This document contains solutions to physics problems involving kinematics. The problems deal with determining velocity, acceleration, displacement and distance traveled for particles moving along a straight line path with varying acceleration. The solutions use kinematic equations and calculus to solve for the requested quantities at given times. Numerical methods are also used in one problem to evaluate an integral.