TAG Holding LLC’s Proposal for: 
Prepared by and Property of: 
James Price Chuck 
T: 312 507 9792 │ E: james.price.chuck@tagholdingllc.com 
A: 5000 N. Marine Dr., Chicago IL 60640 
09/05/2014 
1
Page  2 
1.4 Project Need Improvement needs vary throughout the seven-mile study area and fall into one of five categories: 
•Improve safety for all users. 
•Improve mobility for all users. 
•Address infrastructure deficiencies. 
•Improve access and circulation. 
•Improve modal connections and opportunities. 
Source: http://www.northlakeshoredrive.org/
Page  3 
Situation 
Lake Shore Drive is an essential Chicago artery with more than 150K vehicles per day 
Roadway designed 100 years ago and unable to handle traffic demand 
Congestion, curves and potholes cause crashes and gridlock that have negative social and economic costs 
Physically seperates City from its Lakefront 
Negatively impacts viewsheds, environment and property values 
On/off ramps create dangerous interactions with Lakefront Trail users 
High Usage and Congestion 
A Grey Divide 
5700N 
Red = > 100K vehicles ave/day 
Central Business District & Tourism 
Highest Value Residential & Recreational 
A 12-lane 250 foot – wide 
barrier 
Source: Illinois Department of Transportation
Page  4 
Opportunity to Elevate Chicago 
Immerse Outer Drive in offshore two-level tunnel in shallow trench; eliminate weather impact from road conditions 
Expand Outer Drive to 6-lanes each direction; upgrade access points to alieviate congestion and stoppage risks 
Construct segments offsite at Port of Chicago; float into place. No disruption to the Drive while new one is prepared. 
Create 1000s of jobs via PPP Private, State, Federal funding 
Gain 80 acres of lakefront park and car-free Lakefront Trail 
Cover tunnel with beach erosion-prevention technology 
Lake Depth 
Immersed Tunnel Cross-Section 
Transformative Outcome 
Shallow depth and soft lakebed are optimal for immersed tunnel 
Protection layer 
General fill 
Locking fill 
Gravel bed 
Existing lakebed
Page  5 
Source: Ramboll Group 
Note: Not actual NLSD render. For illustrative purposes only 
6-lanes on two-levels of stacked tunnel + corridors for light rail and/or bus rapid transit 
NLSD-I capacity 2x greater than today; 300,000 cars a day without congestion 
New ingress/egress access to or “under and past” Inner Drive eliminate bottlenecks 
80 acres of parks and expanded auto-free Lakefront Trail for safe capacity increase 
Existing lakebed
Page  6 
What? 
An immersed tunnel is an underwater tunnel composed of segments made of steel or cast iron tubes lined with concrete using conventional shipbuilding techniques. 
Immersed tunnels are used in conjunction with other forms of tunnel at their ends to continue the tunnel from near the water's edge to the at-grade on-land surface. 
How? 
1.The tunnel is made up of separate, prefabricated segments that are produced offsite and sealed at each end with bulkheads so that they can float like a boat. 
2.In parallel to segment production, an underwater trench is dredged and graded along the tunnel’s planned route. 
3.When a trench section and its specific segments are ready, the segments are floated to the appropriate location above the trench, then slowly sunk into place. Once in place, they are aligned and connected to the adjacent segment(s). 
4.After a segment is connected, a water-tight seal is created between adjacent segments, the tunnel is emptied of water and the underwater trench is then backfilled and any necessary protection is installed. 
5.Once the immersed tunnel is connected and sealed airtight from end to end, it is linked to its bored or above-ground access points. Once these connections are completed, then the roadway/infrastructure inside the tunnel can be constructed. 
Where? 
USA: New York City’s 63rd St. 4-bore rail tunnel; San Francisco’s TransBay subway rail tunnel; Oakland’s subway rail tunnel; Baltimore’s 4-tube Fort McHenry tunnel; Detroit-Windsor 2-lane auto tunnel; Boston’s Ted Williams 3-lane auto tunnel. 
Global: Montreal, Denmark, Sweden, Netherlands, Germany, Sydney, UK, Japan.
Page  7 
= Man-made underwater and underground access island 
Returns to above- ground, existing Lake Shore Drive at Montrose Avenue 
Returns to above- ground, existing 
Lake Shore Drive at Grand Avenue 
Access points feed into existing roadways via “merge/yield” instead of stop lights
Page  8 
Segments produced at Port of Chicago 
Segments floated into place 
Segments placed into trench, roadway installed and connected to access points 
1a. Segment Production 
5. Roadway Installation 
4. Tunnel Preparation 
3. Segment Submersion 
2. Segment Transportation 
1b. Trench Preparation 
Images: Creative Commons and Ramboll Group
Page  9 
Segment 
Investment 
Income 
A 
Montrose Avenue - Fullerton Avenue 
Montrose Access Ramp (1640 ft) 
10,838,443 
One-way Toll 
$1.00 
Immersed Tunnel 
1,065,340,909 
Tolls / Day 
130,000 
Fullerton Access Ramp (1640 ft) 
10,838,443 
Days / Year 
365 
Contingency Reserve 
27,175,445 
Toll Income / Year 
$47,450,000 
Segment Cost 
$ 1,114,193,240 
Payback Period 
23.5 years 
B 
Fullerton Avenue - North Avenue 
Fullerton Access Ramp (1640 ft) 
10,838,443 
One-way Toll 
$0.75 
Immersed Tunnel 
349,431,818 
Tolls / Day 
145,000 
North Avenue Access Ramp (1640 ft) 
10,838,443 
Days / Year 
365 
Contingency Reserve 
9,277,718 
Toll Income / Year 
$39,693,750 
Segment Cost 
$ 380,386,422 
Payback Period 
9.6 years 
C 
North Avenue - Oak Street 
North Avenue Access Ramp (1640 ft) 
10,838,443 
One-way Toll 
$0.75 
Immersed Tunnel 
242,897,727 
Tolls / Day 
125,000 
Oak Street Access Ramp (1640 ft) 
10,838,443 
Days / Year 
365 
Contingency Reserve 
6,614,365 
Toll Income / Year 
$34,218,750 
Segment Cost 
$ 271,188,979 
Payback Period 
7.9 years 
D 
Oak Street - Grand Avenue 
Oak Street Access Ramp (1640 ft) 
10,838,443 
One-way Toll 
$0.75 
Immersed Tunnel 
370,738,636 
Tolls / Day 
105,000 
Grand Avenue Access Ramp (1640 ft) 
10,838,443 
Days / Year 
365 
Contingency Reserve 
9,810,388 
Toll Income / Year 
$28,743,750 
Segment Cost 
$ 402,225,910 
Payback Period 
14.0 years 
E 
Project Design and Management 
Initial Feasibility Study 
175,000 
New Parkland 
80 acres 
Project Preparation and Management 
73,083,589 
Time to Construct 
2 years 
Cost 
$ 73,258,589 
Total Project Budget 
$ 2,241,253,139 
Project Payback Period 
13.7 years
Page  10 
World-Class Partners 
Global leader in tunnel analysis, design, engineering, advisory and project mgmt; designed and currently leading implementation of 11 mile immersed tunnel (Fehmarn Belt Tunnel); large-scale project experience in Chicago 
Largest Chicago-based general contracting, construction mgmt, and design-build firm with relevant experience in civil and transportation 
Premier Chicago-based regional development think-tank with expertise in transportation, environmental management and innovative infrastructure finance 
Timelines 
NLSD project management: 
–2014: Identify and evaluate alternatives 
–2015: Alternatives carried forward 
–2016: Select Preferred Alternative 
–2017: Obtain environmental and design approvals 
TAG Holding’s Immersed Tunnel (I.T.) Team: 
–2014: Provide IDOT with I.T. proposal 
–2015: Provide IDOT with additional I.T. Information and Ramboll offer to perform feasibility analysis for $175,000 
–2016: If I.T. is selected, then develop detailed design and engineering plans; work closely with DOTs to redesign and prepare access points 
–2017: Obtain environmental and design approvals, prepare Port of Chicago I.T. segment production 
–2018+19: Manufacture segments, prepare lakebed trench, complete tunnel installation, begin roadway fitting and connect to access points 
–2020: Complete roadway, open new I.T. Outer Drive 
NSDL project management and DOTs: 
–2020+21: close and remove former Outer Drive roadway, enhance Lakefront Trail and Inner Drive, recover 80 acres parkland
Page  11 
TAG Holding’s proposed solution for evolving North Lake Shore Drive through the use of a two-level, stacked offshore immersed tunnel meets and exceeds the defined NLSD Project Needs for safety, mobility, addressing deficiencies, and improving access, circulation and model connections and opportunities. 
TAG’s solution resolves the myriad micro-problems with NLSD’s current design in one fell swoop and strategically elevates Chicago by: 
1.Eliminating a highway from its visible downtown Lakefront 
2.Creating the space for profound Inner Drive and Lakefront Trail improvements 
3.Increasing Lincoln Park’s area 7% with 80 new acres. 
By making use of existing tunnel technology in an innovative manner, TAG’s solution elevates Chicago to a level of global leadership in multi-modal transportation infrastructure. Leveraging innovative infrastructure finance for the $2.2 billion PPP budget provides the capital needed to invest in job creation and preparing Chicago and the metro region for a more sustainable future. And the pay-per-use toll model via I-Pass enables a sub-14 year project payback period. 
If we are to follow Daniel Burnham and “make no little plans”, then TAG’s immersed tunnel solution should be selected as the preferred alternative and implemented over two years by 2020. Thank you for your time and consideration.
TAG Holding LLC’s Proposal for: 
12 
Prepared by and Property of: 
James Price Chuck 
T: 312 507 9792 
E: james.price.chuck@tagholdingllc.com 
A: 5000 N. Marine Dr., Chicago IL 60640 
Disclaimer: Some statements made or information contained in this presentation are forward-looking in nature. As such, they are subject to certain risks and uncertainties, many of which are beyond the control of TAG Holding Alpha LLC. This could cause the actual results to differ from those referenced, projected or contemplated herein.

More Related Content

What's hot

About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen PowerpointHayley Sharp
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen PowerpointMay Begum
 
Padma Brige Project 2017 Slide
Padma Brige Project 2017 Slide Padma Brige Project 2017 Slide
Padma Brige Project 2017 Slide
RJ Sajeeb
 
RCTC & AGC: A Lasting Partnership (A. Mayer)
RCTC & AGC: A Lasting Partnership (A. Mayer)RCTC & AGC: A Lasting Partnership (A. Mayer)
RCTC & AGC: A Lasting Partnership (A. Mayer)
AGC of California
 
2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-en2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-en
Teresa Elliott
 
2013 PTI Project Awards
2013 PTI Project Awards2013 PTI Project Awards
2013 PTI Project Awards
PostTensioningInstitute
 
14.30 tarek shuaib, pace
14.30 tarek shuaib, pace14.30 tarek shuaib, pace
14.30 tarek shuaib, pace
Ibrahim Al-Hudhaif
 
Tim Lindholm Metro
Tim Lindholm MetroTim Lindholm Metro
Tim Lindholm MetroMike Flynn
 
2015 Excellence in Infrastructure Submissions
2015 Excellence in Infrastructure Submissions2015 Excellence in Infrastructure Submissions
2015 Excellence in Infrastructure Submissions
Autodesk AEC
 
Decommissioning: The Benefits, Risks and Liabilities
Decommissioning: The Benefits, Risks and LiabilitiesDecommissioning: The Benefits, Risks and Liabilities
Decommissioning: The Benefits, Risks and Liabilities
TRC Companies, Inc.
 
Group 06 Development Presentation
Group 06 Development PresentationGroup 06 Development Presentation
Group 06 Development PresentationGP Design PS
 
Hampton Jitney Terminal - Butler Manufacturing
Hampton Jitney Terminal - Butler ManufacturingHampton Jitney Terminal - Butler Manufacturing
Hampton Jitney Terminal - Butler Manufacturing
Butler Manufacturing - East Region
 
BC Sir John A. MacDonald BC In A Pet.
BC Sir John A. MacDonald BC In A Pet.BC Sir John A. MacDonald BC In A Pet.
BC Sir John A. MacDonald BC In A Pet.
P. Anna Paddon
 
Construction Choreography
Construction ChoreographyConstruction Choreography
Construction Choreography
Michael Fishman
 
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Miami-Dade Transportation Planning Organization
 
Brookfield Park Wet Pond Construction
Brookfield Park Wet Pond ConstructionBrookfield Park Wet Pond Construction
Brookfield Park Wet Pond Construction
Fairfax County
 
110314_Tunnel_VE-Javad_Akhtar
110314_Tunnel_VE-Javad_Akhtar110314_Tunnel_VE-Javad_Akhtar
110314_Tunnel_VE-Javad_AkhtarJavad Akhtar
 
Sb s written report cjm46
Sb s written report cjm46Sb s written report cjm46
Sb s written report cjm46
cjm46
 
Space 134 - FAQs
Space 134 - FAQsSpace 134 - FAQs

What's hot (20)

About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen Powerpoint
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen Powerpoint
 
Padma Brige Project 2017 Slide
Padma Brige Project 2017 Slide Padma Brige Project 2017 Slide
Padma Brige Project 2017 Slide
 
RCTC & AGC: A Lasting Partnership (A. Mayer)
RCTC & AGC: A Lasting Partnership (A. Mayer)RCTC & AGC: A Lasting Partnership (A. Mayer)
RCTC & AGC: A Lasting Partnership (A. Mayer)
 
2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-en2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-en
 
2013 PTI Project Awards
2013 PTI Project Awards2013 PTI Project Awards
2013 PTI Project Awards
 
14.30 tarek shuaib, pace
14.30 tarek shuaib, pace14.30 tarek shuaib, pace
14.30 tarek shuaib, pace
 
Tim Lindholm Metro
Tim Lindholm MetroTim Lindholm Metro
Tim Lindholm Metro
 
chey 5-29-15
chey 5-29-15chey 5-29-15
chey 5-29-15
 
2015 Excellence in Infrastructure Submissions
2015 Excellence in Infrastructure Submissions2015 Excellence in Infrastructure Submissions
2015 Excellence in Infrastructure Submissions
 
Decommissioning: The Benefits, Risks and Liabilities
Decommissioning: The Benefits, Risks and LiabilitiesDecommissioning: The Benefits, Risks and Liabilities
Decommissioning: The Benefits, Risks and Liabilities
 
Group 06 Development Presentation
Group 06 Development PresentationGroup 06 Development Presentation
Group 06 Development Presentation
 
Hampton Jitney Terminal - Butler Manufacturing
Hampton Jitney Terminal - Butler ManufacturingHampton Jitney Terminal - Butler Manufacturing
Hampton Jitney Terminal - Butler Manufacturing
 
BC Sir John A. MacDonald BC In A Pet.
BC Sir John A. MacDonald BC In A Pet.BC Sir John A. MacDonald BC In A Pet.
BC Sir John A. MacDonald BC In A Pet.
 
Construction Choreography
Construction ChoreographyConstruction Choreography
Construction Choreography
 
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
Okeechobee Road from Krome Avenue to NW 79 Avenue PD&E Study presentation, Ju...
 
Brookfield Park Wet Pond Construction
Brookfield Park Wet Pond ConstructionBrookfield Park Wet Pond Construction
Brookfield Park Wet Pond Construction
 
110314_Tunnel_VE-Javad_Akhtar
110314_Tunnel_VE-Javad_Akhtar110314_Tunnel_VE-Javad_Akhtar
110314_Tunnel_VE-Javad_Akhtar
 
Sb s written report cjm46
Sb s written report cjm46Sb s written report cjm46
Sb s written report cjm46
 
Space 134 - FAQs
Space 134 - FAQsSpace 134 - FAQs
Space 134 - FAQs
 

Similar to Proposal to reclaim Chicago's lakefront from the highway using immersed tunnels

Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank
 
20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_awardSamat Jain
 
APWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line StationAPWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line Station
T.Y. Lin International
 
NJFuture Redevelopment Forum 13 Infrastructure Tregoning
NJFuture Redevelopment Forum 13 Infrastructure TregoningNJFuture Redevelopment Forum 13 Infrastructure Tregoning
NJFuture Redevelopment Forum 13 Infrastructure TregoningNew Jersey Future
 
2014 IRF GRAA Winners
2014 IRF GRAA Winners2014 IRF GRAA Winners
2014 IRF GRAA Winners
Lars Forslöf
 
Devore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 finalDevore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 finalvvchamber123
 
Public Forum 2 - Display Boards
Public Forum 2 - Display BoardsPublic Forum 2 - Display Boards
Public Forum 2 - Display BoardsGardinerEast
 
Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017
Crosstown TO
 
"News and Views" newsletter
"News and Views" newsletter "News and Views" newsletter
"News and Views" newsletter
Maribel Castillo
 
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-FlowTA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-FlowMark Oberschmidt
 
City of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter ProjectCity of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter Project
City of Salina
 
Final DCP
Final DCPFinal DCP
Final DCP
ejjeff
 
City of orlando db colonial ped overpass technical
City of orlando db colonial ped overpass   technicalCity of orlando db colonial ped overpass   technical
City of orlando db colonial ped overpass technical
Brendan O'Connor
 
Gardiner short briefing package
Gardiner   short briefing packageGardiner   short briefing package
Gardiner short briefing package
WaterfrontTO
 
Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010
Daniel X. O'Neil
 
228 congressparkway overview_jan2010
228 congressparkway overview_jan2010228 congressparkway overview_jan2010
228 congressparkway overview_jan2010
Daniel X. O'Neil
 
Campbellford Bridge Detailed Design Council Update.pdf
Campbellford Bridge Detailed Design Council Update.pdfCampbellford Bridge Detailed Design Council Update.pdf
Campbellford Bridge Detailed Design Council Update.pdf
KatrinaMcCullough2
 
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Crosstown TO
 
Caledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCaledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 final
Crosstown TO
 

Similar to Proposal to reclaim Chicago's lakefront from the highway using immersed tunnels (20)

Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015
 
20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award20120201 061327 multi-use_trail_bid_award
20120201 061327 multi-use_trail_bid_award
 
APWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line StationAPWA Reporter - Cermak-McCormick Place Elevated Green Line Station
APWA Reporter - Cermak-McCormick Place Elevated Green Line Station
 
NJFuture Redevelopment Forum 13 Infrastructure Tregoning
NJFuture Redevelopment Forum 13 Infrastructure TregoningNJFuture Redevelopment Forum 13 Infrastructure Tregoning
NJFuture Redevelopment Forum 13 Infrastructure Tregoning
 
2014 IRF GRAA Winners
2014 IRF GRAA Winners2014 IRF GRAA Winners
2014 IRF GRAA Winners
 
Devore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 finalDevore vvcc feb 13 2013 final
Devore vvcc feb 13 2013 final
 
Public Forum 2 - Display Boards
Public Forum 2 - Display BoardsPublic Forum 2 - Display Boards
Public Forum 2 - Display Boards
 
Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017
 
"News and Views" newsletter
"News and Views" newsletter "News and Views" newsletter
"News and Views" newsletter
 
Removing Toronto's Expressway One Piece at a Time
Removing Toronto's Expressway One Piece at a TimeRemoving Toronto's Expressway One Piece at a Time
Removing Toronto's Expressway One Piece at a Time
 
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-FlowTA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
 
City of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter ProjectCity of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter Project
 
Final DCP
Final DCPFinal DCP
Final DCP
 
City of orlando db colonial ped overpass technical
City of orlando db colonial ped overpass   technicalCity of orlando db colonial ped overpass   technical
City of orlando db colonial ped overpass technical
 
Gardiner short briefing package
Gardiner   short briefing packageGardiner   short briefing package
Gardiner short briefing package
 
Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010Congress Parkway Construction Overview, January 2010
Congress Parkway Construction Overview, January 2010
 
228 congressparkway overview_jan2010
228 congressparkway overview_jan2010228 congressparkway overview_jan2010
228 congressparkway overview_jan2010
 
Campbellford Bridge Detailed Design Council Update.pdf
Campbellford Bridge Detailed Design Council Update.pdfCampbellford Bridge Detailed Design Council Update.pdf
Campbellford Bridge Detailed Design Council Update.pdf
 
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
 
Caledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 finalCaledonia Fairbank Oakwood Open House Deck October 2017 final
Caledonia Fairbank Oakwood Open House Deck October 2017 final
 

Recently uploaded

FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance
 
20240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 202420240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 2024
Matthew Sinclair
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
91mobiles
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
James Anderson
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
Neo4j
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
Kari Kakkonen
 
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
Neo4j
 
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Nexer Digital
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
DianaGray10
 
Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
DianaGray10
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Albert Hoitingh
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
ControlCase
 
GraphSummit Singapore | The Art of the Possible with Graph - Q2 2024
GraphSummit Singapore | The Art of the  Possible with Graph - Q2 2024GraphSummit Singapore | The Art of the  Possible with Graph - Q2 2024
GraphSummit Singapore | The Art of the Possible with Graph - Q2 2024
Neo4j
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
Adtran
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
Neo4j
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
Aftab Hussain
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
KatiaHIMEUR1
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
Matthew Sinclair
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Aggregage
 

Recently uploaded (20)

FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
 
20240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 202420240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 2024
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
 
Climate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing DaysClimate Impact of Software Testing at Nordic Testing Days
Climate Impact of Software Testing at Nordic Testing Days
 
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
GraphSummit Singapore | The Future of Agility: Supercharging Digital Transfor...
 
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?
 
UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5UiPath Test Automation using UiPath Test Suite series, part 5
UiPath Test Automation using UiPath Test Suite series, part 5
 
Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1Communications Mining Series - Zero to Hero - Session 1
Communications Mining Series - Zero to Hero - Session 1
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
 
PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
 
GraphSummit Singapore | The Art of the Possible with Graph - Q2 2024
GraphSummit Singapore | The Art of the  Possible with Graph - Q2 2024GraphSummit Singapore | The Art of the  Possible with Graph - Q2 2024
GraphSummit Singapore | The Art of the Possible with Graph - Q2 2024
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
 
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
GraphSummit Singapore | Enhancing Changi Airport Group's Passenger Experience...
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
 

Proposal to reclaim Chicago's lakefront from the highway using immersed tunnels

  • 1. TAG Holding LLC’s Proposal for: Prepared by and Property of: James Price Chuck T: 312 507 9792 │ E: james.price.chuck@tagholdingllc.com A: 5000 N. Marine Dr., Chicago IL 60640 09/05/2014 1
  • 2. Page  2 1.4 Project Need Improvement needs vary throughout the seven-mile study area and fall into one of five categories: •Improve safety for all users. •Improve mobility for all users. •Address infrastructure deficiencies. •Improve access and circulation. •Improve modal connections and opportunities. Source: http://www.northlakeshoredrive.org/
  • 3. Page  3 Situation Lake Shore Drive is an essential Chicago artery with more than 150K vehicles per day Roadway designed 100 years ago and unable to handle traffic demand Congestion, curves and potholes cause crashes and gridlock that have negative social and economic costs Physically seperates City from its Lakefront Negatively impacts viewsheds, environment and property values On/off ramps create dangerous interactions with Lakefront Trail users High Usage and Congestion A Grey Divide 5700N Red = > 100K vehicles ave/day Central Business District & Tourism Highest Value Residential & Recreational A 12-lane 250 foot – wide barrier Source: Illinois Department of Transportation
  • 4. Page  4 Opportunity to Elevate Chicago Immerse Outer Drive in offshore two-level tunnel in shallow trench; eliminate weather impact from road conditions Expand Outer Drive to 6-lanes each direction; upgrade access points to alieviate congestion and stoppage risks Construct segments offsite at Port of Chicago; float into place. No disruption to the Drive while new one is prepared. Create 1000s of jobs via PPP Private, State, Federal funding Gain 80 acres of lakefront park and car-free Lakefront Trail Cover tunnel with beach erosion-prevention technology Lake Depth Immersed Tunnel Cross-Section Transformative Outcome Shallow depth and soft lakebed are optimal for immersed tunnel Protection layer General fill Locking fill Gravel bed Existing lakebed
  • 5. Page  5 Source: Ramboll Group Note: Not actual NLSD render. For illustrative purposes only 6-lanes on two-levels of stacked tunnel + corridors for light rail and/or bus rapid transit NLSD-I capacity 2x greater than today; 300,000 cars a day without congestion New ingress/egress access to or “under and past” Inner Drive eliminate bottlenecks 80 acres of parks and expanded auto-free Lakefront Trail for safe capacity increase Existing lakebed
  • 6. Page  6 What? An immersed tunnel is an underwater tunnel composed of segments made of steel or cast iron tubes lined with concrete using conventional shipbuilding techniques. Immersed tunnels are used in conjunction with other forms of tunnel at their ends to continue the tunnel from near the water's edge to the at-grade on-land surface. How? 1.The tunnel is made up of separate, prefabricated segments that are produced offsite and sealed at each end with bulkheads so that they can float like a boat. 2.In parallel to segment production, an underwater trench is dredged and graded along the tunnel’s planned route. 3.When a trench section and its specific segments are ready, the segments are floated to the appropriate location above the trench, then slowly sunk into place. Once in place, they are aligned and connected to the adjacent segment(s). 4.After a segment is connected, a water-tight seal is created between adjacent segments, the tunnel is emptied of water and the underwater trench is then backfilled and any necessary protection is installed. 5.Once the immersed tunnel is connected and sealed airtight from end to end, it is linked to its bored or above-ground access points. Once these connections are completed, then the roadway/infrastructure inside the tunnel can be constructed. Where? USA: New York City’s 63rd St. 4-bore rail tunnel; San Francisco’s TransBay subway rail tunnel; Oakland’s subway rail tunnel; Baltimore’s 4-tube Fort McHenry tunnel; Detroit-Windsor 2-lane auto tunnel; Boston’s Ted Williams 3-lane auto tunnel. Global: Montreal, Denmark, Sweden, Netherlands, Germany, Sydney, UK, Japan.
  • 7. Page  7 = Man-made underwater and underground access island Returns to above- ground, existing Lake Shore Drive at Montrose Avenue Returns to above- ground, existing Lake Shore Drive at Grand Avenue Access points feed into existing roadways via “merge/yield” instead of stop lights
  • 8. Page  8 Segments produced at Port of Chicago Segments floated into place Segments placed into trench, roadway installed and connected to access points 1a. Segment Production 5. Roadway Installation 4. Tunnel Preparation 3. Segment Submersion 2. Segment Transportation 1b. Trench Preparation Images: Creative Commons and Ramboll Group
  • 9. Page  9 Segment Investment Income A Montrose Avenue - Fullerton Avenue Montrose Access Ramp (1640 ft) 10,838,443 One-way Toll $1.00 Immersed Tunnel 1,065,340,909 Tolls / Day 130,000 Fullerton Access Ramp (1640 ft) 10,838,443 Days / Year 365 Contingency Reserve 27,175,445 Toll Income / Year $47,450,000 Segment Cost $ 1,114,193,240 Payback Period 23.5 years B Fullerton Avenue - North Avenue Fullerton Access Ramp (1640 ft) 10,838,443 One-way Toll $0.75 Immersed Tunnel 349,431,818 Tolls / Day 145,000 North Avenue Access Ramp (1640 ft) 10,838,443 Days / Year 365 Contingency Reserve 9,277,718 Toll Income / Year $39,693,750 Segment Cost $ 380,386,422 Payback Period 9.6 years C North Avenue - Oak Street North Avenue Access Ramp (1640 ft) 10,838,443 One-way Toll $0.75 Immersed Tunnel 242,897,727 Tolls / Day 125,000 Oak Street Access Ramp (1640 ft) 10,838,443 Days / Year 365 Contingency Reserve 6,614,365 Toll Income / Year $34,218,750 Segment Cost $ 271,188,979 Payback Period 7.9 years D Oak Street - Grand Avenue Oak Street Access Ramp (1640 ft) 10,838,443 One-way Toll $0.75 Immersed Tunnel 370,738,636 Tolls / Day 105,000 Grand Avenue Access Ramp (1640 ft) 10,838,443 Days / Year 365 Contingency Reserve 9,810,388 Toll Income / Year $28,743,750 Segment Cost $ 402,225,910 Payback Period 14.0 years E Project Design and Management Initial Feasibility Study 175,000 New Parkland 80 acres Project Preparation and Management 73,083,589 Time to Construct 2 years Cost $ 73,258,589 Total Project Budget $ 2,241,253,139 Project Payback Period 13.7 years
  • 10. Page  10 World-Class Partners Global leader in tunnel analysis, design, engineering, advisory and project mgmt; designed and currently leading implementation of 11 mile immersed tunnel (Fehmarn Belt Tunnel); large-scale project experience in Chicago Largest Chicago-based general contracting, construction mgmt, and design-build firm with relevant experience in civil and transportation Premier Chicago-based regional development think-tank with expertise in transportation, environmental management and innovative infrastructure finance Timelines NLSD project management: –2014: Identify and evaluate alternatives –2015: Alternatives carried forward –2016: Select Preferred Alternative –2017: Obtain environmental and design approvals TAG Holding’s Immersed Tunnel (I.T.) Team: –2014: Provide IDOT with I.T. proposal –2015: Provide IDOT with additional I.T. Information and Ramboll offer to perform feasibility analysis for $175,000 –2016: If I.T. is selected, then develop detailed design and engineering plans; work closely with DOTs to redesign and prepare access points –2017: Obtain environmental and design approvals, prepare Port of Chicago I.T. segment production –2018+19: Manufacture segments, prepare lakebed trench, complete tunnel installation, begin roadway fitting and connect to access points –2020: Complete roadway, open new I.T. Outer Drive NSDL project management and DOTs: –2020+21: close and remove former Outer Drive roadway, enhance Lakefront Trail and Inner Drive, recover 80 acres parkland
  • 11. Page  11 TAG Holding’s proposed solution for evolving North Lake Shore Drive through the use of a two-level, stacked offshore immersed tunnel meets and exceeds the defined NLSD Project Needs for safety, mobility, addressing deficiencies, and improving access, circulation and model connections and opportunities. TAG’s solution resolves the myriad micro-problems with NLSD’s current design in one fell swoop and strategically elevates Chicago by: 1.Eliminating a highway from its visible downtown Lakefront 2.Creating the space for profound Inner Drive and Lakefront Trail improvements 3.Increasing Lincoln Park’s area 7% with 80 new acres. By making use of existing tunnel technology in an innovative manner, TAG’s solution elevates Chicago to a level of global leadership in multi-modal transportation infrastructure. Leveraging innovative infrastructure finance for the $2.2 billion PPP budget provides the capital needed to invest in job creation and preparing Chicago and the metro region for a more sustainable future. And the pay-per-use toll model via I-Pass enables a sub-14 year project payback period. If we are to follow Daniel Burnham and “make no little plans”, then TAG’s immersed tunnel solution should be selected as the preferred alternative and implemented over two years by 2020. Thank you for your time and consideration.
  • 12. TAG Holding LLC’s Proposal for: 12 Prepared by and Property of: James Price Chuck T: 312 507 9792 E: james.price.chuck@tagholdingllc.com A: 5000 N. Marine Dr., Chicago IL 60640 Disclaimer: Some statements made or information contained in this presentation are forward-looking in nature. As such, they are subject to certain risks and uncertainties, many of which are beyond the control of TAG Holding Alpha LLC. This could cause the actual results to differ from those referenced, projected or contemplated herein.