The Ferrari Theme ParkThe Yas IslandProject Finance
Yas Island occupies a total land area of 2,500 hectares1,700 hectares is claimed for developmentIsland will feature attractions such as a world-class motor sports racetrack, signature hotels, the Ferrari theme park, Water Park, and the Abu Dhabi destination retail development of 300,000 sq m retail areaUnique International tourist destination expected to complete by 2014The Yas Island
Work on Yas Marina Circuit began in February 2007, and has included:Employing a workforce of 14,000Investing 35 million man hoursShifting 1.6 million cubic meters of earthworkLaying 720,000 square meters of asphaltPouring 225,000 cubic meters of concreteInstalling 30 kilometres of special electronic ductsInstalling 25 kilometres of electrical cablingInstalling 17 kilometres of drainageInstalling 22 kilometres of irrigation pipingLandscaping 430,000 square meters of groundPlanting 5,000 treesSetting 40 kilometres of curb-stonesYas-Marina Circuit
Outlook
Project Valued at USD 100+ billionCategorized sector: Real Estate | Leisure & EntertainmentFinancing Sources: Abu Dhabi Ministry of Presidential affairs, Abu Dhabi Investment Authority, BNP Paribas, Mashreq Bank, and HSBC are the project financiers.Value & Financing
A project of recordsThe largest indoor theme park and housing the fastest roller coaster in the world it is also the largest standing seam metal roof in the worldThe roof only is over 200.000 m2 whereas the total project volume including aluminum façade covering is approximately 300.000 m2. The equivalent of 50 football pitches!The Ferrari Theme Park
Outlook
Project Valued at USD 40 billionCategorized sector: Leisure & EntertainmentFinancing Sources: BNP Paribas, Mashreq Bank, and HSBC are the project financiers.Value & Financing
Investment Break-up
Started in 2006 the project called in for a AED 1,452.3 millionNet asset value moved by 99% to AED 1,566.6 million in a 12-months period of timeDevelopments under construction increased in value by 175.3 percent to AED 22,934.3 million from AED 8,332.0 million at end 2007Finance structure
Post MoU of NIB & Aldar and Sorouh real estate in 2008, 90% of financing to YAS was done by NIBBy mid-2009, the ferrari theme park was up & runningThe value of developments under construction increased by 119.2% to AED 18,260.1 million (2008: AED 8,332 million)Finance Structure
Thank You

The Yas Island

  • 1.
    The Ferrari ThemeParkThe Yas IslandProject Finance
  • 2.
    Yas Island occupiesa total land area of 2,500 hectares1,700 hectares is claimed for developmentIsland will feature attractions such as a world-class motor sports racetrack, signature hotels, the Ferrari theme park, Water Park, and the Abu Dhabi destination retail development of 300,000 sq m retail areaUnique International tourist destination expected to complete by 2014The Yas Island
  • 3.
    Work on YasMarina Circuit began in February 2007, and has included:Employing a workforce of 14,000Investing 35 million man hoursShifting 1.6 million cubic meters of earthworkLaying 720,000 square meters of asphaltPouring 225,000 cubic meters of concreteInstalling 30 kilometres of special electronic ductsInstalling 25 kilometres of electrical cablingInstalling 17 kilometres of drainageInstalling 22 kilometres of irrigation pipingLandscaping 430,000 square meters of groundPlanting 5,000 treesSetting 40 kilometres of curb-stonesYas-Marina Circuit
  • 4.
  • 5.
    Project Valued atUSD 100+ billionCategorized sector: Real Estate | Leisure & EntertainmentFinancing Sources: Abu Dhabi Ministry of Presidential affairs, Abu Dhabi Investment Authority, BNP Paribas, Mashreq Bank, and HSBC are the project financiers.Value & Financing
  • 6.
    A project ofrecordsThe largest indoor theme park and housing the fastest roller coaster in the world it is also the largest standing seam metal roof in the worldThe roof only is over 200.000 m2 whereas the total project volume including aluminum façade covering is approximately 300.000 m2. The equivalent of 50 football pitches!The Ferrari Theme Park
  • 7.
  • 8.
    Project Valued atUSD 40 billionCategorized sector: Leisure & EntertainmentFinancing Sources: BNP Paribas, Mashreq Bank, and HSBC are the project financiers.Value & Financing
  • 9.
  • 10.
    Started in 2006the project called in for a AED 1,452.3 millionNet asset value moved by 99% to AED 1,566.6 million in a 12-months period of timeDevelopments under construction increased in value by 175.3 percent to AED 22,934.3 million from AED 8,332.0 million at end 2007Finance structure
  • 11.
    Post MoU ofNIB & Aldar and Sorouh real estate in 2008, 90% of financing to YAS was done by NIBBy mid-2009, the ferrari theme park was up & runningThe value of developments under construction increased by 119.2% to AED 18,260.1 million (2008: AED 8,332 million)Finance Structure