Capstone Project Presentation
Department Of Electronics & Telecommunication Engineering
Presented by
Ms. Jadhav A.A.
Mr. Heleve R.D.
Mr. Swami S.B.
Smart Crop
Protection &
Monitoring system
for Farmers
Contents
 Objective
 Introduction
 Problem definition
 Required Components
 Block Diagram
 Project planning
 Working
 Advantages
 Disadvantages
 Applications
Objective
 The aim of this project is farms are many times
ravaged by local animals like buffaloes, cows, goats,
etc. This leads to huge losses for the farmers.
 It is not possible for farmers to barricade entire fields or
stay on field 24 hours and guard it.
 So here we propose automatic crop protection &
monitoring system for farmers.
Introduction
 In many countries like the USA, Australia, Canada, India,
farmers, and landowners from many centuries are struggling
to tackle the problem of wild animal trespassing in their
fields.
 Agriculture is the basis for the human species as it is the main
source of food and it plays important role in the growth of
country’s economy
 By using protecting & monitoring system , we can expect
science the increase in production with low cost by
monitoring the efficiency of the soil, temperature and
humidity monitoring fertilizers efficiency, monitoring storage
capacity of water tanks and also theft detection in agriculture
area.
Problem Definition
 Water crop has become a burden in today’s modern
world.
 Some wild animals like wild boars, elephants, deer,
tigers, and monkeys, etc., cause serious damage to
crops by running over the field and trampling over
the crops. It causes a financial problem for the
farmers.
Hardware
555 IC Relay Module
Piezo buzzer PCB Board
LED’s
Node MCU
Soil Moisture Sensor
9V Battery
Water Pump (5V)
Pipe
DHT11 Sensor
Software
Components Required
555 IC Relay Module
Piezo buzzer PCB Board
LED’s
Node MCU
Soil Moisture Sensor
9V Battery
Water Pump (5V)
Pipe
DHT11 Sensor
Arduino IDE
Blynk App
Block Diagram
Project planning
Implementation of the proposed system.
To study Software & Hardware
components.
Experimental setup of proposed design
by writing
Checking the output
appropriate code.
Result & Discussion.
Working:
Stage-1:
When the animals touch this wire, the buzzer goes on
immediately and the animals run away without any
harm. These buzzers are located in all corners of the
farm so animals cannot enter farm easily.
Stage-2:
When power supply is ON, the input module
of three sensors (DHT11, moisture) start to
activate.
When sensors get ON it will read the data
from soil and from surrounding.
According to the values that are detected by
sensors motor will turn ON/OFF.
Stage-3
If Moisture and Humidity is below threshold
value, then the motor is turn ON.
If moisture and humidity level is high, then it
will stop the motor and water supply will also stop.
Stage-4
Blynk IoT platform is
used for displaying of
temperature, humidity &
soil moisture and can be
accessed from any
distance. This will help
the farmer to understand
the relation between the
plant growth and
mentioned plant
parameters.
Advantages
Improving crop productivity.
It reduces the time of farmers.
Diverts the animal without any harm.
Saves Water.
Minimum human effort.
Disadvantages
System may get damage due to heavy
rain and storms.
 Installing and maintaining the
equipment.
Applications
 Monitoring control system.
 Applicability of IOT in agriculture
 It can also be used in forest regions.
Smart Crop Protection and monitoring system for farmers
Smart Crop Protection and monitoring system for farmers

Smart Crop Protection and monitoring system for farmers

  • 1.
    Capstone Project Presentation DepartmentOf Electronics & Telecommunication Engineering Presented by Ms. Jadhav A.A. Mr. Heleve R.D. Mr. Swami S.B.
  • 2.
  • 3.
    Contents  Objective  Introduction Problem definition  Required Components  Block Diagram  Project planning  Working  Advantages  Disadvantages  Applications
  • 4.
    Objective  The aimof this project is farms are many times ravaged by local animals like buffaloes, cows, goats, etc. This leads to huge losses for the farmers.  It is not possible for farmers to barricade entire fields or stay on field 24 hours and guard it.  So here we propose automatic crop protection & monitoring system for farmers.
  • 5.
    Introduction  In manycountries like the USA, Australia, Canada, India, farmers, and landowners from many centuries are struggling to tackle the problem of wild animal trespassing in their fields.  Agriculture is the basis for the human species as it is the main source of food and it plays important role in the growth of country’s economy  By using protecting & monitoring system , we can expect science the increase in production with low cost by monitoring the efficiency of the soil, temperature and humidity monitoring fertilizers efficiency, monitoring storage capacity of water tanks and also theft detection in agriculture area.
  • 6.
    Problem Definition  Watercrop has become a burden in today’s modern world.  Some wild animals like wild boars, elephants, deer, tigers, and monkeys, etc., cause serious damage to crops by running over the field and trampling over the crops. It causes a financial problem for the farmers.
  • 7.
    Hardware 555 IC RelayModule Piezo buzzer PCB Board LED’s Node MCU Soil Moisture Sensor 9V Battery Water Pump (5V) Pipe DHT11 Sensor Software Components Required 555 IC Relay Module Piezo buzzer PCB Board LED’s Node MCU Soil Moisture Sensor 9V Battery Water Pump (5V) Pipe DHT11 Sensor Arduino IDE Blynk App
  • 8.
  • 9.
    Project planning Implementation ofthe proposed system. To study Software & Hardware components. Experimental setup of proposed design by writing Checking the output appropriate code. Result & Discussion.
  • 10.
    Working: Stage-1: When the animalstouch this wire, the buzzer goes on immediately and the animals run away without any harm. These buzzers are located in all corners of the farm so animals cannot enter farm easily.
  • 11.
    Stage-2: When power supplyis ON, the input module of three sensors (DHT11, moisture) start to activate. When sensors get ON it will read the data from soil and from surrounding. According to the values that are detected by sensors motor will turn ON/OFF.
  • 12.
    Stage-3 If Moisture andHumidity is below threshold value, then the motor is turn ON. If moisture and humidity level is high, then it will stop the motor and water supply will also stop.
  • 13.
    Stage-4 Blynk IoT platformis used for displaying of temperature, humidity & soil moisture and can be accessed from any distance. This will help the farmer to understand the relation between the plant growth and mentioned plant parameters.
  • 14.
    Advantages Improving crop productivity. Itreduces the time of farmers. Diverts the animal without any harm. Saves Water. Minimum human effort.
  • 15.
    Disadvantages System may getdamage due to heavy rain and storms.  Installing and maintaining the equipment.
  • 16.
    Applications  Monitoring controlsystem.  Applicability of IOT in agriculture  It can also be used in forest regions.