Smart Agreements
  & Litigation Risks


James d’Entremont    Scott Wolfe
Phelps Dunbar, LLP   Wolfe Law Group
Baton Rouge, LA      Louisiana | Washington
phelps.com           wolfelaw.com
                     constructionlawmonitor.com
                     LEED AP
Part I:

Litigation Risks
Construction Litigation
          v.
  Green Litigation
Unmet Expectations
Unmet Expectations
• Cost:   The project cost more than expected
Unmet Expectations
• Cost:   The project cost more than expected

• Scope: The project’s scope was more
 expansive than anticipated
Unmet Expectations
• Cost:   The project cost more than expected

• Scope: The project’s scope was more
 expansive than anticipated

• Schedule:   Completion took longer than
 planned
Unmet Expectations
• Cost:   The project cost more than expected

• Scope: The project’s scope was more
 expansive than anticipated

• Schedule:   Completion took longer than
 planned

• Quality: The workmanship quality was
 inferior to expectations.
Still...
    Unmet Expectations
Still...
    Unmet Expectations
   • Energy Performance:   Is the building’s energy
      systems performing as expected (or
      promised)?
Still...
    Unmet Expectations
   • Energy Performance:   Is the building’s energy
      systems performing as expected (or
      promised)?

   • Rating: Did the building achieve the planned
      LEED rating or other certification?
Still...
    Unmet Expectations
   • Energy Performance:   Is the building’s energy
      systems performing as expected (or
      promised)?

   • Rating: Did the building achieve the planned
      LEED rating or other certification?

   • Long-Term Sustainability:  What is the
      project’s impact on the environment, and is
      this as expected?
Plus...
 Unique Risks & Features
Plus...
 Unique Risks & Features
Plus...
 Unique Risks & Features
Plus...
 Unique Risks & Features
Plus...
 Unique Risks & Features
Plus...
 Unique Risks & Features
Damages, Codes &
Structures
Green Building Codes
 • California Green Building Code

 • DC Green Building Act
 (http://bit.ly/ajMac7)

 • IGCC (http://bit.ly/cC1GvV)
Energy Inspectors
• Cities like Austin and New Orleans
are tightening energy codes and
emphasizing role of energy inspectors.

• New York Times Article
(http://nyti.ms/a841ad)

• Construction Law Monitor Article
(http://bit.ly/bP180O)
Reporting Energy
 • Cities like Seattle, WA are passing
 municipal regulations requiring
 certain properties to report their
 energy consumption, with plans on
 regulating consumption in the future.

 • CLM Article on Requirements
 (http://bit.ly/cXk8a0)
Tax Credits
Tax Credits are available in certain
locally, federally and state-wide for
solar installations, energy performance,
rating certifications and more....
LEED Challenges
LEED Challenges:
http://bit.ly/aLvGkL

LEED De-Certifications:
http://bit.ly/bQuxgc
Part II:

Who’s To Blame?
Spearin Doctrine
“[I]f a contractor is bound to build
according to plans and specifications
prepared by the owner, the contractor
will not be responsible for the
consequences of defects in the plans
and specifications.”
             US v. Spearin, 248 US 132
Architects As LEEDer
• Should architects do the design & LEED
 coordination?

• Are architects increasing the price of
 agreement with owner to accommodate the
 additional risk?

• Is it possible to shift some responsibility
 to the contractor, suppliers or other project
 participants?
Contractor Perspective
• Bid-build Projects & Contracts that Shift
 Design Responsibility

• Design-Build, & the Increased Risk

• Don’t Guarantee Certification, or Spearin in
 Jeapordy
Insurance
Insurance
• Not Much Out
 There
Insurance
• Not Much Out
 There

• Policies Available
 Are Riders - so,
 are green risks not
 covered in
 standard policies?
Part III:

Smart Agreements
Things To Keep In Mind To...
   Contract Smart.
Green, Sustainability,
High-Performance
Building, Green
Certification, etc.

No Universal
Meaning. Define
Them, & Choose a
Rating System &
Version.
Things To Keep In Mind To...
   Contract Smart.
Consider a Rating
Coordinator

Identify Responsible
Parties

Delegate Work and
Responsibilities to
Appropriate Parties
Things To Keep In Mind To...
   Contract Smart.

 Certification is paper-
 intensive. Identify who
 will manage the
 documentation and the
 certification’s manual
 requirements.
Things To Keep In Mind To...
   Contract Smart.
 Contractors:

 Don’t tie certification
 with substantial or final
 completion. It can take
 months, and you don’t
 want to be waiting on
 money that long.
Things To Keep In Mind To...
   Contract Smart.
Get to know the
vendors and products
to be used. Don’t
subscribe to a
technology without
investigating, and hold
vendors accountable
for their promises.
Things To Keep In Mind To...
   Contract Smart.
Damages for failure to certify or for failure to meet
certain benchmarks may be murky. Consider waiving
consequential damages, and call out these specific
expectations and considering waiving those damages
or presenting LDs for them.
Things To Keep In Mind To...
   Contract Smart.

Flow Down Clauses:
Make sure your
obligations go up and
down the chain.
Form Contracts
For Architects: B214–2007 establishes duties and
responsibilities when the owner seeks certification from the
U.S. Green Building Council’s Leadership in Energy and
Environmental Design (LEED®).

Among other things, the architect’s services include conducting
a pre-design workshop where the LEED rating system will be
reviewed and LEED points will be targeted, preparing a LEED
Certification Plan, monitoring the LEED Certification process,
providing LEED specifications for inclusion in the Contract
Documents and preparing a LEED Certification Report
detailing the LEED rating the project achieved.
                                         http://bit.ly/acKt78
Form Contracts
For Contractors: On Nov. 10, ConsensusDOCS released the
construction industry's first and only comprehensive standard
contract document addressing the unique risks and
responsibilities associated with building green projects -- the
ConsensusDOCS 310 Green Building Addendum. The
Addendum incorporates contractual best practices to identify the
project participants' roles and responsibilities, as well as the
implementation and coordination efforts critical to achieving a
successful project using green building elements, particularly
those seeking third-party green building rating certification. It
was drafted to work well not only with the other
ConsensusDOCS contract documents, but also with other form
contracts.
                                     http://bit.ly/9WVdvo
Smart Agreements
  & Litigation Risks


James d’Entremont    Scott Wolfe
Phelps Dunbar, LLP   Wolfe Law Group
Baton Rouge, LA      Louisiana | Washington
phelps.com           wolfelaw.com
                     constructionlawmonitor.com
                     LEED AP

More Related Content

What's hot

Neutral Services Resume
Neutral Services ResumeNeutral Services Resume
Neutral Services Resume
Ron Leaders
 
FIDIC SIlver Book in Power Projects
FIDIC SIlver Book in Power ProjectsFIDIC SIlver Book in Power Projects
FIDIC SIlver Book in Power Projects
Francis Ho
 
Sneak Peek: Construction Defect Claims and Additional Insureds
Sneak Peek: Construction Defect Claims and Additional InsuredsSneak Peek: Construction Defect Claims and Additional Insureds
Sneak Peek: Construction Defect Claims and Additional Insureds
Jared Thompson
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closure
srinivas2036
 
FIDIC intro author eng. mohammed fadlalla
FIDIC intro  author eng. mohammed fadlallaFIDIC intro  author eng. mohammed fadlalla
FIDIC intro author eng. mohammed fadlalla
Mohammed Fadlalla ,PMP ®
 
8 Steps to Success in Building Green in a Poor Economy
8 Steps to Success in Building Green in a Poor Economy8 Steps to Success in Building Green in a Poor Economy
8 Steps to Success in Building Green in a Poor Economy
tmstaffordlbfg
 
NRGFS Finance Information
NRGFS Finance InformationNRGFS Finance Information
NRGFS Finance Information
hunter111
 
"Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons...
"Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons..."Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons...
"Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons...
Abhishek Shah
 
Recent Case Law Developments - 2014 Olswang Construction Law Conference
Recent Case Law Developments - 2014 Olswang Construction Law ConferenceRecent Case Law Developments - 2014 Olswang Construction Law Conference
Recent Case Law Developments - 2014 Olswang Construction Law Conference
Francis Ho
 

What's hot (9)

Neutral Services Resume
Neutral Services ResumeNeutral Services Resume
Neutral Services Resume
 
FIDIC SIlver Book in Power Projects
FIDIC SIlver Book in Power ProjectsFIDIC SIlver Book in Power Projects
FIDIC SIlver Book in Power Projects
 
Sneak Peek: Construction Defect Claims and Additional Insureds
Sneak Peek: Construction Defect Claims and Additional InsuredsSneak Peek: Construction Defect Claims and Additional Insureds
Sneak Peek: Construction Defect Claims and Additional Insureds
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closure
 
FIDIC intro author eng. mohammed fadlalla
FIDIC intro  author eng. mohammed fadlallaFIDIC intro  author eng. mohammed fadlalla
FIDIC intro author eng. mohammed fadlalla
 
8 Steps to Success in Building Green in a Poor Economy
8 Steps to Success in Building Green in a Poor Economy8 Steps to Success in Building Green in a Poor Economy
8 Steps to Success in Building Green in a Poor Economy
 
NRGFS Finance Information
NRGFS Finance InformationNRGFS Finance Information
NRGFS Finance Information
 
"Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons...
"Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons..."Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons...
"Ranking of Causes of Disputes and Use of Dispute Resolution Methods for Cons...
 
Recent Case Law Developments - 2014 Olswang Construction Law Conference
Recent Case Law Developments - 2014 Olswang Construction Law ConferenceRecent Case Law Developments - 2014 Olswang Construction Law Conference
Recent Case Law Developments - 2014 Olswang Construction Law Conference
 

Viewers also liked

Ethical Dilemmas and Web Marketing
Ethical Dilemmas and Web MarketingEthical Dilemmas and Web Marketing
Ethical Dilemmas and Web Marketing
Scott Wolfe
 
Solo From Scratch
Solo From ScratchSolo From Scratch
Solo From Scratch
Scott Wolfe
 
LEEDigation: The Impact of LEED 3.0, Litigation & Building Regulation
LEEDigation:  The Impact of LEED 3.0, Litigation & Building RegulationLEEDigation:  The Impact of LEED 3.0, Litigation & Building Regulation
LEEDigation: The Impact of LEED 3.0, Litigation & Building Regulation
Scott Wolfe
 
Chinese Drywall: What Are We Looking For
Chinese Drywall:  What Are We Looking ForChinese Drywall:  What Are We Looking For
Chinese Drywall: What Are We Looking For
Scott Wolfe
 
LEEDigation: LEEDs Impact on the Practice of Law
LEEDigation:  LEEDs Impact on the Practice of LawLEEDigation:  LEEDs Impact on the Practice of Law
LEEDigation: LEEDs Impact on the Practice of Law
Scott Wolfe
 
Crossroads: Attorney Free Speech, Web Marketing & Ethics
Crossroads:  Attorney Free Speech, Web Marketing & EthicsCrossroads:  Attorney Free Speech, Web Marketing & Ethics
Crossroads: Attorney Free Speech, Web Marketing & Ethics
Scott Wolfe
 
Building Code Enforcement and Contractual Consequences
Building Code Enforcement and Contractual ConsequencesBuilding Code Enforcement and Contractual Consequences
Building Code Enforcement and Contractual Consequences
Scott Wolfe
 

Viewers also liked (7)

Ethical Dilemmas and Web Marketing
Ethical Dilemmas and Web MarketingEthical Dilemmas and Web Marketing
Ethical Dilemmas and Web Marketing
 
Solo From Scratch
Solo From ScratchSolo From Scratch
Solo From Scratch
 
LEEDigation: The Impact of LEED 3.0, Litigation & Building Regulation
LEEDigation:  The Impact of LEED 3.0, Litigation & Building RegulationLEEDigation:  The Impact of LEED 3.0, Litigation & Building Regulation
LEEDigation: The Impact of LEED 3.0, Litigation & Building Regulation
 
Chinese Drywall: What Are We Looking For
Chinese Drywall:  What Are We Looking ForChinese Drywall:  What Are We Looking For
Chinese Drywall: What Are We Looking For
 
LEEDigation: LEEDs Impact on the Practice of Law
LEEDigation:  LEEDs Impact on the Practice of LawLEEDigation:  LEEDs Impact on the Practice of Law
LEEDigation: LEEDs Impact on the Practice of Law
 
Crossroads: Attorney Free Speech, Web Marketing & Ethics
Crossroads:  Attorney Free Speech, Web Marketing & EthicsCrossroads:  Attorney Free Speech, Web Marketing & Ethics
Crossroads: Attorney Free Speech, Web Marketing & Ethics
 
Building Code Enforcement and Contractual Consequences
Building Code Enforcement and Contractual ConsequencesBuilding Code Enforcement and Contractual Consequences
Building Code Enforcement and Contractual Consequences
 

Similar to Smart Agreements and Green Litigation Risks

Green Law for Real Estate_Green Legal Matters 2010_10-9-2010
Green Law for Real Estate_Green Legal Matters 2010_10-9-2010Green Law for Real Estate_Green Legal Matters 2010_10-9-2010
Green Law for Real Estate_Green Legal Matters 2010_10-9-2010
rcnewcomer
 
Leed™ At The Jobsite
Leed™ At The JobsiteLeed™ At The Jobsite
Leed™ At The Jobsite
C.L.I. Group, LLC
 
May AACE Presentation, FINAL
May AACE Presentation, FINALMay AACE Presentation, FINAL
May AACE Presentation, FINAL
Brandon Hummel
 
Design build risks and rewards for public owner
Design build risks and rewards for public ownerDesign build risks and rewards for public owner
Design build risks and rewards for public owner
Jon Straw
 
24 Concepts LEED AP
24 Concepts LEED AP24 Concepts LEED AP
24 Concepts LEED AP
Rob Freeman
 
project-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptxproject-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptx
ssuser5fc1e7
 
An improved, productive, skilled, innovative and efficient sector
An improved, productive, skilled, innovative and efficient sectorAn improved, productive, skilled, innovative and efficient sector
An improved, productive, skilled, innovative and efficient sector
LAZOVOY
 
An improved, productive, skilled, innovative and efficient sector копия
An improved, productive, skilled, innovative and efficient sector   копияAn improved, productive, skilled, innovative and efficient sector   копия
An improved, productive, skilled, innovative and efficient sector копия
LAZOVOY
 
Understanding Green Building 2
Understanding Green Building 2Understanding Green Building 2
Understanding Green Building 2
starchris2009
 
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Kipcon Inc.
 
PASBA 2010 presentation
PASBA 2010 presentationPASBA 2010 presentation
PASBA 2010 presentation
Jake Ortego, PE, CCE, CCA
 
Large renovations and what you need to know 2010
Large renovations and what you need to know 2010Large renovations and what you need to know 2010
Large renovations and what you need to know 2010
Wo Built
 
project-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptxproject-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptx
Lisa Cooley, LEED AP
 
Leed green associate vi. stakeholder involvement in innovation answer
Leed green associate vi. stakeholder involvement in innovation   answer Leed green associate vi. stakeholder involvement in innovation   answer
Leed green associate vi. stakeholder involvement in innovation answer
Bilal Mohamed
 
June 30 Green Built Presentation
June 30 Green Built PresentationJune 30 Green Built Presentation
June 30 Green Built Presentation
prdrueke
 
Greening your business is pretty but it may be poisonous
Greening your business is pretty but it may be poisonousGreening your business is pretty but it may be poisonous
Greening your business is pretty but it may be poisonous
Kevin Connolly
 
Chapter 1 [compatibility mode]
Chapter 1 [compatibility mode]Chapter 1 [compatibility mode]
Chapter 1 [compatibility mode]
Delhi Technological University
 
Chapter 1 [compatibility mode]
Chapter 1 [compatibility mode]Chapter 1 [compatibility mode]
Chapter 1 [compatibility mode]
Delhi Technological University
 
Permanent + Research Credit = Competitive Advantage
Permanent + Research Credit = Competitive AdvantagePermanent + Research Credit = Competitive Advantage
Permanent + Research Credit = Competitive Advantage
Zweig Group
 
Reality of implementing green buildings in your city feb 23 2011
Reality of implementing green buildings in your city feb 23 2011Reality of implementing green buildings in your city feb 23 2011
Reality of implementing green buildings in your city feb 23 2011
basicgov
 

Similar to Smart Agreements and Green Litigation Risks (20)

Green Law for Real Estate_Green Legal Matters 2010_10-9-2010
Green Law for Real Estate_Green Legal Matters 2010_10-9-2010Green Law for Real Estate_Green Legal Matters 2010_10-9-2010
Green Law for Real Estate_Green Legal Matters 2010_10-9-2010
 
Leed™ At The Jobsite
Leed™ At The JobsiteLeed™ At The Jobsite
Leed™ At The Jobsite
 
May AACE Presentation, FINAL
May AACE Presentation, FINALMay AACE Presentation, FINAL
May AACE Presentation, FINAL
 
Design build risks and rewards for public owner
Design build risks and rewards for public ownerDesign build risks and rewards for public owner
Design build risks and rewards for public owner
 
24 Concepts LEED AP
24 Concepts LEED AP24 Concepts LEED AP
24 Concepts LEED AP
 
project-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptxproject-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptx
 
An improved, productive, skilled, innovative and efficient sector
An improved, productive, skilled, innovative and efficient sectorAn improved, productive, skilled, innovative and efficient sector
An improved, productive, skilled, innovative and efficient sector
 
An improved, productive, skilled, innovative and efficient sector копия
An improved, productive, skilled, innovative and efficient sector   копияAn improved, productive, skilled, innovative and efficient sector   копия
An improved, productive, skilled, innovative and efficient sector копия
 
Understanding Green Building 2
Understanding Green Building 2Understanding Green Building 2
Understanding Green Building 2
 
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...Contract Specifications, Bidding and Contractor Selection for Capital Replace...
Contract Specifications, Bidding and Contractor Selection for Capital Replace...
 
PASBA 2010 presentation
PASBA 2010 presentationPASBA 2010 presentation
PASBA 2010 presentation
 
Large renovations and what you need to know 2010
Large renovations and what you need to know 2010Large renovations and what you need to know 2010
Large renovations and what you need to know 2010
 
project-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptxproject-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptx
 
Leed green associate vi. stakeholder involvement in innovation answer
Leed green associate vi. stakeholder involvement in innovation   answer Leed green associate vi. stakeholder involvement in innovation   answer
Leed green associate vi. stakeholder involvement in innovation answer
 
June 30 Green Built Presentation
June 30 Green Built PresentationJune 30 Green Built Presentation
June 30 Green Built Presentation
 
Greening your business is pretty but it may be poisonous
Greening your business is pretty but it may be poisonousGreening your business is pretty but it may be poisonous
Greening your business is pretty but it may be poisonous
 
Chapter 1 [compatibility mode]
Chapter 1 [compatibility mode]Chapter 1 [compatibility mode]
Chapter 1 [compatibility mode]
 
Chapter 1 [compatibility mode]
Chapter 1 [compatibility mode]Chapter 1 [compatibility mode]
Chapter 1 [compatibility mode]
 
Permanent + Research Credit = Competitive Advantage
Permanent + Research Credit = Competitive AdvantagePermanent + Research Credit = Competitive Advantage
Permanent + Research Credit = Competitive Advantage
 
Reality of implementing green buildings in your city feb 23 2011
Reality of implementing green buildings in your city feb 23 2011Reality of implementing green buildings in your city feb 23 2011
Reality of implementing green buildings in your city feb 23 2011
 

Recently uploaded

Sunrise Infra Properties Company Profile Pradeep.pdf
Sunrise Infra Properties Company Profile Pradeep.pdfSunrise Infra Properties Company Profile Pradeep.pdf
Sunrise Infra Properties Company Profile Pradeep.pdf
babugunda75
 
一比一原版美国乔治城大学毕业证如何办理
一比一原版美国乔治城大学毕业证如何办理一比一原版美国乔治城大学毕业证如何办理
一比一原版美国乔治城大学毕业证如何办理
pobegz
 
Experience Premier Urban Lifestyle at Kohinoor Satori, Mahalunge
Experience Premier Urban Lifestyle at Kohinoor Satori, MahalungeExperience Premier Urban Lifestyle at Kohinoor Satori, Mahalunge
Experience Premier Urban Lifestyle at Kohinoor Satori, Mahalunge
graphicparadice786
 
#1 Call Girls in Bangalore || 9079923931 || Quick Booking at Affordable Price
#1 Call Girls in Bangalore || 9079923931 || Quick Booking at Affordable Price#1 Call Girls in Bangalore || 9079923931 || Quick Booking at Affordable Price
#1 Call Girls in Bangalore || 9079923931 || Quick Booking at Affordable Price
MEQ - Mainstreet Equity Corp.
 
Eco Green Builders in Sydney By Marvel Homes
Eco Green Builders in Sydney By Marvel HomesEco Green Builders in Sydney By Marvel Homes
Eco Green Builders in Sydney By Marvel Homes
Marvel Homes
 
Gianluigi Torzi | Managing Director and Head of Capital Markets
Gianluigi Torzi | Managing Director and Head of Capital MarketsGianluigi Torzi | Managing Director and Head of Capital Markets
Gianluigi Torzi | Managing Director and Head of Capital Markets
Gianluigi Torzi
 
#1 Call Girls in Delhi || 9873940964 || Quick Booking at Affordable Price
#1 Call Girls in Delhi || 9873940964 || Quick Booking at Affordable Price#1 Call Girls in Delhi || 9873940964 || Quick Booking at Affordable Price
#1 Call Girls in Delhi || 9873940964 || Quick Booking at Affordable Price
MEQ - Mainstreet Equity Corp.
 
The Slifkin Real Estate Team Listing Presentation
The Slifkin Real Estate Team Listing PresentationThe Slifkin Real Estate Team Listing Presentation
The Slifkin Real Estate Team Listing Presentation
Eric B. Slifkin, PA
 
Marbo Medic Real Estate - Belgrade City.pdf
Marbo Medic Real Estate - Belgrade City.pdfMarbo Medic Real Estate - Belgrade City.pdf
Marbo Medic Real Estate - Belgrade City.pdf
IrinaKovacevic4
 
Signature Global TITANIUM SPR | 3.5 & 4.5BHK High rise Apartments in Gurgaon
Signature Global TITANIUM SPR  | 3.5 & 4.5BHK High rise Apartments in GurgaonSignature Global TITANIUM SPR  | 3.5 & 4.5BHK High rise Apartments in Gurgaon
Signature Global TITANIUM SPR | 3.5 & 4.5BHK High rise Apartments in Gurgaon
globalsignature2022
 
Office Building for Sale - 2810 City View Drive, Madison, WI
Office Building for Sale - 2810 City View Drive, Madison, WIOffice Building for Sale - 2810 City View Drive, Madison, WI
Office Building for Sale - 2810 City View Drive, Madison, WI
Lee & Associates of Madison, WI
 
Expressways of India: A Comprehensive Guide
Expressways of India: A Comprehensive GuideExpressways of India: A Comprehensive Guide
Expressways of India: A Comprehensive Guide
narinav14
 
Listing Turkey - Piyalepasa Istanbul Catalog
Listing Turkey -  Piyalepasa Istanbul CatalogListing Turkey -  Piyalepasa Istanbul Catalog
Listing Turkey - Piyalepasa Istanbul Catalog
Listing Turkey
 
Why is Revit MEP Outsourcing considered an as good option for construction pr...
Why is Revit MEP Outsourcing considered an as good option for construction pr...Why is Revit MEP Outsourcing considered an as good option for construction pr...
Why is Revit MEP Outsourcing considered an as good option for construction pr...
MarsBIM1
 
SVN Live 6.24.24 Weekly Property Broadcast
SVN Live 6.24.24 Weekly Property BroadcastSVN Live 6.24.24 Weekly Property Broadcast
SVN Live 6.24.24 Weekly Property Broadcast
SVN International Corp.
 
#1 Call Girls in Mumbai || 9910780858 || Quick Booking at Affordable Price
#1 Call Girls in Mumbai || 9910780858 || Quick Booking at Affordable Price#1 Call Girls in Mumbai || 9910780858 || Quick Booking at Affordable Price
#1 Call Girls in Mumbai || 9910780858 || Quick Booking at Affordable Price
MEQ - Mainstreet Equity Corp.
 
Future of andhra pradesh real estate.pdf
Future of andhra pradesh real estate.pdfFuture of andhra pradesh real estate.pdf
Future of andhra pradesh real estate.pdf
narinav14
 
SVN Live 6.17.24 Weekly Property Broadcast
SVN Live 6.17.24 Weekly Property BroadcastSVN Live 6.17.24 Weekly Property Broadcast
SVN Live 6.17.24 Weekly Property Broadcast
SVN International Corp.
 
Selling your home can be easy. Our team helps make it happen.
Selling your home can be easy. Our team helps make it happen.Selling your home can be easy. Our team helps make it happen.
Selling your home can be easy. Our team helps make it happen.
Eric B. Slifkin, PA
 
Floople Real Estate Market in the UK - Current Trends and Future Prospects
Floople Real Estate Market in the UK - Current Trends and Future ProspectsFloople Real Estate Market in the UK - Current Trends and Future Prospects
Floople Real Estate Market in the UK - Current Trends and Future Prospects
Floople
 

Recently uploaded (20)

Sunrise Infra Properties Company Profile Pradeep.pdf
Sunrise Infra Properties Company Profile Pradeep.pdfSunrise Infra Properties Company Profile Pradeep.pdf
Sunrise Infra Properties Company Profile Pradeep.pdf
 
一比一原版美国乔治城大学毕业证如何办理
一比一原版美国乔治城大学毕业证如何办理一比一原版美国乔治城大学毕业证如何办理
一比一原版美国乔治城大学毕业证如何办理
 
Experience Premier Urban Lifestyle at Kohinoor Satori, Mahalunge
Experience Premier Urban Lifestyle at Kohinoor Satori, MahalungeExperience Premier Urban Lifestyle at Kohinoor Satori, Mahalunge
Experience Premier Urban Lifestyle at Kohinoor Satori, Mahalunge
 
#1 Call Girls in Bangalore || 9079923931 || Quick Booking at Affordable Price
#1 Call Girls in Bangalore || 9079923931 || Quick Booking at Affordable Price#1 Call Girls in Bangalore || 9079923931 || Quick Booking at Affordable Price
#1 Call Girls in Bangalore || 9079923931 || Quick Booking at Affordable Price
 
Eco Green Builders in Sydney By Marvel Homes
Eco Green Builders in Sydney By Marvel HomesEco Green Builders in Sydney By Marvel Homes
Eco Green Builders in Sydney By Marvel Homes
 
Gianluigi Torzi | Managing Director and Head of Capital Markets
Gianluigi Torzi | Managing Director and Head of Capital MarketsGianluigi Torzi | Managing Director and Head of Capital Markets
Gianluigi Torzi | Managing Director and Head of Capital Markets
 
#1 Call Girls in Delhi || 9873940964 || Quick Booking at Affordable Price
#1 Call Girls in Delhi || 9873940964 || Quick Booking at Affordable Price#1 Call Girls in Delhi || 9873940964 || Quick Booking at Affordable Price
#1 Call Girls in Delhi || 9873940964 || Quick Booking at Affordable Price
 
The Slifkin Real Estate Team Listing Presentation
The Slifkin Real Estate Team Listing PresentationThe Slifkin Real Estate Team Listing Presentation
The Slifkin Real Estate Team Listing Presentation
 
Marbo Medic Real Estate - Belgrade City.pdf
Marbo Medic Real Estate - Belgrade City.pdfMarbo Medic Real Estate - Belgrade City.pdf
Marbo Medic Real Estate - Belgrade City.pdf
 
Signature Global TITANIUM SPR | 3.5 & 4.5BHK High rise Apartments in Gurgaon
Signature Global TITANIUM SPR  | 3.5 & 4.5BHK High rise Apartments in GurgaonSignature Global TITANIUM SPR  | 3.5 & 4.5BHK High rise Apartments in Gurgaon
Signature Global TITANIUM SPR | 3.5 & 4.5BHK High rise Apartments in Gurgaon
 
Office Building for Sale - 2810 City View Drive, Madison, WI
Office Building for Sale - 2810 City View Drive, Madison, WIOffice Building for Sale - 2810 City View Drive, Madison, WI
Office Building for Sale - 2810 City View Drive, Madison, WI
 
Expressways of India: A Comprehensive Guide
Expressways of India: A Comprehensive GuideExpressways of India: A Comprehensive Guide
Expressways of India: A Comprehensive Guide
 
Listing Turkey - Piyalepasa Istanbul Catalog
Listing Turkey -  Piyalepasa Istanbul CatalogListing Turkey -  Piyalepasa Istanbul Catalog
Listing Turkey - Piyalepasa Istanbul Catalog
 
Why is Revit MEP Outsourcing considered an as good option for construction pr...
Why is Revit MEP Outsourcing considered an as good option for construction pr...Why is Revit MEP Outsourcing considered an as good option for construction pr...
Why is Revit MEP Outsourcing considered an as good option for construction pr...
 
SVN Live 6.24.24 Weekly Property Broadcast
SVN Live 6.24.24 Weekly Property BroadcastSVN Live 6.24.24 Weekly Property Broadcast
SVN Live 6.24.24 Weekly Property Broadcast
 
#1 Call Girls in Mumbai || 9910780858 || Quick Booking at Affordable Price
#1 Call Girls in Mumbai || 9910780858 || Quick Booking at Affordable Price#1 Call Girls in Mumbai || 9910780858 || Quick Booking at Affordable Price
#1 Call Girls in Mumbai || 9910780858 || Quick Booking at Affordable Price
 
Future of andhra pradesh real estate.pdf
Future of andhra pradesh real estate.pdfFuture of andhra pradesh real estate.pdf
Future of andhra pradesh real estate.pdf
 
SVN Live 6.17.24 Weekly Property Broadcast
SVN Live 6.17.24 Weekly Property BroadcastSVN Live 6.17.24 Weekly Property Broadcast
SVN Live 6.17.24 Weekly Property Broadcast
 
Selling your home can be easy. Our team helps make it happen.
Selling your home can be easy. Our team helps make it happen.Selling your home can be easy. Our team helps make it happen.
Selling your home can be easy. Our team helps make it happen.
 
Floople Real Estate Market in the UK - Current Trends and Future Prospects
Floople Real Estate Market in the UK - Current Trends and Future ProspectsFloople Real Estate Market in the UK - Current Trends and Future Prospects
Floople Real Estate Market in the UK - Current Trends and Future Prospects
 

Smart Agreements and Green Litigation Risks

  • 1. Smart Agreements & Litigation Risks James d’Entremont Scott Wolfe Phelps Dunbar, LLP Wolfe Law Group Baton Rouge, LA Louisiana | Washington phelps.com wolfelaw.com constructionlawmonitor.com LEED AP
  • 3. Construction Litigation v. Green Litigation
  • 5. Unmet Expectations • Cost: The project cost more than expected
  • 6. Unmet Expectations • Cost: The project cost more than expected • Scope: The project’s scope was more expansive than anticipated
  • 7. Unmet Expectations • Cost: The project cost more than expected • Scope: The project’s scope was more expansive than anticipated • Schedule: Completion took longer than planned
  • 8. Unmet Expectations • Cost: The project cost more than expected • Scope: The project’s scope was more expansive than anticipated • Schedule: Completion took longer than planned • Quality: The workmanship quality was inferior to expectations.
  • 9. Still... Unmet Expectations
  • 10. Still... Unmet Expectations • Energy Performance: Is the building’s energy systems performing as expected (or promised)?
  • 11. Still... Unmet Expectations • Energy Performance: Is the building’s energy systems performing as expected (or promised)? • Rating: Did the building achieve the planned LEED rating or other certification?
  • 12. Still... Unmet Expectations • Energy Performance: Is the building’s energy systems performing as expected (or promised)? • Rating: Did the building achieve the planned LEED rating or other certification? • Long-Term Sustainability: What is the project’s impact on the environment, and is this as expected?
  • 13. Plus... Unique Risks & Features
  • 14. Plus... Unique Risks & Features
  • 15. Plus... Unique Risks & Features
  • 16. Plus... Unique Risks & Features
  • 17. Plus... Unique Risks & Features
  • 18. Plus... Unique Risks & Features
  • 20. Green Building Codes • California Green Building Code • DC Green Building Act (http://bit.ly/ajMac7) • IGCC (http://bit.ly/cC1GvV)
  • 21. Energy Inspectors • Cities like Austin and New Orleans are tightening energy codes and emphasizing role of energy inspectors. • New York Times Article (http://nyti.ms/a841ad) • Construction Law Monitor Article (http://bit.ly/bP180O)
  • 22. Reporting Energy • Cities like Seattle, WA are passing municipal regulations requiring certain properties to report their energy consumption, with plans on regulating consumption in the future. • CLM Article on Requirements (http://bit.ly/cXk8a0)
  • 23. Tax Credits Tax Credits are available in certain locally, federally and state-wide for solar installations, energy performance, rating certifications and more....
  • 24. LEED Challenges LEED Challenges: http://bit.ly/aLvGkL LEED De-Certifications: http://bit.ly/bQuxgc
  • 26. Spearin Doctrine “[I]f a contractor is bound to build according to plans and specifications prepared by the owner, the contractor will not be responsible for the consequences of defects in the plans and specifications.” US v. Spearin, 248 US 132
  • 27. Architects As LEEDer • Should architects do the design & LEED coordination? • Are architects increasing the price of agreement with owner to accommodate the additional risk? • Is it possible to shift some responsibility to the contractor, suppliers or other project participants?
  • 28. Contractor Perspective • Bid-build Projects & Contracts that Shift Design Responsibility • Design-Build, & the Increased Risk • Don’t Guarantee Certification, or Spearin in Jeapordy
  • 31. Insurance • Not Much Out There • Policies Available Are Riders - so, are green risks not covered in standard policies?
  • 33. Things To Keep In Mind To... Contract Smart. Green, Sustainability, High-Performance Building, Green Certification, etc. No Universal Meaning. Define Them, & Choose a Rating System & Version.
  • 34. Things To Keep In Mind To... Contract Smart. Consider a Rating Coordinator Identify Responsible Parties Delegate Work and Responsibilities to Appropriate Parties
  • 35. Things To Keep In Mind To... Contract Smart. Certification is paper- intensive. Identify who will manage the documentation and the certification’s manual requirements.
  • 36. Things To Keep In Mind To... Contract Smart. Contractors: Don’t tie certification with substantial or final completion. It can take months, and you don’t want to be waiting on money that long.
  • 37. Things To Keep In Mind To... Contract Smart. Get to know the vendors and products to be used. Don’t subscribe to a technology without investigating, and hold vendors accountable for their promises.
  • 38. Things To Keep In Mind To... Contract Smart. Damages for failure to certify or for failure to meet certain benchmarks may be murky. Consider waiving consequential damages, and call out these specific expectations and considering waiving those damages or presenting LDs for them.
  • 39. Things To Keep In Mind To... Contract Smart. Flow Down Clauses: Make sure your obligations go up and down the chain.
  • 40. Form Contracts For Architects: B214–2007 establishes duties and responsibilities when the owner seeks certification from the U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED®). Among other things, the architect’s services include conducting a pre-design workshop where the LEED rating system will be reviewed and LEED points will be targeted, preparing a LEED Certification Plan, monitoring the LEED Certification process, providing LEED specifications for inclusion in the Contract Documents and preparing a LEED Certification Report detailing the LEED rating the project achieved. http://bit.ly/acKt78
  • 41. Form Contracts For Contractors: On Nov. 10, ConsensusDOCS released the construction industry's first and only comprehensive standard contract document addressing the unique risks and responsibilities associated with building green projects -- the ConsensusDOCS 310 Green Building Addendum. The Addendum incorporates contractual best practices to identify the project participants' roles and responsibilities, as well as the implementation and coordination efforts critical to achieving a successful project using green building elements, particularly those seeking third-party green building rating certification. It was drafted to work well not only with the other ConsensusDOCS contract documents, but also with other form contracts. http://bit.ly/9WVdvo
  • 42.
  • 43. Smart Agreements & Litigation Risks James d’Entremont Scott Wolfe Phelps Dunbar, LLP Wolfe Law Group Baton Rouge, LA Louisiana | Washington phelps.com wolfelaw.com constructionlawmonitor.com LEED AP

Editor's Notes

  1. Introduction
  2. Before talking about the specific (green building litigation), it’s important to get a grasp on general construction litigation...and what causes this type of litigation.
  3. Generally, litigation arises because of unfulfilled expectations.
  4. Generally, litigation arises because of unfulfilled expectations.
  5. Generally, litigation arises because of unfulfilled expectations.
  6. Generally, litigation arises because of unfulfilled expectations.
  7. Generally, litigation arises because of unfulfilled expectations. The same thing for LEED or other green building projects...its just different expectations.
  8. Generally, litigation arises because of unfulfilled expectations. The same thing for LEED or other green building projects...its just different expectations.
  9. Generally, litigation arises because of unfulfilled expectations. The same thing for LEED or other green building projects...its just different expectations.
  10. Generally, litigation arises because of unfulfilled expectations. The same thing for LEED or other green building projects...its just different expectations.
  11. Generally, litigation arises because of unfulfilled expectations. The same thing for LEED or other green building projects...its just different expectations.
  12. Generally, litigation arises because of unfulfilled expectations. The same thing for LEED or other green building projects...its just different expectations.
  13. Generally, litigation arises because of unfulfilled expectations. The same thing for LEED or other green building projects...its just different expectations.
  14. Generally, litigation arises because of unfulfilled expectations. The same thing for LEED or other green building projects...its just different expectations.
  15. Generally, litigation arises because of unfulfilled expectations. The same thing for LEED or other green building projects...its just different expectations.
  16. These green building cases present unique damages issues.
  17. These green building cases present unique damages issues.
  18. These green building cases present unique damages issues.
  19. These green building cases present unique damages issues.
  20. These green building cases present unique damages issues.
  21. These green building cases present unique damages issues.
  22. These green building cases present unique damages issues.
  23. These green building cases present unique damages issues.
  24. These green building cases present unique damages issues.
  25. How Do You Prepare for these green building vulnerabilities?
  26. How Do You Prepare for these green building vulnerabilities?
  27. Generally, litigation arises because of unfulfilled expectations. The same thing for LEED or other green building projects...its just different expectations.
  28. Generally, litigation arises because of unfulfilled expectations. The same thing for LEED or other green building projects...its just different expectations.
  29. Generally, litigation arises because of unfulfilled expectations. The same thing for LEED or other green building projects...its just different expectations.
  30. Generally, litigation arises because of unfulfilled expectations. The same thing for LEED or other green building projects...its just different expectations.
  31. Generally, litigation arises because of unfulfilled expectations. The same thing for LEED or other green building projects...its just different expectations.
  32. Generally, litigation arises because of unfulfilled expectations. The same thing for LEED or other green building projects...its just different expectations.
  33. Generally, litigation arises because of unfulfilled expectations. The same thing for LEED or other green building projects...its just different expectations.
  34. Generally, litigation arises because of unfulfilled expectations. The same thing for LEED or other green building projects...its just different expectations.
  35. Generally, litigation arises because of unfulfilled expectations. The same thing for LEED or other green building projects...its just different expectations.
  36. A basic definition for “green washing”
  37. Introduction