SlideShare a Scribd company logo
Urban Regeneration in Tartu:
Connecting Raekoja Plats to River Emajõgi
Nahshon Jagroop, Mari Kirss, Michael Longley, Kalyna
Paraszczak, & Shawn Rooney
Location and Geography
Land Use
Existing Conditions
Limited accessibility to river
Deterioration of the bridge is evident
Structural integrity is questionable
Safety along river edge is minimum
- Hardscape edge condition along
river
Existing Conditions
Solid landscape
Cobblestone limits bicycle access from
uneven surface
Restaurant seating uses significant amount
of public space
Lack of greenspace and vegetation
Different material textures such as
cobblestone, and brick occupy ground surface
Existing Conditions
Pedestrian access to bridge is hindered
Bicycle accessibility is limited by small
ramp
Pedestrians mainly used ramp instead of
stairs
Existing Conditions
Overgrown trees block view of city square
Greenspace ends with bridge towards
town square
Existing Conditions
Vast green space at the eastern
connection of Kaarsild
There are few places for seating and
leisure within the park
The central multi-use path in Ülejõe
Park lacks lighting and is dark during
evening hours
Safety is a concern
Goals
1. Increase pedestrian access to Emajõgi and Raekoja Plats
2. Increase green space within central square
3. Improve visual connections between Kaarsild and Raekoja Plats
4. Promote greener transportation modes within the city center
Planning Recommendations
Diverting Traffic
Pedestrian & Bicycle Access
Make Walking and Bicycling Part of the Business: Walk at work programs
- Partner with large employers to design and publicize routes to walk or bike to
work
- Nortal (2016 most bicycle-friendly company in Tartu)
Offer Incentives for Biking and Walking
- Mileage clubs
Provide a Guide
- Walking and bicycling maps
Bike Share Implementation Strategies
Build on What's There
- Expand and plan on Tartu’s existing Bike
infrastructure
- Idealy make Town Square site (near Taxi’s)
& at the end of the mainline of Ülejõe Park
Make it Appealing
- Bike to Tartuff Movie festival
Involve Children and Families
- Walk/Bike to school day programs
Educational and historical walks or bike tours
Bike Share Implementation Strategies
Source: www.maaamet.ee
Bike Infrastructure in Tartu
Examples of potential
Bike Share stations in Tartu
Source: www.maaamet.ee
Bike Infrastructure around Tartu
Connectivity to nearby settlements:
Lähte (15 km from Tartu)
Kõrveküla (6 km from Tartu)
Haage (13 km from Tartu)
Lohkva (7 km from Tartu)
Ülenurme (8 km from Tartu)
Külitse (10 km from Tartu)
Source: http://www.tartu.ee/data/Tartu_rattakaart_2012_KL-12-029.pdf
Promoting Growing Trends: Bike Sharing
Addressed Goals
- Increases pedestrian access to Emajõgi and Raekoja Plats
- Promotes greener transportation modes within site
Ideas and Concepts
Site Plan
Site Design: Kaarsild
Site Design: Kaarsild
Site Design: Kaarsild
Goal:
- Provide shade on Kaarsild with a
framed cover that blocks morning
sun and takes in afternoon sun
Source: Google image search
Source: Google image search
Site Design: Kaarsild
Source: http://assets.inhabitat.com/wp-content/blogs.dir/1/files/2010/04/FTL-Solar-Fabric-2.jpg
Source: https://maribyhelena.wordpress.com/tag/tantsupeo-proov/
Solar panels on the top
Estonian national pattern on the reverse side
Site Rejuvenation: Kaarsild
Addressed Goals
- Increases pedestrian access to Emajõgi and Raekoja Plats
- Promotes greener transportation modes within site
- Improves visual connections between Kaarsild and Raekoja Plats
Site Design: Walkability & Bicycle Access
Site Design: Walkability & Bicycle Access
Site Design: Walkability & Bicycle Access
Site Design: Walkability & Bicycle Access
Walkability & Bicycle Access
Addressed Goals
- Increases pedestrian access to Emajõgi and Raekoja Plats
- Promotes greener transportation modes within site
Site Design: River Emajõgi Access
Site Design: River Emajõgi Access
Flood Planning
In extreme climatic circumstances
flooding within site is relatively
contained.
Daily activities within site are not
hindered by flooding
River Emajõgi Access
Addressed Goals
- Increases pedestrian access to Emajõgi and Raekoja Plats
- Improves visual connections between Kaarsild and Raekoja Plats
Site Design: Raekoja Plats
Site Design: Raekoja Plats
Source: Google image search
Site Design: Raekoja Plats
Addressed Goals
- Increases pedestrian access to Emajõgi and Raekoja Plats
- Improves visual connections between Kaarsild and Raekoja Plats
Concluding Increase pedestrian access to Emajõgi and Raekoja
Plats
- Bridge re-design
Increase green space within central square
- Making Design elements transferable
Improve visual connections between Kaarsild and
Raekoja Plats
- Remove elements that block flow and aesthetic
visibility
Promote greener transportation modes within the
city center
- Cont. Bike Share initiatives
Questions?

More Related Content

What's hot

Transportation and Mobility
Transportation and MobilityTransportation and Mobility
Transportation and Mobility
myhbgtv
 
Final report
Final reportFinal report
Final report
Lynnstyles
 
Oct. 19 Complete Streets Open House Boards
Oct. 19 Complete Streets Open House BoardsOct. 19 Complete Streets Open House Boards
Oct. 19 Complete Streets Open House Boards
CityofBoulder
 
TN RTP Presentation 2009
TN RTP Presentation 2009TN RTP Presentation 2009
TN RTP Presentation 2009
TN Mountain Bike Alliance
 
Burlington Bike Path Improvement Public Forum
Burlington Bike Path Improvement Public ForumBurlington Bike Path Improvement Public Forum
Burlington Bike Path Improvement Public Forum
chapinspencer
 
Landscape planning greenway
Landscape planning greenway Landscape planning greenway
Landscape planning greenway
Blaise Nkubiyaho
 
TOD presentation
TOD presentationTOD presentation
TOD presentation
oneregionforward
 
Elements and Components of Urban Design - A Case of Pinamalayan, Oriental Min...
Elements and Components of Urban Design - A Case of Pinamalayan, Oriental Min...Elements and Components of Urban Design - A Case of Pinamalayan, Oriental Min...
Elements and Components of Urban Design - A Case of Pinamalayan, Oriental Min...
AudreyEuniceRillorta
 
Sheridan Road Improvement Project
Sheridan Road Improvement ProjectSheridan Road Improvement Project
Sheridan Road Improvement Project
cityofevanston
 
Dan Goodman: STATE OF THE LANE: PROTECTED BIKE LANES IN THE U.S.
Dan Goodman: STATE OF THE LANE: PROTECTED BIKE LANES IN THE U.S.Dan Goodman: STATE OF THE LANE: PROTECTED BIKE LANES IN THE U.S.
Dan Goodman: STATE OF THE LANE: PROTECTED BIKE LANES IN THE U.S.
Project for Public Spaces & National Center for Biking and Walking
 
Legacy Trail Extension Project - Feasibility Study
Legacy Trail Extension Project - Feasibility StudyLegacy Trail Extension Project - Feasibility Study
Legacy Trail Extension Project - Feasibility Study
gscplanning
 
2016 TOD brochure
2016 TOD brochure2016 TOD brochure
2016 TOD brochure
Stacy Werner
 
TOD Presentation-PDF_-part-I
TOD Presentation-PDF_-part-ITOD Presentation-PDF_-part-I
TOD Presentation-PDF_-part-I
Neha Soni, LEED AP (ND, BD+C), CNU-A
 
Northfield-Warrensville Multi-Modal Connectivity Plan
Northfield-Warrensville Multi-Modal Connectivity PlanNorthfield-Warrensville Multi-Modal Connectivity Plan
Northfield-Warrensville Multi-Modal Connectivity Plan
Cuyahoga County Planning Commission
 
Springfield Community Business Center Commuter Parking Garage: Design Public ...
Springfield Community Business Center Commuter Parking Garage: Design Public ...Springfield Community Business Center Commuter Parking Garage: Design Public ...
Springfield Community Business Center Commuter Parking Garage: Design Public ...
Fairfax County
 
NACTO 2013
NACTO  2013NACTO  2013
NACTO 2013
Zaki Mustafa
 
Sharp presentation
Sharp presentationSharp presentation
Sharp presentation
RPO America
 
Mobility and City Streets: From Roads for Cars to Streets for People
Mobility and City Streets: From Roads for Cars to Streets for PeopleMobility and City Streets: From Roads for Cars to Streets for People
Mobility and City Streets: From Roads for Cars to Streets for People
WRI Ross Center for Sustainable Cities
 
EIR Scoping Meeting 7 18-17 presentation
EIR Scoping Meeting 7 18-17 presentationEIR Scoping Meeting 7 18-17 presentation
EIR Scoping Meeting 7 18-17 presentation
CirculateSD
 
Bhubaneswar Street Design Guidelines
Bhubaneswar Street Design GuidelinesBhubaneswar Street Design Guidelines
Bhubaneswar Street Design Guidelines
WRI Ross Center for Sustainable Cities
 

What's hot (20)

Transportation and Mobility
Transportation and MobilityTransportation and Mobility
Transportation and Mobility
 
Final report
Final reportFinal report
Final report
 
Oct. 19 Complete Streets Open House Boards
Oct. 19 Complete Streets Open House BoardsOct. 19 Complete Streets Open House Boards
Oct. 19 Complete Streets Open House Boards
 
TN RTP Presentation 2009
TN RTP Presentation 2009TN RTP Presentation 2009
TN RTP Presentation 2009
 
Burlington Bike Path Improvement Public Forum
Burlington Bike Path Improvement Public ForumBurlington Bike Path Improvement Public Forum
Burlington Bike Path Improvement Public Forum
 
Landscape planning greenway
Landscape planning greenway Landscape planning greenway
Landscape planning greenway
 
TOD presentation
TOD presentationTOD presentation
TOD presentation
 
Elements and Components of Urban Design - A Case of Pinamalayan, Oriental Min...
Elements and Components of Urban Design - A Case of Pinamalayan, Oriental Min...Elements and Components of Urban Design - A Case of Pinamalayan, Oriental Min...
Elements and Components of Urban Design - A Case of Pinamalayan, Oriental Min...
 
Sheridan Road Improvement Project
Sheridan Road Improvement ProjectSheridan Road Improvement Project
Sheridan Road Improvement Project
 
Dan Goodman: STATE OF THE LANE: PROTECTED BIKE LANES IN THE U.S.
Dan Goodman: STATE OF THE LANE: PROTECTED BIKE LANES IN THE U.S.Dan Goodman: STATE OF THE LANE: PROTECTED BIKE LANES IN THE U.S.
Dan Goodman: STATE OF THE LANE: PROTECTED BIKE LANES IN THE U.S.
 
Legacy Trail Extension Project - Feasibility Study
Legacy Trail Extension Project - Feasibility StudyLegacy Trail Extension Project - Feasibility Study
Legacy Trail Extension Project - Feasibility Study
 
2016 TOD brochure
2016 TOD brochure2016 TOD brochure
2016 TOD brochure
 
TOD Presentation-PDF_-part-I
TOD Presentation-PDF_-part-ITOD Presentation-PDF_-part-I
TOD Presentation-PDF_-part-I
 
Northfield-Warrensville Multi-Modal Connectivity Plan
Northfield-Warrensville Multi-Modal Connectivity PlanNorthfield-Warrensville Multi-Modal Connectivity Plan
Northfield-Warrensville Multi-Modal Connectivity Plan
 
Springfield Community Business Center Commuter Parking Garage: Design Public ...
Springfield Community Business Center Commuter Parking Garage: Design Public ...Springfield Community Business Center Commuter Parking Garage: Design Public ...
Springfield Community Business Center Commuter Parking Garage: Design Public ...
 
NACTO 2013
NACTO  2013NACTO  2013
NACTO 2013
 
Sharp presentation
Sharp presentationSharp presentation
Sharp presentation
 
Mobility and City Streets: From Roads for Cars to Streets for People
Mobility and City Streets: From Roads for Cars to Streets for PeopleMobility and City Streets: From Roads for Cars to Streets for People
Mobility and City Streets: From Roads for Cars to Streets for People
 
EIR Scoping Meeting 7 18-17 presentation
EIR Scoping Meeting 7 18-17 presentationEIR Scoping Meeting 7 18-17 presentation
EIR Scoping Meeting 7 18-17 presentation
 
Bhubaneswar Street Design Guidelines
Bhubaneswar Street Design GuidelinesBhubaneswar Street Design Guidelines
Bhubaneswar Street Design Guidelines
 

Similar to Tartu City Center Planning Challenge

Tega Cay Trails
Tega Cay TrailsTega Cay Trails
Tega Cay Trails
Ben Ullman
 
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Fairfax County
 
Complete Streets in Large Urban Counties
Complete Streets in Large Urban CountiesComplete Streets in Large Urban Counties
Complete Streets in Large Urban Counties
Cuyahoga County Planning Commission
 
Team 1 final
Team 1   finalTeam 1   final
Team 1 final
M. Damon Weiss
 
Bbp Presentation
Bbp PresentationBbp Presentation
Bbp Presentation
laluz914
 
Bbp Presentation
Bbp PresentationBbp Presentation
Bbp Presentation
laluz914
 
Achieving Separated Cycling Facilities in a Constrained Town Centre Environme...
Achieving Separated Cycling Facilities in a Constrained Town Centre Environme...Achieving Separated Cycling Facilities in a Constrained Town Centre Environme...
Achieving Separated Cycling Facilities in a Constrained Town Centre Environme...
Phil Gray
 
Clairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee MeetingClairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee Meeting
CirculateSD
 
Roberto Clemente State Park Revitalization Plan
Roberto Clemente State Park Revitalization PlanRoberto Clemente State Park Revitalization Plan
Roberto Clemente State Park Revitalization Plan
cwestory
 
Draft shore redesign proposals
Draft shore redesign proposalsDraft shore redesign proposals
Draft shore redesign proposals
Greener Leith
 
Hk harbourfront cycleway route by hkcall (rev 3)
Hk harbourfront cycleway route by hkcall (rev 3)Hk harbourfront cycleway route by hkcall (rev 3)
Hk harbourfront cycleway route by hkcall (rev 3)
Nick Andrew
 
AITPM Conference Presentation - Andrew Mc_Clurg
AITPM Conference Presentation - Andrew Mc_ClurgAITPM Conference Presentation - Andrew Mc_Clurg
AITPM Conference Presentation - Andrew Mc_Clurg
JumpingJaq
 
Aloha Streets: Complete Streets and Complete Communities in Hawai`i
Aloha Streets: Complete Streets and Complete Communities in Hawai`iAloha Streets: Complete Streets and Complete Communities in Hawai`i
Aloha Streets: Complete Streets and Complete Communities in Hawai`i
Project for Public Spaces & National Center for Biking and Walking
 
Urban redevelopment
Urban redevelopmentUrban redevelopment
Urban redevelopment
Pratyush Munjal
 
Great streets
Great streetsGreat streets
Great streets
Zaki Mustafa
 
Group 1 site analysis presentation slides pbg
Group 1 site analysis presentation slides pbgGroup 1 site analysis presentation slides pbg
Group 1 site analysis presentation slides pbg
BerniceNYS
 
East Don Trail - Design Concepts
East Don Trail - Design ConceptsEast Don Trail - Design Concepts
East Don Trail - Design Concepts
Toronto Public Consultation Unit
 
Day1 state of_the_trails_sa
Day1 state of_the_trails_saDay1 state of_the_trails_sa
Day1 state of_the_trails_sa
toptrails
 
ARSC2016_GRAY_P
ARSC2016_GRAY_PARSC2016_GRAY_P
ARSC2016_GRAY_P
Phil Gray
 
Getting Children Riding Again: Making Local Streets Safer for Cycling
Getting Children Riding Again: Making Local Streets Safer for CyclingGetting Children Riding Again: Making Local Streets Safer for Cycling
Getting Children Riding Again: Making Local Streets Safer for Cycling
Phil Gray
 

Similar to Tartu City Center Planning Challenge (20)

Tega Cay Trails
Tega Cay TrailsTega Cay Trails
Tega Cay Trails
 
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
 
Complete Streets in Large Urban Counties
Complete Streets in Large Urban CountiesComplete Streets in Large Urban Counties
Complete Streets in Large Urban Counties
 
Team 1 final
Team 1   finalTeam 1   final
Team 1 final
 
Bbp Presentation
Bbp PresentationBbp Presentation
Bbp Presentation
 
Bbp Presentation
Bbp PresentationBbp Presentation
Bbp Presentation
 
Achieving Separated Cycling Facilities in a Constrained Town Centre Environme...
Achieving Separated Cycling Facilities in a Constrained Town Centre Environme...Achieving Separated Cycling Facilities in a Constrained Town Centre Environme...
Achieving Separated Cycling Facilities in a Constrained Town Centre Environme...
 
Clairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee MeetingClairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee Meeting
 
Roberto Clemente State Park Revitalization Plan
Roberto Clemente State Park Revitalization PlanRoberto Clemente State Park Revitalization Plan
Roberto Clemente State Park Revitalization Plan
 
Draft shore redesign proposals
Draft shore redesign proposalsDraft shore redesign proposals
Draft shore redesign proposals
 
Hk harbourfront cycleway route by hkcall (rev 3)
Hk harbourfront cycleway route by hkcall (rev 3)Hk harbourfront cycleway route by hkcall (rev 3)
Hk harbourfront cycleway route by hkcall (rev 3)
 
AITPM Conference Presentation - Andrew Mc_Clurg
AITPM Conference Presentation - Andrew Mc_ClurgAITPM Conference Presentation - Andrew Mc_Clurg
AITPM Conference Presentation - Andrew Mc_Clurg
 
Aloha Streets: Complete Streets and Complete Communities in Hawai`i
Aloha Streets: Complete Streets and Complete Communities in Hawai`iAloha Streets: Complete Streets and Complete Communities in Hawai`i
Aloha Streets: Complete Streets and Complete Communities in Hawai`i
 
Urban redevelopment
Urban redevelopmentUrban redevelopment
Urban redevelopment
 
Great streets
Great streetsGreat streets
Great streets
 
Group 1 site analysis presentation slides pbg
Group 1 site analysis presentation slides pbgGroup 1 site analysis presentation slides pbg
Group 1 site analysis presentation slides pbg
 
East Don Trail - Design Concepts
East Don Trail - Design ConceptsEast Don Trail - Design Concepts
East Don Trail - Design Concepts
 
Day1 state of_the_trails_sa
Day1 state of_the_trails_saDay1 state of_the_trails_sa
Day1 state of_the_trails_sa
 
ARSC2016_GRAY_P
ARSC2016_GRAY_PARSC2016_GRAY_P
ARSC2016_GRAY_P
 
Getting Children Riding Again: Making Local Streets Safer for Cycling
Getting Children Riding Again: Making Local Streets Safer for CyclingGetting Children Riding Again: Making Local Streets Safer for Cycling
Getting Children Riding Again: Making Local Streets Safer for Cycling
 

Tartu City Center Planning Challenge

  • 1. Urban Regeneration in Tartu: Connecting Raekoja Plats to River Emajõgi Nahshon Jagroop, Mari Kirss, Michael Longley, Kalyna Paraszczak, & Shawn Rooney
  • 4. Existing Conditions Limited accessibility to river Deterioration of the bridge is evident Structural integrity is questionable Safety along river edge is minimum - Hardscape edge condition along river
  • 5. Existing Conditions Solid landscape Cobblestone limits bicycle access from uneven surface Restaurant seating uses significant amount of public space Lack of greenspace and vegetation Different material textures such as cobblestone, and brick occupy ground surface
  • 6. Existing Conditions Pedestrian access to bridge is hindered Bicycle accessibility is limited by small ramp Pedestrians mainly used ramp instead of stairs
  • 7. Existing Conditions Overgrown trees block view of city square Greenspace ends with bridge towards town square
  • 8. Existing Conditions Vast green space at the eastern connection of Kaarsild There are few places for seating and leisure within the park The central multi-use path in Ülejõe Park lacks lighting and is dark during evening hours Safety is a concern
  • 9. Goals 1. Increase pedestrian access to Emajõgi and Raekoja Plats 2. Increase green space within central square 3. Improve visual connections between Kaarsild and Raekoja Plats 4. Promote greener transportation modes within the city center
  • 13. Make Walking and Bicycling Part of the Business: Walk at work programs - Partner with large employers to design and publicize routes to walk or bike to work - Nortal (2016 most bicycle-friendly company in Tartu) Offer Incentives for Biking and Walking - Mileage clubs Provide a Guide - Walking and bicycling maps Bike Share Implementation Strategies
  • 14. Build on What's There - Expand and plan on Tartu’s existing Bike infrastructure - Idealy make Town Square site (near Taxi’s) & at the end of the mainline of Ülejõe Park Make it Appealing - Bike to Tartuff Movie festival Involve Children and Families - Walk/Bike to school day programs Educational and historical walks or bike tours Bike Share Implementation Strategies Source: www.maaamet.ee
  • 15. Bike Infrastructure in Tartu Examples of potential Bike Share stations in Tartu Source: www.maaamet.ee
  • 16. Bike Infrastructure around Tartu Connectivity to nearby settlements: Lähte (15 km from Tartu) Kõrveküla (6 km from Tartu) Haage (13 km from Tartu) Lohkva (7 km from Tartu) Ülenurme (8 km from Tartu) Külitse (10 km from Tartu) Source: http://www.tartu.ee/data/Tartu_rattakaart_2012_KL-12-029.pdf
  • 17. Promoting Growing Trends: Bike Sharing Addressed Goals - Increases pedestrian access to Emajõgi and Raekoja Plats - Promotes greener transportation modes within site
  • 22. Site Design: Kaarsild Goal: - Provide shade on Kaarsild with a framed cover that blocks morning sun and takes in afternoon sun Source: Google image search Source: Google image search
  • 23. Site Design: Kaarsild Source: http://assets.inhabitat.com/wp-content/blogs.dir/1/files/2010/04/FTL-Solar-Fabric-2.jpg Source: https://maribyhelena.wordpress.com/tag/tantsupeo-proov/ Solar panels on the top Estonian national pattern on the reverse side
  • 24. Site Rejuvenation: Kaarsild Addressed Goals - Increases pedestrian access to Emajõgi and Raekoja Plats - Promotes greener transportation modes within site - Improves visual connections between Kaarsild and Raekoja Plats
  • 25. Site Design: Walkability & Bicycle Access
  • 26. Site Design: Walkability & Bicycle Access
  • 27. Site Design: Walkability & Bicycle Access
  • 28. Site Design: Walkability & Bicycle Access
  • 29. Walkability & Bicycle Access Addressed Goals - Increases pedestrian access to Emajõgi and Raekoja Plats - Promotes greener transportation modes within site
  • 30. Site Design: River Emajõgi Access
  • 31. Site Design: River Emajõgi Access
  • 32. Flood Planning In extreme climatic circumstances flooding within site is relatively contained. Daily activities within site are not hindered by flooding
  • 33. River Emajõgi Access Addressed Goals - Increases pedestrian access to Emajõgi and Raekoja Plats - Improves visual connections between Kaarsild and Raekoja Plats
  • 35. Site Design: Raekoja Plats Source: Google image search
  • 36. Site Design: Raekoja Plats Addressed Goals - Increases pedestrian access to Emajõgi and Raekoja Plats - Improves visual connections between Kaarsild and Raekoja Plats
  • 37. Concluding Increase pedestrian access to Emajõgi and Raekoja Plats - Bridge re-design Increase green space within central square - Making Design elements transferable Improve visual connections between Kaarsild and Raekoja Plats - Remove elements that block flow and aesthetic visibility Promote greener transportation modes within the city center - Cont. Bike Share initiatives

Editor's Notes

  1. Little to no access to river. Aesthetic view of bridge is deterioration