Navi Mumbai, India
18 January to 21 February, 2015
(Organized by DAE & NPCIL)
Presented by
Md. Khalid Hossain
Scientific Officer
Institute of Electronics, AERE, BAEC
Program Objectives
The FCNE has been developed as fundamental
course for young scientists/engineering
professionals ( having reasonable industrial
experience), particularly for new comer
countries that seek to develop nuclear power.
The proposed program will enable the transfer of
generic nuclear power plant knowledge to
participating country towards their capacity
building efforts.
Course Content
Sl Module Title Hours Credits Marks
1 Nuclear and Reactor Physics 16 2 50
2 Nuclear Fuel Cycle and Material Science 10 2 50
3 Reactor Engineering 14 2 50
4 Nuclear Safety Engineering 08 1 25
5 Radiation Protection 04 1 25
6 Introduction to PWR Reactor System 14 2 50
7 Plant Dynamics and Control 06 1 25
8 Reactor Chemistry and Corrosion 06 1 25
9 Quality Assurance for NPPs 06 1 25
10 Regulatory Framework for NPPs 16 2 50
Project and assignments 25
Total for Modules (5 calendar weeks) 100 15 400
Invited Talks
1. Human Resource Development and Knowledge
Management
2. Indian Nuclear Power Program
3. Financing of Nuclear Power Project - Issues and
Challenges
4. Public Awareness, Corporate Social Responsibility
5. Energy Planning
6. Nuclear Power-The need, The public perception and The
Realities
7. Project Management
Nuclear and Reactor Physics
NUCLEAR ENGINEERING
NUCLEAR FUEL CYCLE
19 ELEMENT PHWR FUEL BUNDLE
Barriers To Activity release
Nuclear Safety Engineering
RADIATION PROTECTION
Introduction to
PWR Reactor System
Different Indian Nuclear
Facility visit
BARC Visit
In BARC we visited the following facility –
1. 100 MW Research Reactor (Dhruva),
2. Reprocessing and Nuclear Waste
Management facility &
3. Division of Remote Handling and
Robotics.
KudanKulam NPP (KKNPP) Visit
Kudankulam NPP (KKNPP) visit
During the visit we came to know that there was
a protest form the public which stopped the
construction for more than a year. At the
beginning there was no problem but due to
communication gap between NPCIL and local
community some anti-nuclear protesters took
the opportunity to spread rumors about NPP
among local people.
Summary fcne
Summary fcne
Summary fcne

More Related Content

Similar to Summary fcne

Risk management in nuclear projects and strategy of small reactors [compatibi...
Risk management in nuclear projects and strategy of small reactors [compatibi...Risk management in nuclear projects and strategy of small reactors [compatibi...
Risk management in nuclear projects and strategy of small reactors [compatibi...HIMADRI BANERJI
 
Nuclear Report Power People
Nuclear Report Power PeopleNuclear Report Power People
Nuclear Report Power PeopleJohn Sadler
 
Small and Modular Reactors..A Paradigm Shift in Nuclear Power Risks
Small and Modular Reactors..A Paradigm Shift in Nuclear Power RisksSmall and Modular Reactors..A Paradigm Shift in Nuclear Power Risks
Small and Modular Reactors..A Paradigm Shift in Nuclear Power RisksHIMADRI BANERJI
 
nucliar power plant
nucliar power plantnucliar power plant
nucliar power plant94600banti
 
Advanced Computational Materials Science: Application to Fusion and Generatio...
Advanced Computational Materials Science: Application to Fusion and Generatio...Advanced Computational Materials Science: Application to Fusion and Generatio...
Advanced Computational Materials Science: Application to Fusion and Generatio...myatom
 
Rooppur Atomic Power Plant, Bangladesh.
Rooppur Atomic Power Plant, Bangladesh.Rooppur Atomic Power Plant, Bangladesh.
Rooppur Atomic Power Plant, Bangladesh.Mehedi Hassan
 
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...HIMADRI BANERJI
 
Icacer 2016 paper_13
Icacer 2016 paper_13Icacer 2016 paper_13
Icacer 2016 paper_13Manoj Kansal
 
2011 UQ Engineering Postgraduate Research Conference
2011 UQ Engineering Postgraduate Research Conference2011 UQ Engineering Postgraduate Research Conference
2011 UQ Engineering Postgraduate Research ConferenceKelly Lipiec
 
Lecture1-1_23437_CIV880_Renewable Energy Systems_Zero lecture.pptx
Lecture1-1_23437_CIV880_Renewable Energy Systems_Zero lecture.pptxLecture1-1_23437_CIV880_Renewable Energy Systems_Zero lecture.pptx
Lecture1-1_23437_CIV880_Renewable Energy Systems_Zero lecture.pptxmrunmayee20
 
China nuclear power: From Importing to exporting technology
China nuclear power: From Importing to exporting technologyChina nuclear power: From Importing to exporting technology
China nuclear power: From Importing to exporting technologyYannick Perez
 
A Review Paper On Nuclear S Power Plants Safety
A Review Paper On Nuclear S Power Plants SafetyA Review Paper On Nuclear S Power Plants Safety
A Review Paper On Nuclear S Power Plants SafetyDaphne Smith
 
Cmd paper 07dec2010
Cmd paper 07dec2010Cmd paper 07dec2010
Cmd paper 07dec2010rameshgoudru
 
Impact of nuclear energy in india
Impact of nuclear energy in indiaImpact of nuclear energy in india
Impact of nuclear energy in indiajebarsonmerson1
 

Similar to Summary fcne (20)

Risk management in nuclear projects and strategy of small reactors [compatibi...
Risk management in nuclear projects and strategy of small reactors [compatibi...Risk management in nuclear projects and strategy of small reactors [compatibi...
Risk management in nuclear projects and strategy of small reactors [compatibi...
 
Nuclear Report Power People
Nuclear Report Power PeopleNuclear Report Power People
Nuclear Report Power People
 
Small and Modular Reactors..A Paradigm Shift in Nuclear Power Risks
Small and Modular Reactors..A Paradigm Shift in Nuclear Power RisksSmall and Modular Reactors..A Paradigm Shift in Nuclear Power Risks
Small and Modular Reactors..A Paradigm Shift in Nuclear Power Risks
 
Gvt 02
Gvt 02Gvt 02
Gvt 02
 
nucliar power plant
nucliar power plantnucliar power plant
nucliar power plant
 
Advanced Computational Materials Science: Application to Fusion and Generatio...
Advanced Computational Materials Science: Application to Fusion and Generatio...Advanced Computational Materials Science: Application to Fusion and Generatio...
Advanced Computational Materials Science: Application to Fusion and Generatio...
 
Rooppur Atomic Power Plant, Bangladesh.
Rooppur Atomic Power Plant, Bangladesh.Rooppur Atomic Power Plant, Bangladesh.
Rooppur Atomic Power Plant, Bangladesh.
 
Nuclear Energy
Nuclear EnergyNuclear Energy
Nuclear Energy
 
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
Permananece of Nuclear Power: Strategies for Managing Safety Risks Post Fukus...
 
bwr-tt102es
bwr-tt102esbwr-tt102es
bwr-tt102es
 
Current IssuesDOE's Nuclear Energy Programs
Current IssuesDOE's Nuclear Energy ProgramsCurrent IssuesDOE's Nuclear Energy Programs
Current IssuesDOE's Nuclear Energy Programs
 
Icacer 2016 paper_13
Icacer 2016 paper_13Icacer 2016 paper_13
Icacer 2016 paper_13
 
IDRC_2014_emerging proliferation update
IDRC_2014_emerging proliferation updateIDRC_2014_emerging proliferation update
IDRC_2014_emerging proliferation update
 
2011 UQ Engineering Postgraduate Research Conference
2011 UQ Engineering Postgraduate Research Conference2011 UQ Engineering Postgraduate Research Conference
2011 UQ Engineering Postgraduate Research Conference
 
Lecture1-1_23437_CIV880_Renewable Energy Systems_Zero lecture.pptx
Lecture1-1_23437_CIV880_Renewable Energy Systems_Zero lecture.pptxLecture1-1_23437_CIV880_Renewable Energy Systems_Zero lecture.pptx
Lecture1-1_23437_CIV880_Renewable Energy Systems_Zero lecture.pptx
 
China nuclear power: From Importing to exporting technology
China nuclear power: From Importing to exporting technologyChina nuclear power: From Importing to exporting technology
China nuclear power: From Importing to exporting technology
 
A Review Paper On Nuclear S Power Plants Safety
A Review Paper On Nuclear S Power Plants SafetyA Review Paper On Nuclear S Power Plants Safety
A Review Paper On Nuclear S Power Plants Safety
 
Cmd paper 07dec2010
Cmd paper 07dec2010Cmd paper 07dec2010
Cmd paper 07dec2010
 
Poster
PosterPoster
Poster
 
Impact of nuclear energy in india
Impact of nuclear energy in indiaImpact of nuclear energy in india
Impact of nuclear energy in india
 

Recently uploaded

Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetHyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetEnjoy Anytime
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Hyundai Motor Group
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 

Recently uploaded (20)

Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your BudgetHyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
Hyderabad Call Girls Khairatabad ✨ 7001305949 ✨ Cheap Price Your Budget
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2Next-generation AAM aircraft unveiled by Supernal, S-A2
Next-generation AAM aircraft unveiled by Supernal, S-A2
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 

Summary fcne

  • 1. Navi Mumbai, India 18 January to 21 February, 2015 (Organized by DAE & NPCIL) Presented by Md. Khalid Hossain Scientific Officer Institute of Electronics, AERE, BAEC
  • 2. Program Objectives The FCNE has been developed as fundamental course for young scientists/engineering professionals ( having reasonable industrial experience), particularly for new comer countries that seek to develop nuclear power. The proposed program will enable the transfer of generic nuclear power plant knowledge to participating country towards their capacity building efforts.
  • 3. Course Content Sl Module Title Hours Credits Marks 1 Nuclear and Reactor Physics 16 2 50 2 Nuclear Fuel Cycle and Material Science 10 2 50 3 Reactor Engineering 14 2 50 4 Nuclear Safety Engineering 08 1 25 5 Radiation Protection 04 1 25 6 Introduction to PWR Reactor System 14 2 50 7 Plant Dynamics and Control 06 1 25 8 Reactor Chemistry and Corrosion 06 1 25 9 Quality Assurance for NPPs 06 1 25 10 Regulatory Framework for NPPs 16 2 50 Project and assignments 25 Total for Modules (5 calendar weeks) 100 15 400
  • 4. Invited Talks 1. Human Resource Development and Knowledge Management 2. Indian Nuclear Power Program 3. Financing of Nuclear Power Project - Issues and Challenges 4. Public Awareness, Corporate Social Responsibility 5. Energy Planning 6. Nuclear Power-The need, The public perception and The Realities 7. Project Management
  • 5.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 45.
  • 46.
  • 47.
  • 48.
  • 49.
  • 50.
  • 51. 19 ELEMENT PHWR FUEL BUNDLE
  • 52.
  • 53.
  • 54.
  • 55.
  • 56.
  • 57.
  • 58.
  • 60.
  • 61.
  • 63.
  • 64.
  • 65.
  • 66.
  • 68.
  • 69.
  • 70.
  • 71.
  • 72.
  • 74.
  • 75.
  • 76.
  • 77.
  • 78.
  • 79.
  • 80.
  • 81.
  • 82.
  • 83.
  • 84.
  • 85.
  • 86.
  • 87.
  • 88.
  • 89.
  • 90.
  • 91.
  • 92.
  • 93.
  • 94.
  • 96. BARC Visit In BARC we visited the following facility – 1. 100 MW Research Reactor (Dhruva), 2. Reprocessing and Nuclear Waste Management facility & 3. Division of Remote Handling and Robotics.
  • 98. Kudankulam NPP (KKNPP) visit During the visit we came to know that there was a protest form the public which stopped the construction for more than a year. At the beginning there was no problem but due to communication gap between NPCIL and local community some anti-nuclear protesters took the opportunity to spread rumors about NPP among local people.