Page 1
PRAMESAK POONTHONG
19 Soi Mabchalude1,MabchaludeRd.,
Huaypong, Muang, Rayong 21150
Tel: +6682-4706-320
E-mail: pramesak@gmail.com
SUMMARY
Engineering professional with extensive experience in process control (DCS, PLC and SCADA in Oil
&Gas, Power plant and petrochemical). Strong capabilities in project execution, commissioning, plant
start-up, production and operation.
Interested for challenging career path that provide opportunity for applying skills and knowledge acquired
as part of professional experience to serve and grow together with the company.
Quick and self learner with strong analytical skills and problem solving capabilities. Able to work up
country or abroad both temporarily and permanently. Enthusiastic and always welcome for new
experience.
Total experience : 4 Years.
Work Experiences :
IDEMITSU Lubricants (Thailand) Co., Ltd. (New Plant)
Production Supervisor
(Oct 2015 – Present)
Responsibilities :
• Establish Operation procedure.
• Design control function of Lubricant and Grease process.
• Conduct the Lubricant and Grease operation training for Engineer and Operator.
• Conduct the FAT, SAT, commissioning of Lubricant and Grease production.
• Provide start-up plan for Lubricant and Grease process.
• Manage and work with engineer, operator, supplier and contractor to start up Lubricant and Grease
production.
• Find root cause on operation and provide solution to solve problem.
• Provide recipes of Lubricant and Grease for production.
• Improved operation condition of Lubricant and Grease process.
• Provide weekly/daily production plan.
Invensys (Now Schneider-Electric), Thailand
Project Application Engineer
(July 2012 – October 2015)
2012 - 2015 Petrochemical, Oil & Gas and Power Projects
Absolute Power P Company Limited,
Process Control System Revamping Project
Lead Engineer
(July 2015 to October 2015)
Develop and implement the engineering design and project execution for PES
Systems.
Responsibilities include the following:
• Front end engineering design.
• Implement of Factory Acceptance Test.
• PES Training for both Engineer and Operator.
Page 2
Siam Kraft Industrial Company Limited,
SKIC PB#8 UpgradeProject
LeadEngineer
(May 2015 to October 2015)
Develop and implement the engineering design and project execution for
Foxboro I/A Series Distributed Control Systems.
Responsibilities include the following:
• Project engineering design.
• Implement of Factory Acceptance Test.
• System installation, System power up, Site Acceptance Test, plant
commissioning and start-up.
• DCS Training for Operator.
Thai Oil Public Company Limited,
IPS-DCS MODBUS & HMI Testing
Project Engineer
(May 2015 to July 2015)
Implement the engineering design for Foxboro I/A Series Distributed Control
Systems&Triconex Emergency Shutdown System.
Responsibilities include the following:
• Implement of Integrated Factory Acceptance Test.
• DCS System interface with TriconexESD & FGS via Modbus.
Sahacogen (Chonburi) Public Company Limited,
SCG DCS Upgrade Project
Project Engineer
(February 2015 to April 2015)
Develop and implement the engineering design and project execution for
Foxboro I/A Series Distributed Control Systemsincluding HART transmitter..
Responsibilities include the following:
• Project engineering design.
• Lead HMI Factory Acceptance Test(FAT).
• Supervision of DCS System & Field instrument installation, System power-
up, Factory Acceptance Test, Site Acceptance Test.
• Plant start-up and commissioning.
Siam Kraft Industrial Company Limited,
SKIC PB#14 DCS Upgrade Project
Project Engineer
(November2014 to February 2015)
Develop and implement the engineering design, Human Machine Interface and
project execution for Foxboro I/A Series Distributed Control Systems.
Responsibilities include the following:
• Perform site survey for interfacing to Foxboro I/A Series DCS.
• Project engineering design.
• Human Machine Interface development.
• DCS System hardware configuration and interface configuration with third
party hardware.
• DCS System installation, System power-up, Factory Acceptance Test, Site
Acceptance Test.
• Plant start-up and commissioning.
Thai Oil Public Company Limited,
03MG02 Upgrade Project
Project Engineer
(November 2014 to December 2014)
Implement the engineering design for Foxboro I/A Series Distributed Control
Systems&Triconex Emergency Shutdown System.
Responsibilities include the following:
• Implement of Integrated Factory Acceptance Test.
Page 3
• DCS System interface with third party via Modbus.
• System hardware configuration and engineering.
• Supervision of DCS System installation, System power-up, Factory
Acceptance Test, Site Acceptance Test.
• Plant start-up and commissioning.
Thai Oil Public Company Limited,
Oil Movement Improvement Project
Project Engineer
(August 2013 to November 2014)
Develop and implement the engineering design, Human Machine Interface and
project execution for Foxboro I/A Series Distributed Control Systems.
Responsibilities include the following:
• Project engineering design.
• Developed THAPPLINE Philosophy document.
• Developed operation procedure and alarm management concept.
• System hardware configuration and engineering.
• System Integration Test and Factory Acceptance Test.
• Developed HMI graphic of Oil Movement and Offsite section.
• DCS System interface with third party via Modbus.
• Supervision of DCS System installation, System power-up, Factory
Acceptance Test, Site Acceptance Test.
• Plant start-up and commissioning.
Global Power SynergyCompany Limited,
Project Engineer
(August 2013 to October 2013)
Develop and implement the engineering design, Human Machine Interface and
project execution for Foxboro I/A Series Distributed Control Systems.
Responsibilities include the following:
• Project engineering design.
• DCS System installation, plant commissioning and start-up.
Thai Polyethylene Company Limited,
Project Engineer
(July 2012 to August 2013)
Develop and implement the engineering design, Human Machine Interface and
project execution for Foxboro I/A Series Distributed Control Systems.
Responsibilities include the following:
• Project engineering design.
• Co-ordinating with customer project team for Factory Acceptance
Test and Site Acceptance Test.
Thai Plastic and Chemicals Public Company Limited
Project Engineer
(July 2012 to October 2013)
Develop and implement the engineering design, Human Machine Interface and
project execution for Foxboro I/A Series Distributed Control Systems.
Responsibilities include the following:
• Perform site survey for interfacing to Foxboro I/A Series DCS.
• System start-up and commissioning.
2010 - 2011 Teacher assistant(Chulalongkorn University)
Responsibilities include the following:
• Teaching Physical Chemistry tests.
• Helping work with the large lecture classes.
• Helping students with their needs, works.
Page 4
2009 – 2010 Researcher (Chulalongkorn University cooperated with Thai Plastic and
Chemicals Public Company Ltd.)
Responsibilities include the following:
• Catalyst attrition dynamic model is designed on Jet, Bubble and Cyclone
area.
• Optimized on Particle size distribution, Time and volume of catalyst for
insert to FCC unit.
• Imporoved the operation condition of FCC unit.
2008 – 2009 Researcher (H.C. Starck GmbH)
Responsibilities include the following:
• Planning and organising production operations at the Test.
• Deoxidation furnace dynamic model is designed for explain behaviour and
reducing cost on product development.
• Improved the operation condition of deoxidation furnace.
• Involved in technical and engineering works that required research and
documentation.
Education:
M.Eng. in Chemical Engineering,
Chulalongkorn University, 2012.
B.Eng. in Chemical Engineering
King Mongkut’s University of Technology North Bangkok, 2007.
Vocational Education in Power Electrical
Thai-Austrian Technical College, 2003.
Training:
Electrical and Electronics Institute, 2009.
- Clean Technology Course
Rayong Gas Separation Plant PTT Public Co., Ltd. 2007
- Training is provide on how to use Distribution Control System(DCSs) for controlling process and
responsible for performance analysis and optimization of Gas Turbine and Waste heat recovery unit
in Gas Separation Plant.
Rayong Engineering & Plant Service Co.,LTD., 2003.
- Training is provide on how to operate a machine that has LCD and PLC oprator interface and
maintenance process.
- Done various other duties as assigned.
Publication:
Modelling of Deoxidation Furnace, The 2
nd
CMU Graduate Research Conference at Chiang Mai
University, 26 November 2010.
Thesis:
Robust MPC Based on nominal performance cost with application in Quadruple Tank System.
- Using MATLAB software to develop and build robust MPC controller.
- Quadruple Tank System is used as benchmark for this controller testing.
- The control performance of this controller was compared with other robust MPC controller.
Page 5
Technical Skills:
Process simulation: Pro/II, DYNSIM, ASPEN, Mathematical modeling
Programming: MATLAB
Automation: DCS (Foxboro Control System), ESD (Triconex System)
PLC (Modicon Quantum, Yokogawa FA-M3, Siemen S7, Azbil),
SCADA (Wonderware InTouch, Vijeo Citect)
Application Software: Wonderware InBatch, Foxview, Foxdraw, Archestra IDE, Tristation, Wildfield,
IACC
Others: Mocrosoft Office
Personal Information:
Date of birth: 30
th
Sep1985
Nationality: Thai
Age: 30
Marital status: Married
References:
Assoc. Prof. Dr. Soorathep Kheawhom
Phone: 02-218-6893
Department of Chemical Engineering, Faculty of Engineering,
Chulalongkorn University, Bangkok 10330, Thailand

Pramesak Poonthong

  • 1.
    Page 1 PRAMESAK POONTHONG 19Soi Mabchalude1,MabchaludeRd., Huaypong, Muang, Rayong 21150 Tel: +6682-4706-320 E-mail: pramesak@gmail.com SUMMARY Engineering professional with extensive experience in process control (DCS, PLC and SCADA in Oil &Gas, Power plant and petrochemical). Strong capabilities in project execution, commissioning, plant start-up, production and operation. Interested for challenging career path that provide opportunity for applying skills and knowledge acquired as part of professional experience to serve and grow together with the company. Quick and self learner with strong analytical skills and problem solving capabilities. Able to work up country or abroad both temporarily and permanently. Enthusiastic and always welcome for new experience. Total experience : 4 Years. Work Experiences : IDEMITSU Lubricants (Thailand) Co., Ltd. (New Plant) Production Supervisor (Oct 2015 – Present) Responsibilities : • Establish Operation procedure. • Design control function of Lubricant and Grease process. • Conduct the Lubricant and Grease operation training for Engineer and Operator. • Conduct the FAT, SAT, commissioning of Lubricant and Grease production. • Provide start-up plan for Lubricant and Grease process. • Manage and work with engineer, operator, supplier and contractor to start up Lubricant and Grease production. • Find root cause on operation and provide solution to solve problem. • Provide recipes of Lubricant and Grease for production. • Improved operation condition of Lubricant and Grease process. • Provide weekly/daily production plan. Invensys (Now Schneider-Electric), Thailand Project Application Engineer (July 2012 – October 2015) 2012 - 2015 Petrochemical, Oil & Gas and Power Projects Absolute Power P Company Limited, Process Control System Revamping Project Lead Engineer (July 2015 to October 2015) Develop and implement the engineering design and project execution for PES Systems. Responsibilities include the following: • Front end engineering design. • Implement of Factory Acceptance Test. • PES Training for both Engineer and Operator.
  • 2.
    Page 2 Siam KraftIndustrial Company Limited, SKIC PB#8 UpgradeProject LeadEngineer (May 2015 to October 2015) Develop and implement the engineering design and project execution for Foxboro I/A Series Distributed Control Systems. Responsibilities include the following: • Project engineering design. • Implement of Factory Acceptance Test. • System installation, System power up, Site Acceptance Test, plant commissioning and start-up. • DCS Training for Operator. Thai Oil Public Company Limited, IPS-DCS MODBUS & HMI Testing Project Engineer (May 2015 to July 2015) Implement the engineering design for Foxboro I/A Series Distributed Control Systems&Triconex Emergency Shutdown System. Responsibilities include the following: • Implement of Integrated Factory Acceptance Test. • DCS System interface with TriconexESD & FGS via Modbus. Sahacogen (Chonburi) Public Company Limited, SCG DCS Upgrade Project Project Engineer (February 2015 to April 2015) Develop and implement the engineering design and project execution for Foxboro I/A Series Distributed Control Systemsincluding HART transmitter.. Responsibilities include the following: • Project engineering design. • Lead HMI Factory Acceptance Test(FAT). • Supervision of DCS System & Field instrument installation, System power- up, Factory Acceptance Test, Site Acceptance Test. • Plant start-up and commissioning. Siam Kraft Industrial Company Limited, SKIC PB#14 DCS Upgrade Project Project Engineer (November2014 to February 2015) Develop and implement the engineering design, Human Machine Interface and project execution for Foxboro I/A Series Distributed Control Systems. Responsibilities include the following: • Perform site survey for interfacing to Foxboro I/A Series DCS. • Project engineering design. • Human Machine Interface development. • DCS System hardware configuration and interface configuration with third party hardware. • DCS System installation, System power-up, Factory Acceptance Test, Site Acceptance Test. • Plant start-up and commissioning. Thai Oil Public Company Limited, 03MG02 Upgrade Project Project Engineer (November 2014 to December 2014) Implement the engineering design for Foxboro I/A Series Distributed Control Systems&Triconex Emergency Shutdown System. Responsibilities include the following: • Implement of Integrated Factory Acceptance Test.
  • 3.
    Page 3 • DCSSystem interface with third party via Modbus. • System hardware configuration and engineering. • Supervision of DCS System installation, System power-up, Factory Acceptance Test, Site Acceptance Test. • Plant start-up and commissioning. Thai Oil Public Company Limited, Oil Movement Improvement Project Project Engineer (August 2013 to November 2014) Develop and implement the engineering design, Human Machine Interface and project execution for Foxboro I/A Series Distributed Control Systems. Responsibilities include the following: • Project engineering design. • Developed THAPPLINE Philosophy document. • Developed operation procedure and alarm management concept. • System hardware configuration and engineering. • System Integration Test and Factory Acceptance Test. • Developed HMI graphic of Oil Movement and Offsite section. • DCS System interface with third party via Modbus. • Supervision of DCS System installation, System power-up, Factory Acceptance Test, Site Acceptance Test. • Plant start-up and commissioning. Global Power SynergyCompany Limited, Project Engineer (August 2013 to October 2013) Develop and implement the engineering design, Human Machine Interface and project execution for Foxboro I/A Series Distributed Control Systems. Responsibilities include the following: • Project engineering design. • DCS System installation, plant commissioning and start-up. Thai Polyethylene Company Limited, Project Engineer (July 2012 to August 2013) Develop and implement the engineering design, Human Machine Interface and project execution for Foxboro I/A Series Distributed Control Systems. Responsibilities include the following: • Project engineering design. • Co-ordinating with customer project team for Factory Acceptance Test and Site Acceptance Test. Thai Plastic and Chemicals Public Company Limited Project Engineer (July 2012 to October 2013) Develop and implement the engineering design, Human Machine Interface and project execution for Foxboro I/A Series Distributed Control Systems. Responsibilities include the following: • Perform site survey for interfacing to Foxboro I/A Series DCS. • System start-up and commissioning. 2010 - 2011 Teacher assistant(Chulalongkorn University) Responsibilities include the following: • Teaching Physical Chemistry tests. • Helping work with the large lecture classes. • Helping students with their needs, works.
  • 4.
    Page 4 2009 –2010 Researcher (Chulalongkorn University cooperated with Thai Plastic and Chemicals Public Company Ltd.) Responsibilities include the following: • Catalyst attrition dynamic model is designed on Jet, Bubble and Cyclone area. • Optimized on Particle size distribution, Time and volume of catalyst for insert to FCC unit. • Imporoved the operation condition of FCC unit. 2008 – 2009 Researcher (H.C. Starck GmbH) Responsibilities include the following: • Planning and organising production operations at the Test. • Deoxidation furnace dynamic model is designed for explain behaviour and reducing cost on product development. • Improved the operation condition of deoxidation furnace. • Involved in technical and engineering works that required research and documentation. Education: M.Eng. in Chemical Engineering, Chulalongkorn University, 2012. B.Eng. in Chemical Engineering King Mongkut’s University of Technology North Bangkok, 2007. Vocational Education in Power Electrical Thai-Austrian Technical College, 2003. Training: Electrical and Electronics Institute, 2009. - Clean Technology Course Rayong Gas Separation Plant PTT Public Co., Ltd. 2007 - Training is provide on how to use Distribution Control System(DCSs) for controlling process and responsible for performance analysis and optimization of Gas Turbine and Waste heat recovery unit in Gas Separation Plant. Rayong Engineering & Plant Service Co.,LTD., 2003. - Training is provide on how to operate a machine that has LCD and PLC oprator interface and maintenance process. - Done various other duties as assigned. Publication: Modelling of Deoxidation Furnace, The 2 nd CMU Graduate Research Conference at Chiang Mai University, 26 November 2010. Thesis: Robust MPC Based on nominal performance cost with application in Quadruple Tank System. - Using MATLAB software to develop and build robust MPC controller. - Quadruple Tank System is used as benchmark for this controller testing. - The control performance of this controller was compared with other robust MPC controller.
  • 5.
    Page 5 Technical Skills: Processsimulation: Pro/II, DYNSIM, ASPEN, Mathematical modeling Programming: MATLAB Automation: DCS (Foxboro Control System), ESD (Triconex System) PLC (Modicon Quantum, Yokogawa FA-M3, Siemen S7, Azbil), SCADA (Wonderware InTouch, Vijeo Citect) Application Software: Wonderware InBatch, Foxview, Foxdraw, Archestra IDE, Tristation, Wildfield, IACC Others: Mocrosoft Office Personal Information: Date of birth: 30 th Sep1985 Nationality: Thai Age: 30 Marital status: Married References: Assoc. Prof. Dr. Soorathep Kheawhom Phone: 02-218-6893 Department of Chemical Engineering, Faculty of Engineering, Chulalongkorn University, Bangkok 10330, Thailand