1. Firesmith’s Testing Pitfalls Checklist 1 November 2014 1
Common System and Software Testing Pitfalls Checklist
The following checklist is based on the book Common System and Software Testing Pitfalls by Donald Firesmith. It has been updated with additional testing pitfalls that have been identified since the book’s manuscript was frozen for publication.
A testing pitfall is defined as a:
• A human mistake that unnecessarily and unexpectedly causes testing to be:
– Less effective at uncovering defects
– Less efficient in terms of time and effort expended
– More frustrating to perform
• A bad decision, an incorrect mindset, a wrong action, or failure to act
• A failure to adequately:
– Meet a testing challenge
– Address a testing problem
• A way to screw up testing
This checklist is intended for use when:
• Producing test strategies/plans and related documentations
• Evaluating contractor proposals
• Evaluating test strategies/plans and related documentation (quality control)
• Evaluating as-performed test process (quality assurance)
• Identifying test-related risks and their mitigation approaches
2. Firesmith’s Testing Pitfalls Checklist 1 November 2014 2
1 General Testing Pitfalls
The following pitfall categories are general and potentially apply to all types of testing:
1. Test Planning and Scheduling
2. Stakeholder Involvement and Commitment
3. Management
4. Staffing
5. Process
6. Pitfall-Related Pitfalls
7. Test Tools and Environments
8. Automated Testing
9. Communication
10. Testing-as-a-Service (TaaS)
11. Requirements
1.1 Test Planning and Scheduling
Testing Pitfalls
Observations and Notes
No Separate Test Planning Documentation (GEN-TPS-1)
There is no separate testing-specific planning documentation, only incomplete, high-level overviews of testing in the general planning documents.
Symptoms Consequences Causes Recommendations
Incomplete Test Planning (GEN-TPS-2)
Test planning and its associated documentation are not sufficiently complete for the current point in the system development cycle.
Symptoms Consequences Causes Recommendations
3. Firesmith’s Testing Pitfalls Checklist 1 November 2014 3
Test Plans Ignored (GEN-TPS-3)
The test planning documentation is ignored (that is, it has become “shelfware”) once developed and delivered.
Symptoms Consequences Causes Recommendations
Test-Case Documents as Test Plans (GEN-TPS-4)
Test-case documents that document specific test cases are mislabeled as test plans.
Symptoms Consequences Causes Recommendations
Inadequate Test Schedule (GEN-TPS-5)
The testing schedule is inadequate to complete proper testing.
Symptoms Consequences Causes Recommendations
Testing at the End (GEN-TPS-6)
All testing is performed late in the development cycle; there is little or no testing of executable models or unit or integration testing planned or performed during the early and middle stages of the development cycle.
Symptoms Consequences Causes Recommendations
Independent Test Schedule (GEN-TPS-7)
The test schedule is developed independently of the project master schedule and the schedules of the other development activities.
Symptoms Consequences Causes Recommendations
1.2 Stakeholder Involvement and Commitment
Testing Pitfalls
Observations and Notes
Wrong Testing Mindset (GEN-SIC-1)
Some testers and testing stakeholders have one or more incorrect
Symptoms Consequences Causes Recommendations
4. Firesmith’s Testing Pitfalls Checklist 1 November 2014 4
beliefs concerning testing.
Unrealistic Testing Expectations (GEN-SIC-2)
Testing stakeholders (especially customer representatives and managers) have various unrealistic expectations with regard to testing.
Symptoms Consequences Causes Recommendations
Lack of Stakeholder Commitment to Testing (GEN-SIC-3)
Stakeholder commitment to the testing effort is inadequate; sufficient resources (for example, people, time in the schedule, tools, or funding) are not allocated the testing effort.
Symptoms Consequences Causes Recommendations
1.3 Management
Testing Pitfalls
Observations and Notes
Inadequate Test Resources (GEN-MGMT-1)
Management allocates inadequate resources (for example, budget, schedule, staffing, and facilities) to the testing effort.
Symptoms Consequences Causes Recommendations
Inappropriate External Pressures (GEN-MGMT-2)
Managers and others in positions of authority subject testers to inappropriate external pressures.
Symptoms Consequences Causes Recommendations
Inadequate Test-Related Risk Management (GEN-MGMT-3)
There are too few test-related risks identified in the project’s official risk repository, and those that are identified have inappropriately low probabilities, low harm severities, and low priorities.
Symptoms Consequences Causes Recommendations
5. Firesmith’s Testing Pitfalls Checklist 1 November 2014 5
Inadequate Test Metrics (GEN-MGMT-4)
Too few test metrics are produced, analyzed, reported, or acted upon, and some of the test metrics that are produced are inappropriate or not very useful.
Symptoms Consequences Causes Recommendations
Inconvenient Test Results Ignored (GEN-MGMT-5)
Management ignores or treats lightly inconvenient negative test results (especially those with negative ramifications for the schedule, budget, or system quality).
Symptoms Consequences Causes Recommendations
Test Lessons Learned Ignored (GEN-MGMT-6)
Lessons learned from testing on previous projects are ignored and not placed into practice on the current project.
Symptoms Consequences Causes Recommendations
1.4 Staffing
Testing Pitfalls
Observations and Notes
Lack of Independence (GEN-STF-1)
The test organization or project test team lack adequate administrative, financial, and technical independence to enable them to withstand inappropriate pressure from the development management to cut corners.
Symptoms Consequences Causes Recommendations
Unclear Testing Responsibilities (GEN-STF-2)
The testing responsibilities are unclear and do not adequately address which organizations, teams, and people are going to be responsible for and perform the different types of testing.
Symptoms Consequences Causes Recommendations
6. Firesmith’s Testing Pitfalls Checklist 1 November 2014 6
Developers Responsible for All Testing (GEN-STF-3)
Developers are responsible for all of the developmental testing that occurs during system or software development.
Symptoms Consequences Causes Recommendations
Testers Responsible for All Testing (GEN-STF-4)
Testers are responsible for all of the developmental testing that occurs during system or software development.
Symptoms Consequences Causes Recommendations
Testers Responsible for Quality (GEN-STF-5)
Testers are (solely) responsible for the quality of the system or software under test.
Symptoms Consequences Causes Recommendations
Users Responsible for Testing (GEN-STF-6)
The users are responsible for most of the testing, which occurs after the system(s) are operational.
Symptoms Consequences Causes Recommendations
Inadequate Testing Expertise (GEN-STF-7)
Some testers, developers, or other testing stakeholders have inadequate testing-related understanding, expertise, experience, or training.
Symptoms Consequences Causes Recommendations
Inadequate Domain Expertise (GEN-STF-8)
Testers do not have adequate training, experience, and expertise in the system’s application domain.
Symptoms Consequences Causes Recommendations
Adversarial Relationship (GEN-STF-9)
A counterproductive adversarial relationship exists between the testers and either management, the developers, or both.
Symptoms Consequences Causes Recommendations
7. Firesmith’s Testing Pitfalls Checklist 1 November 2014 7
1.5 Process
Testing Pitfalls
Observations and Notes
No Planned Testing Process (GEN-PRO-1)
There is no as-planned testing process and all testing (if any) is both ad hoc and completely up to the whims of the individual developers and testers.
Symptoms Consequences Causes Recommendations
Essentially No Testing (GEN-PRO-2)
Very little if any developmental testing is being performed.
Symptoms Consequences Causes Recommendations
Incomplete Testing (GEN-PRO-3)
The testers or developers fail to adequately test certain testable behaviors, characteristics, or components of the system or software under test.
Symptoms Consequences Causes Recommendations
Test Process Ignored (GEN-PRO-4)
The testers, developers, or managers ignore the official documented as-planned test process.
Symptoms Consequences Causes Recommendations
One-Size-Fits-All Testing (GEN-PRO-5)
All testing is performed the same way, to the same level of rigor, regardless of its criticality.
Symptoms Consequences Causes Recommendations
Sunny Day Testing Only )GEN-PRO-6)
Testing is largely or totally restricted to verifying that the system does what it should, but does not verify that the system does not do
Symptoms Consequences Causes Recommendations
8. Firesmith’s Testing Pitfalls Checklist 1 November 2014 8
what it should not do.
Testing and Engineering Process Not Integrated (GEN-PRO-7)
The testing process is not adequately integrated into the overall system engineering process, but is rather treated as a separate specialty engineering activity with only limited interfaces with the primary engineering activities.
Symptoms Consequences Causes Recommendations
Inadequate Test Prioritization (GEN-PRO-8)
Testing is not adequately prioritized (for example, all types of testing have the same priority).
Symptoms Consequences Causes Recommendations
Test-Type Confusion (GEN-PRO-9)
Test cases from one type of testing are redundantly repeated as part of another type of testing, even though the testing types have quite different purposes and scopes.
Symptoms Consequences Causes Recommendations
Functionality Testing Overemphasized (GEN-PRO-10)
There is an overemphasis on testing functionality as opposed to testing quality, data, and interface requirements and testing architectural, design, and implementation constraints.
Symptoms Consequences Causes Recommendations
Black-Box System Testing Overemphasized (GEN-PRO-11)
There is an overemphasis on black-box system testing for requirements conformance, and there is very little white-box unit and integration testing for the architecture, design, and implementation verification.
Symptoms Consequences Causes Recommendations
Black-Box System Testing Underemphasized (GEN-PRO-12)
Symptoms Consequences Causes Recommendations
9. Firesmith’s Testing Pitfalls Checklist 1 November 2014 9
There is an overemphasis on white-box unit and integration testing, and very little time is spent on black-box system testing to verify conformance to the requirements.
Test Preconditions Ignored (GEN-PRO-13)
Test cases do not address preconditions such as the system’s internal mode and states as well as the state(s) of the system’s external environment.
Symptoms Consequences Causes Recommendations
Too Immature for Testing (GEN-PRO-14)
Products are delivered for testing when they are immature and not ready to be tested.
Symptoms Consequences Causes Recommendations
Inadequate Test Data (GEN-PRO-15)
The test data (including individual test data and sets of test data) lack adequate fidelity to operational data, is incomplete, or is invalid.
Symptoms Consequences Causes Recommendations
Inadequate Evaluations of Test Assets (GEN-PRO-16)
The quality of the test assets is not adequately evaluated prior to using them.
Symptoms Consequences Causes Recommendations
Inadequate Maintenance of Test Assets (GEN-PRO-17)
Test assets are not properly maintained (that is, adequately updated and iterated) as defects are found and the object under test (OUT) is changed.
Symptoms Consequences Causes Recommendations
Testing as a Phase (GEN-PRO-18)
Testing is treated as a phase that takes place late in a sequential (also known as waterfall) development cycle instead of as an
Symptoms Consequences Causes Recommendations
10. Firesmith’s Testing Pitfalls Checklist 1 November 2014 10
ongoing activity that takes place continuously in an iterative, incremental, and concurrent (an evolutionary, or agile) development cycle.
Testers Not Involved Early (GEN-PRO-19)
Testers are not involved at the beginning of the project, but rather only once an implementation exists to test.
Symptoms Consequences Causes Recommendations
Developmental Testing During Production (GEN-PRO-20)
Significant system testing is postponed until the system is already in production when fixing defects is much more difficult and expensive.
Symptoms Consequences Causes Recommendations
No Operational Testing (GEN-PRO-21)
Representative users are not performing any operational testing of the “completed” system under actual operational conditions.
Symptoms Consequences Causes Recommendations
Test Oracles Ignore Nondeterministic Behavior (GEN-PRO-22)
Testers do not have any criteria for determining when a test has passed when non-deterministic behavior results in intermittent failures and faults.
Symptoms Consequences Causes Recommendations
Testing in Quality (GEN-PRO-23)
Testing stakeholders rely on testing quality into the system/software under test rather than building quality in from the beginning via all engineering and management activities.
Symptoms Consequences Causes Recommendations
Developers Ignore Testability (GEN-PRO-24)
The system or software under test is unnecessarily difficult to test because the developers did not consider testing when designing and
Symptoms Consequences Causes Recommendations
11. Firesmith’s Testing Pitfalls Checklist 1 November 2014 11
implementing the system or software.
Testing the BackBlob (GEN-PRO-25)
Testers do not adequately deal with their increasing workload due to an ever increasing backlog of testing work including manual regression testing and the maintenance of automated tests.
Symptoms Consequences Causes Recommendations
Test Assets Not Delivered (GEN-PRO-26)
The system or software under test is delivered without its associated testing assets that would enable the receiving organization(s) to test new capabilities and perform regression testing after changes.
Symptoms Consequences Causes Recommendations
1.6 Pitfall-Related Pitfalls
Testing Pitfalls
Observations and Notes
Overly Ambitious Process Improvement (GEN-PRP-1)
The test team is overly ambiguous with regard to improving the testing process by attempting to address too many relevant testing pitfalls at once.
Symptoms Consequences Causes Recommendations
Inadequate Pitfall Prioritization (GEN-PRP-2)
Test managers do not adequately prioritize the testing pitfalls (for example by relevance, frequency, severity of negative consequences, and/or risk) when attempting to improve the testing process by better addressing testing pitfalls.
Symptoms Consequences Causes Recommendations
12. Firesmith’s Testing Pitfalls Checklist 1 November 2014 12
1.7 Test Tools and Environments
Testing Pitfalls
Observations and Notes
Over-Reliance on Manual Testing (GEN-TTE-1)
Testers place too much reliance on manual testing such that the majority of testing is performed manually, without adequate support of test tools or test scripts.
Symptoms Consequences Causes Recommendations
Over-Reliance on Testing Tools (GEN-TTE-2)
Testers and other testing stakeholders place too much reliance on commercial off-the-shelf (COTS) and homegrown testing tools.
Symptoms Consequences Causes Recommendations
Target Platform Difficult to Access (GEN-TTE-3)
The testers are not prepared to perform adequate testing when the target platform is not designed to enable access for testing.
Symptoms Consequences Causes Recommendations
Inadequate Test Environments (GEN-TTE-4)
There are insufficient test tools, test environments or test beds, and test laboratories or facilities, so adequate testing cannot be performed within the schedule and personnel limitations.
Symptoms Consequences Causes Recommendations
Poor Fidelity of Test Environments (GEN-TTE-5)
The testers build and use test environments or test beds that have poor fidelity to the operational environment of the system or software under test (SUT), and this causes inconclusive or incorrect test results (false-positive and false-negative test results).
Symptoms Consequences Causes Recommendations
Inadequate Test Environment Quality (GEN-TTE-6)
Symptoms Consequences Causes Recommendations
13. Firesmith’s Testing Pitfalls Checklist 1 November 2014 13
The quality of one or more test environments is inadequate due to an excessive number of defects.
Test Environments Inadequately Tested (GEN-TTE-7)
Testers do not test their test environments/beds to eliminate defects that could either prevent the testing of the system or software under test or cause incorrect test results.
Symptoms Consequences Causes Recommendations
Inadequate Test Configuration Management (GEN-TTE-8)
Testing work products (for example, test cases, test scripts, test data, test tools, and test environments) are not under configuration management (CM).
Symptoms Consequences Causes Recommendations
Developers Ignore Testability (GEN-TTE-9)
It is unnecessarily difficult to develop automated tests because the developers do not consider testing when designing and implementing their system or software.
Symptoms Consequences Causes Recommendations
1.8 Automated Testing
Testing Pitfalls
Observations and Notes
Over-Reliance on Manual Testing (GEN-AUTO-1)
Testers place too much reliance on manual testing such that the majority of testing is performed manually, without adequate support of test tools or test scripts
Symptoms Consequences Causes Recommendations
Automated Testing Replaces Manual Testing (GEN-AUTO-2)
Symptoms Consequences Causes Recommendations
14. Firesmith’s Testing Pitfalls Checklist 1 November 2014 14
Managers, developers, or testers attempt to replace all manual testing with automated testing.
Excessive Number of Automated Tests (GEN-AUTO-3)
The ratio of the amount of automated tests to the amount of deliverable software is too high.
Symptoms Consequences Causes Recommendations
Inappropriate Distribution of Automated Tests (GEN-AUTO-4)
The distribution of the amount of automated testing among the different levels of testing (such as unit testing, integration testing, system testing, and user interface testing) is inappropriate.
Symptoms Consequences Causes Recommendations
Inadequate Automated Test Quality (GEN-AUTO-5)
The automated tests have excessive numbers of defects.
Symptoms Consequences Causes Recommendations
Automated Tests Excessively Complex (GEN-AUTO-6)
The automated tests are significantly more complex than they need to be.
Symptoms Consequences Causes Recommendations
Automated Tests Not Maintained (GEN-AUTO-7)
The automated tests are not maintained so that they are no longer trusted or reusable.
Symptoms Consequences Causes Recommendations
Insufficient Resources Invested (GEN-AUTO-8)
Insufficient resources are allocated to plan for, develop, and maintain automated tests.
Symptoms Consequences Causes Recommendations
Automation Tools Not Appropriate (GEN-AUTO-9)
The developers and testers select inappropriate tools for supporting
Symptoms Consequences Causes Recommendations
15. Firesmith’s Testing Pitfalls Checklist 1 November 2014 15
automated testing.
Stakeholders Ignored (GEN-AUTO-10)
The developers and testers ignore the stakeholders when planning and performing automated testing.
Symptoms Consequences Causes Recommendations
1.9 Communication
Testing Pitfalls
Observations and Notes
Inadequate Architecture and Design Documentation (GEN-COM- 1)
Architects and designers produce insufficient architecture or design documentation (for example, models and documents) to support white-box (structural) unit and integration testing.
Symptoms Consequences Causes Recommendations
Inadequate Defect Reports (GEN-COM-2)
Testers and others create defect reports (also known as bug and trouble reports) that are incomplete, contain incorrect information, or are difficult to read.
Symptoms Consequences Causes Recommendations
Inadequate Test Documentation (GEN-COM-3)
Testers create test documentation that is incomplete or contains incorrect information.
Symptoms Consequences Causes Recommendations
Source Documents Not Maintained (GEN-COM-4)
Developers do not properly maintain the requirements specifications, architecture documents, design documents, and
Symptoms Consequences Causes Recommendations
16. Firesmith’s Testing Pitfalls Checklist 1 November 2014 16
associated models that are needed as inputs to the development of tests.
Inadequate Communication Concerning Testing (GEN-COM-5)
Verbal and written communication concerning the testing among testers and other testing stakeholders is inadequate.
Symptoms Consequences Causes Recommendations
Inconsistent Testing Terminology (GEN-COM-6)
Different testers, developers, managers, and other testing stakeholders often use inconsistent and ambiguous technical jargon so that the same word has different meanings and different words have the same meaning.
Symptoms Consequences Causes Recommendations
1.10 Testing-as-a-Service (TaaS)
Testing Pitfalls
Observations and Notes
Cost-Driven Provider Selection (GEN-TaaS-1)
Executive or administrative management selects the TaaS provider based solely on minimizing cost.
Symptoms Consequences Causes Recommendations
Inadequate Oversight (GEN-TaaS-2)
Project management does not provide adequate oversight of the TaaS provider’s testing effort.
Symptoms Consequences Causes Recommendations
Lack of Outsourcing Expertise (GEN-TaaS-3)
Project administrative and technical management has insufficient training, expertise, and experience in the outsourcing, especially of
Symptoms Consequences Causes Recommendations
17. Firesmith’s Testing Pitfalls Checklist 1 November 2014 17
testing as a service.
Inadequate TaaS Contract (GEN-TaaS-4)
The contract between the development/maintenance organization and the TaaS contractor/vendor does not adequately address the project’s Key Performance Indicators (KPIs), associated Service Level Agreements (SLAs), and the specific metrics by which achievement of the SLAs will be measured.
Symptoms Consequences Causes Recommendations
TaaS Improperly Chosen (GEN-TaaS-5)
TaaS is selected for the outsourcing of a type of testing for which it is an inappropriate choice.
Symptoms Consequences Causes Recommendations
1.11 Requirements
Testing Pitfalls
Observations and Notes
Tests as Requirements (GEN-REQ-1)
Developers use black-box system- and subsystem-level tests as a replacement for the associated system and subsystem requirements.
Symptoms Consequences Causes Recommendations
Ambiguous Requirements (GEN-REQ-2)
Testers misinterpret a great many ambiguous requirements and therefore base their testing on incorrect interpretations of these requirements.
Symptoms Consequences Causes Recommendations
Obsolete Requirements (GEN-REQ-3)
Testers waste effort and time testing whether the object under test
Symptoms Consequences Causes Recommendations
18. Firesmith’s Testing Pitfalls Checklist 1 November 2014 18
(OUT) correctly implements a great many obsolete requirements.
Missing Requirements (GEN-REQ-4)
Testers overlook many undocumented requirements and therefore do not plan for, develop, or run the associated overlooked test cases.
Symptoms Consequences Causes Recommendations
Incomplete Requirements (GEN-REQ-5)
Testers fail to detect that many requirements are incomplete; therefore, they develop and run correspondingly incomplete or incorrect test cases.
Symptoms Consequences Causes Recommendations
Incorrect Requirements (GEN-REQ-6)
Testers fail to detect that many requirements are incorrect, and therefore develop and run correspondingly incorrect test cases that produce false-positive and false-negative test results.
Symptoms Consequences Causes Recommendations
Requirements Churn (GEN-REQ-7)
Testers waste an excessive amount of time and effort developing and running test cases based on many requirements that are not sufficiently stable and that therefore change one or more times prior to delivery.
Symptoms Consequences Causes Recommendations
Improperly Derived Requirements (GEN-REQ-8)
Testers base their testing on improperly derived requirements, resulting in missing test cases, test cases at the wrong level of abstraction, or incorrect test cases based on cross cutting requirements that are allocated without modification to multiple architectural components.
Symptoms Consequences Causes Recommendations
19. Firesmith’s Testing Pitfalls Checklist 1 November 2014 19
Verification Methods Not Adequately Specified (GEN-REQ-9)
Testers (or other developers) fail to properly specify the verification method(s) for each requirement, thereby causing requirements to be verified using unnecessarily inefficient or ineffective verification method(s).
Symptoms Consequences Causes Recommendations
Lack of Requirements Trace (GEN-REQ-10)
The testers do not trace the requirements to individual tests or test cases, thereby making it unnecessarily difficult to determine whether the tests are inadequate or excessive.
Symptoms Consequences Causes Recommendations
Titanic Effect of Deferred Requirements (GEN-REQ-11)
Managers or chief engineers defer numerous requirements from previous blocks or builds to the current block or build after the resources for the current build have been allocated and largely expended.
Symptoms Consequences Causes Recommendations
20. Firesmith’s Testing Pitfalls Checklist 1 November 2014 20
2 Test-Type-Specific Testing Pitfalls
The following pitfall categories are specific to a single type of testing:
1. Executable Model Testing
2. Unit Testing
3. Integration Testing
4. Specialty Testing
5. System Testing
6. User Testing
7. A/B Testing
8. Acceptance Testing
9. SoS Testing
10. Regression Testing
2.1 Executable Model Testing
Testing Pitfalls
Observations and Notes
Inadequate Executable Models (TTS-MOD-1)
Either there are no executable requirements, architectural, or design models or else the models that exist are inadequate to enable associated test cases to be manually or automatically developed.
Symptoms Consequences Causes Recommendations
Executable Models Not Tested (TTS-MOD-2)
No one (such as testers, requirements engineers, architects, or designers) is testing executable requirements, architectural, or design models to verify whether they conform to the requirements and incorporate any defects.
Symptoms Consequences Causes Recommendations
21. Firesmith’s Testing Pitfalls Checklist 1 November 2014 21
2.2 Unit Testing
Testing Pitfalls
Observations and Notes
Testing Does Not Drive Design and Implementation (TTS-UNT-1)
Software developers and testers do not develop their tests first and then use these tests to drive development of the associated architecture, design, and implementation.
Symptoms Consequences Causes Recommendations
Conflict of Interest (TTS-UNT-2)
Nothing is done to address the following conflict of interest that exists when developers test their own work products: Essentially, they are being asked to demonstrate that their software is defective.
Symptoms Consequences Causes Recommendations
Brittle Test Cases (TTS-UNT-3)
Unit test cases are too brittle and unnecessarily need to be changed when the unit under test changes.
Symptoms Consequences Causes Recommendations
2.3 Integration Testing
Testing Pitfalls
Observations and Notes
Integration Decreases Testability Ignored (TTS-INT-1)
Testers fail to take into account that integration encapsulates the individual parts of the whole and the interactions between them, thereby making the internal parts of the integrated whole less
Symptoms Consequences Causes Recommendations
22. Firesmith’s Testing Pitfalls Checklist 1 November 2014 22
observable and less controllable and, therefore, less testable.
Inadequate Self-Testing (TTS-INT-2)
Testers fail to take into account that integration encapsulates the individual parts of the whole and the interactions between them, thereby making the internal parts of the integrated whole less observable and less controllable and, therefore, less testable.
Symptoms Consequences Causes Recommendations
Unavailable Components (TTS-INT-3)
Integration testing must be postponed due to the unavailability of (1) system hardware or software components or (2) test environment components.
Symptoms Consequences Causes Recommendations
System Testing as Integration Testing (TTS-INT-4)
Testers are actually performing system-level tests of system functionality when they are supposed to be performing integration testing of component interfaces and interactions.
Symptoms Consequences Causes Recommendations
2.4 Specialty Testing
Testing Pitfalls
Observations and Notes
Inadequate Capacity Testing (TTS-SPC-1)
Testers perform little or no capacity testing (or the capacity testing they do perform is superficial) to determine the degree to which the system or software degrades gracefully as capacity limits are
Symptoms Consequences Causes Recommendations
23. Firesmith’s Testing Pitfalls Checklist 1 November 2014 23
approached, reached, and exceeded.
Inadequate Concurrency Testing (TTS-SPC-2)
Testers perform little or no concurrency testing (or the concurrency testing they do perform is superficial) to explicitly uncover the defects that cause the common types of concurrency faults and failures: deadlock, livelock, starvation, priority inversion, race conditions, inconsistent views of shared memory, and unintentional infinite loops.
Symptoms Consequences Causes Recommendations
Inadequate Configuration Testing (TTS-SPC-3)
Testers perform little or no configuration testing to determine the degree to which the software under test functions properly when executing on different platform configurations.
Symptoms Consequences Causes Recommendations
Inadequate Internationalization Testing (TTS-SPC-4)
Testers perform little or no internationalization testing—or the internationalization testing they do perform is superficial—to determine the degree to which the system is configurable to perform appropriately in multiple countries.
Symptoms Consequences Causes Recommendations
Inadequate Interface Standards Compliance Testing (TTS-SPC-5)
Testers perform little or no testing of key interfaces to ensure that they properly comply with associated open interface standards.
Symptoms Consequences Causes Recommendations
Inadequate Interoperability Testing (TTS-SPC-6)
Testers perform little or no interoperability testing (or the interoperability testing they do perform is superficial) to determine the degree to which the system successfully interfaces and
Symptoms Consequences Causes Recommendations
24. Firesmith’s Testing Pitfalls Checklist 1 November 2014 24
collaborates with other systems.
Inadequate Performance Testing (TTS-SPC-7)
Testers perform little or no performance testing (or the testing they do perform is only superficial) to determine the degree to which the system has adequate levels of the performance quality attributes: event schedualability, jitter, latency, response time, and throughput.
Symptoms Consequences Causes Recommendations
Inadequate Reliability Testing (TTS-SPC-8)
Testers perform little or no long-duration reliability testing (also known as stability testing)—or the reliability testing they do perform is superficial (for example, it is not done under operational profiles and is not based on the results of any reliability models)—to determine the degree to which the system continues to function over time without failure.
Symptoms Consequences Causes Recommendations
Inadequate Robustness Testing (TTS-SPC-9)
Testers perform little or no robustness testing, or the robustness testing they do perform is superficial (for example, it is not based on the results of any robustness models), to determine the degree to which the system exhibits adequate error, fault, failure, and environmental tolerance.
Symptoms Consequences Causes Recommendations
Inadequate Safety Testing (TTS-SPC-10)
Testers perform little or no safety testing, or the safety testing they do perform is superficial (for example, it is not based on the results of a safety or hazard analysis), to determine the degree to which the system is safe from causing or suffering accidental harm.
Symptoms Consequences Causes Recommendations
25. Firesmith’s Testing Pitfalls Checklist 1 November 2014 25
Inadequate Security Testing (TTS-SPC-11)
Testers perform little or no security testing—or the security testing they do perform is superficial (for example, it is not based on the results of a security or threat analysis)—to determine the degree to which the system is secure from causing or suffering malicious harm.
Symptoms Consequences Causes Recommendations
Inadequate Usability Testing (TTS-SPC-12)
Testers or usability engineers perform little or no usability testing— or the usability testing they do perform is superficial—to determine the degree to which the system’s human-machine interfaces meet the system’s requirements for usability, manpower, personnel, training, human factors engineering (HFE), and habitability.
Symptoms Consequences Causes Recommendations
2.5 System Testing
Testing Pitfalls
Observations and Notes
Test Hooks Remain (TTS-SYS-1)
Testers fail to remove temporary test hooks after completing testing, so they remain in the delivered or fielded system.
Symptoms Consequences Causes Recommendations
Lack of Test Hooks (TTS-SYS-2)
Testers fail to take into account how a lack of test hooks makes it more difficult to test parts of the system hidden via information hiding.
Symptoms Consequences Causes Recommendations
26. Firesmith’s Testing Pitfalls Checklist 1 November 2014 26
Inadequate End-to-End Testing (TTS-SYS-3)
Testers perform inadequate system-level functional testing of a system’s end-to-end support for its missions.
Symptoms Consequences Causes Recommendations
2.6 User Testing
Testing Pitfalls
Observations and Notes
Inadequate User Involvement (TTS-UT-1)
Too few users representing too few of the different types of users are involved in the performance of user testing and the evaluation of its results.
Symptoms Consequences Causes Recommendations
Unprepared User Representatives (TTS-UT-2)
The representative user performing user testing are not adequately prepared to effectively and efficiently perform user testing.
Symptoms Consequences Causes Recommendations
User Testing Merely Repeats System Testing (TTS-UT-3)
User testing is only a repetition of a subsystem of the existing system tests by representative users.
Symptoms Consequences Causes Recommendations
User Testing is Mistaken for Acceptance Testing (TTS-UT-4)
User testing, often referred as User Acceptance Testing (UAT), is frequently confused with system acceptance testing in spite of their very different goals and descriptions.
Symptoms Consequences Causes Recommendations
Assume Knowledgeable and Careful User (TTS-UT-5)
Symptoms Consequences Causes Recommendations
27. Firesmith’s Testing Pitfalls Checklist 1 November 2014 27
Testers (and developers) mistakenly assume that representative users performing user testing will be careful and as knowledgeable as they are about how the system should work.
2.7 A/B Testing
Testing Pitfalls
Observations and Notes
Poor Key Performance Indicators (TTS-ABT-1)
The key performance indicators (KPIs) of the testing do not support business or mission goals.
Symptoms Consequences Causes Recommendations
Misuse of Probability and Statistics (TTS-ABT-2)
Probability and statistics are misused when interpreting the results of A/B testing.
Symptoms Consequences Causes Recommendations
Confusing Statistical Significance for Business Significance (TTS- ABT-3)
All statistically significant test results are mistakenly assumed to be sufficiently significant to justify choosing one variant over another, even if the benefits do not justify the associated costs.
Symptoms Consequences Causes Recommendations
Error Source(s) not Controlled (TTS-ABT-4)
Various sources of error are not controlled during the testing.
Symptoms Consequences Causes Recommendations
System Variant(s) Changed During Test (TTS-ABT-5)
One or both of the variants of the system or software under test are changed during an A/B test.
Symptoms Consequences Causes Recommendations
28. Firesmith’s Testing Pitfalls Checklist 1 November 2014 28
2.8 Acceptance Testing
Testing Pitfalls
Observations and Notes
No Clear System Acceptance Criteria (TTS-AT-1)
There are no clear system acceptance criteria for use during acceptance testing to determine whether the system is acceptable to the acquiring organization.
Symptoms Consequences Causes Recommendations
2.9 Systems of Systems (SoS) Testing
Testing Pitfalls
Observations and Notes
Inadequate SoS Test Planning (TTS-SoS-1)
Testers and SoS architects perform an inadequate amount of SoS test planning and fail to appropriately document their plans in SoS- level test planning documentation.
Symptoms Consequences Causes Recommendations
Unclear SoS Testing Responsibilities (TTS-SoS-2)
Managers or testers fail to clearly define and document the responsibilities for performing end-to-end SoS testing.
Symptoms Consequences Causes Recommendations
Inadequate Resources for SoS Testing (TTS-SoS-3)
Management fails to provide adequate resources for system of systems (SoS) testing
Symptoms Consequences Causes Recommendations
SoS Testing Not Properly Scheduled (TTS-SoS-4)
System of systems testing is not properly scheduled and coordinated
Symptoms Consequences Causes Recommendations
29. Firesmith’s Testing Pitfalls Checklist 1 November 2014 29
with the individual systems’ testing and delivery schedules
Inadequate SoS Requirements (TTS-SoS-5)
Many SoS-level requirements are missing, are of poor quality, or are never officially approved or funded.
Symptoms Consequences Causes Recommendations
Inadequate Support from Individual System Projects (TTS-SoS-6)
Test support from individual system development or maintenance projects is inadequate to perform system of systems testing.
Symptoms Consequences Causes Recommendations
Inadequate Defect Tracking Across Projects (TTS-SoS-7)
Defect tracking across individual system development or maintenance projects is inadequate to support system of systems testing.
Symptoms Consequences Causes Recommendations
Finger-Pointing (TTS-SoS-8)
Different system development or maintenance projects assign the responsibility for finding and fixing SoS-level defects to other projects.
Symptoms Consequences Causes Recommendations
2.10 Regression Testing
Testing Pitfalls
Observations and Notes
Inadequate Regression Test Automation (TTS-REG-1)
Testers and developers have automated an insufficient number of tests to enable adequate regression testing.
Symptoms Consequences Causes Recommendations
30. Firesmith’s Testing Pitfalls Checklist 1 November 2014 30
Regression Testing Not Performed (TTS-REG-2)
Testers and maintainers perform insufficient regression testing to determine if new defects have been accidentally introduced when changes are made to the system.
Symptoms Consequences Causes Recommendations
Inadequate Scope of Regression Testing (TTS-REG-3)
The scope of regression testing is insufficiently broad.
Symptoms Consequences Causes Recommendations
Only Low-Level Regression Tests (TTS-REG-4)
Only low-level (for example, unit-level and possibly integration) regression tests are rerun, so there is no system, acceptance, or operational regression testing and no SoS regression testing.
Symptoms Consequences Causes Recommendations
Test Resources Not Delivered for Maintenance (TTS-REG-5)
The test resources produced by the development organization are not made available to the maintenance organization to support testing new capabilities and regression testing changes
Symptoms Consequences Causes Recommendations
Only Functional Regression Testing (TTS-REG-6)
Testers and maintainers only perform regression testing to determine if changes introduce functionality-related defects.
Inadequate Retesting of Reused Software (TTS-REG-7)
Developers reuse software without adequately retesting it to ensure that it continues to operate correctly as part of the current system or software.
Symptoms Consequences Causes Recommendations