This document provides a summary of an individual's experience working as an AutoCAD-Arch Revit-Photo Shop draftsman and finishing works supervisor. Over the past 5 years, the individual has gained experience producing CAD drawings for architectural and landscape design projects, as well as supervising finishing works. They have strong skills with AutoCAD, Revit, Photoshop, and Microsoft Office.
What is a completion certificate and how to apply for it? As the name suggests, this certificate is granted after the completion of construction of your house or a group housing society. The certificate is issued when the property is ready to be moved in. Completion certificate is issued by the local development authority/Municipal Corporation.
The document discusses the planning and building approval process for residential buildings in Tamil Nadu, India. It outlines the steps involved, which include obtaining land documents and clearance, drafting building plans according to regulations, applying for approval online, making payments, and receiving permits. The document also provides details on drafting floor plans, elevations, sections, and EDCR plans for approval. Key learning from an internship working on building approvals is summarized.
SLUM REDEVELOPMENT PROCESS MUMBAI MAHARASHTRA INDIA ASIA sunil seth kakkad
Conceptualization OF SRA SCHEME MUMBAI INDIA
Due Diliegence
Development Approval
Design Studio
Engineering and Development
Project Development
Project Funding
Project Marketing
Occupier support
SUNIL SETH KAKKAD
INDIA MAHARASHTRA MUMBAI
09820614117
sethkakkad@gmail.com
This document outlines the requirements for applying for a basement finish building permit, including:
1. A completed permit application form, designer information, and applicable law checklist.
2. Two sets of to-scale plans showing room dimensions, uses, windows, construction details, and locations of fixtures and alarms.
3. A permit fee of $280.50 for a standard 10-day review. Additional fees may apply for new windows or doors.
4. Where work is within a condominium, authorization from the condo corporation is required.
This document outlines requirements for professional seals on architectural and engineering plans and documents in Montana. It states that architects should not seal engineering plans, and engineers should not seal architectural drawings. It provides examples of qualifying statements and exemptions from sealing requirements. Documents that require seals include plans for bidding, permitting, construction, specifications, change orders, addenda, and record drawings. Documents that do not require seals include those for conceptual information and shop drawings. The document describes proper use of seals and provides red flags to watch out for regarding sealing practices. It advises checking licensing of professionals and filing complaints about unlicensed work.
The document summarizes key provisions of the Real Estate (Regulation and Development) Act 2016 in India. Some important considerations before and after launching a real estate project include registering the project with RERA, maintaining separate bank accounts for funds collected, adhering to sanctioned plans, obtaining necessary approvals, forming an association of allottees, and executing agreements for sale and conveyance deeds. The promoter must comply with obligations regarding insurance, refunds, compensation and more to protect consumer interests in the real estate sector.
Start new construction, renovation or remodeling projects with building permit services. Seek proficient building permit expeditors in DC and ensure safety of building occupants.
This document provides a summary of an individual's experience working as an AutoCAD-Arch Revit-Photo Shop draftsman and finishing works supervisor. Over the past 5 years, the individual has gained experience producing CAD drawings for architectural and landscape design projects, as well as supervising finishing works. They have strong skills with AutoCAD, Revit, Photoshop, and Microsoft Office.
What is a completion certificate and how to apply for it? As the name suggests, this certificate is granted after the completion of construction of your house or a group housing society. The certificate is issued when the property is ready to be moved in. Completion certificate is issued by the local development authority/Municipal Corporation.
The document discusses the planning and building approval process for residential buildings in Tamil Nadu, India. It outlines the steps involved, which include obtaining land documents and clearance, drafting building plans according to regulations, applying for approval online, making payments, and receiving permits. The document also provides details on drafting floor plans, elevations, sections, and EDCR plans for approval. Key learning from an internship working on building approvals is summarized.
SLUM REDEVELOPMENT PROCESS MUMBAI MAHARASHTRA INDIA ASIA sunil seth kakkad
Conceptualization OF SRA SCHEME MUMBAI INDIA
Due Diliegence
Development Approval
Design Studio
Engineering and Development
Project Development
Project Funding
Project Marketing
Occupier support
SUNIL SETH KAKKAD
INDIA MAHARASHTRA MUMBAI
09820614117
sethkakkad@gmail.com
This document outlines the requirements for applying for a basement finish building permit, including:
1. A completed permit application form, designer information, and applicable law checklist.
2. Two sets of to-scale plans showing room dimensions, uses, windows, construction details, and locations of fixtures and alarms.
3. A permit fee of $280.50 for a standard 10-day review. Additional fees may apply for new windows or doors.
4. Where work is within a condominium, authorization from the condo corporation is required.
This document outlines requirements for professional seals on architectural and engineering plans and documents in Montana. It states that architects should not seal engineering plans, and engineers should not seal architectural drawings. It provides examples of qualifying statements and exemptions from sealing requirements. Documents that require seals include plans for bidding, permitting, construction, specifications, change orders, addenda, and record drawings. Documents that do not require seals include those for conceptual information and shop drawings. The document describes proper use of seals and provides red flags to watch out for regarding sealing practices. It advises checking licensing of professionals and filing complaints about unlicensed work.
The document summarizes key provisions of the Real Estate (Regulation and Development) Act 2016 in India. Some important considerations before and after launching a real estate project include registering the project with RERA, maintaining separate bank accounts for funds collected, adhering to sanctioned plans, obtaining necessary approvals, forming an association of allottees, and executing agreements for sale and conveyance deeds. The promoter must comply with obligations regarding insurance, refunds, compensation and more to protect consumer interests in the real estate sector.
Start new construction, renovation or remodeling projects with building permit services. Seek proficient building permit expeditors in DC and ensure safety of building occupants.
Preventing savar like tragedy by engr. golam mostafaSakib Nizam
1. The document discusses the process of building permit issuance in Bangladesh, which requires approval from various sections including legal, architectural, structural, and services departments.
2. It also outlines the roles and checkpoints for each section to ensure the safety and structural integrity of proposed buildings.
3. The author emphasizes that structural designs be thoroughly checked by qualified engineers according to the project size and grade, and that local authorities monitor construction quality.
Arrange building applications and approvals.pdfDereje Jima
This unit specifies the necessary outcomes required for applying site surveys and set out procedures to medium-rise building and construction projects. It addresses the skills and practices required to measure, record and interpret data using measuring and leveling equipment and to set out building projects.
This document discusses the process of working drawings, detailing, tendering, contract procurement and administration for construction projects from start to finish. It provides an overview of the minimum requirements for working drawings, outlines the stages of tender documents and contract procurement, and describes the routines involved in handing over the site to the contractor, basic construction monitoring checkpoints, and activities required to manage the project until final completion and certification.
This document provides an insurance valuation report for an apartment building located at 35 Landsborough Parade. It includes a replacement value of $12,950,000 for the building based on calculations considering construction costs, fees, removal of debris, and cost escalation. The report was prepared by an independent inspection company for the body corporate and provides details on the property description, valuation methodology, photographs, and general conditions.
The document discusses the construction industry and construction law in Ethiopia. It defines key terms like construction contracts and describes the types of construction work. It also outlines the licensing requirements for contractors, architects, engineers and consulting offices in Ethiopia. Contractors must register in different grades based on the cost of projects they can undertake and meet experience, staffing and equipment requirements. Architects and engineers also have registration requirements depending on their qualifications.
The document outlines the process for obtaining an Intimation of Disapproval (IOD) from the Municipal Corporation of Greater Mumbai (MCGM) which is required before redevelopment of a building can begin. It discusses the stages prior to IOD including feasibility reports, tendering, and appointing a developer. It then describes the IOD process which involves submitting building plans to MCGM and obtaining various permissions and clearances from departments like environment, trees, and fire before a Commencement Certificate can be issued allowing demolition. Finally, it notes the IOD process can take 18-24 months to complete all requirements.
The document outlines the general provisions of an FIDIC Conditions of Contract for Construction contract. It defines key terms, establishes that the contract will be governed by the law of the country stated in the Contract Data, and addresses communications between parties, priority of documents, assignment, care and supply of documents, confidential details, compliance with laws, and inspections. It also describes the roles and responsibilities of the Employer and Engineer in overseeing the project.
The document outlines conditions of contract for construction projects using FIDIC standards. It defines key terms, outlines general provisions regarding communications, law, priority of documents, and responsibilities of parties. Specifically, it describes the roles and responsibilities of the Employer in providing access and assistance to the Contractor, and the Contractor's general obligations to perform works, provide security, and name a representative. It also covers the Engineer's duties and authority to oversee the project.
This document defines key terms related to construction contracts and documents. It discusses authorship and licensing of the document. It also outlines what constitutes contract documents such as agreements, specifications, drawings, and defines roles like owner, architect, engineer, contractor, and subcontractor. It addresses the intent and conformity of contract documents, supplementary drawings and instructions, and responsibilities around shop drawings. Finally, it covers laws and regulations pertaining to the project site, required permits and taxes, and establishing reference marks.
'DRISHTI' Chapter 16: Checklist for Contract Document (कॉन्ट्रैक्ट डॉक्युमेंट...Vipin Bakiwala
It provides a detailed contract document to be referred by the contractor before starting the construction. It mentions the duties, rights, liabilities, and responsibilities of a contractor before, during and after the construction as well as some other important points.
This document contains the tender for the construction of an overhead tank at a workshop compound in Bahraich, Uttar Pradesh, India. It includes instructions for bidders on submitting the tender, various chapters on specifications for different construction activities (earthwork, concrete work, reinforcement, brickwork etc.), and general conditions of the contract. Bidders are advised to examine conditions of contract, drawings, specifications and visit the site to understand project requirements before submitting their bids. The tender must be submitted with details of bidder's experience and capabilities, and must include earnest money for consideration of the bid.
The document discusses several issues and recommendations regarding real estate development licensing processes in Vietnam. It identifies requirements for investors to obtain numerous approvals and permits before being eligible for an investment certificate, which causes delays. It also notes contradictions in laws that make it impossible for first-time foreign investors to undertake projects. Recommendations include simplifying approval procedures, removing prerequisites for the investment certificate, and clarifying rules regarding land use rights certificates for partial construction works.
This document outlines the requirements and process for obtaining a building permit from the City of Franklin Planning and Zoning Office. Applicants must submit a sketch of the proposed improvements, project costs, contractor information, electrician and plumber names/licenses, payment, letter of authorization if not the owner, septic approval if applicable, and other documents. Applicants will be notified of permit approval or denial within 8-10 working days if all items are submitted. Inspections are required and reinspection fees apply to failed inspections. An occupancy permit must also be obtained once construction is complete.
This document outlines the house rules and regulations for Anson's Centre. It addresses 31 topics including: limitations on unit and common area use; moving in/out procedures; security and access control; elevator, parking and garbage disposal procedures; maintenance responsibilities; and emergency procedures for fire, earthquakes, and other incidents. Safety measures are emphasized, such as proper fire equipment use and participation in fire drills. Behavioral guidelines establish expectations for noise levels, deliveries, pets, vendors and solicitation. The rights of building management to enter units in emergencies are also defined.
This document is a construction contract between Al Noor Consultants and Zulifiqar Ahmed Architectural and Engineering Private Limited for the construction of a residential development project in Lahore, Pakistan. Key details include:
- The contractor will complete construction of 150 plots of land with houses, a mosque, school, park and infrastructure over 4 years.
- As a security, the client will sign over ownership of 8 plots to the contractor initially valued at Rs. 1200 per square foot for structures and Rs. 1000 per square foot for finishes.
- The contractor must complete the project by June 2021. Liquidated damages of 0.5% per day will be charged for delays beyond this date, up to
This document is a fit-out completion certificate issued by the Dubai Creative Clusters Authority for unit P3-07 on podium 3 in The Binary Tower in Business Bay phases 1 and 2. It certifies that the fit-out works have been completed but the authority bears no liability for any errors. Any future changes require approval and tenants must have a valid trade license before occupying the unit.
This document provides administrative requirements for a construction project including project management and coordination, submittal procedures, action submittals, informational submittals, quality requirements, references, temporary facilities and controls, and product requirements. It establishes procedures for requests for information, progress meetings, submittal labeling and processing, testing and inspection reports, references and standards, temporary utilities and facilities, product delivery and storage, and product selection.
A thorough analysis of FIDIC and it implication on COnstruction industry explained in this presentation for the beginners. It has been broken down to simplified version
Gender and Mental Health - Counselling and Family Therapy Applications and In...PsychoTech Services
A proprietary approach developed by bringing together the best of learning theories from Psychology, design principles from the world of visualization, and pedagogical methods from over a decade of training experience, that enables you to: Learn better, faster!
Preventing savar like tragedy by engr. golam mostafaSakib Nizam
1. The document discusses the process of building permit issuance in Bangladesh, which requires approval from various sections including legal, architectural, structural, and services departments.
2. It also outlines the roles and checkpoints for each section to ensure the safety and structural integrity of proposed buildings.
3. The author emphasizes that structural designs be thoroughly checked by qualified engineers according to the project size and grade, and that local authorities monitor construction quality.
Arrange building applications and approvals.pdfDereje Jima
This unit specifies the necessary outcomes required for applying site surveys and set out procedures to medium-rise building and construction projects. It addresses the skills and practices required to measure, record and interpret data using measuring and leveling equipment and to set out building projects.
This document discusses the process of working drawings, detailing, tendering, contract procurement and administration for construction projects from start to finish. It provides an overview of the minimum requirements for working drawings, outlines the stages of tender documents and contract procurement, and describes the routines involved in handing over the site to the contractor, basic construction monitoring checkpoints, and activities required to manage the project until final completion and certification.
This document provides an insurance valuation report for an apartment building located at 35 Landsborough Parade. It includes a replacement value of $12,950,000 for the building based on calculations considering construction costs, fees, removal of debris, and cost escalation. The report was prepared by an independent inspection company for the body corporate and provides details on the property description, valuation methodology, photographs, and general conditions.
The document discusses the construction industry and construction law in Ethiopia. It defines key terms like construction contracts and describes the types of construction work. It also outlines the licensing requirements for contractors, architects, engineers and consulting offices in Ethiopia. Contractors must register in different grades based on the cost of projects they can undertake and meet experience, staffing and equipment requirements. Architects and engineers also have registration requirements depending on their qualifications.
The document outlines the process for obtaining an Intimation of Disapproval (IOD) from the Municipal Corporation of Greater Mumbai (MCGM) which is required before redevelopment of a building can begin. It discusses the stages prior to IOD including feasibility reports, tendering, and appointing a developer. It then describes the IOD process which involves submitting building plans to MCGM and obtaining various permissions and clearances from departments like environment, trees, and fire before a Commencement Certificate can be issued allowing demolition. Finally, it notes the IOD process can take 18-24 months to complete all requirements.
The document outlines the general provisions of an FIDIC Conditions of Contract for Construction contract. It defines key terms, establishes that the contract will be governed by the law of the country stated in the Contract Data, and addresses communications between parties, priority of documents, assignment, care and supply of documents, confidential details, compliance with laws, and inspections. It also describes the roles and responsibilities of the Employer and Engineer in overseeing the project.
The document outlines conditions of contract for construction projects using FIDIC standards. It defines key terms, outlines general provisions regarding communications, law, priority of documents, and responsibilities of parties. Specifically, it describes the roles and responsibilities of the Employer in providing access and assistance to the Contractor, and the Contractor's general obligations to perform works, provide security, and name a representative. It also covers the Engineer's duties and authority to oversee the project.
This document defines key terms related to construction contracts and documents. It discusses authorship and licensing of the document. It also outlines what constitutes contract documents such as agreements, specifications, drawings, and defines roles like owner, architect, engineer, contractor, and subcontractor. It addresses the intent and conformity of contract documents, supplementary drawings and instructions, and responsibilities around shop drawings. Finally, it covers laws and regulations pertaining to the project site, required permits and taxes, and establishing reference marks.
'DRISHTI' Chapter 16: Checklist for Contract Document (कॉन्ट्रैक्ट डॉक्युमेंट...Vipin Bakiwala
It provides a detailed contract document to be referred by the contractor before starting the construction. It mentions the duties, rights, liabilities, and responsibilities of a contractor before, during and after the construction as well as some other important points.
This document contains the tender for the construction of an overhead tank at a workshop compound in Bahraich, Uttar Pradesh, India. It includes instructions for bidders on submitting the tender, various chapters on specifications for different construction activities (earthwork, concrete work, reinforcement, brickwork etc.), and general conditions of the contract. Bidders are advised to examine conditions of contract, drawings, specifications and visit the site to understand project requirements before submitting their bids. The tender must be submitted with details of bidder's experience and capabilities, and must include earnest money for consideration of the bid.
The document discusses several issues and recommendations regarding real estate development licensing processes in Vietnam. It identifies requirements for investors to obtain numerous approvals and permits before being eligible for an investment certificate, which causes delays. It also notes contradictions in laws that make it impossible for first-time foreign investors to undertake projects. Recommendations include simplifying approval procedures, removing prerequisites for the investment certificate, and clarifying rules regarding land use rights certificates for partial construction works.
This document outlines the requirements and process for obtaining a building permit from the City of Franklin Planning and Zoning Office. Applicants must submit a sketch of the proposed improvements, project costs, contractor information, electrician and plumber names/licenses, payment, letter of authorization if not the owner, septic approval if applicable, and other documents. Applicants will be notified of permit approval or denial within 8-10 working days if all items are submitted. Inspections are required and reinspection fees apply to failed inspections. An occupancy permit must also be obtained once construction is complete.
This document outlines the house rules and regulations for Anson's Centre. It addresses 31 topics including: limitations on unit and common area use; moving in/out procedures; security and access control; elevator, parking and garbage disposal procedures; maintenance responsibilities; and emergency procedures for fire, earthquakes, and other incidents. Safety measures are emphasized, such as proper fire equipment use and participation in fire drills. Behavioral guidelines establish expectations for noise levels, deliveries, pets, vendors and solicitation. The rights of building management to enter units in emergencies are also defined.
This document is a construction contract between Al Noor Consultants and Zulifiqar Ahmed Architectural and Engineering Private Limited for the construction of a residential development project in Lahore, Pakistan. Key details include:
- The contractor will complete construction of 150 plots of land with houses, a mosque, school, park and infrastructure over 4 years.
- As a security, the client will sign over ownership of 8 plots to the contractor initially valued at Rs. 1200 per square foot for structures and Rs. 1000 per square foot for finishes.
- The contractor must complete the project by June 2021. Liquidated damages of 0.5% per day will be charged for delays beyond this date, up to
This document is a fit-out completion certificate issued by the Dubai Creative Clusters Authority for unit P3-07 on podium 3 in The Binary Tower in Business Bay phases 1 and 2. It certifies that the fit-out works have been completed but the authority bears no liability for any errors. Any future changes require approval and tenants must have a valid trade license before occupying the unit.
This document provides administrative requirements for a construction project including project management and coordination, submittal procedures, action submittals, informational submittals, quality requirements, references, temporary facilities and controls, and product requirements. It establishes procedures for requests for information, progress meetings, submittal labeling and processing, testing and inspection reports, references and standards, temporary utilities and facilities, product delivery and storage, and product selection.
A thorough analysis of FIDIC and it implication on COnstruction industry explained in this presentation for the beginners. It has been broken down to simplified version
Similar to The Nagaland Building Bye Law 2012 (20)
Gender and Mental Health - Counselling and Family Therapy Applications and In...PsychoTech Services
A proprietary approach developed by bringing together the best of learning theories from Psychology, design principles from the world of visualization, and pedagogical methods from over a decade of training experience, that enables you to: Learn better, faster!
Level 3 NCEA - NZ: A Nation In the Making 1872 - 1900 SML.pptHenry Hollis
The History of NZ 1870-1900.
Making of a Nation.
From the NZ Wars to Liberals,
Richard Seddon, George Grey,
Social Laboratory, New Zealand,
Confiscations, Kotahitanga, Kingitanga, Parliament, Suffrage, Repudiation, Economic Change, Agriculture, Gold Mining, Timber, Flax, Sheep, Dairying,
How to Manage Reception Report in Odoo 17Celine George
A business may deal with both sales and purchases occasionally. They buy things from vendors and then sell them to their customers. Such dealings can be confusing at times. Because multiple clients may inquire about the same product at the same time, after purchasing those products, customers must be assigned to them. Odoo has a tool called Reception Report that can be used to complete this assignment. By enabling this, a reception report comes automatically after confirming a receipt, from which we can assign products to orders.
Information and Communication Technology in EducationMJDuyan
(𝐓𝐋𝐄 𝟏𝟎𝟎) (𝐋𝐞𝐬𝐬𝐨𝐧 2)-𝐏𝐫𝐞𝐥𝐢𝐦𝐬
𝐄𝐱𝐩𝐥𝐚𝐢𝐧 𝐭𝐡𝐞 𝐈𝐂𝐓 𝐢𝐧 𝐞𝐝𝐮𝐜𝐚𝐭𝐢𝐨𝐧:
Students will be able to explain the role and impact of Information and Communication Technology (ICT) in education. They will understand how ICT tools, such as computers, the internet, and educational software, enhance learning and teaching processes. By exploring various ICT applications, students will recognize how these technologies facilitate access to information, improve communication, support collaboration, and enable personalized learning experiences.
𝐃𝐢𝐬𝐜𝐮𝐬𝐬 𝐭𝐡𝐞 𝐫𝐞𝐥𝐢𝐚𝐛𝐥𝐞 𝐬𝐨𝐮𝐫𝐜𝐞𝐬 𝐨𝐧 𝐭𝐡𝐞 𝐢𝐧𝐭𝐞𝐫𝐧𝐞𝐭:
-Students will be able to discuss what constitutes reliable sources on the internet. They will learn to identify key characteristics of trustworthy information, such as credibility, accuracy, and authority. By examining different types of online sources, students will develop skills to evaluate the reliability of websites and content, ensuring they can distinguish between reputable information and misinformation.
How to Download & Install Module From the Odoo App Store in Odoo 17Celine George
Custom modules offer the flexibility to extend Odoo's capabilities, address unique requirements, and optimize workflows to align seamlessly with your organization's processes. By leveraging custom modules, businesses can unlock greater efficiency, productivity, and innovation, empowering them to stay competitive in today's dynamic market landscape. In this tutorial, we'll guide you step by step on how to easily download and install modules from the Odoo App Store.
CapTechTalks Webinar Slides June 2024 Donovan Wright.pptxCapitolTechU
Slides from a Capitol Technology University webinar held June 20, 2024. The webinar featured Dr. Donovan Wright, presenting on the Department of Defense Digital Transformation.
2. BUILDING
PERMIT
No person shall erect, re-erect or
make alteration or demolition in
building or cause the same to be done
without first obtaining a separate
building permit for each building
from the authority.
4. APPLICATION
TO EXECUTE
WORK
Every person who intends to erect, or
make material alteration in any place in
a building shall give notice in writing to
the Authority.
5. PLANS
ACCOMPANYING
NOTICE
Copy of the title deed of the site.
Receipt for having paid the
application fee.
A site plan in triplicate drawn to
appropriate scale.
6. FORM OF
APPLICATION
Certificate of Undertaking.
Undertaking by Architect.
Undertaking by Structural engineer.
Undertaking by Construction engineer.
8. DOCUMENTS TO
BE FURNISHED
The forms, plans, sections and
descriptions to be furnished and signed
by the engineers andArchitect.
Approval of drawings, statement,
documents shall not discharge people on
record who are engaged on the project.
The landowner shall held responsible if
any Unauthorised Construction, addition
& alteration is done without prior
permission of Competent Authority.