Mohamed Hammad
ARCHITECTURE DESIGN
PORTFOLIO
Professional Skills Languaiges
Revit Arch Illustrator Arabic
Sketchup
Hand Drafting and
InDesign English
Digital Fabrication
CAD Arch
V-Ray max
Rhino - Grass
Photoshop
Biography:
As being an archietict, Myslife Mohamed Hammad driven with true
passion to design, create and develop architectural, interior and
fabrication projects. i’m working on (M.Sc.) degree in Architectural
Engineering at Cairo University, which focused on Adaptive kinetic
faced geometry and its effect on Building Energy Performance.
Having a dream to meet the aspect of architectural sustainability and
aesthetics through computational digital design simulation.
Professional ExprerienceFormal Education
Award / Certificates
Cairo University Faculty of Engineering
Thesis Topic: Kinetic facades towards iconic design and
building environmental performance
Hikystep mostakbl city
Architectural and landscape site consultant
AUC the american university in cairo
Prequrment management / Fisability studies /Project Plan-
ning and controlling / Project Budgeting and Finance
/ Project Bids and Contracts / nternational Standards
Flair Egypt
interior designer at Flair-Egypt with more than 12 projects
from allover Cairo, Design Bid Build and Turnkey Proj-
ects ( Design - Working drawings and Construction )
Cairo University Faculty of Engineering
Last year GPA: 3.3 Cumulative GPA: 2.62 (Good)
Graduation project: A+ First ranked
Saleh & Hegab “Integrated Engineering Consultancy”
Design rules landscape and Islamic patterns, insulation
materials and construction
Bauhaus Dessau - Dessau Institute of Architecture
- Summer school -
Learn about local and intercontinental networks of solar
other alternative sustainable energy production.
Al Maghrabi for Construction group
Construction and Engineering site consultant
A’ Design award Silver Winner in Architecture, Building
and Structure Design Category, 2013 - 2014.
http://www.adesignaward.com/design.php?ID=30710
Masters of Science (M.Sc.) in Architecture Soldier/ Architectural site consultant
Junior- Interior Architect and Designer
Architectural training
Construction site training
Project Management (PRMG), Diploma
Bachelor of Science (B.Sc.)
Workshop
2015-2016 Apr 2015-Mar 2016
Apr 2014-Jan 2015
Aug-Sept 2011
Apr 2015-Mar 2016
2013-2014
2008-2013
Jul 2011
01 Mohame Hammad Architectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional
The bridge design is meant to be simple and youthful. The geometry of the intersecting rings is iconic and easy for an eye to rec-
ognize. This simplicity boosts the user sense of friendliness towards the bridge spaces. The floating structure permits small boats to
pass in between, while large boats will need a ring to be displaced horizontally towards a neighboring ring as shown in illustra-
tions.
Dublin
Floating
Bridge
Ac-cA
Competition
Inspired by the technological
advancements in Silicon Docks
where individuals are meant to
be empowered and impactful,
the design of the bridge is af-
fected by people preferences
to enhance social, physical,
and cultural interactivity.
The bridge is designed to ac-
commodate many activities in
its spaces. People rent booths,
hang their advertisement, do
stage performances, modify
their hub cells lighting, and ex-
press their identity through the
bridge. Even their body images
are traced by sensors and re-
flected by light at the Lighting
interactive tracing rings.
02 Mohame Hammad Architectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional
This floating structure minimizes the cost of construc-
tion and adds another layer of functionality, the
functionality of structure which uses water as bearer
of load instead of an obstacle.
Construction is meant to be easy. The illustrations bellow show how the
bridge is joined, and the illustrations to the right show the composition
of the main structural unit.
03 Mohame Hammad Architectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional
THE 4ro
Squared
Complex
Location: Dokki, Gizah, Egypt
Typology: Residential Villas and
apartments
Phase: Profisonal Freelance
Role: Design and Render
Year: 2015
Architectural Design, Working draw-
ings & Rendering, Private villa proj-
ect located at Dokki Egypt. From a
hand drawing sketch to a complete
project
04 Mohame Hammad Architectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional
Design Concept
The concept is to design a Four duplex villas
with 300m2
and Four apartments with 230m2
, all
delighted with private pool and Gym and also
provided a two parking lots for each unit.
The architerural design is aspiered by the northi-
an eclectic clasical archircture shows in the blue
pitched roof and the facade cladding by local
natural stone.
05 Mohame Hammad Architectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional
ParisView
Location: New Cairo, Egypt
Typology: Residential building
Phase: Profisonal Freelance
Role: Design and Render
Year: 2015
Design Concept
The concept design came from
the spirit of paris streets architec-
ture classical era, while the client
dreams to generates the same at-
mosphere to his building, its a five
story building which separated to
a double 280m2
apartments for
each floor.
06 Mohame Hammad Architectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional
Hotob
School
Location: New Cairo, Egypt
Typology: School
Phase: Profisonal Freelance
Role: Design and Render
Year:2015
Design Concept
The Design theme inspired from
the pharaonic architecture, its an
elemantry and kindergarden in-
ternashonal shool foot print area:
1800 m2
.
07 Mohame Hammad Architectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional
Dynamo
Booth
Location: MUST University, Egypt
Typology: Commercial Booth
Phase: Profisonal /Cosign Group
Role: Design and Implementa-
tion
Year: 2014
Design Concept
The design is based on computa-
tional coding design system, the
design built by Rhino-Grasshopper
software.The project duration was
3 weeks design, fabrication and
implementation, the booth is design
for a small indoor cafe.
`
08 Mohame Hammad Architectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional
M44 - T:
Typology: Commercial Table
Phase: Profisonal /Cosign Group
Product Type: Coffee table
materials: plywood with variety in peels
(the moving table ) Inspired by dynamic
movement of the massive panels showing
an interesting optical effect. Based on
parametric solutions.
Vemo - L:
Typology: Commercial Light
Phase: Profisonal /Cosign Group
Product Type: indoor Lighting
materials: plywood with peels and colors.
(contrasting Photon) different light inten-
sities creating a self lighting contrast unit.
adding a shiny sprit.
09 Mohame Hammad Architectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional
VIForion
The project is a Transportation HUB that
links the surrounding urban settlements to
the heart of the dynamic life in easy and
efficient way generated by merging differ-
ent transportation systems like railway sta-
tion, metro station, Nile deck and bus sta-
tion in addition to other services to convert
the place to be the catalyst for the future
development .
This project aiming to create an environ-
ment that is not just a focal point for trans-
portation, it is a new experience for the
users, it is provid ing aplace for people to
access local amenities and work opportu-
nities that helps to improve the community
to achieve a better future.
PROJECTconcept
Creating acatalyst for future develop-
ment which fed by Nile to upgrade the
surrounding urban context.Alsocreating-
arapidtransportingeventswithalong-term-
positiveimpact.
Transportation HUB
10 Mohame Hammad Architectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional
11 Mohame Hammad Architectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional
Egypt
Pavilion
Natural/Cultural Interaction
Adjectives
Chaos- dynamic – discontinuity –
coded - vague – Reactive
Design Concept
The design of the Egyptian Pavil-
ion expressing the interaction on
the Nile natural purity and from
the surrounding man made built
environment
12 Mohame Hammad Architectural Portfolio 2011 - 2012 - 2013- 2014 - 2015 - 2016 Academic Competition Professional
Concept Location
This land plot was carefully chosen to provide pavilion with centric
location, as it is at the end of the main entrance axe. Also the sides
of the pavilion are perpendicular on the visual axe of the other en-
trances and has glowing edges which will be visible from distance
13 Mohame Hammad Architectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional
14 Mohame Hammad Architectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional
Design Concept
designing the building as a
whole interactive continuity
experience through years of
study and building function-
ally. which are clearly pre-
sented in:
1-Continuity in courts
2-Continuity in studios
3-Continuity within context
4-Sustainable aspects
15 Mohame Hammad Architectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional
El Khawas
GYM
Location: Harram, Giza, Egypt
Typology: GYM
Phase: Profisonal Freelance
Role: Re-Design old GYM,
Render and implementation
Year: 2016
The Design Challenge
The challenge is to Redesign
the old GYM with all existing
obstacles: ceiling beams, low
slab level, existing furniture, bad
electrical system and start imple-
menting partly in phases without
closing the GYM
16 Mohame Hammad Architectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional
Interior Design
Interior Design
Staircase design and
Vray Render
Location: Zayid, Giza, Egypt
Typology: building Apartment
Phase: Profisonal Freelance
Role: Design and Render
Year: 2015
Concept Design
Designing contemporary classic
Location: New Cairo, Egypt
TTypology: building Apartment
Phase: Profisonal Freelance
Role: Design and Render
Year: 2015
Concept Design
Designing contemporary classic
17 Mohame Hammad Architectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional
Logo Design
Location: Egypt
Typology: Logo Design
Phase: Profisonal Freelance
Role: Design and Render
Year: 2014
Concept Design
Chance is a logo for a spa and
beauty center, The Design Aim
is to provide an elegant and
beautiful feelings through the
simplicity of design and the
neatness of colorful curves.
Awarded competition
18 Mohame Hammad Architectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional
Location: Kuwait
Typology: Logo Design
Phase: Profisonal Freelance
Role: Design and Render
Year: 2014
Concept Design
The Design Aim is to provide a logo which can be read in
Arabic and English
Awarded competition
Logo Design
Mohamed Hammad
ARCHITECT
T. (EG) +2 01069932339
E. arch.mohamed.mamdouh@gmail.com
eg.linkedin.com/in/hammadmohamed
engmohamedmamdouh.wix.com/arch-mohamed-
Thank You ...

Mohamed Hammad Architectural Portfolio

  • 1.
  • 2.
    Professional Skills Languaiges RevitArch Illustrator Arabic Sketchup Hand Drafting and InDesign English Digital Fabrication CAD Arch V-Ray max Rhino - Grass Photoshop Biography: As being an archietict, Myslife Mohamed Hammad driven with true passion to design, create and develop architectural, interior and fabrication projects. i’m working on (M.Sc.) degree in Architectural Engineering at Cairo University, which focused on Adaptive kinetic faced geometry and its effect on Building Energy Performance. Having a dream to meet the aspect of architectural sustainability and aesthetics through computational digital design simulation.
  • 3.
    Professional ExprerienceFormal Education Award/ Certificates Cairo University Faculty of Engineering Thesis Topic: Kinetic facades towards iconic design and building environmental performance Hikystep mostakbl city Architectural and landscape site consultant AUC the american university in cairo Prequrment management / Fisability studies /Project Plan- ning and controlling / Project Budgeting and Finance / Project Bids and Contracts / nternational Standards Flair Egypt interior designer at Flair-Egypt with more than 12 projects from allover Cairo, Design Bid Build and Turnkey Proj- ects ( Design - Working drawings and Construction ) Cairo University Faculty of Engineering Last year GPA: 3.3 Cumulative GPA: 2.62 (Good) Graduation project: A+ First ranked Saleh & Hegab “Integrated Engineering Consultancy” Design rules landscape and Islamic patterns, insulation materials and construction Bauhaus Dessau - Dessau Institute of Architecture - Summer school - Learn about local and intercontinental networks of solar other alternative sustainable energy production. Al Maghrabi for Construction group Construction and Engineering site consultant A’ Design award Silver Winner in Architecture, Building and Structure Design Category, 2013 - 2014. http://www.adesignaward.com/design.php?ID=30710 Masters of Science (M.Sc.) in Architecture Soldier/ Architectural site consultant Junior- Interior Architect and Designer Architectural training Construction site training Project Management (PRMG), Diploma Bachelor of Science (B.Sc.) Workshop 2015-2016 Apr 2015-Mar 2016 Apr 2014-Jan 2015 Aug-Sept 2011 Apr 2015-Mar 2016 2013-2014 2008-2013 Jul 2011
  • 4.
    01 Mohame HammadArchitectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional The bridge design is meant to be simple and youthful. The geometry of the intersecting rings is iconic and easy for an eye to rec- ognize. This simplicity boosts the user sense of friendliness towards the bridge spaces. The floating structure permits small boats to pass in between, while large boats will need a ring to be displaced horizontally towards a neighboring ring as shown in illustra- tions. Dublin Floating Bridge Ac-cA Competition Inspired by the technological advancements in Silicon Docks where individuals are meant to be empowered and impactful, the design of the bridge is af- fected by people preferences to enhance social, physical, and cultural interactivity. The bridge is designed to ac- commodate many activities in its spaces. People rent booths, hang their advertisement, do stage performances, modify their hub cells lighting, and ex- press their identity through the bridge. Even their body images are traced by sensors and re- flected by light at the Lighting interactive tracing rings.
  • 5.
    02 Mohame HammadArchitectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional This floating structure minimizes the cost of construc- tion and adds another layer of functionality, the functionality of structure which uses water as bearer of load instead of an obstacle. Construction is meant to be easy. The illustrations bellow show how the bridge is joined, and the illustrations to the right show the composition of the main structural unit.
  • 6.
    03 Mohame HammadArchitectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional THE 4ro Squared Complex Location: Dokki, Gizah, Egypt Typology: Residential Villas and apartments Phase: Profisonal Freelance Role: Design and Render Year: 2015 Architectural Design, Working draw- ings & Rendering, Private villa proj- ect located at Dokki Egypt. From a hand drawing sketch to a complete project
  • 7.
    04 Mohame HammadArchitectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional Design Concept The concept is to design a Four duplex villas with 300m2 and Four apartments with 230m2 , all delighted with private pool and Gym and also provided a two parking lots for each unit. The architerural design is aspiered by the northi- an eclectic clasical archircture shows in the blue pitched roof and the facade cladding by local natural stone.
  • 8.
    05 Mohame HammadArchitectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional ParisView Location: New Cairo, Egypt Typology: Residential building Phase: Profisonal Freelance Role: Design and Render Year: 2015 Design Concept The concept design came from the spirit of paris streets architec- ture classical era, while the client dreams to generates the same at- mosphere to his building, its a five story building which separated to a double 280m2 apartments for each floor.
  • 9.
    06 Mohame HammadArchitectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional Hotob School Location: New Cairo, Egypt Typology: School Phase: Profisonal Freelance Role: Design and Render Year:2015 Design Concept The Design theme inspired from the pharaonic architecture, its an elemantry and kindergarden in- ternashonal shool foot print area: 1800 m2 .
  • 10.
    07 Mohame HammadArchitectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional Dynamo Booth Location: MUST University, Egypt Typology: Commercial Booth Phase: Profisonal /Cosign Group Role: Design and Implementa- tion Year: 2014 Design Concept The design is based on computa- tional coding design system, the design built by Rhino-Grasshopper software.The project duration was 3 weeks design, fabrication and implementation, the booth is design for a small indoor cafe.
  • 11.
    ` 08 Mohame HammadArchitectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional M44 - T: Typology: Commercial Table Phase: Profisonal /Cosign Group Product Type: Coffee table materials: plywood with variety in peels (the moving table ) Inspired by dynamic movement of the massive panels showing an interesting optical effect. Based on parametric solutions. Vemo - L: Typology: Commercial Light Phase: Profisonal /Cosign Group Product Type: indoor Lighting materials: plywood with peels and colors. (contrasting Photon) different light inten- sities creating a self lighting contrast unit. adding a shiny sprit.
  • 12.
    09 Mohame HammadArchitectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional VIForion The project is a Transportation HUB that links the surrounding urban settlements to the heart of the dynamic life in easy and efficient way generated by merging differ- ent transportation systems like railway sta- tion, metro station, Nile deck and bus sta- tion in addition to other services to convert the place to be the catalyst for the future development . This project aiming to create an environ- ment that is not just a focal point for trans- portation, it is a new experience for the users, it is provid ing aplace for people to access local amenities and work opportu- nities that helps to improve the community to achieve a better future. PROJECTconcept Creating acatalyst for future develop- ment which fed by Nile to upgrade the surrounding urban context.Alsocreating- arapidtransportingeventswithalong-term- positiveimpact. Transportation HUB
  • 13.
    10 Mohame HammadArchitectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional
  • 14.
    11 Mohame HammadArchitectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional Egypt Pavilion Natural/Cultural Interaction Adjectives Chaos- dynamic – discontinuity – coded - vague – Reactive Design Concept The design of the Egyptian Pavil- ion expressing the interaction on the Nile natural purity and from the surrounding man made built environment
  • 15.
    12 Mohame HammadArchitectural Portfolio 2011 - 2012 - 2013- 2014 - 2015 - 2016 Academic Competition Professional Concept Location This land plot was carefully chosen to provide pavilion with centric location, as it is at the end of the main entrance axe. Also the sides of the pavilion are perpendicular on the visual axe of the other en- trances and has glowing edges which will be visible from distance
  • 16.
    13 Mohame HammadArchitectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional
  • 17.
    14 Mohame HammadArchitectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional Design Concept designing the building as a whole interactive continuity experience through years of study and building function- ally. which are clearly pre- sented in: 1-Continuity in courts 2-Continuity in studios 3-Continuity within context 4-Sustainable aspects
  • 18.
    15 Mohame HammadArchitectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional El Khawas GYM Location: Harram, Giza, Egypt Typology: GYM Phase: Profisonal Freelance Role: Re-Design old GYM, Render and implementation Year: 2016 The Design Challenge The challenge is to Redesign the old GYM with all existing obstacles: ceiling beams, low slab level, existing furniture, bad electrical system and start imple- menting partly in phases without closing the GYM
  • 19.
    16 Mohame HammadArchitectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional Interior Design Interior Design Staircase design and Vray Render Location: Zayid, Giza, Egypt Typology: building Apartment Phase: Profisonal Freelance Role: Design and Render Year: 2015 Concept Design Designing contemporary classic Location: New Cairo, Egypt TTypology: building Apartment Phase: Profisonal Freelance Role: Design and Render Year: 2015 Concept Design Designing contemporary classic
  • 20.
    17 Mohame HammadArchitectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional Logo Design Location: Egypt Typology: Logo Design Phase: Profisonal Freelance Role: Design and Render Year: 2014 Concept Design Chance is a logo for a spa and beauty center, The Design Aim is to provide an elegant and beautiful feelings through the simplicity of design and the neatness of colorful curves. Awarded competition
  • 21.
    18 Mohame HammadArchitectural Portfolio 2011 - 2012 - 2013 - 2014 - 2015 - 2016 Academic Competition Professional Location: Kuwait Typology: Logo Design Phase: Profisonal Freelance Role: Design and Render Year: 2014 Concept Design The Design Aim is to provide a logo which can be read in Arabic and English Awarded competition Logo Design
  • 23.
    Mohamed Hammad ARCHITECT T. (EG)+2 01069932339 E. arch.mohamed.mamdouh@gmail.com eg.linkedin.com/in/hammadmohamed engmohamedmamdouh.wix.com/arch-mohamed-
  • 24.