SAFE WORK PROCEDURE
Issue Date : 15th
Feb 2016
Last Reviewed : 13th
Jan 2016
Next Reviewed Date : 15th
Aug 2017
Page:1 of 12
Authorised By: Ng Say Kok & Ng Say Kiat (General Managers)
Work Description : Jacking of articulated dumper truck
Location : Various sites
Insert Image If Applicable; See below diagrams
Potential Hazards: Topplingof vehicledue to
unstable groundandcrushinghazard
PersonalProtective Equipment (PPE) Required (Checkthe box for required PPE):
Work
Gloves/
Welding
Gloves
Respirator
Eye
Protection
Face
Protection/
Welding
Mask
Safety Boot
Safety
Helmet
Hearing
Protection
Safety
Harness/Belt
Protective
Clothing
Safety
Vest/Life
Jacket
√    √ √    √
Machine / Equipment / Work Tools:
1. Hydraulic jack
2. Wooden block
3. Support stand
4. Air compressor machine
Safe Work Procedure Checklist:
1. PRE-Operation:
 Task (e.g. Drawings, instructions, specifications, hazards etc.) is clearly understood.
 Plan an escape route in case the machinery topple down.
 Inspect work area and ensure the machinery is parked on stable and level ground. Provision
of steel plate when on site.
SAFE WORK PROCEDURE
Issue Date : 15th
Feb 2016
Last Reviewed : 13th
Jan 2016
Next Reviewed Date : 15th
Aug 2017
Page:2 of 12
Authorised By: Ng Say Kok & Ng Say Kiat (General Managers)
 Move the parking brake on ENGAGE position.
 Ensure the dump body is empty before the machine is jacked up.
 Ensure the dump body has been lowered down.
SAFE WORK PROCEDURE
Issue Date : 15th
Feb 2016
Last Reviewed : 13th
Jan 2016
Next Reviewed Date : 15th
Aug 2017
Page:3 of 12
Authorised By: Ng Say Kok & Ng Say Kiat (General Managers)
 Stop the engine, remove the key and keep it.
 Perform Lock Out Tag Out (LOTO) and ensure machines have been isolated from power
sources before jacking up the machinery.
 Inspect hydraulic jack. Use correct hydraulic jack that can support the weight of the machine.
Ensure there’s no leaking and in working condition.
SAFE WORK PROCEDURE
Issue Date : 15th
Feb 2016
Last Reviewed : 13th
Jan 2016
Next Reviewed Date : 15th
Aug 2017
Page:4 of 12
Authorised By: Ng Say Kok & Ng Say Kiat (General Managers)
 Use 40Ton hydraulic jack (or above) for dump truck model 730
 Use 50Ton hydraulic jack (or above) for dump truck model 740 and model 745
SAFE WORK PROCEDURE
Issue Date : 15th
Feb 2016
Last Reviewed : 13th
Jan 2016
Next Reviewed Date : 15th
Aug 2017
Page:5 of 12
Authorised By: Ng Say Kok & Ng Say Kiat (General Managers)
 Inspect wooden blocks and ensure there’s no sign of severe damage.
 Place wooden blocks or wheel chocks to prevent vehicle from rolling.
SAFE WORK PROCEDURE
Issue Date : 15th
Feb 2016
Last Reviewed : 13th
Jan 2016
Next Reviewed Date : 15th
Aug 2017
Page:6 of 12
Authorised By: Ng Say Kok & Ng Say Kiat (General Managers)
 Due to height limitation of some hydraulic jacks, wooden block may be place in between the
firm ground and hydraulic jack. Inspect wooden blocks and ensure the wooden block’s
surface is not slippery/oily and ensure there’s no sign of termite attack/cracked/ decayed/
split/rot or any sign of severe damage on the timber which may pose risk of failure while
jacking up the dumper truck. Only use wooden block that is no less then 500mm in length
and 250mm in width as support.
Minimumum 500mm
Minimum
250mm
SAFE WORK PROCEDURE
Issue Date : 15th
Feb 2016
Last Reviewed : 13th
Jan 2016
Next Reviewed Date : 15th
Aug 2017
Page:7 of 12
Authorised By: Ng Say Kok & Ng Say Kiat (General Managers)
 Set hydraulic jack and wooden block on firm level ground. If 2 wooden blocks are needed to
support the hydraulic jack, ensure the lower wooden block is bigger or as of the same size
with the upper wooden block and is aligned straight upright.
SAFE WORK PROCEDURE
Issue Date : 15th
Feb 2016
Last Reviewed : 13th
Jan 2016
Next Reviewed Date : 15th
Aug 2017
Page:8 of 12
Authorised By: Ng Say Kok & Ng Say Kiat (General Managers)
2. Operation:
 Conduct pre-operational checks on the air compressor.
 Hook up air hose from the air compressor to the hydraulic jack.
 Press lever/switch to raise the hydraulic jack.
SAFE WORK PROCEDURE
Issue Date : 15th
Feb 2016
Last Reviewed : 13th
Jan 2016
Next Reviewed Date : 15th
Aug 2017
Page:9 of 12
Authorised By: Ng Say Kok & Ng Say Kiat (General Managers)
 Do not stand beside the machinery while jacking up the machinery. Stand 2 metres away at
the front or back of the machinery to escape in case of the machinery topple down.
 Inspect the support stand and look out for sign of severe corrosion, cracked or any sign of
severe damage.
SAFE WORK PROCEDURE
Issue Date : 15th
Feb 2016
Last Reviewed : 13th
Jan 2016
Next Reviewed Date : 15th
Aug 2017
Page:10 of 12
Authorised By: Ng Say Kok & Ng Say Kiat (General Managers)
 Ensure the correct stand is use to withstand the weight of the dumper truck.
SAFE WORK PROCEDURE
Issue Date : 15th
Feb 2016
Last Reviewed : 13th
Jan 2016
Next Reviewed Date : 15th
Aug 2017
Page:11 of 12
Authorised By: Ng Say Kok & Ng Say Kiat (General Managers)
 Inspect wooden blocks and ensure the wooden block’s surface is not slippery/oily and ensure
there’s no sign of termite attack/cracked/ decayed/ split/rot or any sign of severe damage on
the timber which may pose risk of failure while jacking up the dumper truck. Only use wooden
block that is no less then 500mm in length and 250mm in width as support.
 Set the support stand on top of the wooden block(s) and (if applicable) place wooden piece
or block on top of the support stand to protect undercarriage and to prevent it from slipping
or damage.
 Besides the main support stand below the front axle/ frame or rear axle/ frame, extra support
stand may be place if needed to ensure stability.
 Once all supports are in place, lower the hydraulic jack until the machine is firmly supported
by the support stands and wooden blocks. Ensure the machine is stable before proceeding
to do any maintenance and servicing work on the machine.
SAFE WORK PROCEDURE
Issue Date : 15th
Feb 2016
Last Reviewed : 13th
Jan 2016
Next Reviewed Date : 15th
Aug 2017
Page:12 of 12
Authorised By: Ng Say Kok & Ng Say Kiat (General Managers)
3. POST-Operation:
 Inspect work area and ensure no one is working on top and below the machinery.
 Set hydraulic jack and wooden block on firm level ground. If 2 wooden blocks are needed to
support the hydraulic jack, ensure the lower wooden block is bigger or as of the same size
with the upper wooden block and is aligned straight upright.
 Hook up air hose to the hydraulic jack.
 Do not stand beside the machinery while jacking up the machinery. Stand 2 metres away at
the front or back of the machinery to escape in case of the machinery topple down.
 Press lever/switch to raise the hydraulic jack.
 Remove away all the supports (support stands and wooden blocks).
 Press lever/switch to lower down the hydraulic jack.
 Remove LOTO tag.
 Remove wheel chocks from vehicle.

More Related Content

What's hot

bar bending safety precautions.pdf
bar bending safety precautions.pdfbar bending safety precautions.pdf
bar bending safety precautions.pdf
construction
 
Road Safety and Defensive Driving Training.pptx
Road Safety and Defensive Driving Training.pptxRoad Safety and Defensive Driving Training.pptx
Road Safety and Defensive Driving Training.pptx
Er.Amrut Shipekar
 
Work at height. The basic needs.
Work at height. The basic needs.Work at height. The basic needs.
Work at height. The basic needs.
Sivasubramaniam Subramanian
 
Powered Pallet Jack Safety Poster
Powered Pallet Jack Safety PosterPowered Pallet Jack Safety Poster
Powered Pallet Jack Safety Poster
Forklift Trucks in Minnesota
 
10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates
Dwarika Bhushan Sharma
 
Working at heights
Working at heightsWorking at heights
Working at heights
Chitra Mohanty
 
29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templates29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templates
Dwarika Bhushan Sharma
 
Rules for a safe lifting_operations
Rules for a safe lifting_operationsRules for a safe lifting_operations
Rules for a safe lifting_operations
Wei Chiao Kuo
 
Do’s And Don’ts For Scaffolding Safety
Do’s And Don’ts For Scaffolding SafetyDo’s And Don’ts For Scaffolding Safety
Do’s And Don’ts For Scaffolding Safety
Bromley Scaffolding
 
Mobile Scaffold Training by UAF
Mobile Scaffold Training by UAFMobile Scaffold Training by UAF
Mobile Scaffold Training by UAF
Atlantic Training, LLC.
 
Stairs and Ladders
Stairs and LaddersStairs and Ladders
Stairs and Ladders
FFSafety
 
Flagman Basic Training.pptx
Flagman Basic Training.pptxFlagman Basic Training.pptx
Flagman Basic Training.pptx
HendraKelana2
 
Construction Safety Training
Construction Safety TrainingConstruction Safety Training
Construction Safety Training
Ali Kamal Mostofa Rubel
 
Safe work-at-heights-presentation
Safe work-at-heights-presentationSafe work-at-heights-presentation
Safe work-at-heights-presentation
JulianElbu
 
Mounted Boom Concrete Pump Safety
Mounted Boom Concrete Pump SafetyMounted Boom Concrete Pump Safety
Mounted Boom Concrete Pump Safety
Ali Kamal Mostofa Rubel
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessment
Simba Zhao
 
Work at Height Awareness
Work at Height AwarenessWork at Height Awareness
Work at Height Awareness
Syed Neyaz Ahmad
 
Safety while sandblasting
Safety while sandblastingSafety while sandblasting
Safety while sandblasting
Jack Smith
 
Daily mobile crane inspection checklist
Daily mobile crane inspection checklist  Daily mobile crane inspection checklist
Daily mobile crane inspection checklist
Rahmat Mohamed
 
Ladder Safety- Safety First!
Ladder Safety- Safety First!Ladder Safety- Safety First!
Ladder Safety- Safety First!
davidhongwei
 

What's hot (20)

bar bending safety precautions.pdf
bar bending safety precautions.pdfbar bending safety precautions.pdf
bar bending safety precautions.pdf
 
Road Safety and Defensive Driving Training.pptx
Road Safety and Defensive Driving Training.pptxRoad Safety and Defensive Driving Training.pptx
Road Safety and Defensive Driving Training.pptx
 
Work at height. The basic needs.
Work at height. The basic needs.Work at height. The basic needs.
Work at height. The basic needs.
 
Powered Pallet Jack Safety Poster
Powered Pallet Jack Safety PosterPowered Pallet Jack Safety Poster
Powered Pallet Jack Safety Poster
 
10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates10 use of mobile concrete pump risk assessment templates
10 use of mobile concrete pump risk assessment templates
 
Working at heights
Working at heightsWorking at heights
Working at heights
 
29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templates29 workplace temporary lighting risk assessment templates
29 workplace temporary lighting risk assessment templates
 
Rules for a safe lifting_operations
Rules for a safe lifting_operationsRules for a safe lifting_operations
Rules for a safe lifting_operations
 
Do’s And Don’ts For Scaffolding Safety
Do’s And Don’ts For Scaffolding SafetyDo’s And Don’ts For Scaffolding Safety
Do’s And Don’ts For Scaffolding Safety
 
Mobile Scaffold Training by UAF
Mobile Scaffold Training by UAFMobile Scaffold Training by UAF
Mobile Scaffold Training by UAF
 
Stairs and Ladders
Stairs and LaddersStairs and Ladders
Stairs and Ladders
 
Flagman Basic Training.pptx
Flagman Basic Training.pptxFlagman Basic Training.pptx
Flagman Basic Training.pptx
 
Construction Safety Training
Construction Safety TrainingConstruction Safety Training
Construction Safety Training
 
Safe work-at-heights-presentation
Safe work-at-heights-presentationSafe work-at-heights-presentation
Safe work-at-heights-presentation
 
Mounted Boom Concrete Pump Safety
Mounted Boom Concrete Pump SafetyMounted Boom Concrete Pump Safety
Mounted Boom Concrete Pump Safety
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessment
 
Work at Height Awareness
Work at Height AwarenessWork at Height Awareness
Work at Height Awareness
 
Safety while sandblasting
Safety while sandblastingSafety while sandblasting
Safety while sandblasting
 
Daily mobile crane inspection checklist
Daily mobile crane inspection checklist  Daily mobile crane inspection checklist
Daily mobile crane inspection checklist
 
Ladder Safety- Safety First!
Ladder Safety- Safety First!Ladder Safety- Safety First!
Ladder Safety- Safety First!
 

Similar to Swp for jacking of articulated dumper truck

2006 chevrolet rezzo service repair manual
2006 chevrolet rezzo service repair manual2006 chevrolet rezzo service repair manual
2006 chevrolet rezzo service repair manual
fjjksekksemm
 
2008 chevrolet rezzo service repair manual
2008 chevrolet rezzo service repair manual2008 chevrolet rezzo service repair manual
2008 chevrolet rezzo service repair manual
fjskkmemem
 
2007 chevrolet rezzo service repair manual
2007 chevrolet rezzo service repair manual2007 chevrolet rezzo service repair manual
2007 chevrolet rezzo service repair manual
jknsedks
 
2006 chevrolet rezzo service repair manual
2006 chevrolet rezzo service repair manual2006 chevrolet rezzo service repair manual
2006 chevrolet rezzo service repair manual
jknhdjskm
 
Mitsubishi FB16KT Forklift Trucks (Controller) Service Repair Manual SN: EFB4...
Mitsubishi FB16KT Forklift Trucks (Controller) Service Repair Manual SN: EFB4...Mitsubishi FB16KT Forklift Trucks (Controller) Service Repair Manual SN: EFB4...
Mitsubishi FB16KT Forklift Trucks (Controller) Service Repair Manual SN: EFB4...
jkskemmdm
 
Mitsubishi FB20KT Forklift Trucks (Controller) Service Repair Manual SN: EFB5...
Mitsubishi FB20KT Forklift Trucks (Controller) Service Repair Manual SN: EFB5...Mitsubishi FB20KT Forklift Trucks (Controller) Service Repair Manual SN: EFB5...
Mitsubishi FB20KT Forklift Trucks (Controller) Service Repair Manual SN: EFB5...
fujsejfjekkdmm
 
Mitsubishi fb18 kt forklift trucks (controller) service repair manual sn efb5...
Mitsubishi fb18 kt forklift trucks (controller) service repair manual sn efb5...Mitsubishi fb18 kt forklift trucks (controller) service repair manual sn efb5...
Mitsubishi fb18 kt forklift trucks (controller) service repair manual sn efb5...
fjjsekdmmme
 
Mitsubishi fb20 kt forklift trucks (controller) service repair manual sn efb5...
Mitsubishi fb20 kt forklift trucks (controller) service repair manual sn efb5...Mitsubishi fb20 kt forklift trucks (controller) service repair manual sn efb5...
Mitsubishi fb20 kt forklift trucks (controller) service repair manual sn efb5...
fjjskejdmdn
 
Mitsubishi fb16 kt forklift trucks (controller) service repair manual sn efb4...
Mitsubishi fb16 kt forklift trucks (controller) service repair manual sn efb4...Mitsubishi fb16 kt forklift trucks (controller) service repair manual sn efb4...
Mitsubishi fb16 kt forklift trucks (controller) service repair manual sn efb4...
jjfksekdmejik
 

Similar to Swp for jacking of articulated dumper truck (9)

2006 chevrolet rezzo service repair manual
2006 chevrolet rezzo service repair manual2006 chevrolet rezzo service repair manual
2006 chevrolet rezzo service repair manual
 
2008 chevrolet rezzo service repair manual
2008 chevrolet rezzo service repair manual2008 chevrolet rezzo service repair manual
2008 chevrolet rezzo service repair manual
 
2007 chevrolet rezzo service repair manual
2007 chevrolet rezzo service repair manual2007 chevrolet rezzo service repair manual
2007 chevrolet rezzo service repair manual
 
2006 chevrolet rezzo service repair manual
2006 chevrolet rezzo service repair manual2006 chevrolet rezzo service repair manual
2006 chevrolet rezzo service repair manual
 
Mitsubishi FB16KT Forklift Trucks (Controller) Service Repair Manual SN: EFB4...
Mitsubishi FB16KT Forklift Trucks (Controller) Service Repair Manual SN: EFB4...Mitsubishi FB16KT Forklift Trucks (Controller) Service Repair Manual SN: EFB4...
Mitsubishi FB16KT Forklift Trucks (Controller) Service Repair Manual SN: EFB4...
 
Mitsubishi FB20KT Forklift Trucks (Controller) Service Repair Manual SN: EFB5...
Mitsubishi FB20KT Forklift Trucks (Controller) Service Repair Manual SN: EFB5...Mitsubishi FB20KT Forklift Trucks (Controller) Service Repair Manual SN: EFB5...
Mitsubishi FB20KT Forklift Trucks (Controller) Service Repair Manual SN: EFB5...
 
Mitsubishi fb18 kt forklift trucks (controller) service repair manual sn efb5...
Mitsubishi fb18 kt forklift trucks (controller) service repair manual sn efb5...Mitsubishi fb18 kt forklift trucks (controller) service repair manual sn efb5...
Mitsubishi fb18 kt forklift trucks (controller) service repair manual sn efb5...
 
Mitsubishi fb20 kt forklift trucks (controller) service repair manual sn efb5...
Mitsubishi fb20 kt forklift trucks (controller) service repair manual sn efb5...Mitsubishi fb20 kt forklift trucks (controller) service repair manual sn efb5...
Mitsubishi fb20 kt forklift trucks (controller) service repair manual sn efb5...
 
Mitsubishi fb16 kt forklift trucks (controller) service repair manual sn efb4...
Mitsubishi fb16 kt forklift trucks (controller) service repair manual sn efb4...Mitsubishi fb16 kt forklift trucks (controller) service repair manual sn efb4...
Mitsubishi fb16 kt forklift trucks (controller) service repair manual sn efb4...
 

Recently uploaded

Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
IJNSA Journal
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
HODECEDSIET
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
Las Vegas Warehouse
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
University of Maribor
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
mamamaam477
 

Recently uploaded (20)

Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMSA SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
A SYSTEMATIC RISK ASSESSMENT APPROACH FOR SECURING THE SMART IRRIGATION SYSTEMS
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEMTIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
TIME DIVISION MULTIPLEXING TECHNIQUE FOR COMMUNICATION SYSTEM
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have oneISPM 15 Heat Treated Wood Stamps and why your shipping must have one
ISPM 15 Heat Treated Wood Stamps and why your shipping must have one
 
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
Presentation of IEEE Slovenia CIS (Computational Intelligence Society) Chapte...
 
Engine Lubrication performance System.pdf
Engine Lubrication performance System.pdfEngine Lubrication performance System.pdf
Engine Lubrication performance System.pdf
 

Swp for jacking of articulated dumper truck

  • 1. SAFE WORK PROCEDURE Issue Date : 15th Feb 2016 Last Reviewed : 13th Jan 2016 Next Reviewed Date : 15th Aug 2017 Page:1 of 12 Authorised By: Ng Say Kok & Ng Say Kiat (General Managers) Work Description : Jacking of articulated dumper truck Location : Various sites Insert Image If Applicable; See below diagrams Potential Hazards: Topplingof vehicledue to unstable groundandcrushinghazard PersonalProtective Equipment (PPE) Required (Checkthe box for required PPE): Work Gloves/ Welding Gloves Respirator Eye Protection Face Protection/ Welding Mask Safety Boot Safety Helmet Hearing Protection Safety Harness/Belt Protective Clothing Safety Vest/Life Jacket √    √ √    √ Machine / Equipment / Work Tools: 1. Hydraulic jack 2. Wooden block 3. Support stand 4. Air compressor machine Safe Work Procedure Checklist: 1. PRE-Operation:  Task (e.g. Drawings, instructions, specifications, hazards etc.) is clearly understood.  Plan an escape route in case the machinery topple down.  Inspect work area and ensure the machinery is parked on stable and level ground. Provision of steel plate when on site.
  • 2. SAFE WORK PROCEDURE Issue Date : 15th Feb 2016 Last Reviewed : 13th Jan 2016 Next Reviewed Date : 15th Aug 2017 Page:2 of 12 Authorised By: Ng Say Kok & Ng Say Kiat (General Managers)  Move the parking brake on ENGAGE position.  Ensure the dump body is empty before the machine is jacked up.  Ensure the dump body has been lowered down.
  • 3. SAFE WORK PROCEDURE Issue Date : 15th Feb 2016 Last Reviewed : 13th Jan 2016 Next Reviewed Date : 15th Aug 2017 Page:3 of 12 Authorised By: Ng Say Kok & Ng Say Kiat (General Managers)  Stop the engine, remove the key and keep it.  Perform Lock Out Tag Out (LOTO) and ensure machines have been isolated from power sources before jacking up the machinery.  Inspect hydraulic jack. Use correct hydraulic jack that can support the weight of the machine. Ensure there’s no leaking and in working condition.
  • 4. SAFE WORK PROCEDURE Issue Date : 15th Feb 2016 Last Reviewed : 13th Jan 2016 Next Reviewed Date : 15th Aug 2017 Page:4 of 12 Authorised By: Ng Say Kok & Ng Say Kiat (General Managers)  Use 40Ton hydraulic jack (or above) for dump truck model 730  Use 50Ton hydraulic jack (or above) for dump truck model 740 and model 745
  • 5. SAFE WORK PROCEDURE Issue Date : 15th Feb 2016 Last Reviewed : 13th Jan 2016 Next Reviewed Date : 15th Aug 2017 Page:5 of 12 Authorised By: Ng Say Kok & Ng Say Kiat (General Managers)  Inspect wooden blocks and ensure there’s no sign of severe damage.  Place wooden blocks or wheel chocks to prevent vehicle from rolling.
  • 6. SAFE WORK PROCEDURE Issue Date : 15th Feb 2016 Last Reviewed : 13th Jan 2016 Next Reviewed Date : 15th Aug 2017 Page:6 of 12 Authorised By: Ng Say Kok & Ng Say Kiat (General Managers)  Due to height limitation of some hydraulic jacks, wooden block may be place in between the firm ground and hydraulic jack. Inspect wooden blocks and ensure the wooden block’s surface is not slippery/oily and ensure there’s no sign of termite attack/cracked/ decayed/ split/rot or any sign of severe damage on the timber which may pose risk of failure while jacking up the dumper truck. Only use wooden block that is no less then 500mm in length and 250mm in width as support. Minimumum 500mm Minimum 250mm
  • 7. SAFE WORK PROCEDURE Issue Date : 15th Feb 2016 Last Reviewed : 13th Jan 2016 Next Reviewed Date : 15th Aug 2017 Page:7 of 12 Authorised By: Ng Say Kok & Ng Say Kiat (General Managers)  Set hydraulic jack and wooden block on firm level ground. If 2 wooden blocks are needed to support the hydraulic jack, ensure the lower wooden block is bigger or as of the same size with the upper wooden block and is aligned straight upright.
  • 8. SAFE WORK PROCEDURE Issue Date : 15th Feb 2016 Last Reviewed : 13th Jan 2016 Next Reviewed Date : 15th Aug 2017 Page:8 of 12 Authorised By: Ng Say Kok & Ng Say Kiat (General Managers) 2. Operation:  Conduct pre-operational checks on the air compressor.  Hook up air hose from the air compressor to the hydraulic jack.  Press lever/switch to raise the hydraulic jack.
  • 9. SAFE WORK PROCEDURE Issue Date : 15th Feb 2016 Last Reviewed : 13th Jan 2016 Next Reviewed Date : 15th Aug 2017 Page:9 of 12 Authorised By: Ng Say Kok & Ng Say Kiat (General Managers)  Do not stand beside the machinery while jacking up the machinery. Stand 2 metres away at the front or back of the machinery to escape in case of the machinery topple down.  Inspect the support stand and look out for sign of severe corrosion, cracked or any sign of severe damage.
  • 10. SAFE WORK PROCEDURE Issue Date : 15th Feb 2016 Last Reviewed : 13th Jan 2016 Next Reviewed Date : 15th Aug 2017 Page:10 of 12 Authorised By: Ng Say Kok & Ng Say Kiat (General Managers)  Ensure the correct stand is use to withstand the weight of the dumper truck.
  • 11. SAFE WORK PROCEDURE Issue Date : 15th Feb 2016 Last Reviewed : 13th Jan 2016 Next Reviewed Date : 15th Aug 2017 Page:11 of 12 Authorised By: Ng Say Kok & Ng Say Kiat (General Managers)  Inspect wooden blocks and ensure the wooden block’s surface is not slippery/oily and ensure there’s no sign of termite attack/cracked/ decayed/ split/rot or any sign of severe damage on the timber which may pose risk of failure while jacking up the dumper truck. Only use wooden block that is no less then 500mm in length and 250mm in width as support.  Set the support stand on top of the wooden block(s) and (if applicable) place wooden piece or block on top of the support stand to protect undercarriage and to prevent it from slipping or damage.  Besides the main support stand below the front axle/ frame or rear axle/ frame, extra support stand may be place if needed to ensure stability.  Once all supports are in place, lower the hydraulic jack until the machine is firmly supported by the support stands and wooden blocks. Ensure the machine is stable before proceeding to do any maintenance and servicing work on the machine.
  • 12. SAFE WORK PROCEDURE Issue Date : 15th Feb 2016 Last Reviewed : 13th Jan 2016 Next Reviewed Date : 15th Aug 2017 Page:12 of 12 Authorised By: Ng Say Kok & Ng Say Kiat (General Managers) 3. POST-Operation:  Inspect work area and ensure no one is working on top and below the machinery.  Set hydraulic jack and wooden block on firm level ground. If 2 wooden blocks are needed to support the hydraulic jack, ensure the lower wooden block is bigger or as of the same size with the upper wooden block and is aligned straight upright.  Hook up air hose to the hydraulic jack.  Do not stand beside the machinery while jacking up the machinery. Stand 2 metres away at the front or back of the machinery to escape in case of the machinery topple down.  Press lever/switch to raise the hydraulic jack.  Remove away all the supports (support stands and wooden blocks).  Press lever/switch to lower down the hydraulic jack.  Remove LOTO tag.  Remove wheel chocks from vehicle.