                                                                                         the potential to stimulate other
                                                                                                                                                            aspect of the tourism sector is
                                                                                                                                                            that it provides employment
                                                                                                                                                                                                            planes in Kerala,
gy to increase India’s share in                ethos and modern outlook.                  Incredible India and World’s   economic        factors through    even to the unskilled and                       Mumbai and Goa.
World Tourist Arrivals. It                     Tourism also draws strength                Leading Tourist Attraction-    its linkages with a host of sec-   semi-skilled      manpower,”
includes the development of                    in India from its diverse                  Taj Mahal.                     tors like agriculture, manufac-    said Chiranjeevi.                                See full story on page 18



Lufthansa bags WTA
                                                                                          Tourism needs a makeover?
                                                                                          Experts believe that bringing change in orientation of the
                                                                                          tourism industry as pro-poor sector and its ability to generate
                                                                                          jobs will put its genuine demands on a stronger pedestal.
                                                                                            VIVEK SETHI                  the top decision makers in the     Professor Emeritus, London
                                                                                                                         travel and hospitality industry    School of Economics, who

 SanJeet, Director, DDP Publications presents the World Travel Award (WTA) to Axel
 Hilgers, Lufthansa’s Director-South Asia. The service has been adjudged as the World's
 Leading Airline- Economy Class. WTA has capped its year-long search for the most
 popular travel and tourism brands in the world with its glittering Grand Finale Gala
                                                                                          T     he interactive session
                                                                                                called by the World
                                                                                                Travel & Tourism
                                                                                          Council, India Initiative
                                                                                          (WTTCII) titled ‘Leading
                                                                                                                         together. The four eminent
                                                                                                                         panelists included Arun
                                                                                                                         Maira, Member, Planning
                                                                                                                         Commission, Parvez Dewan,
                                                                                                                         Secretary, Ministry of Tourism,
                                                                                                                                                            dwelt deep into various possi-
                                                                                                                                                            bilities of making tourism a
                                                                                                                                                            profitable and priority sector.
                                                                                                                                                            Here are the excerpts from the
                                                                                                                                                            various expert insights:-
 Ceremony in Delhi - NCR, India on December 12, 2012. The decision-makers of the
 industry attended the VIP evening, which was officially supported by the Ministry of     Tourism Through Turbulent      Kapil Kaul, CEO, South Asia,
 Tourism, Government of India, and hosted at The Oberoi, Gurgaon.                         Times’ in New Delhi brought    CAPA and Ian Angell,                                      Contd. on page 6
BULLETIN

MOT to study tax impact on tourism
The ministry will conduct the study of comparison on the impact of
excessive taxes on tourism viz-a-viz export industry and also with the
competing neighbouring countries.
  T T B U R E AU

T    he Ministry of Tourism is
    now preparing to study
the ground realities, as to
create a more conducive
business        environment
in the tourism industry.
K Chiranjeevi, Minister of
State for Tourism with
Independent charge has
                                 IATO team with Tourism Minister Chiranjeevi (third from left)
announced that his Ministry
will conduct comprehensive       tries,” said Chiranjeevi,                 and export industry status is     as the export industry is
study on impact of taxation      while addressing the dele-                given to the tourism industry,    exempted from service tax
on the tourism sector.           gation of the Indian                      tourism will go up by at least    whereas the tourism industry
                                 Association    of    Tour                 50 per cent in the country.       is not. This is resulting in
      “The ministry will con-
                                 Operators    (IATO)     in                                                  discrimination not only
duct the study of compari-                                                       “Visa-on-Arrival scheme
                                 New Delhi.                                                                  against the exporters, but
son of the impact of exces-                                                should be extended to all
                                                                                                             also against tour operators in
sive taxes on tourism indus-           The EC members of                   tourism-friendly countries. In
                                                                                                             the neighbouring countries
try viz-a-viz the export         IATO had met the minister in              countries where Visa-on-
                                                                                                             like Sri Lanka, Nepal etc,
industry and also the com-       his office and apprised him of            Arrival is not possible, e-visa
                                                                                                             who are not paying any taxes
parative analysis on the tax     the pertinent issues. Subhash             should be issued for travelling
                                                                                                             and the business for India
structure on the Indian          Goyal, President, IATO                    to India. Indian tour operators
                                                                                                             is being routed through
tourism industry with com-       apprised the minister that if             are being discriminated
                                                                                                             them,” Goyal added.
peting neighbouring coun-        Visa-on-Arrival is expanded               against the physical exporters
STATISTICS

        VIEWPOINT                                                                               1 bn tourists = 1bn opportunities
                                                                                                 According to the United Nations World Tourism Organisation (UNWTO),
     Together in 2013                                                                            one billion tourists have travelled internationally in 2012. This is equal
                                                                                                 to one in every seven people on the planet travelling the world in 2012,
 T    he Travel & Tourism Industry is
      moving forward on a very positive
 note… The policy initiatives launched
                                                                                                 up from just 25 million in 1950.
                                                                                                      T T B U R E AU                                                       • US$ 1.2 trillion in exports                                                 nomic conditions, and is key to                                            the     power      of     one
 during the last two months of the calendar                                                                                                                                  a year                                                                      supporting the global economy                                              billion tourists to affect
 year 2012 hold promise for more path-
 breaking measures that shall be rolled out                                                     T   he figure establishes
                                                                                                    tourism as one of the
                                                                                                world’s largest and fastest
                                                                                                                                                                           • Six per cent of world trade
                                                                                                                                                                           • Eight per cent of the
                                                                                                                                                                                                                                                         in current challenging times.
                                                                                                                                                                                                                                                               UNWTO forecast point-
                                                                                                                                                                                                                                                                                                                                    positive      change
                                                                                                                                                                                                                                                                                                                                    making small changes
                                                                                                                                                                                                                                                                                                                                    to their travel behaviour.
                                                                                                                                                                                                                                                                                                                                                                by


 in 2013. The two new marketing                                                                                                                                                                                                                          ed to the one-billionth tourist
                                                                                                growing economic sectors. It                                                 exports of least developed                                                                                                                             The campaign, One Billion
                                                                                                                                                                                                                                                         arriving somewhere in the
 campaigns covering both international and                                                      accounts for:                                                                countries
                                                                                                                                                                                                                                                         world in December. UNWTO
                                                                                                                                                                                                                                                                                                                                    Tourists:     One      Billion
                                                                                                • Nine per cent of global                                                                                                                                                                                                           Opportunities, called on the
 domestic markets, followed up by a                                                                GDP (direct, indirect and                                               For developing countries,
                                                                                                                                                                                                                                                         chose December 13 as the
                                                                                                                                                                                                                                                                                                                                    one billion tourists to make
                                                                                                                                                                                                                                                         symbolic arrival date of the
 comprehensive study on the fall-out of                                                            induced)                                                                tourism brings much needed-
                                                                                                                                                                                                                                                         one-billionth tourist.
                                                                                                                                                                                                                                                                                                                                    their actions count by saving
 excessive taxation and setting up of a                                                                                                                                    foreign exchange and invest-                                                                                                                             water and energy, using
                                                                                                • One in every 12 jobs
                                                                                                                                                                           ment. Tourism has also proven                                                      To celebrate, the associ-                                             public transport, protecting
 regional tourism promotion council in a                                                          worldwide (direct, indirect
                                                                                                                                                                           to be an extremely resilient                                                  ation ran a global campaign                                                heritage and more.
                                                                                                  and induced)
 span of less than two months, further                                                                                                                                     sector, despite uncertain eco-                                                to raise awareness of
 strengthens our hopes for 2013.
                                                                                                                                                                                                                                                         In 2012, a record one billion tourists crossed international
 New Year brings with it a feeling of good                                                         1 out of 7 people travel in 2012                                                                                                                      borders in a single year.
 will, cheer and relief. One more year has                                                         & how they make a difference                                                                                                                          Another five to six billion are estimated to travel in their own
                                                                                                                                                                                                                                                         countries every year.
 gone and our business is doing well despite
 the global crunch. I don’t want to sound like
 a messiah or a doomsday nemesis, but if we
 want to reach international standards, then
 together as an industry we need to take a
 vow for 2013 to carry our business and
 this country forward with a feeling of pride
 and ownership.
 There are plenty of opportunities in India
 for it to be sold as a destination, bestowed
 with incredible travel offerings that have




                                                                                                                                                                                                                                                                                                                                                                                                        Source:@UNWTO:2012
 plenty to satisfy the needs of all segments
 of travellers. To do this, even the smaller
 operators need to organise and work with
 a strategy:
1. Five years from now, what is the world
    going to look like in which we run our
    business?                                                                                       Tourism matters a lot
2. What will be the role of our company in
    this changed future?
3. What are the steps we need to take,
    starting today, to get there?
 We must learn to value our people as
 much as we value the opinion from the
 other captains of the industry. Ask them
 for their views, let them evaluate their
 own everyday work and fit it into the
 broader discussion of what to achieve in
 that time period. This will help us draw
 the path of operations, which will help in
                                                                                                                                                                                                                                                                                                                                                                                           Source:@UNWTO:2012




 achieving the desired targets five years
 from now.
 Wishing you all a wonderful New Year, filled
 with success and peace of mind.



                   Vikramajit              Editorial          Advertising             Advertising (Mumbai)      TRAVTALK is a publication of DDP Publications Private Limited. All   advice before acting on information contained in this publication    The publisher assumes no responsibility for returning any                                     MUMBAI:
                                                                                          Suchita Saran
                   Chairman             Ratan Kr Paul         Gunjan Sabikhi             Branch Manager         information in TRAVTALK is derived from sources, which               which is provided for general use, and may not be appropriate        material solicited or unsolicited nor is he responsible for           504, Marine Chambers, 43, New Marine Lines, Opp. SNDT College,
                                                             General Manager                                                                                                         for the readers’ particular circumstances. Contents of this          material lost or damaged.                                               Mumbai - 400 020, India, Ph.: +91-22-22070129; 22070130
                                         Vivek Sethi         Karishma Khanna
                                                                                          Harshal Ashar         we consider reliable and a sincere effort is made to report
                                         Megha Paul       Sr. Manager Marketing      Deputy Genral Manager      accurate information. It is passed on to our readers without any     publication are copyright. No part of TRAVTALK or any part of the
                    SanJeet                                                                                                                                                                                                                               This publication is not meant to be an endorsement of any                                  MIDDLE EAST:
                                         Devika Jeet        Shailendra Shukla         Priyanshu Wankhade                                                                             contents thereof may be reproduced, stored in retrieval system                                                                                       Durga Das Publications Middle East (FZE)
                   Publisher                                                       Asst. Manager Advertising    responsibility on our part. The publisher regret that he cannot                                                                           specific product or services offered. The publisher reserves the
                                          Anita Jain      Sr. Manager Marketing                                                                                                                                                                                                                                                         Z1-02, PO Box: 9348, Saif Zone, Sharjah, UAE
                                       Dency Mathew             Udit Pandey               Rishika Karra         accept liability for errors and omissions contained in this pub-     or transmitted in any form without the permission of the pub-
                                                                                                                                                                                                                                                          right to refuse, withdraw, amend or otherwise deal with all                   Ph.:+971-6-5528954, Fax: +971-6-5528956
               Rupali Narasimhan                          Sr. Manager Marketing         Sales Coordinator       lication, however caused. Similarly, opinions/views expressed        lication in writing. The same rule applies when there is a copy-
                                         News-Editor          Geetika Pathak        Advertisement Designers                                                                                                                                               advertisements without explanation.
                Editorial Director                                                                              by third parties in abstract and/or in interviews are not neces-     right or the article is taken from another publication. An exemp-                                                                          TRAVTALK is printed and published by SanJeet on behalf of
                                     Peden Doma Bhutia     Manager Advertising     Vikas Mandotia/Nitin Kumar
                                                                Amit Sarkar                                     sarily shared by TRAVTALK. However, we wish to advice our readers    tion is hereby granted for the extracts used for the purpose of      All advertisements must comply with the Indian and                           DDP Publications Private Limited
                                         Desk-Editor                                Design: Nityanand Misra
                  Deepa Sethi                            Asst. Manager Marketing             Sudhir Mudgal      that one or more recognised authorities may hold different views     fair review, provided two copies of the same publication are sent    International Advertisements Code. The publisher will not be                   72, Todarmal Road, New Delhi-110 001
                                      Archana Sharma                                                                                                                                                                                                                                                                           Ph.: +91-11-23710793, 23716318, E-mail: sanjeet@ddppl.com
                    Editor                                     Photographers       Production: Anil Kharbanda   than those reported. Material used in this publication is intended   to us for our records. Publications reproducing material either      liable for any damage or loss caused by delayed publication, error
                                          Sub-Editor        Simran Kaur-Delhi        Circulation: Ashok Rana                                                                                                                                                                                                                      Printed at Cirrus Graphics Pvt. Ltd. B-62/14, Phase-II,
                                       Raina Mandal      Bharat Dangiya-Mumbai                                  for information purpose only. Readers are advised to seek specific   in part or in whole, without permission could face legal action.     or failure of an advertisement to appear.                                   Naraina Industrial Area, New Delhi - 110 028
MOT                                               JANUARY 1 ST FORTNIGHT ISSUE 2013          TRAVTALK   5

Say Namaste, Italia!
Parvez Dewan, Secretary, Ministry of Tourism at the inauguration of the
exhibition titled - ‘Italia comes to you’, highlighted the need to increase bilateral
efforts to increase the two-way flow of tourists between Italy and India.
  VIVEK SETHI                     counterparts to enhance the    by the Indian Tourism             94 per cent from India. We      (L-R): Dewan and Bruschini at the exhibition
                                  bilateral flow of visitors     Secretary.                        had received 1,97,000 trav-

“L      ike Italy, India has
       cities that are world-
famous with great tourist
                                  between the two countries,”
                                  said Marco Bruschini,
                                  Director General, Italian
                                                                        “India is an important
                                                                 market for us. Over the last
                                                                                                   ellers in 2010 who consumed
                                                                                                   an equivalent of 4,61,000
                                                                                                   overnights. We aim to further
                                                                                                                                   tions with our Indian travel
                                                                                                                                   and trade partners,” he
                                                                                                                                   added. The National Tourism
                                                                                                                                                                            the said exhibition in other
                                                                                                                                                                            BRIC countries successfully
                                                                                                                                                                            and was now held in Delhi
attractions. However, over        State Tourist Board reacting   five years, Italy has witnessed   strengthen these numbers by     Board ENIT, instituted to                and Bengaluru in December
2,00,000 Indians visit Italy      to the gesture extended        a tremendous growth of over       also strengthening our rela-    promote Italy had conducted              2012 over five days.
p.a. while only half the num-
ber of Italians come to India.
Both countries need to
enhance the bilateral flow of
visitors and explore the true
potential of tourism in both
countries,” said Dewan.

      The Secretary, while
discussing the withdrawal of
the mandatory requirement
of the two months gap for
foreigners visiting India
on a tourist visa, stated, “We
need to build awareness
about Indian cuisine and cin-
ema, among many things to
increase the flow of Italian
visitors to India. The with-
drawal of the mandatory gap
for foreigners visiting will
definitely function as an
incentive for our Italian visi-
tors, as well,” he added.

      On the other hand, “We
are reinstating our National
Tourism Board’s office in
New Delhi from January. We
will also undertake several
initiatives with our Indian




 FTAs grow
 by 5.9%
 during
 Jan-Nov.
    As per the statistics
 released by the Ministry
 of Tourism, the Foreign
 Tourist Arrivals (FTAs)
 during     the    period
 January-November 2012
 were 58.99 lakh with a
 growth of 5.9 per cent,
 over the same period in
 2011, as compared to the
 FTAs of 55.72 lakh with a
 growth of 9.4 per cent
 during          January-
 November 2011 over the
 corresponding period of
 2010. FTAs during the
 November 2012 were
 6.90 lakh as compared to
 FTAs of 6.70 lakh during
 the same month in 2011
 and 6.08 lakh in
 November 2010. There
 has been a growth of 3
 per cent in November
 2012 over November
 2011 as compared to a
 growth of 10.1 per cent
 that was registered in
 November 2011 over
 November 2010.
6 TRAVTALK          JANUARY 1 ST FORTNIGHT ISSUE 2013                                             NEWS
 Priya Paul is new
 Chairman, WTTCII
    Priya Paul, Chairperson,
 The Apeejay Surrendra
                                   takes over from Vikram
                                   Madhok, Managing Director,
                                                                      Ease taxation: A loud cry
                                                                          Contd. from page 1
 Park Hotels has been appointed    Abercrombie & Kent India,
                                   who completed his term at the      Arun Maira, Member, Planning                                            Parvez Dewan, Secretary, Ministry
                                   recently held AGM in Delhi.        Commission- The travel industry has                                     of Tourism We are willing to work
                                   The World Travel & Tourism         a strong case to present to the                                         with the industry to facilitate various
                                   Council, India Initiative          government and get most of its                                          measures and try to ease the permis-
                                   (WTTCII) was launched in year      genuine demands addressed. But,                                         sion seeking process, so that only a
                                   2000 with a purpose to unite       firstly, it requires itself to change its                               few permissions shall be required for
                                   key players from the industry      image and portray itself as a sector                                    various processes, like opening a
                                   to work closely with the           that has immense job creation and                                       hotel. But then having said that one
                                   Government and other stake-        poverty alleviation potential. The Arun Maira                           needs to keep the federal set-up of       Parvez Dewan
                                                                      travel industry needs to understand Member                              our country in mind. Everybody            Secretary
   Priya Paul                                                         that like the tourism and hospitality Planning Commission               needs to understand that the central      Ministry of Tourism
   Chairman, WTTCII                                                                                                                           government can help them only to a
                                                                      sector, all the industries want tax
                                                                      concessions from the government. Here, change in orientation            certain extent.
 as the Chairperson and Dipak                                         of the tourism industry as pro-poor sector and its ability to
 Deva, CEO, Destination                                               generate employment will put its case on a stronger pedestal.
 Management, India & South
                                                                                                                                                                           Kapil Kaul, CEO, South Asia,
 Asia, Kuoni Destination                                                                                                                                                   CAPA - The aviation sector in India
                                                                                                    Ian Angell, Professor Emeritus,                                        had long been selling below costs.
 Management has been
                                                                                                    London School of Economics-                                            The under recoveries had been
 appointed as the Vice
                                       Dipak Deva                                                   Excessive taxation is bad. In circum-                                  huge and are contributing to the
 Chairman of WTTC, India               Vice Chairman, WTTCII
                                                                                                    stances where it’s possible for a                                      present position. One needs to
 Initiative 2013 at the recently
                                                                                                    project to pay for it, the government                                  understand that the Incredible
 held Annual General Meeting
                                                                                                    should support it to pay for itself                                    India tourism can’t stand without a
 of the World Travel & Tourism     holders to address issues of
                                                                                                    through measures like tax holidays                                     healthy aviation sector. After so
 Council, India Initiative         concern and advocate policy                                                                                Kapil Kaul
                                                                                                    and other incentives.                     CEO                          many years, the demand and supply
 (WTTCII) in New Delhi. Paul,      directives to support the devel-
                                                                                                                                              South Asia                   dynamics look favourable to the
 who was the Vice Chairperson      opment of the Travel &              Ian Angell
 of WTTCII for the year 2012,      Tourism sector.                     Professor Emeritus                                                                                  Indian airlines.
                                                                       London School of Economics




‘India, China to lead Aviation this year’
According to IATA, India, China and Latin America would continue to lead the growth next year in the
global aviation industry which would improve its profit from USD 6.7 billion to an estimated USD 8.4 billion.
Excerpts from speech by Tony Tyler during the IATA event.
  T T B U R E AU                                                      the past year are slots and           a priority, the IATA Board of    sions to this - cost and avail-      concession agreement might
                                                                      passenger rights. Europe pre-         Governors asked us to defend     ability. As governments              have prevented it. We
W     hile Chinese domestic
      market continues to
expand ‘very strongly’
                                                                      sented initial proposals for an
                                                                      Airports Package of legisla-
                                                                                                            the global system. And yes-
                                                                                                            terday, we had good news
                                                                                                                                             struggle with tight budgets,
                                                                                                                                             many are looking to the pri-
                                                                                                                                                                                  have seen progress in India
                                                                                                                                                                                  since our protests. The
                                                                      tion which included some              from       the      European     vate sector for help in devel-       Minister has directed
despite a slowdown earlier
                                                                      very positive changes such as         Parliament that the corner-      oping airport infrastructure.        the airports to remove
this year, the Indian market,
                                                                      the introduction of greater           stones of the Worldwide Slot     India, for example, devel-           airport development fees.
by contrast, went into a
                                                                      competition for ground han-           Guidelines have been main-       oped Delhi into a first class        That challenge now is to get
‘sharp reverse’ in 2012
                                                                      dling services at European            tained. And it is not just       hub airport with the partici-        that implemented.
following the problems
                                                                      airports. But it also proposed        Europe. We are working in        pation of private partners.
faced by Kingfisher Airlines
                                                                      changes to the regulation of          China, Colombia, India,          The facilities are great. But
and the slowdown in
                                    Tony Tyler                        slots which would have taken          Mexico, Poland, the UK           the structure of the conces-          Taking off
the     Indian      economy.
                                    Director General and CEO          Europe away from some basic           and the US, among other          sion agreement requires the
Following are excerpts from         IATA
                                                                                                                                                                                    Europe presented initial
                                                                      principles of the global best         countries, to defend the         concessionaire to return 46%
a speech by Tony Tyler,                                                                                                                                                             proposals for an Airports
                                                                      practices which are codified          appropriate application of       of the top line revenue to the
Director General and CEO,                                                                                                                                                           Package of legislation which
                                    (and safety for that matter) is   in the Worldwide Slot                 the global system.               government. And this year,
IATA during the event:                                                                                                                                                              included some very positive
                                    global standards, the same is     Guidelines. Among other                                                after a long process, the reg-
     We are also keeping a          true for much of the way that     things, the use-it or lose-it
                                                                                                            Infrastructure                   ulator approved a 346%
                                                                                                                                                                                    changes such as the introduction
                                                                                                                                                                                    of greater competition for ground
close watch on regulation.          the industry is regulated.        rule would have been                       Growth can be facilitat-    increase in charge. That’s             handling services at European
Just as the solution for avia-      Some areas which have been        changed to 85-15 from the             ed or inhibited by infrastruc-   unacceptable for the indus-            airports
tion and the environment            particularly newsworthy over      globally accepted 80-20. As           ture. There are two dimen-       try. And a more realistic
EXHIBITIONS                                                 JANUARY 1 ST FORTNIGHT ISSUE 2013       TRAVTALK    7

Witnessing innovations@FITUR 2013
At FITUR 2012 in Madrid, around 1,800 trade appointments took place at different workshops that were
organised within the framework of the fair.
                                           FITUR Know-How &            Trade Institute (ICEX). It     products and services,         and this is a characteristic that   and have produced some
   T T B U R E AU                    Export Forum, which seeks         aims at promoting the value    to buyers from other           sets the fair apart from            excellent results in the past,
                                     to add a value-added dimen-       of expertise and experience    foreign markets.               other events.                       in terms of providing access
A    ccording to its Ana
     Larranaga,      Director,
FITUR 2013 promises much
                                     sion to the business and
                                     innovation prospects of com-
                                                                       within the tourist industry
                                                                       as a means of boosting inno-   Gateway to Latin               Exhibitor’s delight
                                                                                                                                                                         to new markets, strategic
                                                                                                                                                                         alliances     and       trade
more, as it has enhanced its
                                     panies operating within the       vation and development.        America and more                    These B2B meetings             opportunities. These trade
                                     field, is promoted by the fair,   Around 30 companies will           FITUR effectively serves   will take place within the          meetings have proven to
legacy of niche B2B platforms
                                     in conjunction with SEGIT-        present their potential,       as a hub for the Latin         framework of the Third              be highly effective in
and tools that are made avail-
                                     UR and the Spanish Foreign        know-how and experiences,      American tourist market        Hosted Buyers Workshop              previous years.
able to its travel trade part-
ners. This will cater to the
exhibitors’ delight and con-
tribute important perspective
to the industry on pertinent
global developments. The




Ana Larranaga
Director
FITUR



       The strong
       attendance of
       international
       tourism
       professionals
       reflect their
       interest in FITUR

director elaborates more on
leading FITUR as the gateway
to the Latin American markets
and more. Excerpts:-
Strategic B2B forums
and tools
      Larranaga says that
FITUR is committed to the idea
of innovation, always based on
new trends and new market
needs. In this respect, in addi-
tion to its most important new
initiative on this occasion, in
the form of the business forum
known as FITUR Know How &
Export, the fair will incorpo-
rate a new forum devoted to
wine tourism and hotels, as
well as others that focus on
various areas of interest or of
up-and-coming importance
within the tourism business,
such as tourism efficiency
(FITUR Green), the application
of technology in tourism
(FITURTECH) and the spe-
cialised sections known as
FITUR LGBT, Receptive
Tourism Spain and FITUR
Active. “All of these initiatives,
offer important tools to
tourism professionals and in
this respect, we seek to make
our contribution to the future
growth of the tourist industry,”
she says.
HOTELS

Kolkata airport boosts biz
With rise in the number of existing flights, introduction
of new routes and ever-increasing tourists, hospitality
development will also rise.             speaks to some
eminent stakeholders to get their views on the same.
  M E G H A PAU L                    league of hotels - the business               to be operational by
                                     hotels that will cater exclusive-             2013-14.” The occupancy

T  he new Kolkata airport
   has been upgraded to
handle 20 million passengers,
                                     ly to the MICE segment, he
                                     adds. With a focus to promote
                                     the East as a potential tourism
                                                                                   will also increase, if the
                                                                                   Government is able to
                                                                                   attract investment to
double the current capacity.         hub, CII has been hosting the                 the city. The success of




   Saugata Mukherjee                    MJ Robertson                                 Marco Saxer
   Regional Director -                  Co-Chairman Tourism Committee - Bengal       General Manager
   Eastern Region CII                   Chamber of Commerce & Industry               Swissotel Kolkata



       The development                    The new airport                                Companies
       at the airport will                will bring more                                would like to
       have positive                      hospitality                                    showcase the
       effects on the                     business and                                   new airport to
       hotel industry in                  relieve air                                    their colleagues
       Kolkata                            congestion                                     and partners


The initiative of Airports           event Destination East, the                   their efforts will also
Authority of India (AAI) to          first B2B event in the region.                reflect on occupancy,
transform Kolkata airport into       The airport development will                  he points out.
a hub for South-East Asia will       boost this event as well. The
                                                                                         According to Marco
soon be a reality. The new           third edition of ‘Destination
                                                                                   Saxer, General Manager,
integrated terminal in the           East’ will be organised from
                                                                                   Swissotel Kolkata, the new ter-
upgraded Kolkata airport is to       February 8-15 in Kolkata,
                                                                                   minal will help Kolkata to
be fully functional by the first     he informs.
                                                                                   achieve greater number of
quarter of 2013. Industry
                                           MJ Robertson, Co-                       visitors. Not only corporate,
leaders see a big spurt in the
                                     chairman,            Tourism                  but more of transient guests
hospitality development in
                                     Committee - Bengal Chamber                    will now frequent the city.
the region.
                                     of Commerce & Industry                        MICE and smaller meetings
      Saugata Mukherjee,             opines, “The new airport will                 will be held in Kolkata as many
Regional Director - Eastern          not only bring in more hospi-                 companies in Kolkata would
Region, CII feels, “An increase      tality business, but will also                like to showcase the new air-
in international flights is antic-   relieve the considerable con-                 port to their colleagues and
ipated, as Kolkata is the only       gestion presently seen at the                 partners, he comments. The
gateway to all of eastern India.     existing airport. It will also                General Manager expects a
Also, with the increase in           provide the much-needed                       rise in occupancy from the
inbound footfalls from ASEAN         support to the airlines to                    existing 76 per cent to over 80
and      the       Far      East,    expand operations in the                      per cent. The ARR should also
destinations in this region          eastern sector.”                              witness some growth of
have also been growing.                                                            almost 20 per cent. To cash in
Hospitality growth can never              Regarding the boost to                   on the new airport, the hotel
happen in isolation and these        the hospitality sector,                       will tie-up with the local cor-
developments will surely affect      Robertson says, “There are                    porate houses and airlines.
the hotel industry in Kolkata        a number of hotels coming                     “We have teamed up with
positively.” Also, with more         up on the connecting road                     airlines flying to Kolkata and
number of MICE travellers that       from the airport. Big-ticket                  have optimised the search
might visit the city now,            operators are in the fray                     engine for our hotel on
Kolkata will witness a new           and the hotels are all slated                 the web,” he adds.



 1 lakh footfall in Kite Festival
     A      two-day       Delhi      lakh footfall on both the days.             ture this festival in its regular
 International Kite Festival was         According to GG Saxena,                 extravaganza. Going forward,
 organised by Delhi Tourism &        Managing Director and CEO,                  Delhi Tourism will bring back
 Transport       Development         Delhi Tourism & Transport                   the successful and much-
 Corporation (DTTDC), in asso-       Development Corporation                     awaited food festival - Dilli Ke
 ciation with the Delhi govern-      (DTTDC), Delhi Tourism plans                Pakwaan. The festival will be
 ment on December 8-9. The           to promote more of these old                held at Baba Kharak Singh
 festival witnessed around one       fading traditions and will fea-             Marg from December 24-30.
NEWS                                             JANUARY 1 ST FORTNIGHT ISSUE 2013   TRAVTALK    9

Gujarat gets ready with ITTHE 2013
As an integral part of the Vibrant Gujarat Trade Show, TAFCON is organising the International Travel Tourism
Hospitality Expo (ITTHE) 2013 under the aegis of the Government of Gujarat from January 8-13.
  T T B U R E AU                  nated government cam-           end break or longer holiday       25 countries. ITTHE 2013        all over the world showcase     bound tourism. It will also
                                  paigns       to      promote    to their trip. Foreign tourists   will be an ideal platform for   a diverse range of tourism      see tourism professionals

G     ujarat is one of the most
     proactive states when it
comes to taking initiatives in
                                  ‘Incredible India’.” Owing to
                                  the booming IT and out-
                                  sourcing industry, a growing
                                                                  spend more in India than
                                                                  almost any other country
                                                                  worldwide, he added.
                                                                                                    both national and interna-
                                                                                                    tional tourism organisations
                                                                                                    to meet, collaborate and dis-
                                                                                                                                    products. The Expo presents
                                                                                                                                    a perfect platform for both
                                                                                                                                    local and international trav-
                                                                                                                                                                    from India and around the
                                                                                                                                                                    world showcase a diverse
                                                                                                                                                                    range of accommodation
the tourism segment. Adding       number of business trips are                                      cuss inbound and outbound       el and tourism organisations    options,        breathtaking
another feather to its cap,       made by foreigners to India,         The expo is expected to      tourism. It will help the       to collaborate and discuss      tourism attractions and new
there is another interesting      who will often add a week-      have participation from over      tourism professionals from      inbound, domestic and out-      airline routes.
initiative coming up. At the
IITHE 2013, hoteliers and
other stake holders can
explore new market products,
services and destinations,
sign long-term deals, meet




M L Wadhwa
CMD
TAFCON



     India’s tourism
     industry is
     experiencing a
     strong growth,
     driven by
     burgeoning
     Indian middle
     class, rise in
     high-spending
     foreign tourists
     and government
     campaigns

top international buyers and
generate sales leads. Besides
this, they can meet existing
customers and channel part-
ners, recruit new agents and
distributors and launch new
products and packages at
must-visit show of the year.
     Talking about the
much-awaited event, ML
Wadhwa, CMD, TAFCON
pointed out, “India’s
tourism industry is experi-
encing a strong period of
growth, driven by the bur-
geoning Indian middle class,
growth in high-spending
foreign tourists and coordi-


 Meeting Point
   ITTHE 2013 will be an ideal
   platform for both national
   and international tourism
   organisations to meet,
   collaborate and discuss
   inbound and outbound
   tourism
HOTELS

Moving ahead with caution
Saurabh Rai Bhatnagar, Regional Director (South Asia),
Preferred Hotel Group, talks about commitment to
consolidate the existing portfolio along with the future
growth in key business and leisure cities in India.
  M E G H A PAU L                                                         alliances owing to the diffi-
                                                                          cult financial conditions as

C    hicago-based Preferred
     Hotel Group is targeting
an increase in its clientele to
                                                                          these are anyways niche
                                                                          products.” The group typical-
                                                                          ly works on a five-to-seven
35 hotel members in India by                                              year contract with the hotel;
the end of April 2014. “Over                                              which is relatively shorter
the next 18 months, we plan                                               given the average duration of
to have 35 member hotels. I                                               management contracts of
am very confident that we                                                 the hard brand operators.
will achieve these numbers,”                                              “However, despite having a
Bhatnagar said.                                                           shorter term contract, we
                                    Saurabh Rai Bhatnagar
                                    South Asia Regional Director          have over 95 per cent reten-
     The company currently
                                    Preferred Hotel Group                 tion rate,” he revealed.
has 29 hotels, including New
Delhi-based Imperial and                                                        Confirming that the
The Leela Palace New Delhi          of hotels in the market, we           OTAs are a fundamental part
as its members. In its              are fully committed to deploy         of online travel, Bhatnagar
10-year old operations in the       our existing infrastructure for       emphasised, “We consider
India market, the member            our long-time partners by             them as partners and we
hotels are present in all six       adding to their competitive           would like to ensure that we
brands, from five-star luxury       strength,” he added.                  will continue our regional
Preferred Hotels and Resorts                                              channel management. For
                                           Going forward, the
to four-star Sterling Hotels                                              retail, an OTA will pull in an
                                    group will also look at
and Sterling Design. “We are                                              entire inventory of the hotel,
                                    reassessing its relationship
looking at both business                                                  and henceforth, we have
                                    with member hotels. He
and leisure destinations to                                               tied up with over 140 key
                                    pointed out, “Our prime
expand our portfolio of                                                   Online Travel Distribution
                                    objective is to increase the
travellers,” he revealed.                                                 (OTD) companies around
                                    brand presence of the hotel
                                                                          the world.”
       In the changing sce-         and its profitability. So even
nario, where hospitality busi-      if one of these get realigned,
ness has been hit worldwide,        it is important to reassess the        Future Talk
the group is moving cautious-       relationship. While hotel
ly in India as well. According      owners are riding through               It is of utmost importance that
to Bhatnagar, growth in India       choppy waters, it would not             utility of the existing hotels
cannot just be defined by           be surprising if owners are             ought to be maximised
numbers. “In our business           pushed to take some harsh               While hotel owners are riding
proposition, it is of utmost        decisions such as selling their         through choppy waters,
importance that utility of the      hotels or letting it go to              owners may be pushed to
existing hotels ought to be         another operator. We do                 take some harsh decisions
maximised. With new supply          anticipate changes in                   such as selling their hotels




 Visit Finland adds X-Mas fervour




  Visit Finland invited travel trade to celebrate the spirit of Christmas and mood of the coming New Year
  with Santa from Lapland in New Delhi, which was very well attended by its travel trade partners.
STATES                                     JANUARY 1 ST FORTNIGHT ISSUE 2013   TRAVTALK   11

Uttarakhand lays out the welcome mat
The Nanda Devi Raj Jatt is going to be held after 12 years in 2013 and the
state tourism board is ready to attract visitors, especially during this festival.
Focussing on religious tourism, Uttarakhand is also promoting adventure.
                                   Himalayas      and         the    Reserve, Corbett National      years who come to
  T T B U R E AU                   revered Ganges.                   Park and Rajaji National       visit Gangotri, Yamunotri,
                                                                     Park. The national parks are   Kedarnath and Badrinath, the
D    omestic tourist visits to
     Uttarakhand increased
from 1.9 crore in 2007 to
                                         Uttarakhand has 65%
                                   forest cover and thus is home
                                                                     ideal for those seeking the
                                                                     call of the wild. Till now,
                                                                                                    four most holy pilgrimages
                                                                                                    know as the Char Dham.
                                   to the ‘Valley of Flowers’, the   Uttarakhand has welcomed       Now, the government is also
2.66 crore in 2011, repre-
                                   Nanda Devi Biosphere              pilgrims for thousands of      promoting ‘village stays’.
senting 4.1% growth. The
foreign     tourist      visits
increased from 96,000 in
2007 to 1.14 lakh in 2011
showing a 0.73% increase.
For 2012, the tourism board
expects these numbers to rise
further and is going all out to
attract more tourists.
     The State recorded good
growth in the tourism sector
and has prioritised this indus-




Poonam Chand
Regional Tourism Officer
Uttarakhand Tourism


try due to the festival. Efforts
to get Uttarakhand recog-
nised worldwide as a tourism
destination are underway.
      In 2013, the tourism
board is going all out to pro-
mote Nanda Devi Raj Jatt, an
important spiritual and cul-
tural festival of Uttarakhand,
which takes place after every
12 years. This legendary
yatra will take place for the
first time after the State’s
formation. It would take
place from August 29 to
September 16, 2013 and
will witness hundreds of
thousands of devotees
and enthusiasts from across
the world. It will cover a
long trek of about 280 kms
with 18 halts on the way
at an altitude of 3,960
metres in 18 days.
      Uttarakhand is seen as
fount of spiritual energy.
Everyone cherishes coming
to the hilly state to rejuve-
nate oneself by the virtue of
its pristine beauty, wildlife,
natural environs and places
of religious and pilgrimage
importance. It is ideal for
tourists seeking peace and
tranquillity, along with
leisure and adventure activ-
ities. The State has a perfect
blend of spiritual, adventure
and nature. The charm of
meditation, spirituality, yoga,
rural tourism, skiing,
trekking, rafting amidst the
fascinating views of mighty
HOTELS

The Address Hotels & Resorts

India shining for Dubai Address
The discerning Indian traveller has made it to the top list of The
Address Hotels & Resorts, a Dubai-based five-star premium
hotel of Emaar Hospitality Group with an average of 3-5 nights.
    T T B U R E AU                about deriving true value for         ations in India for The Address
                                  money. With our portfolio of          Hotels & Resorts over the last

I  ndia is among the top five
   markets for us. This has set
an all-new definition for glob-
                                  The Address Downtown
                                  Dubai, The Address Dubai
                                  Mall, The Address Dubai
                                                                        three years. “We have success-
                                                                        fully extended our reach in
                                                                        Delhi, Mumbai and Bengaluru
al standards in luxury hospi-     Marina,     The     Address           through our Indian partner.
tality, says Seema Pande,         Montgomerie Dubai and The             Going forward, we look for-
Group Director, Sales and                                               ward to strengthening our
Marketing of The Address                                                reach in Chennai and
Hotels & Resorts.                                                       Ahmedabad,” said Pande.
     “India has pleasantly
                                                                              “We value all our B2B
surprised us with a fabulous
                                                                        partners and are always acces-
increase in the numbers of
                                                                        sible to all our, small, medium
top-end business in leisure,
                                                                        and large travel partners. We
FIT, corporate and MICE
                                                                        are fortunate to have an equal
front. With increase in the
                                                                        balance of corporate and
family travel from India, we
                                                                        leisure travellers and the
have witnessed an impres-
                                                                        weekdays are as good as
sive growth in Indian wed-
                                                                        weekends. Even though we
dings and engagements at
                                  Seema Pande                           have multiple teams taking
our properties. The Indian        Group Director, Sales and Marketing   care of various travellers, we
families with members             The Address Hotels & Resorts
                                                                        remain accessible and value all
spread all over in USA, UK,
                                                                        our small, medium and big
Europe and other parts of the
                                  Palace Downtown Dubai, we             B2B partners,” she stated.
world, find Dubai to be an
                                  expect to close our 2012 year
easily accessible destination
                                  with over 10-15% growth
with adequate air connectiv-
                                  from the Indian market. We
ity and a welcoming visa
                                  are also looking at expanding          India Market & Address
regime,” informed Pande.
                                  our presence in key destina-            India is among the top five
      “The Indian visitors        tions in the Middle East, North         markets for us
spend on an average of 3-5        Africa, the Indian subconti-
nights and are among the top      nent, South Asia and Europe,”           We expect to close our 2012
spenders. Indians are willing     she added. The Nijhawan                 year with over 10-15 per cent
to spend on premium products      Group has been taking care of           growth from the Indian market
only when they are convinced      the sales and marketing oper-




Jumeirah set to enter India
The Group signs the first management agreement for
a Mumbai property. They are also involved in advance
negotiations on potential projects.
  A N I TA J A I N                                                      our group properties, with
                                                                        room night occupancies

I  n February 2012,
   reported the interest of
Dubai-based luxury hotel
                                                                        improving by close to 50 per
                                                                        cent year-on-year. We have
                                                                        set our sight on city centres
management         group      -                                         and resort destinations like
Jumeirah Hotels, Resorts &                                              Mumbai,       New      Delhi,
Residences to enter the                                                 Bengaluru, Hyderabad, Goa
Indian hospitality sector. In a                                         and Kerala.
latest development, the
group has recently signed its                                           The need for five-
first management agreement                                              star hotels in India
for a five-star property in       Gerald Lawless
Lower Parel area of Central
                                  President & Group CEO                 has been growing
                                  Jumeirah Group
Mumbai. The property is                                                 and we are happy to
expected to be launched by
                                  worldwide. At the macro
                                                                        have initiated the
2017 and will house about
                                  level, Jumeirah will adhere to        first phase of our
470 spacious rooms, suites
and apartments along with
                                  its core business in India;           expansion in India
                                  managing luxury and five-             with our first
wide range of banqueting and
                                  star hotels and resorts using
F&B services. The name of
                                  an asset light approach.
                                                                        project in Mumbai.”
the property, investment
details and additional facts           Gerald          Lawless,              The group currently
will be disclosed by mid          President & Group CEO,                operates 20 luxury hotels
2013. The group's operating       Jumeirah Group said, “India           and serviced apartments,
model is expansion through        is one of the major players in        including 10 in the UAE,
the acquisition of manage-        the global hospitality and            seven in Europe, seven
ment contracts in both key        tourism industry, particularly        in the Maldives and 1 in
gateway cities and aspira-        Asia. It is currently the third       China with 15 additional
tional resort destinations        fastest growing market for            under development.
HOTELS                                          JANUARY 1 ST FORTNIGHT ISSUE 2013   TRAVTALK   13
Bengaluru gets its                                                     The Khyber Himalayan Resort & Spa
first Marriott Hotel
   Marriott Hotel Whitefield,
Bengaluru city’s first Marriott
sits atop the newest mall
                                    IT hub in India and also has
                                    a GDP growth four times that
                                    of Bengaluru city.
                                                                      Adding value to the Valley
Inorbit. It has one of the
largest ballrooms in the city
                                        Although the city has a lot
                                    of hotels but in Whitefield
                                                                      The new Gulmarg enterprise will aim at converting hordes of tourist day
with 2,500 sq metres of             area, there is yet a dearth of    trips to Gulmarg into overnight stays and more.
outdoor space. The hotel            rooms. There are no interna-
has 324 rooms, including 17         tional five-star hotels in this
                                                                         T T B U R E AU                   year, the growth story
                                    area at this given point and
                                                                                                          of increasing footfalls only
                                    time. Whitefield not only
                                    houses most of the Fortune
                                    500 companies but also has a
                                                                      W     ith peace prevailing in
                                                                            Kashmir, tourism has
                                                                      now got a boost in the Valley.
                                                                                                          got better. However, now the
                                                                                                          problem that still looms
                                                                                                          large is the issue of
                                    steadily growing residential      With an unprecedented 10.73         accommodation.
                                    population. The area itself is    lakh tourists till September
                                    about 18km from the heart of                                               Addressing this dilem-
                                    the city. The city roads                                              ma is The Khyber Himalayan
                                    are choc block almost all                                             Resort & Spa in Gulmarg.
                                    through the day, and residents                                        The resort opened its doors
  Matthew Cooper                    prefer to stay in Whitefield                                          on December 21 last year.
  General Manager
                                    over the weekend, constantly                                          The 85-key resort is
  Marriott Hotel Whitefield
                                                                                                          Gulmarg’s first luxury resort
                                    looking for places to go to.
                                                                                                          and is spread over seven
                                    There are also plenty of com-
suites. The executive lounge        panies around the hotel and
                                                                                                          acres and located at an eleva-   time and return to Srinagar       “We are eyeing
                                                                                                          tion of 8,825 ft in the          at night. Thus, the objective     the inbound
on the 15th floor offers the view   these companies have ample                                            Pir Panjal range of the          of the hotel is to convert the
of Whitefield and is available      Marriott Rewards members                                              Himalayas while overlooking      day trips to overnight trips.”    market, specifically
to guests staying on the exec-      who are currently staying                                             the Affarwat peaks.                                                the travellers
utive floor to conduct business     elsewhere. Given this                                                                                       “Right from its opening
and meetings.                       scenario, the hotel is bound      Alex Koshy                                Supporting the desti-      on December 21, the hotel         who visit Gulmarg
    Talking about the               to do well.”
                                                                      General Manager
                                                                      The Khyber Himalayan Resort & Spa
                                                                                                          nation with the hotel, Alex      was sold out for the first two    for skiing
choice of location for the              The hotel property is also                                        Koshy, General Manager,          weeks,” he adds.                  during winters
                                                                                                          The Khyber Himalayan
hotel, Matthew Cooper,              banking on the MICE segment
                                                                      30 in 2011, it seems that the       Resort & Spa said, “All                 Being the best skiing
                                                                                                                                                                             while during
General Manager, Marriott           to boost their occupancy, since                                                                                                          summers, we will
                                                                      love for Kashmir has been           tourists include Gulmarg in      destination in India, the hotel
Hotel Whitefield, says,             the hotel houses a large func-
“Bengaluru’s business hub is        tion space. The hotel estimates
                                                                      rediscovered. This is a first,      their itinerary. However,        is targetting skiing enthusi-     eye the domestic
                                                                      as it is the highest number of      owing to the dearth of good      asts all over. “Domestic travel   tourists,” the
clearly moving to micro-mar-        the business mix to be about
                                                                      tourist arrivals in the state,      hotels in the region, they       is still at its peak during the
kets. Whitefield is the largest     80:20 in the initial period.      over the past 25 years. Last        visit Gulmarg during day-        summers in India.”                GM reveals.
NTO

More than just stop-overs
For the first time, Turkish Hoteliers Federation hosted
a 5-city roadshow in India to focus on the varied
destinations such as Istanbul, Cappadocia and Antalya.
    T T B U R E AU

I  n 2011, Turkey received
   31.4 million foreign
tourists of which 74,000
were from India. In 2012,
from January to September,
the arrivals from India
reached 66,700. In a bid to
hard-sell itself as a business
and leisure destination in
India, the country is now tar-
getting a 30 per cent growth         Emin Cakmak                                Ozgur Ayturk
                                     Founding Chairman                          Culture and Tourism Counsellor
to get more than one lakh            Turkish Healthcare Travel Council          Turkey
Indian arrivals by 2013.
      This is the first time the         The motive for                             Turkey has
Turkish Hoteliers Federation
has organised a roadshow in              this roadshow                              planned
India. Emphasisng on wed-                is to convert                              workshops and
ding, golf and honeymoon des-
tinations such as Istanbul,              this transit                               joint marketing
Cappadocia and Antalya, Emin
Cakmak, Founding Chairman,               business                                   events with
Turkish Healthcare Travel                into overnight                             leading Indian
Council pointed out, “India
is one of the key markets for            stays                                      tour operators
us and the positive growth rate
of Indians visiting Turkey
has      strengthened        our
                                         Turkey has planned                   2013, we have also increased
confidence in the market.
                                   media and ad campaigns apart               our promotional budget, which
Currently, a chunk of Indian
                                   from workshops and joint mar-              has been earmarked for US$
travellers visit Turkey only as
                                   keting events with leading                 two million. We will be spend-
a transit destination. The road-
                                   Indian tour operators. Revealed            ing nearly US$ 1 million for
show is to convert these
                                   Ozgur Ayturk, Culture and                  media and advertisement cam-
transits into overnight stays
                                   Tourism Counsellor, Turkey, “In            paigns as well.”
in the country.”




VisitBritain ups promotion
In a strategic initiative, it announced partnership with
Yatra.com in New Delhi. Both entities will work on
promoting new itineraries via a 3600 media campaign.
    T T B U R E AU                 the end of December. The                   through our TSI-Yatra initia-
                                   print campaign will kick-start             tive. It has over 3,000 B2B

I  ndia remains one of our
   most important inbound
markets,says Patricia Yates,
                                   in mid of January to be fol-
                                   lowed up by an intensive
                                   online campaign. The idea is
                                                                              partners, which will help us
                                                                              make the strategic alliance
                                                                              into a successful partner-
Director - Strategy and            to create various new itiner-              ship,” Dev Added.
Communications,VisitBritain.       aries spread across 5-12 days.
                                                                                  Yatra.com has already
“This partnership will help        They can cost anywhere
                                                                              done successful joint cam-
us to broaden our appeal as        between ` 90,000-2,25,000,
a special destination and
promote all that is great
about Britain, as to capitalise
on all the positive mega cov-
erage after the London
Olympics. Indian tourists can
very well choose from a tour
of Buckingham Palace, see-
ing     the     sunrise      at
Stonehenge or watching a
cricket test match to name a
few,” she says.                    (L-R); Neeraj Singh Dev, Patricia Yates & Shivali Suri

                                   which can be customised fur-               paigns with other destina-
      The joint promotional
                                   ther and they will deliver on              tions such as Thailand and
initiative is estimated to be
                                   the Indian aspiration to visit             Malaysia. According to Dev,
over £ 100,000 and will be
                                   tourist attractions beyond                 Yatra.com has seen growth in
beamed across electronic,
                                   London.”                                   its visitor arrivals to Britain
print and B2B channels.
                                                                              by over 50 per cent.
Here, Neeraj Dev, Head-                  “The B2B players in
                                                                              VisitBritain on the other
Outbound Product, Yatra.com        India will also be able to ben-
                                                                              hand, has set an ambitious
added, “We aim to utilise the      efit from our strategic
                                                                              target of welcoming over
star power of Salman Khan to       alliance, as they can sell the
                                                                              5,00,000 Indian visitors
engage with the audience.          various itineraries that will
                                                                              by 2012.
The first TVC will go on air by    be a part of our campaign
ASSOCIATIONS                                                  JANUARY 1 ST FORTNIGHT ISSUE 2013      TRAVTALK    15

IAAI National Convention in January
IATA Agents Association of India (IAAI) is organising its National Convention from January 24-26, 2013 in Mumbai.
The theme for this year’s convention is, ‘Emerging Challenges and Opportunities in the Aviation Industry’.
                                   issues and are working to            The main business ses-      discuss survival strategies    convention will be very busi-      widespread       awareness
   T T B U R E AU                  put airlines, travel agents    sion is, ‘ASHA: Agents semi-      and different ways to handle   nesslike and professional. We      about such important
                                   and GDS on the same plat-      nar on Handling Adversities’,     these issues,” he adds.        are also planning to circulate     issues,” adds Eapen.
I  AAI had decided to con-
   duct its IAAI biennial
National Convention (ICON
                                   form that will help us
                                   debate relevant issues and
                                                                  which they feel, assumes
                                                                  humongous significance at a             There will be four to
                                                                                                                                   a white paper discussing the
                                                                                                                                   tragic difficulties faced by the        IAAI hopes this conven-
                                   address all uncertainties,”    juncture when airlines, GDS       five business sessions along   industry and address issues        tion will help evolve new
2013) from January 24- 26,
                                   said Biji Eapen, National      and Travel Agents are strug-      with the annual general        such as weekly payments            strategies in the present and
2013 at The Retreat, Hotel &
                                   President, IATA Agents         gling for co-existence. “In the   meeting and the elections      and highlight its misfortunes      an all the more challenging
Convention Centre, Mumbai.
                                   Association of India (IAAI).   business session, we want to      during this convention. “Our   for us. We want to create          aviation industry.
About 400-500 members of
the travel fraternity from
India are expected to attend
this convention. The associ-
ation feels that this conven-
tion will add extra mileage
in      promoting       India
Tourism. The theme of
ICON 2O13 is, ‘Emerging
Challenges and Opportunities
in Aviation Industry’.




Biji Eapen
National President
IATA Agents Association of India



       We are planning to
       circulate a white
       paper discussing
       the tragic
       difficulties faced by
       the industry and
       address issues
       such as weekly
       payments

     “Under this theme, we
will address the biggest
challenges faced by the
industry today. We want to
provide meaning to the


  Premium
  economy class
  in Cathay
     Starting January 1, 2013,
  Cathay Pacific Airways is
  introducing its new Premium
  Economy Class cabin along
  with Business Class on
  Chennai-Hong Kong route.
  Following the recent increase
  of Chennai flights, from four
  times a week to a daily serv-
  ice, Chennai will be the first
  city in South India to offer a
  three-class configuration –
  new Business Class, Premium
  Economy Class and the new
  long-haul Economy Class for
  passengers travelling.
16 TRAVTALK           JANUARY 1 ST FORTNIGHT ISSUE 2013                    FAMILY ALBUM

LPTI sets mood for festivities
Le Passage to India (LPTI) organised its annual cookout to bring together the travel trade partners and set the jovial mood for ushering
in the year-end celebrations, which was held on December 22, 2012 at the Select City Walk.




Jyotsna Suri is new FICCI Vice President
It is the first occasion, when a popular figure in travel and tourism has been bestowed such an honour. Her
popularity is evident as she was recently voted as the most popular woman in a survey conducted by     .
                                       T T B U R E AU                     She has been the             has been bestowed such hon-      survey was overwhelming        Tour operators (IATO)
                                                                     Chairperson of FICCI Tourism      our. Her popularity is evident   and Suri had registered a      annually to the most

                                    J  yotsna Suri, Chairperson &
                                       Managing Director, The
                                    Lalit Suri Hospitality Group
                                                                     Committee for the last five
                                                                     years. Under her leadership,
                                                                     FICCI introduced ‘The Great
                                                                                                       as she was recently voted as
                                                                                                       the most popular woman in
                                                                                                       the travel industry survey
                                                                                                                                        clean sweep over other nom-
                                                                                                                                        inees. Lately, Suri was also
                                                                                                                                        conferred the ‘Hall of Fame
                                                                                                                                                                       prominent personalities,
                                                                                                                                                                       who have contributed to
                                                                                                                                                                       the growth of Indian
                                    has been elected as the Vice     India Travel Bazaar’ in 2008      conducted by       .             Award 2012’ by Prithviraj      tourism. Suri has created
                                    President of FICCI at the 85th   and ‘The Great Domestic                                            Chavan, Chief Minister of      many new benchmarks in
                                    Annual General Meeting           Tourism Bazaar’ in 2011 – two         This was a survey done to    Maharashtra at the 28th IATO   the tourism industry by fol-
                                    of FICCI held in December        heavily-attended events facil-    recognise and felicitate         Annual Convention held at      lowing her dictum of
                                    2012. Suri has been vocifer-     itating tourism business inter-   women, who have achieved         NCPA, Mumbai in September.     ‘Developing the destination
                                    ously promoting Indian           actions. It is the first such     exemplary results in the field                                  and not just hotels’,
Jyotsna Suri                        tourism both nationally and      occasion, when a popular fig-     of travel and tourism. The           The Award is given by      which has won her many
Vice President , FICCI
                                    internationally.                 ure in the travel and tourism     response received from the       the Indian Association of      accolades.
AVIATION

Emirates: Confident of India
Emirates launched a network wide ‘fare promotion’ campaign,
renewed partnership with Jet Airways and also introduced
unique packages to increase loads from the Indian market.
    T T B U R E AU                                                            in aviation being relaxed this
                                                                              year, it is a matter of time

I  nternationally, India is the
   biggest operating market
(in terms of number of cities
                                                                              before international carriers
                                                                              decide to participate.”
                                                                              Moving forward, the airline is
connected to Dubai) for                                                       optimistic that the industry
Emirates Airline with 185                                                     will record a positive growth
weekly flights from 10 Indian                                                 in 2013. “Airlines venturing
cities. With an average load                                                  into newer markets and
of over 70 per cent on every                                                  expanding their current net-
route in India, the airline is                                                work will be a key.
not looking at expanding its                                                  Consolidation in some mar-
operations but consolidating                 Essa Sulaiman Ahmad              kets will take place while in
                                             Vice President – India & Nepal
on current routes. It has                    Emirates Airline
                                                                              others operators will look to
recently renewed its partner-                                                 pool resources and reduce
ship with Jet Airways under                                                   their costs. International
which all the Emirates fre-                       Talking about India as      LCC’s will continue to grow
quent flyer members have                     an aviation market, Essa         and prosper with areas
options to fly on five daily                 Sulaiman Ahmad, Vice             such as back-offices, ground
direct flights of Emirates and               President – India & Nepal,       handling and cargo logistics,
daily flights of Jet Airways on              Emirates Airline said,           becoming        outsourced,”
Mumbai-Dubai             route.                                               adds Ahmad.
Moreover, considering India                  “Our focus on India
                                                                                    Furthermore, Ahmad
being a late booking market,                 remains where                    explained about some very
the airline also introduced a                it is bullish and                promising trends in the
network-wide fare promotion
from       November        23-               confident and that               industry in 2013. The airline
                                                                              expects a substantial increase
December 2, 2012 for travel                  we are operating in              in the number of MICE trav-
between January 21-June                      a fundamentally                  ellers with many global
10, 2013, offering maximum
                                             strong economy.                  events and is expected to
                                                                              attract tourists from across
                                                                              the globe. Leisure travel is
 Growth chart for 2013                                                        expected to rise around the
Emirates will launch services to Warsaw and Algiers in February               mid-year period as the indus-
and March 2013 respectively, adding to its global network of 128              try approaches the summer
locations, while its fleet will also increase as the airline takes delivery   vacation period. Adding to
of new aircraft. The airline has 212 aircrafts on order worth USD             this, will be a good amount of
62 billion and is the leading customer of the Airbus A380 with 27             student traffic during the
in its fleet and 63 on order.                                                 peak admission time of April
                                                                              – September. “All in all, I
60 per cent and minimum                            Taking into account the    would say the year 2013
30 per cent discount on                      long-term potential of the       looks exciting for the industry
select routes to encourage                   Indian market, our operations    as well as Emirates,” con-
early bookings.                              reflect this outlook. With FDI   cludes Ahmad.




 Lounge@New Delhi Railway Station




IRCTC has unveiled its swanky new
"executive” waiting lounge at the Ajmeri
Gate entry point of the New Delhi
Railway Station. For ` 300 a person, one
can now enter the facility for three hours
and enjoy complementary buffet meals
or snacks, tea, coffee and accessing wi-
fi, The lounge has TV screens with train
information display, apart from other
screens that display other channels. If
passengers want to stay beyond three
hours, ` 125 will be charged for an
hour.Catering services are provided by
SSP Catering India, which also provides
catering to Emirates’ lounge at T3, IGI
Airport. Spread over 300 sq m and two
floors, the lounge has a seating capacity
for 125 persons.
18 TRAVTALK      JANUARY 1 ST FORTNIGHT ISSUE 2013                                 AVIATION

Sea taxis to fly over Mumbai skies    “The services will com-      ports in these areas, adds
   D E N C Y M AT H E W         mence by late January, 2013        Verma. It is also expected to
                                once we clear a few permis-        boost spiritual tourism from
M     EHAIR will undertake a
      very ambitious project
in the skies of Mumbai by
                                sions that are pending and
                                will be undertaken on a
                                                                   Mumbai as the time required
                                                                   to travel from Mumbai to
                                Cessna 208 amphibian air-          Shirdi is less than one hour.
introducing seaplanes in the
                                craft which can carry 9 pas-       There are also plans to intro-
city. The operations will be
                                sengers and 2 pilots at a time.    duce our seaplanes as air
undertaken in two phases
                                We have signed an MoU with         taxis in Mumbai to fly from
with phase one involving
                                MDTC for three years who           Juhu to Chowpatty. This will
services from Juhu to Mulla
                                will promote and market our        cut down the time drastically
Dam for Shirdi, Varasgaon
                                seaplanes in their resorts,        for someone who needs to
                                websites and buses and will        commute from suburbs to
                                also sell some tickets on our      south Mumbai everyday.
                                behalf. We are also planning
                                on partnering with some
                                                                   Pilot Project was in
                                leading travel operators to
                                                                   Andaman and Nicobar
                                sell the tickets,” says
                                                                   Islands
                                Siddharth Verma, Director,              MEHAIR started intro-
                                                                                                    Andaman and Nicobar. The             pricing the tickets and mak-         says AP Anilkumar, Minister
                                MEHAIR                             ducing seaplanes in the skies
                                                                                                    phenomenal response they             ing it an economical journey.        for Tourism, Kerala.
                                                                   of India from the inlands of
                                                                                                    received in their pilot project      So a 25 minute ride from
                                How will it benefit                                                 has encouraged them to               Cochin will cost only Rs             Investment incurred and
                                Mumbaikars?
                                                                    Modus Operandi                  introduce a second and big-          4,500 or so,” says Verma.            future plans
                                      The company is quite                                          ger seaplane in Andaman by
                                                                                                                                               “Kerala has a beautiful             MEHAIR has invested
Siddharth Verma                 confident of the success of          The operations will be         late quarter of 2013. Besides
Director                        the project in Mumbai. This          undertaken in two phases       this, they will also be intro-
                                                                                                                                         aerial view and we want our          ` 25-30 crore in each of the
MEHAIR                                                                                                                                   tourist to get a glimpse of the      projects in Kerala and
                                service, Verma says, is “ideal       with phase one involving       ducing seaplanes for the first
                                                                                                                                         picturesque landscape of the         Mumbai and will invest Rs
                                for the people in Mumbai to          services from Juhu to Mulla    time in Kerala. “We hope to
Dam for Lavasa, Murud           reach places that don’t even         Dam for Shirdi, Varasgaon      start our services in Kerala
                                                                                                                                         state. By travelling on a sea-       ` 250 crore in the next five
                                                                     Dam for Lavasa, Murud
                                                                                                                                         plane, the tourist visiting          years in other projects across
Janjira, Girgaum - Chowpatty    have runaways.” This will                                           by January-end. Our inten-
                                                                     Janjira, Girgaum - Chowpatty                                        Kerala will get a very differ-       India. The company hopes to
and Bhandardara Dam. Phase      also generate employment                                            tion was to introduce this as
                                                                     and Bhandardara Dam                                                 ent perspective and experi-          introduce services in Goa
two will be begin from          and infrastructure in these                                         a novel experience for leisure
                                                                                                                                         ence of the state. We plan to        in 2013 also which will
October 2013 and include        areas and the government is          The services will commence
                                                                                                    travellers coming to Kerala.
                                                                                                                                         start the services from              allow people to commute
routes on the Konkan coast      also keen on implementing            by late January, 2013          And we are concentrating
                                                                                                                                         Cochin        to      Munnar,        faster from Goa airport to
like Tarkarli, Harihareshwar    this service as it is more cost-                                    more on volume rather than
                                                                                                                                         Kumarakam and Alappuzha,”            North Goa.
and Ganpatipule.                effective than building air-                                        margin. Hence, are not over




                                                                                                     Mumbai gets Shangri-La Hotel




                                                                                                      The much-awaited Shangri-La Hotel, Mumbai recently opened its doors to guests. The hotel is located
                                                                                                      15 kilometres from Mumbai's international airport, nestled between the city’s two main commercial areas
                                                                                                      — Nariman Point and Bandra Kurla Complex. “It is our pleasure to announce the official opening of the
                                                                                                      Shangri-La Hotel, Mumbai, which is the group’s second hotel in India. We look forward to welcoming
                                                                                                      guests and providing them with our hallmark hospitality from the heart,” said Greg Dogan, President and
                                                                                                      CEO, Shangri-La International Hotel Management.




                                                                                                     4.65 lakh domestic air passengers
                                                                                                        The total domestic pas-          month of October 2012               the month of November
                                                                                                     sengers carried by the              were 45.55 lakhs. This              2012 is as follows: Air
                                                                                                     scheduled domestic airlines         shows that 4.65 lakh more           India-20.7 per cent, Jet
                                                                                                     in the month of November            passengers travelled in the         Airways-18.3 per cent,
                                                                                                     2012 were 50.20 lakhs. The          month of November 2012              JetLite-6.9 per cent,
                                                                                                     total domestic passengers           compared to October 2012.           IndiGo-27.3 per cent, Spice
                                                                                                     carried by the scheduled            The market share of sched-          Jet- 19.5 per cent and Go
                                                                                                     domestic airlines in the            uled domestic airlines for          Air- 7.4 per cent.
AVIATION

Tiger Airways on India route
The alliance will help Via.com and its agent partners
to tap the leisure segment with value for money
packages with Tiger Airways’ network of over 50
destinations in the Asia-Pacific region.
  T T B U R E AU

S   ingapore-based low cost
    carrier (LCC) Tiger
Airways has now more to offer
to the Indian traveller. Tiger
Airways has joined hands with
Via.com as the exclusive travel
agent distributor for its
tickets in India, Indonesia and
the Philippines.
      According to Vinay
Gupta, CEO, Via.com, this                       Vinay Gupta                              Kaneswaran Avili
                                                CEO                                      Commercial Director
partnership perfectly aligns                    Via.com                                  Tiger Airways
with Tiger Airways and
Via.com’s strategic initiatives
to expand their existing cus-
                                                    This                                     Customers
tomer base, while also expand-                      partnership                              can access
ing into new geographic mar-
kets. This enables both com-                        also enables                             Tiger’s
panies to better serve the bur-
geoning Asian business and
                                                    the airline to                           offerings
leisure travel market. “This                        actively                                 through
will also act as one-stop assis-
tance for other travel needs                        promote its                              Via.com’s
such as hotels and travel                           other routes                             network
insurance. This partnership
also enables the airline to
actively promote its other
routes by allowing the cus-                  Airways revealed, “The                     from India.” Going forward,
tomers from India to connect                 objective of this alliance is to           the group aims to increase
with other destinations, con-                make it easier for customers               flight frequency on its Indian
nected through the airline                   to book flights with Tiger                 routes and would like to add
such as Indonesia, Hong Kong,                Airways. They can now                      Kolkata to the network in the
Macau, China and Australia,”                 access the full range of                   next 12 to 15 months.
he added.                                    Tiger’s offerings through
                                                                                              To celebrate this part-
                                             Via.com’s network of 7,000
      The alliance will help                                                            nership, Tiger Airways is
                                             travel agencies throughout
Via.com and its agent part-                                                             offering special promotional
                                             India. This acts as an exten-
ners to tap the leisure seg-                                                            fares from INR 3,900 one-
                                             sion to Tiger’s website,
ment with value-for-money                                                               way all-inclusive of taxes.
                                             www.tigerairways.com.”
packages with the airline’s                                                             Booking period starts from
network of over 50                                                                      December 6 -19, 2012 with a
                                                   Regarding the impor-
destinations in the Asia-                                                               travel period from February
                                             tance of the India market,
Pacific region.                                                                         1- March 31, 2013.
                                             Avili pointed out, “India is a
      Talking about increasing               key market for the airline. We                  Tiger Airways is keen to
ties in the B2B and the B2C                  operate from six Indian cities             further expand with its recent
market, Kaneswaran Avili,                    and have been experiencing                 move to Changi International
Commercial Director, Tiger                   load factor of 80 per cent                 Airport, Terminal 2.



 Travel agents on track                                                                  Japan tops
 with Rail Europe prog.                                                                  VoA list
                                                                                             The Visa on Arrival
                                                                                         (VoA) Scheme of the gov-
                                                                                         ernment has become pop-
                                                                                         ular with the tourists. The
                                                                                         scheme registered a
                                                                                         growth of 25 per cent dur-
                                                                                         ing the period January-
                                                                                         November 2012 over the
                                                                                         corresponding period of
                                                                                         2011. A total number of
                                                                                         13,903 VoAs were issued
                                                                                         during       the    period
                                                                                         January-November 2012
                                                                                         as compared to 11,121
                                                                                         VoAs issued during the
                                                                                         corresponding period of
                                                                                         2011. The highest number
 Kunal Kothari, Executive Director, Rail Europe India (Left) along with Jason Tarabo,
 a trainer from Rail Europe’s head office in Paris in New Delhi.
                                                                                         of 3,913 VoAs was issued
 In order to increase product awareness and educate the Indian travel agents about       to tourists from Japan fol-
 its products and offerings, Rail Europe India conducted training programmes for         lowed by New Zealand
 retail agents, General Sales Agents (GSAs) and their sub-agents across India. The
                                                                                         (2,645)       and       The
 programme received a massive response from the travel trade. The agents were
 made aware of new products from Rail Europe’s upgraded portfolio.                       Philippines (2,205).
20 TRAVTALK       JANUARY 1 ST FORTNIGHT ISSUE 2013                             ANALYSIS

Saying ‘I do’ on foreign shores
Indian weddings are getting larger than life and are increasingly becoming a booming affair involving large
scale expenditure. Realising the worth of hosting Indian weddings abroad, foreign tourism boards and
hotels are keen to attract this niche segment.
  D E N C Y M AT H E W          and resorts being booked to            The global economic
                                conduct a traditional Indian      meltdown had little effect on

R   ecently, a Karan Johar
    directed movie showed
an India-based family choos-
                                wedding in the exotic islands
                                of Thailand. These glimpses
                                from reel life have now come
                                                                  the huge Indian wedding
                                                                  budgets. With wedding
                                                                  themes getting extravagant
ing Thailand as a wedding       alive in real life too, as many   and over-the-top, many
destination for their son’s     Indian couples and families       international hotels and
wedding. What followed on       are opting for a destination      resorts are bending back-
screen were charter flights     wedding away from India.          wards to accommodate the
                                                                  requests of Indians families.
                                                                  While special chefs are
 Malaysia                                                         being flown down to cater
                                                                  to the large wedding
      “A segment that has grown                                   entourage, there are also
exceedingly well is the wedding                                   special arrangements being
segment in Malaysia. Many dis-                                    made to facilitate the Indian
cerning Indian families now prefer                                weddings which include
to host their weddings in more                                    arranging special garlands
exclusive surroundings and                                        and lights to king-size
Malaysia has plenty of just that. In                              chandeliers.
2011, over 30 Indian weddings
                                                                  Spreading overseas              travel packages and tie-ups
were held in Malaysia. Favourite
                                      Manoharan Periasamy              Among international        with Malaysia Airlines and         Thailand
amongst the destinations are          Director                    destinations, Indians have      other 5-star properties to               Thailand too has witnessed a
Langkawi, Pangkor, Penang and         Tourism Malaysia
                                                                  shown a lot of interest in      encourage and attract Indian      lot of Indian weddings over the
Kuala Lumpur. More than a dozen
                                                                  Thailand, Malaysia, South       wedding planners. Besides         years. “Over 100 large-scale wed-
of India’s leading wedding planners have been taken on host-
                                                                  Africa and Mauritius for wed-   this, they have conducted         dings ranging from 200 to 800 peo-
ed tours to Malaysia to discover the best that is on offer,”
                                                                  ding destinations. Malaysia     many fam tours for Indian         ple were organised in Thailand in
says Manoharan Periasamy, Director, Tourism Malaysia.
                                                                  has drafted many affordable     wedding planners to experi-       2011. In 2012, the Mumbai office
                                                                                                  ence first-hand service and       facilitated 20 weddings in Thailand.
                                                                                                  facilities available as well as   To increase our growth and attract
                                                                                                  possible venues for different     more Indian weddings, we facilitate
                                                                                                  budgets. All these efforts        family or wedding planners in terms     Sethaphan Buddhani
                                                                                                  have borne fruit as they have     of immigration, welcome reception,      Director
                                                                                                                                                                            Tourism Authority of Thailand
                                                                                                  seen an increasing interest       provide Thai cultural show and
                                                                                                  among people from Gujarat,        ticket to bride and groom who are
                                                                                                  Rajasthan, Uttar Pradesh,         really keen to see the wedding venue. We also support with
                                                                                                  Maharashtra, Tamil Nadu and       upgrading flight tickets to business class and we also inform
                                                                                                  Andhra Pradesh in holding         the family in terms of names of wedding planners in India and
                                                                                                  their weddings in Malaysia.       Thailand,” says Sethaphan Buddhani, Director, Tourism
                                                                                                                                    Authority of Thailand.

                                                                                                      New York City
                                                                                                           Seeing the large stream of income that weddings generate
                                                                                                     and the potential of this market, many new destinations are
                                                                                                     emerging which aim at wooing the wedding planners. Even long-
                                                                                                     haul and expensive destinations like New York City are ready to
                                                                                                     host the Indian weddings on its soil. “NYC & Company has start-
                                                                                                     ed a ‘NYC I DO’ initiative to promote the City as a wedding des-
                                                                                                     tination for all couples. We work with wedding organisers to
                                                                                                     consider New York City’s hot spots or most elegant venues to     Makiko Matsuda Healy
                                                                                                     tie the knot. The large NRI community in America often considers VP Business Development
                                                                                                     a reception or other events in India and New York City to invite NYC & Company
                                                                                                     family, friends and business partners for the big occasion. Our
                                                                                                     hotel members offer year-round attractive wedding arrangements and fine Indian cuisine
                                                                                                     with regional variations are available,” says Makiko Matsuda Healy, VP Business
                                                                                                     Development, NYC & Company.




                                                                                                   Jet Airways expands code-share
                                                                                                   agreement with Etihad Airways
                                                                                                       Jet Airways has placed its                                      code-share to Paris is in
                                                                                                   code on Etihad’s flight oper-                                       addition to the existing
                                                                                                   ating out of Abu Dhabi to                                           code-share between Jet
                                                                                                   Paris Charles de-Gaulle air-                                        Airways and Etihad Airways
                                                                                                   port from December 10,                                              on the Abu Dhabi-
                                                                                                   2012. This code-share will                                          Mumbai/Delhi           routes
                                                                                                   allow Jet Airways to offer its                                      operated by Jet Airways and
                                                                                                   guests excellent connectivity                                       the Etihad flights connecting
                                                                                                   from India to Paris via Abu                                         Abu        Dhabi         with
                                                                                                   Dhabi.      The      airline’s                                      Mumbai, Delhi, Kochi,
                                                                                                   JetPrivilege members will                                           Thiruvananthapuram,
                                                                                                   earn JPMiles for their entire    Airways code-share flights         Kozhikode, Chennai and
                                                                                                   journey when they fly on Jet     from India to Paris. This          Hyderabad.
STATES                                             JANUARY 1 ST FORTNIGHT ISSUE 2013           TRAVTALK        21

Bekal – The new kid on Kerala’s block
Bekal has been identified as an untapped tourist destination by the Government of Kerala.
Kerala will promote Bekal to attract repeat travellers and off- beat travellers.
   T T B U R E AU                  developed in the region. From       Resort & Spa Bekal. With the       go     are       Guruvayoor,     inbound markets. However,
                                   the initial stage itself a rigor-   advent of many more resorts        Cheruthuruthy, Nattika Beach,    Bekal as a destination still

“W        e are actively pro-
         moting more of our
northern areas like Bekal as
                                   ous sales activity has been
                                   ongoing with focus on print
                                   media, developing a movie on
                                                                       and hotels in the region, Bekal,
                                                                       got a much needed impetus.
                                                                       “North Kerala is maturing
                                                                                                          Nilambur, Palakkad, Wayanad,
                                                                                                          Kannur, Calicut and Bekal. Out
                                                                                                          of these places, Bekal and
                                                                                                                                           suffers from lack of publicity
                                                                                                                                           and quality tourism infrastruc-
                                                                                                                                           tures like guides and quality
these places now hold the          Bekal called ‘Bekal-The Big         as a region to look out            Wayanad are the fastest          transport,” says Mathew
key to attract tourism.            Water’,” says Dilip Mishra,         for. Among the prominent           growing destinations for the     Joseph, Managing Director,        AK Anilkumar
Places like Bekal are still        Resident Manager, The Lalit         places where travellers            domestic as well as the          Pepper Tours.                     Minister for Tourism, Kerala
untapped and have a lot to
offer tourists. There will be
subsequent infrastructural
developments in these areas
besides beautifying them,”
says     AK      Anilkumar,
Minister for Tourism, Kerala.
      In      1992,      the
Government       of    India
declared Bekal as a Special
Tourism Area. The untouched
and scenic landscape, exten-
sive beaches, backwaters and
unspoilt environs qualified




Dilip Mishra
Resident Manager
The Lalit Resort & Spa Bekal


Bekal as a potential site for an
international standard beach
destination. Bekal also has
several historic and religious
sites. And to tap the potential
of this destination, Bekal
Resort Development Corpo-
ration was formed for the
implementation of Bekal
Tourism Project. The Bekal




Mathew Joseph
Managing Director
Pepper Tours



Resort         Development
Corporation had acquired
land for the development
of resorts and hotels of star
category. In 2004, The
Bekal Resorts Development
Corporation had leased out 6
plots of land to major hospi-
tality players with Bharat
Hotels (owner of The Lalit
Suri Hospitality Group)
being one of them.

     “The Lalit Resort & Spa
Bekal is the first Five Star
deluxe Resort & Spa to have
22 TRAVTALK        JANUARY 1 ST FORTNIGHT ISSUE 2013                        SPOTLIGHT-2013

Travel Trade: All guns blazing for 2013
The coming year will definitely be better than the last, believe travel bosses.   speaks to the biggest names in
travel and tourism and asks them what they expect from 2013 in terms of business.

LPTI & TUI India                                                                                                                                                                       Kuoni India
                            Arjun Sharma, Managing Director                                                                          Rajeev Wagle, Managing Director
                            India is believed to be one of the best tourist destinations from                                        The year 2013 looks optimistic for the travel industry. This is primarily
                            2009-2018. According to the World Travel and Tourism Council,                                            because of various economic reforms introduced in the second half of
                            the country has the highest ten-year growth potential. Our focus,                                        the year 2012. Initiatives like FDI in retail and aviation are likely to
                            in the coming year, will remain on exclusive and differentiated                                          boost the Indian economy growth thereby increasing discretionary
                            products. It is our intention to create a range of specific products                                     spending on services like travel. There is a tremendous scope for expan-
                            target at different customer segments and tailored to meet tastes                                        sion and evolution in the market. Increase in number of young travellers
                            of the global consumer.                                                                                  seeking unique, off-beat experiences is opening up new doors to the
                                                                                                                                     tourism segment. With a view to enhance loyalty and productivity, cor-
                                                                                                                                     porates are setting increasing budgets aside for incentive trips.




Nijhawan Group of Companies                                                                                                                                 Travel Spirit International
                           Ankush Nijhawan, Managing Director                                            Jatinder Taneja, Managing Director
                           In 2013, with an infusion of FDI in the aviation sector, domestic airlines    India should focus on infrastructure growth. We need to have high-
                           will get a major boost. The investment shall help in a significant            quality highways, which will help reduce travel-time from one city
                           increase in load factors of the airlines and hotel occupancy. 2012 was        to another. We also need high-speed trains connecting important
                           a challenging year, however the business of the Travel Boutique Online        tourist cities, which will help increase tourism. Thirdly, when tourists
                           (TBO) grew by 40-45 per cent. We would also be focussing a lot on             are visiting monuments, we need to provide them with a good expe-
                           innovating technology especially for the hotel content. We would also         rience. The cities should be clean and so should be the surroundings
                           launch our smartphone applications for our travel partners by early           monuments. The developments and upgrading of various
                           2013. TBO will continue to strengthen its position in India, Middle           airports is commendable indeed. Now we have a lot new
                           East and North Africa. We would start our operations in Thailand in           airports in India which convey a strong message that we are chang-
                           early 2013.                                                                   ing for the better.



 Kuoni India                                                                                            Cox & Kings
 Dipak Deva, CEO Destination Management, India & South Asia                                             Arup Sen, Director, Special Projects
 The coming year looks positive. The government has recently eased                                      The incoming foreign tourist arrivals in India registered a growth
 restrictions on tourist visas which had earlier mandated a two-                                        of 5.9 per cent and this is primarily due to a collective bag of positive
 month gap between consecutive visits by foreign nationals. This is                                     forces. The recovery of the euro and green shoots in USA, Australia,
 a positive step and should show results in the coming year. The                                        Canada, Middle East, CIS & Africa was a positive contribution along
 effort put in by the MOT, in the form of roadshows around the globe,                                   with augmentation of infrastructure including increased hotel inven-
 is an important way of maintaining tourist interest in India as a des-                                 tory, modernisation of airports due to the Commonwealth Games
 tination. As for Sita, we will be focussing our attention on issues                                    provided much required relief. On the domestic front, enhanced
 that will be crucial to our long-term success - the importance of                                      purchasing power further contributed to the growth.
 quality, technology and training to help meet and exceed customer expectations.

                                                                                                                                                                                         Contd. on page 35


                                                                                   TECHNOLOGY
InterGlobe Technology Quotient                                                                            Wizie
J B Singh, President & CEO                                                                               Moondeep Aggarwal, Director
The travel and hospitality sector has gone through unprecedented                                         As a technology company, I would be like to comment on the technology
times amidst challenges such as the economic slowdown, surging                                           demand dynamics for 2013. In this age of technology, we still believe
fuel prices and rupee depreciation. These posed an imminent risk                                         that there is a high demand for a good online booking engine that works
to the growth of the industry. However, the rate at which technology                                     for wholesalers and travel agents. Moreover, automation products are
is seeping into the travel and hospitality sector and the level at                                       high in demand, so that agents can reduce cost of operations and the
which innovations being introduced by companies, prospects appear                                        airline debit memos. We are planning to launch a solution which will
optimistic for both leisure and business travel.                                                         help travel agents to work on all three GDS sans training and increase
                                                                                                         sales and reduce cost of operations.




                                                                           Abacus India                                                                                                 Arzoo.com
                           Jeet Sawhney, Managing Director                                                                            Amal Purandare, Head Operations
                           Abacus is expecting to see India maintain its position as one of                                           Initiatives like FDI are always good news for the travel Industry,
                           the leading travel markets within the Asia-Pacific region. The trav-                                       which means making more inbound travel. Currently, airlines are
                           el industry within India is set to see greater growth in 2013. This                                        doing their best to delve into Kingfisher’s share of business. In
                           will be brought about both by the stabilisation of the overall avi-                                        2013, we will also focus on consolidating our B2C customer base
                           ation situation as well as the continued rise of the middle class,                                         and try and further strengthen our B2B stronghold. The end of
                           leading to increased travel.                                                                               2013 may also see the beginning of mergers and acquisitions in
                                                                                                                                      the OTA space.
24 TRAVTALK    JANUARY 1 ST FORTNIGHT ISSUE 2013        FAMILY ALBUM

‘Leading Tourism through turbulent times’
The leading decision-makers across different value chains in the tourism industry gathered to attend the interactive session ‘Leading Tourism through
Turbulent Times’ on 12-12-12 in New Delhi. The who’s who took time out to look into best perspectives and the needful directions which will help
the industry to sail through present testing times.
SPOTLIGHT-2013

Hospitality: What’s in store
With mixed fortunes, the general outlook of hospitality
growth in India remained disappointing in 2012.
However, industry experts forecast 2013 as being the
year when business will bounce back to good health.
The Lalit Suri Hospitality Group
Samil Malhotra, Vice President
The start of 2013 may bring some relief to the industry. We expect
this to be a long slog to recovery but would want a real grip to
return to the industry by 2013. However, we remain optimistic
on the long-term growth story for the industry. As our expansion
plans, the group is opening two new properties in 2013 - The
Lalit Chandigarh and the re-opening of the much-awaited Lalit
Great Eastern Kolkata. Also, The Lalit New Delhi has commenced
with celebrations of 25years.




                                                          The Suryaa New Delhi
                             Greesh Bindra, Vice President and General Manager
                               The industry will remain the same like last year because of the downturn
                               in the European market. However, we can expect sustained growth in
                               the corporate and domestic leisure. Commercial activity and international
                               leisure segment will pick up only in 2014. However, our hotel will witness
                               some major movements in the international leisure segment. The industry
                               will also witness massive rate correction this year. Going forward, the
                               strategy that hoteliers should adopt this year is the exploration of new
                               markets. New travel segments ought to be be created. Suiting the target
 business areas, it will be wise for hoteliers to concentrate on product augmentation and differentiation
 and create a different experience for the customers.




Fairmont Jaipur
 Atul Lall, General Manager
 Fairmont Jaipur opened at a time when the number of luxury room
 nights offered in Jaipur has gone up to 1500 from 721 just two years
 ago. In 2011, Jaipur showed a 13 per cent rise in the average room
 rates. Thus, it is because of the nature of the hotel rooms that business
 is changing in Jaipur. Traditionally viewed as a leisure destination,
 Jaipur has emerged as a MICE and wedding market too. The two seg-
 ments that will drive business for us and the entire Jaipur market in
 2013 are wedding and MICE. Incentives are expected to pick up in
 Jan-March period. The transit travel segment has also been increasing over the last year. There
 will be fluctuation in the ARRs this year. However, whether it will be negative or positive, is
 difficult to say now. But whatever the case, it will stabilise eventually.



                                                                 Best Western India
                             Sudhir Sinha, President & COO
                            Overall, for the industry, the growth should be in the range of around
                            seven-eight per cent based on how the global economic environment
                            pans out, specifically related to the European debt crisis and the US
                            fiscal cliff. Also, guest preference is decisively shifting in favour of
                            chain hotels vis-à-vis standalone properties and this trend is expect-
                            ed to increase steadily. Reservations through mobile-based platforms
                            are expected to gain further momentum as more people use the
                            internet through their smartphones rather than through their desk-
top/laptop. The role of intermediaries is expected to shrink unless they are able to transform
themselves into MICE specialists and work., work as the in-house corporate travel agency for
corporate houses or focus on niche segments.


 Leisure Hotels
Vibhas Prasad, Director
We continue to remain bullish on the future of the hospitality indus-
try in India, especially in the domestic segment. The popularity of
short-haul destinations from key metros will gain momentum this
year. Another important development over the last two years which
will continue in 2013 is the opening of Kashmir to ‘mass tourism’.
India will attract a large number of spiritual tourists. Maha Kumbh
2013 in Allahabad is also expected to be on the itinerary of every
spiritual traveller in the first quarter of this year. However, going
forward, there will be a few roadblocks which need to be tackled. Infrastructure issues with
air and road connectivity and cheaper overseas destinations with easy connectivity can play
spoilsport. Air traffic will remain muted due to high oil prices (high international Brent Crude).
26 TRAVTALK         JANUARY 1 ST FORTNIGHT ISSUE 2013                                  NTO

Korea sees increase in India outbound
Indian travellers spent an average of 13.5 days in contrast with other nationalities who spent an average
of 10 days. This only reflects the amount of scope outbound travel has as an opportunity for India.
  T T B U R E AU                  Korea. Since then the Indian    partly helped in boosting     2008. Lee who was visiting   among others. Since then,
                                  outbound to Korea has been on   numbers from the India out-   the newly opened Korean      the MICE market in

K    orea Tourism Organisation
     (KTO) opened a represen-
tative office in Mumbai in
                                  the rise, says Jae Sang Lee,
                                  Director, Korea Tourism
                                  Organisation, New Delhi.
                                                                  bound,” he said.

                                                                       Korea has registered a
                                                                                                Cultural Center in New
                                                                                                Delhi informed. The Korean
                                                                                                government        selected
                                                                                                                             Korea has garnered expert-
                                                                                                                             ise with support from the
                                                                                                                             government and its initia-
2011 and the Korean Embassy       “The number of documents        growth of 25 per cent from    MICE as one of the ‘new      tive to develop creative
also appointed VFS to make it     required to obtain a visa       the Indian market, since it   growth engine’ industries,   content and technology
easier for Indians to travel to   has been reduced and has        opened office in India, in    along with green energy      indigenous to Korea.         Jae Sang Lee
                                                                                                                                                          Director
                                                                                                                                                          Korea Tourism Organisation, New Delhi



                                                                                                                                                               The organisation is also
                                                                                                                                                          targetting the FITs and family
                                                                                                                                                          travel from India.

                                                                                                                                                          “According to a
                                                                                                                                                          survey conducted by
                                                                                                                                                          the KTO in 2010,
                                                                                                                                                          Indians spent US$
                                                                                                                                                          1446 per trip. This is
                                                                                                                                                          in contrast to other
                                                                                                                                                          visitors who spent
                                                                                                                                                          US$ 1298 per trip
                                                                                                                                                          when visiting Korea.
                                                                                                                                                                Indian travellers spent
                                                                                                                                                          an average of 13.5 days in con-
                                                                                                                                                          trast with other nationalities
                                                                                                                                                          who spent an average of 10
                                                                                                                                                          days. This only reflects that
                                                                                                                                                          there is a huge scope in this
                                                                                                                                                          segment,” he pointed out.
                                                                                                                                                          Comparing India market with
                                                                                                                                                          China, Lee opined, “Ten years
                                                                                                                                                          ago, five lakh Chinese trav-
                                                                                                                                                          ellers visited Korea. In 2011,
                                                                                                                                                          we received 2.2 million. This
                                                                                                                                                          is a very sharp curve and we
                                                                                                                                                          expect this kind of a spurt
                                                                                                                                                          from India as well.”



                                                                                                                                                            Virgin Atlantic
                                                                                                                                                            to connect
                                                                                                                                                            Delhi and
                                                                                                                                                            Mumbai with
                                                                                                                                                            new routes
                                                                                                                                                                Virgin Atlantic has
                                                                                                                                                            finalised plans to launch a
                                                                                                                                                            domestic flying pro-
                                                                                                                                                            gramme within the UK
                                                                                                                                                            from spring 2013. The air-
                                                                                                                                                            line will be adding 24
                                                                                                                                                            domestic flights a day
                                                                                                                                                            within the UK to its exist-
                                                                                                                                                            ing long haul network that
                                                                                                                                                            will strengthen connectiv-
                                                                                                                                                            ity for its Indian passen-
                                                                                                                                                            gers. The airline will focus
                                                                                                                                                            its operations on flights to
                                                                                                                                                            and from Scotland. From
                                                                                                                                                            April 2013, the airline will
                                                                                                                                                            operate six round-trip
                                                                                                                                                            flights a day between
                                                                                                                                                            Heathrow and Edinburgh,
                                                                                                                                                            with three daily round-trip
                                                                                                                                                            flights between Heathrow
                                                                                                                                                            and Aberdeen. The airline
                                                                                                                                                            has also utilised three of its
                                                                                                                                                            own Heathrow slot-pairs to
                                                                                                                                                            complement the new
                                                                                                                                                            Scottish routes with three
                                                                                                                                                            daily round-trip services
                                                                                                                                                            between           Heathrow
                                                                                                                                                            and Manchester from
                                                                                                                                                            March 31, 2013.
SPOTLIGHT-2013                                                          JANUARY 1 ST FORTNIGHT ISSUE 2013          TRAVTALK     27

Looking on the brighter side
After combating challenges in 2012, travel associations are looking forward to brighter prospects in 2013. The
veterans are hoping that taxes will be reduced, thereby bringing a breather for the industry.     reports.

OTOAI                                                               IATO                                                                     ADTOI
                        Guldeep Singh Sahni, President              Subhash Goyal, President                                                 Subhash Verma, President
                       The industry is currently caught             We had been pressing for the                                             The year 2013 will surely be a good one
                       between ‘A Rock and A Hard Place’. On        demand of granting industrial status                                     for domestic tourism in India. As the
                       one side, it is extremely vulnerable to      and similar benefits to the tourism                                      growth in the international tourist
                       external shocks and events and on the        industry. We hope that in year 2013,                                     arrivals has been constant, the rise in
                       other side, it is battling an internal       many such demands of our inbound                                         domestic tourists will drive tourism.
                       transformation with the increased use        industry will be accepted. There is                                      Tour operators should make use of the
                       of technology and changing market            a strong case for extending the tax                                      opportunity. They should utilise the
                       dynamics. Going forward, I feel, how         benefits to the travel industry, which                                   time in strengthening the manpower in
                       the industry faces the external head-        we’ll urge the MOT to pursue with the Ministry of Finance.               the office by providing special training
winds and internal shocks will define the market in the years       There are merits in opening the skies further.                           programme and educational tours with-
to come. 2013 promises to be a great year for our association.                                                                               in the country to launch new packages based on new products.


                      WTTC, India Initiative                                                                                    TAFI                                                                   IAAI
                          Vikram Madhok,                                                      Praveen Chugh, Vice President                                             Biji Eapen, President
                          Former Chairperson                                                  This uncertain trend might also spill over                                 2013 will be a promising year for the
                                                                                              to the next year. Experts’ fears are com-                                  inbound business. The MOT,
                           India is high on the priority radar of
                                                                                              pounded by the thought that the coming                                     Government of India has a new team.
                           leading developed countries, which
                                                                                              budget might add to the existing tax bur-                                  Initiatives such as ‘Hunar se Rozgar’
                           are now in the advanced stages of
                                                                                              den adversely affecting the existing tourist                               programme, Clean India campaign,
                           economic revival. This means that
                                                                                              flow to the country. However, it is hoped                                  safe and honourable tourism and the
                           after a lull due to difficult economic
                                                                                              that India’s inbound tourist volume will                                   promotion of medical and wellness
                           conditions, Incredible India will reg-
                                                                    grow due to its rapidly increasing average disposable income, rising                                 tourism are definitely going to yield
                           ister rapid increase in arrivals. The
                                                                    number of business opportunities, vast natural and cultural              positive results. With the new team, it is expected that continuity
recent announcement of the Kerala Government to to start its
                                                                    resources and increased spending by the government on developing         will be maintained in implementing above programmes in an
own airline is a step in the right direction.                                                                                                accelerated manner.
                                                                    tourism infrastructure.
FAMILY ALBUM                                   JANUARY 1 ST FORTNIGHT ISSUE 2013   TRAVTALK   29

Neptune Foundation’s charity polo match
The Jaipur Polo Ground in New Delhi was buzzing with activity as diplomats, bureaucrats, businessmen
and socialites got together to cheer their favourite team to victory at the Neptune Foundation Charity Polo
Match. The Ambassador of Thailand to India, Pisan Manawapat, was the chief guest at the event. The
Amazing Thailand Team lifted the cup beating Team Constance.
SPOTLIGHT-2013                                                  JANUARY 1 ST FORTNIGHT ISSUE 2013     TRAVTALK      31

Wooing Indian travellers in 2013
Even as people tighten their belts bracing for the year ahead, tourism boards get ready with a host of new
products and promotional plans to woo Indian travellers.      reports...

South African Tourism                                                               Tourism Australia                                                                Tourism New
Hanneli Slabber, Country Manager                                                    Nishant Kashikar, Country Manager                                                Zealand
2013 will see some interesting initiatives by South                                 We expect the growth momentum for visitor arrivals
African Tourism in India. Increasing competition                                    to continue in 2013. Our focus will remain on devel-
from other tourism boards and the present con-                                      oping demand for Australia as a holiday destination
dition of the economy will be a challenge for us.                                   among the affluent, well-informed, seasoned trav-
The key to success will be to deal with the chang-                                  eller, residing in the top metro cities, especially in
ing travel patterns and preferences effectively by                                  Mumbai and Delhi. Simultaneously, there will be
diversifying our products, maintaining excellent                                    initiatives to develop the business events segment
service and innovating our marketing channels.                                      and on gaining more incentive visits to Australia.
The most critical element would be to ensure that we deliver value for money        The Tourism Forecasting Committee estimates arrival of 178,000 visitors for
holiday experience.                                                                 the year 2013/14.
                                                                                                                                                                     Mischa Mannix-Opie
                                                                                                                                                                     Regional Manager - South &
                                                   Atout France                                                Ministry of Tourism, Oman                             South East Asia
                                                                                                                                                                     Currently, India is our 12th largest
                            Catherine Oden, Country Manager                                                   Lubaina Sheerazi, India Representative                 market and we expect it to grow
                            The global economic situation will, to a large                                    We have managed to reach out to people in Tier II      at a steady pace. Based on
                            extent, influence travel trends for the first half of                             cities of Pune, Hyderabad and Ahmedabad in 2012        Tourism New Zealand’s research,
                            2013. At our end, we will renew our efforts to                                    besides the Tier I cities of Mumbai, Delhi,            there are approximately over 21
                            present France as an affordable destination and                                   Bengaluru and Chennai. In 2013, we want to take        million people in India who fall
                            make it attractive for our potential visitors. We are                             it to the next level and reach out to more cities.     into this category of travellers.
                            confident that we will find ways to cope with                                     We hope to increase the passenger numbers from         This coupled with the rise in
                            adverse situations and will find different means of                               India to Oman. We also hope to create more brand       spending power of Indians make
                            generating footfalls to France. All our best efforts                              awareness for Oman through our Bollywood asso-         the future appear pretty bright for
will be put forth to increase arrival figures for 2013.                             ciation with the movie ‘Once Upon a Time in Mumbai Again’ which is slated        an increase in the number of
                                                                                    to release in mid 2013.                                                          Indian travellers
                                                                                                                                                                                  Continued overleaf
SPOTLIGHT-2013
Contd. from page 31

Canadian Tourism Commission, Representative in India
Tina Singh, Assistant Vice President
In 2013, CTCs main focus continues to remain on the Travel Trade.
Approximately 77% of the budget would be spent on marketing activities
through the trade. While we have already obtained good presence in Delhi
and Mumbai, we would be expanding our sales network in 2013 to newer
markets like Bengaluru, Hyderabad, Chennai and Kolkata by conducting
training seminars to educate the travel trade in these cities on the desti-
nation. Further, we will be launching Signature Experience Collection (SEC)
in the India market where the destination will be repositioned as a truly
unique, experiential destination. We also plan to develop co-op programmes with tour operators. We
will also be promoting our consumer website ‘Keep Exploring’ in 2013.


                              Macau Government Tourism Office, India
                              Madhvi Awasthi, Media Manager
                              Despite a gloomy global economy, the Indian market performed well in
                              visitor arrivals in 2012.
                              2013 is going to be an important year for Macau’s tourism industry, as we
                              celebrate the 60th Macau Grand Prix and 25 years of the Macau International
                              Fireworks Display Contest. Besides promoting our heritage sites and other
                              attractions, we will continue to focus our efforts on business tourism initia-
                              tives. We have been expanding our tourism products to diversify our source
market profile. We will also leverage our recently launched Wedding Incentive Scheme and Student
Excursion Incentive Scheme to boost visitor arrival figures. The Incentive stimulation plan offered by
Macau Government Tourist Office (MGTO) helps agents and corporate look at Macau as a destination for
business movement. We have had group moments throughout the year to the tune of 200 – 1800.


Phillipines Tourism Marketing Office, India
Chetna Singh, Senior Marketing Manager
India is an emerging market with a vast source of potential travellers.
Over the past ten months, the Phillipines recorded a double-digit growth
of 42.0 per cent with month-on-month comparison for October 2011
and 2012. This milestone may be attributed to the recent implemen-
tation of the 14-day visa-free entry facility for Indian tourists with the
existing valid multiple entry visa of US, Japan, Australia, Canada,
Schengen, Singapore or UK (they should have travelled to these desti-
nations at least once). The Phillipines Tourism Marketing Office in India
is expecting to bolster Indian travel to the Philippines through integrated marketing efforts in 2013.
We predict an increase in the number of inbound travellers from India in the coming years as the
Phillipines is fast becoming a destination of choice amongst the Indians.




Sterling Holidays opens 19th resort
   Sterling Holidays, a              to be one that exudes beauty         engage members and guests
Vacation Ownership and               and charm. The USP of The            in fun-filled, memorable hol-
Leisure Hospitality Company,         Sanctuary thus is its location.      iday experiences.
opened its 19th resort,              With the majestic view of the            The hotel also hopes to
Dharamshala         -    The         Dhauladhar range and the             attract MICE inspite of being
Sanctuary. Talking about the         gurgling, perennial brooks of        located in a leisure zone. All
choice of location for the           the Beas River, it is the loca-      of Sterling’s resorts in fact
hotel, Lata Subramanian,             tion which is the property’s         are located in leisure locales
Vice President - Marketing of        biggest draw. It offers won-         in India and are built to offer
Sterling Holiday Resorts             derful scenic canvas of              stunning views of the desti-
                                                                                      nation. “This fact
                                                                                      alone makes each
                                                                                      of our resorts the
                                                                                      perfect choice for
                                                                                      offsite conferences
                                                                                      and events as the
                                                                                      breathtaking views
                                                                                      and fresh air prove
                                                                                      to be invigourating
                                                                                      for MICE dele-
                                                                                      gates. The MICE
                                                                                      offering       from
                                                                                      Sterling is not a
                                                                                      new venture as
                                                                                      our resorts have
                                                                                      been built to host
                                                                                      conferences from
                                                                                      inception. Sterling
(India) says, “At Sterling,          Himalayas and the emerald            offers complete MICE solu-
great emphasis is laid on            green Kangra Valley. The             tions at value pricing, which
choosing the locations for the       property is also very close to       include well-equipped con-
resorts within each destina-         the Norbulingka monastery.”          ference facilities and guest
tion. The goal remains to                The full-service, modern         rooms, banquets, airport
delighting holidayers with           resort has 26 elegantly fur-         transfers and a team of ‘Fun
stunning views. With that            nished rooms, a multi-cuisine        Rangers’ who organize a
very philosophy, when it             restaurant, bar, conference          range of holiday and team
came to choosing a destina-          facilities and a range of recre-     building activities,” says
tion for our new resort, it had      ational activities designed to       Subramanian.
SPOTLIGHT-2013                                                    JANUARY 1 ST FORTNIGHT ISSUE 2013         TRAVTALK     35

New Year to see more in-out traffic
The year 2012 saw a lot of ups and downs in the tourism industry. In the initial months tourism was moving
slowly, but picked up towards the end of the year.     spoke to some of the leading travel agents and asked
them to review the year that was 2012.

 Contd. from page 22

Nomad Travels                                                                                                   Thomas Cook (India)
Ajay Prakash, Chief Executive                                                                                   Madhav Pai, Director – Leisure Travel (Outbound)
2012 was a year that saw some tough times for the industry. Young                                               Thomas Cook India has bucked the trend by launching Summer
Indians have shown a move towards niche or experiential holidays -                                              Tours – ‘European Holiday Supermarket’ and ‘American Holiday
and this trend will grow. We shall crawl past the 6 million mark for                                            Supermarket’ this October for 2013. This unique ‘Super Market’
inbound tourists, but at less than 0.5% of global tourism. India is far                                         concept has been impactful and our forward booking position is
from realising its potential for inbound tourism - and the reasons are                                          already up by an impressive 65% . Almost 45% of our individual
there for all of us to see. It's heartening to see additional rooms being                                       holiday travellers are youth, and this segment is poised to grow at
added in all the major cities. Hopefully, that will keep room rates at a                                        an exponential rate of 25-30%.
reasonable level for both inbound as well as domestic tourists.



                                                                                Pepper Tours                                                                          Inorbit Tours & Travels
                             Mathew Joseph, Managing Director                                                                            OmPrakash Sehgal, Director
                             In 2013, business will be difficult and travel operators who are more proac-                                This year was full of evolution and changes and I'm happy to see that
                             tive in terms of advertising, media and networking will do well. In terms                                   we all were able to adopt to the changes. For 2013, we will have to
                             of inbound tourists, UK, Russia and Australia will be our biggest source                                    come up with innovative strategies and business model. If there is any
                             markets. Places like Kashmir will do well in 2013 as it is opening up and                                   external unrest in the Indian economy on macro level, our tourism
                             has the potential to attract tourists. Kerala market will face stiff competition                            industry will be influenced on a greater scale. Thus, all service providers
                             from other markets unless it will become more flexible in terms of its hotel                                need to be cautious and at the same time start with new products,
                             rates. Outbound travel will increase in 2013 to Far East and Middle East                                    innovative marketing strategies and come up with affordable travel
                             along with niche destinations in Europe.                                                                    packages to attract our booming middle class.
36 TRAVTALK         JANUARY 1 ST FORTNIGHT ISSUE 2013                    FAMILY ALBUM

Abacus India gets trade on the dance floor
November was a busy month for the Indian travel industry as Abacus India staged trade gatherings in Mumbai, Delhi, Bengaluru and Kolkata. The events
were well-attended and received by the industry partners in the cities. Different themes were explored in each venue. Mumbai went Hawaiian, replete with
flower garlands, while the Kolkata event went ‘Disco Nite’ with travel consultants turning up in grooving outfits and dancing the night away.




FICCI rolls
out CITI
    FICCI in partnership
                                Club Med rolls out red carpet for Indians
with the state govern-          Having 80 resorts worldwide, the USP of the Club Med is their ‘All-Inclusive’ resorts. Since
ments and the Ministry of
Tourism will organise           successfully launching the concept of ‘All-Inclusive’ resorts many years ago across the world,
the first-ever two-day
focussed Conclave on            Club Med hopes that Indians too will soon see value-for-money in this product.
Investment in Tourism
Infrastructure (CITI). It
will encompass exclusive           T T B U R E AU                                                                                                                        in luxury travel in India. India
state presentations, B2B                                                                                                                                                 now has a lot of FITs who take
meeting of investors with
state governments and           T   he ‘All-Inclusive’ pack-
                                    ages of Club Med include
                                accommodation and all meals
                                                                                                                                                                         shorter breaks to spend more
                                                                                                                                                                         time with their family
                                                                                                                                                                         because of which we think
exhibition by organisations
in the hotel supply chain,      and transfers. The guests                                                                                                                that this ‘All-Inclusive
forging one to one meet-        have, at their disposal, exqui-                                                                                                          Holidays’ will work in India,”
                                                                                                                                                                         says Vijay Sharma, Country
ings with their target con-
                                                                                                                                                                         Manager, Club Med, India
sumers during January 16-
17, 2013 at the Federation                                                                                                                                                     Club Med, a French
House, FICCI. Investors in                                                                                                                                               company owns several pre-
tourism infrastructure                                                                                                                                                   mium resorts across the
from across India and a                                                                                                                                                  globe and currently, the com-
strong 50-member Asian                                                                                                                                                   pany receives more than
American Hotel Owners                                                                                                                                                    2000 Indian families across
Association ( AAHOA) del-                                                                                                                                                its properties with 80 per
egation from USA led by                                                                                                                                                  cent staying at their Asian
                                                                  lagoons. Club Med’s core         include the relaxing volley-      time in the sunshine. And
their Chairman, members                                                                                                                                                  resorts while 20 per cent in
                                                                  charges also include unlimit-    ball, surfing, golf, archery,     there is an element of enter-
of FHRAI, HAI, IHHA,                                                                                                                                                     their European resorts.
                                Vijay Sharma                      ed quantities of alcoholic and   tennis, beach soccer, kayak-      tainment behind every Club
members from state level        Country Manager                   non-alcoholic beverages. The     ing, snorkeling and flying tra-   Med stay as there are daily
hotel associations and          Club Med, India                   all-inclusive concept ensures    peze. The chain’s ‘Kids Clubs’    entertainment shows featur-          A la carte
organisations in the hotel                                        that the guests’ adrenaline      are state-of-the-art facilities   ing live performances.
supply chain will forge ties    site buffets, chef’s specials     levels don’t reach safe lows,    where trained professionals                                             The all-inclusive concept
                                and specialty bars. And also      thanks to a cross-section of     look over and entertain the            “Our concept of ‘All-            ensures that guests remain
through B2B meetings
                                the dining locations are set in   activities and adventures        young ones while their par-       Inclusive’ is still new in India.     entertained thanks to activities
with one another.
                                picturesque spots such as         sports at each resort. These     ents and guardians have their     However, we now see a rise            and adventures sports
38 TRAVTALK          JANUARY 1 ST FORTNIGHT ISSUE 2013                 FAMILY ALBUM

                                                                OTOAI celebrates 1 anniversary                               st
                                                                OTOAI (Outbound Tour Operators Association of India), which was formed last year to boost India's outbound
                                                                tourism, has recently completed one year of success and achievements. Moving forward in the next year,
                     JANUARY                                    the association is all geared up with increase in its member base (currently has 170 active members), enhanced
                                                                relationship with NTOs and with its foraying into the smaller cities of India.
4-6      Chennai            Travel & Tourism Fair
8-13     Gujarat            International Travel Tourism &
                            Hospitality Expo
9        Coimbatore         Tourism Authority of Thailand’s
                            B2B Event
11       Mangalore          Tourism Authority of Thailand’s
                            B2B Event
11-13    Bengaluru          Travel & Tourism Fair
14       Pune               Tourism Authority of Thailand’s
                            B2B Event
16-17    New Delhi          FICCI’s Conclave on Investment
                            in Tourism Infrastructure 2013
16-18    New Delhi          Tourism Malaysia’s Roadshow
19       Kolkata            Tourism Malaysia’s Roadshow
20-22    Guwahati           ATOAI’s Annual Convention
21       Mumbai             Tourism Malaysia’s Roadshow
21       Mumbai             Tourism Fiji’s Roadshow
22       Ahmedabad          Tourism Fiji’s Roadshow
23       Kolkata            Tourism Fiji’s Roadshow
23       Chennai            Tourism Malaysia’s Roadshow
24       New Delhi          Tourism Fiji’s Roadshow
24-27    Singapore          Zak Salaam India Tourism
                            Expo - Singapore
25-27    Switzerland        Travel Expo
25-27    Coimbatore         Holiday Expo
25-27    Nagpur             India International
                            Travel Exhibition
25-27    Germany            Leisure Travel Market
30-3     Spain              Fitur
31-2     Kochi              India International Travel Mart
                            Cochin




                    FEBRUARY
5        Mumbai             Austrian National Tourist
                            Office’s B2B Event
6        Chennai            Austrian National Tourist
                            Office’s B2B Event
7        New Delhi          Austrian National Tourist
                            Office’s B2B Event
12       Ahmedabad          Tourism Philippines’ Roadshow
13       Kolkata            Tourism Philippines’ Roadshow
19       Mumbai             Disney Parks - Disney Days Trade
                            Event
21       Delhi              Disney Parks - Disney Days Trade
                            Event
22       Ahmedabad          Macau Govt Tourist Office’s Trade
                            Workshop
22       Mumbai             Canadian Tourism Commission
                            Agents Training Programme
25       Delhi              Canadian Tourism Commission
                            Agents Training Programme
25-26    New Delhi          ATOUT France’s Paris
                            Promotion
27-1     Mumbai             ATOUT France’s Paris
                            Promotion
27- 2    Jaipur             Canadian Tourism Commission’s
                            Focus Canada India
28-2     Kolkata            IITM Kolkata



                       MARCH
1        New Delhi          Starwood Hotels Worldwide’s
                            Sales Expo for B2B / MICE &
                            Corporate Agents
2        Kolkata            Starwood Hotels Worldwide’s
                            Sales Expo for B2B / MICE &
                            Corporate Agents
4-6      Thailand           Kiwi Link South & South
                            East Asia
8        Chandigarh         Macau Govt Tourist Office’s B2B
                            Workshop
22       Kolkata            Macau Govt Tourist Office’s B2B
                            Workshop

For more information, contact us at: talk@ddppl.com
Calendar of Travel Events
                      JANUARY                                                              MARCH                                                                       JULY
                                                                      1       Delhi               Starwood Hotels
4-6       Chennai             Travel & Tourism Fair                                               Worldwide’s Sales Expo for B2B /        5-7         Kolkata             TTF
8-13      Gujarat             International Travel Tourism &                                      MICE & Corporate Agents                 9           Chennai             Macau Govt Tourist Office’s B2B
                              Hospitality Expo                                                                                                                            Minimart
                                                                      1-3     Vijayawada          India International Travel Exhibition
8-13      Utrecht,            Holiday Fair                                                        (IITE)                                  10          Bengaluru           Macau Govt Tourist Office’s B2B
          The Netherland                                                                                                                                                  Minimart
                                                                      2       Kolkata             Starwood Hotels Worldwide’s
9         Coimbatore          Tourism Authority of Thailand’s                                     Sales Expo for B2B / MICE &             12-14       Hyderabad           TTF
                              B2B Event                                                           Corporate Agents                        19-21       Bengaluru           IITM Bangalore
11        Mangalore           Tourism Authority of Thailand’s
                              B2B Event                               4-5     Warsaw &            Polish Outgoing Workshop                26-28       Chennai             IITM Chennai
                                                                              Katowice, Poland
11-13     Bengaluru           Travel & Tourism Fair
                                                                      4-6     Thailand           Kiwi Link South & South East Asia

                                                                                                                                                                   AUGUST
14        Pune                Tourism Authority of Thailand’s
                              B2B Event                               6-10    Berlin, Germany    ITB
16-17     Delhi               FICCI’s Conclave on Investment in       7-9     Guangzhou, China   Guangzhou International Travel Fair
                              Tourism Infrastructure 2013             8       Chandigarh         Macau Govt Tourist Office’s B2B          9-11        Aurangabad          IITE
16-18     Delhi               Tourism Malaysia’s Roadshow                                        Workshop                                 16-18       Ahmedabad           TTF
16-18     Delhi               South Asian Travel and Tourism          14      Moscow, Russia Luxury Travel Mart                           20          Chennai             German India Pool, B2B Event
                              Exhibition (SATTE)                      15-17   Raipur             Indian International Travel Exhibition   22          Delhi               German India Pool, B2B Event
17-20     Helsinki, Finland   Matka Expo Nordic Travel Fair                                      (IITE)                                   23-25       Surat               TTF
19        Kolkata             Tourism Malaysia’s Roadshow             19-21   London, UK         International Confex                     30-1 Sept   Mumbai              TTF
20-22     Guwahati            ATOAI’s Annual Convention               20-23   Moscow, Russia Moscow International Travel and
21        Mumbai              Tourism Malaysia’s Roadshow                                        Tourism Exhibition (MITT)*
21
21-22
          Mumbai
          Mumbai
                              Tourism Fiji’s Roadshow
                              SATTE Mumbai
                                                                      21-24   Gothenburg, Sweden Tur                                                          SEPTEMBER
                                                                      22      Kolkata            Macau Govt Tourist Office’s B2B          2-3         Delhi           Atout France’s ‘France
22        Ahmedabad           Tourism Fiji’s Roadshow                                            Workshop                                                             Promotion’
23        Kolkata             Tourism Fiji’s Roadshow                 25-27   Abu Dhabi, UAE GIBTM*                                       2-4      Beijing, China     China Incentive Business
23        Chennai             Tourism Malaysia’s Roadshow             27-29   Kiev, Ukraine      UITT*                                                                Travel Market (CIBTM)*
24        Delhi               Tourism Fiji’s Roadshow                                                                                     4-6      Mumbai             Atout France’s ‘France
24-27     Singapore           Zak Salaam India Tourism
                                                                                               APRIL
                                                                                                                                                                      Promotion’
                              Expo - Singapore
                                                                                                                                          6-8      Mumbai             IITM Mumbai
25-27    Switzerland          Travel Expo
                                                                                                                                          6-8      Pune               TTF
25-27    Coimbatore           Holiday Expo                            4-6     Baku, Azerbaijan    Azerbaijan International Tourism
                                                                                                  Fair (AITF)*                            8-11     Prince Edward      Canadian Tourism Commission’s
25-27    Nagpur               India International Travel Exhibition
                                                                      5       Lucknow             Macau Govt Tourist Office B2B                    Island, Canada     Go Media
25-27    Germany              Leisure Travel Market
                                                                                                  Workshop                                13-15    Delhi-NCR          IITM Gurgaon
30-3     Madrid,              FITUR*
         Spain                                                        8-9     Cape Town,          International Luxury Travel Market      17-20    Moscow, Russia Otdykh Leisure
31-2     Kochi                India International Travel Mart                 South Africa        Africa (ILTM Africa)                    17-20    Moscow, Russia Luxury Leisure
31-3 Feb Istanbul, Turkey     EMITT*                                  9-11    Beijing, China      China Outbound Travel Tourism           24       Kiev, Ukraine      Luxury Travel Market
                                                                                                  Mart (COTTM)*
                                                                                                                                          24-27    Paris, France      International French Travel Market

                    FEBRUARY
                                                                      11-13   Novosibirsk, Russia SITT (TOURSIB)*                                                     Top Resa
                                                                      14-16   Jaipur              Great India Travel Bazaar               25-27    Astana, Kazakhstan Astana Leisure*
2-3       Innsbruck, Austria Travel Trend                             21-24   Auckland,           Tourism New Zealand                     27       Almaty, Kazakhstan Luxury Travel Market
                                                                              New Zealand         TRENZ 2013
2-4       Chandigarh         India Travel Mart (ITM)                                                                                      30-3 Oct Cancun, Mexico International Luxury Travel
                                                                      23-25   Sao Paulo, Brazil World Travel Market
5         Mumbai             Austrian National Tourist Office’s                                                                                                       Market Americas (ILTMA)*
                             B2B Event                                                            Latin America*
5-6       London, UK         The Travel Technology Show               23-26   Riyadh,             Riyadh Travel Fair
5-6
5-6
          London, UK
          Tel Aviv, Israel
                             Business Travel & Meetings Show
                             International Mediterranean
                                                                      24-26
                                                                              Saudi Arabia
                                                                              Almaty,             Kazakhstan International Tourism
                                                                                                                                                                  OCTOBER
                             Tourism Market                                   Kazakhstan          Fair (KITF)*                            1-3         Bangkok, Thailand   IT&CMA CTW
6         Chennai            Austrian National Tourist Office’s                                                                           4-6         Indore              IITE
                             B2B Event
7         Delhi              Austrian National Tourist Office’s
                             B2B Event
                                                                                                MAY                                       10-12       St. Petersburg,
                                                                                                                                                      Russia
                                                                                                                                                                          Inwetex-CIS Travel Market

                                                                      5-7     Stuttgart,           German Travel Mart                     10-12       St. Petersburg,     MICE Industry
7-10      Prague,            Holiday World                                                                                                            Russia
          Czech Republic                                                      Germany
                                                                                                                                          14-18       Hanzhou, China      Canadian Tourism Commission’s
8-10      Mumbai             TTF & OTM                                6-9     Dubai,               Arabian Travel                                                         Showcase Asia
12        Ahmedabad          Tourism Philippines’ Roadshow                    UAE                  Market (ATM)*
                                                                                                                                          18-21       Taipei, Taiwan      Taipei International Travel Fair
13        Kolkata            Tourism Philippines’ Roadshow            9-11    Shanghai, China      World Travel Fair
                                                                                                                                          23-25       Singapore           ITB Asia
14-16     Delhi              TTF & OTM                                11-14   Durban,              Indaba Expo
14-17     Milan, Italy       BIT                                              South Africa

                                                                                                                                                                NOVEMBER
18-21     Johannesburg,      Meetings Africa                          12-15   Ottawa, Canada       Canadian Tourism
          South Africa                                                                             Commission’s Rendezvous
19        Mumbai             Disney Parks - Disney Days Trade                                      Canada
                             Event                                    13-15   Kuwait City,         Travel World Expo                      4-7         London,             World Travel Market*
                                                                              Kuwait                                                                  UK                  (WTM)
21        Delhi              Disney Parks - Disney Days Trade
                             Event                                    16-18   Lugano,              Meeting Luxury                         6-7         London, UK          Business Travel Market
22        Ahmedabad          Macau Govt Tourist Office’s Trade                Switzerland                                                 11-14       Costa Daurada,      International Golf Travel Market
                             Workshop                                                                                                                 Spain
22        Mumbai             Canadian Tourism Commission
                                                                                               JUNE
                                                                                                                                          22-24       Pune                IITM
                             Agents Training Programme
                                                                                                                                          22-24       Pune                IITM Pune
22-24     Bhubaneswar        Holiday Expo
23-25     Ahmedabad          Indian Travel Mart (ITM)                 3-6     Shanghai, China      International Luxury Travel            26          Delhi               German National Tourist Board
                                                                                                   Market Asia (ILTMA)*                                                   Roadshow’s B2B Event
25        Delhi              Canadian Tourism
                             Commission Agents Training               11-13   Chicago, USA         Americas Incentive                     27          Bengaluru           German National Tourist Board
                             Programme                                                             Business Travel &                                                      Roadshow’s B2B Event
25-26     Delhi              ATOUT France’s Paris                                                  Meetings Exhibitions (AIBTM)*          29          Mumbai              German National Tourist Board
                             Promotion                                13-16   Hong Kong,           International Travel Expo                                              Roadshow’s B2B Event
26-27     Melbourne,         Asia Pacific Meetings and                        SAR China                                                   29 -1 Dec Hyderabad             IITM Hyderabad
          Australia          Incentive Expo (AIME)                    13-16   Hong Kong,           ITE MICE
27-1      Mumbai             ATOUT France’s Paris Promotion                   SAR China
27- 2 Mar Jaipur             Canadian Tourism
                             Commission’s Focus Canada India
                                                                      21-23   Beijing, China       Beijing International Tourism Expo
                                                                                                   (BITE)                                                       DECEMBER
27-3 Mar Lisbon, Portugal BTL                                         26-27   Auckland,            Tourism New Zealand                    2-5         Cannes, France      International Luxury
28-2 Mar Kolkata             IITM Kolkata                                     New Zealand          MEETINGS 2013                                                          Travel Market*



                      *For more details, contact: ddpexhibitions@ddppl.com
NEWS

Teeing off on Indian grounds
India Golf Tourism Association (IGTA) will kickstart
2013 on a positive note by participating in the Ministry
of Tourism’s North East International Travel Mart
scheduled to be held in January in Assam…
                                                                     Secretary, Vipan Sharma- Jt.
  T T B U R E AU                                                     Secretary and RK Mathur-
                                                                     Treasurer. The IGTA officials
L   eading golf enthusiasts
    from the tourism and
hospitality industry have
                                                                     desire to work closely with
                                                                     the Ministry of Tourism to
                                                                     ensure that Golf in near
come together to launch
                                                                     future becomes a major con-
India       Golf     Tourism
                                                                     tributor to the tourist arrivals
Association (IGTA), which
                                                                     in India.
strives to enhance India’s golf
offerings. The new associa-                                                Here, Sehgal adds, “Golf
tion also strives forward to                                         is India’s best kept secret.
bring International Golf Meet                                        The country has the rare
Asia 2014 to India.               Rajan Sehgal                       advantage of having an array
                                  President
                                  IGTA
                                                                     of golf courses from the met-
     As per Rajan Sehgal,
                                                                     ros to the mountains as well
President, IGTA, “The India
                                                                     as courses with great histor-
Golf Tourism Association has      conduct an annual Golf
                                                                     ical importance. Once in
been formed to bring all golf     Tourism Conference, work as
                                                                     India, the tourists coming
courses and golf tour promot-     a dialogue facilitator with all
                                                                     arriving for experiencing golf
ers on one platform. This         stakeholders to better pack-
                                                                     will also be inspired by
helps in bringing better          age the Indian golf product to
                                                                     India’s attractions such as
understanding and coordina-       maximise foreign visitor
                                                                     spa, culture, adventure, din-
tion among various stake-         arrivals in India,” he added.
                                                                     ing and business offerings.”
holders promoting golf in
                                       IGTA has planned a host
India. Our membership will
                                  of events and will kick start
be open to travel and tour
operators, golf courses,
                                  2013 on a positive note by          Plan of action
                                  participation in the Ministry
hotels, airlines, state tourism
                                  of Tourism’s North East              The IGTA was launched in the
boards and international
                                  International Travel Mart            first week of December 2012
tourism organisations.”
                                  scheduled to be held in              at Suryaa, New Delhi
     “IGTA hopes to bring in      January in Assam. The IGTA
the prestigious International     was launched in the first            The IGTA officials desire to
Golf Meet Asia 2014 to India.     week of December 2012 at             work closely with the Ministry
                                                                       of Tourism to ensure that Golf
Besides this, the association     Suryaa, New Delhi and its
                                                                       in near future becomes a
will work towards inviting        executive team also includes
                                                                       major contributor to the tourist
foreign golf tour operators to    Gajender          Singh-Vice
                                                                       arrivals in India
experience golfing in India,      President, Uday Marwah-




IGTA launched in New Delhi
The IGTA was launched in the first week of December 2012 at Suryaa, New
Delhi and its executive team includes Gajender Singh-Vice President, Uday
Marwah-Secretary, Vipan Sharma- Jt. Secretary and RK Mathur-Treasurer.
The IGTA will strive forward to make India a leading golfing destination.




 Courtyard Kochi Airport by Marriott
     Strategically located 300    have a contemporary look          Rooms making it the highest
 meters from the Kochi            and feel, the hotel reflects      room inventory in the vicin-
 International         Airport,   the refreshing hospitality        ity of the Kochi International
 Courtyard by Marriott, Kochi     offered by the Marriott           Airport. All the rooms come
 Airport is well connected to     Group. The hotel has 107          fully equipped with hi-speed
 all major destinations in and    rooms that include 7 Suites,      internet, ergonomic seating,
 around Kochi. Designed to        22 Twin Rooms & 78 King           tea/coffee maker etc.
OPPORTUNITY
CLIPBOARD   JANUARY 1 ST FORTNIGHT ISSUE 2013   TRAVTALK   43
44 TRAVTALK                 JANUARY 1 ST FORTNIGHT ISSUE 2013                                        MOVEMENTS
Bhutan Tourism Corporation Limited                                                         Marriott Hotels India                                                       JW Marriott Hotel New Delhi Aerocity
Delhi                                                                                      Delhi                                                                                             New Delhi
Vishal Kumar has been appointed as the Head Sales &                                        Vishal Gupta is the new Director of Travel Trade Sales for the              Josef Schuppler has been appointed as the Director of
Marketing - India Representative for Bhutan Tourism Corporation                            Marriott Hotels India. Prior to this stint, he was the Director of          Operations at the JW Marriott Hotel New Delhi Aerocity, which
Limited (BTCL). He brings with him almost                                                  Sales for the Greenbelt Marriott and Marriott                               is scheduled to open in early 2013.
13 years of experience in Hospitality &                                                    Inn & Conference Centre UMUC in Maryland,                                   Schuppler has over seven years of
Aviation industry. In his current role, he                                                 USA. He has been with Marriott International                                experience in managing the Food &
would take care of Sales & Marketing                                                       for 12 years now and has extensive                                          Beverage division across Marriott hotels
and setting up Bhutan as a destination                                                     international work-experience that covers                                   in Asia including the JW Marriott Hong
for the Indian Market. Kumar has worked                                                    countries such as Australia, St. Kitts                                      Kong, JW Marriott Beijing and JW
with Eaton Smart Transit hotel – T-3, DIAL                                                 (Caribbean) and United States before                                        Marriott Shanghai. He tables invaluable
for the T3 Operations & Project Planning                                                   returning back home to India.                                               multi-property experience, off-property
& hotels in various locations in India such                                                Gupta has worked with                                                       events and expertise in F&B as well as
as InterContinental The Grand &                                                            eminent brands such as Hotel                                                operations management.
The Grand New Delhi.                                                                       InterContinental, Sydney and
                                                                                           The Hilton New Delhi.




                                              Bengaluru Marriott Hotel Whitefield
                                                         Bengaluru                                                                                                     Neeraj Maharshi is the new Director of Sales and Marketing
                                                                                                                                                                       at JW Marriott Hotel New Delhi Aerocity. He comes with 15
 Sonika Chaturvedi is the new Director of Human Resource                                   Gaurav Apte has joined the Bengaluru Marriott Hotel,                        years of experience in the hotel industry. In his previous role,
                           at the Bengaluru Marriott Hotel Whitefield. She                                  Whitefield as the Director of Rooms. In this               Maharshi held the position of the Director of Sales and
                                comes in with 14 years of experience in                                       profile, he will be responsible for overseeing           Marketing at the Jaipur Marriott. He was
                                 the field of Human Resources,                                                  financial interactions & transactions.                 also instrumental in positioning the
                                  organisation development, training &                                          Previously, Apte was associated with the               Jaipur Marriott as the ideal destination
                                  customer service in hotels, telecom &                                         Courtyard by Marriott, Pune Hinjewadi as               for MICE and leisure business. In his
                                  BPO. Prior to joining this profile,                                           the Director of Rooms, where he played a               present profile, he will work towards
                                   Chaturvedi worked at the Renaissance                                         significant role in ensuring its successful            maximizing the hotel revenue from
                                  Hotel and Convention Centre & Marriott                                      opening. He has earlier worked with The                  different market segments and lead the
                                 Executive Apartments, Mumbai as the                                                 Lakeside Chalet Marriott Executive                hotel’s sales team.
                                   Director of Human Resources, where                                                          Apartments       and     The
                                         she successfully managed the                                                           Renaissance Mumbai Hotel
                                           department with her experience                                                       & Convention Centre
                                           in this segment.                                                                     for 7 years.


Renaissance Mumbai Convention                                                              Hilton Mumbai International Airport                                    Courtyard by Marriott Pune City Centre
Centre Hotel and Lakeside Chalet                                                           Mumbai                                                                 Pune
Mumbai, Marriott Executive                                                                 Kasturi Deo has joined the Hilton Mumbai International Airport         Shubhendu Kadam is appointed as the Executive Chef at
Apartments                                                                                 as the Executive Housekeeper. She brings in more than 15 years         Courtyard by Marriott Pune City Centre. He brings with him 16
                                                                                           of experience with her to this new role. In                            years of experience in the hospitality
Mumbai                                                                                     her former position at Bombay Dyeing                                   domain. Kadam encompasses an
                                                                                           & Manufacturing, she was heading                                       expertise in pre-opening and refurbishing
Neesha Mohapatra has joined                                                                                                                                       of Hotel F&B, Speciality restaurants and
                                                                                           housekeeping operations for the
Renaissance Mumbai Convention Centre                                                                                                                              Cruise Ships in India, The Philippines and
                                                                                           Mumbai-based company with
Hotel and Lakeside Chalet - Mumbai,                                                                                                                               USA. He started his career as a
                                                                                           diverse interests in textile, airlines,
Marriott Executive Apartments as                                                                                                                                  Commis - II chef at Hyatt Regency, New
                                                                                           FMCG and realty. Prior to this, Deo
the new Director of Human                                                                                                                                         Delhi in October 1996. His career stints also
                                                                                           held positions with Leela
Resources. Her portfolio includes                                                                                                                                 include working at Park Hyatt Goa
                                                                                           Kempinski in Mumbai, Taj
working with brands like The Unison                                                                                                                               and Fort Aguada Beach
                                                                                           Residency in Vadodara,
Hotels Group, The Leela Group                                                                                                                                     Resort, Goa as and the
                                                                                           Hotel Ramada in
and the InterContinental                                                                                                                                          InterContinental Goa.
                                                                                           Mumbai and others.
Hotels Group.




                                                                                                        Karim Makhlouf , Chief                                           Simon Wan, Chief Executive and
                                                                                                        Commercial Officer, Gulf Air                                     Managing Director, StayWell
                                                                                                        was in India to celebrate 31                                     Hospitality Group says, “I spend
                                                                                                        years of operations. He was                                      around two weeks every month trav-
                                                                                                        born in Germany and started                                      elling for work. Thus, my wife has
                                                                                                        his career with Lufthansa,                                       started calling me Mr Who,” he
                 Talking People is a special dedicated corner, created as a sounding                    where he worked for over 10                                      chuckles. When Wan is home, he likes
              board for who’s who of the Indian and International travel industry. With                 years. He loves the multicultur-                                 to spend time with his wife and two
              Talking People, it is our endeavour to bring you face-to-face with people.
                      Contributed by: Vivek Sethi, Dency Mathew & Megha Paul                            al environment in Bahrain,          Karim Makhlouf               daughters, aged 15 and 17. “I love         Simon Wan
                                                                                                        which he believes has strong        Chief Commercial Officer     cooking. It acts as the best rejuvena-     Chief Executive and
                                                                                                        resemblance with Indian ethos.      Gulf Air                     tion therapy for me. I grow my own         Managing Director,
                                                                                                                                                                                                                    StayWell Hospitality Group
                                                                                                        Makhlouf is passionate about                                     herbs and vegetables in my garden.”
                                 Patricia Yates, Director of Strategy and                               golf, cooking and fitness. He has recently been blessed
                                                                                                                                                                              Wan also likes sneaking in for a game of golf occasionally.
                                 Communications, VisitBritain has done her masters                      with a baby girl and loves spending time with his family
                                                                                                                                                                         He loves to watch action-packed movies. “Skyfall was the
                                 in Physics from Oxford University and treaded into                     that includes his wife and son.
                                                                                                                                                                         last movie I saw and thoroughly enjoyed it,” he says.
                                 travel writing, while working for a science journal.
                                 She is also a fellow of the Tourism Society and had
                                 joined VisitBritain just prior to London was
                                 announced as the host city of Olympics and
                                                                                                                                 Yann Gillet, General Manager, Park Hyatt Chennai was born and brought up in Pessac, a village
                                                                                                                                 next to Bordeaux in France, known for the Chateau Haut Brion. Hailing from a family of a physicist
                                 Paralympic Games. Yates loves travelling, reading
                                                                                                                                 father and three doctor sisters, Yann has travelled extensively as a child to countries that include
                                 and is also a fitness freak. “I firmly believe that the
Patricia Yates                                                                                                                   Sweden, USA, South Africa, Spain, China and many others. This, he believes, is where the first
Director of Strategy and         travellers today have a global vision and their needs
                                                                                                                                 seed of his passion for the hospitality industry were sown.
Communications                   should be addressed accordingly,” she says.
VisitBritain                                                                                                                          Gillet is an avid sports enthusiast with interests ranging from football, running and water
                                                                                                                                 sports. He is adept at sailing, surfing, kite surfing and windsurfing and has also been an instructor
                                                                                                                                 of the latter at Bordeaux. “I love running and am doing a 10 km run with absolute ease every
                                                                                                         Yann Gillet
                                                                                                         General Manager         weekend,” he says while talking about his daily routine.
                                                                                                         Park Hyatt Chennai
Postal Reg. No.: DL(ND)-11/6044/2012-13-14;
                                          WPP No.: U(C)-178/2012-14 for posting on 1st-2nd and 15th-16th
                                           of the same month at New Delhi P.S.O., RNI No.: 53492/91
                                                                     Date of Publication:30-12-2012


                                                  HIGHLIGHT

Affordable travel in 2013: Kuoni
Rajeev Wagle, Managing Director at Kuoni India is making all efforts to bring
out the best business models, marketing strategies and product lines with more
focus on FITs. He also plans to make travel more affordable for Indians.
                                  Why cautiously opti-                 are doing lot of stuff on the           Moreover, we are also
  A N I TA J A I N                mistic and not confident-            product, destination and dis-      working closely with our
                                  ly positive?                         tribution sides which we           Kuoni offices worldwide to
D     espite turbulence faced
     by the Indian tourism
industry in 2012, Kuoni
                                        This is because no one
                                  can take a beat on the growth
                                                                       believe will take us to much
                                                                       higher growth in 2013. We
                                                                                                          bring in more diverse knowl-
                                                                                                          edge of various destinations,
                                                                       are used to the new level of       better deals with suppliers
India comfortably managed         rates in 2013. I feel we are on
                                                                       rupee and we still have            and seamless experience for
to record single digit            the right track and might hit
                                                                       affordability as a plank. At       our customers in any part of
growth. However, with             the seven per cent GDP.
                                                                       Kuoni India, we are ready for      the world by consistent serv-
things looking cautiously
positive and pleasantly con-
                                  With more travellers                 this year with better hotel        ice under Kuoni umbrella.
fusing in 2013, the company
                                  searching online and                 deals, affordable travel pack-
                                                                                                          How will you make travel
is well-prepared with a solid
                                  gaining confidence in                ages, revamped distribution
                                                                                                          more affordable for
business strategy to record
                                  OTAs, what lies ahead                model, our spread out reach
                                                                                                          Indian travellers in 2013?
a higher double digit growth
                                  for the offline agents?              in the country and with
                                                                       our differentiated products              I think the industry
this year. Moreover, it is also         OTAs have done a great
                                                                       on-board etc.                      needs to do a lot of affordabil-
ready to take on its B2B divi-    job by opening up the travel
                                                                                                          ity. Our economy is growing;
sion - Kuoni Business Travel      market in the country. With                 There is a lot of growth
                                                                                                          our middle class travellers are
to the next level by bringing     seamless technology, they are        coming from Tier II and Tier
                                                                                                          becoming richer and need for
in more efficiency and tak-       really good at air ticketing         III cities and we are all set to
                                                                                                          travel is already implanted in
ing it to the international       and one-destination pack-            tap that growth. Also, after
                                                                                                          their head. So, if our travel
markets in a few years.           ages. However, complex and           consolidating our group tour
                                                                                                          packages become more afford-
                                  multi-destination       travel       business, we are now looking
                                                                                                          able, the overall economy will
The year 2012 witnessed           bookings market is still             at FIT (both high-end and
                                                                                                          benefit out of it. Thus by mak-
unstable global economy,          owned by offline agents. With        budget), a segment where we
                                                                                                          ing the price point cheaper,
drifting currency, fluctu-        evolving market, there is            want to make a difference.
                                                                                                          more numbers will travel. This
ating airfares, etc. How          place for both online and            This is now possible with our
                                                                                                          part can be worked upon by
will you see 2013 for your        offline travel agents. India is      strong IT system (CRM) in
                                                                                                          the industry, but, on the other
business?                         a unique market with a               place which enables us to
                                                                                                          side, government should fur-
                                  hybrid operating model (com-         service the customer at the
      During the first half,                                                                              ther open up our skies,
                                  pany with both online and            point of sale with good rates.
Indian tourism industry faced                                                                             improve air connectivity,
                                  offline presence).                   It will also help us maximise
tough times, but the second                                                                               develop infrastructure, etc.
                                                                       each line of product to cater
half was more pleasant with             Kuoni India has aspira-                                           India is one of the highest
                                                                       to every segment of traveller.
reforms coming from the           tions to go online, but we will                                         spending markets for various
government’s side like FDI in     never try to compete with                                               countries and thus there are
retail and aviation, regulating   any OTA as the business                                                 good numbers of NTOs pres-
the banking industry, amend-      model is different. We do                                               ent here. This shows our
ment Bill being passed, stock     have our website and high-                                              potential and it’s time to
markets performing well, etc.     light our products, but, for                                            make travel affordable. Let
These reforms proved to be a      bookings, we will direct the                                            more people travel and
boon for the Indian economy       customer to a branch.                                                   expand our market size.
making 2013 look more pos-
itive. A feel good economy
                                  Are you prepared for
makes people do discre-
                                  2013?                                                                    Trends in 2012
tionary spend and thus, trav-           Rupee drift-                                                        Trends of people travelling
el comes into picture. I think    ing with the econ-                                                        more frequently became
the general view is good.         omy and travellers                                                        more pronounced
Economy grew at 5.4% in the       down-trading was                                                          Category of travellers has
first half and is expected to     observed in 2012.                                                         been widened with travellers
end at 5.8-5.9%, which            Since it came in                                                          travelling with friends, family,
means second half is already      suddenly, travel                                                          in groups, etc
budgeted at higher level.         industry was not                                                          Travellers down-trading on
Since our tourism industry is     prepared for it. This                                                     their trips (cutting down
directly attached to the coun-    year we are better                                                        on number of travelling
try’s economy at macro level,     prepared. We still                                                        days, opting for short-haul
I’m cautiously optimistic         grew last year but we                                                     destinations,        selecting
about the growth opportuni-       did not meet our tar-                                                     domestic over short-haul
ties for this year.               gets. So this year, we    Rajeev Wagle, MD, Kuoni India                   international destinations etc)

Tti+jan13+1st

  • 1.
    Vol. XXV No.1; January 1 st fortnight issue 2013 A DDP PUBLICATION Pages: 44 (Excluding cover) ` 50/- travtalkindia.com ddppl.com
  • 3.
    JANUARY 1 STFORTNIGHT ISSUE 2013 TRAVTALK 1 travtalkindia.com ddppl.com India ready with a new approach Seaplanes to soar in The new initiative includes developing world-class infrastructure and training manpower. It also Indian skies includes undertaking aggressive promotional and marketing activities… With extensive the world-class infrastructure coastlines and T T B U R E AU Our ministry has prepared a and manpower and undertak- numerous lakes I ncredible India has lined up a multi-pronged approach to aggressively promote tourism in India, said K Chiranjeevi, Minister for ing aggressive promotional and marketing activities. The recently launched phase two of Incredible India campaign indicates a paradigm shift multi-pronged strategy to increase India’s share in World Tourist Arrivals in several parts of the country, State for Tourism with with the focus now being on Maritime Energy Independent Charge to the consumers. The emphasis is wildlife, breath taking “Tourism is now recog- global audience that had gath- on the fact that international mountains and vibrant nised as the driver of the Heli Air Services ered to witness the grand tourists can find their destina- festivals. In fact, India economic growth. It’s also finale of the World Travel tion or product of desire in bagged three prestigious reckoned as the best tool to K Chiranjeevi Minister for State for Tourism (MEHAIR) plans Awards in India. India,” said Chiranjeevi. India offers a wide variety of travel World Travel Awards (WTA), namely World’s Leading promote sustainable develop- ment and address the inclusive turing, etc. Another unique to introduce sea- “Our ministry has pre- pared a multi-pronged strate- attractions, which exhibit our traditional culture, Destination- India, World’s Leading Tourist Board- growth concerns. Tourism has the potential to stimulate other aspect of the tourism sector is that it provides employment planes in Kerala, gy to increase India’s share in ethos and modern outlook. Incredible India and World’s economic factors through even to the unskilled and Mumbai and Goa. World Tourist Arrivals. It Tourism also draws strength Leading Tourist Attraction- its linkages with a host of sec- semi-skilled manpower,” includes the development of in India from its diverse Taj Mahal. tors like agriculture, manufac- said Chiranjeevi. See full story on page 18 Lufthansa bags WTA Tourism needs a makeover? Experts believe that bringing change in orientation of the tourism industry as pro-poor sector and its ability to generate jobs will put its genuine demands on a stronger pedestal. VIVEK SETHI the top decision makers in the Professor Emeritus, London travel and hospitality industry School of Economics, who SanJeet, Director, DDP Publications presents the World Travel Award (WTA) to Axel Hilgers, Lufthansa’s Director-South Asia. The service has been adjudged as the World's Leading Airline- Economy Class. WTA has capped its year-long search for the most popular travel and tourism brands in the world with its glittering Grand Finale Gala T he interactive session called by the World Travel & Tourism Council, India Initiative (WTTCII) titled ‘Leading together. The four eminent panelists included Arun Maira, Member, Planning Commission, Parvez Dewan, Secretary, Ministry of Tourism, dwelt deep into various possi- bilities of making tourism a profitable and priority sector. Here are the excerpts from the various expert insights:- Ceremony in Delhi - NCR, India on December 12, 2012. The decision-makers of the industry attended the VIP evening, which was officially supported by the Ministry of Tourism Through Turbulent Kapil Kaul, CEO, South Asia, Tourism, Government of India, and hosted at The Oberoi, Gurgaon. Times’ in New Delhi brought CAPA and Ian Angell, Contd. on page 6
  • 5.
    BULLETIN MOT to studytax impact on tourism The ministry will conduct the study of comparison on the impact of excessive taxes on tourism viz-a-viz export industry and also with the competing neighbouring countries. T T B U R E AU T he Ministry of Tourism is now preparing to study the ground realities, as to create a more conducive business environment in the tourism industry. K Chiranjeevi, Minister of State for Tourism with Independent charge has IATO team with Tourism Minister Chiranjeevi (third from left) announced that his Ministry will conduct comprehensive tries,” said Chiranjeevi, and export industry status is as the export industry is study on impact of taxation while addressing the dele- given to the tourism industry, exempted from service tax on the tourism sector. gation of the Indian tourism will go up by at least whereas the tourism industry Association of Tour 50 per cent in the country. is not. This is resulting in “The ministry will con- Operators (IATO) in discrimination not only duct the study of compari- “Visa-on-Arrival scheme New Delhi. against the exporters, but son of the impact of exces- should be extended to all also against tour operators in sive taxes on tourism indus- The EC members of tourism-friendly countries. In the neighbouring countries try viz-a-viz the export IATO had met the minister in countries where Visa-on- like Sri Lanka, Nepal etc, industry and also the com- his office and apprised him of Arrival is not possible, e-visa who are not paying any taxes parative analysis on the tax the pertinent issues. Subhash should be issued for travelling and the business for India structure on the Indian Goyal, President, IATO to India. Indian tour operators is being routed through tourism industry with com- apprised the minister that if are being discriminated them,” Goyal added. peting neighbouring coun- Visa-on-Arrival is expanded against the physical exporters
  • 6.
    STATISTICS VIEWPOINT 1 bn tourists = 1bn opportunities According to the United Nations World Tourism Organisation (UNWTO), Together in 2013 one billion tourists have travelled internationally in 2012. This is equal to one in every seven people on the planet travelling the world in 2012, T he Travel & Tourism Industry is moving forward on a very positive note… The policy initiatives launched up from just 25 million in 1950. T T B U R E AU • US$ 1.2 trillion in exports nomic conditions, and is key to the power of one during the last two months of the calendar a year supporting the global economy billion tourists to affect year 2012 hold promise for more path- breaking measures that shall be rolled out T he figure establishes tourism as one of the world’s largest and fastest • Six per cent of world trade • Eight per cent of the in current challenging times. UNWTO forecast point- positive change making small changes to their travel behaviour. by in 2013. The two new marketing ed to the one-billionth tourist growing economic sectors. It exports of least developed The campaign, One Billion arriving somewhere in the campaigns covering both international and accounts for: countries world in December. UNWTO Tourists: One Billion • Nine per cent of global Opportunities, called on the domestic markets, followed up by a GDP (direct, indirect and For developing countries, chose December 13 as the one billion tourists to make symbolic arrival date of the comprehensive study on the fall-out of induced) tourism brings much needed- one-billionth tourist. their actions count by saving excessive taxation and setting up of a foreign exchange and invest- water and energy, using • One in every 12 jobs ment. Tourism has also proven To celebrate, the associ- public transport, protecting regional tourism promotion council in a worldwide (direct, indirect to be an extremely resilient ation ran a global campaign heritage and more. and induced) span of less than two months, further sector, despite uncertain eco- to raise awareness of strengthens our hopes for 2013. In 2012, a record one billion tourists crossed international New Year brings with it a feeling of good 1 out of 7 people travel in 2012 borders in a single year. will, cheer and relief. One more year has & how they make a difference Another five to six billion are estimated to travel in their own countries every year. gone and our business is doing well despite the global crunch. I don’t want to sound like a messiah or a doomsday nemesis, but if we want to reach international standards, then together as an industry we need to take a vow for 2013 to carry our business and this country forward with a feeling of pride and ownership. There are plenty of opportunities in India for it to be sold as a destination, bestowed with incredible travel offerings that have Source:@UNWTO:2012 plenty to satisfy the needs of all segments of travellers. To do this, even the smaller operators need to organise and work with a strategy: 1. Five years from now, what is the world going to look like in which we run our business? Tourism matters a lot 2. What will be the role of our company in this changed future? 3. What are the steps we need to take, starting today, to get there? We must learn to value our people as much as we value the opinion from the other captains of the industry. Ask them for their views, let them evaluate their own everyday work and fit it into the broader discussion of what to achieve in that time period. This will help us draw the path of operations, which will help in Source:@UNWTO:2012 achieving the desired targets five years from now. Wishing you all a wonderful New Year, filled with success and peace of mind. Vikramajit Editorial Advertising Advertising (Mumbai) TRAVTALK is a publication of DDP Publications Private Limited. All advice before acting on information contained in this publication The publisher assumes no responsibility for returning any MUMBAI: Suchita Saran Chairman Ratan Kr Paul Gunjan Sabikhi Branch Manager information in TRAVTALK is derived from sources, which which is provided for general use, and may not be appropriate material solicited or unsolicited nor is he responsible for 504, Marine Chambers, 43, New Marine Lines, Opp. SNDT College, General Manager for the readers’ particular circumstances. Contents of this material lost or damaged. Mumbai - 400 020, India, Ph.: +91-22-22070129; 22070130 Vivek Sethi Karishma Khanna Harshal Ashar we consider reliable and a sincere effort is made to report Megha Paul Sr. Manager Marketing Deputy Genral Manager accurate information. It is passed on to our readers without any publication are copyright. No part of TRAVTALK or any part of the SanJeet This publication is not meant to be an endorsement of any MIDDLE EAST: Devika Jeet Shailendra Shukla Priyanshu Wankhade contents thereof may be reproduced, stored in retrieval system Durga Das Publications Middle East (FZE) Publisher Asst. Manager Advertising responsibility on our part. The publisher regret that he cannot specific product or services offered. The publisher reserves the Anita Jain Sr. Manager Marketing Z1-02, PO Box: 9348, Saif Zone, Sharjah, UAE Dency Mathew Udit Pandey Rishika Karra accept liability for errors and omissions contained in this pub- or transmitted in any form without the permission of the pub- right to refuse, withdraw, amend or otherwise deal with all Ph.:+971-6-5528954, Fax: +971-6-5528956 Rupali Narasimhan Sr. Manager Marketing Sales Coordinator lication, however caused. Similarly, opinions/views expressed lication in writing. The same rule applies when there is a copy- News-Editor Geetika Pathak Advertisement Designers advertisements without explanation. Editorial Director by third parties in abstract and/or in interviews are not neces- right or the article is taken from another publication. An exemp- TRAVTALK is printed and published by SanJeet on behalf of Peden Doma Bhutia Manager Advertising Vikas Mandotia/Nitin Kumar Amit Sarkar sarily shared by TRAVTALK. However, we wish to advice our readers tion is hereby granted for the extracts used for the purpose of All advertisements must comply with the Indian and DDP Publications Private Limited Desk-Editor Design: Nityanand Misra Deepa Sethi Asst. Manager Marketing Sudhir Mudgal that one or more recognised authorities may hold different views fair review, provided two copies of the same publication are sent International Advertisements Code. The publisher will not be 72, Todarmal Road, New Delhi-110 001 Archana Sharma Ph.: +91-11-23710793, 23716318, E-mail: sanjeet@ddppl.com Editor Photographers Production: Anil Kharbanda than those reported. Material used in this publication is intended to us for our records. Publications reproducing material either liable for any damage or loss caused by delayed publication, error Sub-Editor Simran Kaur-Delhi Circulation: Ashok Rana Printed at Cirrus Graphics Pvt. Ltd. B-62/14, Phase-II, Raina Mandal Bharat Dangiya-Mumbai for information purpose only. Readers are advised to seek specific in part or in whole, without permission could face legal action. or failure of an advertisement to appear. Naraina Industrial Area, New Delhi - 110 028
  • 7.
    MOT JANUARY 1 ST FORTNIGHT ISSUE 2013 TRAVTALK 5 Say Namaste, Italia! Parvez Dewan, Secretary, Ministry of Tourism at the inauguration of the exhibition titled - ‘Italia comes to you’, highlighted the need to increase bilateral efforts to increase the two-way flow of tourists between Italy and India. VIVEK SETHI counterparts to enhance the by the Indian Tourism 94 per cent from India. We (L-R): Dewan and Bruschini at the exhibition bilateral flow of visitors Secretary. had received 1,97,000 trav- “L ike Italy, India has cities that are world- famous with great tourist between the two countries,” said Marco Bruschini, Director General, Italian “India is an important market for us. Over the last ellers in 2010 who consumed an equivalent of 4,61,000 overnights. We aim to further tions with our Indian travel and trade partners,” he added. The National Tourism the said exhibition in other BRIC countries successfully and was now held in Delhi attractions. However, over State Tourist Board reacting five years, Italy has witnessed strengthen these numbers by Board ENIT, instituted to and Bengaluru in December 2,00,000 Indians visit Italy to the gesture extended a tremendous growth of over also strengthening our rela- promote Italy had conducted 2012 over five days. p.a. while only half the num- ber of Italians come to India. Both countries need to enhance the bilateral flow of visitors and explore the true potential of tourism in both countries,” said Dewan. The Secretary, while discussing the withdrawal of the mandatory requirement of the two months gap for foreigners visiting India on a tourist visa, stated, “We need to build awareness about Indian cuisine and cin- ema, among many things to increase the flow of Italian visitors to India. The with- drawal of the mandatory gap for foreigners visiting will definitely function as an incentive for our Italian visi- tors, as well,” he added. On the other hand, “We are reinstating our National Tourism Board’s office in New Delhi from January. We will also undertake several initiatives with our Indian FTAs grow by 5.9% during Jan-Nov. As per the statistics released by the Ministry of Tourism, the Foreign Tourist Arrivals (FTAs) during the period January-November 2012 were 58.99 lakh with a growth of 5.9 per cent, over the same period in 2011, as compared to the FTAs of 55.72 lakh with a growth of 9.4 per cent during January- November 2011 over the corresponding period of 2010. FTAs during the November 2012 were 6.90 lakh as compared to FTAs of 6.70 lakh during the same month in 2011 and 6.08 lakh in November 2010. There has been a growth of 3 per cent in November 2012 over November 2011 as compared to a growth of 10.1 per cent that was registered in November 2011 over November 2010.
  • 8.
    6 TRAVTALK JANUARY 1 ST FORTNIGHT ISSUE 2013 NEWS Priya Paul is new Chairman, WTTCII Priya Paul, Chairperson, The Apeejay Surrendra takes over from Vikram Madhok, Managing Director, Ease taxation: A loud cry Contd. from page 1 Park Hotels has been appointed Abercrombie & Kent India, who completed his term at the Arun Maira, Member, Planning Parvez Dewan, Secretary, Ministry recently held AGM in Delhi. Commission- The travel industry has of Tourism We are willing to work The World Travel & Tourism a strong case to present to the with the industry to facilitate various Council, India Initiative government and get most of its measures and try to ease the permis- (WTTCII) was launched in year genuine demands addressed. But, sion seeking process, so that only a 2000 with a purpose to unite firstly, it requires itself to change its few permissions shall be required for key players from the industry image and portray itself as a sector various processes, like opening a to work closely with the that has immense job creation and hotel. But then having said that one Government and other stake- poverty alleviation potential. The Arun Maira needs to keep the federal set-up of Parvez Dewan travel industry needs to understand Member our country in mind. Everybody Secretary Priya Paul that like the tourism and hospitality Planning Commission needs to understand that the central Ministry of Tourism Chairman, WTTCII government can help them only to a sector, all the industries want tax concessions from the government. Here, change in orientation certain extent. as the Chairperson and Dipak of the tourism industry as pro-poor sector and its ability to Deva, CEO, Destination generate employment will put its case on a stronger pedestal. Management, India & South Kapil Kaul, CEO, South Asia, Asia, Kuoni Destination CAPA - The aviation sector in India Ian Angell, Professor Emeritus, had long been selling below costs. Management has been London School of Economics- The under recoveries had been appointed as the Vice Dipak Deva Excessive taxation is bad. In circum- huge and are contributing to the Chairman of WTTC, India Vice Chairman, WTTCII stances where it’s possible for a present position. One needs to Initiative 2013 at the recently project to pay for it, the government understand that the Incredible held Annual General Meeting should support it to pay for itself India tourism can’t stand without a of the World Travel & Tourism holders to address issues of through measures like tax holidays healthy aviation sector. After so Council, India Initiative concern and advocate policy Kapil Kaul and other incentives. CEO many years, the demand and supply (WTTCII) in New Delhi. Paul, directives to support the devel- South Asia dynamics look favourable to the who was the Vice Chairperson opment of the Travel & Ian Angell of WTTCII for the year 2012, Tourism sector. Professor Emeritus Indian airlines. London School of Economics ‘India, China to lead Aviation this year’ According to IATA, India, China and Latin America would continue to lead the growth next year in the global aviation industry which would improve its profit from USD 6.7 billion to an estimated USD 8.4 billion. Excerpts from speech by Tony Tyler during the IATA event. T T B U R E AU the past year are slots and a priority, the IATA Board of sions to this - cost and avail- concession agreement might passenger rights. Europe pre- Governors asked us to defend ability. As governments have prevented it. We W hile Chinese domestic market continues to expand ‘very strongly’ sented initial proposals for an Airports Package of legisla- the global system. And yes- terday, we had good news struggle with tight budgets, many are looking to the pri- have seen progress in India since our protests. The tion which included some from the European vate sector for help in devel- Minister has directed despite a slowdown earlier very positive changes such as Parliament that the corner- oping airport infrastructure. the airports to remove this year, the Indian market, the introduction of greater stones of the Worldwide Slot India, for example, devel- airport development fees. by contrast, went into a competition for ground han- Guidelines have been main- oped Delhi into a first class That challenge now is to get ‘sharp reverse’ in 2012 dling services at European tained. And it is not just hub airport with the partici- that implemented. following the problems airports. But it also proposed Europe. We are working in pation of private partners. faced by Kingfisher Airlines changes to the regulation of China, Colombia, India, The facilities are great. But and the slowdown in Tony Tyler slots which would have taken Mexico, Poland, the UK the structure of the conces- Taking off the Indian economy. Director General and CEO Europe away from some basic and the US, among other sion agreement requires the Following are excerpts from IATA Europe presented initial principles of the global best countries, to defend the concessionaire to return 46% a speech by Tony Tyler, proposals for an Airports practices which are codified appropriate application of of the top line revenue to the Director General and CEO, Package of legislation which (and safety for that matter) is in the Worldwide Slot the global system. government. And this year, IATA during the event: included some very positive global standards, the same is Guidelines. Among other after a long process, the reg- We are also keeping a true for much of the way that things, the use-it or lose-it Infrastructure ulator approved a 346% changes such as the introduction of greater competition for ground close watch on regulation. the industry is regulated. rule would have been Growth can be facilitat- increase in charge. That’s handling services at European Just as the solution for avia- Some areas which have been changed to 85-15 from the ed or inhibited by infrastruc- unacceptable for the indus- airports tion and the environment particularly newsworthy over globally accepted 80-20. As ture. There are two dimen- try. And a more realistic
  • 9.
    EXHIBITIONS JANUARY 1 ST FORTNIGHT ISSUE 2013 TRAVTALK 7 Witnessing innovations@FITUR 2013 At FITUR 2012 in Madrid, around 1,800 trade appointments took place at different workshops that were organised within the framework of the fair. FITUR Know-How & Trade Institute (ICEX). It products and services, and this is a characteristic that and have produced some T T B U R E AU Export Forum, which seeks aims at promoting the value to buyers from other sets the fair apart from excellent results in the past, to add a value-added dimen- of expertise and experience foreign markets. other events. in terms of providing access A ccording to its Ana Larranaga, Director, FITUR 2013 promises much sion to the business and innovation prospects of com- within the tourist industry as a means of boosting inno- Gateway to Latin Exhibitor’s delight to new markets, strategic alliances and trade more, as it has enhanced its panies operating within the vation and development. America and more These B2B meetings opportunities. These trade field, is promoted by the fair, Around 30 companies will FITUR effectively serves will take place within the meetings have proven to legacy of niche B2B platforms in conjunction with SEGIT- present their potential, as a hub for the Latin framework of the Third be highly effective in and tools that are made avail- UR and the Spanish Foreign know-how and experiences, American tourist market Hosted Buyers Workshop previous years. able to its travel trade part- ners. This will cater to the exhibitors’ delight and con- tribute important perspective to the industry on pertinent global developments. The Ana Larranaga Director FITUR The strong attendance of international tourism professionals reflect their interest in FITUR director elaborates more on leading FITUR as the gateway to the Latin American markets and more. Excerpts:- Strategic B2B forums and tools Larranaga says that FITUR is committed to the idea of innovation, always based on new trends and new market needs. In this respect, in addi- tion to its most important new initiative on this occasion, in the form of the business forum known as FITUR Know How & Export, the fair will incorpo- rate a new forum devoted to wine tourism and hotels, as well as others that focus on various areas of interest or of up-and-coming importance within the tourism business, such as tourism efficiency (FITUR Green), the application of technology in tourism (FITURTECH) and the spe- cialised sections known as FITUR LGBT, Receptive Tourism Spain and FITUR Active. “All of these initiatives, offer important tools to tourism professionals and in this respect, we seek to make our contribution to the future growth of the tourist industry,” she says.
  • 10.
    HOTELS Kolkata airport boostsbiz With rise in the number of existing flights, introduction of new routes and ever-increasing tourists, hospitality development will also rise. speaks to some eminent stakeholders to get their views on the same. M E G H A PAU L league of hotels - the business to be operational by hotels that will cater exclusive- 2013-14.” The occupancy T he new Kolkata airport has been upgraded to handle 20 million passengers, ly to the MICE segment, he adds. With a focus to promote the East as a potential tourism will also increase, if the Government is able to attract investment to double the current capacity. hub, CII has been hosting the the city. The success of Saugata Mukherjee MJ Robertson Marco Saxer Regional Director - Co-Chairman Tourism Committee - Bengal General Manager Eastern Region CII Chamber of Commerce & Industry Swissotel Kolkata The development The new airport Companies at the airport will will bring more would like to have positive hospitality showcase the effects on the business and new airport to hotel industry in relieve air their colleagues Kolkata congestion and partners The initiative of Airports event Destination East, the their efforts will also Authority of India (AAI) to first B2B event in the region. reflect on occupancy, transform Kolkata airport into The airport development will he points out. a hub for South-East Asia will boost this event as well. The According to Marco soon be a reality. The new third edition of ‘Destination Saxer, General Manager, integrated terminal in the East’ will be organised from Swissotel Kolkata, the new ter- upgraded Kolkata airport is to February 8-15 in Kolkata, minal will help Kolkata to be fully functional by the first he informs. achieve greater number of quarter of 2013. Industry MJ Robertson, Co- visitors. Not only corporate, leaders see a big spurt in the chairman, Tourism but more of transient guests hospitality development in Committee - Bengal Chamber will now frequent the city. the region. of Commerce & Industry MICE and smaller meetings Saugata Mukherjee, opines, “The new airport will will be held in Kolkata as many Regional Director - Eastern not only bring in more hospi- companies in Kolkata would Region, CII feels, “An increase tality business, but will also like to showcase the new air- in international flights is antic- relieve the considerable con- port to their colleagues and ipated, as Kolkata is the only gestion presently seen at the partners, he comments. The gateway to all of eastern India. existing airport. It will also General Manager expects a Also, with the increase in provide the much-needed rise in occupancy from the inbound footfalls from ASEAN support to the airlines to existing 76 per cent to over 80 and the Far East, expand operations in the per cent. The ARR should also destinations in this region eastern sector.” witness some growth of have also been growing. almost 20 per cent. To cash in Hospitality growth can never Regarding the boost to on the new airport, the hotel happen in isolation and these the hospitality sector, will tie-up with the local cor- developments will surely affect Robertson says, “There are porate houses and airlines. the hotel industry in Kolkata a number of hotels coming “We have teamed up with positively.” Also, with more up on the connecting road airlines flying to Kolkata and number of MICE travellers that from the airport. Big-ticket have optimised the search might visit the city now, operators are in the fray engine for our hotel on Kolkata will witness a new and the hotels are all slated the web,” he adds. 1 lakh footfall in Kite Festival A two-day Delhi lakh footfall on both the days. ture this festival in its regular International Kite Festival was According to GG Saxena, extravaganza. Going forward, organised by Delhi Tourism & Managing Director and CEO, Delhi Tourism will bring back Transport Development Delhi Tourism & Transport the successful and much- Corporation (DTTDC), in asso- Development Corporation awaited food festival - Dilli Ke ciation with the Delhi govern- (DTTDC), Delhi Tourism plans Pakwaan. The festival will be ment on December 8-9. The to promote more of these old held at Baba Kharak Singh festival witnessed around one fading traditions and will fea- Marg from December 24-30.
  • 11.
    NEWS JANUARY 1 ST FORTNIGHT ISSUE 2013 TRAVTALK 9 Gujarat gets ready with ITTHE 2013 As an integral part of the Vibrant Gujarat Trade Show, TAFCON is organising the International Travel Tourism Hospitality Expo (ITTHE) 2013 under the aegis of the Government of Gujarat from January 8-13. T T B U R E AU nated government cam- end break or longer holiday 25 countries. ITTHE 2013 all over the world showcase bound tourism. It will also paigns to promote to their trip. Foreign tourists will be an ideal platform for a diverse range of tourism see tourism professionals G ujarat is one of the most proactive states when it comes to taking initiatives in ‘Incredible India’.” Owing to the booming IT and out- sourcing industry, a growing spend more in India than almost any other country worldwide, he added. both national and interna- tional tourism organisations to meet, collaborate and dis- products. The Expo presents a perfect platform for both local and international trav- from India and around the world showcase a diverse range of accommodation the tourism segment. Adding number of business trips are cuss inbound and outbound el and tourism organisations options, breathtaking another feather to its cap, made by foreigners to India, The expo is expected to tourism. It will help the to collaborate and discuss tourism attractions and new there is another interesting who will often add a week- have participation from over tourism professionals from inbound, domestic and out- airline routes. initiative coming up. At the IITHE 2013, hoteliers and other stake holders can explore new market products, services and destinations, sign long-term deals, meet M L Wadhwa CMD TAFCON India’s tourism industry is experiencing a strong growth, driven by burgeoning Indian middle class, rise in high-spending foreign tourists and government campaigns top international buyers and generate sales leads. Besides this, they can meet existing customers and channel part- ners, recruit new agents and distributors and launch new products and packages at must-visit show of the year. Talking about the much-awaited event, ML Wadhwa, CMD, TAFCON pointed out, “India’s tourism industry is experi- encing a strong period of growth, driven by the bur- geoning Indian middle class, growth in high-spending foreign tourists and coordi- Meeting Point ITTHE 2013 will be an ideal platform for both national and international tourism organisations to meet, collaborate and discuss inbound and outbound tourism
  • 12.
    HOTELS Moving ahead withcaution Saurabh Rai Bhatnagar, Regional Director (South Asia), Preferred Hotel Group, talks about commitment to consolidate the existing portfolio along with the future growth in key business and leisure cities in India. M E G H A PAU L alliances owing to the diffi- cult financial conditions as C hicago-based Preferred Hotel Group is targeting an increase in its clientele to these are anyways niche products.” The group typical- ly works on a five-to-seven 35 hotel members in India by year contract with the hotel; the end of April 2014. “Over which is relatively shorter the next 18 months, we plan given the average duration of to have 35 member hotels. I management contracts of am very confident that we the hard brand operators. will achieve these numbers,” “However, despite having a Bhatnagar said. shorter term contract, we Saurabh Rai Bhatnagar South Asia Regional Director have over 95 per cent reten- The company currently Preferred Hotel Group tion rate,” he revealed. has 29 hotels, including New Delhi-based Imperial and Confirming that the The Leela Palace New Delhi of hotels in the market, we OTAs are a fundamental part as its members. In its are fully committed to deploy of online travel, Bhatnagar 10-year old operations in the our existing infrastructure for emphasised, “We consider India market, the member our long-time partners by them as partners and we hotels are present in all six adding to their competitive would like to ensure that we brands, from five-star luxury strength,” he added. will continue our regional Preferred Hotels and Resorts channel management. For Going forward, the to four-star Sterling Hotels retail, an OTA will pull in an group will also look at and Sterling Design. “We are entire inventory of the hotel, reassessing its relationship looking at both business and henceforth, we have with member hotels. He and leisure destinations to tied up with over 140 key pointed out, “Our prime expand our portfolio of Online Travel Distribution objective is to increase the travellers,” he revealed. (OTD) companies around brand presence of the hotel the world.” In the changing sce- and its profitability. So even nario, where hospitality busi- if one of these get realigned, ness has been hit worldwide, it is important to reassess the Future Talk the group is moving cautious- relationship. While hotel ly in India as well. According owners are riding through It is of utmost importance that to Bhatnagar, growth in India choppy waters, it would not utility of the existing hotels cannot just be defined by be surprising if owners are ought to be maximised numbers. “In our business pushed to take some harsh While hotel owners are riding proposition, it is of utmost decisions such as selling their through choppy waters, importance that utility of the hotels or letting it go to owners may be pushed to existing hotels ought to be another operator. We do take some harsh decisions maximised. With new supply anticipate changes in such as selling their hotels Visit Finland adds X-Mas fervour Visit Finland invited travel trade to celebrate the spirit of Christmas and mood of the coming New Year with Santa from Lapland in New Delhi, which was very well attended by its travel trade partners.
  • 13.
    STATES JANUARY 1 ST FORTNIGHT ISSUE 2013 TRAVTALK 11 Uttarakhand lays out the welcome mat The Nanda Devi Raj Jatt is going to be held after 12 years in 2013 and the state tourism board is ready to attract visitors, especially during this festival. Focussing on religious tourism, Uttarakhand is also promoting adventure. Himalayas and the Reserve, Corbett National years who come to T T B U R E AU revered Ganges. Park and Rajaji National visit Gangotri, Yamunotri, Park. The national parks are Kedarnath and Badrinath, the D omestic tourist visits to Uttarakhand increased from 1.9 crore in 2007 to Uttarakhand has 65% forest cover and thus is home ideal for those seeking the call of the wild. Till now, four most holy pilgrimages know as the Char Dham. to the ‘Valley of Flowers’, the Uttarakhand has welcomed Now, the government is also 2.66 crore in 2011, repre- Nanda Devi Biosphere pilgrims for thousands of promoting ‘village stays’. senting 4.1% growth. The foreign tourist visits increased from 96,000 in 2007 to 1.14 lakh in 2011 showing a 0.73% increase. For 2012, the tourism board expects these numbers to rise further and is going all out to attract more tourists. The State recorded good growth in the tourism sector and has prioritised this indus- Poonam Chand Regional Tourism Officer Uttarakhand Tourism try due to the festival. Efforts to get Uttarakhand recog- nised worldwide as a tourism destination are underway. In 2013, the tourism board is going all out to pro- mote Nanda Devi Raj Jatt, an important spiritual and cul- tural festival of Uttarakhand, which takes place after every 12 years. This legendary yatra will take place for the first time after the State’s formation. It would take place from August 29 to September 16, 2013 and will witness hundreds of thousands of devotees and enthusiasts from across the world. It will cover a long trek of about 280 kms with 18 halts on the way at an altitude of 3,960 metres in 18 days. Uttarakhand is seen as fount of spiritual energy. Everyone cherishes coming to the hilly state to rejuve- nate oneself by the virtue of its pristine beauty, wildlife, natural environs and places of religious and pilgrimage importance. It is ideal for tourists seeking peace and tranquillity, along with leisure and adventure activ- ities. The State has a perfect blend of spiritual, adventure and nature. The charm of meditation, spirituality, yoga, rural tourism, skiing, trekking, rafting amidst the fascinating views of mighty
  • 14.
    HOTELS The Address Hotels& Resorts India shining for Dubai Address The discerning Indian traveller has made it to the top list of The Address Hotels & Resorts, a Dubai-based five-star premium hotel of Emaar Hospitality Group with an average of 3-5 nights. T T B U R E AU about deriving true value for ations in India for The Address money. With our portfolio of Hotels & Resorts over the last I ndia is among the top five markets for us. This has set an all-new definition for glob- The Address Downtown Dubai, The Address Dubai Mall, The Address Dubai three years. “We have success- fully extended our reach in Delhi, Mumbai and Bengaluru al standards in luxury hospi- Marina, The Address through our Indian partner. tality, says Seema Pande, Montgomerie Dubai and The Going forward, we look for- Group Director, Sales and ward to strengthening our Marketing of The Address reach in Chennai and Hotels & Resorts. Ahmedabad,” said Pande. “India has pleasantly “We value all our B2B surprised us with a fabulous partners and are always acces- increase in the numbers of sible to all our, small, medium top-end business in leisure, and large travel partners. We FIT, corporate and MICE are fortunate to have an equal front. With increase in the balance of corporate and family travel from India, we leisure travellers and the have witnessed an impres- weekdays are as good as sive growth in Indian wed- weekends. Even though we dings and engagements at Seema Pande have multiple teams taking our properties. The Indian Group Director, Sales and Marketing care of various travellers, we families with members The Address Hotels & Resorts remain accessible and value all spread all over in USA, UK, our small, medium and big Europe and other parts of the Palace Downtown Dubai, we B2B partners,” she stated. world, find Dubai to be an expect to close our 2012 year easily accessible destination with over 10-15% growth with adequate air connectiv- from the Indian market. We ity and a welcoming visa are also looking at expanding India Market & Address regime,” informed Pande. our presence in key destina- India is among the top five “The Indian visitors tions in the Middle East, North markets for us spend on an average of 3-5 Africa, the Indian subconti- nights and are among the top nent, South Asia and Europe,” We expect to close our 2012 spenders. Indians are willing she added. The Nijhawan year with over 10-15 per cent to spend on premium products Group has been taking care of growth from the Indian market only when they are convinced the sales and marketing oper- Jumeirah set to enter India The Group signs the first management agreement for a Mumbai property. They are also involved in advance negotiations on potential projects. A N I TA J A I N our group properties, with room night occupancies I n February 2012, reported the interest of Dubai-based luxury hotel improving by close to 50 per cent year-on-year. We have set our sight on city centres management group - and resort destinations like Jumeirah Hotels, Resorts & Mumbai, New Delhi, Residences to enter the Bengaluru, Hyderabad, Goa Indian hospitality sector. In a and Kerala. latest development, the group has recently signed its The need for five- first management agreement star hotels in India for a five-star property in Gerald Lawless Lower Parel area of Central President & Group CEO has been growing Jumeirah Group Mumbai. The property is and we are happy to expected to be launched by worldwide. At the macro have initiated the 2017 and will house about level, Jumeirah will adhere to first phase of our 470 spacious rooms, suites and apartments along with its core business in India; expansion in India managing luxury and five- with our first wide range of banqueting and star hotels and resorts using F&B services. The name of an asset light approach. project in Mumbai.” the property, investment details and additional facts Gerald Lawless, The group currently will be disclosed by mid President & Group CEO, operates 20 luxury hotels 2013. The group's operating Jumeirah Group said, “India and serviced apartments, model is expansion through is one of the major players in including 10 in the UAE, the acquisition of manage- the global hospitality and seven in Europe, seven ment contracts in both key tourism industry, particularly in the Maldives and 1 in gateway cities and aspira- Asia. It is currently the third China with 15 additional tional resort destinations fastest growing market for under development.
  • 15.
    HOTELS JANUARY 1 ST FORTNIGHT ISSUE 2013 TRAVTALK 13 Bengaluru gets its The Khyber Himalayan Resort & Spa first Marriott Hotel Marriott Hotel Whitefield, Bengaluru city’s first Marriott sits atop the newest mall IT hub in India and also has a GDP growth four times that of Bengaluru city. Adding value to the Valley Inorbit. It has one of the largest ballrooms in the city Although the city has a lot of hotels but in Whitefield The new Gulmarg enterprise will aim at converting hordes of tourist day with 2,500 sq metres of area, there is yet a dearth of trips to Gulmarg into overnight stays and more. outdoor space. The hotel rooms. There are no interna- has 324 rooms, including 17 tional five-star hotels in this T T B U R E AU year, the growth story area at this given point and of increasing footfalls only time. Whitefield not only houses most of the Fortune 500 companies but also has a W ith peace prevailing in Kashmir, tourism has now got a boost in the Valley. got better. However, now the problem that still looms large is the issue of steadily growing residential With an unprecedented 10.73 accommodation. population. The area itself is lakh tourists till September about 18km from the heart of Addressing this dilem- the city. The city roads ma is The Khyber Himalayan are choc block almost all Resort & Spa in Gulmarg. through the day, and residents The resort opened its doors Matthew Cooper prefer to stay in Whitefield on December 21 last year. General Manager over the weekend, constantly The 85-key resort is Marriott Hotel Whitefield Gulmarg’s first luxury resort looking for places to go to. and is spread over seven There are also plenty of com- suites. The executive lounge panies around the hotel and acres and located at an eleva- time and return to Srinagar “We are eyeing tion of 8,825 ft in the at night. Thus, the objective the inbound on the 15th floor offers the view these companies have ample Pir Panjal range of the of the hotel is to convert the of Whitefield and is available Marriott Rewards members Himalayas while overlooking day trips to overnight trips.” market, specifically to guests staying on the exec- who are currently staying the Affarwat peaks. the travellers utive floor to conduct business elsewhere. Given this “Right from its opening and meetings. scenario, the hotel is bound Alex Koshy Supporting the desti- on December 21, the hotel who visit Gulmarg Talking about the to do well.” General Manager The Khyber Himalayan Resort & Spa nation with the hotel, Alex was sold out for the first two for skiing choice of location for the The hotel property is also Koshy, General Manager, weeks,” he adds. during winters The Khyber Himalayan hotel, Matthew Cooper, banking on the MICE segment 30 in 2011, it seems that the Resort & Spa said, “All Being the best skiing while during General Manager, Marriott to boost their occupancy, since summers, we will love for Kashmir has been tourists include Gulmarg in destination in India, the hotel Hotel Whitefield, says, the hotel houses a large func- “Bengaluru’s business hub is tion space. The hotel estimates rediscovered. This is a first, their itinerary. However, is targetting skiing enthusi- eye the domestic as it is the highest number of owing to the dearth of good asts all over. “Domestic travel tourists,” the clearly moving to micro-mar- the business mix to be about tourist arrivals in the state, hotels in the region, they is still at its peak during the kets. Whitefield is the largest 80:20 in the initial period. over the past 25 years. Last visit Gulmarg during day- summers in India.” GM reveals.
  • 16.
    NTO More than juststop-overs For the first time, Turkish Hoteliers Federation hosted a 5-city roadshow in India to focus on the varied destinations such as Istanbul, Cappadocia and Antalya. T T B U R E AU I n 2011, Turkey received 31.4 million foreign tourists of which 74,000 were from India. In 2012, from January to September, the arrivals from India reached 66,700. In a bid to hard-sell itself as a business and leisure destination in India, the country is now tar- getting a 30 per cent growth Emin Cakmak Ozgur Ayturk Founding Chairman Culture and Tourism Counsellor to get more than one lakh Turkish Healthcare Travel Council Turkey Indian arrivals by 2013. This is the first time the The motive for Turkey has Turkish Hoteliers Federation has organised a roadshow in this roadshow planned India. Emphasisng on wed- is to convert workshops and ding, golf and honeymoon des- tinations such as Istanbul, this transit joint marketing Cappadocia and Antalya, Emin Cakmak, Founding Chairman, business events with Turkish Healthcare Travel into overnight leading Indian Council pointed out, “India is one of the key markets for stays tour operators us and the positive growth rate of Indians visiting Turkey has strengthened our Turkey has planned 2013, we have also increased confidence in the market. media and ad campaigns apart our promotional budget, which Currently, a chunk of Indian from workshops and joint mar- has been earmarked for US$ travellers visit Turkey only as keting events with leading two million. We will be spend- a transit destination. The road- Indian tour operators. Revealed ing nearly US$ 1 million for show is to convert these Ozgur Ayturk, Culture and media and advertisement cam- transits into overnight stays Tourism Counsellor, Turkey, “In paigns as well.” in the country.” VisitBritain ups promotion In a strategic initiative, it announced partnership with Yatra.com in New Delhi. Both entities will work on promoting new itineraries via a 3600 media campaign. T T B U R E AU the end of December. The through our TSI-Yatra initia- print campaign will kick-start tive. It has over 3,000 B2B I ndia remains one of our most important inbound markets,says Patricia Yates, in mid of January to be fol- lowed up by an intensive online campaign. The idea is partners, which will help us make the strategic alliance into a successful partner- Director - Strategy and to create various new itiner- ship,” Dev Added. Communications,VisitBritain. aries spread across 5-12 days. Yatra.com has already “This partnership will help They can cost anywhere done successful joint cam- us to broaden our appeal as between ` 90,000-2,25,000, a special destination and promote all that is great about Britain, as to capitalise on all the positive mega cov- erage after the London Olympics. Indian tourists can very well choose from a tour of Buckingham Palace, see- ing the sunrise at Stonehenge or watching a cricket test match to name a few,” she says. (L-R); Neeraj Singh Dev, Patricia Yates & Shivali Suri which can be customised fur- paigns with other destina- The joint promotional ther and they will deliver on tions such as Thailand and initiative is estimated to be the Indian aspiration to visit Malaysia. According to Dev, over £ 100,000 and will be tourist attractions beyond Yatra.com has seen growth in beamed across electronic, London.” its visitor arrivals to Britain print and B2B channels. by over 50 per cent. Here, Neeraj Dev, Head- “The B2B players in VisitBritain on the other Outbound Product, Yatra.com India will also be able to ben- hand, has set an ambitious added, “We aim to utilise the efit from our strategic target of welcoming over star power of Salman Khan to alliance, as they can sell the 5,00,000 Indian visitors engage with the audience. various itineraries that will by 2012. The first TVC will go on air by be a part of our campaign
  • 17.
    ASSOCIATIONS JANUARY 1 ST FORTNIGHT ISSUE 2013 TRAVTALK 15 IAAI National Convention in January IATA Agents Association of India (IAAI) is organising its National Convention from January 24-26, 2013 in Mumbai. The theme for this year’s convention is, ‘Emerging Challenges and Opportunities in the Aviation Industry’. issues and are working to The main business ses- discuss survival strategies convention will be very busi- widespread awareness T T B U R E AU put airlines, travel agents sion is, ‘ASHA: Agents semi- and different ways to handle nesslike and professional. We about such important and GDS on the same plat- nar on Handling Adversities’, these issues,” he adds. are also planning to circulate issues,” adds Eapen. I AAI had decided to con- duct its IAAI biennial National Convention (ICON form that will help us debate relevant issues and which they feel, assumes humongous significance at a There will be four to a white paper discussing the tragic difficulties faced by the IAAI hopes this conven- address all uncertainties,” juncture when airlines, GDS five business sessions along industry and address issues tion will help evolve new 2013) from January 24- 26, said Biji Eapen, National and Travel Agents are strug- with the annual general such as weekly payments strategies in the present and 2013 at The Retreat, Hotel & President, IATA Agents gling for co-existence. “In the meeting and the elections and highlight its misfortunes an all the more challenging Convention Centre, Mumbai. Association of India (IAAI). business session, we want to during this convention. “Our for us. We want to create aviation industry. About 400-500 members of the travel fraternity from India are expected to attend this convention. The associ- ation feels that this conven- tion will add extra mileage in promoting India Tourism. The theme of ICON 2O13 is, ‘Emerging Challenges and Opportunities in Aviation Industry’. Biji Eapen National President IATA Agents Association of India We are planning to circulate a white paper discussing the tragic difficulties faced by the industry and address issues such as weekly payments “Under this theme, we will address the biggest challenges faced by the industry today. We want to provide meaning to the Premium economy class in Cathay Starting January 1, 2013, Cathay Pacific Airways is introducing its new Premium Economy Class cabin along with Business Class on Chennai-Hong Kong route. Following the recent increase of Chennai flights, from four times a week to a daily serv- ice, Chennai will be the first city in South India to offer a three-class configuration – new Business Class, Premium Economy Class and the new long-haul Economy Class for passengers travelling.
  • 18.
    16 TRAVTALK JANUARY 1 ST FORTNIGHT ISSUE 2013 FAMILY ALBUM LPTI sets mood for festivities Le Passage to India (LPTI) organised its annual cookout to bring together the travel trade partners and set the jovial mood for ushering in the year-end celebrations, which was held on December 22, 2012 at the Select City Walk. Jyotsna Suri is new FICCI Vice President It is the first occasion, when a popular figure in travel and tourism has been bestowed such an honour. Her popularity is evident as she was recently voted as the most popular woman in a survey conducted by . T T B U R E AU She has been the has been bestowed such hon- survey was overwhelming Tour operators (IATO) Chairperson of FICCI Tourism our. Her popularity is evident and Suri had registered a annually to the most J yotsna Suri, Chairperson & Managing Director, The Lalit Suri Hospitality Group Committee for the last five years. Under her leadership, FICCI introduced ‘The Great as she was recently voted as the most popular woman in the travel industry survey clean sweep over other nom- inees. Lately, Suri was also conferred the ‘Hall of Fame prominent personalities, who have contributed to the growth of Indian has been elected as the Vice India Travel Bazaar’ in 2008 conducted by . Award 2012’ by Prithviraj tourism. Suri has created President of FICCI at the 85th and ‘The Great Domestic Chavan, Chief Minister of many new benchmarks in Annual General Meeting Tourism Bazaar’ in 2011 – two This was a survey done to Maharashtra at the 28th IATO the tourism industry by fol- of FICCI held in December heavily-attended events facil- recognise and felicitate Annual Convention held at lowing her dictum of 2012. Suri has been vocifer- itating tourism business inter- women, who have achieved NCPA, Mumbai in September. ‘Developing the destination ously promoting Indian actions. It is the first such exemplary results in the field and not just hotels’, Jyotsna Suri tourism both nationally and occasion, when a popular fig- of travel and tourism. The The Award is given by which has won her many Vice President , FICCI internationally. ure in the travel and tourism response received from the the Indian Association of accolades.
  • 19.
    AVIATION Emirates: Confident ofIndia Emirates launched a network wide ‘fare promotion’ campaign, renewed partnership with Jet Airways and also introduced unique packages to increase loads from the Indian market. T T B U R E AU in aviation being relaxed this year, it is a matter of time I nternationally, India is the biggest operating market (in terms of number of cities before international carriers decide to participate.” Moving forward, the airline is connected to Dubai) for optimistic that the industry Emirates Airline with 185 will record a positive growth weekly flights from 10 Indian in 2013. “Airlines venturing cities. With an average load into newer markets and of over 70 per cent on every expanding their current net- route in India, the airline is work will be a key. not looking at expanding its Consolidation in some mar- operations but consolidating Essa Sulaiman Ahmad kets will take place while in Vice President – India & Nepal on current routes. It has Emirates Airline others operators will look to recently renewed its partner- pool resources and reduce ship with Jet Airways under their costs. International which all the Emirates fre- Talking about India as LCC’s will continue to grow quent flyer members have an aviation market, Essa and prosper with areas options to fly on five daily Sulaiman Ahmad, Vice such as back-offices, ground direct flights of Emirates and President – India & Nepal, handling and cargo logistics, daily flights of Jet Airways on Emirates Airline said, becoming outsourced,” Mumbai-Dubai route. adds Ahmad. Moreover, considering India “Our focus on India Furthermore, Ahmad being a late booking market, remains where explained about some very the airline also introduced a it is bullish and promising trends in the network-wide fare promotion from November 23- confident and that industry in 2013. The airline expects a substantial increase December 2, 2012 for travel we are operating in in the number of MICE trav- between January 21-June a fundamentally ellers with many global 10, 2013, offering maximum strong economy. events and is expected to attract tourists from across the globe. Leisure travel is Growth chart for 2013 expected to rise around the Emirates will launch services to Warsaw and Algiers in February mid-year period as the indus- and March 2013 respectively, adding to its global network of 128 try approaches the summer locations, while its fleet will also increase as the airline takes delivery vacation period. Adding to of new aircraft. The airline has 212 aircrafts on order worth USD this, will be a good amount of 62 billion and is the leading customer of the Airbus A380 with 27 student traffic during the in its fleet and 63 on order. peak admission time of April – September. “All in all, I 60 per cent and minimum Taking into account the would say the year 2013 30 per cent discount on long-term potential of the looks exciting for the industry select routes to encourage Indian market, our operations as well as Emirates,” con- early bookings. reflect this outlook. With FDI cludes Ahmad. Lounge@New Delhi Railway Station IRCTC has unveiled its swanky new "executive” waiting lounge at the Ajmeri Gate entry point of the New Delhi Railway Station. For ` 300 a person, one can now enter the facility for three hours and enjoy complementary buffet meals or snacks, tea, coffee and accessing wi- fi, The lounge has TV screens with train information display, apart from other screens that display other channels. If passengers want to stay beyond three hours, ` 125 will be charged for an hour.Catering services are provided by SSP Catering India, which also provides catering to Emirates’ lounge at T3, IGI Airport. Spread over 300 sq m and two floors, the lounge has a seating capacity for 125 persons.
  • 20.
    18 TRAVTALK JANUARY 1 ST FORTNIGHT ISSUE 2013 AVIATION Sea taxis to fly over Mumbai skies “The services will com- ports in these areas, adds D E N C Y M AT H E W mence by late January, 2013 Verma. It is also expected to once we clear a few permis- boost spiritual tourism from M EHAIR will undertake a very ambitious project in the skies of Mumbai by sions that are pending and will be undertaken on a Mumbai as the time required to travel from Mumbai to Cessna 208 amphibian air- Shirdi is less than one hour. introducing seaplanes in the craft which can carry 9 pas- There are also plans to intro- city. The operations will be sengers and 2 pilots at a time. duce our seaplanes as air undertaken in two phases We have signed an MoU with taxis in Mumbai to fly from with phase one involving MDTC for three years who Juhu to Chowpatty. This will services from Juhu to Mulla will promote and market our cut down the time drastically Dam for Shirdi, Varasgaon seaplanes in their resorts, for someone who needs to websites and buses and will commute from suburbs to also sell some tickets on our south Mumbai everyday. behalf. We are also planning on partnering with some Pilot Project was in leading travel operators to Andaman and Nicobar sell the tickets,” says Islands Siddharth Verma, Director, MEHAIR started intro- Andaman and Nicobar. The pricing the tickets and mak- says AP Anilkumar, Minister MEHAIR ducing seaplanes in the skies phenomenal response they ing it an economical journey. for Tourism, Kerala. of India from the inlands of received in their pilot project So a 25 minute ride from How will it benefit has encouraged them to Cochin will cost only Rs Investment incurred and Mumbaikars? Modus Operandi introduce a second and big- 4,500 or so,” says Verma. future plans The company is quite ger seaplane in Andaman by “Kerala has a beautiful MEHAIR has invested Siddharth Verma confident of the success of The operations will be late quarter of 2013. Besides Director the project in Mumbai. This undertaken in two phases this, they will also be intro- aerial view and we want our ` 25-30 crore in each of the MEHAIR tourist to get a glimpse of the projects in Kerala and service, Verma says, is “ideal with phase one involving ducing seaplanes for the first picturesque landscape of the Mumbai and will invest Rs for the people in Mumbai to services from Juhu to Mulla time in Kerala. “We hope to Dam for Lavasa, Murud reach places that don’t even Dam for Shirdi, Varasgaon start our services in Kerala state. By travelling on a sea- ` 250 crore in the next five Dam for Lavasa, Murud plane, the tourist visiting years in other projects across Janjira, Girgaum - Chowpatty have runaways.” This will by January-end. Our inten- Janjira, Girgaum - Chowpatty Kerala will get a very differ- India. The company hopes to and Bhandardara Dam. Phase also generate employment tion was to introduce this as and Bhandardara Dam ent perspective and experi- introduce services in Goa two will be begin from and infrastructure in these a novel experience for leisure ence of the state. We plan to in 2013 also which will October 2013 and include areas and the government is The services will commence travellers coming to Kerala. start the services from allow people to commute routes on the Konkan coast also keen on implementing by late January, 2013 And we are concentrating Cochin to Munnar, faster from Goa airport to like Tarkarli, Harihareshwar this service as it is more cost- more on volume rather than Kumarakam and Alappuzha,” North Goa. and Ganpatipule. effective than building air- margin. Hence, are not over Mumbai gets Shangri-La Hotel The much-awaited Shangri-La Hotel, Mumbai recently opened its doors to guests. The hotel is located 15 kilometres from Mumbai's international airport, nestled between the city’s two main commercial areas — Nariman Point and Bandra Kurla Complex. “It is our pleasure to announce the official opening of the Shangri-La Hotel, Mumbai, which is the group’s second hotel in India. We look forward to welcoming guests and providing them with our hallmark hospitality from the heart,” said Greg Dogan, President and CEO, Shangri-La International Hotel Management. 4.65 lakh domestic air passengers The total domestic pas- month of October 2012 the month of November sengers carried by the were 45.55 lakhs. This 2012 is as follows: Air scheduled domestic airlines shows that 4.65 lakh more India-20.7 per cent, Jet in the month of November passengers travelled in the Airways-18.3 per cent, 2012 were 50.20 lakhs. The month of November 2012 JetLite-6.9 per cent, total domestic passengers compared to October 2012. IndiGo-27.3 per cent, Spice carried by the scheduled The market share of sched- Jet- 19.5 per cent and Go domestic airlines in the uled domestic airlines for Air- 7.4 per cent.
  • 21.
    AVIATION Tiger Airways onIndia route The alliance will help Via.com and its agent partners to tap the leisure segment with value for money packages with Tiger Airways’ network of over 50 destinations in the Asia-Pacific region. T T B U R E AU S ingapore-based low cost carrier (LCC) Tiger Airways has now more to offer to the Indian traveller. Tiger Airways has joined hands with Via.com as the exclusive travel agent distributor for its tickets in India, Indonesia and the Philippines. According to Vinay Gupta, CEO, Via.com, this Vinay Gupta Kaneswaran Avili CEO Commercial Director partnership perfectly aligns Via.com Tiger Airways with Tiger Airways and Via.com’s strategic initiatives to expand their existing cus- This Customers tomer base, while also expand- partnership can access ing into new geographic mar- kets. This enables both com- also enables Tiger’s panies to better serve the bur- geoning Asian business and the airline to offerings leisure travel market. “This actively through will also act as one-stop assis- tance for other travel needs promote its Via.com’s such as hotels and travel other routes network insurance. This partnership also enables the airline to actively promote its other routes by allowing the cus- Airways revealed, “The from India.” Going forward, tomers from India to connect objective of this alliance is to the group aims to increase with other destinations, con- make it easier for customers flight frequency on its Indian nected through the airline to book flights with Tiger routes and would like to add such as Indonesia, Hong Kong, Airways. They can now Kolkata to the network in the Macau, China and Australia,” access the full range of next 12 to 15 months. he added. Tiger’s offerings through To celebrate this part- Via.com’s network of 7,000 The alliance will help nership, Tiger Airways is travel agencies throughout Via.com and its agent part- offering special promotional India. This acts as an exten- ners to tap the leisure seg- fares from INR 3,900 one- sion to Tiger’s website, ment with value-for-money way all-inclusive of taxes. www.tigerairways.com.” packages with the airline’s Booking period starts from network of over 50 December 6 -19, 2012 with a Regarding the impor- destinations in the Asia- travel period from February tance of the India market, Pacific region. 1- March 31, 2013. Avili pointed out, “India is a Talking about increasing key market for the airline. We Tiger Airways is keen to ties in the B2B and the B2C operate from six Indian cities further expand with its recent market, Kaneswaran Avili, and have been experiencing move to Changi International Commercial Director, Tiger load factor of 80 per cent Airport, Terminal 2. Travel agents on track Japan tops with Rail Europe prog. VoA list The Visa on Arrival (VoA) Scheme of the gov- ernment has become pop- ular with the tourists. The scheme registered a growth of 25 per cent dur- ing the period January- November 2012 over the corresponding period of 2011. A total number of 13,903 VoAs were issued during the period January-November 2012 as compared to 11,121 VoAs issued during the corresponding period of 2011. The highest number Kunal Kothari, Executive Director, Rail Europe India (Left) along with Jason Tarabo, a trainer from Rail Europe’s head office in Paris in New Delhi. of 3,913 VoAs was issued In order to increase product awareness and educate the Indian travel agents about to tourists from Japan fol- its products and offerings, Rail Europe India conducted training programmes for lowed by New Zealand retail agents, General Sales Agents (GSAs) and their sub-agents across India. The (2,645) and The programme received a massive response from the travel trade. The agents were made aware of new products from Rail Europe’s upgraded portfolio. Philippines (2,205).
  • 22.
    20 TRAVTALK JANUARY 1 ST FORTNIGHT ISSUE 2013 ANALYSIS Saying ‘I do’ on foreign shores Indian weddings are getting larger than life and are increasingly becoming a booming affair involving large scale expenditure. Realising the worth of hosting Indian weddings abroad, foreign tourism boards and hotels are keen to attract this niche segment. D E N C Y M AT H E W and resorts being booked to The global economic conduct a traditional Indian meltdown had little effect on R ecently, a Karan Johar directed movie showed an India-based family choos- wedding in the exotic islands of Thailand. These glimpses from reel life have now come the huge Indian wedding budgets. With wedding themes getting extravagant ing Thailand as a wedding alive in real life too, as many and over-the-top, many destination for their son’s Indian couples and families international hotels and wedding. What followed on are opting for a destination resorts are bending back- screen were charter flights wedding away from India. wards to accommodate the requests of Indians families. While special chefs are Malaysia being flown down to cater to the large wedding “A segment that has grown entourage, there are also exceedingly well is the wedding special arrangements being segment in Malaysia. Many dis- made to facilitate the Indian cerning Indian families now prefer weddings which include to host their weddings in more arranging special garlands exclusive surroundings and and lights to king-size Malaysia has plenty of just that. In chandeliers. 2011, over 30 Indian weddings Spreading overseas travel packages and tie-ups were held in Malaysia. Favourite Manoharan Periasamy Among international with Malaysia Airlines and Thailand amongst the destinations are Director destinations, Indians have other 5-star properties to Thailand too has witnessed a Langkawi, Pangkor, Penang and Tourism Malaysia shown a lot of interest in encourage and attract Indian lot of Indian weddings over the Kuala Lumpur. More than a dozen Thailand, Malaysia, South wedding planners. Besides years. “Over 100 large-scale wed- of India’s leading wedding planners have been taken on host- Africa and Mauritius for wed- this, they have conducted dings ranging from 200 to 800 peo- ed tours to Malaysia to discover the best that is on offer,” ding destinations. Malaysia many fam tours for Indian ple were organised in Thailand in says Manoharan Periasamy, Director, Tourism Malaysia. has drafted many affordable wedding planners to experi- 2011. In 2012, the Mumbai office ence first-hand service and facilitated 20 weddings in Thailand. facilities available as well as To increase our growth and attract possible venues for different more Indian weddings, we facilitate budgets. All these efforts family or wedding planners in terms Sethaphan Buddhani have borne fruit as they have of immigration, welcome reception, Director Tourism Authority of Thailand seen an increasing interest provide Thai cultural show and among people from Gujarat, ticket to bride and groom who are Rajasthan, Uttar Pradesh, really keen to see the wedding venue. We also support with Maharashtra, Tamil Nadu and upgrading flight tickets to business class and we also inform Andhra Pradesh in holding the family in terms of names of wedding planners in India and their weddings in Malaysia. Thailand,” says Sethaphan Buddhani, Director, Tourism Authority of Thailand. New York City Seeing the large stream of income that weddings generate and the potential of this market, many new destinations are emerging which aim at wooing the wedding planners. Even long- haul and expensive destinations like New York City are ready to host the Indian weddings on its soil. “NYC & Company has start- ed a ‘NYC I DO’ initiative to promote the City as a wedding des- tination for all couples. We work with wedding organisers to consider New York City’s hot spots or most elegant venues to Makiko Matsuda Healy tie the knot. The large NRI community in America often considers VP Business Development a reception or other events in India and New York City to invite NYC & Company family, friends and business partners for the big occasion. Our hotel members offer year-round attractive wedding arrangements and fine Indian cuisine with regional variations are available,” says Makiko Matsuda Healy, VP Business Development, NYC & Company. Jet Airways expands code-share agreement with Etihad Airways Jet Airways has placed its code-share to Paris is in code on Etihad’s flight oper- addition to the existing ating out of Abu Dhabi to code-share between Jet Paris Charles de-Gaulle air- Airways and Etihad Airways port from December 10, on the Abu Dhabi- 2012. This code-share will Mumbai/Delhi routes allow Jet Airways to offer its operated by Jet Airways and guests excellent connectivity the Etihad flights connecting from India to Paris via Abu Abu Dhabi with Dhabi. The airline’s Mumbai, Delhi, Kochi, JetPrivilege members will Thiruvananthapuram, earn JPMiles for their entire Airways code-share flights Kozhikode, Chennai and journey when they fly on Jet from India to Paris. This Hyderabad.
  • 23.
    STATES JANUARY 1 ST FORTNIGHT ISSUE 2013 TRAVTALK 21 Bekal – The new kid on Kerala’s block Bekal has been identified as an untapped tourist destination by the Government of Kerala. Kerala will promote Bekal to attract repeat travellers and off- beat travellers. T T B U R E AU developed in the region. From Resort & Spa Bekal. With the go are Guruvayoor, inbound markets. However, the initial stage itself a rigor- advent of many more resorts Cheruthuruthy, Nattika Beach, Bekal as a destination still “W e are actively pro- moting more of our northern areas like Bekal as ous sales activity has been ongoing with focus on print media, developing a movie on and hotels in the region, Bekal, got a much needed impetus. “North Kerala is maturing Nilambur, Palakkad, Wayanad, Kannur, Calicut and Bekal. Out of these places, Bekal and suffers from lack of publicity and quality tourism infrastruc- tures like guides and quality these places now hold the Bekal called ‘Bekal-The Big as a region to look out Wayanad are the fastest transport,” says Mathew key to attract tourism. Water’,” says Dilip Mishra, for. Among the prominent growing destinations for the Joseph, Managing Director, AK Anilkumar Places like Bekal are still Resident Manager, The Lalit places where travellers domestic as well as the Pepper Tours. Minister for Tourism, Kerala untapped and have a lot to offer tourists. There will be subsequent infrastructural developments in these areas besides beautifying them,” says AK Anilkumar, Minister for Tourism, Kerala. In 1992, the Government of India declared Bekal as a Special Tourism Area. The untouched and scenic landscape, exten- sive beaches, backwaters and unspoilt environs qualified Dilip Mishra Resident Manager The Lalit Resort & Spa Bekal Bekal as a potential site for an international standard beach destination. Bekal also has several historic and religious sites. And to tap the potential of this destination, Bekal Resort Development Corpo- ration was formed for the implementation of Bekal Tourism Project. The Bekal Mathew Joseph Managing Director Pepper Tours Resort Development Corporation had acquired land for the development of resorts and hotels of star category. In 2004, The Bekal Resorts Development Corporation had leased out 6 plots of land to major hospi- tality players with Bharat Hotels (owner of The Lalit Suri Hospitality Group) being one of them. “The Lalit Resort & Spa Bekal is the first Five Star deluxe Resort & Spa to have
  • 24.
    22 TRAVTALK JANUARY 1 ST FORTNIGHT ISSUE 2013 SPOTLIGHT-2013 Travel Trade: All guns blazing for 2013 The coming year will definitely be better than the last, believe travel bosses. speaks to the biggest names in travel and tourism and asks them what they expect from 2013 in terms of business. LPTI & TUI India Kuoni India Arjun Sharma, Managing Director Rajeev Wagle, Managing Director India is believed to be one of the best tourist destinations from The year 2013 looks optimistic for the travel industry. This is primarily 2009-2018. According to the World Travel and Tourism Council, because of various economic reforms introduced in the second half of the country has the highest ten-year growth potential. Our focus, the year 2012. Initiatives like FDI in retail and aviation are likely to in the coming year, will remain on exclusive and differentiated boost the Indian economy growth thereby increasing discretionary products. It is our intention to create a range of specific products spending on services like travel. There is a tremendous scope for expan- target at different customer segments and tailored to meet tastes sion and evolution in the market. Increase in number of young travellers of the global consumer. seeking unique, off-beat experiences is opening up new doors to the tourism segment. With a view to enhance loyalty and productivity, cor- porates are setting increasing budgets aside for incentive trips. Nijhawan Group of Companies Travel Spirit International Ankush Nijhawan, Managing Director Jatinder Taneja, Managing Director In 2013, with an infusion of FDI in the aviation sector, domestic airlines India should focus on infrastructure growth. We need to have high- will get a major boost. The investment shall help in a significant quality highways, which will help reduce travel-time from one city increase in load factors of the airlines and hotel occupancy. 2012 was to another. We also need high-speed trains connecting important a challenging year, however the business of the Travel Boutique Online tourist cities, which will help increase tourism. Thirdly, when tourists (TBO) grew by 40-45 per cent. We would also be focussing a lot on are visiting monuments, we need to provide them with a good expe- innovating technology especially for the hotel content. We would also rience. The cities should be clean and so should be the surroundings launch our smartphone applications for our travel partners by early monuments. The developments and upgrading of various 2013. TBO will continue to strengthen its position in India, Middle airports is commendable indeed. Now we have a lot new East and North Africa. We would start our operations in Thailand in airports in India which convey a strong message that we are chang- early 2013. ing for the better. Kuoni India Cox & Kings Dipak Deva, CEO Destination Management, India & South Asia Arup Sen, Director, Special Projects The coming year looks positive. The government has recently eased The incoming foreign tourist arrivals in India registered a growth restrictions on tourist visas which had earlier mandated a two- of 5.9 per cent and this is primarily due to a collective bag of positive month gap between consecutive visits by foreign nationals. This is forces. The recovery of the euro and green shoots in USA, Australia, a positive step and should show results in the coming year. The Canada, Middle East, CIS & Africa was a positive contribution along effort put in by the MOT, in the form of roadshows around the globe, with augmentation of infrastructure including increased hotel inven- is an important way of maintaining tourist interest in India as a des- tory, modernisation of airports due to the Commonwealth Games tination. As for Sita, we will be focussing our attention on issues provided much required relief. On the domestic front, enhanced that will be crucial to our long-term success - the importance of purchasing power further contributed to the growth. quality, technology and training to help meet and exceed customer expectations. Contd. on page 35 TECHNOLOGY InterGlobe Technology Quotient Wizie J B Singh, President & CEO Moondeep Aggarwal, Director The travel and hospitality sector has gone through unprecedented As a technology company, I would be like to comment on the technology times amidst challenges such as the economic slowdown, surging demand dynamics for 2013. In this age of technology, we still believe fuel prices and rupee depreciation. These posed an imminent risk that there is a high demand for a good online booking engine that works to the growth of the industry. However, the rate at which technology for wholesalers and travel agents. Moreover, automation products are is seeping into the travel and hospitality sector and the level at high in demand, so that agents can reduce cost of operations and the which innovations being introduced by companies, prospects appear airline debit memos. We are planning to launch a solution which will optimistic for both leisure and business travel. help travel agents to work on all three GDS sans training and increase sales and reduce cost of operations. Abacus India Arzoo.com Jeet Sawhney, Managing Director Amal Purandare, Head Operations Abacus is expecting to see India maintain its position as one of Initiatives like FDI are always good news for the travel Industry, the leading travel markets within the Asia-Pacific region. The trav- which means making more inbound travel. Currently, airlines are el industry within India is set to see greater growth in 2013. This doing their best to delve into Kingfisher’s share of business. In will be brought about both by the stabilisation of the overall avi- 2013, we will also focus on consolidating our B2C customer base ation situation as well as the continued rise of the middle class, and try and further strengthen our B2B stronghold. The end of leading to increased travel. 2013 may also see the beginning of mergers and acquisitions in the OTA space.
  • 26.
    24 TRAVTALK JANUARY 1 ST FORTNIGHT ISSUE 2013 FAMILY ALBUM ‘Leading Tourism through turbulent times’ The leading decision-makers across different value chains in the tourism industry gathered to attend the interactive session ‘Leading Tourism through Turbulent Times’ on 12-12-12 in New Delhi. The who’s who took time out to look into best perspectives and the needful directions which will help the industry to sail through present testing times.
  • 27.
    SPOTLIGHT-2013 Hospitality: What’s instore With mixed fortunes, the general outlook of hospitality growth in India remained disappointing in 2012. However, industry experts forecast 2013 as being the year when business will bounce back to good health. The Lalit Suri Hospitality Group Samil Malhotra, Vice President The start of 2013 may bring some relief to the industry. We expect this to be a long slog to recovery but would want a real grip to return to the industry by 2013. However, we remain optimistic on the long-term growth story for the industry. As our expansion plans, the group is opening two new properties in 2013 - The Lalit Chandigarh and the re-opening of the much-awaited Lalit Great Eastern Kolkata. Also, The Lalit New Delhi has commenced with celebrations of 25years. The Suryaa New Delhi Greesh Bindra, Vice President and General Manager The industry will remain the same like last year because of the downturn in the European market. However, we can expect sustained growth in the corporate and domestic leisure. Commercial activity and international leisure segment will pick up only in 2014. However, our hotel will witness some major movements in the international leisure segment. The industry will also witness massive rate correction this year. Going forward, the strategy that hoteliers should adopt this year is the exploration of new markets. New travel segments ought to be be created. Suiting the target business areas, it will be wise for hoteliers to concentrate on product augmentation and differentiation and create a different experience for the customers. Fairmont Jaipur Atul Lall, General Manager Fairmont Jaipur opened at a time when the number of luxury room nights offered in Jaipur has gone up to 1500 from 721 just two years ago. In 2011, Jaipur showed a 13 per cent rise in the average room rates. Thus, it is because of the nature of the hotel rooms that business is changing in Jaipur. Traditionally viewed as a leisure destination, Jaipur has emerged as a MICE and wedding market too. The two seg- ments that will drive business for us and the entire Jaipur market in 2013 are wedding and MICE. Incentives are expected to pick up in Jan-March period. The transit travel segment has also been increasing over the last year. There will be fluctuation in the ARRs this year. However, whether it will be negative or positive, is difficult to say now. But whatever the case, it will stabilise eventually. Best Western India Sudhir Sinha, President & COO Overall, for the industry, the growth should be in the range of around seven-eight per cent based on how the global economic environment pans out, specifically related to the European debt crisis and the US fiscal cliff. Also, guest preference is decisively shifting in favour of chain hotels vis-à-vis standalone properties and this trend is expect- ed to increase steadily. Reservations through mobile-based platforms are expected to gain further momentum as more people use the internet through their smartphones rather than through their desk- top/laptop. The role of intermediaries is expected to shrink unless they are able to transform themselves into MICE specialists and work., work as the in-house corporate travel agency for corporate houses or focus on niche segments. Leisure Hotels Vibhas Prasad, Director We continue to remain bullish on the future of the hospitality indus- try in India, especially in the domestic segment. The popularity of short-haul destinations from key metros will gain momentum this year. Another important development over the last two years which will continue in 2013 is the opening of Kashmir to ‘mass tourism’. India will attract a large number of spiritual tourists. Maha Kumbh 2013 in Allahabad is also expected to be on the itinerary of every spiritual traveller in the first quarter of this year. However, going forward, there will be a few roadblocks which need to be tackled. Infrastructure issues with air and road connectivity and cheaper overseas destinations with easy connectivity can play spoilsport. Air traffic will remain muted due to high oil prices (high international Brent Crude).
  • 28.
    26 TRAVTALK JANUARY 1 ST FORTNIGHT ISSUE 2013 NTO Korea sees increase in India outbound Indian travellers spent an average of 13.5 days in contrast with other nationalities who spent an average of 10 days. This only reflects the amount of scope outbound travel has as an opportunity for India. T T B U R E AU Korea. Since then the Indian partly helped in boosting 2008. Lee who was visiting among others. Since then, outbound to Korea has been on numbers from the India out- the newly opened Korean the MICE market in K orea Tourism Organisation (KTO) opened a represen- tative office in Mumbai in the rise, says Jae Sang Lee, Director, Korea Tourism Organisation, New Delhi. bound,” he said. Korea has registered a Cultural Center in New Delhi informed. The Korean government selected Korea has garnered expert- ise with support from the government and its initia- 2011 and the Korean Embassy “The number of documents growth of 25 per cent from MICE as one of the ‘new tive to develop creative also appointed VFS to make it required to obtain a visa the Indian market, since it growth engine’ industries, content and technology easier for Indians to travel to has been reduced and has opened office in India, in along with green energy indigenous to Korea. Jae Sang Lee Director Korea Tourism Organisation, New Delhi The organisation is also targetting the FITs and family travel from India. “According to a survey conducted by the KTO in 2010, Indians spent US$ 1446 per trip. This is in contrast to other visitors who spent US$ 1298 per trip when visiting Korea. Indian travellers spent an average of 13.5 days in con- trast with other nationalities who spent an average of 10 days. This only reflects that there is a huge scope in this segment,” he pointed out. Comparing India market with China, Lee opined, “Ten years ago, five lakh Chinese trav- ellers visited Korea. In 2011, we received 2.2 million. This is a very sharp curve and we expect this kind of a spurt from India as well.” Virgin Atlantic to connect Delhi and Mumbai with new routes Virgin Atlantic has finalised plans to launch a domestic flying pro- gramme within the UK from spring 2013. The air- line will be adding 24 domestic flights a day within the UK to its exist- ing long haul network that will strengthen connectiv- ity for its Indian passen- gers. The airline will focus its operations on flights to and from Scotland. From April 2013, the airline will operate six round-trip flights a day between Heathrow and Edinburgh, with three daily round-trip flights between Heathrow and Aberdeen. The airline has also utilised three of its own Heathrow slot-pairs to complement the new Scottish routes with three daily round-trip services between Heathrow and Manchester from March 31, 2013.
  • 29.
    SPOTLIGHT-2013 JANUARY 1 ST FORTNIGHT ISSUE 2013 TRAVTALK 27 Looking on the brighter side After combating challenges in 2012, travel associations are looking forward to brighter prospects in 2013. The veterans are hoping that taxes will be reduced, thereby bringing a breather for the industry. reports. OTOAI IATO ADTOI Guldeep Singh Sahni, President Subhash Goyal, President Subhash Verma, President The industry is currently caught We had been pressing for the The year 2013 will surely be a good one between ‘A Rock and A Hard Place’. On demand of granting industrial status for domestic tourism in India. As the one side, it is extremely vulnerable to and similar benefits to the tourism growth in the international tourist external shocks and events and on the industry. We hope that in year 2013, arrivals has been constant, the rise in other side, it is battling an internal many such demands of our inbound domestic tourists will drive tourism. transformation with the increased use industry will be accepted. There is Tour operators should make use of the of technology and changing market a strong case for extending the tax opportunity. They should utilise the dynamics. Going forward, I feel, how benefits to the travel industry, which time in strengthening the manpower in the industry faces the external head- we’ll urge the MOT to pursue with the Ministry of Finance. the office by providing special training winds and internal shocks will define the market in the years There are merits in opening the skies further. programme and educational tours with- to come. 2013 promises to be a great year for our association. in the country to launch new packages based on new products. WTTC, India Initiative TAFI IAAI Vikram Madhok, Praveen Chugh, Vice President Biji Eapen, President Former Chairperson This uncertain trend might also spill over 2013 will be a promising year for the to the next year. Experts’ fears are com- inbound business. The MOT, India is high on the priority radar of pounded by the thought that the coming Government of India has a new team. leading developed countries, which budget might add to the existing tax bur- Initiatives such as ‘Hunar se Rozgar’ are now in the advanced stages of den adversely affecting the existing tourist programme, Clean India campaign, economic revival. This means that flow to the country. However, it is hoped safe and honourable tourism and the after a lull due to difficult economic that India’s inbound tourist volume will promotion of medical and wellness conditions, Incredible India will reg- grow due to its rapidly increasing average disposable income, rising tourism are definitely going to yield ister rapid increase in arrivals. The number of business opportunities, vast natural and cultural positive results. With the new team, it is expected that continuity recent announcement of the Kerala Government to to start its resources and increased spending by the government on developing will be maintained in implementing above programmes in an own airline is a step in the right direction. accelerated manner. tourism infrastructure.
  • 31.
    FAMILY ALBUM JANUARY 1 ST FORTNIGHT ISSUE 2013 TRAVTALK 29 Neptune Foundation’s charity polo match The Jaipur Polo Ground in New Delhi was buzzing with activity as diplomats, bureaucrats, businessmen and socialites got together to cheer their favourite team to victory at the Neptune Foundation Charity Polo Match. The Ambassador of Thailand to India, Pisan Manawapat, was the chief guest at the event. The Amazing Thailand Team lifted the cup beating Team Constance.
  • 33.
    SPOTLIGHT-2013 JANUARY 1 ST FORTNIGHT ISSUE 2013 TRAVTALK 31 Wooing Indian travellers in 2013 Even as people tighten their belts bracing for the year ahead, tourism boards get ready with a host of new products and promotional plans to woo Indian travellers. reports... South African Tourism Tourism Australia Tourism New Hanneli Slabber, Country Manager Nishant Kashikar, Country Manager Zealand 2013 will see some interesting initiatives by South We expect the growth momentum for visitor arrivals African Tourism in India. Increasing competition to continue in 2013. Our focus will remain on devel- from other tourism boards and the present con- oping demand for Australia as a holiday destination dition of the economy will be a challenge for us. among the affluent, well-informed, seasoned trav- The key to success will be to deal with the chang- eller, residing in the top metro cities, especially in ing travel patterns and preferences effectively by Mumbai and Delhi. Simultaneously, there will be diversifying our products, maintaining excellent initiatives to develop the business events segment service and innovating our marketing channels. and on gaining more incentive visits to Australia. The most critical element would be to ensure that we deliver value for money The Tourism Forecasting Committee estimates arrival of 178,000 visitors for holiday experience. the year 2013/14. Mischa Mannix-Opie Regional Manager - South & Atout France Ministry of Tourism, Oman South East Asia Currently, India is our 12th largest Catherine Oden, Country Manager Lubaina Sheerazi, India Representative market and we expect it to grow The global economic situation will, to a large We have managed to reach out to people in Tier II at a steady pace. Based on extent, influence travel trends for the first half of cities of Pune, Hyderabad and Ahmedabad in 2012 Tourism New Zealand’s research, 2013. At our end, we will renew our efforts to besides the Tier I cities of Mumbai, Delhi, there are approximately over 21 present France as an affordable destination and Bengaluru and Chennai. In 2013, we want to take million people in India who fall make it attractive for our potential visitors. We are it to the next level and reach out to more cities. into this category of travellers. confident that we will find ways to cope with We hope to increase the passenger numbers from This coupled with the rise in adverse situations and will find different means of India to Oman. We also hope to create more brand spending power of Indians make generating footfalls to France. All our best efforts awareness for Oman through our Bollywood asso- the future appear pretty bright for will be put forth to increase arrival figures for 2013. ciation with the movie ‘Once Upon a Time in Mumbai Again’ which is slated an increase in the number of to release in mid 2013. Indian travellers Continued overleaf
  • 34.
    SPOTLIGHT-2013 Contd. from page31 Canadian Tourism Commission, Representative in India Tina Singh, Assistant Vice President In 2013, CTCs main focus continues to remain on the Travel Trade. Approximately 77% of the budget would be spent on marketing activities through the trade. While we have already obtained good presence in Delhi and Mumbai, we would be expanding our sales network in 2013 to newer markets like Bengaluru, Hyderabad, Chennai and Kolkata by conducting training seminars to educate the travel trade in these cities on the desti- nation. Further, we will be launching Signature Experience Collection (SEC) in the India market where the destination will be repositioned as a truly unique, experiential destination. We also plan to develop co-op programmes with tour operators. We will also be promoting our consumer website ‘Keep Exploring’ in 2013. Macau Government Tourism Office, India Madhvi Awasthi, Media Manager Despite a gloomy global economy, the Indian market performed well in visitor arrivals in 2012. 2013 is going to be an important year for Macau’s tourism industry, as we celebrate the 60th Macau Grand Prix and 25 years of the Macau International Fireworks Display Contest. Besides promoting our heritage sites and other attractions, we will continue to focus our efforts on business tourism initia- tives. We have been expanding our tourism products to diversify our source market profile. We will also leverage our recently launched Wedding Incentive Scheme and Student Excursion Incentive Scheme to boost visitor arrival figures. The Incentive stimulation plan offered by Macau Government Tourist Office (MGTO) helps agents and corporate look at Macau as a destination for business movement. We have had group moments throughout the year to the tune of 200 – 1800. Phillipines Tourism Marketing Office, India Chetna Singh, Senior Marketing Manager India is an emerging market with a vast source of potential travellers. Over the past ten months, the Phillipines recorded a double-digit growth of 42.0 per cent with month-on-month comparison for October 2011 and 2012. This milestone may be attributed to the recent implemen- tation of the 14-day visa-free entry facility for Indian tourists with the existing valid multiple entry visa of US, Japan, Australia, Canada, Schengen, Singapore or UK (they should have travelled to these desti- nations at least once). The Phillipines Tourism Marketing Office in India is expecting to bolster Indian travel to the Philippines through integrated marketing efforts in 2013. We predict an increase in the number of inbound travellers from India in the coming years as the Phillipines is fast becoming a destination of choice amongst the Indians. Sterling Holidays opens 19th resort Sterling Holidays, a to be one that exudes beauty engage members and guests Vacation Ownership and and charm. The USP of The in fun-filled, memorable hol- Leisure Hospitality Company, Sanctuary thus is its location. iday experiences. opened its 19th resort, With the majestic view of the The hotel also hopes to Dharamshala - The Dhauladhar range and the attract MICE inspite of being Sanctuary. Talking about the gurgling, perennial brooks of located in a leisure zone. All choice of location for the the Beas River, it is the loca- of Sterling’s resorts in fact hotel, Lata Subramanian, tion which is the property’s are located in leisure locales Vice President - Marketing of biggest draw. It offers won- in India and are built to offer Sterling Holiday Resorts derful scenic canvas of stunning views of the desti- nation. “This fact alone makes each of our resorts the perfect choice for offsite conferences and events as the breathtaking views and fresh air prove to be invigourating for MICE dele- gates. The MICE offering from Sterling is not a new venture as our resorts have been built to host conferences from inception. Sterling (India) says, “At Sterling, Himalayas and the emerald offers complete MICE solu- great emphasis is laid on green Kangra Valley. The tions at value pricing, which choosing the locations for the property is also very close to include well-equipped con- resorts within each destina- the Norbulingka monastery.” ference facilities and guest tion. The goal remains to The full-service, modern rooms, banquets, airport delighting holidayers with resort has 26 elegantly fur- transfers and a team of ‘Fun stunning views. With that nished rooms, a multi-cuisine Rangers’ who organize a very philosophy, when it restaurant, bar, conference range of holiday and team came to choosing a destina- facilities and a range of recre- building activities,” says tion for our new resort, it had ational activities designed to Subramanian.
  • 37.
    SPOTLIGHT-2013 JANUARY 1 ST FORTNIGHT ISSUE 2013 TRAVTALK 35 New Year to see more in-out traffic The year 2012 saw a lot of ups and downs in the tourism industry. In the initial months tourism was moving slowly, but picked up towards the end of the year. spoke to some of the leading travel agents and asked them to review the year that was 2012. Contd. from page 22 Nomad Travels Thomas Cook (India) Ajay Prakash, Chief Executive Madhav Pai, Director – Leisure Travel (Outbound) 2012 was a year that saw some tough times for the industry. Young Thomas Cook India has bucked the trend by launching Summer Indians have shown a move towards niche or experiential holidays - Tours – ‘European Holiday Supermarket’ and ‘American Holiday and this trend will grow. We shall crawl past the 6 million mark for Supermarket’ this October for 2013. This unique ‘Super Market’ inbound tourists, but at less than 0.5% of global tourism. India is far concept has been impactful and our forward booking position is from realising its potential for inbound tourism - and the reasons are already up by an impressive 65% . Almost 45% of our individual there for all of us to see. It's heartening to see additional rooms being holiday travellers are youth, and this segment is poised to grow at added in all the major cities. Hopefully, that will keep room rates at a an exponential rate of 25-30%. reasonable level for both inbound as well as domestic tourists. Pepper Tours Inorbit Tours & Travels Mathew Joseph, Managing Director OmPrakash Sehgal, Director In 2013, business will be difficult and travel operators who are more proac- This year was full of evolution and changes and I'm happy to see that tive in terms of advertising, media and networking will do well. In terms we all were able to adopt to the changes. For 2013, we will have to of inbound tourists, UK, Russia and Australia will be our biggest source come up with innovative strategies and business model. If there is any markets. Places like Kashmir will do well in 2013 as it is opening up and external unrest in the Indian economy on macro level, our tourism has the potential to attract tourists. Kerala market will face stiff competition industry will be influenced on a greater scale. Thus, all service providers from other markets unless it will become more flexible in terms of its hotel need to be cautious and at the same time start with new products, rates. Outbound travel will increase in 2013 to Far East and Middle East innovative marketing strategies and come up with affordable travel along with niche destinations in Europe. packages to attract our booming middle class.
  • 38.
    36 TRAVTALK JANUARY 1 ST FORTNIGHT ISSUE 2013 FAMILY ALBUM Abacus India gets trade on the dance floor November was a busy month for the Indian travel industry as Abacus India staged trade gatherings in Mumbai, Delhi, Bengaluru and Kolkata. The events were well-attended and received by the industry partners in the cities. Different themes were explored in each venue. Mumbai went Hawaiian, replete with flower garlands, while the Kolkata event went ‘Disco Nite’ with travel consultants turning up in grooving outfits and dancing the night away. FICCI rolls out CITI FICCI in partnership Club Med rolls out red carpet for Indians with the state govern- Having 80 resorts worldwide, the USP of the Club Med is their ‘All-Inclusive’ resorts. Since ments and the Ministry of Tourism will organise successfully launching the concept of ‘All-Inclusive’ resorts many years ago across the world, the first-ever two-day focussed Conclave on Club Med hopes that Indians too will soon see value-for-money in this product. Investment in Tourism Infrastructure (CITI). It will encompass exclusive T T B U R E AU in luxury travel in India. India state presentations, B2B now has a lot of FITs who take meeting of investors with state governments and T he ‘All-Inclusive’ pack- ages of Club Med include accommodation and all meals shorter breaks to spend more time with their family because of which we think exhibition by organisations in the hotel supply chain, and transfers. The guests that this ‘All-Inclusive forging one to one meet- have, at their disposal, exqui- Holidays’ will work in India,” says Vijay Sharma, Country ings with their target con- Manager, Club Med, India sumers during January 16- 17, 2013 at the Federation Club Med, a French House, FICCI. Investors in company owns several pre- tourism infrastructure mium resorts across the from across India and a globe and currently, the com- strong 50-member Asian pany receives more than American Hotel Owners 2000 Indian families across Association ( AAHOA) del- its properties with 80 per egation from USA led by cent staying at their Asian lagoons. Club Med’s core include the relaxing volley- time in the sunshine. And their Chairman, members resorts while 20 per cent in charges also include unlimit- ball, surfing, golf, archery, there is an element of enter- of FHRAI, HAI, IHHA, their European resorts. Vijay Sharma ed quantities of alcoholic and tennis, beach soccer, kayak- tainment behind every Club members from state level Country Manager non-alcoholic beverages. The ing, snorkeling and flying tra- Med stay as there are daily hotel associations and Club Med, India all-inclusive concept ensures peze. The chain’s ‘Kids Clubs’ entertainment shows featur- A la carte organisations in the hotel that the guests’ adrenaline are state-of-the-art facilities ing live performances. supply chain will forge ties site buffets, chef’s specials levels don’t reach safe lows, where trained professionals The all-inclusive concept and specialty bars. And also thanks to a cross-section of look over and entertain the “Our concept of ‘All- ensures that guests remain through B2B meetings the dining locations are set in activities and adventures young ones while their par- Inclusive’ is still new in India. entertained thanks to activities with one another. picturesque spots such as sports at each resort. These ents and guardians have their However, we now see a rise and adventures sports
  • 40.
    38 TRAVTALK JANUARY 1 ST FORTNIGHT ISSUE 2013 FAMILY ALBUM OTOAI celebrates 1 anniversary st OTOAI (Outbound Tour Operators Association of India), which was formed last year to boost India's outbound tourism, has recently completed one year of success and achievements. Moving forward in the next year, JANUARY the association is all geared up with increase in its member base (currently has 170 active members), enhanced relationship with NTOs and with its foraying into the smaller cities of India. 4-6 Chennai Travel & Tourism Fair 8-13 Gujarat International Travel Tourism & Hospitality Expo 9 Coimbatore Tourism Authority of Thailand’s B2B Event 11 Mangalore Tourism Authority of Thailand’s B2B Event 11-13 Bengaluru Travel & Tourism Fair 14 Pune Tourism Authority of Thailand’s B2B Event 16-17 New Delhi FICCI’s Conclave on Investment in Tourism Infrastructure 2013 16-18 New Delhi Tourism Malaysia’s Roadshow 19 Kolkata Tourism Malaysia’s Roadshow 20-22 Guwahati ATOAI’s Annual Convention 21 Mumbai Tourism Malaysia’s Roadshow 21 Mumbai Tourism Fiji’s Roadshow 22 Ahmedabad Tourism Fiji’s Roadshow 23 Kolkata Tourism Fiji’s Roadshow 23 Chennai Tourism Malaysia’s Roadshow 24 New Delhi Tourism Fiji’s Roadshow 24-27 Singapore Zak Salaam India Tourism Expo - Singapore 25-27 Switzerland Travel Expo 25-27 Coimbatore Holiday Expo 25-27 Nagpur India International Travel Exhibition 25-27 Germany Leisure Travel Market 30-3 Spain Fitur 31-2 Kochi India International Travel Mart Cochin FEBRUARY 5 Mumbai Austrian National Tourist Office’s B2B Event 6 Chennai Austrian National Tourist Office’s B2B Event 7 New Delhi Austrian National Tourist Office’s B2B Event 12 Ahmedabad Tourism Philippines’ Roadshow 13 Kolkata Tourism Philippines’ Roadshow 19 Mumbai Disney Parks - Disney Days Trade Event 21 Delhi Disney Parks - Disney Days Trade Event 22 Ahmedabad Macau Govt Tourist Office’s Trade Workshop 22 Mumbai Canadian Tourism Commission Agents Training Programme 25 Delhi Canadian Tourism Commission Agents Training Programme 25-26 New Delhi ATOUT France’s Paris Promotion 27-1 Mumbai ATOUT France’s Paris Promotion 27- 2 Jaipur Canadian Tourism Commission’s Focus Canada India 28-2 Kolkata IITM Kolkata MARCH 1 New Delhi Starwood Hotels Worldwide’s Sales Expo for B2B / MICE & Corporate Agents 2 Kolkata Starwood Hotels Worldwide’s Sales Expo for B2B / MICE & Corporate Agents 4-6 Thailand Kiwi Link South & South East Asia 8 Chandigarh Macau Govt Tourist Office’s B2B Workshop 22 Kolkata Macau Govt Tourist Office’s B2B Workshop For more information, contact us at: talk@ddppl.com
  • 42.
    Calendar of TravelEvents JANUARY MARCH JULY 1 Delhi Starwood Hotels 4-6 Chennai Travel & Tourism Fair Worldwide’s Sales Expo for B2B / 5-7 Kolkata TTF 8-13 Gujarat International Travel Tourism & MICE & Corporate Agents 9 Chennai Macau Govt Tourist Office’s B2B Hospitality Expo Minimart 1-3 Vijayawada India International Travel Exhibition 8-13 Utrecht, Holiday Fair (IITE) 10 Bengaluru Macau Govt Tourist Office’s B2B The Netherland Minimart 2 Kolkata Starwood Hotels Worldwide’s 9 Coimbatore Tourism Authority of Thailand’s Sales Expo for B2B / MICE & 12-14 Hyderabad TTF B2B Event Corporate Agents 19-21 Bengaluru IITM Bangalore 11 Mangalore Tourism Authority of Thailand’s B2B Event 4-5 Warsaw & Polish Outgoing Workshop 26-28 Chennai IITM Chennai Katowice, Poland 11-13 Bengaluru Travel & Tourism Fair 4-6 Thailand Kiwi Link South & South East Asia AUGUST 14 Pune Tourism Authority of Thailand’s B2B Event 6-10 Berlin, Germany ITB 16-17 Delhi FICCI’s Conclave on Investment in 7-9 Guangzhou, China Guangzhou International Travel Fair Tourism Infrastructure 2013 8 Chandigarh Macau Govt Tourist Office’s B2B 9-11 Aurangabad IITE 16-18 Delhi Tourism Malaysia’s Roadshow Workshop 16-18 Ahmedabad TTF 16-18 Delhi South Asian Travel and Tourism 14 Moscow, Russia Luxury Travel Mart 20 Chennai German India Pool, B2B Event Exhibition (SATTE) 15-17 Raipur Indian International Travel Exhibition 22 Delhi German India Pool, B2B Event 17-20 Helsinki, Finland Matka Expo Nordic Travel Fair (IITE) 23-25 Surat TTF 19 Kolkata Tourism Malaysia’s Roadshow 19-21 London, UK International Confex 30-1 Sept Mumbai TTF 20-22 Guwahati ATOAI’s Annual Convention 20-23 Moscow, Russia Moscow International Travel and 21 Mumbai Tourism Malaysia’s Roadshow Tourism Exhibition (MITT)* 21 21-22 Mumbai Mumbai Tourism Fiji’s Roadshow SATTE Mumbai 21-24 Gothenburg, Sweden Tur SEPTEMBER 22 Kolkata Macau Govt Tourist Office’s B2B 2-3 Delhi Atout France’s ‘France 22 Ahmedabad Tourism Fiji’s Roadshow Workshop Promotion’ 23 Kolkata Tourism Fiji’s Roadshow 25-27 Abu Dhabi, UAE GIBTM* 2-4 Beijing, China China Incentive Business 23 Chennai Tourism Malaysia’s Roadshow 27-29 Kiev, Ukraine UITT* Travel Market (CIBTM)* 24 Delhi Tourism Fiji’s Roadshow 4-6 Mumbai Atout France’s ‘France 24-27 Singapore Zak Salaam India Tourism APRIL Promotion’ Expo - Singapore 6-8 Mumbai IITM Mumbai 25-27 Switzerland Travel Expo 6-8 Pune TTF 25-27 Coimbatore Holiday Expo 4-6 Baku, Azerbaijan Azerbaijan International Tourism Fair (AITF)* 8-11 Prince Edward Canadian Tourism Commission’s 25-27 Nagpur India International Travel Exhibition 5 Lucknow Macau Govt Tourist Office B2B Island, Canada Go Media 25-27 Germany Leisure Travel Market Workshop 13-15 Delhi-NCR IITM Gurgaon 30-3 Madrid, FITUR* Spain 8-9 Cape Town, International Luxury Travel Market 17-20 Moscow, Russia Otdykh Leisure 31-2 Kochi India International Travel Mart South Africa Africa (ILTM Africa) 17-20 Moscow, Russia Luxury Leisure 31-3 Feb Istanbul, Turkey EMITT* 9-11 Beijing, China China Outbound Travel Tourism 24 Kiev, Ukraine Luxury Travel Market Mart (COTTM)* 24-27 Paris, France International French Travel Market FEBRUARY 11-13 Novosibirsk, Russia SITT (TOURSIB)* Top Resa 14-16 Jaipur Great India Travel Bazaar 25-27 Astana, Kazakhstan Astana Leisure* 2-3 Innsbruck, Austria Travel Trend 21-24 Auckland, Tourism New Zealand 27 Almaty, Kazakhstan Luxury Travel Market New Zealand TRENZ 2013 2-4 Chandigarh India Travel Mart (ITM) 30-3 Oct Cancun, Mexico International Luxury Travel 23-25 Sao Paulo, Brazil World Travel Market 5 Mumbai Austrian National Tourist Office’s Market Americas (ILTMA)* B2B Event Latin America* 5-6 London, UK The Travel Technology Show 23-26 Riyadh, Riyadh Travel Fair 5-6 5-6 London, UK Tel Aviv, Israel Business Travel & Meetings Show International Mediterranean 24-26 Saudi Arabia Almaty, Kazakhstan International Tourism OCTOBER Tourism Market Kazakhstan Fair (KITF)* 1-3 Bangkok, Thailand IT&CMA CTW 6 Chennai Austrian National Tourist Office’s 4-6 Indore IITE B2B Event 7 Delhi Austrian National Tourist Office’s B2B Event MAY 10-12 St. Petersburg, Russia Inwetex-CIS Travel Market 5-7 Stuttgart, German Travel Mart 10-12 St. Petersburg, MICE Industry 7-10 Prague, Holiday World Russia Czech Republic Germany 14-18 Hanzhou, China Canadian Tourism Commission’s 8-10 Mumbai TTF & OTM 6-9 Dubai, Arabian Travel Showcase Asia 12 Ahmedabad Tourism Philippines’ Roadshow UAE Market (ATM)* 18-21 Taipei, Taiwan Taipei International Travel Fair 13 Kolkata Tourism Philippines’ Roadshow 9-11 Shanghai, China World Travel Fair 23-25 Singapore ITB Asia 14-16 Delhi TTF & OTM 11-14 Durban, Indaba Expo 14-17 Milan, Italy BIT South Africa NOVEMBER 18-21 Johannesburg, Meetings Africa 12-15 Ottawa, Canada Canadian Tourism South Africa Commission’s Rendezvous 19 Mumbai Disney Parks - Disney Days Trade Canada Event 13-15 Kuwait City, Travel World Expo 4-7 London, World Travel Market* Kuwait UK (WTM) 21 Delhi Disney Parks - Disney Days Trade Event 16-18 Lugano, Meeting Luxury 6-7 London, UK Business Travel Market 22 Ahmedabad Macau Govt Tourist Office’s Trade Switzerland 11-14 Costa Daurada, International Golf Travel Market Workshop Spain 22 Mumbai Canadian Tourism Commission JUNE 22-24 Pune IITM Agents Training Programme 22-24 Pune IITM Pune 22-24 Bhubaneswar Holiday Expo 23-25 Ahmedabad Indian Travel Mart (ITM) 3-6 Shanghai, China International Luxury Travel 26 Delhi German National Tourist Board Market Asia (ILTMA)* Roadshow’s B2B Event 25 Delhi Canadian Tourism Commission Agents Training 11-13 Chicago, USA Americas Incentive 27 Bengaluru German National Tourist Board Programme Business Travel & Roadshow’s B2B Event 25-26 Delhi ATOUT France’s Paris Meetings Exhibitions (AIBTM)* 29 Mumbai German National Tourist Board Promotion 13-16 Hong Kong, International Travel Expo Roadshow’s B2B Event 26-27 Melbourne, Asia Pacific Meetings and SAR China 29 -1 Dec Hyderabad IITM Hyderabad Australia Incentive Expo (AIME) 13-16 Hong Kong, ITE MICE 27-1 Mumbai ATOUT France’s Paris Promotion SAR China 27- 2 Mar Jaipur Canadian Tourism Commission’s Focus Canada India 21-23 Beijing, China Beijing International Tourism Expo (BITE) DECEMBER 27-3 Mar Lisbon, Portugal BTL 26-27 Auckland, Tourism New Zealand 2-5 Cannes, France International Luxury 28-2 Mar Kolkata IITM Kolkata New Zealand MEETINGS 2013 Travel Market* *For more details, contact: ddpexhibitions@ddppl.com
  • 43.
    NEWS Teeing off onIndian grounds India Golf Tourism Association (IGTA) will kickstart 2013 on a positive note by participating in the Ministry of Tourism’s North East International Travel Mart scheduled to be held in January in Assam… Secretary, Vipan Sharma- Jt. T T B U R E AU Secretary and RK Mathur- Treasurer. The IGTA officials L eading golf enthusiasts from the tourism and hospitality industry have desire to work closely with the Ministry of Tourism to ensure that Golf in near come together to launch future becomes a major con- India Golf Tourism tributor to the tourist arrivals Association (IGTA), which in India. strives to enhance India’s golf offerings. The new associa- Here, Sehgal adds, “Golf tion also strives forward to is India’s best kept secret. bring International Golf Meet The country has the rare Asia 2014 to India. Rajan Sehgal advantage of having an array President IGTA of golf courses from the met- As per Rajan Sehgal, ros to the mountains as well President, IGTA, “The India as courses with great histor- Golf Tourism Association has conduct an annual Golf ical importance. Once in been formed to bring all golf Tourism Conference, work as India, the tourists coming courses and golf tour promot- a dialogue facilitator with all arriving for experiencing golf ers on one platform. This stakeholders to better pack- will also be inspired by helps in bringing better age the Indian golf product to India’s attractions such as understanding and coordina- maximise foreign visitor spa, culture, adventure, din- tion among various stake- arrivals in India,” he added. ing and business offerings.” holders promoting golf in IGTA has planned a host India. Our membership will of events and will kick start be open to travel and tour operators, golf courses, 2013 on a positive note by Plan of action participation in the Ministry hotels, airlines, state tourism of Tourism’s North East The IGTA was launched in the boards and international International Travel Mart first week of December 2012 tourism organisations.” scheduled to be held in at Suryaa, New Delhi “IGTA hopes to bring in January in Assam. The IGTA the prestigious International was launched in the first The IGTA officials desire to Golf Meet Asia 2014 to India. week of December 2012 at work closely with the Ministry of Tourism to ensure that Golf Besides this, the association Suryaa, New Delhi and its in near future becomes a will work towards inviting executive team also includes major contributor to the tourist foreign golf tour operators to Gajender Singh-Vice arrivals in India experience golfing in India, President, Uday Marwah- IGTA launched in New Delhi The IGTA was launched in the first week of December 2012 at Suryaa, New Delhi and its executive team includes Gajender Singh-Vice President, Uday Marwah-Secretary, Vipan Sharma- Jt. Secretary and RK Mathur-Treasurer. The IGTA will strive forward to make India a leading golfing destination. Courtyard Kochi Airport by Marriott Strategically located 300 have a contemporary look Rooms making it the highest meters from the Kochi and feel, the hotel reflects room inventory in the vicin- International Airport, the refreshing hospitality ity of the Kochi International Courtyard by Marriott, Kochi offered by the Marriott Airport. All the rooms come Airport is well connected to Group. The hotel has 107 fully equipped with hi-speed all major destinations in and rooms that include 7 Suites, internet, ergonomic seating, around Kochi. Designed to 22 Twin Rooms & 78 King tea/coffee maker etc.
  • 44.
  • 45.
    CLIPBOARD JANUARY 1 ST FORTNIGHT ISSUE 2013 TRAVTALK 43
  • 46.
    44 TRAVTALK JANUARY 1 ST FORTNIGHT ISSUE 2013 MOVEMENTS Bhutan Tourism Corporation Limited Marriott Hotels India JW Marriott Hotel New Delhi Aerocity Delhi Delhi New Delhi Vishal Kumar has been appointed as the Head Sales & Vishal Gupta is the new Director of Travel Trade Sales for the Josef Schuppler has been appointed as the Director of Marketing - India Representative for Bhutan Tourism Corporation Marriott Hotels India. Prior to this stint, he was the Director of Operations at the JW Marriott Hotel New Delhi Aerocity, which Limited (BTCL). He brings with him almost Sales for the Greenbelt Marriott and Marriott is scheduled to open in early 2013. 13 years of experience in Hospitality & Inn & Conference Centre UMUC in Maryland, Schuppler has over seven years of Aviation industry. In his current role, he USA. He has been with Marriott International experience in managing the Food & would take care of Sales & Marketing for 12 years now and has extensive Beverage division across Marriott hotels and setting up Bhutan as a destination international work-experience that covers in Asia including the JW Marriott Hong for the Indian Market. Kumar has worked countries such as Australia, St. Kitts Kong, JW Marriott Beijing and JW with Eaton Smart Transit hotel – T-3, DIAL (Caribbean) and United States before Marriott Shanghai. He tables invaluable for the T3 Operations & Project Planning returning back home to India. multi-property experience, off-property & hotels in various locations in India such Gupta has worked with events and expertise in F&B as well as as InterContinental The Grand & eminent brands such as Hotel operations management. The Grand New Delhi. InterContinental, Sydney and The Hilton New Delhi. Bengaluru Marriott Hotel Whitefield Bengaluru Neeraj Maharshi is the new Director of Sales and Marketing at JW Marriott Hotel New Delhi Aerocity. He comes with 15 Sonika Chaturvedi is the new Director of Human Resource Gaurav Apte has joined the Bengaluru Marriott Hotel, years of experience in the hotel industry. In his previous role, at the Bengaluru Marriott Hotel Whitefield. She Whitefield as the Director of Rooms. In this Maharshi held the position of the Director of Sales and comes in with 14 years of experience in profile, he will be responsible for overseeing Marketing at the Jaipur Marriott. He was the field of Human Resources, financial interactions & transactions. also instrumental in positioning the organisation development, training & Previously, Apte was associated with the Jaipur Marriott as the ideal destination customer service in hotels, telecom & Courtyard by Marriott, Pune Hinjewadi as for MICE and leisure business. In his BPO. Prior to joining this profile, the Director of Rooms, where he played a present profile, he will work towards Chaturvedi worked at the Renaissance significant role in ensuring its successful maximizing the hotel revenue from Hotel and Convention Centre & Marriott opening. He has earlier worked with The different market segments and lead the Executive Apartments, Mumbai as the Lakeside Chalet Marriott Executive hotel’s sales team. Director of Human Resources, where Apartments and The she successfully managed the Renaissance Mumbai Hotel department with her experience & Convention Centre in this segment. for 7 years. Renaissance Mumbai Convention Hilton Mumbai International Airport Courtyard by Marriott Pune City Centre Centre Hotel and Lakeside Chalet Mumbai Pune Mumbai, Marriott Executive Kasturi Deo has joined the Hilton Mumbai International Airport Shubhendu Kadam is appointed as the Executive Chef at Apartments as the Executive Housekeeper. She brings in more than 15 years Courtyard by Marriott Pune City Centre. He brings with him 16 of experience with her to this new role. In years of experience in the hospitality Mumbai her former position at Bombay Dyeing domain. Kadam encompasses an & Manufacturing, she was heading expertise in pre-opening and refurbishing Neesha Mohapatra has joined of Hotel F&B, Speciality restaurants and housekeeping operations for the Renaissance Mumbai Convention Centre Cruise Ships in India, The Philippines and Mumbai-based company with Hotel and Lakeside Chalet - Mumbai, USA. He started his career as a diverse interests in textile, airlines, Marriott Executive Apartments as Commis - II chef at Hyatt Regency, New FMCG and realty. Prior to this, Deo the new Director of Human Delhi in October 1996. His career stints also held positions with Leela Resources. Her portfolio includes include working at Park Hyatt Goa Kempinski in Mumbai, Taj working with brands like The Unison and Fort Aguada Beach Residency in Vadodara, Hotels Group, The Leela Group Resort, Goa as and the Hotel Ramada in and the InterContinental InterContinental Goa. Mumbai and others. Hotels Group. Karim Makhlouf , Chief Simon Wan, Chief Executive and Commercial Officer, Gulf Air Managing Director, StayWell was in India to celebrate 31 Hospitality Group says, “I spend years of operations. He was around two weeks every month trav- born in Germany and started elling for work. Thus, my wife has his career with Lufthansa, started calling me Mr Who,” he Talking People is a special dedicated corner, created as a sounding where he worked for over 10 chuckles. When Wan is home, he likes board for who’s who of the Indian and International travel industry. With years. He loves the multicultur- to spend time with his wife and two Talking People, it is our endeavour to bring you face-to-face with people. Contributed by: Vivek Sethi, Dency Mathew & Megha Paul al environment in Bahrain, Karim Makhlouf daughters, aged 15 and 17. “I love Simon Wan which he believes has strong Chief Commercial Officer cooking. It acts as the best rejuvena- Chief Executive and resemblance with Indian ethos. Gulf Air tion therapy for me. I grow my own Managing Director, StayWell Hospitality Group Makhlouf is passionate about herbs and vegetables in my garden.” Patricia Yates, Director of Strategy and golf, cooking and fitness. He has recently been blessed Wan also likes sneaking in for a game of golf occasionally. Communications, VisitBritain has done her masters with a baby girl and loves spending time with his family He loves to watch action-packed movies. “Skyfall was the in Physics from Oxford University and treaded into that includes his wife and son. last movie I saw and thoroughly enjoyed it,” he says. travel writing, while working for a science journal. She is also a fellow of the Tourism Society and had joined VisitBritain just prior to London was announced as the host city of Olympics and Yann Gillet, General Manager, Park Hyatt Chennai was born and brought up in Pessac, a village next to Bordeaux in France, known for the Chateau Haut Brion. Hailing from a family of a physicist Paralympic Games. Yates loves travelling, reading father and three doctor sisters, Yann has travelled extensively as a child to countries that include and is also a fitness freak. “I firmly believe that the Patricia Yates Sweden, USA, South Africa, Spain, China and many others. This, he believes, is where the first Director of Strategy and travellers today have a global vision and their needs seed of his passion for the hospitality industry were sown. Communications should be addressed accordingly,” she says. VisitBritain Gillet is an avid sports enthusiast with interests ranging from football, running and water sports. He is adept at sailing, surfing, kite surfing and windsurfing and has also been an instructor of the latter at Bordeaux. “I love running and am doing a 10 km run with absolute ease every Yann Gillet General Manager weekend,” he says while talking about his daily routine. Park Hyatt Chennai
  • 48.
    Postal Reg. No.:DL(ND)-11/6044/2012-13-14; WPP No.: U(C)-178/2012-14 for posting on 1st-2nd and 15th-16th of the same month at New Delhi P.S.O., RNI No.: 53492/91 Date of Publication:30-12-2012 HIGHLIGHT Affordable travel in 2013: Kuoni Rajeev Wagle, Managing Director at Kuoni India is making all efforts to bring out the best business models, marketing strategies and product lines with more focus on FITs. He also plans to make travel more affordable for Indians. Why cautiously opti- are doing lot of stuff on the Moreover, we are also A N I TA J A I N mistic and not confident- product, destination and dis- working closely with our ly positive? tribution sides which we Kuoni offices worldwide to D espite turbulence faced by the Indian tourism industry in 2012, Kuoni This is because no one can take a beat on the growth believe will take us to much higher growth in 2013. We bring in more diverse knowl- edge of various destinations, are used to the new level of better deals with suppliers India comfortably managed rates in 2013. I feel we are on rupee and we still have and seamless experience for to record single digit the right track and might hit affordability as a plank. At our customers in any part of growth. However, with the seven per cent GDP. Kuoni India, we are ready for the world by consistent serv- things looking cautiously positive and pleasantly con- With more travellers this year with better hotel ice under Kuoni umbrella. fusing in 2013, the company searching online and deals, affordable travel pack- How will you make travel is well-prepared with a solid gaining confidence in ages, revamped distribution more affordable for business strategy to record OTAs, what lies ahead model, our spread out reach Indian travellers in 2013? a higher double digit growth for the offline agents? in the country and with our differentiated products I think the industry this year. Moreover, it is also OTAs have done a great on-board etc. needs to do a lot of affordabil- ready to take on its B2B divi- job by opening up the travel ity. Our economy is growing; sion - Kuoni Business Travel market in the country. With There is a lot of growth our middle class travellers are to the next level by bringing seamless technology, they are coming from Tier II and Tier becoming richer and need for in more efficiency and tak- really good at air ticketing III cities and we are all set to travel is already implanted in ing it to the international and one-destination pack- tap that growth. Also, after their head. So, if our travel markets in a few years. ages. However, complex and consolidating our group tour packages become more afford- multi-destination travel business, we are now looking able, the overall economy will The year 2012 witnessed bookings market is still at FIT (both high-end and benefit out of it. Thus by mak- unstable global economy, owned by offline agents. With budget), a segment where we ing the price point cheaper, drifting currency, fluctu- evolving market, there is want to make a difference. more numbers will travel. This ating airfares, etc. How place for both online and This is now possible with our part can be worked upon by will you see 2013 for your offline travel agents. India is strong IT system (CRM) in the industry, but, on the other business? a unique market with a place which enables us to side, government should fur- hybrid operating model (com- service the customer at the During the first half, ther open up our skies, pany with both online and point of sale with good rates. Indian tourism industry faced improve air connectivity, offline presence). It will also help us maximise tough times, but the second develop infrastructure, etc. each line of product to cater half was more pleasant with Kuoni India has aspira- India is one of the highest to every segment of traveller. reforms coming from the tions to go online, but we will spending markets for various government’s side like FDI in never try to compete with countries and thus there are retail and aviation, regulating any OTA as the business good numbers of NTOs pres- the banking industry, amend- model is different. We do ent here. This shows our ment Bill being passed, stock have our website and high- potential and it’s time to markets performing well, etc. light our products, but, for make travel affordable. Let These reforms proved to be a bookings, we will direct the more people travel and boon for the Indian economy customer to a branch. expand our market size. making 2013 look more pos- itive. A feel good economy Are you prepared for makes people do discre- 2013? Trends in 2012 tionary spend and thus, trav- Rupee drift- Trends of people travelling el comes into picture. I think ing with the econ- more frequently became the general view is good. omy and travellers more pronounced Economy grew at 5.4% in the down-trading was Category of travellers has first half and is expected to observed in 2012. been widened with travellers end at 5.8-5.9%, which Since it came in travelling with friends, family, means second half is already suddenly, travel in groups, etc budgeted at higher level. industry was not Travellers down-trading on Since our tourism industry is prepared for it. This their trips (cutting down directly attached to the coun- year we are better on number of travelling try’s economy at macro level, prepared. We still days, opting for short-haul I’m cautiously optimistic grew last year but we destinations, selecting about the growth opportuni- did not meet our tar- domestic over short-haul ties for this year. gets. So this year, we Rajeev Wagle, MD, Kuoni India international destinations etc)