SUTTMAN BUILDING
REDEVELOPMENT
Downtown Miamisburg, Ohio
1
Location!
2
Location Merits
Site Location & Access to Lifestyle Amenities
Area Amenities
1. Bullwinkle’s Top Hat Bistro
2. Ron’s Pizza and Ribs
3. Good Time Charlies
4. Bear Creek Donuts
5. TJ Chumps
6. Lucky Star Brewery
7. Star City Brewery
8. A Taste of Wine
3
• Located 4 miles west of I-75 exit 44 (Dayton Mall).
• Great Miami River Trail links Downtown Miamisburg to 75
miles or bike trails through out the Dayton region.
• Miamisburg offers many parks and recreational facilities
including Sycamore Trails Aquatic Center, Pipestone Golf
Course, Carnegie Meeting/Event Center, and Sycamore
Trails Park.
• Riverfront Park. The City of Miamisburg continues to move
forward with implementation of Riverfront Park. This spring
will see the completion of a new roadway along the back-
side of the buildings that front Main Street. This has been
seen as the critical infrastructure improvement needed to
spur private investment in the rear of those properties.
Event related investments are planned for 2018 in order to
support additional events in downtown.
• Downtown hosts multiple events that has gain regional
attention attracting visitors form outside the City. Events
include the Spring Fling, car shows, weekend music
festivals, Boo-in-the-Burg and other special programing.
• Suttmans is located in an ideal location surrounded by
other restaurants that have become local favorites such as
those listed the to left.
Surrounding Amenities
4
Location Map
Dayton
Mall
5
Location, Location, Location
The City of Miamisburg continues to move forward with
implementation of Riverfront Park.
This spring will see the completion of a new roadway along the
back-side of the buildings that
front Main Street. Event related investments are planned for
2018 in order to support
additional events in downtown.
6
Existing Conditions
View of site looking west
from rear alley. Building on left,
3-story building in center, and
vacant lot on right are part
of the project site.
View of site looking east
from Main Street.
7
+/- 1,200 SF Usable
+/- 1,300 SF
(Low Ceiling Storage)
+/- 2,500 SF (Low Ceiling Storage)
Basement Floor Plan
8
Outdoor Space
First Floor Plan
+/- 2,400 SF
9
+/- 3,000 SF
Second Floor Plan
10
Third Floor Plan
11
Historic DP&L
Power Building
Downtown Dayton, Ohio
12
Spectacular 10,000 Square Feet with
40 foot high ceilings
13
Adjacent to a
4-level parking
garage
14
Site Attributes
– The site is located at 118 East 4th St.
Clair in the “Downtown Core” on the
southwest corner of East 4th and St
Clair.
– Less than 0.5 mile to Sinclair’s campus
(22,200 students & 2,600 employees).
– One block from the new Levitt Pavilion
(34 FREE concerts featuring local,
national, and international musicians).
– Two blocks from the Historic Oregon
District shops and restaurants.
– Supports developing residential
housing in Downtown Dayton.
– Convenient access from I-75 & SR 35
allowing regional attraction.
– Main & 4th traffic count is approx.
12,000. St Clair & 4th is about 8,000.
– Located ideally between Downtown
Dayton’s CBD, Historic Oregon District,
Sinclair, Miami Valley Hospital,
University of Dayton, Oakwood and
Kettering (demand drivers).
15
City of Dayton
“Core”
700 businesses
21,000 employees
Oregon Historic
District
Miami Valley
Hospital
$110M Bed Tower
420,000 visits
7,000 employees
University of Dayton
10,000 students
2,200 employees
City of Oakwood
3,600 households
$84,000 hh income
Sinclair College
22,600 students
2,300 employees
Downtown Housing
almost 2,000 units
at 97.5% occupancy
Diner Demand Drivers
16
Downtown Dayton’s Come Back
Since the launch of the Greater Downtown Dayton Plan, more
than $600 million has been invested
in downtown, and a significant amount of that investment has
created new downtown housing
options.
With $600 million more in projects in the pipeline, downtown
Dayton is coming back, and the
growing demand for downtown housing is one of the core
initiatives pushing development and
demand for services, like restaurants.
17
Source: Downtown Dayton Partnership
18
As the 2017 Downtown Dayton Housing Demand Study
demonstrates, downtown Dayton’s
residential market has significant depth beyond the housing that
has been added over the past
several years and the housing currently in the development
pipeline – even considering that the
number of units in downtown Dayton has already doubled since
2010.
Certainly as some of the current projects get underway closer to
completion – Levitt Pavilion, the Arcade, Fire Blocks, Centre
City,
Water Street – the momentum around choosing a downtown
address will only build.
Source: Downtown Dayton Partnership 19
Population & Housing
20
21
34 FREE concerts featuring local, national, and international
musicians
one block away
22
23
24
D A T E
S H E E T
P R O J E C T N O.
m
ia
m
isb
ur
g
, o
hi
o
4
53
42
A
U
TH
O
RI
ZE
D
S
EA
LE
D
D
RA
W
IN
G
S
IG
N
ED
IN
B
LU
E.
R
EP
RO
D
U
C
TI
O
N
O
FS
EA
LE
D
D
RA
W
IN
G
P
RO
H
IB
IT
ED
DATE ISSUED
d
p
s
a
rc
hi
te
c
ts
, l
lc
38
1
a
lm
e
d
ia
d
riv
e
(9
37
)
46
9-
39
04
w
w
w
.d
p
s-
a
rc
hi
te
c
ts
.c
o
m
P
A
R
T
IA
L
B
U
IL
D
IN
G
D
E
M
O
L
IT
IO
N
2
4
-3
2
S
.
M
A
IN
S
T
.,
M
IA
M
IS
B
U
R
G
,
O
H
IO
4
5
3
4
2
F
O
R
T
H
E
C
IT
Y
O
F
M
IA
M
IS
B
U
R
G
- -
- -
D.M.I.
ARCHITECT
381 ALMEDIA DR.
MIAMISBURG, OHIO 45342
dps architects, llc
10 N. FIRST ST.
MIAMISBURG, OHIO 45342
PHONE: (937) 469-3904
PHONE: (513) 396-8900
660 LINCOLN AVE SUITE 305
CINCINNATI, OH 45206
ADVANTAGE GROUP ENGINEERS, INC.
STRUCTURAL ENGINEER
OWNER
24-32 S. MAIN STREET, MIAMISBURG, OHIO 45342
ISSUED FOR BID
PROJECT NO. 16114.00
PARTIAL BUILDING DEMOLITION
T1 TITLE SHEET
A1.1 DEMO BASEMENT & FIRST FLOOR PLAN
A1.2 DEMO SECOND & THIRD FLOOR PLAN
CITY OF MIAMISBURG
SUTTMAN'S
BUILDING 1
BUILDING 3
BUILDING 2
1
7
.6
6
'
143.0'
4
1
.0
0
'
1
3
.6
0
'
1
7
.6
6
'
4
1
.0
0
'
1
3
.6
0
'
47.7'
47.7'
47.7'
47.7'95.3'
95.3'
95.3'
95.3'
BUILDING 1
BUILDING 3
BUILDING 2
D A T E
S H E E T
P R O J E C T N O.
m
ia
m
isb
ur
g
, o
hi
o
4
53
42
A
U
TH
O
RI
ZE
D
S
EA
LE
D
D
RA
W
IN
G
S
IG
N
ED
IN
B
LU
E.
R
EP
RO
D
U
C
TI
O
N
O
FS
EA
LE
D
D
RA
W
IN
G
P
RO
H
IB
IT
ED
DATE ISSUED
d
p
s
a
rc
hi
te
c
ts
, l
lc
38
1
a
lm
e
d
ia
d
riv
e
(9
37
)
46
9-
39
04
w
w
w
.d
p
s-
a
rc
hi
te
c
ts
.c
o
m
P
A
R
T
IA
L
B
U
IL
D
IN
G
D
E
M
O
L
IT
IO
N
2
4
-3
2
S
.
M
A
IN
S
T
.,
M
IA
M
IS
B
U
R
G
,
O
H
IO
4
5
3
4
2
F
O
R
T
H
E
C
IT
Y
O
F
M
IA
M
IS
B
U
R
G
- -
- -
BUILDING 1
BUILDING 1
BUILDING 3
BUILDING 2
D A T E
S H E E T
P R O J E C T N O.
m
ia
m
isb
ur
g
, o
hi
o
4
53
42
A
U
TH
O
RI
ZE
D
S
EA
LE
D
D
RA
W
IN
G
S
IG
N
ED
IN
B
LU
E.
R
EP
RO
D
U
C
TI
O
N
O
FS
EA
LE
D
D
RA
W
IN
G
P
RO
H
IB
IT
ED
DATE ISSUED
d
p
s
a
rc
hi
te
c
ts
, l
lc
38
1
a
lm
e
d
ia
d
riv
e
(9
37
)
46
9-
39
04
w
w
w
.d
p
s-
a
rc
hi
te
c
ts
.c
o
m
P
A
R
T
IA
L
B
U
IL
D
IN
G
D
E
M
O
L
IT
IO
N
2
4
-3
2
S
.
M
A
IN
S
T
.,
M
IA
M
IS
B
U
R
G
,
O
H
IO
4
5
3
4
2
F
O
R
T
H
E
C
IT
Y
O
F
M
IA
M
IS
B
U
R
G
- -
- -
Respond to a mock Request-For-Proposal typically issued by a
City for the re-use and redevelopment of certain real estate
owned by the City.
REQUEST FOR PROPOSAL
Introduction
Downtown City Inc. (DCI) seeks a highly-qualified Developer
to redevelop 1 of 2 properties to its highest and best use to
enhance and promote the vibrancy of the downtown area with a
newly renovated, high profile development. The Developer may
choose 1 of the following to properties:
1) The Silberman Building: A 3-story historic building of
approximately 17,750 square feet located at 26-
32 South Main Street, Miamisburg.
2) The Power House. A multi-story historic building of
approximately 35,750 square feet located at 118 East 4th Street,
Dayton.
See Attachment A for more details concerning each property.
Downtown Market Lease Rates
The rents for downtown have risen over the last 10 years. Newly
renovated retail spaces are seeing rents in the range of $11-$13
per square foot per year. Office spaces are seeing rents in the
range of $9-$11 per square foot per year. Industrial space is
renting for $5-$7 per square foot.
Residential development in upper floor units has been slowly
increasing over the past 10 years. Two recent projects have
proven a market exists for market rate residential units in the
downtown area. Newly created apartments with urban “loft
style” design elements are seeing rents in the range of $.75 -
$1.10 per square foot per month.
Supplemental Reports
A recent Environmental Report concludes there is NO hazardous
environmental conditions affecting the properties. A recent
Construction Report concluded that each building’s renovation
cost is approximately $75.00 per square foot for the needed
repairs; electrical, plumbing and heating/cooling systems;
exterior renovations; and interior finishes. Demolition of any
portions of the existing building costs approximately $5.00 per
square foot.
Potential Project Financial Assistance
· CRA Tax Abatement – 100% abatement of property taxes
resulting from project investment for 15 yrs.
· PACE – Property Accessed Clean Energy financing allows for
government insured financing at 3% interest rate over a 30 year
amortization schedule of any “Energy Star” improvements
(windows, doors, insulation, water heaters, solar panels, low
flow toilets, etc.) which typically costs 10% more than non-
energy star products.
· DMI Assistance – May come in the form of mezzanine
financing.
· Federal and State Historic Preservation Tax Credits – Up to
20% tax credit on qualified redevelopment expenditures which
typically costs 10% more than non-historical products.
· State Historic Preservation Tax Credits – Up to 25% credit on
qualified redevelopment expenditures which typically costs 10%
more than non-historical products.
· Jobs Ohio will also consider funding 50% of any construction
costs anticipating a manufacturing use. RFP Submissions must
include the following elements:
1. Statement of Interest: Please describe your particular interest
in this project, your familiarity with the community, how you
envision a successful public-private partnership proceeding, and
how you expect your entity to make a positive contribution to
the City’s central business district.
2. Property Vision: Please describe your Vision for the Property
3. Development Team Overview: Resumes for each individual
describing their roles and responsibilities as the Project
develops including professional licenses, certificates, education,
relevant experience, and awards.
4 Conceptual Development Plan: Describe your conceptual plan
depicting general elevations of proposed buildings, uses,
streets, parking, landscaped areas, public amenities, etc.
including additional graphics or narrative as needed to describe
the physical design of the proposed development.
5. Financing Capacity: Describe your anticipated level and
types of financing needed for the Project including a
preliminary pro forma and financing structure (including a
summary of assumptions used) and your proposed purchase/land
lease price.
Selection Criteria:
Responses to this RFP will be evaluated based on the following
criteria:
· Content: adequate depth of coverage, thoroughness of
development, quality of argument
· Organization and coherence: logical order of evidence and
structure; avoidance ofirrelevancies
· Readability: clarity of expression, all academic mechanics are
correct, appropriatedocumentation provided
· Mechanical and grammatical correctness: appropriate sentence
structure; punctuation; andcapitalization
Anticipated Timeline:
RFP Issued:
September 10, 2018
Outline Response Due:
September 30, 2018
Draft Response Due:
October 31, 2018
Final Response Due:
November 20, 2018
Responses to this RFP will be accepted no later than 5:00 PM,
November 20, 2018. All responses are to be submitted via both
1) hardcopy (stapled) delivered to Eric Joo and 2) electronic
copy submitted to Pilot’s Dropbox. The responses are to be
double-spaced in Times New Roman size 12 font including no
less than 4,000 words and no more than 5,000 words (excluding
tables, graphs and exhibits).
Aimen Al Mishqab
Mr. Eric Joo
FIN 4150
10/2/2018
The Stuttman Building
The property chosen is the Stuttman Building.
1. Statement of Interest
The building is located in Downtown Miamisburg, Ohio, four
miles from exit 44. Downtown is a lively city since it hosts
various events like car shows, Spring Fling, and weekend music
festivals that have also attracted many tourists. My interest
would be to create a small restaurant and a recreational center.
The restaurant will provide various local delicacies to the
people. At the same time, the recreational services will include
swimming, cultural shows, music festivals, and Spring Flings.
The goal is to attract more tourists for better income. Since the
market is relatively friendly, it would be easy to partner with
successful entrepreneurs in the region to expand the business.
1. property Vision
At the end of the third year, the property will have become a
famous business center through the restaurant and recreational
services. It will be one of the centers for employment in the
city.
1. Development Team Overview
The personnel expected to work in the property include
electrical and civil engineers, professional chefs, waiters,
personal assistants, casual workers, and recreational guides.
Each must have a minimum of three years’ experience in their
respective fields and diploma certificates. As the project
develops, the electrical engineer will take care of all electrical
installations and maintenance while the civil engineer will act
as site manager. Chefs, waiters, and recreational guides will
ensure the daily operations of the project run as stated in their
job specifications, and the casual workers will act as support
staff in charge of cleanliness and deliveries among other roles.
1. Conceptual Development Plan
The proposed building will have a 75 square meter courtyard for
recreational activities. The yard will have pools, gardens,
sculptures, and geyser fountains. It will also have an
amphitheater and a plenary hall. They will have a capacity of
200 and 1500 people respectively. The rooftop will be designed
to have panoramic views of the neighboring building. The
restaurant rooms will be 20 by 15 square meters each. The
passenger lifts, plumbing, and toilet ducts will be located at the
core of the buildings. A parking lot of up to 400 cars will be
positioned in the basement. Lastly, the walls will be made of an
African cultural texture that includes brown terracotta materials
fitted with a small motif.
1. Financing Capacity
The anticipated financial use will be $1.5 million. Types of
financing need will include stakeholder shares, personal
contribution, and loans from financial bodies, grants, and
leases. It is assumed that during the project, inflation rates will
be minimal, and the government will impose low taxation of up
to twenty percent of total income.
Preliminary Pro forma
Item
Estimated Costs
Construction and electrical installations
$950,000
Salaries and benefits
$79, 000
Land
$80,000
Machinery
$170,000
Certificates and licenses
$ 1000
Others
$130,000
Total Estimation
$1.5 million

More Related Content

Similar to SUTTMAN BUILDING REDEVELOPMENTDowntown Miamisburg, Ohio.docx

WWTBuildersPresentation
WWTBuildersPresentationWWTBuildersPresentation
WWTBuildersPresentationLane Spencer
 
Greg Barratt - AGM 2019
Greg Barratt - AGM 2019Greg Barratt - AGM 2019
Greg Barratt - AGM 2019PEGcompanies
 
2017 Info Night Presentation - TIF bond
2017 Info Night Presentation - TIF bond2017 Info Night Presentation - TIF bond
2017 Info Night Presentation - TIF bondF. X. Flinn
 
Infrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's FutureInfrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's FutureFulton County Government
 
Infrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's FutureInfrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's Futurejacorbitt
 
Public Consultation Presentation: 468-476 James St N, Hamilton
Public Consultation Presentation: 468-476 James St N, HamiltonPublic Consultation Presentation: 468-476 James St N, Hamilton
Public Consultation Presentation: 468-476 James St N, HamiltonJohn van Nostrand Developments
 
Oceanside Beach Project
Oceanside Beach ProjectOceanside Beach Project
Oceanside Beach ProjectEpic
 
South Park Development Presentation
South Park Development PresentationSouth Park Development Presentation
South Park Development PresentationJordan Dias
 
2008 DREAM Initiative CID Presentation
2008 DREAM Initiative CID Presentation2008 DREAM Initiative CID Presentation
2008 DREAM Initiative CID PresentationStephanie Lindley
 
The Keystone Center - Midterm Review
The Keystone Center - Midterm ReviewThe Keystone Center - Midterm Review
The Keystone Center - Midterm ReviewElizabeth Mosley
 
Summer 2018 Dowtown Development Forecast
Summer 2018 Dowtown Development ForecastSummer 2018 Dowtown Development Forecast
Summer 2018 Dowtown Development ForecastHeather McClaren
 
Downtown development-report-summer-2018
Downtown development-report-summer-2018Downtown development-report-summer-2018
Downtown development-report-summer-2018Heather McClaren
 
Wheels of Progress: Downtown Planning 2.0 Beyond the Vision
Wheels of Progress: Downtown Planning 2.0 Beyond the VisionWheels of Progress: Downtown Planning 2.0 Beyond the Vision
Wheels of Progress: Downtown Planning 2.0 Beyond the VisionOHM Advisors
 
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19RPO America
 
Think Brinc.2014 (BRINC: The BelRed Incubator)
Think Brinc.2014 (BRINC: The BelRed Incubator)Think Brinc.2014 (BRINC: The BelRed Incubator)
Think Brinc.2014 (BRINC: The BelRed Incubator)Genevieve Tremblay
 
The Power of a Park. Urban Open Spaces as Value Generators
The Power of a Park. Urban Open Spaces as Value GeneratorsThe Power of a Park. Urban Open Spaces as Value Generators
The Power of a Park. Urban Open Spaces as Value GeneratorsVirtual ULI
 
South Ironbound Resiliency Action Plan (Newark)
South Ironbound Resiliency Action Plan (Newark)South Ironbound Resiliency Action Plan (Newark)
South Ironbound Resiliency Action Plan (Newark)APA-NJ
 
Bellaire Forward 3.0 5:3:16
Bellaire Forward 3.0 5:3:16Bellaire Forward 3.0 5:3:16
Bellaire Forward 3.0 5:3:16Tyler Bevier
 

Similar to SUTTMAN BUILDING REDEVELOPMENTDowntown Miamisburg, Ohio.docx (20)

WWTBuildersPresentation
WWTBuildersPresentationWWTBuildersPresentation
WWTBuildersPresentation
 
Greg Barratt - AGM 2019
Greg Barratt - AGM 2019Greg Barratt - AGM 2019
Greg Barratt - AGM 2019
 
2017 Info Night Presentation - TIF bond
2017 Info Night Presentation - TIF bond2017 Info Night Presentation - TIF bond
2017 Info Night Presentation - TIF bond
 
Infrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's FutureInfrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's Future
 
Infrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's FutureInfrastructure for All: Building Fulton's Future
Infrastructure for All: Building Fulton's Future
 
SNEAPA 2013 Thursday c2 1_45 meeting the growing demand
SNEAPA 2013 Thursday c2 1_45 meeting the growing demandSNEAPA 2013 Thursday c2 1_45 meeting the growing demand
SNEAPA 2013 Thursday c2 1_45 meeting the growing demand
 
Public Consultation Presentation: 468-476 James St N, Hamilton
Public Consultation Presentation: 468-476 James St N, HamiltonPublic Consultation Presentation: 468-476 James St N, Hamilton
Public Consultation Presentation: 468-476 James St N, Hamilton
 
F3 Village Development
F3 Village DevelopmentF3 Village Development
F3 Village Development
 
Oceanside Beach Project
Oceanside Beach ProjectOceanside Beach Project
Oceanside Beach Project
 
South Park Development Presentation
South Park Development PresentationSouth Park Development Presentation
South Park Development Presentation
 
2008 DREAM Initiative CID Presentation
2008 DREAM Initiative CID Presentation2008 DREAM Initiative CID Presentation
2008 DREAM Initiative CID Presentation
 
The Keystone Center - Midterm Review
The Keystone Center - Midterm ReviewThe Keystone Center - Midterm Review
The Keystone Center - Midterm Review
 
Summer 2018 Dowtown Development Forecast
Summer 2018 Dowtown Development ForecastSummer 2018 Dowtown Development Forecast
Summer 2018 Dowtown Development Forecast
 
Downtown development-report-summer-2018
Downtown development-report-summer-2018Downtown development-report-summer-2018
Downtown development-report-summer-2018
 
Wheels of Progress: Downtown Planning 2.0 Beyond the Vision
Wheels of Progress: Downtown Planning 2.0 Beyond the VisionWheels of Progress: Downtown Planning 2.0 Beyond the Vision
Wheels of Progress: Downtown Planning 2.0 Beyond the Vision
 
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
Brownfields Tour: A Visit to Hazelwood Green & RIDC Mill 19
 
Think Brinc.2014 (BRINC: The BelRed Incubator)
Think Brinc.2014 (BRINC: The BelRed Incubator)Think Brinc.2014 (BRINC: The BelRed Incubator)
Think Brinc.2014 (BRINC: The BelRed Incubator)
 
The Power of a Park. Urban Open Spaces as Value Generators
The Power of a Park. Urban Open Spaces as Value GeneratorsThe Power of a Park. Urban Open Spaces as Value Generators
The Power of a Park. Urban Open Spaces as Value Generators
 
South Ironbound Resiliency Action Plan (Newark)
South Ironbound Resiliency Action Plan (Newark)South Ironbound Resiliency Action Plan (Newark)
South Ironbound Resiliency Action Plan (Newark)
 
Bellaire Forward 3.0 5:3:16
Bellaire Forward 3.0 5:3:16Bellaire Forward 3.0 5:3:16
Bellaire Forward 3.0 5:3:16
 

More from mabelf3

SW 619Infancy and Early Childhood Development of Drug Addicted.docx
SW 619Infancy and Early Childhood Development of Drug Addicted.docxSW 619Infancy and Early Childhood Development of Drug Addicted.docx
SW 619Infancy and Early Childhood Development of Drug Addicted.docxmabelf3
 
SWK311 Assessment 2 Final EssayWhat is t.docx
SWK311 Assessment 2 Final EssayWhat is t.docxSWK311 Assessment 2 Final EssayWhat is t.docx
SWK311 Assessment 2 Final EssayWhat is t.docxmabelf3
 
Surname 1Students NameProfessors NameCourseDate Kano.docx
Surname 1Students NameProfessors NameCourseDate Kano.docxSurname 1Students NameProfessors NameCourseDate Kano.docx
Surname 1Students NameProfessors NameCourseDate Kano.docxmabelf3
 
SWK 527 -Signature Assignment Social Work Theory and Practice Ass.docx
SWK 527 -Signature Assignment Social Work Theory and Practice Ass.docxSWK 527 -Signature Assignment Social Work Theory and Practice Ass.docx
SWK 527 -Signature Assignment Social Work Theory and Practice Ass.docxmabelf3
 
SURNMAE3Self-assessment Student nameProfessor nameInstit.docx
SURNMAE3Self-assessment Student nameProfessor nameInstit.docxSURNMAE3Self-assessment Student nameProfessor nameInstit.docx
SURNMAE3Self-assessment Student nameProfessor nameInstit.docxmabelf3
 
Surname 2Student’s NameProfessor’s NameCourse CodeDate.docx
Surname 2Student’s NameProfessor’s NameCourse CodeDate.docxSurname 2Student’s NameProfessor’s NameCourse CodeDate.docx
Surname 2Student’s NameProfessor’s NameCourse CodeDate.docxmabelf3
 
Switching costs ____________________________.Question 1 options.docx
Switching costs ____________________________.Question 1 options.docxSwitching costs ____________________________.Question 1 options.docx
Switching costs ____________________________.Question 1 options.docxmabelf3
 
swer the following questionsWhy would it be important for you.docx
swer the following questionsWhy would it be important for you.docxswer the following questionsWhy would it be important for you.docx
swer the following questionsWhy would it be important for you.docxmabelf3
 
Swifts A Modest Proposal is one of the most famous examples of sa.docx
Swifts A Modest Proposal is one of the most famous examples of sa.docxSwifts A Modest Proposal is one of the most famous examples of sa.docx
Swifts A Modest Proposal is one of the most famous examples of sa.docxmabelf3
 
Sweep up a small area of your floor. Take a look at the trace evide.docx
Sweep up a small area of your floor. Take a look at the trace evide.docxSweep up a small area of your floor. Take a look at the trace evide.docx
Sweep up a small area of your floor. Take a look at the trace evide.docxmabelf3
 
Sweat” by Zora Neale Hurston from Carol Oates, Joyce,.docx
Sweat” by Zora Neale Hurston   from Carol Oates, Joyce,.docxSweat” by Zora Neale Hurston   from Carol Oates, Joyce,.docx
Sweat” by Zora Neale Hurston from Carol Oates, Joyce,.docxmabelf3
 
sweep things under the rug or pre-tend it never happened. in.docx
sweep things under the rug or pre-tend it never happened. in.docxsweep things under the rug or pre-tend it never happened. in.docx
sweep things under the rug or pre-tend it never happened. in.docxmabelf3
 
Susan serves on the city building commission.The city is plannin.docx
Susan serves on the city building commission.The city is plannin.docxSusan serves on the city building commission.The city is plannin.docx
Susan serves on the city building commission.The city is plannin.docxmabelf3
 
Susan serves on the city building commission.The city is plann.docx
Susan serves on the city building commission.The city is plann.docxSusan serves on the city building commission.The city is plann.docx
Susan serves on the city building commission.The city is plann.docxmabelf3
 
SUSAN GLASPELL TRIFLES      SCENE The kitchen in the now aba.docx
SUSAN GLASPELL TRIFLES      SCENE The kitchen in the now aba.docxSUSAN GLASPELL TRIFLES      SCENE The kitchen in the now aba.docx
SUSAN GLASPELL TRIFLES      SCENE The kitchen in the now aba.docxmabelf3
 
SUSTAINABLE URBAN DEVELOPMENT, GOVERNANCE, AND POLICY A COMPARATIVE.docx
SUSTAINABLE URBAN DEVELOPMENT, GOVERNANCE, AND POLICY A COMPARATIVE.docxSUSTAINABLE URBAN DEVELOPMENT, GOVERNANCE, AND POLICY A COMPARATIVE.docx
SUSTAINABLE URBAN DEVELOPMENT, GOVERNANCE, AND POLICY A COMPARATIVE.docxmabelf3
 
Susan Wolf thinks that that meaning has both a subjective and an.docx
Susan Wolf thinks that that meaning has both a subjective and an.docxSusan Wolf thinks that that meaning has both a subjective and an.docx
Susan Wolf thinks that that meaning has both a subjective and an.docxmabelf3
 
Sustainable Urban Development, Governance and Policy A Comparative .docx
Sustainable Urban Development, Governance and Policy A Comparative .docxSustainable Urban Development, Governance and Policy A Comparative .docx
Sustainable Urban Development, Governance and Policy A Comparative .docxmabelf3
 
SU_NSG6001_W4A2_PANDEY_R.doc.docxby Ram PandeySubmis.docx
SU_NSG6001_W4A2_PANDEY_R.doc.docxby Ram PandeySubmis.docxSU_NSG6001_W4A2_PANDEY_R.doc.docxby Ram PandeySubmis.docx
SU_NSG6001_W4A2_PANDEY_R.doc.docxby Ram PandeySubmis.docxmabelf3
 
SUSTAINABLE ENERGY SYSTEMS 1 P a g e .docx
SUSTAINABLE ENERGY SYSTEMS  1  P a g e .docxSUSTAINABLE ENERGY SYSTEMS  1  P a g e .docx
SUSTAINABLE ENERGY SYSTEMS 1 P a g e .docxmabelf3
 

More from mabelf3 (20)

SW 619Infancy and Early Childhood Development of Drug Addicted.docx
SW 619Infancy and Early Childhood Development of Drug Addicted.docxSW 619Infancy and Early Childhood Development of Drug Addicted.docx
SW 619Infancy and Early Childhood Development of Drug Addicted.docx
 
SWK311 Assessment 2 Final EssayWhat is t.docx
SWK311 Assessment 2 Final EssayWhat is t.docxSWK311 Assessment 2 Final EssayWhat is t.docx
SWK311 Assessment 2 Final EssayWhat is t.docx
 
Surname 1Students NameProfessors NameCourseDate Kano.docx
Surname 1Students NameProfessors NameCourseDate Kano.docxSurname 1Students NameProfessors NameCourseDate Kano.docx
Surname 1Students NameProfessors NameCourseDate Kano.docx
 
SWK 527 -Signature Assignment Social Work Theory and Practice Ass.docx
SWK 527 -Signature Assignment Social Work Theory and Practice Ass.docxSWK 527 -Signature Assignment Social Work Theory and Practice Ass.docx
SWK 527 -Signature Assignment Social Work Theory and Practice Ass.docx
 
SURNMAE3Self-assessment Student nameProfessor nameInstit.docx
SURNMAE3Self-assessment Student nameProfessor nameInstit.docxSURNMAE3Self-assessment Student nameProfessor nameInstit.docx
SURNMAE3Self-assessment Student nameProfessor nameInstit.docx
 
Surname 2Student’s NameProfessor’s NameCourse CodeDate.docx
Surname 2Student’s NameProfessor’s NameCourse CodeDate.docxSurname 2Student’s NameProfessor’s NameCourse CodeDate.docx
Surname 2Student’s NameProfessor’s NameCourse CodeDate.docx
 
Switching costs ____________________________.Question 1 options.docx
Switching costs ____________________________.Question 1 options.docxSwitching costs ____________________________.Question 1 options.docx
Switching costs ____________________________.Question 1 options.docx
 
swer the following questionsWhy would it be important for you.docx
swer the following questionsWhy would it be important for you.docxswer the following questionsWhy would it be important for you.docx
swer the following questionsWhy would it be important for you.docx
 
Swifts A Modest Proposal is one of the most famous examples of sa.docx
Swifts A Modest Proposal is one of the most famous examples of sa.docxSwifts A Modest Proposal is one of the most famous examples of sa.docx
Swifts A Modest Proposal is one of the most famous examples of sa.docx
 
Sweep up a small area of your floor. Take a look at the trace evide.docx
Sweep up a small area of your floor. Take a look at the trace evide.docxSweep up a small area of your floor. Take a look at the trace evide.docx
Sweep up a small area of your floor. Take a look at the trace evide.docx
 
Sweat” by Zora Neale Hurston from Carol Oates, Joyce,.docx
Sweat” by Zora Neale Hurston   from Carol Oates, Joyce,.docxSweat” by Zora Neale Hurston   from Carol Oates, Joyce,.docx
Sweat” by Zora Neale Hurston from Carol Oates, Joyce,.docx
 
sweep things under the rug or pre-tend it never happened. in.docx
sweep things under the rug or pre-tend it never happened. in.docxsweep things under the rug or pre-tend it never happened. in.docx
sweep things under the rug or pre-tend it never happened. in.docx
 
Susan serves on the city building commission.The city is plannin.docx
Susan serves on the city building commission.The city is plannin.docxSusan serves on the city building commission.The city is plannin.docx
Susan serves on the city building commission.The city is plannin.docx
 
Susan serves on the city building commission.The city is plann.docx
Susan serves on the city building commission.The city is plann.docxSusan serves on the city building commission.The city is plann.docx
Susan serves on the city building commission.The city is plann.docx
 
SUSAN GLASPELL TRIFLES      SCENE The kitchen in the now aba.docx
SUSAN GLASPELL TRIFLES      SCENE The kitchen in the now aba.docxSUSAN GLASPELL TRIFLES      SCENE The kitchen in the now aba.docx
SUSAN GLASPELL TRIFLES      SCENE The kitchen in the now aba.docx
 
SUSTAINABLE URBAN DEVELOPMENT, GOVERNANCE, AND POLICY A COMPARATIVE.docx
SUSTAINABLE URBAN DEVELOPMENT, GOVERNANCE, AND POLICY A COMPARATIVE.docxSUSTAINABLE URBAN DEVELOPMENT, GOVERNANCE, AND POLICY A COMPARATIVE.docx
SUSTAINABLE URBAN DEVELOPMENT, GOVERNANCE, AND POLICY A COMPARATIVE.docx
 
Susan Wolf thinks that that meaning has both a subjective and an.docx
Susan Wolf thinks that that meaning has both a subjective and an.docxSusan Wolf thinks that that meaning has both a subjective and an.docx
Susan Wolf thinks that that meaning has both a subjective and an.docx
 
Sustainable Urban Development, Governance and Policy A Comparative .docx
Sustainable Urban Development, Governance and Policy A Comparative .docxSustainable Urban Development, Governance and Policy A Comparative .docx
Sustainable Urban Development, Governance and Policy A Comparative .docx
 
SU_NSG6001_W4A2_PANDEY_R.doc.docxby Ram PandeySubmis.docx
SU_NSG6001_W4A2_PANDEY_R.doc.docxby Ram PandeySubmis.docxSU_NSG6001_W4A2_PANDEY_R.doc.docxby Ram PandeySubmis.docx
SU_NSG6001_W4A2_PANDEY_R.doc.docxby Ram PandeySubmis.docx
 
SUSTAINABLE ENERGY SYSTEMS 1 P a g e .docx
SUSTAINABLE ENERGY SYSTEMS  1  P a g e .docxSUSTAINABLE ENERGY SYSTEMS  1  P a g e .docx
SUSTAINABLE ENERGY SYSTEMS 1 P a g e .docx
 

Recently uploaded

INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdfINU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdfbu07226
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersPedroFerreira53928
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaasiemaillard
 
Matatag-Curriculum and the 21st Century Skills Presentation.pptx
Matatag-Curriculum and the 21st Century Skills Presentation.pptxMatatag-Curriculum and the 21st Century Skills Presentation.pptx
Matatag-Curriculum and the 21st Century Skills Presentation.pptxJenilouCasareno
 
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...Denish Jangid
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...Nguyen Thanh Tu Collection
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePedroFerreira53928
 
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdfDanh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdfQucHHunhnh
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptxJosvitaDsouza2
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXMIRIAMSALINAS13
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxbennyroshan06
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasGeoBlogs
 
Basic_QTL_Marker-assisted_Selection_Sourabh.ppt
Basic_QTL_Marker-assisted_Selection_Sourabh.pptBasic_QTL_Marker-assisted_Selection_Sourabh.ppt
Basic_QTL_Marker-assisted_Selection_Sourabh.pptSourabh Kumar
 
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptxJose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptxricssacare
 
Salient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptxSalient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptxakshayaramakrishnan21
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativePeter Windle
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleCeline George
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...Jisc
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxJisc
 

Recently uploaded (20)

INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdfINU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
INU_CAPSTONEDESIGN_비밀번호486_업로드용 발표자료.pdf
 
Basic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumersBasic phrases for greeting and assisting costumers
Basic phrases for greeting and assisting costumers
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Matatag-Curriculum and the 21st Century Skills Presentation.pptx
Matatag-Curriculum and the 21st Century Skills Presentation.pptxMatatag-Curriculum and the 21st Century Skills Presentation.pptx
Matatag-Curriculum and the 21st Century Skills Presentation.pptx
 
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...Basic Civil Engineering Notes of Chapter-6,  Topic- Ecosystem, Biodiversity G...
Basic Civil Engineering Notes of Chapter-6, Topic- Ecosystem, Biodiversity G...
 
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
GIÁO ÁN DẠY THÊM (KẾ HOẠCH BÀI BUỔI 2) - TIẾNG ANH 8 GLOBAL SUCCESS (2 CỘT) N...
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
 
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdfDanh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
Danh sách HSG Bộ môn cấp trường - Cấp THPT.pdf
 
1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx1.4 modern child centered education - mahatma gandhi-2.pptx
1.4 modern child centered education - mahatma gandhi-2.pptx
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptxMARUTI SUZUKI- A Successful Joint Venture in India.pptx
MARUTI SUZUKI- A Successful Joint Venture in India.pptx
 
The geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideasThe geography of Taylor Swift - some ideas
The geography of Taylor Swift - some ideas
 
Basic_QTL_Marker-assisted_Selection_Sourabh.ppt
Basic_QTL_Marker-assisted_Selection_Sourabh.pptBasic_QTL_Marker-assisted_Selection_Sourabh.ppt
Basic_QTL_Marker-assisted_Selection_Sourabh.ppt
 
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptxJose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
Jose-Rizal-and-Philippine-Nationalism-National-Symbol-2.pptx
 
Salient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptxSalient features of Environment protection Act 1986.pptx
Salient features of Environment protection Act 1986.pptx
 
Embracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic ImperativeEmbracing GenAI - A Strategic Imperative
Embracing GenAI - A Strategic Imperative
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
 
How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...How libraries can support authors with open access requirements for UKRI fund...
How libraries can support authors with open access requirements for UKRI fund...
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
 

SUTTMAN BUILDING REDEVELOPMENTDowntown Miamisburg, Ohio.docx

  • 1. SUTTMAN BUILDING REDEVELOPMENT Downtown Miamisburg, Ohio 1 Location! 2 Location Merits Site Location & Access to Lifestyle Amenities Area Amenities 1. Bullwinkle’s Top Hat Bistro 2. Ron’s Pizza and Ribs 3. Good Time Charlies 4. Bear Creek Donuts 5. TJ Chumps 6. Lucky Star Brewery 7. Star City Brewery 8. A Taste of Wine 3 • Located 4 miles west of I-75 exit 44 (Dayton Mall).
  • 2. • Great Miami River Trail links Downtown Miamisburg to 75 miles or bike trails through out the Dayton region. • Miamisburg offers many parks and recreational facilities including Sycamore Trails Aquatic Center, Pipestone Golf Course, Carnegie Meeting/Event Center, and Sycamore Trails Park. • Riverfront Park. The City of Miamisburg continues to move forward with implementation of Riverfront Park. This spring will see the completion of a new roadway along the back- side of the buildings that front Main Street. This has been seen as the critical infrastructure improvement needed to spur private investment in the rear of those properties. Event related investments are planned for 2018 in order to support additional events in downtown. • Downtown hosts multiple events that has gain regional attention attracting visitors form outside the City. Events include the Spring Fling, car shows, weekend music festivals, Boo-in-the-Burg and other special programing. • Suttmans is located in an ideal location surrounded by other restaurants that have become local favorites such as those listed the to left. Surrounding Amenities 4 Location Map
  • 3. Dayton Mall 5 Location, Location, Location The City of Miamisburg continues to move forward with implementation of Riverfront Park. This spring will see the completion of a new roadway along the back-side of the buildings that front Main Street. Event related investments are planned for 2018 in order to support additional events in downtown. 6 Existing Conditions View of site looking west from rear alley. Building on left, 3-story building in center, and vacant lot on right are part of the project site. View of site looking east from Main Street. 7
  • 4. +/- 1,200 SF Usable +/- 1,300 SF (Low Ceiling Storage) +/- 2,500 SF (Low Ceiling Storage) Basement Floor Plan 8 Outdoor Space First Floor Plan +/- 2,400 SF 9 +/- 3,000 SF Second Floor Plan 10 Third Floor Plan 11
  • 5. Historic DP&L Power Building Downtown Dayton, Ohio 12 Spectacular 10,000 Square Feet with 40 foot high ceilings 13 Adjacent to a 4-level parking garage 14 Site Attributes – The site is located at 118 East 4th St. Clair in the “Downtown Core” on the southwest corner of East 4th and St Clair.
  • 6. – Less than 0.5 mile to Sinclair’s campus (22,200 students & 2,600 employees). – One block from the new Levitt Pavilion (34 FREE concerts featuring local, national, and international musicians). – Two blocks from the Historic Oregon District shops and restaurants. – Supports developing residential housing in Downtown Dayton. – Convenient access from I-75 & SR 35 allowing regional attraction. – Main & 4th traffic count is approx. 12,000. St Clair & 4th is about 8,000. – Located ideally between Downtown Dayton’s CBD, Historic Oregon District, Sinclair, Miami Valley Hospital, University of Dayton, Oakwood and Kettering (demand drivers). 15 City of Dayton “Core”
  • 7. 700 businesses 21,000 employees Oregon Historic District Miami Valley Hospital $110M Bed Tower 420,000 visits 7,000 employees University of Dayton 10,000 students 2,200 employees City of Oakwood 3,600 households $84,000 hh income Sinclair College 22,600 students 2,300 employees Downtown Housing almost 2,000 units at 97.5% occupancy Diner Demand Drivers 16
  • 8. Downtown Dayton’s Come Back Since the launch of the Greater Downtown Dayton Plan, more than $600 million has been invested in downtown, and a significant amount of that investment has created new downtown housing options. With $600 million more in projects in the pipeline, downtown Dayton is coming back, and the growing demand for downtown housing is one of the core initiatives pushing development and demand for services, like restaurants. 17 Source: Downtown Dayton Partnership 18 As the 2017 Downtown Dayton Housing Demand Study demonstrates, downtown Dayton’s residential market has significant depth beyond the housing that has been added over the past several years and the housing currently in the development pipeline – even considering that the number of units in downtown Dayton has already doubled since 2010. Certainly as some of the current projects get underway closer to completion – Levitt Pavilion, the Arcade, Fire Blocks, Centre City,
  • 9. Water Street – the momentum around choosing a downtown address will only build. Source: Downtown Dayton Partnership 19 Population & Housing 20 21 34 FREE concerts featuring local, national, and international musicians one block away 22 23 24 D A T E
  • 10. S H E E T P R O J E C T N O. m ia m isb ur g , o hi o 4 53 42 A U TH O RI ZE D S EA LE
  • 17. M IS B U R G - - - - D.M.I. ARCHITECT 381 ALMEDIA DR. MIAMISBURG, OHIO 45342 dps architects, llc 10 N. FIRST ST. MIAMISBURG, OHIO 45342 PHONE: (937) 469-3904 PHONE: (513) 396-8900 660 LINCOLN AVE SUITE 305 CINCINNATI, OH 45206 ADVANTAGE GROUP ENGINEERS, INC. STRUCTURAL ENGINEER
  • 18. OWNER 24-32 S. MAIN STREET, MIAMISBURG, OHIO 45342 ISSUED FOR BID PROJECT NO. 16114.00 PARTIAL BUILDING DEMOLITION T1 TITLE SHEET A1.1 DEMO BASEMENT & FIRST FLOOR PLAN A1.2 DEMO SECOND & THIRD FLOOR PLAN CITY OF MIAMISBURG SUTTMAN'S BUILDING 1 BUILDING 3 BUILDING 2 1 7 .6 6 '
  • 20. 47.7' 47.7' 47.7' 47.7'95.3' 95.3' 95.3' 95.3' BUILDING 1 BUILDING 3 BUILDING 2 D A T E S H E E T P R O J E C T N O. m ia m isb ur g
  • 28. BUILDING 1 BUILDING 1 BUILDING 3 BUILDING 2 D A T E S H E E T P R O J E C T N O. m ia m isb ur g , o hi o 4 53 42 A
  • 35. H E C IT Y O F M IA M IS B U R G - - - - Respond to a mock Request-For-Proposal typically issued by a City for the re-use and redevelopment of certain real estate owned by the City. REQUEST FOR PROPOSAL Introduction
  • 36. Downtown City Inc. (DCI) seeks a highly-qualified Developer to redevelop 1 of 2 properties to its highest and best use to enhance and promote the vibrancy of the downtown area with a newly renovated, high profile development. The Developer may choose 1 of the following to properties: 1) The Silberman Building: A 3-story historic building of approximately 17,750 square feet located at 26- 32 South Main Street, Miamisburg. 2) The Power House. A multi-story historic building of approximately 35,750 square feet located at 118 East 4th Street, Dayton. See Attachment A for more details concerning each property. Downtown Market Lease Rates The rents for downtown have risen over the last 10 years. Newly renovated retail spaces are seeing rents in the range of $11-$13 per square foot per year. Office spaces are seeing rents in the range of $9-$11 per square foot per year. Industrial space is renting for $5-$7 per square foot. Residential development in upper floor units has been slowly increasing over the past 10 years. Two recent projects have proven a market exists for market rate residential units in the downtown area. Newly created apartments with urban “loft style” design elements are seeing rents in the range of $.75 - $1.10 per square foot per month. Supplemental Reports A recent Environmental Report concludes there is NO hazardous
  • 37. environmental conditions affecting the properties. A recent Construction Report concluded that each building’s renovation cost is approximately $75.00 per square foot for the needed repairs; electrical, plumbing and heating/cooling systems; exterior renovations; and interior finishes. Demolition of any portions of the existing building costs approximately $5.00 per square foot. Potential Project Financial Assistance · CRA Tax Abatement – 100% abatement of property taxes resulting from project investment for 15 yrs. · PACE – Property Accessed Clean Energy financing allows for government insured financing at 3% interest rate over a 30 year amortization schedule of any “Energy Star” improvements (windows, doors, insulation, water heaters, solar panels, low flow toilets, etc.) which typically costs 10% more than non- energy star products. · DMI Assistance – May come in the form of mezzanine financing. · Federal and State Historic Preservation Tax Credits – Up to 20% tax credit on qualified redevelopment expenditures which typically costs 10% more than non-historical products. · State Historic Preservation Tax Credits – Up to 25% credit on qualified redevelopment expenditures which typically costs 10% more than non-historical products. · Jobs Ohio will also consider funding 50% of any construction costs anticipating a manufacturing use. RFP Submissions must include the following elements: 1. Statement of Interest: Please describe your particular interest in this project, your familiarity with the community, how you
  • 38. envision a successful public-private partnership proceeding, and how you expect your entity to make a positive contribution to the City’s central business district. 2. Property Vision: Please describe your Vision for the Property 3. Development Team Overview: Resumes for each individual describing their roles and responsibilities as the Project develops including professional licenses, certificates, education, relevant experience, and awards. 4 Conceptual Development Plan: Describe your conceptual plan depicting general elevations of proposed buildings, uses, streets, parking, landscaped areas, public amenities, etc. including additional graphics or narrative as needed to describe the physical design of the proposed development. 5. Financing Capacity: Describe your anticipated level and types of financing needed for the Project including a preliminary pro forma and financing structure (including a summary of assumptions used) and your proposed purchase/land lease price. Selection Criteria: Responses to this RFP will be evaluated based on the following criteria: · Content: adequate depth of coverage, thoroughness of development, quality of argument · Organization and coherence: logical order of evidence and structure; avoidance ofirrelevancies · Readability: clarity of expression, all academic mechanics are correct, appropriatedocumentation provided
  • 39. · Mechanical and grammatical correctness: appropriate sentence structure; punctuation; andcapitalization Anticipated Timeline: RFP Issued: September 10, 2018 Outline Response Due: September 30, 2018 Draft Response Due: October 31, 2018 Final Response Due: November 20, 2018 Responses to this RFP will be accepted no later than 5:00 PM, November 20, 2018. All responses are to be submitted via both 1) hardcopy (stapled) delivered to Eric Joo and 2) electronic copy submitted to Pilot’s Dropbox. The responses are to be double-spaced in Times New Roman size 12 font including no less than 4,000 words and no more than 5,000 words (excluding tables, graphs and exhibits). Aimen Al Mishqab Mr. Eric Joo FIN 4150 10/2/2018 The Stuttman Building The property chosen is the Stuttman Building. 1. Statement of Interest The building is located in Downtown Miamisburg, Ohio, four miles from exit 44. Downtown is a lively city since it hosts various events like car shows, Spring Fling, and weekend music festivals that have also attracted many tourists. My interest
  • 40. would be to create a small restaurant and a recreational center. The restaurant will provide various local delicacies to the people. At the same time, the recreational services will include swimming, cultural shows, music festivals, and Spring Flings. The goal is to attract more tourists for better income. Since the market is relatively friendly, it would be easy to partner with successful entrepreneurs in the region to expand the business. 1. property Vision At the end of the third year, the property will have become a famous business center through the restaurant and recreational services. It will be one of the centers for employment in the city. 1. Development Team Overview The personnel expected to work in the property include electrical and civil engineers, professional chefs, waiters, personal assistants, casual workers, and recreational guides. Each must have a minimum of three years’ experience in their respective fields and diploma certificates. As the project develops, the electrical engineer will take care of all electrical installations and maintenance while the civil engineer will act as site manager. Chefs, waiters, and recreational guides will ensure the daily operations of the project run as stated in their job specifications, and the casual workers will act as support staff in charge of cleanliness and deliveries among other roles. 1. Conceptual Development Plan The proposed building will have a 75 square meter courtyard for recreational activities. The yard will have pools, gardens, sculptures, and geyser fountains. It will also have an amphitheater and a plenary hall. They will have a capacity of 200 and 1500 people respectively. The rooftop will be designed to have panoramic views of the neighboring building. The restaurant rooms will be 20 by 15 square meters each. The passenger lifts, plumbing, and toilet ducts will be located at the core of the buildings. A parking lot of up to 400 cars will be positioned in the basement. Lastly, the walls will be made of an African cultural texture that includes brown terracotta materials
  • 41. fitted with a small motif. 1. Financing Capacity The anticipated financial use will be $1.5 million. Types of financing need will include stakeholder shares, personal contribution, and loans from financial bodies, grants, and leases. It is assumed that during the project, inflation rates will be minimal, and the government will impose low taxation of up to twenty percent of total income. Preliminary Pro forma Item Estimated Costs Construction and electrical installations $950,000 Salaries and benefits $79, 000 Land $80,000 Machinery $170,000 Certificates and licenses $ 1000 Others $130,000 Total Estimation $1.5 million