SlideShare a Scribd company logo
DESIGN PROJECT REPORT
COLLABORATIVE WORKSPACE
NAME : CHONG YI HUI
STUDENT ID : 0324404
TUTOR : MR. PRINCE FAVIS ISIP
CONTENTS
1.0 INTRODUCTION
1.1 ABSTRACT
1.2 PROJECT INTRODUCTION
1.3 AIM & OBJECTIVE
2.0 SITE INVESTIGATION & CONTEXTUAL STUDIES
2.1 SITE INTRODUCTION
2.2 HISTORICAL BACKGROUND
2.3 SITE ISSUE
2.4 URBAN STUDIES
2.5 MACRO SITE ANALYSIS
3.0 PROJECT BACKGROUND & DESIGN INTENTION STRATEGIES
3.1 MICRO SITE ANALYSIS
3.2 PRECEDENT STUDIES
3.3 DESIGN INTENTION, DESIGN DEVELOPMENT & MASSING STRATEGIES
3.4 SPATIAL PROGRAMMING
4.0 ENVIRONMENTAL AND TECHNOLOGICAL STRATEGIES
4.1 ENVIRONMENTAL STRATEGIES
4.2 SUSTAINABILITY CONCEPT (MATERIALS)
4.3 CONSTRUCTION DETAILS
5.0 FINAL DESIGN
1.0 INTRODUCTION
1.1 ABSTRACT
Creating architecture with the intention to connect people and accentuate a sense of
community in my opinion has much more meaning rather than having a very good aesthetics
with no story behind it. The idea of bridging a particular design with the context becomes a
personal goal in order to reach the intention of connection.
With that being said, this particular studio focuses on the theme of sustaining humanities
through the existence of a collaborative workspace. The goal of sustaining humanities covers a
wide array of aspects such as the technological, environmental as well as the cultural context
all in one building which results in a social impact that benefits the community of that
particular place.
The design project also deals with existing urban issues as a form of site response which stems
from our site analysis, which becomes the first stepping stone for the workspace design.
Through proposals with multiple strategies, along with several reworks to the design it results
in a final outcome that responds to the issues as well as introducing several innovations that
carves the path to a better urban landscape.
1.2 PROJECT INTRODUCTION
This project intends to develop a creative collaborative workspace within the heart of Chow Kit
as part of the client’s aim to introduce a creative workforce within a hectic and typical city
worklife. As the buildings on site has a formal and intimidating typology, it lacks the sense of
community and leisure aspect. This collaborative workspace aims to create a balance work and
live component by introducing unconventional but functional spaces for users to work in.
To bring a sense of community and more leisure activities within the site, the programs and
function of the collaborative workspace would be more towards creating a community within
the building by having a mixture of users from entrepreneurs to designers. Fun and
multipurpose spaces will not only increase communication between users but also makes them
feel more welcomed. Spaces such as galleries are not usual in a typical collaborative space, but
this provides a space for users to display and share ideas among each other. Thus, increasing
the connectivity among themselves.
1.3 AIMS & OBJECTIVES
The aim of this project is to connect the gap between people of various skills and experiences
in the creative field and the community of Chow Kit. Its objective is to improve on the
engagement of the community within the site by having a public realm where the people can
use. It also is a hub where the creative workers can connect by having collaborations with one
another as well as the community. It nurtures the discipline of work in comfortable and livable
spaces. Therefore, it hopes to balance the “WORK+LIVE” component.
The building acts as a venue for fashion and design related exhibitions, activities and programs
as the main targeted users are from the creative field. Thus, the third component “CREATE” is
added. Green pockets are introduced in the building for a fresher working environment and as
the main green space in the site.
WORK
COWORK
LIVE
CREATE
2.0 SITE INVESTIGATION & CONTEXTUAL STUDIES
2.1 SITE INTRODUCTION
The site is located in Chow Kit, Kuala Lumpur. It is currently a private owned land which
provides parking services to anyone. Surrounding the site are high rise office buildings, hotel,
busy city road intersection and a sky bridge.
SITE PHOTOS
HIGH RISE
HOTEL
SITE
PARKING
SKY BRIDGE
HISTORICAL MORPHOLOGY
how the city of Chow Kit has changed
1980s
2000s
2 0 1 8 ?
2.2 HISTORICAL BACKGROUND
URBAN MORPHOLOGY 1980
1980s
Even during the 90s, Chow Kit has already
been known for being a dense city. A few
free-standing buildings have begun to
emerge to cater for the growing city.
2000s
Modern development rates have rapidly
increased as commercial becomes a focus
on site.
2018 (PRESENT)
The domination of new development and
modernisation leaning towards corporate
purposes, resulting in the lack of community
life.
TIMELINE
past to present of Chow Kit
PAST PRESENT
2.3 SITE ISSUES
● Repetitive building type
● Scale & proportion of building is intimating, not accommodating
● Lack of greeneries around macro site
● Lack of leisure activity areas around site context
● Segregation of society on site; fast paced community & laid back living
2.4 URBAN STUDIES
PRECINCT
● 3 main precincts around the site which is the Chow Kit Precinct, Kampung Bharu
Precinct and River of Life Precinct.
SITE
2.4 URBAN STUDIES
DISTRICT & BUILDING TYPE
● There are 3 districts surrounding the site which are the commercial, educational and corporate districts.
● As seen, the commercial districts are more on the east side of the site which comprises of traditional shophouse terraces. Most of free standing buildings surrounding the site are corporate
buildings and on the west side of the site is the educational district that consists of two schools.
2.5 MACRO SITE ANALYSIS
USER GROUPS
On site, there are four main user groups that can be categorized where the main user group on
site are the white collars followed by blue collars, students and visitors. The white collars are
concentrated more on the corporate district where the blue collars are on the commercial
districts. Students and visitors both can be found in small clusters around site.
TIME ANALYSIS
In the morning, the density of people coming into the site is moderate as the white collars
come in for work in their respective offices and some of the stall owners also open their stalls.
Traffic congestion is quite high on the main junction due to cars passing by to reach respective
destinations and to parking lots.
2.5 MACRO SITE ANALYSIS
TIME ANALYSIS
At this peak hour, there are more people on site as the working people as well as those around
the site walk around to find places for lunch. The vendors and food stalls are also packed due
to lunch hours. Traffic congestion is higher than in the morning as some people drive out for
lunch and some are parents picking up their kids from school.
TIME ANALYSIS
At night, the density of people around the site decreases as people retire back to their homes.
The ones that are left wondering around are the homeless around the sky bridge area. Traffic is
low at night as there are no activities. Shops also closes around this time.
3.0 PROJECT BACKGROUND & DESIGN INTENTION STRATEGIES
3.1 MICRO SITE ANALYSIS
Strengths
● Easily accessed by both vehicles and pedestrians
● Close proximity to public transports
Weaknesses
● Blocked views from nearby buildings and pedestrian bridge
● Heavy vehicular traffic during peak hours
● Vacant buildings are present around site creates a hollow feel in site
Opportunities
● The pedestrian bridge at close proximity to the site allows those who use it to immediately see the
building
● Cultural activities arounds the site can be brought in to enhance the user experience on the ground
floor level
● Multiple entrances and exits in design is possible due to the way the site is currently utilised
Threats
● Scale of nearby building and pedestrian bridge causes visual obstruction
● Bad drainage at the back of the site may cause bad odor to enter building
3.0 PROJECT BACKGROUND & DESIGN INTENTION STRATEGIES
3.2 PRECEDENT STUDIES
UNCOMMON, FULHAM
Location : 126 New King's Rd Fulham, London
The inspiration of the collaborative workspace is taken from Uncommon in the sense of space
planning, creative spaces and also implementation of green into the workspaces. Curtain walls
as exterior wall creates a sense of privacy to the workspaces but also allows views from either
side which is incorporated into the workspace also. Having huge openings also allows the
spaces to be combined into another use space. The interior look of the workspace is also
inspired from Uncommon by having greens not only on the outside but also inside. This creates
a different feeling while working. It gives some sort of freedom and freshness to the
environment.
FASHION FARM FOUNDATION
Location : Unit A, 9/F, D2 Place, 9 Cheung Yee Street, Lai Chi Kok, Hong Kong, Hong Kong
As for this precedent, mainly it is taken for its unique program that is more into the fashion
industry. Spaces such as retail and gallery are present in the coworking space as public spaces
which attracts people in. Workshops that are dedicated to the fashion designers are also taken
from precedent. This allows the users to comfortably utilise the space provided.
3.0 PROJECT BACKGROUND & DESIGN INTENTION STRATEGIES
3.3 DESIGN INTENTION, DESIGN DEVELOPMENT & MASSING STRATEGIES
DESIGN INTENTION DESIGN DEVELOPMENT
MASSING STRATEGIES
3.0 PROJECT BACKGROUND & DESIGN INTENTION STRATEGIES
3.4 SPATIAL PROGRAMMING
LAYOUT
● The building is arranged in a clustered manner and placed on each floor depending on
the intended groups of users for each space
LANDSCAPE
● The project is designed with the landscape as well as integrating nature into the design
as part of the response of the site where the presence of vegetation is lacking in the face
of the concrete jungle that the site mostly is.
CIRCULATION
● The circulation of the collaborative workspace is fairly straightforward to ease
movement for both normal and handicapped users. The building itself will have
subtraction of spaces as the user goes up the building as a sign on increased privacy as
one ascends to accentuate the intention of a working space.
PUBLIC SPACES
● The main plaza, reception, lobby, gallery, food and beverages, and chilling spaces are
located at the ground floor.
● These public spaces are mostly located at the ground floor to create a space that is
accessible for all.
CREATIVE & MIXED USE SPACES
● Spaces such as mini library, cafes, shared workspaces, workshops, brainstorm room and
audiovisual room are located on the upper floors where the work component of the
collaborative workspace takes place.
● Some of the space provided when combined can be multi-use. (eg : workshop &
brainstorm room). Moveable furnitures are also incorporated in the shared workspaces
for a creative work station.
GREEN SPACES
● Pockets of green spaces are provided in the building to create a refreshing workspace
and also counter the lack of greeneries on site.
● On the ground floor, a main plaza and other green spaces are present. Spaces on the
upper levels in the building can also connect with the green element incorporated by
having views and green spaces in between.
3.0 PROJECT BACKGROUND & DESIGN INTENTION STRATEGIES
3.4 SPATIAL PROGRAMMING-LIST OF SPACE
COURTYARD & PLAZA
Provides spaces with cooling and fresh air.
Creates stack ventilation in courtyard and
featured staircase. Helps to cool spaces.
Stack Ventilation
4.0 ENVIRONMENTAL AND TECHNOLOGICAL STRATEGIES
4.1 ENVIRONMENTAL STRATEGIES
PARAMETER GREENERIES
Landscaping are added as a response to the
lack of greeneries around the site context.
This allows the building to tap into the natural
landscape that is lacking. Besides, this also
helps to cool down the building while giving
the surrounding buildings pleasant view.
GREEN ROOF
Green roof is incorporated into the building to
cool down further the temperature of the
interior spaces. Having a green roof also
allows users to relax and conduct social
activities on the rooftop.
GREEN ROOF
● Cools building
● Improve stormwater management by reducing runoff
● Reduce noise & air pollution
● Increase biodiversity
4.0 ENVIRONMENTAL AND TECHNOLOGICAL STRATEGIES
4.2 SUSTAINABILITY CONCEPT (MATERIALS)
CURTAIN WALL
● Allows natural light into building making spaces brighter and less depressing
● Creates a sense of privacy while also allowing views from both sides
LIGHT COLOURED CONCRETE WALL
● Reflects light and heat
● Cools building
4.0 ENVIRONMENTAL AND TECHNOLOGICAL STRATEGIES
4.3 CONSTRUCTION DETAILS
BASEMENT DETAIL STAIRCASE DETAIL
5.0 FINAL DESIGN
FLOOR PLANS
5.0 FINAL DESIGN
FLOOR PLANS
5.0 FINAL DESIGN
FLOOR PLANS
5.0 FINAL DESIGN
ELEVATIONS
5.0 FINAL DESIGN
ELEVATIONS
5.0 FINAL DESIGN
SECTIONAL PERSPECTIVE
5.0 FINAL DESIGN
SECTIONAL PERSPECTIVE
5.0 FINAL DESIGN

More Related Content

Similar to Studio report

Adp report yew wing kee 0323555
Adp report yew wing kee 0323555Adp report yew wing kee 0323555
Adp report yew wing kee 0323555
Yew Wingkee
 
Yihui's pm final
Yihui's pm finalYihui's pm final
Yihui's pm final
Chong Yi Hui
 
Architectural Portfolio-Bharathwaj Iyengar
Architectural Portfolio-Bharathwaj IyengarArchitectural Portfolio-Bharathwaj Iyengar
Architectural Portfolio-Bharathwaj Iyengar
Bharathwaj Iyengar
 
Studio report
Studio reportStudio report
Studio report
aarenneoone
 
Project management final
Project management finalProject management final
Project management final
Aidiel Azhar
 
Architectural Comprehensive Design Report
Architectural Comprehensive Design ReportArchitectural Comprehensive Design Report
Architectural Comprehensive Design Report
LimSiewNi
 
Sem 6 studio report
Sem  6 studio reportSem  6 studio report
Sem 6 studio report
Chong Chin Pin
 
Project management (3)
Project management (3)Project management (3)
Project management (3)
Benjamin Tan
 
Project management
Project managementProject management
Project management
kimberlywjs
 
PROJECT MANAGEMENT PROJECT 2 REPORT
PROJECT MANAGEMENT PROJECT 2 REPORTPROJECT MANAGEMENT PROJECT 2 REPORT
PROJECT MANAGEMENT PROJECT 2 REPORT
Adibah Awang
 
Project management(roro)
Project management(roro)Project management(roro)
Project management(roro)
AwZhiXuan
 
Project Management
Project Management Project Management
Project Management
jernjack
 
Project Management (Project 1 - Defining and documenting a project)
Project Management (Project 1 - Defining and documenting a project)Project Management (Project 1 - Defining and documenting a project)
Project Management (Project 1 - Defining and documenting a project)
Tan Jaden
 
Project management report document a medium size project.
Project management report document a medium size project. Project management report document a medium size project.
Project management report document a medium size project.
Weng Chuan
 
Project management final - KSHV SZ
Project management final - KSHV SZProject management final - KSHV SZ
Project management final - KSHV SZ
Keshav Seewraz
 
Adp final-report
Adp final-reportAdp final-report
Adp final-report
Ong Shi Hui
 
Ici- final project
Ici- final projectIci- final project
Ici- final project
dinnahanny
 
Final Project Management Report
Final Project Management ReportFinal Project Management Report
Final Project Management Report
zerospaces_
 
Project management
Project management Project management
Project management
Jing Fan Koh
 
Graduate Portfolio Ornella LK
Graduate Portfolio Ornella LKGraduate Portfolio Ornella LK
Graduate Portfolio Ornella LK
OrnellaLeungKei
 

Similar to Studio report (20)

Adp report yew wing kee 0323555
Adp report yew wing kee 0323555Adp report yew wing kee 0323555
Adp report yew wing kee 0323555
 
Yihui's pm final
Yihui's pm finalYihui's pm final
Yihui's pm final
 
Architectural Portfolio-Bharathwaj Iyengar
Architectural Portfolio-Bharathwaj IyengarArchitectural Portfolio-Bharathwaj Iyengar
Architectural Portfolio-Bharathwaj Iyengar
 
Studio report
Studio reportStudio report
Studio report
 
Project management final
Project management finalProject management final
Project management final
 
Architectural Comprehensive Design Report
Architectural Comprehensive Design ReportArchitectural Comprehensive Design Report
Architectural Comprehensive Design Report
 
Sem 6 studio report
Sem  6 studio reportSem  6 studio report
Sem 6 studio report
 
Project management (3)
Project management (3)Project management (3)
Project management (3)
 
Project management
Project managementProject management
Project management
 
PROJECT MANAGEMENT PROJECT 2 REPORT
PROJECT MANAGEMENT PROJECT 2 REPORTPROJECT MANAGEMENT PROJECT 2 REPORT
PROJECT MANAGEMENT PROJECT 2 REPORT
 
Project management(roro)
Project management(roro)Project management(roro)
Project management(roro)
 
Project Management
Project Management Project Management
Project Management
 
Project Management (Project 1 - Defining and documenting a project)
Project Management (Project 1 - Defining and documenting a project)Project Management (Project 1 - Defining and documenting a project)
Project Management (Project 1 - Defining and documenting a project)
 
Project management report document a medium size project.
Project management report document a medium size project. Project management report document a medium size project.
Project management report document a medium size project.
 
Project management final - KSHV SZ
Project management final - KSHV SZProject management final - KSHV SZ
Project management final - KSHV SZ
 
Adp final-report
Adp final-reportAdp final-report
Adp final-report
 
Ici- final project
Ici- final projectIci- final project
Ici- final project
 
Final Project Management Report
Final Project Management ReportFinal Project Management Report
Final Project Management Report
 
Project management
Project management Project management
Project management
 
Graduate Portfolio Ornella LK
Graduate Portfolio Ornella LKGraduate Portfolio Ornella LK
Graduate Portfolio Ornella LK
 

More from Chong Yi Hui

btechcompiled.pdf
btechcompiled.pdfbtechcompiled.pdf
btechcompiled.pdf
Chong Yi Hui
 
BSCIENCE_REPORT_yihui-a4.pdf
BSCIENCE_REPORT_yihui-a4.pdfBSCIENCE_REPORT_yihui-a4.pdf
BSCIENCE_REPORT_yihui-a4.pdf
Chong Yi Hui
 
Comparative Analysis Essay Yi Hui.pdf
Comparative Analysis Essay Yi Hui.pdfComparative Analysis Essay Yi Hui.pdf
Comparative Analysis Essay Yi Hui.pdf
Chong Yi Hui
 
THEORIES_YIHUI.pdf
THEORIES_YIHUI.pdfTHEORIES_YIHUI.pdf
THEORIES_YIHUI.pdf
Chong Yi Hui
 
Btechii-project2
Btechii-project2Btechii-project2
Btechii-project2
Chong Yi Hui
 
Btechii
BtechiiBtechii
Btechii
Chong Yi Hui
 
Slides for bscience ii
Slides for bscience iiSlides for bscience ii
Slides for bscience ii
Chong Yi Hui
 
Building science 2 report
Building science 2 reportBuilding science 2 report
Building science 2 report
Chong Yi Hui
 
Building technology report
Building technology reportBuilding technology report
Building technology report
Chong Yi Hui
 
ARC2625 REPORT FILE ChongYiHui0324404
ARC2625 REPORT FILE ChongYiHui0324404ARC2625 REPORT FILE ChongYiHui0324404
ARC2625 REPORT FILE ChongYiHui0324404
Chong Yi Hui
 
Building construction report
Building construction reportBuilding construction report
Building construction report
Chong Yi Hui
 
Final report
Final reportFinal report
Final report
Chong Yi Hui
 
Culture project-ii-finalized
Culture project-ii-finalizedCulture project-ii-finalized
Culture project-ii-finalized
Chong Yi Hui
 
Statitics
StatiticsStatitics
Statitics
Chong Yi Hui
 
English report
English report English report
English report
Chong Yi Hui
 
Social psychology project ii(comic)
Social psychology project ii(comic)Social psychology project ii(comic)
Social psychology project ii(comic)
Chong Yi Hui
 
Account assignment report finale(1)
Account assignment report finale(1)Account assignment report finale(1)
Account assignment report finale(1)
Chong Yi Hui
 
Epc
EpcEpc
Eng (ass 1)
Eng (ass 1)Eng (ass 1)
Eng (ass 1)
Chong Yi Hui
 

More from Chong Yi Hui (20)

btechcompiled.pdf
btechcompiled.pdfbtechcompiled.pdf
btechcompiled.pdf
 
BSCIENCE_REPORT_yihui-a4.pdf
BSCIENCE_REPORT_yihui-a4.pdfBSCIENCE_REPORT_yihui-a4.pdf
BSCIENCE_REPORT_yihui-a4.pdf
 
Comparative Analysis Essay Yi Hui.pdf
Comparative Analysis Essay Yi Hui.pdfComparative Analysis Essay Yi Hui.pdf
Comparative Analysis Essay Yi Hui.pdf
 
THEORIES_YIHUI.pdf
THEORIES_YIHUI.pdfTHEORIES_YIHUI.pdf
THEORIES_YIHUI.pdf
 
Pm final
Pm finalPm final
Pm final
 
Btechii-project2
Btechii-project2Btechii-project2
Btechii-project2
 
Btechii
BtechiiBtechii
Btechii
 
Slides for bscience ii
Slides for bscience iiSlides for bscience ii
Slides for bscience ii
 
Building science 2 report
Building science 2 reportBuilding science 2 report
Building science 2 report
 
Building technology report
Building technology reportBuilding technology report
Building technology report
 
ARC2625 REPORT FILE ChongYiHui0324404
ARC2625 REPORT FILE ChongYiHui0324404ARC2625 REPORT FILE ChongYiHui0324404
ARC2625 REPORT FILE ChongYiHui0324404
 
Building construction report
Building construction reportBuilding construction report
Building construction report
 
Final report
Final reportFinal report
Final report
 
Culture project-ii-finalized
Culture project-ii-finalizedCulture project-ii-finalized
Culture project-ii-finalized
 
Statitics
StatiticsStatitics
Statitics
 
English report
English report English report
English report
 
Social psychology project ii(comic)
Social psychology project ii(comic)Social psychology project ii(comic)
Social psychology project ii(comic)
 
Account assignment report finale(1)
Account assignment report finale(1)Account assignment report finale(1)
Account assignment report finale(1)
 
Epc
EpcEpc
Epc
 
Eng (ass 1)
Eng (ass 1)Eng (ass 1)
Eng (ass 1)
 

Recently uploaded

Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
Jheel Barad
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
RaedMohamed3
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
Excellence Foundation for South Sudan
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Thiyagu K
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
MIRIAMSALINAS13
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
BhavyaRajput3
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
DeeptiGupta154
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
Vikramjit Singh
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
Celine George
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
PedroFerreira53928
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
siemaillard
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
Jisc
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
Special education needs
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
Anna Sz.
 
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
AzmatAli747758
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
Celine George
 
Template Jadual Bertugas Kelas (Boleh Edit)
Template Jadual Bertugas Kelas (Boleh Edit)Template Jadual Bertugas Kelas (Boleh Edit)
Template Jadual Bertugas Kelas (Boleh Edit)
rosedainty
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
Vivekanand Anglo Vedic Academy
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
Tamralipta Mahavidyalaya
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 

Recently uploaded (20)

Instructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptxInstructions for Submissions thorugh G- Classroom.pptx
Instructions for Submissions thorugh G- Classroom.pptx
 
Palestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptxPalestine last event orientationfvgnh .pptx
Palestine last event orientationfvgnh .pptx
 
Introduction to Quality Improvement Essentials
Introduction to Quality Improvement EssentialsIntroduction to Quality Improvement Essentials
Introduction to Quality Improvement Essentials
 
Unit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdfUnit 2- Research Aptitude (UGC NET Paper I).pdf
Unit 2- Research Aptitude (UGC NET Paper I).pdf
 
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXXPhrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
Phrasal Verbs.XXXXXXXXXXXXXXXXXXXXXXXXXX
 
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCECLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
CLASS 11 CBSE B.St Project AIDS TO TRADE - INSURANCE
 
Overview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with MechanismOverview on Edible Vaccine: Pros & Cons with Mechanism
Overview on Edible Vaccine: Pros & Cons with Mechanism
 
Digital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and ResearchDigital Tools and AI for Teaching Learning and Research
Digital Tools and AI for Teaching Learning and Research
 
Model Attribute Check Company Auto Property
Model Attribute  Check Company Auto PropertyModel Attribute  Check Company Auto Property
Model Attribute Check Company Auto Property
 
PART A. Introduction to Costumer Service
PART A. Introduction to Costumer ServicePART A. Introduction to Costumer Service
PART A. Introduction to Costumer Service
 
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
 
Supporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptxSupporting (UKRI) OA monographs at Salford.pptx
Supporting (UKRI) OA monographs at Salford.pptx
 
special B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdfspecial B.ed 2nd year old paper_20240531.pdf
special B.ed 2nd year old paper_20240531.pdf
 
Polish students' mobility in the Czech Republic
Polish students' mobility in the Czech RepublicPolish students' mobility in the Czech Republic
Polish students' mobility in the Czech Republic
 
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...Cambridge International AS  A Level Biology Coursebook - EBook (MaryFosbery J...
Cambridge International AS A Level Biology Coursebook - EBook (MaryFosbery J...
 
How to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS ModuleHow to Split Bills in the Odoo 17 POS Module
How to Split Bills in the Odoo 17 POS Module
 
Template Jadual Bertugas Kelas (Boleh Edit)
Template Jadual Bertugas Kelas (Boleh Edit)Template Jadual Bertugas Kelas (Boleh Edit)
Template Jadual Bertugas Kelas (Boleh Edit)
 
Sectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdfSectors of the Indian Economy - Class 10 Study Notes pdf
Sectors of the Indian Economy - Class 10 Study Notes pdf
 
Home assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdfHome assignment II on Spectroscopy 2024 Answers.pdf
Home assignment II on Spectroscopy 2024 Answers.pdf
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 

Studio report

  • 1. DESIGN PROJECT REPORT COLLABORATIVE WORKSPACE NAME : CHONG YI HUI STUDENT ID : 0324404 TUTOR : MR. PRINCE FAVIS ISIP
  • 2. CONTENTS 1.0 INTRODUCTION 1.1 ABSTRACT 1.2 PROJECT INTRODUCTION 1.3 AIM & OBJECTIVE 2.0 SITE INVESTIGATION & CONTEXTUAL STUDIES 2.1 SITE INTRODUCTION 2.2 HISTORICAL BACKGROUND 2.3 SITE ISSUE 2.4 URBAN STUDIES 2.5 MACRO SITE ANALYSIS 3.0 PROJECT BACKGROUND & DESIGN INTENTION STRATEGIES 3.1 MICRO SITE ANALYSIS 3.2 PRECEDENT STUDIES 3.3 DESIGN INTENTION, DESIGN DEVELOPMENT & MASSING STRATEGIES 3.4 SPATIAL PROGRAMMING 4.0 ENVIRONMENTAL AND TECHNOLOGICAL STRATEGIES 4.1 ENVIRONMENTAL STRATEGIES 4.2 SUSTAINABILITY CONCEPT (MATERIALS) 4.3 CONSTRUCTION DETAILS 5.0 FINAL DESIGN
  • 3. 1.0 INTRODUCTION 1.1 ABSTRACT Creating architecture with the intention to connect people and accentuate a sense of community in my opinion has much more meaning rather than having a very good aesthetics with no story behind it. The idea of bridging a particular design with the context becomes a personal goal in order to reach the intention of connection. With that being said, this particular studio focuses on the theme of sustaining humanities through the existence of a collaborative workspace. The goal of sustaining humanities covers a wide array of aspects such as the technological, environmental as well as the cultural context all in one building which results in a social impact that benefits the community of that particular place. The design project also deals with existing urban issues as a form of site response which stems from our site analysis, which becomes the first stepping stone for the workspace design. Through proposals with multiple strategies, along with several reworks to the design it results in a final outcome that responds to the issues as well as introducing several innovations that carves the path to a better urban landscape. 1.2 PROJECT INTRODUCTION This project intends to develop a creative collaborative workspace within the heart of Chow Kit as part of the client’s aim to introduce a creative workforce within a hectic and typical city worklife. As the buildings on site has a formal and intimidating typology, it lacks the sense of community and leisure aspect. This collaborative workspace aims to create a balance work and live component by introducing unconventional but functional spaces for users to work in. To bring a sense of community and more leisure activities within the site, the programs and function of the collaborative workspace would be more towards creating a community within the building by having a mixture of users from entrepreneurs to designers. Fun and multipurpose spaces will not only increase communication between users but also makes them feel more welcomed. Spaces such as galleries are not usual in a typical collaborative space, but this provides a space for users to display and share ideas among each other. Thus, increasing the connectivity among themselves. 1.3 AIMS & OBJECTIVES The aim of this project is to connect the gap between people of various skills and experiences in the creative field and the community of Chow Kit. Its objective is to improve on the engagement of the community within the site by having a public realm where the people can use. It also is a hub where the creative workers can connect by having collaborations with one another as well as the community. It nurtures the discipline of work in comfortable and livable spaces. Therefore, it hopes to balance the “WORK+LIVE” component. The building acts as a venue for fashion and design related exhibitions, activities and programs as the main targeted users are from the creative field. Thus, the third component “CREATE” is added. Green pockets are introduced in the building for a fresher working environment and as the main green space in the site. WORK COWORK LIVE CREATE
  • 4. 2.0 SITE INVESTIGATION & CONTEXTUAL STUDIES 2.1 SITE INTRODUCTION The site is located in Chow Kit, Kuala Lumpur. It is currently a private owned land which provides parking services to anyone. Surrounding the site are high rise office buildings, hotel, busy city road intersection and a sky bridge. SITE PHOTOS HIGH RISE HOTEL SITE PARKING SKY BRIDGE
  • 5. HISTORICAL MORPHOLOGY how the city of Chow Kit has changed 1980s 2000s 2 0 1 8 ? 2.2 HISTORICAL BACKGROUND
  • 6. URBAN MORPHOLOGY 1980 1980s Even during the 90s, Chow Kit has already been known for being a dense city. A few free-standing buildings have begun to emerge to cater for the growing city. 2000s Modern development rates have rapidly increased as commercial becomes a focus on site. 2018 (PRESENT) The domination of new development and modernisation leaning towards corporate purposes, resulting in the lack of community life. TIMELINE past to present of Chow Kit PAST PRESENT
  • 7. 2.3 SITE ISSUES ● Repetitive building type ● Scale & proportion of building is intimating, not accommodating ● Lack of greeneries around macro site ● Lack of leisure activity areas around site context ● Segregation of society on site; fast paced community & laid back living 2.4 URBAN STUDIES PRECINCT ● 3 main precincts around the site which is the Chow Kit Precinct, Kampung Bharu Precinct and River of Life Precinct. SITE
  • 8. 2.4 URBAN STUDIES DISTRICT & BUILDING TYPE ● There are 3 districts surrounding the site which are the commercial, educational and corporate districts. ● As seen, the commercial districts are more on the east side of the site which comprises of traditional shophouse terraces. Most of free standing buildings surrounding the site are corporate buildings and on the west side of the site is the educational district that consists of two schools.
  • 9. 2.5 MACRO SITE ANALYSIS USER GROUPS On site, there are four main user groups that can be categorized where the main user group on site are the white collars followed by blue collars, students and visitors. The white collars are concentrated more on the corporate district where the blue collars are on the commercial districts. Students and visitors both can be found in small clusters around site. TIME ANALYSIS In the morning, the density of people coming into the site is moderate as the white collars come in for work in their respective offices and some of the stall owners also open their stalls. Traffic congestion is quite high on the main junction due to cars passing by to reach respective destinations and to parking lots.
  • 10. 2.5 MACRO SITE ANALYSIS TIME ANALYSIS At this peak hour, there are more people on site as the working people as well as those around the site walk around to find places for lunch. The vendors and food stalls are also packed due to lunch hours. Traffic congestion is higher than in the morning as some people drive out for lunch and some are parents picking up their kids from school. TIME ANALYSIS At night, the density of people around the site decreases as people retire back to their homes. The ones that are left wondering around are the homeless around the sky bridge area. Traffic is low at night as there are no activities. Shops also closes around this time.
  • 11. 3.0 PROJECT BACKGROUND & DESIGN INTENTION STRATEGIES 3.1 MICRO SITE ANALYSIS Strengths ● Easily accessed by both vehicles and pedestrians ● Close proximity to public transports Weaknesses ● Blocked views from nearby buildings and pedestrian bridge ● Heavy vehicular traffic during peak hours ● Vacant buildings are present around site creates a hollow feel in site Opportunities ● The pedestrian bridge at close proximity to the site allows those who use it to immediately see the building ● Cultural activities arounds the site can be brought in to enhance the user experience on the ground floor level ● Multiple entrances and exits in design is possible due to the way the site is currently utilised Threats ● Scale of nearby building and pedestrian bridge causes visual obstruction ● Bad drainage at the back of the site may cause bad odor to enter building
  • 12. 3.0 PROJECT BACKGROUND & DESIGN INTENTION STRATEGIES 3.2 PRECEDENT STUDIES UNCOMMON, FULHAM Location : 126 New King's Rd Fulham, London The inspiration of the collaborative workspace is taken from Uncommon in the sense of space planning, creative spaces and also implementation of green into the workspaces. Curtain walls as exterior wall creates a sense of privacy to the workspaces but also allows views from either side which is incorporated into the workspace also. Having huge openings also allows the spaces to be combined into another use space. The interior look of the workspace is also inspired from Uncommon by having greens not only on the outside but also inside. This creates a different feeling while working. It gives some sort of freedom and freshness to the environment. FASHION FARM FOUNDATION Location : Unit A, 9/F, D2 Place, 9 Cheung Yee Street, Lai Chi Kok, Hong Kong, Hong Kong As for this precedent, mainly it is taken for its unique program that is more into the fashion industry. Spaces such as retail and gallery are present in the coworking space as public spaces which attracts people in. Workshops that are dedicated to the fashion designers are also taken from precedent. This allows the users to comfortably utilise the space provided.
  • 13. 3.0 PROJECT BACKGROUND & DESIGN INTENTION STRATEGIES 3.3 DESIGN INTENTION, DESIGN DEVELOPMENT & MASSING STRATEGIES DESIGN INTENTION DESIGN DEVELOPMENT MASSING STRATEGIES
  • 14. 3.0 PROJECT BACKGROUND & DESIGN INTENTION STRATEGIES 3.4 SPATIAL PROGRAMMING LAYOUT ● The building is arranged in a clustered manner and placed on each floor depending on the intended groups of users for each space LANDSCAPE ● The project is designed with the landscape as well as integrating nature into the design as part of the response of the site where the presence of vegetation is lacking in the face of the concrete jungle that the site mostly is. CIRCULATION ● The circulation of the collaborative workspace is fairly straightforward to ease movement for both normal and handicapped users. The building itself will have subtraction of spaces as the user goes up the building as a sign on increased privacy as one ascends to accentuate the intention of a working space. PUBLIC SPACES ● The main plaza, reception, lobby, gallery, food and beverages, and chilling spaces are located at the ground floor. ● These public spaces are mostly located at the ground floor to create a space that is accessible for all. CREATIVE & MIXED USE SPACES ● Spaces such as mini library, cafes, shared workspaces, workshops, brainstorm room and audiovisual room are located on the upper floors where the work component of the collaborative workspace takes place. ● Some of the space provided when combined can be multi-use. (eg : workshop & brainstorm room). Moveable furnitures are also incorporated in the shared workspaces for a creative work station. GREEN SPACES ● Pockets of green spaces are provided in the building to create a refreshing workspace and also counter the lack of greeneries on site. ● On the ground floor, a main plaza and other green spaces are present. Spaces on the upper levels in the building can also connect with the green element incorporated by having views and green spaces in between.
  • 15. 3.0 PROJECT BACKGROUND & DESIGN INTENTION STRATEGIES 3.4 SPATIAL PROGRAMMING-LIST OF SPACE
  • 16. COURTYARD & PLAZA Provides spaces with cooling and fresh air. Creates stack ventilation in courtyard and featured staircase. Helps to cool spaces. Stack Ventilation 4.0 ENVIRONMENTAL AND TECHNOLOGICAL STRATEGIES 4.1 ENVIRONMENTAL STRATEGIES PARAMETER GREENERIES Landscaping are added as a response to the lack of greeneries around the site context. This allows the building to tap into the natural landscape that is lacking. Besides, this also helps to cool down the building while giving the surrounding buildings pleasant view. GREEN ROOF Green roof is incorporated into the building to cool down further the temperature of the interior spaces. Having a green roof also allows users to relax and conduct social activities on the rooftop.
  • 17. GREEN ROOF ● Cools building ● Improve stormwater management by reducing runoff ● Reduce noise & air pollution ● Increase biodiversity 4.0 ENVIRONMENTAL AND TECHNOLOGICAL STRATEGIES 4.2 SUSTAINABILITY CONCEPT (MATERIALS) CURTAIN WALL ● Allows natural light into building making spaces brighter and less depressing ● Creates a sense of privacy while also allowing views from both sides LIGHT COLOURED CONCRETE WALL ● Reflects light and heat ● Cools building
  • 18. 4.0 ENVIRONMENTAL AND TECHNOLOGICAL STRATEGIES 4.3 CONSTRUCTION DETAILS BASEMENT DETAIL STAIRCASE DETAIL