Page 1 of 4
CURRICULUM VITAE
IRFAZ MOHAMMED SALI
DOHA QATAR
+974 30623200
+91 8904880247
B.E. (Bachelor of Engineering).
Major: Electronics and Communication.
E-Mail: irfazabdul@ymail.com
Objective:
Project and Maintenance Engineer with strong desire to advance my skills seeking a position in
which to continue growing within my desired field.
Professional Profile:
 Electronics and Communication Engineering professional with experience and knowledge
in the project life-cycle that includes project design, equipment installation & integration,
testing and commissioning.
 Hands on practical knowledge and experience in the DDC Controls, PLC’s, building
management system, water leakage detection system, CO system and Aircraft warning
lights.
 Exposure in handling installation and operation of Chillers, Chilled water Pumps,
Secondary Pumps, Central Plant Air Conditioners (AHU, FAHU, FCU, Package units, Split
units etc.), & operation & maintenance of the same.
 Experience in Site Supervision, Drawing, Estimation and BOQ preparation, installations
and troubleshooting.
 Prompt decision maker having good communication skill with capability to wade through
crisis situation with great objectivity.
 Have experience in software’s like MS office, VLSI, EC-NET, Niagara, Lonwatcher and all
Distech Controls related Software’s.
 Have experience working as a BMS and Aircraft warning lights Maintenance Engineer
visiting handed projects for monthly, bi-monthly and quarterly preventive maintenance
which includes troubleshooting all the problems and also prepare relevant documents.
Key Skills:
Building Managment
System
PLC's and SCADA
Programing and Wiring
Low Voltage System
Industrial Automation Aircraft Warning Lights
Maintenace and Troubleshooting
Installation and
Commissioning
DDC Programming
Design and
Estimation
Troubleshooting and
Maintenance
Page 2 of 4
Professional Experience:
1. Project and Maintenance Engineer.
Arabian Controls W.L.L. January 2015 to Present
A distech Controls Canada representative
Doha, Qatar.
www.distech-controls.com
Arabian Controls Ltd in association with Distech Controls, Canada as its sole Distributor and
Authorized System integrator in the State of Qatar to provide clients with the full range of Distech
Controls Products, state of the art Building Automation System and services. Arabian Controls
provides its clients with full design, procurement, installation supervision, testing, commissioning
& maintenance service of BMS, Low current systems and many various instrumentation and
Electro-Mechanical products.
Responsible for BMS integration projects with complete control system design, sequence of
operation strategies, parts selection/procurement, installation management, commissioning, and
troubleshooting.
Job Profile:
 Designing the appropriate locations of DDC controllers and DDC Panels. Provide technical
and engineering support to the field, related to design, equipments/devices, such as
drawings and other engineering information.
 Programming, Simulation, Testing and Commissioning of DDC panel.
 Preparing BOQ based on the I/O’s, And Preparing quotation.
 Installation of CO system and water leakage detection system.
 Responsible for management of material and human resources on project sites
 Assist engineers and designers in designing layout and site research
 Coordinate with site inspectors to check the on-going project status and development
 Check the material quality as per prescribed standards
 Maintain reports of contractors for proper execution of key projects on a daily basis.
 Preparation of O&M Manuals.
 Provide inputs for budget planning.
Projects Involved in:
 Q Mall - (Doha, Qatar).
o Consultant: FACB
o MEP Contractor: Power supply trading co.
 Palestinian School (Abu Hamour, Qatar)
o Consultant: A.E.B. Qatar
o MEP Contractor: Power mech Engineering Company.
 Proposed Residential building-100 (Doha, Qatar)
o Consultant: A.E.B. Qatar
o MEP Contractor: RAMACO.
 FNAC Store Lagoona Mall (Pearl Qatar, Qatar)
o Consultant: MZ & Partners.
o MEP Contractor: Polaris trading and contracting.
Page 3 of 4
 Three New Schools (Mesaimeer and Mesaieed, Qatar)
o Consultant: C.E.G. International.
o MEP Contractor: Gulf Lights Electrical Engineering W.L.L.
 Union Residential Tower (Al Dafna, Qatar)
o Consultant: A.E.B. Qatar
o MEP Contractor: Power mech Engineering Company.
Job profile as BMS Maintenance Engineer:
 Providing basic Training to Operators and Clients on the installed System.
 Maintenance of Control Systems and Troubleshooting problems as necessary.
 Visiting handed projects for monthly, bi-monthly, and quarterly preventive maintenance.
 Generating necessary spare parts required for troubleshooting.
 Make relevant documents required after visiting preventive maintenance.
Projects working as BMS Maintenance Engineer:
 VB-22 & VB-23(2B+G+20F) (Pearl Qatar, Qatar).
o Contractor: MMG Group, Qatar
 MV1 data center (Doha, Qatar).
o Contractor: Debbas Enterprises, Qatar
 World Trade Centre - (4B+G+50 Floors) (Doha, Qatar).
o Contractor: MMG Group, Qatar
 City Tower - (2B+G+34F) (Doha, Qatar).
o Contractor: Eagle Group, Qatar
 Ooredoo Wadi Sail (Doha, Qatar).
o Contractor: MMG Group, Qatar
 Dukhan Palace (Dukhan, Qatar).
o Contractor: Elegancia, Qatar
Job profile as Aircraft Warning Lights Maintenance Engineer:
 Maintenance of Aircraft Warning Lights and Troubleshooting problems as necessary.
 Visiting handed projects for monthly, bi-monthly, and quarterly preventive maintenance.
 Generating necessary spare parts required for troubleshooting.
 Make relevant documents required after visiting preventive maintenance.
Projects working as Aircraft Warning Lights Maintenance Engineer:
 Kempinski Residences & Suites, Doha (3B+G+64 Floors) (Doha, Qatar).
o Client: Kempinski, Qatar
 World Trade Centre - (4B+G+50 Floors) (Doha, Qatar).
o Contractor: MMG Group, Qatar
Page 4 of 4
2. Technical Trainee:
July 2014 to October 2014
Diya system Mangalore, India
http://www.diyasystems.com
Job profile:
 To solve technical issues related to websites,
 To migrate websites from other domain providers to ours.
 Upgrading and downgrading website package plans.
 Provide on-call support as needed by our clients.
3. Trainee Industrial Automation:
November 2014 to December 2014
Technologics Bangalore, India
http://technologics.in/
Job profile:
 Programming Various PLC’s like ABB, Alan Bradley, Schneider electric, Delta etc.
 Programing SCADA and HMI.
 Designing relay logic for various circuits.
 Wiring of Various PLC’s like ABB, Alan Bradley, Schneider electric, Delta etc. .
Education:
 Post-Graduation Diploma in Industrial Automation in Technologics Bangalore.
 Bachelor of Engineering in Electronics and Communication Engineering in NMAMIT, NITTE
Karnataka, India with First class(68.9%).
 Diploma in Electronics and Communication from P.A Polytechnic College Mangalore, India with
76% Distinction with honors.
Personal Minutes:
Passport No. : L8712739
Date of Birth : 10th
August 1989.
Nationality : Indian.
Gender male : Male.
Marital Status : Single.
Language Known : English, Hindi, Kannada, Malayalam, Arabic (read)
Declaration:
I hereby declare that above information is authentic to the best of my knowledge.
Place : Doha Yours truly,
Date : Irfaz Mohammed Sali

Irfaz Project and Maintenance Engineer CV

  • 1.
    Page 1 of4 CURRICULUM VITAE IRFAZ MOHAMMED SALI DOHA QATAR +974 30623200 +91 8904880247 B.E. (Bachelor of Engineering). Major: Electronics and Communication. E-Mail: irfazabdul@ymail.com Objective: Project and Maintenance Engineer with strong desire to advance my skills seeking a position in which to continue growing within my desired field. Professional Profile:  Electronics and Communication Engineering professional with experience and knowledge in the project life-cycle that includes project design, equipment installation & integration, testing and commissioning.  Hands on practical knowledge and experience in the DDC Controls, PLC’s, building management system, water leakage detection system, CO system and Aircraft warning lights.  Exposure in handling installation and operation of Chillers, Chilled water Pumps, Secondary Pumps, Central Plant Air Conditioners (AHU, FAHU, FCU, Package units, Split units etc.), & operation & maintenance of the same.  Experience in Site Supervision, Drawing, Estimation and BOQ preparation, installations and troubleshooting.  Prompt decision maker having good communication skill with capability to wade through crisis situation with great objectivity.  Have experience in software’s like MS office, VLSI, EC-NET, Niagara, Lonwatcher and all Distech Controls related Software’s.  Have experience working as a BMS and Aircraft warning lights Maintenance Engineer visiting handed projects for monthly, bi-monthly and quarterly preventive maintenance which includes troubleshooting all the problems and also prepare relevant documents. Key Skills: Building Managment System PLC's and SCADA Programing and Wiring Low Voltage System Industrial Automation Aircraft Warning Lights Maintenace and Troubleshooting Installation and Commissioning DDC Programming Design and Estimation Troubleshooting and Maintenance
  • 2.
    Page 2 of4 Professional Experience: 1. Project and Maintenance Engineer. Arabian Controls W.L.L. January 2015 to Present A distech Controls Canada representative Doha, Qatar. www.distech-controls.com Arabian Controls Ltd in association with Distech Controls, Canada as its sole Distributor and Authorized System integrator in the State of Qatar to provide clients with the full range of Distech Controls Products, state of the art Building Automation System and services. Arabian Controls provides its clients with full design, procurement, installation supervision, testing, commissioning & maintenance service of BMS, Low current systems and many various instrumentation and Electro-Mechanical products. Responsible for BMS integration projects with complete control system design, sequence of operation strategies, parts selection/procurement, installation management, commissioning, and troubleshooting. Job Profile:  Designing the appropriate locations of DDC controllers and DDC Panels. Provide technical and engineering support to the field, related to design, equipments/devices, such as drawings and other engineering information.  Programming, Simulation, Testing and Commissioning of DDC panel.  Preparing BOQ based on the I/O’s, And Preparing quotation.  Installation of CO system and water leakage detection system.  Responsible for management of material and human resources on project sites  Assist engineers and designers in designing layout and site research  Coordinate with site inspectors to check the on-going project status and development  Check the material quality as per prescribed standards  Maintain reports of contractors for proper execution of key projects on a daily basis.  Preparation of O&M Manuals.  Provide inputs for budget planning. Projects Involved in:  Q Mall - (Doha, Qatar). o Consultant: FACB o MEP Contractor: Power supply trading co.  Palestinian School (Abu Hamour, Qatar) o Consultant: A.E.B. Qatar o MEP Contractor: Power mech Engineering Company.  Proposed Residential building-100 (Doha, Qatar) o Consultant: A.E.B. Qatar o MEP Contractor: RAMACO.  FNAC Store Lagoona Mall (Pearl Qatar, Qatar) o Consultant: MZ & Partners. o MEP Contractor: Polaris trading and contracting.
  • 3.
    Page 3 of4  Three New Schools (Mesaimeer and Mesaieed, Qatar) o Consultant: C.E.G. International. o MEP Contractor: Gulf Lights Electrical Engineering W.L.L.  Union Residential Tower (Al Dafna, Qatar) o Consultant: A.E.B. Qatar o MEP Contractor: Power mech Engineering Company. Job profile as BMS Maintenance Engineer:  Providing basic Training to Operators and Clients on the installed System.  Maintenance of Control Systems and Troubleshooting problems as necessary.  Visiting handed projects for monthly, bi-monthly, and quarterly preventive maintenance.  Generating necessary spare parts required for troubleshooting.  Make relevant documents required after visiting preventive maintenance. Projects working as BMS Maintenance Engineer:  VB-22 & VB-23(2B+G+20F) (Pearl Qatar, Qatar). o Contractor: MMG Group, Qatar  MV1 data center (Doha, Qatar). o Contractor: Debbas Enterprises, Qatar  World Trade Centre - (4B+G+50 Floors) (Doha, Qatar). o Contractor: MMG Group, Qatar  City Tower - (2B+G+34F) (Doha, Qatar). o Contractor: Eagle Group, Qatar  Ooredoo Wadi Sail (Doha, Qatar). o Contractor: MMG Group, Qatar  Dukhan Palace (Dukhan, Qatar). o Contractor: Elegancia, Qatar Job profile as Aircraft Warning Lights Maintenance Engineer:  Maintenance of Aircraft Warning Lights and Troubleshooting problems as necessary.  Visiting handed projects for monthly, bi-monthly, and quarterly preventive maintenance.  Generating necessary spare parts required for troubleshooting.  Make relevant documents required after visiting preventive maintenance. Projects working as Aircraft Warning Lights Maintenance Engineer:  Kempinski Residences & Suites, Doha (3B+G+64 Floors) (Doha, Qatar). o Client: Kempinski, Qatar  World Trade Centre - (4B+G+50 Floors) (Doha, Qatar). o Contractor: MMG Group, Qatar
  • 4.
    Page 4 of4 2. Technical Trainee: July 2014 to October 2014 Diya system Mangalore, India http://www.diyasystems.com Job profile:  To solve technical issues related to websites,  To migrate websites from other domain providers to ours.  Upgrading and downgrading website package plans.  Provide on-call support as needed by our clients. 3. Trainee Industrial Automation: November 2014 to December 2014 Technologics Bangalore, India http://technologics.in/ Job profile:  Programming Various PLC’s like ABB, Alan Bradley, Schneider electric, Delta etc.  Programing SCADA and HMI.  Designing relay logic for various circuits.  Wiring of Various PLC’s like ABB, Alan Bradley, Schneider electric, Delta etc. . Education:  Post-Graduation Diploma in Industrial Automation in Technologics Bangalore.  Bachelor of Engineering in Electronics and Communication Engineering in NMAMIT, NITTE Karnataka, India with First class(68.9%).  Diploma in Electronics and Communication from P.A Polytechnic College Mangalore, India with 76% Distinction with honors. Personal Minutes: Passport No. : L8712739 Date of Birth : 10th August 1989. Nationality : Indian. Gender male : Male. Marital Status : Single. Language Known : English, Hindi, Kannada, Malayalam, Arabic (read) Declaration: I hereby declare that above information is authentic to the best of my knowledge. Place : Doha Yours truly, Date : Irfaz Mohammed Sali