This document summarizes traffic calming plans presented by the Town of Foxborough Planning Director and transportation engineer for two major local roads, North Street and Beach Street. It identifies issues with high traffic volumes, speeds, and lack of pedestrian infrastructure on these roads. The proposed plans include narrowing road widths, adding sidewalks and landscaped medians, installing a small roundabout at an intersection, and other geometric changes to improve safety and reduce cut-through traffic in residential neighborhoods. Funding and implementation of the improvements are also discussed.