This document outlines the procedures for dismantling an IOH MOCN Project wireless site model. It includes requirements for equipment, tools, certificates, safety inspections of the antenna and rack areas before and after dismantling, equipment labeling and packing, capturing the network management system configuration before and after, and updating the Netgear system after completion. The dismantling work will be documented through photos and an equipment list to ensure all materials are properly accounted for.