Champions Six Sigma
Training
Santo André
October, 2015
Bem vindos…
Opening
Why are we
here?
Agenda
# Item Time duration
1 Opening 15 min
2 Global OpEx overview 5 min
3 M2S overview 5 min
4 M2S CI overview 5 min
5 OpEx multifunctional Teams 1h
6 Improvement Model 30 min
7 Lean Six Sigma 1h
OpEx
Global OpEx Overview
Maxion Wheels Confidential and Proprietary
Don Polk
President Americas
Tracey Nicholson
Director
Global Operational Excellence
Eduardo Borges
Regional OPEX
Manager
Americas
Carles Caparros
Regional OPEX
Manager – Europe
Steel
Mert Cetinel
Regional OPEX
Manager – Europe,
S. Africa – Alum.
Vijay Kari
Regional OPEX
Manager -Asia
Juan Lorenzo
President EAAP
Global OpEx Structure
Global OpEx Vision and Mission
Global OpEx Vision:
To become Maxion Wheels' leading support function providing
sustainable operational improvements to generate value for
the company.
Global OpEx Mission:
Support the Maxion wheel plants to exceed or to achieve the
performance targets by deploying Continuous Improvement
culture and engaging the employees through the use of OpEx
tools and methodologies.
Main Roles of OpEx Department to ensure the factory achieve
Best in Class performance.
1) Define methods and tools
2) Training of methodology and tools
3) Provide coaching on methodologies and tools
4) Ensure the right application of the concepts, methodology
and tools
5) Recognize the best OpEx teams and Natural Work Teams
Main OpEx Roles and Responsibilities
OpEx
M2S
Maxion Management System
Maxion Wheels Global Footprint
21 factories with different cultures
To become “One Global Company”
Maxion Wheels Global Footprint
Best Practices Sharing
How to identify the Best Practices?
Maxion Management System
The Maxion Management System is our set of global, integrated
business and operational process standards utilized throughout
the organization to produce value for our stakeholders.
The way to identify and deploy the Maxion Wheels Best
Practices.
M2S Definition
M2S Pillars Structure
Started with Production Management pillar – other potential pillars in the future:
People, Quality, Finance, IT,
Global Management Systems,
Product & Process Engineering, etc.
PRODUCTION
A. Standard Work
B. Communication
C. Visual Management
D. Workforce Planning
E. Maintenance
Systems
F. Production Planning
G. Continuous
Improvement
Different Pillars.
Standards within the pillar contain elements.
PILLARS STANDARDS ELEMENTS
14
PEOPLE
A. Organizational
Development
B. Workforce Planning
& Talent Acquisition
C. Leadership
Development
D. Performance
Management
E. Employee
Development
F. Employee Relations
G. Compensation &
Benefits
M2S Pillars Structure
Started with Production Management pillar – other potential pillars in the future:
Materials, People, Quality, Finance, IT,
Product & Process Engineering, Sales,
Legal, etc.
PRODUCTION
MANAGEMENT
A. Standard Work
B. Communication
C. Visual Management
D. Workforce Planning
E. Maintenance
Systems
F. Production Planning
G. Continuous
Improvement
7 Standards
PILLARS STANDARDS ELEMENTS
Elements
A. 5 E. 13
B. 5 F. 6
C. 10 G. 8
D. 6
Requirements
383
M2S Standards
M2S
Standard Work
Communication
Visual Management
Workforce Planning
Production Planning
Maintenance
Continuous Improvement
1
2
3
4
5
7
6
Plan - M2S Assessment
M2S Assessment Form example
ELEMENT DESCRIPTION
All Process Leaders know how their actual performance compares to the takt time; evidence of the
actual and takt times are readily available.
All Process Leaders understand the difference between takt time and cycle time.
Takt Time
Takt time is the rate at which the customer is buying our
wheels. Once we know the takt time, we know the rate at
which we must produce products throughout our processes;
it is rate at which parts need to leave a cell. It reflects the
customer demand and it can be used as a basis to allocate
work among employees and the efficient use of resources,
such as optimum staffing requirements, minimum work-in-
process (WIP) requirements and the number of machines
required to meet the customer demand. Takt time is
sometimes referred to as the Voice of the Customer inside
the process.
Process Leaders understand how to calculate the takt time. Takt times are updated for each
significant change and at a minimum of each quarter.
All Process Leaders know what the current takt time is.
REQUIREMENTS REF
Takt time is understood by Process Leaders.
Plan - M2S Assessment
M2S Scores Definition
1 – No evidence of use. Action Plan is required to go to required level.
2 – Limited evidence of use. Plant is aware of the requirement and is
currently executing plan to achieve Level 3.
3 – Full evidence of use. Plant meets all of the requirements of Maxion
Standard.
4 – Plant exceeds all requirements.
M2S – Continuous Improvement Cycle
Plan
•Execute the M2S Assessment
•Define the plant target
•Elaborate the action plan
Do
•Execute the Action Plan
Check
•M2S plant monthly review
•M2S quarterly report
Act
•If the actions are according
the planning-> OK!
•If it is not elaborate and
prioritize another actions
What are the focus of the Continuous Improvement standard?
M2S – Maxion Management System
Vision and Mission
OpEx Structure
Natural Work Teams
OpEx Multifunctional Teams
Improvement Suggestion Program
Cost Reduction Projects
5S Program
1
2
3
4
5
7
6
8
M2S
Continuous Improvement
(Melhoria Contínua)
OpEx and Production
Departments
involved
Establish the Best Practices and standard format
regarding the CI initiatives around the world.
Main Objective
M2S
 Vision and Mission
 Continuous Improvement Structure
 Natural Work teams
 OPEX Teams
 Improvement Suggestion System
 Cost Reduction Process
 5S and Workplace Organization
Continuous Improvement
(Melhoria Contínua)
M2S
Continuous Improvement
(Melhoria Contínua)
Natural Work Teams
OpEx Multifunctional
Teams
Improvement
Suggestion Program 5S Program
Teams formed by people
from the same area /
lines with weekly
meetings
300 Natural Teams in
2014
System to capture, manage
and recognize the ideas
from the teams
Around of 4000
improvements
implemented in 2014
Monthly
assessments
Targets for 100% of
the teams
Semi–annual waves of
Green / Black belts
Projects
Kaizen events
Total of projects
concluded 180 in 2014
OpEx Multifunctional Teams
Overview
3.
NWT
4.
OpEx
Teams
5. Improvement
Suggestion
System
&
7. Cost
Reduction
Process
CI process overview according the M2S CI elements
8. Lean
tools
6. Six
Sigma
Tools
• 1. NWT
Vision
Plant
Vision
• 1. NWT
Mission
Plant
Mission
CI Process
Continuous Improvement Process
Input Process Output
OpEx Multifunctional Teams
In your opinion: “What is the OpEx Multifunctional Team
definition?”
“OpEx Multifunctional Teams is.....
OpEx Multifunctional Teams
What is the OpEx Multifunctional Team
definition?
OpEx Multifunctional Team is a group of people with different
functional expertise working toward a common goal. In Maxion
Wheels, these are teams whose mission is to solve complex
problems, characterized for having their knowledge multiplied in
different and diverse knowledge areas. These teams present a
beginning, middle and end, that is, a definite time frame for the
conclusion, according to the project schedule.
OpEx teams management system
Define the
project and
team members
Define the
methodology
Train the
projects
leaders
Develop the
projects
Perform the
coaching
sessions
Performance
the tollgates
review
Certify the
project leaders
Define the
project and
team members
Define the
methodology
Train the
projects
leaders
Develop the
projects
Perform the
coaching
sessions
Performance
the tollgates
review
Certify the
project
leaders
OpEx teams management system
Source of Projects
Who is responsible
to define the
projects???
OpEx Committee:
• Lead by OpEx
• Participants are
Plant Manager
and the Staff
Managers
How to define Lean Six Sigma projects?
Total 5329 5221 42168
102611 30079 11946 8518 8462 7117 6983 5673
Percent 2,3 2,2 18,0
43,8 12,8 5,1 3,6 3,6 3,0 3,0 2,4
Cum % 79,8 82,0 100,0
43,8 56,7 61,8 65,4 69,0 72,1 75,1 77,5
C2
O
th
er
Testespara
conf fa
lh
a
G
ravação
Irregula
r
Vazam
ento
ST
Defe
ito
sST
D
efeito
s
de
Pintu
ra
Trinca
e
Rachado
Aros
Danificados
Suje
ira
sobre
Pintu
ra
O
scila
ção
Radial
Riscos e
Marcas
250000
200000
150000
100000
50000
0
100
80
60
40
20
0
Total
Percent
Principais defeitos PPM Interno (Jan-Ago/2014)
Projetos Seis Sigma: 0,35 0,35 0,30 1,00 0,40 0,20 0,40 1,00
Projeto: descrição
Proj.
Aprov.
(S/N)
Satisfação
de Clientes /
Corporação
Redução de
Custo
Impacto
Indicadores
Sistema de
Gestão
Total do
Benefício
Conflito com
iniciativas já
existentes
Prazo p/
conclusão
Probabilidade
de
Investimento
($$$)
Total do
Esforço
Pontuação
final
Produtividade MO Direta S 10 10 10 10,00 1 7 3 1,60 8,40
Energia Elétrica S 10 10 10 10,00 1 7 7 3,20 6,80
% de treinamentos x realizados
– Investimento em treinamento
S 1 5 10 5,10 1 7 1 0,80 4,30
Gestão de peças de Falha de
fornecedor
S 5 5 10 6,50 3 5 3 2,40 4,10
Tempo de desenvolvimento de
produto
S 10 1 10 6,85 5 5 3 3,20 3,65
Inventário do aço (peso de
corte)
S 1 5 5 3,60 1 7 1 0,80 2,80
Concentração do Boro S 10 1 7 5,95 3 7 5 3,20 2,75
Aumento do OEE das
blanqueadeiras
S 3 7 5 5,00 1 5 5 2,40 2,60
Aumento do OEE da Linha 04 -
Laminação
N 5 5 5 5,00 1 7 5 2,40 2,60
OEE da Montagem L02 N 5 1 7 4,20 1 7 5 2,40 1,80
Sujeira sobre pintura S 5 1 7 4,20 1 5 5 2,40 1,80
Custo de Prevenção (Custo da
qualidade)
N 1 1 5 2,20 1 10 1 0,80 1,40
OEE da Montagem L01 N 5 1 5 3,60 1 7 5 2,40 1,20
Esforço
Benefícios
Analyze the Factory KPI´s
Identify and prioritize projects
Define the team members
How to define Lean Six Sigma projects?
Total 5329 5221 42168
102611 30079 11946 8518 8462 7117 6983 5673
Percent 2,3 2,2 18,0
43,8 12,8 5,1 3,6 3,6 3,0 3,0 2,4
Cum % 79,8 82,0 100,0
43,8 56,7 61,8 65,4 69,0 72,1 75,1 77,5
C2
O
th
er
Testespara
conf fa
lh
a
G
ravação
Irregula
r
Vazam
ento
ST
Defe
ito
sST
D
efeito
s
de
Pintu
ra
Trinca
e
Rachado
Aros
Danificados
Suje
ira
sobre
Pintu
ra
O
scila
ção
Radial
Riscos e
Marcas
250000
200000
150000
100000
50000
0
100
80
60
40
20
0
Total
Percent
Principais defeitos PPM Interno (Jan-Ago/2014)
Projetos Seis Sigma: 0,35 0,35 0,30 1,00 0,40 0,20 0,40 1,00
Projeto: descrição
Proj.
Aprov.
(S/N)
Satisfação
de Clientes /
Corporação
Redução de
Custo
Impacto
Indicadores
Sistema de
Gestão
Total do
Benefício
Conflito com
iniciativas já
existentes
Prazo p/
conclusão
Probabilidade
de
Investimento
($$$)
Total do
Esforço
Pontuação
final
Produtividade MO Direta S 10 10 10 10,00 1 7 3 1,60 8,40
Energia Elétrica S 10 10 10 10,00 1 7 7 3,20 6,80
% de treinamentos x realizados
– Investimento em treinamento
S 1 5 10 5,10 1 7 1 0,80 4,30
Gestão de peças de Falha de
fornecedor
S 5 5 10 6,50 3 5 3 2,40 4,10
Tempo de desenvolvimento de
produto
S 10 1 10 6,85 5 5 3 3,20 3,65
Inventário do aço (peso de
corte)
S 1 5 5 3,60 1 7 1 0,80 2,80
Concentração do Boro S 10 1 7 5,95 3 7 5 3,20 2,75
Aumento do OEE das
blanqueadeiras
S 3 7 5 5,00 1 5 5 2,40 2,60
Aumento do OEE da Linha 04 -
Laminação
N 5 5 5 5,00 1 7 5 2,40 2,60
OEE da Montagem L02 N 5 1 7 4,20 1 7 5 2,40 1,80
Sujeira sobre pintura S 5 1 7 4,20 1 5 5 2,40 1,80
Custo de Prevenção (Custo da
qualidade)
N 1 1 5 2,20 1 10 1 0,80 1,40
OEE da Montagem L01 N 5 1 5 3,60 1 7 5 2,40 1,20
Esforço
Benefícios
Analyze the Factory KPI´s
Identify and prioritize projects
Define the team members
The main source of Lean Six Sigma projects are:
 VSM
 POR metrics
 PD metrics
 Deployment of cost
 Managers interview to define the VOC
How to define Lean Six Sigma projects?
The root cause is unknown
Process can be optimized to define the best performance
There is GAP between the current performance compared with
the request performance
Project is aligned with the company strategy
Project should increase the Customer satisfaction
Six Sigma projects characteristics
How to define Lean Six Sigma projects?
Total 5329 5221 42168
102611 30079 11946 8518 8462 7117 6983 5673
Percent 2,3 2,2 18,0
43,8 12,8 5,1 3,6 3,6 3,0 3,0 2,4
Cum % 79,8 82,0 100,0
43,8 56,7 61,8 65,4 69,0 72,1 75,1 77,5
C2
O
th
er
Testespara
conf fa
lh
a
G
ravação
Irregula
r
Vazam
ento
ST
Defe
ito
sST
D
efeito
s
de
Pintu
ra
Trinca
e
Rachado
Aros
Danificados
Suje
ira
sobre
Pintu
ra
O
scila
ção
Radial
Riscos e
Marcas
250000
200000
150000
100000
50000
0
100
80
60
40
20
0
Total
Percent
Principais defeitos PPM Interno (Jan-Ago/2014)
Projetos Seis Sigma: 0,35 0,35 0,30 1,00 0,40 0,20 0,40 1,00
Projeto: descrição
Proj.
Aprov.
(S/N)
Satisfação
de Clientes /
Corporação
Redução de
Custo
Impacto
Indicadores
Sistema de
Gestão
Total do
Benefício
Conflito com
iniciativas já
existentes
Prazo p/
conclusão
Probabilidade
de
Investimento
($$$)
Total do
Esforço
Pontuação
final
Produtividade MO Direta S 10 10 10 10,00 1 7 3 1,60 8,40
Energia Elétrica S 10 10 10 10,00 1 7 7 3,20 6,80
% de treinamentos x realizados
– Investimento em treinamento
S 1 5 10 5,10 1 7 1 0,80 4,30
Gestão de peças de Falha de
fornecedor
S 5 5 10 6,50 3 5 3 2,40 4,10
Tempo de desenvolvimento de
produto
S 10 1 10 6,85 5 5 3 3,20 3,65
Inventário do aço (peso de
corte)
S 1 5 5 3,60 1 7 1 0,80 2,80
Concentração do Boro S 10 1 7 5,95 3 7 5 3,20 2,75
Aumento do OEE das
blanqueadeiras
S 3 7 5 5,00 1 5 5 2,40 2,60
Aumento do OEE da Linha 04 -
Laminação
N 5 5 5 5,00 1 7 5 2,40 2,60
OEE da Montagem L02 N 5 1 7 4,20 1 7 5 2,40 1,80
Sujeira sobre pintura S 5 1 7 4,20 1 5 5 2,40 1,80
Custo de Prevenção (Custo da
qualidade)
N 1 1 5 2,20 1 10 1 0,80 1,40
OEE da Montagem L01 N 5 1 5 3,60 1 7 5 2,40 1,20
Esforço
Benefícios
Analyze the Factory KPI´s
Identify and prioritize projects
Define the team members
Projects priorization Matrix
Oportunidades de Projetos
Projetos Seis Sigma: 0,35 0,35 0,30 1,00 0,40 0,20 0,40 1,00
Nr Projeto: descrição
Proj.
Aprov.
(S/N)
Satisfação
de Clientes /
Corporação
Redução de
Custo
Impacto
Indicadores
Sistema de
Gestão
Total do
Benefício
Conflito com
iniciativas já
existentes
Prazo p/
conclusão
Probabilidade
de
Investimento
($$$)
Total do
Esforço
Pontuação
final
Clas
do
1 Produtividade MO Direta S 10 10 10 10,00 1 7 3 1,60 8,40
2 Energia Elétrica S 10 10 10 10,00 1 7 7 3,20 6,80
3
% de treinamentos x realizados
– Investimento em treinamento
S 1 5 10 5,10 1 7 1 0,80 4,30
4
Gestão de peças de Falha de
fornecedor
S 5 5 10 6,50 3 5 3 2,40 4,10
5
Tempo de desenvolvimento de
produto
S 10 1 10 6,85 5 5 3 3,20 3,65
6
Inventário do aço (peso de
corte)
S 1 5 5 3,60 1 7 1 0,80 2,80
7 Concentração do Boro S 10 1 7 5,95 3 7 5 3,20 2,75
8
Aumento do OEE das
blanqueadeiras
S 3 7 5 5,00 1 5 5 2,40 2,60
9
Aumento do OEE da Linha 04 -
Laminação
N 5 5 5 5,00 1 7 5 2,40 2,60
Esforço
Benefícios
How to define Lean Six Sigma projects?
Total 5329 5221 42168
102611 30079 11946 8518 8462 7117 6983 5673
Percent 2,3 2,2 18,0
43,8 12,8 5,1 3,6 3,6 3,0 3,0 2,4
Cum % 79,8 82,0 100,0
43,8 56,7 61,8 65,4 69,0 72,1 75,1 77,5
C2
O
th
er
Testespara
conf fa
lh
a
G
ravação
Irregula
r
Vazam
ento
ST
Defe
ito
sST
D
efeito
s
de
Pintu
ra
Trinca
e
Rachado
Aros
Danificados
Suje
ira
sobre
Pintu
ra
O
scila
ção
Radial
Riscos e
Marcas
250000
200000
150000
100000
50000
0
100
80
60
40
20
0
Total
Percent
Principais defeitos PPM Interno (Jan-Ago/2014)
Projetos Seis Sigma: 0,35 0,35 0,30 1,00 0,40 0,20 0,40 1,00
Projeto: descrição
Proj.
Aprov.
(S/N)
Satisfação
de Clientes /
Corporação
Redução de
Custo
Impacto
Indicadores
Sistema de
Gestão
Total do
Benefício
Conflito com
iniciativas já
existentes
Prazo p/
conclusão
Probabilidade
de
Investimento
($$$)
Total do
Esforço
Pontuação
final
Produtividade MO Direta S 10 10 10 10,00 1 7 3 1,60 8,40
Energia Elétrica S 10 10 10 10,00 1 7 7 3,20 6,80
% de treinamentos x realizados
– Investimento em treinamento
S 1 5 10 5,10 1 7 1 0,80 4,30
Gestão de peças de Falha de
fornecedor
S 5 5 10 6,50 3 5 3 2,40 4,10
Tempo de desenvolvimento de
produto
S 10 1 10 6,85 5 5 3 3,20 3,65
Inventário do aço (peso de
corte)
S 1 5 5 3,60 1 7 1 0,80 2,80
Concentração do Boro S 10 1 7 5,95 3 7 5 3,20 2,75
Aumento do OEE das
blanqueadeiras
S 3 7 5 5,00 1 5 5 2,40 2,60
Aumento do OEE da Linha 04 -
Laminação
N 5 5 5 5,00 1 7 5 2,40 2,60
OEE da Montagem L02 N 5 1 7 4,20 1 7 5 2,40 1,80
Sujeira sobre pintura S 5 1 7 4,20 1 5 5 2,40 1,80
Custo de Prevenção (Custo da
qualidade)
N 1 1 5 2,20 1 10 1 0,80 1,40
OEE da Montagem L01 N 5 1 5 3,60 1 7 5 2,40 1,20
Esforço
Benefícios
Analyze the Factory KPI´s
Identify and prioritize projects
Define the team members
OpEx Multifunctional Team Structure
Champion Team Members
Factory OpEx Black Belt
Main responsibilities:
 Support the project development
 Remove barriers during the project
execution
 Keep the team members motivated
Champion
OpEx Multifunctional Team Structure
Main responsibilities:
 Train the Belts candidates
 Follow up the projects
 Perform the coaching and
check points meetings
 Support the projects
execution related to
methodology and tools
Factory OpEx Black Belt
OpEx Multifunctional Team Structure
Main Responsibilities:
 Participate of the training
sessions
 Develop the projects
 Get help to remove barriers
during the project execution
Team Members
OpEx Multifunctional Team Structure
Green Belts Skills
Green Belts behavior
GB should understand and question
why the things are as they are!!!!
Behaviors like:
That’s no way...
Should not be used by the GB!!!
They should present
 Initiative
 Enthusiasm
 Skills in communications
 Analytical skills
 Interpersonal relationship,
 Excellent knowledge of the project working area.
Some skills desirable for the team members
Define the
project and
team members
Define the
methodology
Train the
projects
leaders
Develop the
projects
Perform the
coaching
sessions
Performance
the tollgates
review
Certify the
project leaders
OpEx teams management system
Definition of Methodology
Define the
project and
team members
Define the
methodology
Train the team
members
Develop the
projects
Perform the
coaching
sessions
Performance
the tollgates
review
Certify the
project leaders
OpEx teams management system
Maxion Wheels LSS Methodologies
Competence
NWT Facilitators
Yellow Belt
Green Belts
Green Belt
Black Belts
Black Belt
NWT Leaders
White Belt
Training
PHASES
NÍVEIS DO DMAIC
White Belt
(Facilitadores e líderes
times naturais)
Yellow Belt Green Belt Black Belt
DEFINE
Definition of problem, gap
and target
Trend Graph
Definition of problem, gap and
target
Trend Graph
Definition of problem, gap and target
Trend Graph
SIPOC
Definition of problem, gap and target
Trend Graph
Time Series
SIPOC
MEASURE
Stratification
data collection Plan
Check sheet
Pareto Analysis
data collection Plan
Pareto Analysis
Control Charts
Process Capability
Descriptive Statistics
data collection Plan, Check Sheet and
Pareto
M.S.A (Measuring System Analysis)
Control Charts
Process Capability
Sampling
M.S.A. (Measuring System Analysis)
ANALYZE
Brainstorming
Cause-and-Effect Diagram
5 Whys Test
AV and NAV Diagram
Writestorming
Affinity Diagram
FTA
Prioritization Matrix
Process Map, FTA
Hypotheses Test
Correlation Graph
Prioritization Matrix
Full Factorial DOE
Process Map, FMEA, FTA
Full and Fractioned Factorial DOE
EVOP
Response Surface
Regression Analysis
Variance Analysis
IMPROVE 5W2H
Impact Effort Diagram
5W2H
Impact Effort Diagram
5W2H
BASICO Matrix
5W2H
Decision Matrix
CONTROL
Trend Graph, Pareto
Operational instruction,
Poka Yoke
Verify the achievement of target
(Hypotheses Test, Trend Graph,
ets)
Poka yoke, Control Plan
Operational instruction
Verify the achievement of target
(Hypotheses Test, Trend Graph, ets)
Poka yoke, Control Plan
Operational instruction
Verify the achievement of target
(Hypotheses Test, Trend Graph, ets)
Poka yoke, Control Plan
Operational instruction
GB Training Tools
Lean Six Sigma projects Agenda
2015 Six Sigma Project Agenda
June July August Project Definition
S M T W T F S S M T W T F S S M T W T F S
1 2 3 4 5 6 1 2 3 4 1 Launch of Projects
7 8 9 10 11 12 13 5 6 7 8 9 10 11 2 3 4 5 6 7 8
14 15 16 17 18 19 20 12 13 14 15 16 17 18 9 10 11 12 13 14 15 Project Charter Validation
21 22 23 24 25 26 27 19 20 21 22 23 24 25 16 17 18 19 20 21 22
28 29 30 26 27 28 29 30 31 23 24 25 26 27 28 29 Project Coaching meeting
30 31
Green Belt Training
1st session - Introduction &
Define phase
2nd - Measure
3rd - Analyze
4th - Improve & Control
September October November
S M T W T F S S M T W T F S S M T W T F S
1 2 3 4 5 1 2 3 1 2 3 4 5 6 7
6 7 8 9 10 11 12 4 5 6 7 8 9 10 8 9 10 11 12 13 14
13 14 15 16 17 18 19 11 12 13 14 15 16 17 15 16 17 18 19 20 21
20 21 22 23 24 25 26 18 19 20 21 22 23 24 22 23 24 25 26 27 28 Check Point Meeting
27 28 29 30 25 26 27 28 29 30 31 29 30
Project Certification
December
S M T W T F S
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
Agenda Example
Define the
project and
project leader
Define the
methodology
Train the
projects
leaders
Develop the
project
Perform the
coaching
sessions
Performance
the tollgates
review
Certify the
project
leaders
OpEx teams management system
GB meetings structure
We can
improve this
process
We can not
talk now!!!
We are very
busy!!!
 Our suggestion for each team is to
dedicate at least 10 hours per week to
execute their projects.
 The team meetings should be organized
and to have meetings objectives.
 Each meeting should have between 2 ~
3 hours maximum to be productive
 The team should dedicate time to meet
and go to the Gemba to develop their
projects.
GB meetings structure
Some actions can be divided by the team members and
they can work it out of the meetings.
During the tools application: all team members should be
participating of the meetings!
GB meetings structure
Define the
project and
project leader
Define the
methodology
Train the
projects
leaders
Develop the
projects
Perform the
coaching
sessions
Performance
the tollgates
review
Certify the
project
leaders
OpEx teams management system
Follow up meetings
Frequency: Monthly meetings
Participants: team members, Champion and the Factory OpEx
Black Belt
Objective: follow-up and guidance as to the application of the
methodology, tools, project documentation and project
schedule.
Project Coaching meetings
Project Coaching meetings
Coaching
1
Coaching
2
Coaching
3
Coaching
4
Coaching
5
Coaching
6
Coaching
7
Coaching
8
Coaching
9
Coaching
10
Coaching
11
Coaching
12
Coaching
13
Coaching
14
Coaching
15
Team
information
Project
information
Items to be verified during the
coaching meetings:
1. Project timeline
2. Methodology and tools
3. Project documentation
Guide Mapping
Objective
 Register the sequence of the project documentation.
 Guide the team members since the Define phase until the
Control phase.
Main Benefits
 Help the team members the sequence of the problem solving
methodology.
 Provide to the company the project reach and Create a Learning
Organization.
Project Documentation
 During the project development, all the information and analysis done by the
Team must be recorded. One tool to do this is the Guide Mapping.
Define the
project and
project leader
Define the
methodology
Train the
projects
leaders
Develop the
projects
Perform the
coaching
sessions
Performance the
tollgates review
Certify the
project
leaders
OpEx teams management system
Tollgate review
Frequency: Bimonthly meetings
Participants: team members, Champion, OpEx area, Plant Manager,
Managers and BU Operations Director, BU Quality/OPEX Director, Global
OPEX Director.
Objective: Follow-up of the results reached in the period, evidence of the
use of analysis and problem solution tools, evidence of improvements
implemented, necessary redirections of the project. These are results
focused meetings
Check Point meetings
Define the
project and
project leader
Define the
methodology
Train the
projects
leaders
Develop the
projects
Perform the
coaching
sessions
Performance
the tollgates
review
Certify the team
members
OpEx teams management system
GB certification process
Criterias to be certified:
100% of participation in training
Participate of the project
Apply the correct methodology
Target met for 3 month and
standardized process
Improvement Model
Fundamental Concept
Change Improvement
Not always
results in
Demands
≠
Improvement Concept
16
14
12
10
8
6
4
2
9
8
7
6
5
4
3
2
Semana
Tempo
(s)
Tempo de ciclo da laminadora
Change
Improvement
Improvement is a positive, relevant and lasting impact on the
Organization’s interest indicators.
Improvement Concept
Exercise: How to know whether a change is an improvement?
 A change was projected to reduce the
cycle time of an operation.
 The test planning established that the
change would be made between the
seventh and eighth week from the
beginning of the project.
 A cycle time measure was performed in
the fourth week and the result was 8
minutes.
 In the tenth week, a new measure was
performed and result was 3 minutes.
 The cycle time reduction from 8 to 3
minutes was considered very significant
to the process of interest.
 What is the degree of conviction that
the change is an improvement?
Measures of cycle time
Before and After
8
3
0
1
2
3
4
5
6
7
8
9
Before (week 4) After (week 11)
Cycle
Time
(min)
Consider the six scenarios below with cycle time measures every week during 14 weeks from
the beginning of the project. Analyze the cycle time trend graph for each of the scenarios.
For each scenario, what is the degree of conviction that the change is an improvement?
Week Scenario 1 Scenario 2 Scenario 3 Scenario 4 Scenario 5 Scenario 6
1 6 6 9 8 6 3
2 9 2 9 9 9 4
3 7 3 6 7 7 2
4 8 8 8 8 8 8
5 6 4 7 6 3 3
6 7 2 6 7 2 2
7 9 9 6 9 4 4
8 2 7 4 2 3 2
9 3 3 4 1 2 3
10 4 7 3 3 4 4
11 3 3 3 3 3 3
12 4 6 2 5 2 3
13 2 9 3 8 4 4
Improvement Concept
12
10
8
6
4
2
10
8
6
4
2
Semana
Cenário
1
12
10
8
6
4
2
10
8
6
4
2
Semana
Cenário
4
12
10
8
6
4
2
10
8
6
4
2
Semana
Cenário
2
12
10
8
6
4
2
10
8
6
4
2
Semana
Cenário
5
12
10
8
6
4
2
10
8
6
4
2
Semana
Cenário
3
12
10
8
6
4
2
10
8
6
4
2
Semana
Cenário
6
Tempo de Ciclo Tempo de Ciclo
Tempo de Ciclo Tempo de Ciclo
Tempo de Ciclo Tempo de Ciclo
Improvement Concept
Result
Result
Result
Result
Result
Result
Change
Change
Change
Change
Change
Change
Before After
Was the change an improvement?
Improvement Concept
Before A week later
Was the change an improvement?
A month later
Improvement Concept
Before A week later
Was the change an improvement?
A month later
Improvement Concept
A year later
Lean Six Sigma
Lean Six Sigma
What is the Lean Six Sigma
definition???
Lean Manufacturing
Before to understand what is
Lean Six Sigma we need to
understand what is Lean
Manufacturing and Six Sigma
separately...
Lean Manufacturing
1990
James Womack
MIT
Lean Manufacturing
After Second World War – 1960’s
Japan was destroyed!
Supply shortages.
Lean Manufacturing
Taiichi Ohno
Toyota
Toyota Production System:
 Elimination of wastes
 Standardization
 Respect of People
After Second World War – 1960’s
Lean Manufacturing
What does Lean Manufacturing mean?
Lean mentality is an operational philosophy to reach
eliminate wastes continuously where analyze and optimize
processes according added value and no added value to
the customer perspective.
Lean Manufacturing
What does add value
mean??
Which one day added
value, can not add more
value today...
Lean Manufacturing
It is not possible to eliminate no added value activities
in the first moment ...
... Due to it Lean Manufacturing is a continuous
improvement philosophy to reduce and eliminate wastes.
Lean Manufacturing
Main Lean Manufacturing principles...
Six Sigma
What is Six Sigma??
Six Sigma history
1980’s
In this period, Motorola spent 5 to 10% of their investments to correct
defects. It means almost US$ 900 millions per year.
1980’s
In one the Motorola factory, a Japanese group took the lead and with
the same workforce and the same machines, they got results reducing
defects in 80%.The way of Management got better results!!!
Six Sigma history
1980’s
Bill Smith, senior engineer and scientist at Motorola's Communications
Division, introduced the concept of Six Sigma as a response to rising
warranty claims on complaints from the sales sector. This was a
method to standardize the way of counting defects, and Six Sigma a
level close to perfect
Six Sigma history
Six Sigma
What does 6 Sigma mean???
Six Sigma example
Six Sigma example
Six Sigma example
Six Sigma
It aims to reduce the variability of critical processes to the
business, thereby minimizing the number of defects present in
them.
Interpreting Sigma Capability
LSL USL
What is the objective of Six Sigma?
Variability of Process
Low Process Capability
Variability of Process
High Process Capability
Improvement
LSL USL
LSL USL
Sigma Capability measures process easiness at meeting
Customers’ requests!!!!
If process shows low Sigma Capability, it is necessary to
Reduce the process variability (Reduce car size!!!)
Six Sigma
The day of a man
The day of a woman
Six Sigma
= Process variation measurement
Brasmotor
General Eletric
AlliedSignal
Asea Brown
Boveri - ABB
Motorola
1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000
Savings of US$ 2,2 billion between the end of the 1980s and thet early 1990s
Savings of US$ 898 million / year in the first 2 years
Savings until 1998: US$ 1,2
billion
Savings in 1999:
US$ 1,5 billion
Savings of more than
US$ 10 million in 1999
Six Sigma beginning
Six Sigma background
Six Sigma
Six Sigma
*% the company’s revenue
What is Six Sigma Level?
So, there is a direct link between the Sigma level and defects
occurrence ! ! !
Parts per million (ppm)
Sigma Level
308.537
2
66.807
3
6.210
4
233
5
6 3,4
Non quality costs*
Not applicable
25 a 40%
15 a 25%
5 a 15%
< 1%
Comparison between the Six Sigma Performance and
Standard Performance
4 Sigma (99,38% ok) 6 Sigma (99,99966% ok)
7 hours of Electricity lack per month 1 hour of Electricity lack per each 34
years.
5.000 incorrect surgeries per week 1,7 incorrect surgeries per week
6 200 customer complaints for each
1.000.000 produced parts
3,4 customer complaints for each
1.000.000 produced parts
15 minutes of water lack per day 1 minute of water lack for each 7 months
Six Sigma
Lean and Six Sigma
 Aims the variability
reduction;
 Applies statiscal tools to
data analysis and problems
solving;
 In general projects lasts
between 4 until 6 months.
 Aims the lead time
reduction and wastes
reduction in the process;
 Applies simple techniques
to analyze data;
 In general projects lasts
between 1 until 4 weeks.
Six Sigma Lean Manufacturing
How do the Lean and Six Sigma
complement each other?
Lean and Six Sigma
Identifies problems in
the flow
Improves the capability of add
value operations.
Six Sigma
Lean
Lean Six Sigma
What is the method applied in
the Lean Six Sigma?
Método DMAIC
DEFINE
Define the scope and target of
the project.
MEASURE
Define the focus of the
problem.
ANALYZE
Define the root causes of
the focused problem.
IMPROVE
Proposal, evaluation and
implementation of the
problems solutions.
CONTROL
Assure the improvements in
the results a long term.
Define Phase
Overview of DMAIC Phases - DEFINE
DEFINE
Define accurately the project scope
Define the Problem
Get Records about the problem, define gap
and target (Trend Graph, Pictures)
Build the team in charge of the project
Define schedule
Elaborate Project Charter
Financial Survey
Show Current Loss and Feasible Gains
Overview of DMAIC Phases - DEFINE
DEFINE
Define accurately the project scope
Define the Problem
To improve a process...
... the first step is to know about it!
Define Phase
Define and understand the problem
Team needs understand why the project was defined and
align the knowledge level regarding the problem among
the team members.
Define Phase
Define and understand the problem
Overview of DMAIC Phases - DEFINE
DEFINE
Define accurately the project scope
Define the Problem
Get Records about the problem, define gap
and target (Trend Graph, Pictures)
129
The data importance
A trend graph is a diagram of individual values of the results
of a process as a function of time.
When interpreting a trend graph, we observe if there are
special settings in points along time or if there are points
which are too far fro the others.
Times Series Plot
Define Phase
Times Series Plot
Define Phase
Questions that can be answered using a trend graph :
 What has the indicator performance been the along the two
last years?
 Does it have an increasing or decreasing trend? Or is it stable?
 Does the indicator have a uniform performance along time or
does it show peaks?
 What values is the indicator placed between? Does it show any
cyclic or seasonal characteristic?
 What is the lowest indicator value ever obtained? What about
the highest one? At what moment did it occur?
 Observing the historical performance, does the general target
seem realistic? Is it challenging? Has it ever been achieved in
the past?
Times Series Plot
Define Phase
The Times Series Plot shall be used for monitoring the
evolution of ongoing work and of results achieved.
 It may be enhanced by adding :
 An arrow indicating the direction for the best result.
 The best result achieved by another line, another unit
or a competitor.
 A line indicating the value of the target to be
achieved.
Times Series Plot
Define Phase
Example of Time Series
0
1
2
3
4
5
6
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Months
Scrap
Percentage
Target
Best
result
Average
Define Phase
Exercise
Suppose that Ronaldo Santana, “Selit Corporation’s” Brazilian
subsidiary sales vice-president has just received a report
containing the quarter sales report in the last five years in the
regions in his charge. Dissatisfied with the results, he
immediately called his secretary: “Márcia, tell the regional
managers that I need to talk to them tomorrow afternoon. All of
them must be present.”
Define Phase
Exercise
Márcia had been Ronaldo’s secretary for over tem years. She knew
that by his tone of voice that he meant “we must do business” and
then she contacted the regional managers to schedule the
unexpected meeting for 2 o’clock p.m. the next day.
On the next day, it was five minutes to two o’clock and all the
managers were already in the meeting room. When they were called
for meetings, the reason was always the same: Ronaldo was
dissatisfied with something.
Define Phase
Exercise
Ronaldo went straight to the point: “I have just received the sales
report for this quarter. Sales were fantastic. Silas, you not only
increased sales in 17.6%, but also increased sales in 20.6%
comparing to last year! I don’t know how you do that!” Silas
smiled. His philosophy of finishing the year with a “bang”, making
customers increase inventory worked once again. Ronaldo had
not realized how Silas’ sales in the first quarter were always low.
Define Phase
Exercise
Ronaldo went on: “Teresa, sales in the southeast region were
also phenomenal! You managed an increase of 11.7% in the last
quarter and an increase of 11.8% comparing to last year!” Teresa
also smiled. She did not know why she had done so well, but she
was sure that she would not change anything.
“João, sales in the southeast have grown 17.2%, but dropped
8.2% comparing to last year”, said Ronaldo. “You have to find out
what you did before for your sales to increase so much. Still, your
performance in the last quarter was good.”
Define Phase
Exercise
João tried to hide his surprise. Although he had received a large order in
November, it the only “large” one in a long time. In a general basis, sales
in the Southeast region were decreasing.
Then, Ronaldo was ready to deal with the region which presented
problems. “Lúcia, sales in the West-Central region have decreased 5.5%
in the last quarter, but increased 4.7% comparing to last year. I do not
understand how your sales can vary so much! Do you need more
incentive? She looked down. She had been working hard in the last five
years and had gotten several new accounts. She had even gotten a
bonus for having captured most of the new accounts in 2003.
Define Phase
Exercise
“Kátia, sales in the North region have decreased 3.2% in the last
quarter and 2.6% comparing to last year. I am very disappointed
with your performance. You have already been responsible for
the highest increase in our sales! I had great expectations about
you. Now, I can only hope you show some sign of life in this
quarter.” Kátia felt her face blush. She knew that she had sold
more units in 2005 than in 2004. “After all, what does Ronaldo
actually know about sales?”, she thought.
Define Phase
Exercise
Ronaldo turned to Daniel, who felt an discharge of adrenaline.
“Daniel, sales in the Northeast have the worst f all! There has
been a drop of 19.7% in the last quarter and a drop of 22.3%
comparing to last year. How can you explain that? Do you prize
your job? I want to see a significant improvement this quarter,
otherwise...” Daniel felt paralyzed. This is hard region, full of
competitors. It is true that some accounts have been lost along
the years, but they have been substituted by new ones. How
could it be going so badly?
Define Phase
Exercise
Let’s read the analysis made by Ronaldo Santana and answer
the questions below:
a) Do you agree with the statements made by the vice-president
to his sales team? Justify your answer using statistic reasoning.
b) Which factors which were not mentioned should the vice-
president have taken into account to make the correct conclusion
about his sales staff?
Define Phase
Exercise
Define Phase
Exercise
Define Phase
Exercise
Define Phase
Exercise
Define Phase
Exercise
Define Phase
Exercise
Define Phase
INCREASING TREND
0
20
40
60
80
100
120
140
160
1 2 3 4 5 6 7 8 9 10 11 12
DECREASING TREND
0
20
40
60
80
100
120
140
160
1 2 3 4 5 6 7 8 9 10 11 12
PEAKS
0
20
40
60
80
100
120
140
160
180
1 2 3 4 5 6 7 8 9 10 11 12
SEASONALITY
0
20
40
60
80
100
120
140
160
0 5 10 15 20 25
SPECIAL CAUSE
0
20
40
60
80
100
120
140
160
180
Metrics calculation
Metrics calculation
Exercise
It was presented in the last edition of “Good Player” magazine , the
data about some goalkeeper in the last season. The data regarding
the Corinthians ‘s goalkeeper are presented bellow:
2011 2012 2013 2014
39 goals
conceded
52 goals
conceded
60 goals
conceded
45 goals
conceded
Absolut metrics: They are independents metric,
without link with other data.
Example: amount of goals conceded.
Metrics calculation
Absolut metric:
2014
2013
2012
2011
80
70
60
50
40
30
20
Ano
Qtd
Gols
45
60
52
39
Quantidade de gols sofridos
Goleiro - Corinthians
Metrics calculation
Metrics calculation
Exercise
After the data presentation in the magazine, it was possible to see
the performance variation along the years. From this, the team
coach questioned about the number of games that the goalkeeper
had performed in each year, because he knew that he had have a
contusion in 2011 and 2014.
2011 2012 2013 2014
39 goals
conceded
52 goals
conceded
60 goals
conceded
45 goals
conceded
51 games 75 games 99 games 67 games
Relative metrics: They are metrics that demonstrate the
relation between the data and some parameter.
Example: Amount of goals conceded by games performed.
Metrics calculation
Indicadores Relativos:
2014
2013
2012
2011
0,76
0,74
0,72
0,70
0,68
0,66
0,64
0,62
0,60
Ano
Gols
/
jogo
0,67
0,61
0,69
0,76
Gols sofridos por jogos
Goleiro - Corinthians
Formas dos dados
Absolut X Relative
2014
2013
2012
2011
0,76
0,74
0,72
0,70
0,68
0,66
0,64
0,62
0,60
Ano
Gols
/
jogo
0,67
0,61
0,69
0,76
Gols sofridos por jogos
Goleiro - Corinthians
2014
2013
2012
2011
80
70
60
50
40
30
20
Ano
Qtd
Gols
45
60
52
39
Quantidade de gols sofridos
Goleiro - Corinthians
Define Phase
Example 1
Problem: At the Itatiba Plant, the Diversão Cookie net weight is a
chronic problem in this year’s Deployment of Targets, representing
80% of factory’s cost of non quality. The high net weight is set by the
excess of product delivered to consumer above the net weight shown
on the package or also by the individual weight of cookies higher than
specified. The data on chart 1 show the records of the months of
Jan/11 to Dec/11.
Table 1: Monthly percentage of net weight of Diversão cookie – Jan/11 to Dez/11
Months
Overweight % in
cookies
Jan 0.53
Feb 0.63
Mar 0.47
Apr 0.50
May 0.59
Jun 0.58
Months
Overweight % in
cookies
Jul 0,46
Aug 0,51
Sep 0,56
Oct 0,69
Nov 0,68
Dec 0,51
Define Phase
 The overweight percentage of diversão cookie is high, ranging from
0.46 to 0.69, with an average of 0.56 in 2011.
dez
nov
out
set
ago
jul
jun
mai
abr
mar
fev
jan
0,70
0,65
0,60
0,55
0,50
0,45
mês 2011
%
sobrepeso
Média = 0,56
Gráfico de Tendência do % sobrepeso do biscoito Diversão
Define Phase
Definition of Target
 Defining the target value is evaluating the gap, or better,
“where I am at” and “where I want to get to”.
Dialog between Alice and the Master Cat
Alice: - Which way shall I follow?
Master Cat: - Where do you want to go?
Alice: - I don’t know!
Master Cat: - Then, Any way will work!
Lewis Carroll – Alice in Wonderland
Define Phase
 Target: result to be achieved
 We think:
“Defining targets is easy!”
Do we really know how to define targets?
Definition of Target
To define a target, we need to calculate the gap.
Define Phase
 Gap = Current Situation (Average) - Benchmark
Definition of Gap
 Benchmark = Is a world-reference value of the best result
ever achieved for an indicator
Define Phase
Researching Benchmark
Internal
Internal
comparison
between different
lines, areas, plants,
etc.
Competitive
Comparison with
competitors
Functional
Comparison
between the same
functions in different
ambiences
Types of Benchmark:
Define Phase
 If the direction of the indicator is to “Increase”
 Target Value = Current Situation (Average) + (% of reduction x Gap)
 If the direction of the indicator is to “Decrease”
 Target Value = Current Situation (Average) - (% of reduction x Gap)
Definition of Target Value
 Target Value = Current Situation ± (% of Reduction x Gap)
Target = Management Goal + Value + Deadline
Define Phase
Check if target is well defined
Only the last one is a target. Why?
Target = Management Goal + Value + Deadline
There is no management without targets
Consider the following situations:
 Increase OEE of Assembly line 5.
 Lower technical stops wheel rolling lines 1 and 2 in 25%.
 Increase productivity of Cutting lines until the end of this year.
 Lower Scrap for Scratches and Marks PPM from 850 to 330 starting at
03/12/2011.
Define Phase
Definition of Target Value
 Defining the target value is evaluating the gap, or better,
“where I am at” and “where I want to get to”.
 A graph analysis is very effective to evaluate the current
situation. Only after such analysis it is indicated proposing
challenging and tangible targets.
Definition of Deadline
 Deadline must be compliable with the complexity of the
problem.
Define Phase
Always remember the SMART concept
 Specfic – clear and concise statement of must be done/ achieved;
 Measurable – concrete and observable measure;
 Achievable – feasible in terms of costs, challenge and time;
 Relevant – specifically related to process goals;
 Time-boxed (deadline) – includes a specific schedule for achieving.
Define Phase
dez
nov
out
set
ago
jul
jun
mai
abr
mar
fev
jan
0,70
0,65
0,60
0,55
0,50
0,45
mês 2011
%
sobrepeso
Média = 0,56
Meta = 0,5
Benchmarking = 0,46
Gráfico de Tendência do % sobrepeso do biscoito Diversão
Target is a % of gap to be achieved (a challenge).
Ex.: Lower in 10.7% the diversão cookie overweight rate from 0.56 (2008 average) to 0.50
lowering 60% of gap starting in may/09.
Target = 0.56 – (0.10*0.60)  Target: 0.50% /month (reduction of 10.7% of current
average)
Gap:
(Current Average – Benchmark)
0.56 – 0.46 = 0.10
Last year’s average loss: 0,56%
Benchmark (best result):
0.46%/month
Trend Graph of % overweight for Diversão
cookie
Define Phase
DEFINE
Define accurately the project scope
Define the Problem
Get Records about the problem, define gap
and target (Trend Graph, Pictures)
Financial Survey
Show Current Loss and Feasible Gains
Build the team in charge of the project
Lean Six Sigma
The main sucess factor are
the people...
Teamwork
Why do we have so difficult to establish
good relationship??
Because the people are different!!!!
How do you classify the personality of these people??
 He was an inventor, business men in
the informatics sector.
 He was co-founder, president and
executive director of Apple
 He was an executive director of Pixar
company and majority actionist of The
Walt Disney Company.
Teamwork
He is the most Brazilian important Formula 1 pilot.
Ayrton Senna da Silva was born in Sao Paulo, Brazil
and when he was four years old his father Milton
bought him a go-kart, and by age eight Ayrton was
regularly competing in karting events. Over the
next ten years he won the World Championship
three times and engaged in some controversial
racing with France's Alain Prost and England's Nigel
Mansell. Ayrton Senna was killed on 1 May 1994 in
a race at the San Marino Grand Prix.
Teamwork
How do you classify the personality of these people??
Main titles:
Barcelona:
UEFA Champions League: 2005–06, 2008–09,
2010–11
UEFA Super Cup: 2009, 2011
Fifa Clubs World Cup: 2009 and 2011
Argentina:
Olympic games: Gold in 2008
Individuals awards:
Gold Ball from FIFA: 2010, 2011, 2012
Gold Ball – World Cup: 2014
Teamwork
How do you classify the personality of these people??
 He is considered the best soccer player
from Argentina in the history
Champion and Vice champion in the
World cup in 1986 and 1990
respectively
Teamwork
How do you classify the personality of these people??
People totally different...
But all them reached the SUCCESS!!!
Teamwork
Negative people also help the
team!!!
How do you classify the personality of these people??
Teamwork
Our team are formed by different people...
We need to lear how to use the talent of each one to
reach the TEAM SUCCESS!!!
Teamwork
And how about your team???
The sponsor must manage the team
conflicts
Sponsor responsability
Overview of DMAIC Phases - DEFINE
DEFINE
Define accurately the project scope
Define the Problem
Get Records about the problem, define gap
and target (Trend Graph, Pictures)
Financial Survey
Show Current Loss and Feasible Gains
Build the team in charge of the project
Define schedule
Tips for Schedule Elaboration:
 Elaborate a schedule considering all the activities of each phase
of DMAIC method;
 This schedule shall be used in each Phase;
 When planning, assess possible absences in a unit;
 Take into consideration the time dedicated and the possible
need of data colleting;
 The schedule must be planned in compliance with the project’s
deadline;
 Remember that in case of delay, the deadline is not changed.
Activities E/A S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13
D
E
F
I
N
E
1.1 Definition of Problem Expected
Achieved
1.2 Survey of problem History,
definition of gap and target
Expected
Achieved
1.3 Financial Survey Expected
Achieved
1.4 Definition of Project Team Expected
Achieved
1.5 Definition of Work Schedule Expected
Achieved
....
C
O
N
T
R
O
L
5.3 Transfer of New Standards to All
Involved
Expected
Achieved
5.4 Implement Performance
Monitoring Plan
Expected
Achieved
5.5 Summarize work Expected
Achieved
Example of Schedule
Planned (Blue)
Late (Red)
In Development (Yellow)
Completed in time (Green)
Tips for Schedule Elaboration – DMAIC Project
Phases Green Belt
D 15 days
M 45 days (including data
collection)
A 70 days
I 50 days
Subtotal 180 days
C 90 days
Total 270 dias
After 6 months results
start to be achieved
Overview of DMAIC Phases - DEFINE
DEFINE
Define accurately the project scope
Define the Problem
Get Records about the problem, define gap
and target (Trend Graph, Pictures)
Financial Survey
Show Current Loss and Feasible Gains
Build the team in charge of the project
Define schedule
Elaborate Project Charter
Project Charter
 Purpose: document which represents the contract signed by
team in charge of project implementation, Sponsor and
Facilitator.
 Shows clearly what is expected from the team
 Keeps the team aligned with company’s primary goals
 Keeps the team within the scope defined for the project
Measure Phase
The Measure phase
consists in identifying
the focus that will
lead all the project!!
Measure
Measure
Try to solve all the
problems will not
work...
Why is important to prioritize the project
problems?
Measure
MEASURE
Determine the location or source of the
problem
Collect new
data
Analyze the Measuring System (M.S.A.)
Are there reliable data to focus on the
problem?
NO YES
Use existing
records
Is the problem on focus?
NO
1
YES
identify stratification criteria
Identify priority problems
(Sampling Tree & Pareto Chart)
1
1
Study the variation of priority Problems
(Control Chart and Capability Rates)
Establish specific targets for each priority
problem
Go to Analyze Phase
Evaluate impact vs effort in the priority
problems
Analyze
Analyze
The main goal of the Analyze phase is to identify the
root cause of the problem prioritized at the Measure
phase...
Analyze
Analyze
The GB roles is to discover why the priority problems
happened...
... The Team will receive a lot of answers and ideas
but they should be proved using statistical tools...
But remember if they ideas really are true the
problems had already been solved before!!!
Analyze
The analyze phase is how to connect the pieces of a
puzzle...
Everything starts with the hypothsis, but just applying
statistical tools the team can confirm or not them and
find the root cause!!!!
Analyze
ANALYZE
Define the causes of each priority problem
Analyze priority problem and root cause data
(Trend Graph, Histogram, boxplot, Scatter Plot)
Prioritize potential causes of priority problem
(Cause & Effect Matrix)
Quantify the importance of potential causes
(Control Chart, Regression Analysis, Hypotheses
Tests, ANOVA)
Go to Improve Phase
Analyze the root cause of the problem (Process
Map, FTA, VSM)
Improve
Improve
The objective of the Improve phase is to prioritize and
implement actions
In this phase the Champion has very important roles to
help the team members get resource and money to
implement the actions!!!!
Improve
IMPROVE
Propose, analyze and implement
solutions for each priority problem
Improve
Create ideas of potential solutions for
the elimination of the most impacting
causes of priority problems
Test the selected solutions in small
scale (pilot test)
Identify and implement the
improvements or adjustments for the
selected solutions if necessary
Go to Control Phase
Prioritize the solutions for the priority
problems (BASICO Matrix)
Elaborate action plan (5W e 2H)
disclose action plan (5W e 2H)
Implement action plan
Control
Control
Control
The Control phase is the last but not the less important.
The objective of this phase is to ensure that the
achievement of target is kept for long term.
Control
The main deliveries of the Control phase are:
 Results
 Standard
 Knowledge
Target Achieved?
Innovate or return to M
phase or implement
DFSS
NO
CONTROL
Ensure that the achievement of target is kept for
long term
Analyze the achievement of target (Before and
After)
Forward the new standards to all
employees involved
Implement a performance control plan
(Control Chart and Capability Rate)
YES
Reflect on the lessons learned and
recomend to future works
Standardize the changes
(create new standard or update existing
standard)
In case there is the possibility of
Horizontal Replication, expand the
improvement implementation to the
other lines
Define and implement a corrective
action plan (OCAP)
Calculate project’s actual payback
Control
Champion responsability
As the Champion of the project you need to
assure that the team will follow the steps of
methodology…
Champion responsability
For the project success it is necessary…
METHODOLOGY TEAMWORK SUPPORT
Champion responsability
… And for this, you need to be the
example…
Questions?
Obrigado!!!!
Champions Six Sigma
Training
Santo André
October, 2015

More Related Content

Similar to Treinamento OPEX Champion Training_rev03.pptx

Overview of U.S. Leadership's Consulting Services
Overview of U.S. Leadership's Consulting ServicesOverview of U.S. Leadership's Consulting Services
Overview of U.S. Leadership's Consulting Servicesrickj41
 
HFMS Free University: Presentation on Asset Management on 30 March 2016 in Bu...
HFMS Free University: Presentation on Asset Management on 30 March 2016 in Bu...HFMS Free University: Presentation on Asset Management on 30 March 2016 in Bu...
HFMS Free University: Presentation on Asset Management on 30 March 2016 in Bu...Hungarian Facility Management Society
 
The_ABCs_of_Six_Sigma_Everest
The_ABCs_of_Six_Sigma_EverestThe_ABCs_of_Six_Sigma_Everest
The_ABCs_of_Six_Sigma_EverestSoumya De
 
2014 Process Management Strategic Overview
2014 Process Management Strategic Overview2014 Process Management Strategic Overview
2014 Process Management Strategic OverviewRiz Hasan
 
Integrated Improvement Model
Integrated Improvement ModelIntegrated Improvement Model
Integrated Improvement ModelGareth Stone
 
Manoj Sathi Resume
Manoj Sathi ResumeManoj Sathi Resume
Manoj Sathi ResumeManoj Sathi
 
Project Overview - Pfister Time & Motion Study 2017
Project Overview - Pfister Time & Motion Study 2017Project Overview - Pfister Time & Motion Study 2017
Project Overview - Pfister Time & Motion Study 2017Victor Javier Marranzini
 
OnTrac_StarCertificationProgram-3Day.pptx
OnTrac_StarCertificationProgram-3Day.pptxOnTrac_StarCertificationProgram-3Day.pptx
OnTrac_StarCertificationProgram-3Day.pptxNilaanjanTripathy1
 
Vaishali Soneri_Resume (1)
Vaishali Soneri_Resume (1)Vaishali Soneri_Resume (1)
Vaishali Soneri_Resume (1)Tina Soneri
 
Having a PMO with agile flavor
Having a PMO with agile flavorHaving a PMO with agile flavor
Having a PMO with agile flavorImad Alsadeq
 
Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503Omnex Inc.
 
Efficient Partners - Training List March 2016
Efficient Partners - Training List  March 2016Efficient Partners - Training List  March 2016
Efficient Partners - Training List March 2016Efficient Partners
 
Diana M. Arias Resume - 2017
Diana M. Arias Resume - 2017Diana M. Arias Resume - 2017
Diana M. Arias Resume - 2017Diana M. Arias
 
Operating Model & Organization Design Toolkit and Playbook
Operating Model & Organization Design Toolkit and PlaybookOperating Model & Organization Design Toolkit and Playbook
Operating Model & Organization Design Toolkit and PlaybookAurelien Domont, MBA
 
Projectmanagement 141108102434-conversion-gate01
Projectmanagement 141108102434-conversion-gate01Projectmanagement 141108102434-conversion-gate01
Projectmanagement 141108102434-conversion-gate01Mehmet Demir
 

Similar to Treinamento OPEX Champion Training_rev03.pptx (20)

Hrd as business partner
Hrd as business partnerHrd as business partner
Hrd as business partner
 
Practical experiences of portfolio management
Practical experiences of portfolio managementPractical experiences of portfolio management
Practical experiences of portfolio management
 
Training Strategies to Gain Support
Training Strategies to Gain SupportTraining Strategies to Gain Support
Training Strategies to Gain Support
 
Overview of U.S. Leadership's Consulting Services
Overview of U.S. Leadership's Consulting ServicesOverview of U.S. Leadership's Consulting Services
Overview of U.S. Leadership's Consulting Services
 
HFMS Free University: Presentation on Asset Management on 30 March 2016 in Bu...
HFMS Free University: Presentation on Asset Management on 30 March 2016 in Bu...HFMS Free University: Presentation on Asset Management on 30 March 2016 in Bu...
HFMS Free University: Presentation on Asset Management on 30 March 2016 in Bu...
 
The_ABCs_of_Six_Sigma_Everest
The_ABCs_of_Six_Sigma_EverestThe_ABCs_of_Six_Sigma_Everest
The_ABCs_of_Six_Sigma_Everest
 
2014 Process Management Strategic Overview
2014 Process Management Strategic Overview2014 Process Management Strategic Overview
2014 Process Management Strategic Overview
 
Integrated Improvement Model
Integrated Improvement ModelIntegrated Improvement Model
Integrated Improvement Model
 
Manoj Sathi Resume
Manoj Sathi ResumeManoj Sathi Resume
Manoj Sathi Resume
 
Action learning @ hrec july 2013 v2
Action learning @ hrec july 2013 v2Action learning @ hrec july 2013 v2
Action learning @ hrec july 2013 v2
 
Action learning @ hrec july 2013 v2
Action learning @ hrec july 2013 v2Action learning @ hrec july 2013 v2
Action learning @ hrec july 2013 v2
 
Project Overview - Pfister Time & Motion Study 2017
Project Overview - Pfister Time & Motion Study 2017Project Overview - Pfister Time & Motion Study 2017
Project Overview - Pfister Time & Motion Study 2017
 
OnTrac_StarCertificationProgram-3Day.pptx
OnTrac_StarCertificationProgram-3Day.pptxOnTrac_StarCertificationProgram-3Day.pptx
OnTrac_StarCertificationProgram-3Day.pptx
 
Vaishali Soneri_Resume (1)
Vaishali Soneri_Resume (1)Vaishali Soneri_Resume (1)
Vaishali Soneri_Resume (1)
 
Having a PMO with agile flavor
Having a PMO with agile flavorHaving a PMO with agile flavor
Having a PMO with agile flavor
 
Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503Reducing timeincreasingvalue0503
Reducing timeincreasingvalue0503
 
Efficient Partners - Training List March 2016
Efficient Partners - Training List  March 2016Efficient Partners - Training List  March 2016
Efficient Partners - Training List March 2016
 
Diana M. Arias Resume - 2017
Diana M. Arias Resume - 2017Diana M. Arias Resume - 2017
Diana M. Arias Resume - 2017
 
Operating Model & Organization Design Toolkit and Playbook
Operating Model & Organization Design Toolkit and PlaybookOperating Model & Organization Design Toolkit and Playbook
Operating Model & Organization Design Toolkit and Playbook
 
Projectmanagement 141108102434-conversion-gate01
Projectmanagement 141108102434-conversion-gate01Projectmanagement 141108102434-conversion-gate01
Projectmanagement 141108102434-conversion-gate01
 

Recently uploaded

Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 

Recently uploaded (20)

Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 

Treinamento OPEX Champion Training_rev03.pptx

  • 1. Champions Six Sigma Training Santo André October, 2015
  • 4. Agenda # Item Time duration 1 Opening 15 min 2 Global OpEx overview 5 min 3 M2S overview 5 min 4 M2S CI overview 5 min 5 OpEx multifunctional Teams 1h 6 Improvement Model 30 min 7 Lean Six Sigma 1h
  • 6. Maxion Wheels Confidential and Proprietary Don Polk President Americas Tracey Nicholson Director Global Operational Excellence Eduardo Borges Regional OPEX Manager Americas Carles Caparros Regional OPEX Manager – Europe Steel Mert Cetinel Regional OPEX Manager – Europe, S. Africa – Alum. Vijay Kari Regional OPEX Manager -Asia Juan Lorenzo President EAAP Global OpEx Structure
  • 7. Global OpEx Vision and Mission Global OpEx Vision: To become Maxion Wheels' leading support function providing sustainable operational improvements to generate value for the company. Global OpEx Mission: Support the Maxion wheel plants to exceed or to achieve the performance targets by deploying Continuous Improvement culture and engaging the employees through the use of OpEx tools and methodologies.
  • 8. Main Roles of OpEx Department to ensure the factory achieve Best in Class performance. 1) Define methods and tools 2) Training of methodology and tools 3) Provide coaching on methodologies and tools 4) Ensure the right application of the concepts, methodology and tools 5) Recognize the best OpEx teams and Natural Work Teams Main OpEx Roles and Responsibilities
  • 10. Maxion Wheels Global Footprint 21 factories with different cultures
  • 11. To become “One Global Company” Maxion Wheels Global Footprint
  • 12. Best Practices Sharing How to identify the Best Practices?
  • 13. Maxion Management System The Maxion Management System is our set of global, integrated business and operational process standards utilized throughout the organization to produce value for our stakeholders. The way to identify and deploy the Maxion Wheels Best Practices. M2S Definition
  • 14. M2S Pillars Structure Started with Production Management pillar – other potential pillars in the future: People, Quality, Finance, IT, Global Management Systems, Product & Process Engineering, etc. PRODUCTION A. Standard Work B. Communication C. Visual Management D. Workforce Planning E. Maintenance Systems F. Production Planning G. Continuous Improvement Different Pillars. Standards within the pillar contain elements. PILLARS STANDARDS ELEMENTS 14 PEOPLE A. Organizational Development B. Workforce Planning & Talent Acquisition C. Leadership Development D. Performance Management E. Employee Development F. Employee Relations G. Compensation & Benefits
  • 15. M2S Pillars Structure Started with Production Management pillar – other potential pillars in the future: Materials, People, Quality, Finance, IT, Product & Process Engineering, Sales, Legal, etc. PRODUCTION MANAGEMENT A. Standard Work B. Communication C. Visual Management D. Workforce Planning E. Maintenance Systems F. Production Planning G. Continuous Improvement 7 Standards PILLARS STANDARDS ELEMENTS Elements A. 5 E. 13 B. 5 F. 6 C. 10 G. 8 D. 6 Requirements 383
  • 16. M2S Standards M2S Standard Work Communication Visual Management Workforce Planning Production Planning Maintenance Continuous Improvement 1 2 3 4 5 7 6
  • 17. Plan - M2S Assessment M2S Assessment Form example ELEMENT DESCRIPTION All Process Leaders know how their actual performance compares to the takt time; evidence of the actual and takt times are readily available. All Process Leaders understand the difference between takt time and cycle time. Takt Time Takt time is the rate at which the customer is buying our wheels. Once we know the takt time, we know the rate at which we must produce products throughout our processes; it is rate at which parts need to leave a cell. It reflects the customer demand and it can be used as a basis to allocate work among employees and the efficient use of resources, such as optimum staffing requirements, minimum work-in- process (WIP) requirements and the number of machines required to meet the customer demand. Takt time is sometimes referred to as the Voice of the Customer inside the process. Process Leaders understand how to calculate the takt time. Takt times are updated for each significant change and at a minimum of each quarter. All Process Leaders know what the current takt time is. REQUIREMENTS REF Takt time is understood by Process Leaders.
  • 18. Plan - M2S Assessment M2S Scores Definition 1 – No evidence of use. Action Plan is required to go to required level. 2 – Limited evidence of use. Plant is aware of the requirement and is currently executing plan to achieve Level 3. 3 – Full evidence of use. Plant meets all of the requirements of Maxion Standard. 4 – Plant exceeds all requirements.
  • 19. M2S – Continuous Improvement Cycle Plan •Execute the M2S Assessment •Define the plant target •Elaborate the action plan Do •Execute the Action Plan Check •M2S plant monthly review •M2S quarterly report Act •If the actions are according the planning-> OK! •If it is not elaborate and prioritize another actions
  • 20. What are the focus of the Continuous Improvement standard? M2S – Maxion Management System Vision and Mission OpEx Structure Natural Work Teams OpEx Multifunctional Teams Improvement Suggestion Program Cost Reduction Projects 5S Program 1 2 3 4 5 7 6 8
  • 21. M2S Continuous Improvement (Melhoria Contínua) OpEx and Production Departments involved Establish the Best Practices and standard format regarding the CI initiatives around the world. Main Objective
  • 22. M2S  Vision and Mission  Continuous Improvement Structure  Natural Work teams  OPEX Teams  Improvement Suggestion System  Cost Reduction Process  5S and Workplace Organization Continuous Improvement (Melhoria Contínua)
  • 23. M2S Continuous Improvement (Melhoria Contínua) Natural Work Teams OpEx Multifunctional Teams Improvement Suggestion Program 5S Program Teams formed by people from the same area / lines with weekly meetings 300 Natural Teams in 2014 System to capture, manage and recognize the ideas from the teams Around of 4000 improvements implemented in 2014 Monthly assessments Targets for 100% of the teams Semi–annual waves of Green / Black belts Projects Kaizen events Total of projects concluded 180 in 2014
  • 25. 3. NWT 4. OpEx Teams 5. Improvement Suggestion System & 7. Cost Reduction Process CI process overview according the M2S CI elements 8. Lean tools 6. Six Sigma Tools • 1. NWT Vision Plant Vision • 1. NWT Mission Plant Mission CI Process Continuous Improvement Process Input Process Output
  • 26. OpEx Multifunctional Teams In your opinion: “What is the OpEx Multifunctional Team definition?” “OpEx Multifunctional Teams is.....
  • 27. OpEx Multifunctional Teams What is the OpEx Multifunctional Team definition? OpEx Multifunctional Team is a group of people with different functional expertise working toward a common goal. In Maxion Wheels, these are teams whose mission is to solve complex problems, characterized for having their knowledge multiplied in different and diverse knowledge areas. These teams present a beginning, middle and end, that is, a definite time frame for the conclusion, according to the project schedule.
  • 28. OpEx teams management system Define the project and team members Define the methodology Train the projects leaders Develop the projects Perform the coaching sessions Performance the tollgates review Certify the project leaders
  • 29. Define the project and team members Define the methodology Train the projects leaders Develop the projects Perform the coaching sessions Performance the tollgates review Certify the project leaders OpEx teams management system
  • 30. Source of Projects Who is responsible to define the projects??? OpEx Committee: • Lead by OpEx • Participants are Plant Manager and the Staff Managers
  • 31. How to define Lean Six Sigma projects? Total 5329 5221 42168 102611 30079 11946 8518 8462 7117 6983 5673 Percent 2,3 2,2 18,0 43,8 12,8 5,1 3,6 3,6 3,0 3,0 2,4 Cum % 79,8 82,0 100,0 43,8 56,7 61,8 65,4 69,0 72,1 75,1 77,5 C2 O th er Testespara conf fa lh a G ravação Irregula r Vazam ento ST Defe ito sST D efeito s de Pintu ra Trinca e Rachado Aros Danificados Suje ira sobre Pintu ra O scila ção Radial Riscos e Marcas 250000 200000 150000 100000 50000 0 100 80 60 40 20 0 Total Percent Principais defeitos PPM Interno (Jan-Ago/2014) Projetos Seis Sigma: 0,35 0,35 0,30 1,00 0,40 0,20 0,40 1,00 Projeto: descrição Proj. Aprov. (S/N) Satisfação de Clientes / Corporação Redução de Custo Impacto Indicadores Sistema de Gestão Total do Benefício Conflito com iniciativas já existentes Prazo p/ conclusão Probabilidade de Investimento ($$$) Total do Esforço Pontuação final Produtividade MO Direta S 10 10 10 10,00 1 7 3 1,60 8,40 Energia Elétrica S 10 10 10 10,00 1 7 7 3,20 6,80 % de treinamentos x realizados – Investimento em treinamento S 1 5 10 5,10 1 7 1 0,80 4,30 Gestão de peças de Falha de fornecedor S 5 5 10 6,50 3 5 3 2,40 4,10 Tempo de desenvolvimento de produto S 10 1 10 6,85 5 5 3 3,20 3,65 Inventário do aço (peso de corte) S 1 5 5 3,60 1 7 1 0,80 2,80 Concentração do Boro S 10 1 7 5,95 3 7 5 3,20 2,75 Aumento do OEE das blanqueadeiras S 3 7 5 5,00 1 5 5 2,40 2,60 Aumento do OEE da Linha 04 - Laminação N 5 5 5 5,00 1 7 5 2,40 2,60 OEE da Montagem L02 N 5 1 7 4,20 1 7 5 2,40 1,80 Sujeira sobre pintura S 5 1 7 4,20 1 5 5 2,40 1,80 Custo de Prevenção (Custo da qualidade) N 1 1 5 2,20 1 10 1 0,80 1,40 OEE da Montagem L01 N 5 1 5 3,60 1 7 5 2,40 1,20 Esforço Benefícios Analyze the Factory KPI´s Identify and prioritize projects Define the team members
  • 32. How to define Lean Six Sigma projects? Total 5329 5221 42168 102611 30079 11946 8518 8462 7117 6983 5673 Percent 2,3 2,2 18,0 43,8 12,8 5,1 3,6 3,6 3,0 3,0 2,4 Cum % 79,8 82,0 100,0 43,8 56,7 61,8 65,4 69,0 72,1 75,1 77,5 C2 O th er Testespara conf fa lh a G ravação Irregula r Vazam ento ST Defe ito sST D efeito s de Pintu ra Trinca e Rachado Aros Danificados Suje ira sobre Pintu ra O scila ção Radial Riscos e Marcas 250000 200000 150000 100000 50000 0 100 80 60 40 20 0 Total Percent Principais defeitos PPM Interno (Jan-Ago/2014) Projetos Seis Sigma: 0,35 0,35 0,30 1,00 0,40 0,20 0,40 1,00 Projeto: descrição Proj. Aprov. (S/N) Satisfação de Clientes / Corporação Redução de Custo Impacto Indicadores Sistema de Gestão Total do Benefício Conflito com iniciativas já existentes Prazo p/ conclusão Probabilidade de Investimento ($$$) Total do Esforço Pontuação final Produtividade MO Direta S 10 10 10 10,00 1 7 3 1,60 8,40 Energia Elétrica S 10 10 10 10,00 1 7 7 3,20 6,80 % de treinamentos x realizados – Investimento em treinamento S 1 5 10 5,10 1 7 1 0,80 4,30 Gestão de peças de Falha de fornecedor S 5 5 10 6,50 3 5 3 2,40 4,10 Tempo de desenvolvimento de produto S 10 1 10 6,85 5 5 3 3,20 3,65 Inventário do aço (peso de corte) S 1 5 5 3,60 1 7 1 0,80 2,80 Concentração do Boro S 10 1 7 5,95 3 7 5 3,20 2,75 Aumento do OEE das blanqueadeiras S 3 7 5 5,00 1 5 5 2,40 2,60 Aumento do OEE da Linha 04 - Laminação N 5 5 5 5,00 1 7 5 2,40 2,60 OEE da Montagem L02 N 5 1 7 4,20 1 7 5 2,40 1,80 Sujeira sobre pintura S 5 1 7 4,20 1 5 5 2,40 1,80 Custo de Prevenção (Custo da qualidade) N 1 1 5 2,20 1 10 1 0,80 1,40 OEE da Montagem L01 N 5 1 5 3,60 1 7 5 2,40 1,20 Esforço Benefícios Analyze the Factory KPI´s Identify and prioritize projects Define the team members
  • 33. The main source of Lean Six Sigma projects are:  VSM  POR metrics  PD metrics  Deployment of cost  Managers interview to define the VOC How to define Lean Six Sigma projects?
  • 34. The root cause is unknown Process can be optimized to define the best performance There is GAP between the current performance compared with the request performance Project is aligned with the company strategy Project should increase the Customer satisfaction Six Sigma projects characteristics
  • 35. How to define Lean Six Sigma projects? Total 5329 5221 42168 102611 30079 11946 8518 8462 7117 6983 5673 Percent 2,3 2,2 18,0 43,8 12,8 5,1 3,6 3,6 3,0 3,0 2,4 Cum % 79,8 82,0 100,0 43,8 56,7 61,8 65,4 69,0 72,1 75,1 77,5 C2 O th er Testespara conf fa lh a G ravação Irregula r Vazam ento ST Defe ito sST D efeito s de Pintu ra Trinca e Rachado Aros Danificados Suje ira sobre Pintu ra O scila ção Radial Riscos e Marcas 250000 200000 150000 100000 50000 0 100 80 60 40 20 0 Total Percent Principais defeitos PPM Interno (Jan-Ago/2014) Projetos Seis Sigma: 0,35 0,35 0,30 1,00 0,40 0,20 0,40 1,00 Projeto: descrição Proj. Aprov. (S/N) Satisfação de Clientes / Corporação Redução de Custo Impacto Indicadores Sistema de Gestão Total do Benefício Conflito com iniciativas já existentes Prazo p/ conclusão Probabilidade de Investimento ($$$) Total do Esforço Pontuação final Produtividade MO Direta S 10 10 10 10,00 1 7 3 1,60 8,40 Energia Elétrica S 10 10 10 10,00 1 7 7 3,20 6,80 % de treinamentos x realizados – Investimento em treinamento S 1 5 10 5,10 1 7 1 0,80 4,30 Gestão de peças de Falha de fornecedor S 5 5 10 6,50 3 5 3 2,40 4,10 Tempo de desenvolvimento de produto S 10 1 10 6,85 5 5 3 3,20 3,65 Inventário do aço (peso de corte) S 1 5 5 3,60 1 7 1 0,80 2,80 Concentração do Boro S 10 1 7 5,95 3 7 5 3,20 2,75 Aumento do OEE das blanqueadeiras S 3 7 5 5,00 1 5 5 2,40 2,60 Aumento do OEE da Linha 04 - Laminação N 5 5 5 5,00 1 7 5 2,40 2,60 OEE da Montagem L02 N 5 1 7 4,20 1 7 5 2,40 1,80 Sujeira sobre pintura S 5 1 7 4,20 1 5 5 2,40 1,80 Custo de Prevenção (Custo da qualidade) N 1 1 5 2,20 1 10 1 0,80 1,40 OEE da Montagem L01 N 5 1 5 3,60 1 7 5 2,40 1,20 Esforço Benefícios Analyze the Factory KPI´s Identify and prioritize projects Define the team members
  • 36. Projects priorization Matrix Oportunidades de Projetos Projetos Seis Sigma: 0,35 0,35 0,30 1,00 0,40 0,20 0,40 1,00 Nr Projeto: descrição Proj. Aprov. (S/N) Satisfação de Clientes / Corporação Redução de Custo Impacto Indicadores Sistema de Gestão Total do Benefício Conflito com iniciativas já existentes Prazo p/ conclusão Probabilidade de Investimento ($$$) Total do Esforço Pontuação final Clas do 1 Produtividade MO Direta S 10 10 10 10,00 1 7 3 1,60 8,40 2 Energia Elétrica S 10 10 10 10,00 1 7 7 3,20 6,80 3 % de treinamentos x realizados – Investimento em treinamento S 1 5 10 5,10 1 7 1 0,80 4,30 4 Gestão de peças de Falha de fornecedor S 5 5 10 6,50 3 5 3 2,40 4,10 5 Tempo de desenvolvimento de produto S 10 1 10 6,85 5 5 3 3,20 3,65 6 Inventário do aço (peso de corte) S 1 5 5 3,60 1 7 1 0,80 2,80 7 Concentração do Boro S 10 1 7 5,95 3 7 5 3,20 2,75 8 Aumento do OEE das blanqueadeiras S 3 7 5 5,00 1 5 5 2,40 2,60 9 Aumento do OEE da Linha 04 - Laminação N 5 5 5 5,00 1 7 5 2,40 2,60 Esforço Benefícios
  • 37. How to define Lean Six Sigma projects? Total 5329 5221 42168 102611 30079 11946 8518 8462 7117 6983 5673 Percent 2,3 2,2 18,0 43,8 12,8 5,1 3,6 3,6 3,0 3,0 2,4 Cum % 79,8 82,0 100,0 43,8 56,7 61,8 65,4 69,0 72,1 75,1 77,5 C2 O th er Testespara conf fa lh a G ravação Irregula r Vazam ento ST Defe ito sST D efeito s de Pintu ra Trinca e Rachado Aros Danificados Suje ira sobre Pintu ra O scila ção Radial Riscos e Marcas 250000 200000 150000 100000 50000 0 100 80 60 40 20 0 Total Percent Principais defeitos PPM Interno (Jan-Ago/2014) Projetos Seis Sigma: 0,35 0,35 0,30 1,00 0,40 0,20 0,40 1,00 Projeto: descrição Proj. Aprov. (S/N) Satisfação de Clientes / Corporação Redução de Custo Impacto Indicadores Sistema de Gestão Total do Benefício Conflito com iniciativas já existentes Prazo p/ conclusão Probabilidade de Investimento ($$$) Total do Esforço Pontuação final Produtividade MO Direta S 10 10 10 10,00 1 7 3 1,60 8,40 Energia Elétrica S 10 10 10 10,00 1 7 7 3,20 6,80 % de treinamentos x realizados – Investimento em treinamento S 1 5 10 5,10 1 7 1 0,80 4,30 Gestão de peças de Falha de fornecedor S 5 5 10 6,50 3 5 3 2,40 4,10 Tempo de desenvolvimento de produto S 10 1 10 6,85 5 5 3 3,20 3,65 Inventário do aço (peso de corte) S 1 5 5 3,60 1 7 1 0,80 2,80 Concentração do Boro S 10 1 7 5,95 3 7 5 3,20 2,75 Aumento do OEE das blanqueadeiras S 3 7 5 5,00 1 5 5 2,40 2,60 Aumento do OEE da Linha 04 - Laminação N 5 5 5 5,00 1 7 5 2,40 2,60 OEE da Montagem L02 N 5 1 7 4,20 1 7 5 2,40 1,80 Sujeira sobre pintura S 5 1 7 4,20 1 5 5 2,40 1,80 Custo de Prevenção (Custo da qualidade) N 1 1 5 2,20 1 10 1 0,80 1,40 OEE da Montagem L01 N 5 1 5 3,60 1 7 5 2,40 1,20 Esforço Benefícios Analyze the Factory KPI´s Identify and prioritize projects Define the team members
  • 38. OpEx Multifunctional Team Structure Champion Team Members Factory OpEx Black Belt
  • 39. Main responsibilities:  Support the project development  Remove barriers during the project execution  Keep the team members motivated Champion OpEx Multifunctional Team Structure
  • 40. Main responsibilities:  Train the Belts candidates  Follow up the projects  Perform the coaching and check points meetings  Support the projects execution related to methodology and tools Factory OpEx Black Belt OpEx Multifunctional Team Structure
  • 41. Main Responsibilities:  Participate of the training sessions  Develop the projects  Get help to remove barriers during the project execution Team Members OpEx Multifunctional Team Structure
  • 43. Green Belts behavior GB should understand and question why the things are as they are!!!! Behaviors like: That’s no way... Should not be used by the GB!!!
  • 44. They should present  Initiative  Enthusiasm  Skills in communications  Analytical skills  Interpersonal relationship,  Excellent knowledge of the project working area. Some skills desirable for the team members
  • 45. Define the project and team members Define the methodology Train the projects leaders Develop the projects Perform the coaching sessions Performance the tollgates review Certify the project leaders OpEx teams management system
  • 47. Define the project and team members Define the methodology Train the team members Develop the projects Perform the coaching sessions Performance the tollgates review Certify the project leaders OpEx teams management system
  • 48. Maxion Wheels LSS Methodologies Competence NWT Facilitators Yellow Belt Green Belts Green Belt Black Belts Black Belt NWT Leaders White Belt Training
  • 49. PHASES NÍVEIS DO DMAIC White Belt (Facilitadores e líderes times naturais) Yellow Belt Green Belt Black Belt DEFINE Definition of problem, gap and target Trend Graph Definition of problem, gap and target Trend Graph Definition of problem, gap and target Trend Graph SIPOC Definition of problem, gap and target Trend Graph Time Series SIPOC MEASURE Stratification data collection Plan Check sheet Pareto Analysis data collection Plan Pareto Analysis Control Charts Process Capability Descriptive Statistics data collection Plan, Check Sheet and Pareto M.S.A (Measuring System Analysis) Control Charts Process Capability Sampling M.S.A. (Measuring System Analysis) ANALYZE Brainstorming Cause-and-Effect Diagram 5 Whys Test AV and NAV Diagram Writestorming Affinity Diagram FTA Prioritization Matrix Process Map, FTA Hypotheses Test Correlation Graph Prioritization Matrix Full Factorial DOE Process Map, FMEA, FTA Full and Fractioned Factorial DOE EVOP Response Surface Regression Analysis Variance Analysis IMPROVE 5W2H Impact Effort Diagram 5W2H Impact Effort Diagram 5W2H BASICO Matrix 5W2H Decision Matrix CONTROL Trend Graph, Pareto Operational instruction, Poka Yoke Verify the achievement of target (Hypotheses Test, Trend Graph, ets) Poka yoke, Control Plan Operational instruction Verify the achievement of target (Hypotheses Test, Trend Graph, ets) Poka yoke, Control Plan Operational instruction Verify the achievement of target (Hypotheses Test, Trend Graph, ets) Poka yoke, Control Plan Operational instruction GB Training Tools
  • 50. Lean Six Sigma projects Agenda 2015 Six Sigma Project Agenda June July August Project Definition S M T W T F S S M T W T F S S M T W T F S 1 2 3 4 5 6 1 2 3 4 1 Launch of Projects 7 8 9 10 11 12 13 5 6 7 8 9 10 11 2 3 4 5 6 7 8 14 15 16 17 18 19 20 12 13 14 15 16 17 18 9 10 11 12 13 14 15 Project Charter Validation 21 22 23 24 25 26 27 19 20 21 22 23 24 25 16 17 18 19 20 21 22 28 29 30 26 27 28 29 30 31 23 24 25 26 27 28 29 Project Coaching meeting 30 31 Green Belt Training 1st session - Introduction & Define phase 2nd - Measure 3rd - Analyze 4th - Improve & Control September October November S M T W T F S S M T W T F S S M T W T F S 1 2 3 4 5 1 2 3 1 2 3 4 5 6 7 6 7 8 9 10 11 12 4 5 6 7 8 9 10 8 9 10 11 12 13 14 13 14 15 16 17 18 19 11 12 13 14 15 16 17 15 16 17 18 19 20 21 20 21 22 23 24 25 26 18 19 20 21 22 23 24 22 23 24 25 26 27 28 Check Point Meeting 27 28 29 30 25 26 27 28 29 30 31 29 30 Project Certification December S M T W T F S 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Agenda Example
  • 51. Define the project and project leader Define the methodology Train the projects leaders Develop the project Perform the coaching sessions Performance the tollgates review Certify the project leaders OpEx teams management system
  • 52. GB meetings structure We can improve this process We can not talk now!!! We are very busy!!!
  • 53.  Our suggestion for each team is to dedicate at least 10 hours per week to execute their projects.  The team meetings should be organized and to have meetings objectives.  Each meeting should have between 2 ~ 3 hours maximum to be productive  The team should dedicate time to meet and go to the Gemba to develop their projects. GB meetings structure
  • 54. Some actions can be divided by the team members and they can work it out of the meetings. During the tools application: all team members should be participating of the meetings! GB meetings structure
  • 55. Define the project and project leader Define the methodology Train the projects leaders Develop the projects Perform the coaching sessions Performance the tollgates review Certify the project leaders OpEx teams management system
  • 56. Follow up meetings Frequency: Monthly meetings Participants: team members, Champion and the Factory OpEx Black Belt Objective: follow-up and guidance as to the application of the methodology, tools, project documentation and project schedule. Project Coaching meetings
  • 58. Guide Mapping Objective  Register the sequence of the project documentation.  Guide the team members since the Define phase until the Control phase. Main Benefits  Help the team members the sequence of the problem solving methodology.  Provide to the company the project reach and Create a Learning Organization.
  • 59. Project Documentation  During the project development, all the information and analysis done by the Team must be recorded. One tool to do this is the Guide Mapping.
  • 60. Define the project and project leader Define the methodology Train the projects leaders Develop the projects Perform the coaching sessions Performance the tollgates review Certify the project leaders OpEx teams management system
  • 61. Tollgate review Frequency: Bimonthly meetings Participants: team members, Champion, OpEx area, Plant Manager, Managers and BU Operations Director, BU Quality/OPEX Director, Global OPEX Director. Objective: Follow-up of the results reached in the period, evidence of the use of analysis and problem solution tools, evidence of improvements implemented, necessary redirections of the project. These are results focused meetings Check Point meetings
  • 62. Define the project and project leader Define the methodology Train the projects leaders Develop the projects Perform the coaching sessions Performance the tollgates review Certify the team members OpEx teams management system
  • 63. GB certification process Criterias to be certified: 100% of participation in training Participate of the project Apply the correct methodology Target met for 3 month and standardized process
  • 65. Fundamental Concept Change Improvement Not always results in Demands ≠
  • 66. Improvement Concept 16 14 12 10 8 6 4 2 9 8 7 6 5 4 3 2 Semana Tempo (s) Tempo de ciclo da laminadora Change Improvement Improvement is a positive, relevant and lasting impact on the Organization’s interest indicators.
  • 67. Improvement Concept Exercise: How to know whether a change is an improvement?  A change was projected to reduce the cycle time of an operation.  The test planning established that the change would be made between the seventh and eighth week from the beginning of the project.  A cycle time measure was performed in the fourth week and the result was 8 minutes.  In the tenth week, a new measure was performed and result was 3 minutes.  The cycle time reduction from 8 to 3 minutes was considered very significant to the process of interest.  What is the degree of conviction that the change is an improvement? Measures of cycle time Before and After 8 3 0 1 2 3 4 5 6 7 8 9 Before (week 4) After (week 11) Cycle Time (min)
  • 68. Consider the six scenarios below with cycle time measures every week during 14 weeks from the beginning of the project. Analyze the cycle time trend graph for each of the scenarios. For each scenario, what is the degree of conviction that the change is an improvement? Week Scenario 1 Scenario 2 Scenario 3 Scenario 4 Scenario 5 Scenario 6 1 6 6 9 8 6 3 2 9 2 9 9 9 4 3 7 3 6 7 7 2 4 8 8 8 8 8 8 5 6 4 7 6 3 3 6 7 2 6 7 2 2 7 9 9 6 9 4 4 8 2 7 4 2 3 2 9 3 3 4 1 2 3 10 4 7 3 3 4 4 11 3 3 3 3 3 3 12 4 6 2 5 2 3 13 2 9 3 8 4 4 Improvement Concept
  • 69. 12 10 8 6 4 2 10 8 6 4 2 Semana Cenário 1 12 10 8 6 4 2 10 8 6 4 2 Semana Cenário 4 12 10 8 6 4 2 10 8 6 4 2 Semana Cenário 2 12 10 8 6 4 2 10 8 6 4 2 Semana Cenário 5 12 10 8 6 4 2 10 8 6 4 2 Semana Cenário 3 12 10 8 6 4 2 10 8 6 4 2 Semana Cenário 6 Tempo de Ciclo Tempo de Ciclo Tempo de Ciclo Tempo de Ciclo Tempo de Ciclo Tempo de Ciclo Improvement Concept Result Result Result Result Result Result Change Change Change Change Change Change
  • 70. Before After Was the change an improvement? Improvement Concept
  • 71. Before A week later Was the change an improvement? A month later Improvement Concept
  • 72. Before A week later Was the change an improvement? A month later Improvement Concept A year later
  • 74. Lean Six Sigma What is the Lean Six Sigma definition???
  • 75. Lean Manufacturing Before to understand what is Lean Six Sigma we need to understand what is Lean Manufacturing and Six Sigma separately...
  • 77. Lean Manufacturing After Second World War – 1960’s Japan was destroyed! Supply shortages.
  • 78. Lean Manufacturing Taiichi Ohno Toyota Toyota Production System:  Elimination of wastes  Standardization  Respect of People After Second World War – 1960’s
  • 79. Lean Manufacturing What does Lean Manufacturing mean? Lean mentality is an operational philosophy to reach eliminate wastes continuously where analyze and optimize processes according added value and no added value to the customer perspective.
  • 80. Lean Manufacturing What does add value mean?? Which one day added value, can not add more value today...
  • 81. Lean Manufacturing It is not possible to eliminate no added value activities in the first moment ... ... Due to it Lean Manufacturing is a continuous improvement philosophy to reduce and eliminate wastes.
  • 82. Lean Manufacturing Main Lean Manufacturing principles...
  • 83. Six Sigma What is Six Sigma??
  • 84. Six Sigma history 1980’s In this period, Motorola spent 5 to 10% of their investments to correct defects. It means almost US$ 900 millions per year.
  • 85. 1980’s In one the Motorola factory, a Japanese group took the lead and with the same workforce and the same machines, they got results reducing defects in 80%.The way of Management got better results!!! Six Sigma history
  • 86. 1980’s Bill Smith, senior engineer and scientist at Motorola's Communications Division, introduced the concept of Six Sigma as a response to rising warranty claims on complaints from the sales sector. This was a method to standardize the way of counting defects, and Six Sigma a level close to perfect Six Sigma history
  • 87. Six Sigma What does 6 Sigma mean???
  • 91. Six Sigma It aims to reduce the variability of critical processes to the business, thereby minimizing the number of defects present in them. Interpreting Sigma Capability LSL USL
  • 92. What is the objective of Six Sigma? Variability of Process Low Process Capability Variability of Process High Process Capability Improvement LSL USL LSL USL Sigma Capability measures process easiness at meeting Customers’ requests!!!! If process shows low Sigma Capability, it is necessary to Reduce the process variability (Reduce car size!!!)
  • 93. Six Sigma The day of a man The day of a woman
  • 94. Six Sigma = Process variation measurement
  • 95. Brasmotor General Eletric AlliedSignal Asea Brown Boveri - ABB Motorola 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 Savings of US$ 2,2 billion between the end of the 1980s and thet early 1990s Savings of US$ 898 million / year in the first 2 years Savings until 1998: US$ 1,2 billion Savings in 1999: US$ 1,5 billion Savings of more than US$ 10 million in 1999 Six Sigma beginning Six Sigma background Six Sigma
  • 96. Six Sigma *% the company’s revenue What is Six Sigma Level? So, there is a direct link between the Sigma level and defects occurrence ! ! ! Parts per million (ppm) Sigma Level 308.537 2 66.807 3 6.210 4 233 5 6 3,4 Non quality costs* Not applicable 25 a 40% 15 a 25% 5 a 15% < 1%
  • 97. Comparison between the Six Sigma Performance and Standard Performance 4 Sigma (99,38% ok) 6 Sigma (99,99966% ok) 7 hours of Electricity lack per month 1 hour of Electricity lack per each 34 years. 5.000 incorrect surgeries per week 1,7 incorrect surgeries per week 6 200 customer complaints for each 1.000.000 produced parts 3,4 customer complaints for each 1.000.000 produced parts 15 minutes of water lack per day 1 minute of water lack for each 7 months Six Sigma
  • 98. Lean and Six Sigma  Aims the variability reduction;  Applies statiscal tools to data analysis and problems solving;  In general projects lasts between 4 until 6 months.  Aims the lead time reduction and wastes reduction in the process;  Applies simple techniques to analyze data;  In general projects lasts between 1 until 4 weeks. Six Sigma Lean Manufacturing
  • 99. How do the Lean and Six Sigma complement each other? Lean and Six Sigma Identifies problems in the flow Improves the capability of add value operations. Six Sigma Lean
  • 100. Lean Six Sigma What is the method applied in the Lean Six Sigma?
  • 101. Método DMAIC DEFINE Define the scope and target of the project. MEASURE Define the focus of the problem. ANALYZE Define the root causes of the focused problem. IMPROVE Proposal, evaluation and implementation of the problems solutions. CONTROL Assure the improvements in the results a long term.
  • 103. Overview of DMAIC Phases - DEFINE DEFINE Define accurately the project scope Define the Problem Get Records about the problem, define gap and target (Trend Graph, Pictures) Build the team in charge of the project Define schedule Elaborate Project Charter Financial Survey Show Current Loss and Feasible Gains
  • 104. Overview of DMAIC Phases - DEFINE DEFINE Define accurately the project scope Define the Problem
  • 105. To improve a process... ... the first step is to know about it! Define Phase Define and understand the problem
  • 106. Team needs understand why the project was defined and align the knowledge level regarding the problem among the team members. Define Phase Define and understand the problem
  • 107. Overview of DMAIC Phases - DEFINE DEFINE Define accurately the project scope Define the Problem Get Records about the problem, define gap and target (Trend Graph, Pictures)
  • 109. A trend graph is a diagram of individual values of the results of a process as a function of time. When interpreting a trend graph, we observe if there are special settings in points along time or if there are points which are too far fro the others. Times Series Plot Define Phase
  • 110. Times Series Plot Define Phase Questions that can be answered using a trend graph :  What has the indicator performance been the along the two last years?  Does it have an increasing or decreasing trend? Or is it stable?  Does the indicator have a uniform performance along time or does it show peaks?  What values is the indicator placed between? Does it show any cyclic or seasonal characteristic?  What is the lowest indicator value ever obtained? What about the highest one? At what moment did it occur?  Observing the historical performance, does the general target seem realistic? Is it challenging? Has it ever been achieved in the past?
  • 111. Times Series Plot Define Phase The Times Series Plot shall be used for monitoring the evolution of ongoing work and of results achieved.  It may be enhanced by adding :  An arrow indicating the direction for the best result.  The best result achieved by another line, another unit or a competitor.  A line indicating the value of the target to be achieved.
  • 112. Times Series Plot Define Phase Example of Time Series 0 1 2 3 4 5 6 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Months Scrap Percentage Target Best result Average
  • 113. Define Phase Exercise Suppose that Ronaldo Santana, “Selit Corporation’s” Brazilian subsidiary sales vice-president has just received a report containing the quarter sales report in the last five years in the regions in his charge. Dissatisfied with the results, he immediately called his secretary: “Márcia, tell the regional managers that I need to talk to them tomorrow afternoon. All of them must be present.”
  • 114. Define Phase Exercise Márcia had been Ronaldo’s secretary for over tem years. She knew that by his tone of voice that he meant “we must do business” and then she contacted the regional managers to schedule the unexpected meeting for 2 o’clock p.m. the next day. On the next day, it was five minutes to two o’clock and all the managers were already in the meeting room. When they were called for meetings, the reason was always the same: Ronaldo was dissatisfied with something.
  • 115. Define Phase Exercise Ronaldo went straight to the point: “I have just received the sales report for this quarter. Sales were fantastic. Silas, you not only increased sales in 17.6%, but also increased sales in 20.6% comparing to last year! I don’t know how you do that!” Silas smiled. His philosophy of finishing the year with a “bang”, making customers increase inventory worked once again. Ronaldo had not realized how Silas’ sales in the first quarter were always low.
  • 116. Define Phase Exercise Ronaldo went on: “Teresa, sales in the southeast region were also phenomenal! You managed an increase of 11.7% in the last quarter and an increase of 11.8% comparing to last year!” Teresa also smiled. She did not know why she had done so well, but she was sure that she would not change anything. “João, sales in the southeast have grown 17.2%, but dropped 8.2% comparing to last year”, said Ronaldo. “You have to find out what you did before for your sales to increase so much. Still, your performance in the last quarter was good.”
  • 117. Define Phase Exercise João tried to hide his surprise. Although he had received a large order in November, it the only “large” one in a long time. In a general basis, sales in the Southeast region were decreasing. Then, Ronaldo was ready to deal with the region which presented problems. “Lúcia, sales in the West-Central region have decreased 5.5% in the last quarter, but increased 4.7% comparing to last year. I do not understand how your sales can vary so much! Do you need more incentive? She looked down. She had been working hard in the last five years and had gotten several new accounts. She had even gotten a bonus for having captured most of the new accounts in 2003.
  • 118. Define Phase Exercise “Kátia, sales in the North region have decreased 3.2% in the last quarter and 2.6% comparing to last year. I am very disappointed with your performance. You have already been responsible for the highest increase in our sales! I had great expectations about you. Now, I can only hope you show some sign of life in this quarter.” Kátia felt her face blush. She knew that she had sold more units in 2005 than in 2004. “After all, what does Ronaldo actually know about sales?”, she thought.
  • 119. Define Phase Exercise Ronaldo turned to Daniel, who felt an discharge of adrenaline. “Daniel, sales in the Northeast have the worst f all! There has been a drop of 19.7% in the last quarter and a drop of 22.3% comparing to last year. How can you explain that? Do you prize your job? I want to see a significant improvement this quarter, otherwise...” Daniel felt paralyzed. This is hard region, full of competitors. It is true that some accounts have been lost along the years, but they have been substituted by new ones. How could it be going so badly?
  • 120. Define Phase Exercise Let’s read the analysis made by Ronaldo Santana and answer the questions below: a) Do you agree with the statements made by the vice-president to his sales team? Justify your answer using statistic reasoning. b) Which factors which were not mentioned should the vice- president have taken into account to make the correct conclusion about his sales staff?
  • 127. Define Phase INCREASING TREND 0 20 40 60 80 100 120 140 160 1 2 3 4 5 6 7 8 9 10 11 12 DECREASING TREND 0 20 40 60 80 100 120 140 160 1 2 3 4 5 6 7 8 9 10 11 12 PEAKS 0 20 40 60 80 100 120 140 160 180 1 2 3 4 5 6 7 8 9 10 11 12 SEASONALITY 0 20 40 60 80 100 120 140 160 0 5 10 15 20 25 SPECIAL CAUSE 0 20 40 60 80 100 120 140 160 180
  • 130. Exercise It was presented in the last edition of “Good Player” magazine , the data about some goalkeeper in the last season. The data regarding the Corinthians ‘s goalkeeper are presented bellow: 2011 2012 2013 2014 39 goals conceded 52 goals conceded 60 goals conceded 45 goals conceded
  • 131. Absolut metrics: They are independents metric, without link with other data. Example: amount of goals conceded. Metrics calculation
  • 134. Exercise After the data presentation in the magazine, it was possible to see the performance variation along the years. From this, the team coach questioned about the number of games that the goalkeeper had performed in each year, because he knew that he had have a contusion in 2011 and 2014. 2011 2012 2013 2014 39 goals conceded 52 goals conceded 60 goals conceded 45 goals conceded 51 games 75 games 99 games 67 games
  • 135. Relative metrics: They are metrics that demonstrate the relation between the data and some parameter. Example: Amount of goals conceded by games performed. Metrics calculation
  • 137. Absolut X Relative 2014 2013 2012 2011 0,76 0,74 0,72 0,70 0,68 0,66 0,64 0,62 0,60 Ano Gols / jogo 0,67 0,61 0,69 0,76 Gols sofridos por jogos Goleiro - Corinthians 2014 2013 2012 2011 80 70 60 50 40 30 20 Ano Qtd Gols 45 60 52 39 Quantidade de gols sofridos Goleiro - Corinthians
  • 138. Define Phase Example 1 Problem: At the Itatiba Plant, the Diversão Cookie net weight is a chronic problem in this year’s Deployment of Targets, representing 80% of factory’s cost of non quality. The high net weight is set by the excess of product delivered to consumer above the net weight shown on the package or also by the individual weight of cookies higher than specified. The data on chart 1 show the records of the months of Jan/11 to Dec/11. Table 1: Monthly percentage of net weight of Diversão cookie – Jan/11 to Dez/11 Months Overweight % in cookies Jan 0.53 Feb 0.63 Mar 0.47 Apr 0.50 May 0.59 Jun 0.58 Months Overweight % in cookies Jul 0,46 Aug 0,51 Sep 0,56 Oct 0,69 Nov 0,68 Dec 0,51
  • 139. Define Phase  The overweight percentage of diversão cookie is high, ranging from 0.46 to 0.69, with an average of 0.56 in 2011. dez nov out set ago jul jun mai abr mar fev jan 0,70 0,65 0,60 0,55 0,50 0,45 mês 2011 % sobrepeso Média = 0,56 Gráfico de Tendência do % sobrepeso do biscoito Diversão
  • 140. Define Phase Definition of Target  Defining the target value is evaluating the gap, or better, “where I am at” and “where I want to get to”. Dialog between Alice and the Master Cat Alice: - Which way shall I follow? Master Cat: - Where do you want to go? Alice: - I don’t know! Master Cat: - Then, Any way will work! Lewis Carroll – Alice in Wonderland
  • 141. Define Phase  Target: result to be achieved  We think: “Defining targets is easy!” Do we really know how to define targets? Definition of Target To define a target, we need to calculate the gap.
  • 142. Define Phase  Gap = Current Situation (Average) - Benchmark Definition of Gap  Benchmark = Is a world-reference value of the best result ever achieved for an indicator
  • 143. Define Phase Researching Benchmark Internal Internal comparison between different lines, areas, plants, etc. Competitive Comparison with competitors Functional Comparison between the same functions in different ambiences Types of Benchmark:
  • 144. Define Phase  If the direction of the indicator is to “Increase”  Target Value = Current Situation (Average) + (% of reduction x Gap)  If the direction of the indicator is to “Decrease”  Target Value = Current Situation (Average) - (% of reduction x Gap) Definition of Target Value  Target Value = Current Situation ± (% of Reduction x Gap) Target = Management Goal + Value + Deadline
  • 145. Define Phase Check if target is well defined Only the last one is a target. Why? Target = Management Goal + Value + Deadline There is no management without targets Consider the following situations:  Increase OEE of Assembly line 5.  Lower technical stops wheel rolling lines 1 and 2 in 25%.  Increase productivity of Cutting lines until the end of this year.  Lower Scrap for Scratches and Marks PPM from 850 to 330 starting at 03/12/2011.
  • 146. Define Phase Definition of Target Value  Defining the target value is evaluating the gap, or better, “where I am at” and “where I want to get to”.  A graph analysis is very effective to evaluate the current situation. Only after such analysis it is indicated proposing challenging and tangible targets. Definition of Deadline  Deadline must be compliable with the complexity of the problem.
  • 147. Define Phase Always remember the SMART concept  Specfic – clear and concise statement of must be done/ achieved;  Measurable – concrete and observable measure;  Achievable – feasible in terms of costs, challenge and time;  Relevant – specifically related to process goals;  Time-boxed (deadline) – includes a specific schedule for achieving.
  • 148. Define Phase dez nov out set ago jul jun mai abr mar fev jan 0,70 0,65 0,60 0,55 0,50 0,45 mês 2011 % sobrepeso Média = 0,56 Meta = 0,5 Benchmarking = 0,46 Gráfico de Tendência do % sobrepeso do biscoito Diversão Target is a % of gap to be achieved (a challenge). Ex.: Lower in 10.7% the diversão cookie overweight rate from 0.56 (2008 average) to 0.50 lowering 60% of gap starting in may/09. Target = 0.56 – (0.10*0.60)  Target: 0.50% /month (reduction of 10.7% of current average) Gap: (Current Average – Benchmark) 0.56 – 0.46 = 0.10 Last year’s average loss: 0,56% Benchmark (best result): 0.46%/month Trend Graph of % overweight for Diversão cookie
  • 149. Define Phase DEFINE Define accurately the project scope Define the Problem Get Records about the problem, define gap and target (Trend Graph, Pictures) Financial Survey Show Current Loss and Feasible Gains Build the team in charge of the project
  • 150. Lean Six Sigma The main sucess factor are the people...
  • 151. Teamwork Why do we have so difficult to establish good relationship?? Because the people are different!!!!
  • 152. How do you classify the personality of these people??  He was an inventor, business men in the informatics sector.  He was co-founder, president and executive director of Apple  He was an executive director of Pixar company and majority actionist of The Walt Disney Company. Teamwork
  • 153. He is the most Brazilian important Formula 1 pilot. Ayrton Senna da Silva was born in Sao Paulo, Brazil and when he was four years old his father Milton bought him a go-kart, and by age eight Ayrton was regularly competing in karting events. Over the next ten years he won the World Championship three times and engaged in some controversial racing with France's Alain Prost and England's Nigel Mansell. Ayrton Senna was killed on 1 May 1994 in a race at the San Marino Grand Prix. Teamwork How do you classify the personality of these people??
  • 154. Main titles: Barcelona: UEFA Champions League: 2005–06, 2008–09, 2010–11 UEFA Super Cup: 2009, 2011 Fifa Clubs World Cup: 2009 and 2011 Argentina: Olympic games: Gold in 2008 Individuals awards: Gold Ball from FIFA: 2010, 2011, 2012 Gold Ball – World Cup: 2014 Teamwork How do you classify the personality of these people??
  • 155.  He is considered the best soccer player from Argentina in the history Champion and Vice champion in the World cup in 1986 and 1990 respectively Teamwork How do you classify the personality of these people??
  • 156. People totally different... But all them reached the SUCCESS!!! Teamwork
  • 157. Negative people also help the team!!! How do you classify the personality of these people?? Teamwork
  • 158. Our team are formed by different people... We need to lear how to use the talent of each one to reach the TEAM SUCCESS!!! Teamwork
  • 159. And how about your team??? The sponsor must manage the team conflicts Sponsor responsability
  • 160. Overview of DMAIC Phases - DEFINE DEFINE Define accurately the project scope Define the Problem Get Records about the problem, define gap and target (Trend Graph, Pictures) Financial Survey Show Current Loss and Feasible Gains Build the team in charge of the project Define schedule
  • 161. Tips for Schedule Elaboration:  Elaborate a schedule considering all the activities of each phase of DMAIC method;  This schedule shall be used in each Phase;  When planning, assess possible absences in a unit;  Take into consideration the time dedicated and the possible need of data colleting;  The schedule must be planned in compliance with the project’s deadline;  Remember that in case of delay, the deadline is not changed.
  • 162. Activities E/A S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 D E F I N E 1.1 Definition of Problem Expected Achieved 1.2 Survey of problem History, definition of gap and target Expected Achieved 1.3 Financial Survey Expected Achieved 1.4 Definition of Project Team Expected Achieved 1.5 Definition of Work Schedule Expected Achieved .... C O N T R O L 5.3 Transfer of New Standards to All Involved Expected Achieved 5.4 Implement Performance Monitoring Plan Expected Achieved 5.5 Summarize work Expected Achieved Example of Schedule Planned (Blue) Late (Red) In Development (Yellow) Completed in time (Green)
  • 163. Tips for Schedule Elaboration – DMAIC Project Phases Green Belt D 15 days M 45 days (including data collection) A 70 days I 50 days Subtotal 180 days C 90 days Total 270 dias After 6 months results start to be achieved
  • 164. Overview of DMAIC Phases - DEFINE DEFINE Define accurately the project scope Define the Problem Get Records about the problem, define gap and target (Trend Graph, Pictures) Financial Survey Show Current Loss and Feasible Gains Build the team in charge of the project Define schedule Elaborate Project Charter
  • 165. Project Charter  Purpose: document which represents the contract signed by team in charge of project implementation, Sponsor and Facilitator.  Shows clearly what is expected from the team  Keeps the team aligned with company’s primary goals  Keeps the team within the scope defined for the project
  • 167. The Measure phase consists in identifying the focus that will lead all the project!! Measure
  • 168. Measure Try to solve all the problems will not work... Why is important to prioritize the project problems?
  • 169. Measure MEASURE Determine the location or source of the problem Collect new data Analyze the Measuring System (M.S.A.) Are there reliable data to focus on the problem? NO YES Use existing records Is the problem on focus? NO 1 YES identify stratification criteria Identify priority problems (Sampling Tree & Pareto Chart) 1 1 Study the variation of priority Problems (Control Chart and Capability Rates) Establish specific targets for each priority problem Go to Analyze Phase Evaluate impact vs effort in the priority problems
  • 171. The main goal of the Analyze phase is to identify the root cause of the problem prioritized at the Measure phase... Analyze
  • 172. Analyze The GB roles is to discover why the priority problems happened... ... The Team will receive a lot of answers and ideas but they should be proved using statistical tools... But remember if they ideas really are true the problems had already been solved before!!!
  • 173. Analyze The analyze phase is how to connect the pieces of a puzzle... Everything starts with the hypothsis, but just applying statistical tools the team can confirm or not them and find the root cause!!!!
  • 174. Analyze ANALYZE Define the causes of each priority problem Analyze priority problem and root cause data (Trend Graph, Histogram, boxplot, Scatter Plot) Prioritize potential causes of priority problem (Cause & Effect Matrix) Quantify the importance of potential causes (Control Chart, Regression Analysis, Hypotheses Tests, ANOVA) Go to Improve Phase Analyze the root cause of the problem (Process Map, FTA, VSM)
  • 176. The objective of the Improve phase is to prioritize and implement actions In this phase the Champion has very important roles to help the team members get resource and money to implement the actions!!!! Improve
  • 177. IMPROVE Propose, analyze and implement solutions for each priority problem Improve Create ideas of potential solutions for the elimination of the most impacting causes of priority problems Test the selected solutions in small scale (pilot test) Identify and implement the improvements or adjustments for the selected solutions if necessary Go to Control Phase Prioritize the solutions for the priority problems (BASICO Matrix) Elaborate action plan (5W e 2H) disclose action plan (5W e 2H) Implement action plan
  • 179. Control The Control phase is the last but not the less important. The objective of this phase is to ensure that the achievement of target is kept for long term.
  • 180. Control The main deliveries of the Control phase are:  Results  Standard  Knowledge
  • 181. Target Achieved? Innovate or return to M phase or implement DFSS NO CONTROL Ensure that the achievement of target is kept for long term Analyze the achievement of target (Before and After) Forward the new standards to all employees involved Implement a performance control plan (Control Chart and Capability Rate) YES Reflect on the lessons learned and recomend to future works Standardize the changes (create new standard or update existing standard) In case there is the possibility of Horizontal Replication, expand the improvement implementation to the other lines Define and implement a corrective action plan (OCAP) Calculate project’s actual payback Control
  • 182. Champion responsability As the Champion of the project you need to assure that the team will follow the steps of methodology…
  • 183. Champion responsability For the project success it is necessary… METHODOLOGY TEAMWORK SUPPORT
  • 184. Champion responsability … And for this, you need to be the example…
  • 187. Champions Six Sigma Training Santo André October, 2015