SlideShare a Scribd company logo
SA 18-310 Site fencing/ security due to high winds
Infrastructure & Services
Issued and authorised by the Director Safety and Engineering Systems Safety Alert Template.docx
Safety Alert Page 1 of 1
Safety Alert
SA 18-310 Site fencing/ security due to high winds
Audience
• All Transport
Projects
employees
• Transport
Projects
Contractors
• Project
Managers
Background
The risk of personal injury from high winds has been highlighted
by a recent weather reports in which strong winds can impact
the security and integrity of our worksites. Lessons learned
include preparing for weather changes, assessing immediate
risk when circumstances change and securing our worksites.
Contact:
Graham Jackson, Director Safety and Engineering Systems
9422 5450
Kylie Mills, Associate Director Safety Services 9200 0243
Background
High winds and other extreme weather events can create the potential for serious injury to workers
and damage to infrastructure.
This risk has been highlighted to remind ourselves to check our projects worksite protection
arrangements are compliant with supplier requirements which will assist with mitigating such events.
Further background: (SA 14-234 Access Gates and High Winds) this risk has been highlighted when
strong winds caused a gate to swing and hit a contractor causing injury to his hand and knee.
Injuries received included sutures and bruising.
This Safety Alert focuses on the risk of personal injury arising from the uncontrolled movement of
access gates during high wind conditions.
Lesson learned
• Access gates in high winds can become fast moving high energy objects that can cause
significant impact and/or crush injuries, especially to body extremities.
• Lock or secure gates to prevent uncontrolled movements.
• Review site for any unsecured items which may present a risk to safety during high wind
events.
Actions Required
• Regularly review site for any unsecured items which may present a risk to safety
during high wind events
• Ensure this Safety Alert is communicated to relevant workers on Transport Projects
sites via toolbox talks
• Place this Safety Alert on site notice boards
Issued and authorised by the Director Safety and Engineering Systems
Signature ____________________________________________
Name: Graham Jackson, Director Safety and Engineering Systems. Dated: 23 Nov 2018

More Related Content

What's hot

FM Magazine - December / January - Spark in the dark
FM Magazine - December / January - Spark in the darkFM Magazine - December / January - Spark in the dark
FM Magazine - December / January - Spark in the dark
Paul Angus
 
Safety and Health During Construction
Safety and Health During ConstructionSafety and Health During Construction
Safety and Health During Construction
Dr K M SONI
 
11 falls leading cause of death
11 falls leading cause of death11 falls leading cause of death
11 falls leading cause of death
Cervelliere Limited
 
Working at height in new zealand a guideline for best practices
Working at height in new zealand a guideline for best practicesWorking at height in new zealand a guideline for best practices
Working at height in new zealand a guideline for best practices
Rory_Conti
 
Construction safety lecture-3
Construction safety  lecture-3Construction safety  lecture-3
Construction safety lecture-3Saleem Malik
 
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)Waqas Ahmad
 
Safety practice In Construction
Safety practice In Construction Safety practice In Construction
Safety practice In Construction
Muhammad Ghulam Mustafa Joyia
 
Major accident-identification-and-risk-assessment-ppt4816
Major accident-identification-and-risk-assessment-ppt4816Major accident-identification-and-risk-assessment-ppt4816
Major accident-identification-and-risk-assessment-ppt4816
duy nguyen
 
Industrial safety final
Industrial safety finalIndustrial safety final
Industrial safety final
ARUNAYESUDAS
 
Whitecard Update: Steps to Managing a Fall Hazard
Whitecard Update: Steps to Managing a Fall HazardWhitecard Update: Steps to Managing a Fall Hazard
Whitecard Update: Steps to Managing a Fall Hazardwhitecardaustralia0
 
Whitecard Update: Steps to Managing a Fall Hazard
Whitecard Update: Steps to Managing a Fall HazardWhitecard Update: Steps to Managing a Fall Hazard
Whitecard Update: Steps to Managing a Fall Hazardwhitecardaustralia0
 

What's hot (11)

FM Magazine - December / January - Spark in the dark
FM Magazine - December / January - Spark in the darkFM Magazine - December / January - Spark in the dark
FM Magazine - December / January - Spark in the dark
 
Safety and Health During Construction
Safety and Health During ConstructionSafety and Health During Construction
Safety and Health During Construction
 
11 falls leading cause of death
11 falls leading cause of death11 falls leading cause of death
11 falls leading cause of death
 
Working at height in new zealand a guideline for best practices
Working at height in new zealand a guideline for best practicesWorking at height in new zealand a guideline for best practices
Working at height in new zealand a guideline for best practices
 
Construction safety lecture-3
Construction safety  lecture-3Construction safety  lecture-3
Construction safety lecture-3
 
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
 
Safety practice In Construction
Safety practice In Construction Safety practice In Construction
Safety practice In Construction
 
Major accident-identification-and-risk-assessment-ppt4816
Major accident-identification-and-risk-assessment-ppt4816Major accident-identification-and-risk-assessment-ppt4816
Major accident-identification-and-risk-assessment-ppt4816
 
Industrial safety final
Industrial safety finalIndustrial safety final
Industrial safety final
 
Whitecard Update: Steps to Managing a Fall Hazard
Whitecard Update: Steps to Managing a Fall HazardWhitecard Update: Steps to Managing a Fall Hazard
Whitecard Update: Steps to Managing a Fall Hazard
 
Whitecard Update: Steps to Managing a Fall Hazard
Whitecard Update: Steps to Managing a Fall HazardWhitecard Update: Steps to Managing a Fall Hazard
Whitecard Update: Steps to Managing a Fall Hazard
 

Similar to Tfnsw safety alert 18 310

Dam construction safety management (group 2, 7th reporter)
Dam construction safety management (group 2, 7th reporter)Dam construction safety management (group 2, 7th reporter)
Dam construction safety management (group 2, 7th reporter)
Jefferson Pura Basista
 
Site Selection for Mission Critical Facilities
Site Selection for Mission Critical FacilitiesSite Selection for Mission Critical Facilities
Site Selection for Mission Critical Facilities
Schneider Electric
 
Safety equipments
Safety equipments Safety equipments
Safety equipments
Dip Kadia
 
Erau webinar january 2017 airport construction
Erau webinar january 2017 airport construction Erau webinar january 2017 airport construction
Erau webinar january 2017 airport construction
ERAUWebinars
 
Basic civil engineering pdf
Basic civil engineering pdfBasic civil engineering pdf
Basic civil engineering pdf
Saqib Imran
 
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...
Ariful Islam
 
1661351022Unit 3 1054-V1 Site Organisation.pdf
1661351022Unit 3 1054-V1 Site Organisation.pdf1661351022Unit 3 1054-V1 Site Organisation.pdf
1661351022Unit 3 1054-V1 Site Organisation.pdf
ahsansaeed78
 
Const safety manag by prabhunath sharma
Const safety manag by prabhunath sharmaConst safety manag by prabhunath sharma
Const safety manag by prabhunath sharmaPrabhunath Sharma
 
White Card Update: Most Common Construction Site Accidents
White Card Update: Most Common Construction Site AccidentsWhite Card Update: Most Common Construction Site Accidents
White Card Update: Most Common Construction Site Accidentswhitecardcourse
 
Doing Business in Myanmar
Doing Business in MyanmarDoing Business in Myanmar
Doing Business in Myanmar
Dr. Oliver Massmann
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..doc
Atif767782
 
Summer training report
Summer training reportSummer training report
Summer training report
INDRANIL BANERJEE
 
2 IMPORTANCE OCC SFTY & H.ppt
2 IMPORTANCE OCC SFTY & H.ppt2 IMPORTANCE OCC SFTY & H.ppt
2 IMPORTANCE OCC SFTY & H.ppt
Fredel De Vera
 
Uniline multisafe uni rail eng bcr
Uniline multisafe uni rail eng bcr Uniline multisafe uni rail eng bcr
Uniline multisafe uni rail eng bcr TRABALHO VERTICAL
 
12 trenching and excavation safety
12 trenching and excavation safety12 trenching and excavation safety
12 trenching and excavation safety
Cervelliere Limited
 
Safety_Melgar_EEII_2011
Safety_Melgar_EEII_2011Safety_Melgar_EEII_2011
Safety_Melgar_EEII_2011Andres Galvis
 
Safety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptxSafety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptx
alutarep1
 
Safety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptxSafety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptx
alutarep1
 

Similar to Tfnsw safety alert 18 310 (20)

Dam construction safety management (group 2, 7th reporter)
Dam construction safety management (group 2, 7th reporter)Dam construction safety management (group 2, 7th reporter)
Dam construction safety management (group 2, 7th reporter)
 
Fall Prevention in Construction
Fall Prevention in ConstructionFall Prevention in Construction
Fall Prevention in Construction
 
Site Selection for Mission Critical Facilities
Site Selection for Mission Critical FacilitiesSite Selection for Mission Critical Facilities
Site Selection for Mission Critical Facilities
 
Safety equipments
Safety equipments Safety equipments
Safety equipments
 
Erau webinar january 2017 airport construction
Erau webinar january 2017 airport construction Erau webinar january 2017 airport construction
Erau webinar january 2017 airport construction
 
Basic civil engineering pdf
Basic civil engineering pdfBasic civil engineering pdf
Basic civil engineering pdf
 
WEN_Issue25_GMS_02
WEN_Issue25_GMS_02WEN_Issue25_GMS_02
WEN_Issue25_GMS_02
 
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...
Engineering Failure(Case Study of Rana Plaza Collapse-An Example of Engineeri...
 
1661351022Unit 3 1054-V1 Site Organisation.pdf
1661351022Unit 3 1054-V1 Site Organisation.pdf1661351022Unit 3 1054-V1 Site Organisation.pdf
1661351022Unit 3 1054-V1 Site Organisation.pdf
 
Const safety manag by prabhunath sharma
Const safety manag by prabhunath sharmaConst safety manag by prabhunath sharma
Const safety manag by prabhunath sharma
 
White Card Update: Most Common Construction Site Accidents
White Card Update: Most Common Construction Site AccidentsWhite Card Update: Most Common Construction Site Accidents
White Card Update: Most Common Construction Site Accidents
 
Doing Business in Myanmar
Doing Business in MyanmarDoing Business in Myanmar
Doing Business in Myanmar
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..doc
 
Summer training report
Summer training reportSummer training report
Summer training report
 
2 IMPORTANCE OCC SFTY & H.ppt
2 IMPORTANCE OCC SFTY & H.ppt2 IMPORTANCE OCC SFTY & H.ppt
2 IMPORTANCE OCC SFTY & H.ppt
 
Uniline multisafe uni rail eng bcr
Uniline multisafe uni rail eng bcr Uniline multisafe uni rail eng bcr
Uniline multisafe uni rail eng bcr
 
12 trenching and excavation safety
12 trenching and excavation safety12 trenching and excavation safety
12 trenching and excavation safety
 
Safety_Melgar_EEII_2011
Safety_Melgar_EEII_2011Safety_Melgar_EEII_2011
Safety_Melgar_EEII_2011
 
Safety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptxSafety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptx
 
Safety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptxSafety Engineering in Project Supervision.pptx
Safety Engineering in Project Supervision.pptx
 

More from Garry Pepper

September 2019 amendments flyer
September 2019 amendments flyerSeptember 2019 amendments flyer
September 2019 amendments flyer
Garry Pepper
 
Safe tracks 2019 08-network rules amendments
Safe tracks 2019 08-network rules amendmentsSafe tracks 2019 08-network rules amendments
Safe tracks 2019 08-network rules amendments
Garry Pepper
 
Laha memo
Laha memoLaha memo
Laha memo
Garry Pepper
 
Infraworks social media policy v1.0
Infraworks social media policy v1.0Infraworks social media policy v1.0
Infraworks social media policy v1.0
Garry Pepper
 
Safe notice 2019 003
Safe notice 2019 003Safe notice 2019 003
Safe notice 2019 003
Garry Pepper
 
Artc safety alert no. 112
Artc safety alert no. 112Artc safety alert no. 112
Artc safety alert no. 112
Garry Pepper
 
Safe notice permanent 009
Safe notice permanent 009Safe notice permanent 009
Safe notice permanent 009
Garry Pepper
 
Changes to css script for toa
Changes to css script for toaChanges to css script for toa
Changes to css script for toa
Garry Pepper
 
Safe tracks july 07
Safe tracks july 07Safe tracks july 07
Safe tracks july 07
Garry Pepper
 
S afe notice 193 194 204
S afe notice 193 194 204S afe notice 193 194 204
S afe notice 193 194 204
Garry Pepper
 
Plumbers sydney water work completions memo
Plumbers sydney water work completions memoPlumbers sydney water work completions memo
Plumbers sydney water work completions memo
Garry Pepper
 
Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019
Garry Pepper
 
Alert riw transition from pegasus to mta
Alert riw transition from pegasus to mtaAlert riw transition from pegasus to mta
Alert riw transition from pegasus to mta
Garry Pepper
 
Safe notice 192 191
Safe notice 192 191Safe notice 192 191
Safe notice 192 191
Garry Pepper
 
Safe notice telegram 1027
Safe notice telegram 1027Safe notice telegram 1027
Safe notice telegram 1027
Garry Pepper
 
Infraworks induction presentaion v4.0
Infraworks induction presentaion v4.0Infraworks induction presentaion v4.0
Infraworks induction presentaion v4.0
Garry Pepper
 
Safe notice 178 189 206
Safe notice 178 189 206Safe notice 178 189 206
Safe notice 178 189 206
Garry Pepper
 
Safe notice permanent 008 2019
Safe notice permanent 008 2019Safe notice permanent 008 2019
Safe notice permanent 008 2019
Garry Pepper
 
Reminder to vote EA
Reminder to vote EAReminder to vote EA
Reminder to vote EA
Garry Pepper
 
Safe notice 160 231 176 175
Safe notice 160 231 176 175Safe notice 160 231 176 175
Safe notice 160 231 176 175
Garry Pepper
 

More from Garry Pepper (20)

September 2019 amendments flyer
September 2019 amendments flyerSeptember 2019 amendments flyer
September 2019 amendments flyer
 
Safe tracks 2019 08-network rules amendments
Safe tracks 2019 08-network rules amendmentsSafe tracks 2019 08-network rules amendments
Safe tracks 2019 08-network rules amendments
 
Laha memo
Laha memoLaha memo
Laha memo
 
Infraworks social media policy v1.0
Infraworks social media policy v1.0Infraworks social media policy v1.0
Infraworks social media policy v1.0
 
Safe notice 2019 003
Safe notice 2019 003Safe notice 2019 003
Safe notice 2019 003
 
Artc safety alert no. 112
Artc safety alert no. 112Artc safety alert no. 112
Artc safety alert no. 112
 
Safe notice permanent 009
Safe notice permanent 009Safe notice permanent 009
Safe notice permanent 009
 
Changes to css script for toa
Changes to css script for toaChanges to css script for toa
Changes to css script for toa
 
Safe tracks july 07
Safe tracks july 07Safe tracks july 07
Safe tracks july 07
 
S afe notice 193 194 204
S afe notice 193 194 204S afe notice 193 194 204
S afe notice 193 194 204
 
Plumbers sydney water work completions memo
Plumbers sydney water work completions memoPlumbers sydney water work completions memo
Plumbers sydney water work completions memo
 
Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019
 
Alert riw transition from pegasus to mta
Alert riw transition from pegasus to mtaAlert riw transition from pegasus to mta
Alert riw transition from pegasus to mta
 
Safe notice 192 191
Safe notice 192 191Safe notice 192 191
Safe notice 192 191
 
Safe notice telegram 1027
Safe notice telegram 1027Safe notice telegram 1027
Safe notice telegram 1027
 
Infraworks induction presentaion v4.0
Infraworks induction presentaion v4.0Infraworks induction presentaion v4.0
Infraworks induction presentaion v4.0
 
Safe notice 178 189 206
Safe notice 178 189 206Safe notice 178 189 206
Safe notice 178 189 206
 
Safe notice permanent 008 2019
Safe notice permanent 008 2019Safe notice permanent 008 2019
Safe notice permanent 008 2019
 
Reminder to vote EA
Reminder to vote EAReminder to vote EA
Reminder to vote EA
 
Safe notice 160 231 176 175
Safe notice 160 231 176 175Safe notice 160 231 176 175
Safe notice 160 231 176 175
 

Recently uploaded

Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 

Recently uploaded (20)

Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 

Tfnsw safety alert 18 310

  • 1. SA 18-310 Site fencing/ security due to high winds Infrastructure & Services Issued and authorised by the Director Safety and Engineering Systems Safety Alert Template.docx Safety Alert Page 1 of 1 Safety Alert SA 18-310 Site fencing/ security due to high winds Audience • All Transport Projects employees • Transport Projects Contractors • Project Managers Background The risk of personal injury from high winds has been highlighted by a recent weather reports in which strong winds can impact the security and integrity of our worksites. Lessons learned include preparing for weather changes, assessing immediate risk when circumstances change and securing our worksites. Contact: Graham Jackson, Director Safety and Engineering Systems 9422 5450 Kylie Mills, Associate Director Safety Services 9200 0243 Background High winds and other extreme weather events can create the potential for serious injury to workers and damage to infrastructure. This risk has been highlighted to remind ourselves to check our projects worksite protection arrangements are compliant with supplier requirements which will assist with mitigating such events. Further background: (SA 14-234 Access Gates and High Winds) this risk has been highlighted when strong winds caused a gate to swing and hit a contractor causing injury to his hand and knee. Injuries received included sutures and bruising. This Safety Alert focuses on the risk of personal injury arising from the uncontrolled movement of access gates during high wind conditions. Lesson learned • Access gates in high winds can become fast moving high energy objects that can cause significant impact and/or crush injuries, especially to body extremities. • Lock or secure gates to prevent uncontrolled movements. • Review site for any unsecured items which may present a risk to safety during high wind events. Actions Required • Regularly review site for any unsecured items which may present a risk to safety during high wind events • Ensure this Safety Alert is communicated to relevant workers on Transport Projects sites via toolbox talks • Place this Safety Alert on site notice boards Issued and authorised by the Director Safety and Engineering Systems Signature ____________________________________________ Name: Graham Jackson, Director Safety and Engineering Systems. Dated: 23 Nov 2018