SlideShare a Scribd company logo
Space 134
Glendale, California
Rough Order of Magnitude Statement of Probable Cost
43560
Scope Assumptions Unit Cost Quantity Unit Total Quantity Unit Total Quantity Unit Total Quantity Unit Total Quantity Unit Total Quantity Unit Total Quantity Unit Total Total $/SF
Preliminary Costs
Selective Demolition $0.85 206,910 SF $175,874 200,376 SF $170,320 209,959 SF $178,465 300,128 SF $255,109 114,127 SF $97,008 57,935 SF $49,245 479,160 SF $407,286 $1,333,306
Traffic Control $10.00 206,910 SF $2,069,100 200,376 SF $2,003,760 209,959 SF $2,099,592 300,128 SF $3,001,284 114,127 SF $1,141,272 57,935 SF $579,348 479,160 SF $4,791,600 $15,685,956
Utilities, wet $1.50 206,910 SF $310,365 200,376 SF $300,564 209,959 SF $314,939 300,128 SF $450,193 114,127 SF $171,191 57,935 SF $86,902 479,160 SF $718,740 $2,352,893
Earthwork $2.50 206,910 SF $517,275 200,376 SF $500,940 209,959 SF $524,898 300,128 SF $750,321 114,127 SF $285,318 57,935 SF $144,837 479,160 SF $1,197,900 $3,921,489
Sub-Total: $3,072,614 $2,975,584 $3,117,894 $4,456,907 $1,694,789 $860,332 $7,115,526 $23,293,645 $14.85
Infrastructure Scope
Demolish Off Ramp $25.00 110,000 SF $2,750,000 $2,750,000
Mechanical Ventilation $24.00 206,910 SF $4,965,840 200,376 SF $4,809,024 209,959 SF $5,039,021 300,128 SF $7,203,082 114,127 SF $2,739,053 57,935 SF $1,390,435 479,160 SF $11,499,840 $37,646,294
Electrical service and lighting $15.00 206,910 SF $3,103,650 200,376 SF $3,005,640 209,959 SF $3,149,388 300,128 SF $4,501,926 114,127 SF $1,711,908 57,935 SF $869,022 479,160 SF $7,187,400 $23,528,934
Widen Bridge, under 5-0" $400.00 1,160 SF $464,000 $464,000
Widen Bridge, over 5'-0" $500.00 2,240 SF $1,120,000 $1,120,000
Precast Concrete Deck System, Heavy $400.00 206,910 SF $82,764,000 209,959 SF $83,983,680 114,127 SF $45,650,880 $212,398,560
Precast Concrete Deck System, General $350.00 200,376 SF $70,131,600 300,128 SF $105,044,940 57,935 SF $20,277,180 479,160 SF $167,706,000 $363,159,720
Sub-Total: $95,167,490 $77,946,264 $92,172,089 $116,749,948 $50,101,841 $22,536,637 $186,393,240 $641,067,508 $408.69
Buildings
Event Space / Community Pavilion $600.00 14,396 SF $8,637,600 $8,637,600
Café $200.00 1,560 SF $312,000 11,386 SF $2,277,200 5,486 SF $1,097,200 $3,686,400
Transit Hub / LRT $750.00 6,011 SF $4,508,250 6,500 SF $4,875,000 3,607 SF $2,705,250 $12,088,500
Community Center, shell $250.00 15,795 SF $3,948,750 $3,948,750
Sub-Total: $13,145,850 $4,875,000 $3,948,750 $312,000 $2,277,200 $2,705,250 $1,097,200 $28,361,250 $18.08
Hardscape / Furnishings
Paving and seat walls $32.00 50,292 SF $1,609,344 76,776 SF $2,456,832 78,378 SF $2,508,102 114,553 SF $3,665,709 14,861 SF $475,558 14,012 SF $448,378 318,770 SF $10,200,640 $21,364,563
Site furnishings $2.00 50,292 SF $100,584 76,776 SF $153,552 78,378 SF $156,756 114,553 SF $229,107 14,861 SF $29,722 14,012 SF $28,024 318,770 SF $637,540 $1,335,285
Sub-Total: 1,709,928$ 2,610,384$ 2,664,859$ 3,894,816$ 505,281$ 476,401$ 10,838,180$ $22,699,848 $14.47
Streetscape
Decorative pedestrian paving & perimeter trees $18.00 13,767 SF $247,806 16,284 SF $293,112 17,102 SF $307,836 15,385 SF $276,930 17,215 SF $309,870 13,761 SF $247,698 102,563 SF $1,846,134 $3,529,386
Sub-Total: $247,806 $293,112 $307,836 $276,930 $309,870 $247,698 $1,846,134 $3,529,386 $2.25
Planted Understory
Shrubs and groundcover $25.00 50,122 SF $1,253,050 90,974 SF $2,274,350 62,336 SF $1,558,400 59,799 SF $1,494,975 64,250 SF $1,606,250 21,433 SF $535,825 4,197 SF $104,925 $8,827,775
Sub-Total: $1,253,050 $2,274,350 $1,558,400 $1,494,975 $1,606,250 $535,825 $104,925 $8,827,775 $5.63
Tree Grove Area
Variety of trees, up to 42" box w/ DG below $20.00 41,516 SF $830,320 9,842 SF $196,840 36,348 SF $726,960 64,072 SF $1,281,440 6,415 SF $128,300 5,122 SF $102,440 26,190 SF $523,800 $3,790,100
Sub-Total: $830,320 $196,840 $726,960 $1,281,440 $128,300 $102,440 $523,800 $3,790,100 $2.42
Turf Area
Sod turf $3.50 30,806 SF $107,821 44,759 SF $156,657 21,954 SF $76,839 $341,317
Sub-Total: $107,821 $156,657 $76,839 $341,317 $0.22
Off Ramp Trellis
$90.00 43,434 SF $3,909,060 $3,909,060
Sub-Total: $107,821 $3,909,060 $3,909,060 $2.49
Developer Parcel
942,980 SF
Sub-Total:
Markups
General conditions, Fee, Bond/Insurance 18.00 % $20,815,686 18.00 % $17,114,507 18.00 % $18,809,422 18.00 % $23,152,261 18.00 % $10,192,235 18.00 % $4,943,625 18.00 % $37,439,252 $132,466,988
Sub-Total: $20,815,686 $17,114,507 $18,809,422 $23,152,261 $10,192,235 $4,943,625 $37,439,252 $132,466,988 $84.45
Contingencies
Design Contingency 20.00 % $4,163,137 20.00 % $3,422,901 20.00 % $3,761,884 20.00 % $4,630,452 20.00 % $2,038,447 20.00 % $988,725 20.00 % $7,487,850 $26,493,398
Escalation %
Sub-Total: $4,163,137 $3,422,901 $3,761,884 $4,630,452 $2,038,447 $988,725 $7,487,850 $26,493,398 $16.89
Total Construction Cost $140,621,523 $115,618,002 $127,068,094 $156,406,384 $68,854,213 $33,396,933 $252,922,946
Cost Per SF $679.63 $577.01 $605.20 $521.13 $603.31 $576.46 $527.85
Cost Per ACRE $29,604,531 $25,134,348 $26,362,675 $22,700,491 $26,280,234 $25,110,476 $22,992,995
August 10, 2015
Space 134 Construction Cost - Draft 2015 $
Phase 1
206,910 SF
Phase 2A
200,376 SF
Phase 2B
209,959 SF
Phase 2C
300,128 SF
11.00 Acres
Phase 2D
114,127 SF
Phase 2E
57,935 SF
Phase 2F
479,160 SF
4.75 Acres 4.60 Acres 4.82 Acres 6.89 Acres 2.62 Acres 1.33 Acres
Total
1,568,596 SF
36.01 Acres
$894,888,095
$571 / SF
$24,851,100 / Acre
Prepared by Cumming Sheet 1 of 1

More Related Content

Similar to Space 134 - Statement of Probable Cost

2014 EPRI Conference Impact of Developments in HEI Correction Factors on Cond...
2014 EPRI Conference Impact of Developments in HEI Correction Factors on Cond...2014 EPRI Conference Impact of Developments in HEI Correction Factors on Cond...
2014 EPRI Conference Impact of Developments in HEI Correction Factors on Cond...
Komandur Sunder Raj, P.E.
 
020 ejemplo de presupuesto (mano de obra, materiales y transporte)
020 ejemplo de presupuesto (mano de obra, materiales y transporte)020 ejemplo de presupuesto (mano de obra, materiales y transporte)
020 ejemplo de presupuesto (mano de obra, materiales y transporte)
independiente
 
2005 ASME Power Conference Performance Considerations in Replacement of Low P...
2005 ASME Power Conference Performance Considerations in Replacement of Low P...2005 ASME Power Conference Performance Considerations in Replacement of Low P...
2005 ASME Power Conference Performance Considerations in Replacement of Low P...
Komandur Sunder Raj, P.E.
 
Structural costs
Structural costsStructural costs
Structural costs
J C
 
Potential Gross Income (PGI) EstimatorPlease Only Change ite.docx
Potential Gross Income (PGI) EstimatorPlease Only Change ite.docxPotential Gross Income (PGI) EstimatorPlease Only Change ite.docx
Potential Gross Income (PGI) EstimatorPlease Only Change ite.docx
ChantellPantoja184
 
Suburban Steel Maintenance Building
Suburban Steel Maintenance BuildingSuburban Steel Maintenance Building
Suburban Steel Maintenance Building
TylerShisler
 
Suburban Steel Maintenance Building
Suburban Steel Maintenance BuildingSuburban Steel Maintenance Building
Suburban Steel Maintenance Building
TylerShisler
 
15. flujo de caja
15. flujo de caja15. flujo de caja
15. flujo de caja
Maria Jose Aristizabal
 
Round 2Dec. 31, 2015 C57912AndrewsTracy CalhounVict.docx
Round 2Dec. 31, 2015 C57912AndrewsTracy CalhounVict.docxRound 2Dec. 31, 2015 C57912AndrewsTracy CalhounVict.docx
Round 2Dec. 31, 2015 C57912AndrewsTracy CalhounVict.docx
joellemurphey
 
Jasper pool study 061014
Jasper pool study 061014Jasper pool study 061014
Jasper pool study 061014
Matthew Crane
 
Corital collectibles
Corital collectiblesCorital collectibles
Corital collectibles
Priscilla Corado
 
2004 ASME Power Conference Multi-Pressure Surface Condenser Performance Eval...
2004 ASME Power Conference Multi-Pressure Surface Condenser  Performance Eval...2004 ASME Power Conference Multi-Pressure Surface Condenser  Performance Eval...
2004 ASME Power Conference Multi-Pressure Surface Condenser Performance Eval...
Komandur Sunder Raj, P.E.
 
Precios
PreciosPrecios
Precios
carrilloa
 
Maiz grano para blog
Maiz grano para blogMaiz grano para blog
Maiz grano para blog
Miguel Lopez
 
EQS - EARTHWORK FOR ROADS AND CANALS.pdf
EQS -  EARTHWORK FOR ROADS AND CANALS.pdfEQS -  EARTHWORK FOR ROADS AND CANALS.pdf
EQS - EARTHWORK FOR ROADS AND CANALS.pdf
GovindarajuluBadana
 
Maths A Textbook - Answers
Maths A Textbook - AnswersMaths A Textbook - Answers
Maths A Textbook - Answers
westy67968
 
Project Floor Plans
Project Floor PlansProject Floor Plans
Project Floor Plans
IshaniYewalekar
 
BREAKDOWN OF COST CALCULATIONS
BREAKDOWN OF COST CALCULATIONSBREAKDOWN OF COST CALCULATIONS
BREAKDOWN OF COST CALCULATIONS
ahmong4
 
Chap 2 case 1(maverick m.)
Chap 2 case 1(maverick m.)Chap 2 case 1(maverick m.)
Chap 2 case 1(maverick m.)
maverick-the-one
 
Trilogy Power Ranch market analysis June 1, 2012
Trilogy Power Ranch market analysis June 1, 2012Trilogy Power Ranch market analysis June 1, 2012
Trilogy Power Ranch market analysis June 1, 2012
Ken Schmidt
 

Similar to Space 134 - Statement of Probable Cost (20)

2014 EPRI Conference Impact of Developments in HEI Correction Factors on Cond...
2014 EPRI Conference Impact of Developments in HEI Correction Factors on Cond...2014 EPRI Conference Impact of Developments in HEI Correction Factors on Cond...
2014 EPRI Conference Impact of Developments in HEI Correction Factors on Cond...
 
020 ejemplo de presupuesto (mano de obra, materiales y transporte)
020 ejemplo de presupuesto (mano de obra, materiales y transporte)020 ejemplo de presupuesto (mano de obra, materiales y transporte)
020 ejemplo de presupuesto (mano de obra, materiales y transporte)
 
2005 ASME Power Conference Performance Considerations in Replacement of Low P...
2005 ASME Power Conference Performance Considerations in Replacement of Low P...2005 ASME Power Conference Performance Considerations in Replacement of Low P...
2005 ASME Power Conference Performance Considerations in Replacement of Low P...
 
Structural costs
Structural costsStructural costs
Structural costs
 
Potential Gross Income (PGI) EstimatorPlease Only Change ite.docx
Potential Gross Income (PGI) EstimatorPlease Only Change ite.docxPotential Gross Income (PGI) EstimatorPlease Only Change ite.docx
Potential Gross Income (PGI) EstimatorPlease Only Change ite.docx
 
Suburban Steel Maintenance Building
Suburban Steel Maintenance BuildingSuburban Steel Maintenance Building
Suburban Steel Maintenance Building
 
Suburban Steel Maintenance Building
Suburban Steel Maintenance BuildingSuburban Steel Maintenance Building
Suburban Steel Maintenance Building
 
15. flujo de caja
15. flujo de caja15. flujo de caja
15. flujo de caja
 
Round 2Dec. 31, 2015 C57912AndrewsTracy CalhounVict.docx
Round 2Dec. 31, 2015 C57912AndrewsTracy CalhounVict.docxRound 2Dec. 31, 2015 C57912AndrewsTracy CalhounVict.docx
Round 2Dec. 31, 2015 C57912AndrewsTracy CalhounVict.docx
 
Jasper pool study 061014
Jasper pool study 061014Jasper pool study 061014
Jasper pool study 061014
 
Corital collectibles
Corital collectiblesCorital collectibles
Corital collectibles
 
2004 ASME Power Conference Multi-Pressure Surface Condenser Performance Eval...
2004 ASME Power Conference Multi-Pressure Surface Condenser  Performance Eval...2004 ASME Power Conference Multi-Pressure Surface Condenser  Performance Eval...
2004 ASME Power Conference Multi-Pressure Surface Condenser Performance Eval...
 
Precios
PreciosPrecios
Precios
 
Maiz grano para blog
Maiz grano para blogMaiz grano para blog
Maiz grano para blog
 
EQS - EARTHWORK FOR ROADS AND CANALS.pdf
EQS -  EARTHWORK FOR ROADS AND CANALS.pdfEQS -  EARTHWORK FOR ROADS AND CANALS.pdf
EQS - EARTHWORK FOR ROADS AND CANALS.pdf
 
Maths A Textbook - Answers
Maths A Textbook - AnswersMaths A Textbook - Answers
Maths A Textbook - Answers
 
Project Floor Plans
Project Floor PlansProject Floor Plans
Project Floor Plans
 
BREAKDOWN OF COST CALCULATIONS
BREAKDOWN OF COST CALCULATIONSBREAKDOWN OF COST CALCULATIONS
BREAKDOWN OF COST CALCULATIONS
 
Chap 2 case 1(maverick m.)
Chap 2 case 1(maverick m.)Chap 2 case 1(maverick m.)
Chap 2 case 1(maverick m.)
 
Trilogy Power Ranch market analysis June 1, 2012
Trilogy Power Ranch market analysis June 1, 2012Trilogy Power Ranch market analysis June 1, 2012
Trilogy Power Ranch market analysis June 1, 2012
 

More from Community Development Department-Glendale, CA

Glendale Transit Experience Guide
Glendale Transit Experience GuideGlendale Transit Experience Guide
Glendale Transit Experience Guide
Community Development Department-Glendale, CA
 
Space 134 - RFP for Glendale Freeway Ramps/Vision Plan
Space 134 - RFP for Glendale Freeway Ramps/Vision PlanSpace 134 - RFP for Glendale Freeway Ramps/Vision Plan
Space 134 - RFP for Glendale Freeway Ramps/Vision Plan
Community Development Department-Glendale, CA
 
Space 134 - Caltrans Transportation Concept Report (2012)
Space 134 - Caltrans Transportation Concept Report (2012)Space 134 - Caltrans Transportation Concept Report (2012)
Space 134 - Caltrans Transportation Concept Report (2012)
Community Development Department-Glendale, CA
 
2013 Space 134 Vision Plan
2013 Space 134 Vision Plan2013 Space 134 Vision Plan
Space 134 Workshop #2 - Summary
Space 134 Workshop #2 - SummarySpace 134 Workshop #2 - Summary
Space 134 Workshop #2 - Summary
Community Development Department-Glendale, CA
 
Space 134 Vision Plan - 2016
Space 134 Vision Plan - 2016Space 134 Vision Plan - 2016
Space 134 Vision Plan - 2016
Community Development Department-Glendale, CA
 
Downtown Specific Plan Pipeline Projects - 11-2015
Downtown Specific Plan Pipeline Projects - 11-2015Downtown Specific Plan Pipeline Projects - 11-2015
Downtown Specific Plan Pipeline Projects - 11-2015
Community Development Department-Glendale, CA
 
Space 134 - Potential for Transit Connections
Space 134 - Potential for Transit ConnectionsSpace 134 - Potential for Transit Connections
Space 134 - Potential for Transit Connections
Community Development Department-Glendale, CA
 
Space 134 - FAQs
Space 134 - FAQsSpace 134 - FAQs
Space 134 Community Input - Earth Day 05-02-2015
Space 134 Community Input - Earth Day 05-02-2015Space 134 Community Input - Earth Day 05-02-2015
Space 134 Community Input - Earth Day 05-02-2015
Community Development Department-Glendale, CA
 
Space 134 Mixer Survey
Space 134 Mixer SurveySpace 134 Mixer Survey
ABC's of Cap Parks
ABC's of Cap ParksABC's of Cap Parks
Space 134 Information Sheet
Space 134 Information SheetSpace 134 Information Sheet
Online Appointment Scheduling: Glendale Permit Services Center
Online Appointment Scheduling: Glendale Permit Services CenterOnline Appointment Scheduling: Glendale Permit Services Center
Online Appointment Scheduling: Glendale Permit Services Center
Community Development Department-Glendale, CA
 
Glendale Downtown Specific Plan Policy Review
Glendale Downtown Specific Plan Policy ReviewGlendale Downtown Specific Plan Policy Review
Glendale Downtown Specific Plan Policy Review
Community Development Department-Glendale, CA
 

More from Community Development Department-Glendale, CA (15)

Glendale Transit Experience Guide
Glendale Transit Experience GuideGlendale Transit Experience Guide
Glendale Transit Experience Guide
 
Space 134 - RFP for Glendale Freeway Ramps/Vision Plan
Space 134 - RFP for Glendale Freeway Ramps/Vision PlanSpace 134 - RFP for Glendale Freeway Ramps/Vision Plan
Space 134 - RFP for Glendale Freeway Ramps/Vision Plan
 
Space 134 - Caltrans Transportation Concept Report (2012)
Space 134 - Caltrans Transportation Concept Report (2012)Space 134 - Caltrans Transportation Concept Report (2012)
Space 134 - Caltrans Transportation Concept Report (2012)
 
2013 Space 134 Vision Plan
2013 Space 134 Vision Plan2013 Space 134 Vision Plan
2013 Space 134 Vision Plan
 
Space 134 Workshop #2 - Summary
Space 134 Workshop #2 - SummarySpace 134 Workshop #2 - Summary
Space 134 Workshop #2 - Summary
 
Space 134 Vision Plan - 2016
Space 134 Vision Plan - 2016Space 134 Vision Plan - 2016
Space 134 Vision Plan - 2016
 
Downtown Specific Plan Pipeline Projects - 11-2015
Downtown Specific Plan Pipeline Projects - 11-2015Downtown Specific Plan Pipeline Projects - 11-2015
Downtown Specific Plan Pipeline Projects - 11-2015
 
Space 134 - Potential for Transit Connections
Space 134 - Potential for Transit ConnectionsSpace 134 - Potential for Transit Connections
Space 134 - Potential for Transit Connections
 
Space 134 - FAQs
Space 134 - FAQsSpace 134 - FAQs
Space 134 - FAQs
 
Space 134 Community Input - Earth Day 05-02-2015
Space 134 Community Input - Earth Day 05-02-2015Space 134 Community Input - Earth Day 05-02-2015
Space 134 Community Input - Earth Day 05-02-2015
 
Space 134 Mixer Survey
Space 134 Mixer SurveySpace 134 Mixer Survey
Space 134 Mixer Survey
 
ABC's of Cap Parks
ABC's of Cap ParksABC's of Cap Parks
ABC's of Cap Parks
 
Space 134 Information Sheet
Space 134 Information SheetSpace 134 Information Sheet
Space 134 Information Sheet
 
Online Appointment Scheduling: Glendale Permit Services Center
Online Appointment Scheduling: Glendale Permit Services CenterOnline Appointment Scheduling: Glendale Permit Services Center
Online Appointment Scheduling: Glendale Permit Services Center
 
Glendale Downtown Specific Plan Policy Review
Glendale Downtown Specific Plan Policy ReviewGlendale Downtown Specific Plan Policy Review
Glendale Downtown Specific Plan Policy Review
 

Recently uploaded

PPT Item # 8&9 - Demolition Code Amendments
PPT Item # 8&9 - Demolition Code AmendmentsPPT Item # 8&9 - Demolition Code Amendments
PPT Item # 8&9 - Demolition Code Amendments
ahcitycouncil
 
Item # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. DistrictsItem # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. Districts
ahcitycouncil
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Christina Parmionova
 
About Potato, The scientific name of the plant is Solanum tuberosum (L).
About Potato, The scientific name of the plant is Solanum tuberosum (L).About Potato, The scientific name of the plant is Solanum tuberosum (L).
About Potato, The scientific name of the plant is Solanum tuberosum (L).
Christina Parmionova
 
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC CharlotteA Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
University of North Carolina at Charlotte
 
Border towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdfBorder towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdf
Scalabrini Institute for Human Mobility in Africa
 
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
yemqpj
 
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
Christina Parmionova
 
A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
Roger Valdez
 
RFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance CenterRFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance Center
This Is Reno
 
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Jamesadhikaram land matter consultancy 9447464502
 
Practical guide for the celebration of World Environment Day on june 5th.
Practical guide for the  celebration of World Environment Day on  june 5th.Practical guide for the  celebration of World Environment Day on  june 5th.
Practical guide for the celebration of World Environment Day on june 5th.
Christina Parmionova
 
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
3woawyyl
 
Researching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssssResearching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssss
DanielOliver74
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
SERUDS INDIA
 
Item #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code AmendmentItem #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code Amendment
ahcitycouncil
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
Partito democratico
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
3woawyyl
 
Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.
Christina Parmionova
 
2024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 382024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 38
JSchaus & Associates
 

Recently uploaded (20)

PPT Item # 8&9 - Demolition Code Amendments
PPT Item # 8&9 - Demolition Code AmendmentsPPT Item # 8&9 - Demolition Code Amendments
PPT Item # 8&9 - Demolition Code Amendments
 
Item # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. DistrictsItem # 10 -- Historical Presv. Districts
Item # 10 -- Historical Presv. Districts
 
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHOMonitoring Health for the SDGs - Global Health Statistics 2024 - WHO
Monitoring Health for the SDGs - Global Health Statistics 2024 - WHO
 
About Potato, The scientific name of the plant is Solanum tuberosum (L).
About Potato, The scientific name of the plant is Solanum tuberosum (L).About Potato, The scientific name of the plant is Solanum tuberosum (L).
About Potato, The scientific name of the plant is Solanum tuberosum (L).
 
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC CharlotteA Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
A Guide to AI for Smarter Nonprofits - Dr. Cori Faklaris, UNC Charlotte
 
Border towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdfBorder towns and spaces of (in)visibility.pdf
Border towns and spaces of (in)visibility.pdf
 
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
快速办理(UVM毕业证书)佛蒙特大学毕业证学位证一模一样
 
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
United Nations World Oceans Day 2024; June 8th " Awaken new dephts".
 
A proposed request for information on LIHTC
A proposed request for information on LIHTCA proposed request for information on LIHTC
A proposed request for information on LIHTC
 
RFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance CenterRFP for Reno's Community Assistance Center
RFP for Reno's Community Assistance Center
 
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
Indira P.S Vs sub Collector Kochi - The settlement register is not a holy cow...
 
Practical guide for the celebration of World Environment Day on june 5th.
Practical guide for the  celebration of World Environment Day on  june 5th.Practical guide for the  celebration of World Environment Day on  june 5th.
Practical guide for the celebration of World Environment Day on june 5th.
 
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
快速办理(Bristol毕业证书)布里斯托大学毕业证Offer一模一样
 
Researching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssssResearching the client.pptxsxssssssssssssssssssssss
Researching the client.pptxsxssssssssssssssssssssss
 
Donate to charity during this holiday season
Donate to charity during this holiday seasonDonate to charity during this holiday season
Donate to charity during this holiday season
 
Item #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code AmendmentItem #s 8&9 -- Demolition Code Amendment
Item #s 8&9 -- Demolition Code Amendment
 
Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019Contributi dei parlamentari del PD - Contributi L. 3/2019
Contributi dei parlamentari del PD - Contributi L. 3/2019
 
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
原版制作(英国Southampton毕业证书)南安普顿大学毕业证录取通知书一模一样
 
Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.Awaken new depths - World Ocean Day 2024, June 8th.
Awaken new depths - World Ocean Day 2024, June 8th.
 
2024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 382024: The FAR - Federal Acquisition Regulations, Part 38
2024: The FAR - Federal Acquisition Regulations, Part 38
 

Space 134 - Statement of Probable Cost

  • 1. Space 134 Glendale, California Rough Order of Magnitude Statement of Probable Cost 43560 Scope Assumptions Unit Cost Quantity Unit Total Quantity Unit Total Quantity Unit Total Quantity Unit Total Quantity Unit Total Quantity Unit Total Quantity Unit Total Total $/SF Preliminary Costs Selective Demolition $0.85 206,910 SF $175,874 200,376 SF $170,320 209,959 SF $178,465 300,128 SF $255,109 114,127 SF $97,008 57,935 SF $49,245 479,160 SF $407,286 $1,333,306 Traffic Control $10.00 206,910 SF $2,069,100 200,376 SF $2,003,760 209,959 SF $2,099,592 300,128 SF $3,001,284 114,127 SF $1,141,272 57,935 SF $579,348 479,160 SF $4,791,600 $15,685,956 Utilities, wet $1.50 206,910 SF $310,365 200,376 SF $300,564 209,959 SF $314,939 300,128 SF $450,193 114,127 SF $171,191 57,935 SF $86,902 479,160 SF $718,740 $2,352,893 Earthwork $2.50 206,910 SF $517,275 200,376 SF $500,940 209,959 SF $524,898 300,128 SF $750,321 114,127 SF $285,318 57,935 SF $144,837 479,160 SF $1,197,900 $3,921,489 Sub-Total: $3,072,614 $2,975,584 $3,117,894 $4,456,907 $1,694,789 $860,332 $7,115,526 $23,293,645 $14.85 Infrastructure Scope Demolish Off Ramp $25.00 110,000 SF $2,750,000 $2,750,000 Mechanical Ventilation $24.00 206,910 SF $4,965,840 200,376 SF $4,809,024 209,959 SF $5,039,021 300,128 SF $7,203,082 114,127 SF $2,739,053 57,935 SF $1,390,435 479,160 SF $11,499,840 $37,646,294 Electrical service and lighting $15.00 206,910 SF $3,103,650 200,376 SF $3,005,640 209,959 SF $3,149,388 300,128 SF $4,501,926 114,127 SF $1,711,908 57,935 SF $869,022 479,160 SF $7,187,400 $23,528,934 Widen Bridge, under 5-0" $400.00 1,160 SF $464,000 $464,000 Widen Bridge, over 5'-0" $500.00 2,240 SF $1,120,000 $1,120,000 Precast Concrete Deck System, Heavy $400.00 206,910 SF $82,764,000 209,959 SF $83,983,680 114,127 SF $45,650,880 $212,398,560 Precast Concrete Deck System, General $350.00 200,376 SF $70,131,600 300,128 SF $105,044,940 57,935 SF $20,277,180 479,160 SF $167,706,000 $363,159,720 Sub-Total: $95,167,490 $77,946,264 $92,172,089 $116,749,948 $50,101,841 $22,536,637 $186,393,240 $641,067,508 $408.69 Buildings Event Space / Community Pavilion $600.00 14,396 SF $8,637,600 $8,637,600 Café $200.00 1,560 SF $312,000 11,386 SF $2,277,200 5,486 SF $1,097,200 $3,686,400 Transit Hub / LRT $750.00 6,011 SF $4,508,250 6,500 SF $4,875,000 3,607 SF $2,705,250 $12,088,500 Community Center, shell $250.00 15,795 SF $3,948,750 $3,948,750 Sub-Total: $13,145,850 $4,875,000 $3,948,750 $312,000 $2,277,200 $2,705,250 $1,097,200 $28,361,250 $18.08 Hardscape / Furnishings Paving and seat walls $32.00 50,292 SF $1,609,344 76,776 SF $2,456,832 78,378 SF $2,508,102 114,553 SF $3,665,709 14,861 SF $475,558 14,012 SF $448,378 318,770 SF $10,200,640 $21,364,563 Site furnishings $2.00 50,292 SF $100,584 76,776 SF $153,552 78,378 SF $156,756 114,553 SF $229,107 14,861 SF $29,722 14,012 SF $28,024 318,770 SF $637,540 $1,335,285 Sub-Total: 1,709,928$ 2,610,384$ 2,664,859$ 3,894,816$ 505,281$ 476,401$ 10,838,180$ $22,699,848 $14.47 Streetscape Decorative pedestrian paving & perimeter trees $18.00 13,767 SF $247,806 16,284 SF $293,112 17,102 SF $307,836 15,385 SF $276,930 17,215 SF $309,870 13,761 SF $247,698 102,563 SF $1,846,134 $3,529,386 Sub-Total: $247,806 $293,112 $307,836 $276,930 $309,870 $247,698 $1,846,134 $3,529,386 $2.25 Planted Understory Shrubs and groundcover $25.00 50,122 SF $1,253,050 90,974 SF $2,274,350 62,336 SF $1,558,400 59,799 SF $1,494,975 64,250 SF $1,606,250 21,433 SF $535,825 4,197 SF $104,925 $8,827,775 Sub-Total: $1,253,050 $2,274,350 $1,558,400 $1,494,975 $1,606,250 $535,825 $104,925 $8,827,775 $5.63 Tree Grove Area Variety of trees, up to 42" box w/ DG below $20.00 41,516 SF $830,320 9,842 SF $196,840 36,348 SF $726,960 64,072 SF $1,281,440 6,415 SF $128,300 5,122 SF $102,440 26,190 SF $523,800 $3,790,100 Sub-Total: $830,320 $196,840 $726,960 $1,281,440 $128,300 $102,440 $523,800 $3,790,100 $2.42 Turf Area Sod turf $3.50 30,806 SF $107,821 44,759 SF $156,657 21,954 SF $76,839 $341,317 Sub-Total: $107,821 $156,657 $76,839 $341,317 $0.22 Off Ramp Trellis $90.00 43,434 SF $3,909,060 $3,909,060 Sub-Total: $107,821 $3,909,060 $3,909,060 $2.49 Developer Parcel 942,980 SF Sub-Total: Markups General conditions, Fee, Bond/Insurance 18.00 % $20,815,686 18.00 % $17,114,507 18.00 % $18,809,422 18.00 % $23,152,261 18.00 % $10,192,235 18.00 % $4,943,625 18.00 % $37,439,252 $132,466,988 Sub-Total: $20,815,686 $17,114,507 $18,809,422 $23,152,261 $10,192,235 $4,943,625 $37,439,252 $132,466,988 $84.45 Contingencies Design Contingency 20.00 % $4,163,137 20.00 % $3,422,901 20.00 % $3,761,884 20.00 % $4,630,452 20.00 % $2,038,447 20.00 % $988,725 20.00 % $7,487,850 $26,493,398 Escalation % Sub-Total: $4,163,137 $3,422,901 $3,761,884 $4,630,452 $2,038,447 $988,725 $7,487,850 $26,493,398 $16.89 Total Construction Cost $140,621,523 $115,618,002 $127,068,094 $156,406,384 $68,854,213 $33,396,933 $252,922,946 Cost Per SF $679.63 $577.01 $605.20 $521.13 $603.31 $576.46 $527.85 Cost Per ACRE $29,604,531 $25,134,348 $26,362,675 $22,700,491 $26,280,234 $25,110,476 $22,992,995 August 10, 2015 Space 134 Construction Cost - Draft 2015 $ Phase 1 206,910 SF Phase 2A 200,376 SF Phase 2B 209,959 SF Phase 2C 300,128 SF 11.00 Acres Phase 2D 114,127 SF Phase 2E 57,935 SF Phase 2F 479,160 SF 4.75 Acres 4.60 Acres 4.82 Acres 6.89 Acres 2.62 Acres 1.33 Acres Total 1,568,596 SF 36.01 Acres $894,888,095 $571 / SF $24,851,100 / Acre Prepared by Cumming Sheet 1 of 1