The document presents a lightweight machine learning method for TCP throughput prediction using Support Vector Regression (SVR), enhancing prediction accuracy by incorporating measurements of path properties along with historical data. The predictor shows significant improvements over traditional history-based methods, achieving predictions within 10% of the actual throughput 87% of the time in laboratory settings. Additionally, the tool, named PathPerf, has been tested across diverse wide area paths and is designed to adapt to changes in network conditions.