116 NEW MONTGOMERY STREET, SUITE 500 SAN FRANCISCO, CA 94105 415-284-1544 FAX 415-284-1554
www.nelsonnygaard.com
M E M O R A N D U M
To: Alan Loomis and Amber Hawkes
From: Steve Boland
Date: November 25, 2015
Subject: Space 134 Final Transit Recommendations (Draft)
This memorandum is the final transit deliverable for the second phase of the Space 134 planning
process. It includes:
 A brief introduction to the proposed Space 134 project and planning process, and the role
of transit within the project
 Contextual information relevant to the design of transit within the Space 134 project
 Draft recommendations for transit infrastructure and service associated with the project
 Transit-related next steps in the planning process
THE PROJECT
Space 134
Space 134 is a proposed at-grade cap over the below-grade State Route 134 (SR-134) freeway in
downtown Glendale, between Central Avenue and Balboa Avenue, a distance of approximately 0.7
miles. The cap or deck would be configured as a linear park with cross streets in place of existing
overpasses. The park would include a variety of community amenities and active programming in
addition to open and recreational spaces.
Planning Process
The project is currently in Phase II of the planning process. The first phase, the Space 134 Vision
Plan, was a visioning effort culminating in City Council approval of ongoing project development.
The Phase II study includes both technical planning, community outreach efforts and a
preliminary economic analysis, and upon completion at the end of 2015 will position the project
for preliminary engineering, to occur in its next phase. This will be followed by environmental
review, final engineering, and final approval of the project. Construction is anticipated to begin in
2020. The project would be implemented in phases, starting with the one-block segment between
Central Avenue and Brand Boulevard.
It is envisioned that funding would be obtained from both public and private sources, as has
occurred on similar projects in other North American cities.
SPACE 134 | Final Transit Recommendations (Draft)
City of Glendale
NelsonNygaard Consulting Associates Inc. | 2
Role of Transit
The Space 134 project site is along a proposed rapid transit corridor – the SR-134 corridor
described in the following section – and indeed is the location of a likely future station within this
corridor. For this reason, and because the site is about three-quarters of a mile from the existing
transit hub at Brand and Broadway and surrounding retail destinations, slightly beyond the
distance that most are willing to walk, facilities for transit will be integral to the project.
Additionally, depending on the configuration of transit elements in the project’s final design, it
might be funded in part using federal, state, regional and/or local sources earmarked for transit
capital projects. These might include sources typically used for the design and construction of bus
transit centers.
PROJECT CONTEXT
Existing Transit
Space 134 is located at what is envisioned to be a major hub within the regional transit system,
with east-west rapid transit service connecting to north-south local/feeder bus service.
Currently, however, there is little existing transit in the east-west SR-134 corridor. The Los
Angeles Department of Transportation’s (LADOT) Commuter Express Route 549 operates only
during peak periods, and relatively infrequently, between Encino and Pasadena. In downtown
Glendale, it stops on Goode Avenue (westbound) and Sanchez Drive (eastbound), one-way streets
on the north and south sides of SR-134 between Central Avenue and Brand Boulevard.
In Spring 2016, in association with the opening of the Los Angeles County Metropolitan
Transportation Authority (Metro) Metro Rail Gold Line Foothill Extension, a six-month pilot
program will begin to provide express bus service every 15 minutes during peak periods and every
30 minutes off-peak between the Metro Rail Red Line North Hollywood Station and Pasadena.
The route of this service is shown in Figure 1, provided by Metro.
Figure 1 Pilot North Hollywood-Pasadena Express Bus Route
SPACE 134 | Final Transit Recommendations (Draft)
City of Glendale
NelsonNygaard Consulting Associates Inc. | 3
In regards to existing north-south transit connections from Space 134, there is a variety of
existing bus service connecting the site to the retail and civic core of downtown Glendale, to the
nearest existing major east-west bus route, Metro’s Route 780 Rapid service on Broadway and on
Central Avenue south of Broadway, and to the Metrolink commuter rail Glendale Station on the
city’s southern border with Los Angeles.
Bus service is provided by both Metro and the City of Glendale, operating as Beeline. Services
operate on both Central Avenue and Brand Boulevard, each of which is a two-way arterial street
despite their relative proximity to one another (they are about 900 feet apart). Beeline Routes 1
(clockwise) and 2 (counterclockwise) effectively constitute a single route operating in a loop on
Central Avenue and Brand Boulevard. Metro service in the corridor, however, is consolidated on
Brand Boulevard, in the form of Route 92 continuing south to Downtown Los Angeles and north
to Downtown Burbank. Metro Routes 90 and 91 operate north-south on Glendale Boulevard, at
the eastern end of the site.
Figure 2 shows current activity levels at existing Metro Bus stops in the vicinity of Space 134. As
the figure indicates, ridership is heavily concentrated in ther etail and civic area about a 15-
minute walk south of the Space 134 site. The most-heavily used stops are at the intersection of
Broadway and Brand Boulevard, as well as on the Metro Rapid 780 at Broadway and Glendale
Boulevard and at Central Avenue and Colorado Street.
Figure 2 Metro Weekday Average Ridership by Stop
SPACE 134 | Final Transit Recommendations (Draft)
City of Glendale
NelsonNygaard Consulting Associates Inc. | 4
Proposed Transit
The SR-134 corridor between the southeastern San Fernando Valley and Pasadena, through
downtown Glendale, has long been envisioned by planners, activists and elected officials as a
potential high-capacity rapid transit corridor. Figure 3 shows a 1968 proposal for a regional rapid
transit network including the SR-134 corridor.
Figure 3 1968 Proposed Regional Rapid Transit Corridors
While the SR-134 corridor has long been thought of as a potential rapid transit corridor, no
official plan as yet exists to provide rapid transit service in the corridor. However, planning
efforts are underway. If all proceeds according to schedule, Metro’s North Hollywood to Pasadena
Bus Rapid Transit Technical Study will issue a recommendation for one or possibly two preferred
project alternatives by September 2016. If the Metro Board adopts the recommendation and
formally includes the project in its Long Range Transportation Plan (LRTP), it will become
eligible for funding. If the Metro Board proceeds to place a measure to increase the countywide
sales tax for transportation on the November 2016 ballot, it could be included in the package of
capital projects to be funded.
“Bus rapid transit” or BRT is a transit mode designed to provide relatively high-quality transit
service using buses rather than trains. While multiple alternatives remain under consideration as
part of the Metro Technical Study, a previous staff assessment recommended “freeway BRT”
operating in the high-occupancy vehicle (HOV) lanes on SR-134 and stopping at platforms in the
median of the freeway, similar to existing Metro Silver Line service on Interstate 110 (the Harbor
SPACE 134 | Final Transit Recommendations (Draft)
City of Glendale
NelsonNygaard Consulting Associates Inc. | 5
Freeway). The staff assessment also recommended interim service using stops on Goode Avenue
and Sanchez Drive, just as Route 549 does today and the pilot service will have beginning in the
spring. However, depending on the recommendation of the Technical Study, Metro may proceed
directly to the final project.
While multiple alignments for SR-134 BRT service remain under consideration, the route would
likely terminate at a Metro Rail Gold Line station in Pasadena (the pilot express bus service will
terminate at the Memorial Park Station near the Pasadena Civic Center). To the west, service
could operate to Downtown Burbank and the Burbank Airport or remain on SR-134 through the
Burbank Media Center, as Route 549 does today and as the pilot service will do. At North
Hollywood, it could terminate or continue on as part of the Metro Orange Line BRT to Warner
Center and Chatsworth in the western San Fernando Valley.
Ultimately, light rail transit (LRT) service might be provided in the SR-134 corridor. It would
likely operate in the freeway median, just as the Gold Line operates in the median of Interstate
210 in Pasadena, and it could continue on to the Gold Line right-of-way to the east and/or, if it
were upgraded to light rail as has been proposed, the Orange Line right-of-way to the west. The
Metro staff assessment considered these possibilities; however, no such service is currently
planned.
RECOMMENDATIONS
The following recommendations for transit facilities, amenities and service to be developed as
part of and in association with the Space 134 project are designed to: integrate SR-134 rapid
transit service into the Space 134 site and program; be supportive of that service; and leverage the
service to provide enhanced “first/last mile” connectivity from the regional transit hub to
destinations in the vicinity of Space 134 but beyond walking distance. The recommendations are
also designed to ensure a high-quality experience for users of Space 134-area transit stops and
stations, and to ensure that transit service is attractive to a broad segment of potential users.
The recommendations consist of:
 Proposed locations of transit stops and stations
 Proposed changes to existing local service
 Proposed improvements to stop and station access
 Proposed designs of stops and stations
 Proposed elements of a transit-related “mobility hub”
The recommendations also address possible changes to roadway and intersection configurations
that are not recommended at this time but should be further studied.
The recommendations for stop and station location and design, new services and access
improvements are organized around the two basic configurations of SR-134 BRT service that are
most likely to be recommended by Metro: service exiting SR-134 to stop between Central Avenue
and Brand Boulevard on Goode Avenue and Sanchez Drive, and service remaining on SR-134 with
a median station between Central Avenue and Brand Boulevard.
Figure 4 shows major existing and planned/proposed transit corridors in the vicinity of Space
134. It also shows the potential locations for BRT or LRT stops at and adjacent to Space 134
described in the following sections.
SPACE 134 | Final Transit Recommendations (Draft)
City of Glendale
NelsonNygaard Consulting Associates Inc. | 6
Figure 4 Existing and Proposed Transit Corridors
SPACE 134 | Final Transit Recommendations (Draft)
City of Glendale
NelsonNygaard Consulting Associates Inc. | 7
BRT On Goode Avenue and Sanchez Drive
Figure 5 shows proposed locations of BRT and connecting local bus stops if BRT were to operate
on Goode Avenue and Sanchez Drive between Central Avenue and Brand Boulevard rather than
on SR-134.
BRT stops would be located:
 Eastbound mid-block between Central Avenue and Brand Boulevard, adjacent to a mid-
block crossing to Space 134. The stop should be sited far enough from the intersection so
that right-turn queues would not prevent buses from accessing the stop under typical
peak conditions.
 Westbound on the far side of Brand Boulevard.
Siting the BRT stops on Goode Avenue and Sanchez Drive near Brand Boulevard, rather than at
Central Avenue or at both streets, would enable the highest level of connectivity between BRT and
local bus stops. Under this proposal, local bus stops on Brand Boulevard would be sited as close
as possible to both BRT stops:
 Northbound near-side at Sanchez Drive and far-side at Goode Avenue
 Southbound near-side at Goode Avenue and far-side at Sanchez Drive
Figure 5 also shows locations where crosswalks would be need to be added or improved to provide
safe and direct pedestrian connections between BRT and local bus stops. Note that the
“continental,” “ladder” or “zebra” striped treatment shown here is just one possible design. Also
note that the bus pathways identified assume current roadway and signal configurations. It might
be possible to provide shared right-turn and transit-only “queue jump” lanes on each off-ramp
pending further analysis of impacts on traffic from adding transit signal priority and a transit-
only queue jump phase to each signal. This would serve to reduce transit delay and travel time
and improve the reliability of BRT service.
SPACE 134 | Final Transit Recommendations (Draft)
City of Glendale
NelsonNygaard Consulting Associates Inc. | 8
Figure 5 Recommendations for BRT on Goode Avenue and Sanchez Drive
SPACE 134 | Final Transit Recommendations (Draft)
City of Glendale
NelsonNygaard Consulting Associates Inc. | 9
While the recommendations do not require that Beeline service on Central Avenue be relocated to
Brand Boulevard, consolidating all Beeline and Metro service at stops on Brand Boulevard would
reduce effective (combined) frequencies for service between Space 134 and downtown
destinations to the south. Figure 6 shows current scheduled departures between 8 and 9 a.m. in
the southbound direction on Beeline Routes 1 and 2 and Metro Route 92 from the area of Space
1341 2. While Routes 1 and 92 operate southbound on Brand Boulevard, Route 2 operates
southbound on Central Avenue.
Figure 6 Southbound Departures Between 8 and 9 a.m.
Departure Route
8:07 1
8:12 92
8:20 2
8:27 1
8:34 92
8:41 2
8:46 1
8:58 92
8:59 2
As Figure 6 indicates, between 8 and 9 a.m. there are nine scheduled departures southbound from
the Space 134 site, for an average headway of 6.7 minutes. However, these departures are divided
between stops on Brand Boulevard and Central Avenue, resulting in an average headway of 10
minutes at Brand Boulevard (six trips per hour) and 20 minutes on Central Avenue (three trips
per hour). Riders bound for destinations to the south must choose between stops on Brand
Boulevard and Central Avenue. While real-time arrival information allows them to make an
informed choice, this information is not always reliable. Consolidating service on Brand
Boulevard would allow riders bound for the southern part of downtown to simply walk to the
nearest stop, wait an average of no more than seven minutes (assuming existing service levels)
and “take the first bus that comes along.”
As Figure 6 indicates, there is a relatively high level of existing transit service between the Space
134 site and the rest of downtown during peak periods. This level is only slightly reduced off-
peak, although the span of Beeline service is somewhat limited (Routes 1 and 2 cease operating
between 7 and 8 p.m. on weekdays, and before 6 p.m. on weekends). Additional service such as a
branded circulator, then, is likely to be unnecessary. However, care should be taken to ensure
that passengers are fully aware of their options for connecting service. This will require
additional passenger information at stops (e.g., signage with statements such as “Board any bus
for Downtown Glendale”) as well as “wayfinding” directional signage pointing users toward
1 There are currently no stops on Brand or Central Avenue at Goode Avenue or Sanchez Drive; the nearest stops are
north of Monterey Road and Burchett Street to the north and near Doran Street to the south. The times shown are thus
approximate times at which buses pass the Space 134 site, based on scheduled departures from nearby timepoints.
2 Beeline Route 11 also operates on Brand. However, in the morning it operates northbound only, and southbound
afternoon departures do not provide service to Brand Boulevard between Wilson Avenue and Colorado Street.
SPACE 134 | Final Transit Recommendations (Draft)
City of Glendale
NelsonNygaard Consulting Associates Inc. | 10
connecting stops. Special branding on Beeline buses providing connections to and from Space 134
and SR-134 rapid transit service may also be desirable.
Along with custom signage, BRT stops should include a number of special amenities for
passengers. While development of BRT stops will ultimately be the responsibility of Metro,
Glendale can serve as an active and vocal partner in the process. Amenities might include:
 Raised platforms allowing for level or near-level boarding (and faster loading and
unloading of buses)
 Ticket vending machines (TVMs) and TAP Card readers allowing for off-board fare
payment (and further reducing delay in the boarding process)
 Designated loading areas for bicycles (if they are allowed on-board), strollers, wheelchair
and other mobility devices
 Large, distinctly branded shelters with ample seating
 Prominent signage identifying the stop location, routes providing service to the stop, and
major details of their operation
 Enhanced passenger information including real-time arrival displays, route and area
maps, and schedules
 Garbage and recycling receptacles
 Public art
While local bus stops do not need to provide the same degree of amenity (or require the same
level of investment, including ongoing investment in maintenance), all stops should include
shelters, seating and high-quality signage.
BRT on SR-134
Figure 9 shows proposed locations of BRT/LRT and connecting local bus stops if BRT or LRT
were to remain on SR-134 rather than exiting onto Goode Avenue and Sanchez Drive.
BRT stops would be located:
 East and westbound within the SR-134 right-of-way. While the location and design of
these stops will ultimately be determined by Metro, again, Glendale can play a role in this
process. Ideally, the stops would be located below or just west of Brand Boulevard,
allowing for portal entries at surface grade within the proposed transit plaza on the west
side of Brand Boulevard between Goode Avenue and Sanchez Drive. If the stops were on a
shared center island platform station in the median of the freeway, all vertical circulation
elements (stairs, escalators and elevators) could be consolidated. Alternately, stops could
be located on either side of median transit lanes or tracks, allowing passengers to face
each other and face away from traffic as shown in Figures 7 and 8.
SPACE 134 | Final Transit Recommendations (Draft)
City of Glendale
NelsonNygaard Consulting Associates Inc. | 11
Figure 7 Example of Freeway Median Station Buffered from Traffic (Metro Silver Line 37th Street/USC Station)
Photo by METRO96 (Wikipedia)
Figure 8 Example of Freeway Median Station Buffered from Traffic (Evergreen Point Station, Medina, WA)
Photo by SounderBruce (Flickr)
SPACE 134 | Final Transit Recommendations (Draft)
City of Glendale
NelsonNygaard Consulting Associates Inc. | 12
While this design could serve to improve passenger comfort, it would require a greater footprint,
as a shared island configuration allows for “sharing” by stops in both directions of elements such
as vertical circulation, shelters, TVMs and other furniture. Alternately, platforms could be
screened from traffic noise using walls between the transit right-of-way and traffic lanes. Ideally,
these walls would be transparent in order to enhance the sense of openness and safety, potentially
using acrylic glass (more commonly known under the brand name Plexiglas). At a minimum,
fencing should be provided in order to enhance perceived (if not actual) safety.
In this scenario, the four local bus stops proposed for the previous scenario (a pair for each BRT
stop) would be consolidated into a single northbound and single southbound stop:
 The northbound stop would be just north of Sanchez , adjacent to the crosswalk, allowing
for the quickest possible connection to the BRT station.
 The southbound stop would be located mid-block between Goode Avenue and Sanchez
Drive, immediately adjacent to the transit plaza.
SPACE 134 | Final Transit Recommendations (Draft)
City of Glendale
NelsonNygaard Consulting Associates Inc. | 13
Figure 9 Recommendations for BRT/LRT on SR-134
SPACE 134 | Final Transit Recommendations (Draft)
City of Glendale
NelsonNygaard Consulting Associates Inc. | 14
Just as in the previous scenario, it is recommended that high-visibility crosswalks be provided
between all connecting transit stops that are across the street from one another, that all local bus
connections be consolidated at the stops on Brand Boulevard, and that enhanced passenger
amenities be provided at stops. Additionally, further steps should be taken to ensure passenger
comfort on the BRT/LRT platform, which would not only be adjacent to freeway traffic, but would
be below the Space 134 cap – effectively, it would be a subway platform surrounded by speeding
cars. Figures 10 and 11 shows a Metro Rail station and a light rail station in Denver, Colorado,
that are within a freeway right-of-way under an overpass. While these stations include minimal
public art, and while shelter from the elements is unnecessary in this situation, the examples
shown could provide additional seating and other amenities such as passenger information.
Ideally, skylights would be provided above the platform allowing natural light to filter down,
potentially raised above grade in order to reduce the risk of accidental falls.
Figure 10 Example of Station Below Overpass (Metro Green Line Norwalk Station)
Photo by GTD Aquitaine (Wikipedia)
potentially raised above grade in order to reduce the risk of accidental falls.
SPACE 134 | Final Transit Recommendations (Draft)
City of Glendale
NelsonNygaard Consulting Associates Inc. | 15
Figure 11 Example of Station Below Overpass (Louisiana/Pearl Station, Denver, CO)
Photo by Matt Johnson
Mobility Hub Elements
A “mobility hub” is a facility offering a range of “first/last mile” travel options, as well as
information on options and other amenities for travelers. A mobility hub can serve to greatly
improve access to a transit station by offering services and amenities such as:
 A full-service bikestation with bike repair, rental, secure storage and shower facilities
 A bikeshare (short-term rental) pod
 A transit (TAP) card sales outlet
 Pick-up and drop-off zones or “kiss-and-ride” curb space
 Taxi/shared-ride stands
 Electric vehicle parking and charging stations
 Dedicated carpool/vanpool parking
 Carsharing services
 Information kiosks with trip-planning information
 A café and/or market with wireless internet, restrooms
In addition to increasing the usefulness of the SR-134 BRT or LRT stops at Space 134, a mobility
hub within the proposed transit plaza along Brand Boulevard would also serve to greatly increase
the visibility of transit service on the site, which may be of particular importance if platforms are
SPACE 134 | Final Transit Recommendations (Draft)
City of Glendale
NelsonNygaard Consulting Associates Inc. | 16
located below the cap, out of sight (although a high-visible portal structure could also serve this
purpose).
NEXT STEPS
As the SR-134 BRT project progresses, the City of Glendale will need to actively engage with
Metro staff and Board members in order to ensure that the Space 134 and SR-134 projects are
aligned with one another, and that the City’s interests are fully represented.
According to Metro staff, the BRT Technical Study team will:
 conduct public outreach in January or February;
 analyze and refine alternatives over the spring and summer; and
 recommend a preferred alternative or alternatives to the Metro Board by September.
Glendale staff have met with Metro BRT staff on several occasions. It is imperative that staff from
both agencies, as well as the BRT consultant team, maintain open channels of communication
over the next nine months as the BRT alternatives are narrowed to a final preferred design. As
part of these discussions, Glendale should advocate for the BRT stop-related recommendations
contained in this document, and the design of Space 134 should be adjusted as necessary to reflect
and remain compatible with the BRT project design. Glendale should also support inclusion of the
BRT project in the upcoming Metro sales tax measure, if that measure proceeds.
Following adoption of a preferred alternative next fall, the BRT process will proceed to
environmental review, a process which typically takes about two years to complete.

More Related Content

What's hot

121224 railyards summary_memo_reduced
121224 railyards summary_memo_reduced121224 railyards summary_memo_reduced
121224 railyards summary_memo_reducedAdina Levin
 
pt 3: The Quickway Proposal: Central Zone
pt 3: The Quickway Proposal: Central Zonept 3: The Quickway Proposal: Central Zone
pt 3: The Quickway Proposal: Central ZoneAlan Hoffman
 
Apett Presidential Lecture The National Network Of Highway Projects And The...
Apett Presidential Lecture   The National Network Of Highway Projects And The...Apett Presidential Lecture   The National Network Of Highway Projects And The...
Apett Presidential Lecture The National Network Of Highway Projects And The...ceal2005
 
pt 4: The Quickway Proposal: South County
pt 4: The Quickway Proposal: South Countypt 4: The Quickway Proposal: South County
pt 4: The Quickway Proposal: South CountyAlan Hoffman
 
Los Gatos Trail Letter San Jose to Caltrain
Los Gatos Trail Letter San Jose to CaltrainLos Gatos Trail Letter San Jose to Caltrain
Los Gatos Trail Letter San Jose to CaltrainAdina Levin
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal linkascemiami-dade
 
North Oakland Community Analysis Final Report
North Oakland Community Analysis Final ReportNorth Oakland Community Analysis Final Report
North Oakland Community Analysis Final ReportSara Barz
 
Kennedy Mobility Hub Presentation
Kennedy Mobility Hub PresentationKennedy Mobility Hub Presentation
Kennedy Mobility Hub PresentationCrosstown TO
 
Bus Rapid Transit: The Next Opportunity for TO D (Roger Moliere) - ULI fall m...
Bus Rapid Transit: The Next Opportunity for TO D (Roger Moliere) - ULI fall m...Bus Rapid Transit: The Next Opportunity for TO D (Roger Moliere) - ULI fall m...
Bus Rapid Transit: The Next Opportunity for TO D (Roger Moliere) - ULI fall m...Virtual ULI
 
Transbay presentation-2-14-13
Transbay presentation-2-14-13Transbay presentation-2-14-13
Transbay presentation-2-14-13Adina Levin
 
Managing California HSPR Programs-Caltrain, Bazeley
Managing California HSPR Programs-Caltrain, Bazeley Managing California HSPR Programs-Caltrain, Bazeley
Managing California HSPR Programs-Caltrain, Bazeley Roger Bazeley, USA
 
Trans facility timeline and other bs
Trans facility timeline and other bsTrans facility timeline and other bs
Trans facility timeline and other bsKenneth Hogge Sr
 

What's hot (18)

121224 railyards summary_memo_reduced
121224 railyards summary_memo_reduced121224 railyards summary_memo_reduced
121224 railyards summary_memo_reduced
 
pt 3: The Quickway Proposal: Central Zone
pt 3: The Quickway Proposal: Central Zonept 3: The Quickway Proposal: Central Zone
pt 3: The Quickway Proposal: Central Zone
 
Resume_Stantec_2016_10
Resume_Stantec_2016_10Resume_Stantec_2016_10
Resume_Stantec_2016_10
 
Apett Presidential Lecture The National Network Of Highway Projects And The...
Apett Presidential Lecture   The National Network Of Highway Projects And The...Apett Presidential Lecture   The National Network Of Highway Projects And The...
Apett Presidential Lecture The National Network Of Highway Projects And The...
 
pt 4: The Quickway Proposal: South County
pt 4: The Quickway Proposal: South Countypt 4: The Quickway Proposal: South County
pt 4: The Quickway Proposal: South County
 
Los Gatos Trail Letter San Jose to Caltrain
Los Gatos Trail Letter San Jose to CaltrainLos Gatos Trail Letter San Jose to Caltrain
Los Gatos Trail Letter San Jose to Caltrain
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal link
 
North Oakland Community Analysis Final Report
North Oakland Community Analysis Final ReportNorth Oakland Community Analysis Final Report
North Oakland Community Analysis Final Report
 
Kennedy Mobility Hub Presentation
Kennedy Mobility Hub PresentationKennedy Mobility Hub Presentation
Kennedy Mobility Hub Presentation
 
Evaluation process and criteria june 2 2015 final
Evaluation process and criteria june 2 2015 finalEvaluation process and criteria june 2 2015 final
Evaluation process and criteria june 2 2015 final
 
Bus Rapid Transit: The Next Opportunity for TO D (Roger Moliere) - ULI fall m...
Bus Rapid Transit: The Next Opportunity for TO D (Roger Moliere) - ULI fall m...Bus Rapid Transit: The Next Opportunity for TO D (Roger Moliere) - ULI fall m...
Bus Rapid Transit: The Next Opportunity for TO D (Roger Moliere) - ULI fall m...
 
GIS442FINALREPORT
GIS442FINALREPORTGIS442FINALREPORT
GIS442FINALREPORT
 
Executive summary of the study GCIN english
Executive summary of the study GCIN   englishExecutive summary of the study GCIN   english
Executive summary of the study GCIN english
 
04.ENTRIPS
04.ENTRIPS04.ENTRIPS
04.ENTRIPS
 
Relief Line - Draft Evaluation Process and Criteria
Relief Line - Draft Evaluation Process and CriteriaRelief Line - Draft Evaluation Process and Criteria
Relief Line - Draft Evaluation Process and Criteria
 
Transbay presentation-2-14-13
Transbay presentation-2-14-13Transbay presentation-2-14-13
Transbay presentation-2-14-13
 
Managing California HSPR Programs-Caltrain, Bazeley
Managing California HSPR Programs-Caltrain, Bazeley Managing California HSPR Programs-Caltrain, Bazeley
Managing California HSPR Programs-Caltrain, Bazeley
 
Trans facility timeline and other bs
Trans facility timeline and other bsTrans facility timeline and other bs
Trans facility timeline and other bs
 

Viewers also liked

Blore For Enterprise
Blore For EnterpriseBlore For Enterprise
Blore For EnterpriseBlore Active
 
Twists and Turns on the Road to College
Twists and Turns on the Road to CollegeTwists and Turns on the Road to College
Twists and Turns on the Road to CollegeChristina Castro
 
Cовременные решения для организации и контроля доступа
Cовременные решения для организации и контроля доступаCовременные решения для организации и контроля доступа
Cовременные решения для организации и контроля доступаOleg Sherstnev
 
BEST WEDDING EMCEE-SIA PATEL
BEST WEDDING EMCEE-SIA PATELBEST WEDDING EMCEE-SIA PATEL
BEST WEDDING EMCEE-SIA PATELSia Patel
 
Offshore Mobile Web Application Product Development
Offshore Mobile Web Application Product Development Offshore Mobile Web Application Product Development
Offshore Mobile Web Application Product Development Nehal Shah
 
What is affiliate marketing and how does it work
What is affiliate marketing and how does it workWhat is affiliate marketing and how does it work
What is affiliate marketing and how does it workPeter Mantu
 

Viewers also liked (18)

Space 134 Community Input - Earth Day 05-02-2015
Space 134 Community Input - Earth Day 05-02-2015Space 134 Community Input - Earth Day 05-02-2015
Space 134 Community Input - Earth Day 05-02-2015
 
Space 134 Vision Plan - 2016
Space 134 Vision Plan - 2016Space 134 Vision Plan - 2016
Space 134 Vision Plan - 2016
 
Space 134 - FAQs
Space 134 - FAQsSpace 134 - FAQs
Space 134 - FAQs
 
ABC's of Cap Parks
ABC's of Cap ParksABC's of Cap Parks
ABC's of Cap Parks
 
Space 134 - Design Potential
Space 134 - Design PotentialSpace 134 - Design Potential
Space 134 - Design Potential
 
Space 134 - Statement of Probable Cost
Space 134 - Statement of Probable CostSpace 134 - Statement of Probable Cost
Space 134 - Statement of Probable Cost
 
Mirror
MirrorMirror
Mirror
 
Blore For Enterprise
Blore For EnterpriseBlore For Enterprise
Blore For Enterprise
 
Twists and Turns on the Road to College
Twists and Turns on the Road to CollegeTwists and Turns on the Road to College
Twists and Turns on the Road to College
 
Infografiche
InfograficheInfografiche
Infografiche
 
Pankajini pani
Pankajini paniPankajini pani
Pankajini pani
 
Cовременные решения для организации и контроля доступа
Cовременные решения для организации и контроля доступаCовременные решения для организации и контроля доступа
Cовременные решения для организации и контроля доступа
 
BEST WEDDING EMCEE-SIA PATEL
BEST WEDDING EMCEE-SIA PATELBEST WEDDING EMCEE-SIA PATEL
BEST WEDDING EMCEE-SIA PATEL
 
Textual analysis
Textual analysisTextual analysis
Textual analysis
 
Fra le stelle
Fra le stelleFra le stelle
Fra le stelle
 
Offshore Mobile Web Application Product Development
Offshore Mobile Web Application Product Development Offshore Mobile Web Application Product Development
Offshore Mobile Web Application Product Development
 
C3 new
C3 newC3 new
C3 new
 
What is affiliate marketing and how does it work
What is affiliate marketing and how does it workWhat is affiliate marketing and how does it work
What is affiliate marketing and how does it work
 

Similar to Transit Recommendations for the Space 134 Project

Streetcar Report Final CP Front
Streetcar Report Final CP FrontStreetcar Report Final CP Front
Streetcar Report Final CP FrontLeumis Richardson
 
19th Ave Transit Study Fall 2013 Presentation and Survey
19th Ave Transit Study Fall 2013 Presentation and Survey19th Ave Transit Study Fall 2013 Presentation and Survey
19th Ave Transit Study Fall 2013 Presentation and SurveySFCTA
 
Scarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of ReferenceScarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of ReferenceToronto Public Consultation Unit
 
New Rochelle TOD Study
New Rochelle TOD StudyNew Rochelle TOD Study
New Rochelle TOD Studyrcox1963
 
Splost Presentation 2008
Splost Presentation 2008Splost Presentation 2008
Splost Presentation 2008Brett Deaton
 
Eric Girod Project Resume
Eric Girod Project ResumeEric Girod Project Resume
Eric Girod Project ResumeEric Girod
 
Chapter 3 -Line-Based Analysis-edited-final
Chapter 3 -Line-Based Analysis-edited-finalChapter 3 -Line-Based Analysis-edited-final
Chapter 3 -Line-Based Analysis-edited-finalAdriana Abramovich
 
PPT Item # 12 - Midblock Pedestrian Crossing Improvement
PPT Item # 12 - Midblock Pedestrian Crossing ImprovementPPT Item # 12 - Midblock Pedestrian Crossing Improvement
PPT Item # 12 - Midblock Pedestrian Crossing Improvementahcitycouncil
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal linkascemiami-dade
 
Transit Supportive Development Case Study and CDTA’s North-South Corridors Ac...
Transit Supportive Development Case Study and CDTA’s North-South Corridors Ac...Transit Supportive Development Case Study and CDTA’s North-South Corridors Ac...
Transit Supportive Development Case Study and CDTA’s North-South Corridors Ac...New York Public Transit Association
 
Transit Supportive Development Case Study and CDTA’s North-South Corridors Ac...
Transit Supportive Development Case Study and CDTA’s North-South Corridors Ac...Transit Supportive Development Case Study and CDTA’s North-South Corridors Ac...
Transit Supportive Development Case Study and CDTA’s North-South Corridors Ac...New York Public Transit Association
 

Similar to Transit Recommendations for the Space 134 Project (20)

Space 134 - RFP for Glendale Freeway Ramps/Vision Plan
Space 134 - RFP for Glendale Freeway Ramps/Vision PlanSpace 134 - RFP for Glendale Freeway Ramps/Vision Plan
Space 134 - RFP for Glendale Freeway Ramps/Vision Plan
 
Streetcar Report Final CP Front
Streetcar Report Final CP FrontStreetcar Report Final CP Front
Streetcar Report Final CP Front
 
19th Ave Transit Study Fall 2013 Presentation and Survey
19th Ave Transit Study Fall 2013 Presentation and Survey19th Ave Transit Study Fall 2013 Presentation and Survey
19th Ave Transit Study Fall 2013 Presentation and Survey
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
Final EIS Appendix G Part 3
Final EIS Appendix G Part 3Final EIS Appendix G Part 3
Final EIS Appendix G Part 3
 
Scarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of ReferenceScarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of Reference
 
New Rochelle TOD Study
New Rochelle TOD StudyNew Rochelle TOD Study
New Rochelle TOD Study
 
Splost Presentation 2008
Splost Presentation 2008Splost Presentation 2008
Splost Presentation 2008
 
Splost Projects
Splost ProjectsSplost Projects
Splost Projects
 
Eric Girod Project Resume
Eric Girod Project ResumeEric Girod Project Resume
Eric Girod Project Resume
 
Chapter 3 -Line-Based Analysis-edited-final
Chapter 3 -Line-Based Analysis-edited-finalChapter 3 -Line-Based Analysis-edited-final
Chapter 3 -Line-Based Analysis-edited-final
 
05.ENTRIPS
05.ENTRIPS05.ENTRIPS
05.ENTRIPS
 
Ntaylor_FLL_CompPlanAmendments
Ntaylor_FLL_CompPlanAmendmentsNtaylor_FLL_CompPlanAmendments
Ntaylor_FLL_CompPlanAmendments
 
Task 3.b: EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...
Task 3.b:  EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...Task 3.b:  EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...
Task 3.b: EN TRIPS Priority Corridors - Preliminary Street Redesign Alternat...
 
Technical Report
Technical ReportTechnical Report
Technical Report
 
PPT Item # 12 - Midblock Pedestrian Crossing Improvement
PPT Item # 12 - Midblock Pedestrian Crossing ImprovementPPT Item # 12 - Midblock Pedestrian Crossing Improvement
PPT Item # 12 - Midblock Pedestrian Crossing Improvement
 
Toronto Relief Line Public Meeting Presentation
Toronto Relief Line Public Meeting PresentationToronto Relief Line Public Meeting Presentation
Toronto Relief Line Public Meeting Presentation
 
2.2 tri rail coastal link
2.2 tri rail coastal link2.2 tri rail coastal link
2.2 tri rail coastal link
 
Transit Supportive Development Case Study and CDTA’s North-South Corridors Ac...
Transit Supportive Development Case Study and CDTA’s North-South Corridors Ac...Transit Supportive Development Case Study and CDTA’s North-South Corridors Ac...
Transit Supportive Development Case Study and CDTA’s North-South Corridors Ac...
 
Transit Supportive Development Case Study and CDTA’s North-South Corridors Ac...
Transit Supportive Development Case Study and CDTA’s North-South Corridors Ac...Transit Supportive Development Case Study and CDTA’s North-South Corridors Ac...
Transit Supportive Development Case Study and CDTA’s North-South Corridors Ac...
 

More from Community Development Department-Glendale, CA (8)

Glendale Transit Experience Guide
Glendale Transit Experience GuideGlendale Transit Experience Guide
Glendale Transit Experience Guide
 
2013 Space 134 Vision Plan
2013 Space 134 Vision Plan2013 Space 134 Vision Plan
2013 Space 134 Vision Plan
 
Space 134 Workshop #2 - Summary
Space 134 Workshop #2 - SummarySpace 134 Workshop #2 - Summary
Space 134 Workshop #2 - Summary
 
Downtown Specific Plan Pipeline Projects - 11-2015
Downtown Specific Plan Pipeline Projects - 11-2015Downtown Specific Plan Pipeline Projects - 11-2015
Downtown Specific Plan Pipeline Projects - 11-2015
 
Space 134 Mixer Survey
Space 134 Mixer SurveySpace 134 Mixer Survey
Space 134 Mixer Survey
 
Space 134 Information Sheet
Space 134 Information SheetSpace 134 Information Sheet
Space 134 Information Sheet
 
Online Appointment Scheduling: Glendale Permit Services Center
Online Appointment Scheduling: Glendale Permit Services CenterOnline Appointment Scheduling: Glendale Permit Services Center
Online Appointment Scheduling: Glendale Permit Services Center
 
Glendale Downtown Specific Plan Policy Review
Glendale Downtown Specific Plan Policy ReviewGlendale Downtown Specific Plan Policy Review
Glendale Downtown Specific Plan Policy Review
 

Recently uploaded

2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos WebinarLinda Reinstein
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...ranjana rawat
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCongressional Budget Office
 
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024Energy for One World
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceHigh Profile Call Girls
 
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28JSchaus & Associates
 
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...ankitnayak356677
 
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP Call Girls Pune Vani 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Vani 8617697112 Independent Escort Service PuneVIP Call Girls Pune Vani 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Vani 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...anilsa9823
 
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escortssonatiwari757
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...Suhani Kapoor
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)ahcitycouncil
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.Christina Parmionova
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escortsaditipandeya
 
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...Christina Parmionova
 

Recently uploaded (20)

2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 37 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related Topics
 
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
(SUHANI) Call Girls Pimple Saudagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
 
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28
 
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
 
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
(TARA) Call Girls Chakan ( 7001035870 ) HI-Fi Pune Escorts Service
 
VIP Call Girls Pune Vani 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Vani 8617697112 Independent Escort Service PuneVIP Call Girls Pune Vani 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Vani 8617697112 Independent Escort Service Pune
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
 
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
 
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
VIP Call Girls Service Bikaner Aishwarya 8250192130 Independent Escort Servic...
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
 
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
 

Transit Recommendations for the Space 134 Project

  • 1. 116 NEW MONTGOMERY STREET, SUITE 500 SAN FRANCISCO, CA 94105 415-284-1544 FAX 415-284-1554 www.nelsonnygaard.com M E M O R A N D U M To: Alan Loomis and Amber Hawkes From: Steve Boland Date: November 25, 2015 Subject: Space 134 Final Transit Recommendations (Draft) This memorandum is the final transit deliverable for the second phase of the Space 134 planning process. It includes:  A brief introduction to the proposed Space 134 project and planning process, and the role of transit within the project  Contextual information relevant to the design of transit within the Space 134 project  Draft recommendations for transit infrastructure and service associated with the project  Transit-related next steps in the planning process THE PROJECT Space 134 Space 134 is a proposed at-grade cap over the below-grade State Route 134 (SR-134) freeway in downtown Glendale, between Central Avenue and Balboa Avenue, a distance of approximately 0.7 miles. The cap or deck would be configured as a linear park with cross streets in place of existing overpasses. The park would include a variety of community amenities and active programming in addition to open and recreational spaces. Planning Process The project is currently in Phase II of the planning process. The first phase, the Space 134 Vision Plan, was a visioning effort culminating in City Council approval of ongoing project development. The Phase II study includes both technical planning, community outreach efforts and a preliminary economic analysis, and upon completion at the end of 2015 will position the project for preliminary engineering, to occur in its next phase. This will be followed by environmental review, final engineering, and final approval of the project. Construction is anticipated to begin in 2020. The project would be implemented in phases, starting with the one-block segment between Central Avenue and Brand Boulevard. It is envisioned that funding would be obtained from both public and private sources, as has occurred on similar projects in other North American cities.
  • 2. SPACE 134 | Final Transit Recommendations (Draft) City of Glendale NelsonNygaard Consulting Associates Inc. | 2 Role of Transit The Space 134 project site is along a proposed rapid transit corridor – the SR-134 corridor described in the following section – and indeed is the location of a likely future station within this corridor. For this reason, and because the site is about three-quarters of a mile from the existing transit hub at Brand and Broadway and surrounding retail destinations, slightly beyond the distance that most are willing to walk, facilities for transit will be integral to the project. Additionally, depending on the configuration of transit elements in the project’s final design, it might be funded in part using federal, state, regional and/or local sources earmarked for transit capital projects. These might include sources typically used for the design and construction of bus transit centers. PROJECT CONTEXT Existing Transit Space 134 is located at what is envisioned to be a major hub within the regional transit system, with east-west rapid transit service connecting to north-south local/feeder bus service. Currently, however, there is little existing transit in the east-west SR-134 corridor. The Los Angeles Department of Transportation’s (LADOT) Commuter Express Route 549 operates only during peak periods, and relatively infrequently, between Encino and Pasadena. In downtown Glendale, it stops on Goode Avenue (westbound) and Sanchez Drive (eastbound), one-way streets on the north and south sides of SR-134 between Central Avenue and Brand Boulevard. In Spring 2016, in association with the opening of the Los Angeles County Metropolitan Transportation Authority (Metro) Metro Rail Gold Line Foothill Extension, a six-month pilot program will begin to provide express bus service every 15 minutes during peak periods and every 30 minutes off-peak between the Metro Rail Red Line North Hollywood Station and Pasadena. The route of this service is shown in Figure 1, provided by Metro. Figure 1 Pilot North Hollywood-Pasadena Express Bus Route
  • 3. SPACE 134 | Final Transit Recommendations (Draft) City of Glendale NelsonNygaard Consulting Associates Inc. | 3 In regards to existing north-south transit connections from Space 134, there is a variety of existing bus service connecting the site to the retail and civic core of downtown Glendale, to the nearest existing major east-west bus route, Metro’s Route 780 Rapid service on Broadway and on Central Avenue south of Broadway, and to the Metrolink commuter rail Glendale Station on the city’s southern border with Los Angeles. Bus service is provided by both Metro and the City of Glendale, operating as Beeline. Services operate on both Central Avenue and Brand Boulevard, each of which is a two-way arterial street despite their relative proximity to one another (they are about 900 feet apart). Beeline Routes 1 (clockwise) and 2 (counterclockwise) effectively constitute a single route operating in a loop on Central Avenue and Brand Boulevard. Metro service in the corridor, however, is consolidated on Brand Boulevard, in the form of Route 92 continuing south to Downtown Los Angeles and north to Downtown Burbank. Metro Routes 90 and 91 operate north-south on Glendale Boulevard, at the eastern end of the site. Figure 2 shows current activity levels at existing Metro Bus stops in the vicinity of Space 134. As the figure indicates, ridership is heavily concentrated in ther etail and civic area about a 15- minute walk south of the Space 134 site. The most-heavily used stops are at the intersection of Broadway and Brand Boulevard, as well as on the Metro Rapid 780 at Broadway and Glendale Boulevard and at Central Avenue and Colorado Street. Figure 2 Metro Weekday Average Ridership by Stop
  • 4. SPACE 134 | Final Transit Recommendations (Draft) City of Glendale NelsonNygaard Consulting Associates Inc. | 4 Proposed Transit The SR-134 corridor between the southeastern San Fernando Valley and Pasadena, through downtown Glendale, has long been envisioned by planners, activists and elected officials as a potential high-capacity rapid transit corridor. Figure 3 shows a 1968 proposal for a regional rapid transit network including the SR-134 corridor. Figure 3 1968 Proposed Regional Rapid Transit Corridors While the SR-134 corridor has long been thought of as a potential rapid transit corridor, no official plan as yet exists to provide rapid transit service in the corridor. However, planning efforts are underway. If all proceeds according to schedule, Metro’s North Hollywood to Pasadena Bus Rapid Transit Technical Study will issue a recommendation for one or possibly two preferred project alternatives by September 2016. If the Metro Board adopts the recommendation and formally includes the project in its Long Range Transportation Plan (LRTP), it will become eligible for funding. If the Metro Board proceeds to place a measure to increase the countywide sales tax for transportation on the November 2016 ballot, it could be included in the package of capital projects to be funded. “Bus rapid transit” or BRT is a transit mode designed to provide relatively high-quality transit service using buses rather than trains. While multiple alternatives remain under consideration as part of the Metro Technical Study, a previous staff assessment recommended “freeway BRT” operating in the high-occupancy vehicle (HOV) lanes on SR-134 and stopping at platforms in the median of the freeway, similar to existing Metro Silver Line service on Interstate 110 (the Harbor
  • 5. SPACE 134 | Final Transit Recommendations (Draft) City of Glendale NelsonNygaard Consulting Associates Inc. | 5 Freeway). The staff assessment also recommended interim service using stops on Goode Avenue and Sanchez Drive, just as Route 549 does today and the pilot service will have beginning in the spring. However, depending on the recommendation of the Technical Study, Metro may proceed directly to the final project. While multiple alignments for SR-134 BRT service remain under consideration, the route would likely terminate at a Metro Rail Gold Line station in Pasadena (the pilot express bus service will terminate at the Memorial Park Station near the Pasadena Civic Center). To the west, service could operate to Downtown Burbank and the Burbank Airport or remain on SR-134 through the Burbank Media Center, as Route 549 does today and as the pilot service will do. At North Hollywood, it could terminate or continue on as part of the Metro Orange Line BRT to Warner Center and Chatsworth in the western San Fernando Valley. Ultimately, light rail transit (LRT) service might be provided in the SR-134 corridor. It would likely operate in the freeway median, just as the Gold Line operates in the median of Interstate 210 in Pasadena, and it could continue on to the Gold Line right-of-way to the east and/or, if it were upgraded to light rail as has been proposed, the Orange Line right-of-way to the west. The Metro staff assessment considered these possibilities; however, no such service is currently planned. RECOMMENDATIONS The following recommendations for transit facilities, amenities and service to be developed as part of and in association with the Space 134 project are designed to: integrate SR-134 rapid transit service into the Space 134 site and program; be supportive of that service; and leverage the service to provide enhanced “first/last mile” connectivity from the regional transit hub to destinations in the vicinity of Space 134 but beyond walking distance. The recommendations are also designed to ensure a high-quality experience for users of Space 134-area transit stops and stations, and to ensure that transit service is attractive to a broad segment of potential users. The recommendations consist of:  Proposed locations of transit stops and stations  Proposed changes to existing local service  Proposed improvements to stop and station access  Proposed designs of stops and stations  Proposed elements of a transit-related “mobility hub” The recommendations also address possible changes to roadway and intersection configurations that are not recommended at this time but should be further studied. The recommendations for stop and station location and design, new services and access improvements are organized around the two basic configurations of SR-134 BRT service that are most likely to be recommended by Metro: service exiting SR-134 to stop between Central Avenue and Brand Boulevard on Goode Avenue and Sanchez Drive, and service remaining on SR-134 with a median station between Central Avenue and Brand Boulevard. Figure 4 shows major existing and planned/proposed transit corridors in the vicinity of Space 134. It also shows the potential locations for BRT or LRT stops at and adjacent to Space 134 described in the following sections.
  • 6. SPACE 134 | Final Transit Recommendations (Draft) City of Glendale NelsonNygaard Consulting Associates Inc. | 6 Figure 4 Existing and Proposed Transit Corridors
  • 7. SPACE 134 | Final Transit Recommendations (Draft) City of Glendale NelsonNygaard Consulting Associates Inc. | 7 BRT On Goode Avenue and Sanchez Drive Figure 5 shows proposed locations of BRT and connecting local bus stops if BRT were to operate on Goode Avenue and Sanchez Drive between Central Avenue and Brand Boulevard rather than on SR-134. BRT stops would be located:  Eastbound mid-block between Central Avenue and Brand Boulevard, adjacent to a mid- block crossing to Space 134. The stop should be sited far enough from the intersection so that right-turn queues would not prevent buses from accessing the stop under typical peak conditions.  Westbound on the far side of Brand Boulevard. Siting the BRT stops on Goode Avenue and Sanchez Drive near Brand Boulevard, rather than at Central Avenue or at both streets, would enable the highest level of connectivity between BRT and local bus stops. Under this proposal, local bus stops on Brand Boulevard would be sited as close as possible to both BRT stops:  Northbound near-side at Sanchez Drive and far-side at Goode Avenue  Southbound near-side at Goode Avenue and far-side at Sanchez Drive Figure 5 also shows locations where crosswalks would be need to be added or improved to provide safe and direct pedestrian connections between BRT and local bus stops. Note that the “continental,” “ladder” or “zebra” striped treatment shown here is just one possible design. Also note that the bus pathways identified assume current roadway and signal configurations. It might be possible to provide shared right-turn and transit-only “queue jump” lanes on each off-ramp pending further analysis of impacts on traffic from adding transit signal priority and a transit- only queue jump phase to each signal. This would serve to reduce transit delay and travel time and improve the reliability of BRT service.
  • 8. SPACE 134 | Final Transit Recommendations (Draft) City of Glendale NelsonNygaard Consulting Associates Inc. | 8 Figure 5 Recommendations for BRT on Goode Avenue and Sanchez Drive
  • 9. SPACE 134 | Final Transit Recommendations (Draft) City of Glendale NelsonNygaard Consulting Associates Inc. | 9 While the recommendations do not require that Beeline service on Central Avenue be relocated to Brand Boulevard, consolidating all Beeline and Metro service at stops on Brand Boulevard would reduce effective (combined) frequencies for service between Space 134 and downtown destinations to the south. Figure 6 shows current scheduled departures between 8 and 9 a.m. in the southbound direction on Beeline Routes 1 and 2 and Metro Route 92 from the area of Space 1341 2. While Routes 1 and 92 operate southbound on Brand Boulevard, Route 2 operates southbound on Central Avenue. Figure 6 Southbound Departures Between 8 and 9 a.m. Departure Route 8:07 1 8:12 92 8:20 2 8:27 1 8:34 92 8:41 2 8:46 1 8:58 92 8:59 2 As Figure 6 indicates, between 8 and 9 a.m. there are nine scheduled departures southbound from the Space 134 site, for an average headway of 6.7 minutes. However, these departures are divided between stops on Brand Boulevard and Central Avenue, resulting in an average headway of 10 minutes at Brand Boulevard (six trips per hour) and 20 minutes on Central Avenue (three trips per hour). Riders bound for destinations to the south must choose between stops on Brand Boulevard and Central Avenue. While real-time arrival information allows them to make an informed choice, this information is not always reliable. Consolidating service on Brand Boulevard would allow riders bound for the southern part of downtown to simply walk to the nearest stop, wait an average of no more than seven minutes (assuming existing service levels) and “take the first bus that comes along.” As Figure 6 indicates, there is a relatively high level of existing transit service between the Space 134 site and the rest of downtown during peak periods. This level is only slightly reduced off- peak, although the span of Beeline service is somewhat limited (Routes 1 and 2 cease operating between 7 and 8 p.m. on weekdays, and before 6 p.m. on weekends). Additional service such as a branded circulator, then, is likely to be unnecessary. However, care should be taken to ensure that passengers are fully aware of their options for connecting service. This will require additional passenger information at stops (e.g., signage with statements such as “Board any bus for Downtown Glendale”) as well as “wayfinding” directional signage pointing users toward 1 There are currently no stops on Brand or Central Avenue at Goode Avenue or Sanchez Drive; the nearest stops are north of Monterey Road and Burchett Street to the north and near Doran Street to the south. The times shown are thus approximate times at which buses pass the Space 134 site, based on scheduled departures from nearby timepoints. 2 Beeline Route 11 also operates on Brand. However, in the morning it operates northbound only, and southbound afternoon departures do not provide service to Brand Boulevard between Wilson Avenue and Colorado Street.
  • 10. SPACE 134 | Final Transit Recommendations (Draft) City of Glendale NelsonNygaard Consulting Associates Inc. | 10 connecting stops. Special branding on Beeline buses providing connections to and from Space 134 and SR-134 rapid transit service may also be desirable. Along with custom signage, BRT stops should include a number of special amenities for passengers. While development of BRT stops will ultimately be the responsibility of Metro, Glendale can serve as an active and vocal partner in the process. Amenities might include:  Raised platforms allowing for level or near-level boarding (and faster loading and unloading of buses)  Ticket vending machines (TVMs) and TAP Card readers allowing for off-board fare payment (and further reducing delay in the boarding process)  Designated loading areas for bicycles (if they are allowed on-board), strollers, wheelchair and other mobility devices  Large, distinctly branded shelters with ample seating  Prominent signage identifying the stop location, routes providing service to the stop, and major details of their operation  Enhanced passenger information including real-time arrival displays, route and area maps, and schedules  Garbage and recycling receptacles  Public art While local bus stops do not need to provide the same degree of amenity (or require the same level of investment, including ongoing investment in maintenance), all stops should include shelters, seating and high-quality signage. BRT on SR-134 Figure 9 shows proposed locations of BRT/LRT and connecting local bus stops if BRT or LRT were to remain on SR-134 rather than exiting onto Goode Avenue and Sanchez Drive. BRT stops would be located:  East and westbound within the SR-134 right-of-way. While the location and design of these stops will ultimately be determined by Metro, again, Glendale can play a role in this process. Ideally, the stops would be located below or just west of Brand Boulevard, allowing for portal entries at surface grade within the proposed transit plaza on the west side of Brand Boulevard between Goode Avenue and Sanchez Drive. If the stops were on a shared center island platform station in the median of the freeway, all vertical circulation elements (stairs, escalators and elevators) could be consolidated. Alternately, stops could be located on either side of median transit lanes or tracks, allowing passengers to face each other and face away from traffic as shown in Figures 7 and 8.
  • 11. SPACE 134 | Final Transit Recommendations (Draft) City of Glendale NelsonNygaard Consulting Associates Inc. | 11 Figure 7 Example of Freeway Median Station Buffered from Traffic (Metro Silver Line 37th Street/USC Station) Photo by METRO96 (Wikipedia) Figure 8 Example of Freeway Median Station Buffered from Traffic (Evergreen Point Station, Medina, WA) Photo by SounderBruce (Flickr)
  • 12. SPACE 134 | Final Transit Recommendations (Draft) City of Glendale NelsonNygaard Consulting Associates Inc. | 12 While this design could serve to improve passenger comfort, it would require a greater footprint, as a shared island configuration allows for “sharing” by stops in both directions of elements such as vertical circulation, shelters, TVMs and other furniture. Alternately, platforms could be screened from traffic noise using walls between the transit right-of-way and traffic lanes. Ideally, these walls would be transparent in order to enhance the sense of openness and safety, potentially using acrylic glass (more commonly known under the brand name Plexiglas). At a minimum, fencing should be provided in order to enhance perceived (if not actual) safety. In this scenario, the four local bus stops proposed for the previous scenario (a pair for each BRT stop) would be consolidated into a single northbound and single southbound stop:  The northbound stop would be just north of Sanchez , adjacent to the crosswalk, allowing for the quickest possible connection to the BRT station.  The southbound stop would be located mid-block between Goode Avenue and Sanchez Drive, immediately adjacent to the transit plaza.
  • 13. SPACE 134 | Final Transit Recommendations (Draft) City of Glendale NelsonNygaard Consulting Associates Inc. | 13 Figure 9 Recommendations for BRT/LRT on SR-134
  • 14. SPACE 134 | Final Transit Recommendations (Draft) City of Glendale NelsonNygaard Consulting Associates Inc. | 14 Just as in the previous scenario, it is recommended that high-visibility crosswalks be provided between all connecting transit stops that are across the street from one another, that all local bus connections be consolidated at the stops on Brand Boulevard, and that enhanced passenger amenities be provided at stops. Additionally, further steps should be taken to ensure passenger comfort on the BRT/LRT platform, which would not only be adjacent to freeway traffic, but would be below the Space 134 cap – effectively, it would be a subway platform surrounded by speeding cars. Figures 10 and 11 shows a Metro Rail station and a light rail station in Denver, Colorado, that are within a freeway right-of-way under an overpass. While these stations include minimal public art, and while shelter from the elements is unnecessary in this situation, the examples shown could provide additional seating and other amenities such as passenger information. Ideally, skylights would be provided above the platform allowing natural light to filter down, potentially raised above grade in order to reduce the risk of accidental falls. Figure 10 Example of Station Below Overpass (Metro Green Line Norwalk Station) Photo by GTD Aquitaine (Wikipedia) potentially raised above grade in order to reduce the risk of accidental falls.
  • 15. SPACE 134 | Final Transit Recommendations (Draft) City of Glendale NelsonNygaard Consulting Associates Inc. | 15 Figure 11 Example of Station Below Overpass (Louisiana/Pearl Station, Denver, CO) Photo by Matt Johnson Mobility Hub Elements A “mobility hub” is a facility offering a range of “first/last mile” travel options, as well as information on options and other amenities for travelers. A mobility hub can serve to greatly improve access to a transit station by offering services and amenities such as:  A full-service bikestation with bike repair, rental, secure storage and shower facilities  A bikeshare (short-term rental) pod  A transit (TAP) card sales outlet  Pick-up and drop-off zones or “kiss-and-ride” curb space  Taxi/shared-ride stands  Electric vehicle parking and charging stations  Dedicated carpool/vanpool parking  Carsharing services  Information kiosks with trip-planning information  A café and/or market with wireless internet, restrooms In addition to increasing the usefulness of the SR-134 BRT or LRT stops at Space 134, a mobility hub within the proposed transit plaza along Brand Boulevard would also serve to greatly increase the visibility of transit service on the site, which may be of particular importance if platforms are
  • 16. SPACE 134 | Final Transit Recommendations (Draft) City of Glendale NelsonNygaard Consulting Associates Inc. | 16 located below the cap, out of sight (although a high-visible portal structure could also serve this purpose). NEXT STEPS As the SR-134 BRT project progresses, the City of Glendale will need to actively engage with Metro staff and Board members in order to ensure that the Space 134 and SR-134 projects are aligned with one another, and that the City’s interests are fully represented. According to Metro staff, the BRT Technical Study team will:  conduct public outreach in January or February;  analyze and refine alternatives over the spring and summer; and  recommend a preferred alternative or alternatives to the Metro Board by September. Glendale staff have met with Metro BRT staff on several occasions. It is imperative that staff from both agencies, as well as the BRT consultant team, maintain open channels of communication over the next nine months as the BRT alternatives are narrowed to a final preferred design. As part of these discussions, Glendale should advocate for the BRT stop-related recommendations contained in this document, and the design of Space 134 should be adjusted as necessary to reflect and remain compatible with the BRT project design. Glendale should also support inclusion of the BRT project in the upcoming Metro sales tax measure, if that measure proceeds. Following adoption of a preferred alternative next fall, the BRT process will proceed to environmental review, a process which typically takes about two years to complete.