...As far as the production of energy, โ€œShivee Energyโ€ proj-
ect is being implemented. First, we need to build 4 to 5
power plants to ensure the supply of energy over the next
10 years. By doing so, we will be capable of fully supplying
domestic energy demands in the next 10 to 15 years.
In the long run, once our energy supply exceeds domestic
demand, we intend to export the excess energy. Under this
requirement, we will continue to utilize our thermal coal.
We have an abundant amount of natural resources, which
are in high global demand and we have the opportunity to
utilize and process those resources efficiently...
Prime Minister of Mongolia, Erdenebat Jargaltulga
โ€œ
โ€œ
100-day report of the Government of Mongolia
27.10.2016
Shivee Energy integrated energy complex
Project Profile
2016
Shivee Energy integrated energy complex
Summary
Introduction
About Us
Project Overview	
Location
Exploration History
	
Resource Data
Mining Licenses
Project Description	
Regulatory Environment
Feasibility Study
Contact
Contents
* Any information mentioned in this com-
pany profile contains no conflict of interest
and is intended for internal introductory
purposes only. All data and information
regarding operations are in the research
stages and may change depending on the
market conditions.
05
06
07
09
10
10
11
12
13
14
15
16
Shivee Energy integrated energy complex
Summary
Resources:
Renewable energy (wind, solar)
Coal-1,303.1 Mt and Coal bed methane (CBM)
Feasibility Study:
Pre-feasibility Study- Completed in April, 2016
Feasibility Study- Expected to be completed
in November, 2016 by State Grid Corporation
of China
Our aim:
Our project aim is to build integrated
eco-friendly and economical coal and
renewable energy based power plant to
supply energy to both domestic and Chinese
market as well as Northeast Asia
Project Developer: Erdenes Shivee Energy LLC
Shareholders:
Erdenes Mongol, LLC & Aq Sora, LLC
Ulaanbaatar
Russia
China
Mongolia
Legend
ESE project Transmission line
Northeast Asia
interconnection
Coal mineWind power plant
Solar power plant
Japan
South
Korea
5
Shivee Energy integrated energy complex
Introduction
Mongolia has enormous resources in terms of its mineral reserves and
renewable energy such as wind and solar. Oyu Tolgoi (OT), in the South
Gobi region of the country, is the worldโ€™s largest undeveloped cop-
per-gold project and the reserve value of the asset is greater than the en-
tire current GDP level of Mongolia. The government has signed an histor-
ic agreement with Ivanhoe mines and Rio Tinto for the development of
this project. Next biggest project is Tavan Tolgoi (TT) mine, which is the
biggest coal operation in Mongolia. The government is now in process of
selecting the strategic investment partner to take over the management
of Mongolian state-owned firm in charge of TT coal deposit.
It is estimated that the total coal resource of Mongolia is about 175 billion
tons. As of today, there are 300 coal deposits within 15 coal basins in
Mongolia. In addition to the coal resources, 12 active renewable energy
projects including 5 wind energy and 7 solar energy projects now ac-
complishing the research phase and ready to be implemented. Three of
them are planned to be implemented in the area of Choir and Dornogobi
region nearby Shivee-Ovoo, where our company plans to implement the
Shivee Energy Complex Project of Energy Export.
6
Renewable Energy Projects in Mongolia
Enormous amount
of mineral reserves
and renewable
energy source in
Shivee Energy
project area
โ€œ
โ€œ
Shivee energy
project area
Shivee Energy integrated energy complex 7
โ€œ15% of total installed capacity
will be renewable energyโ€
Shivee Energy integrated energy complex
About Us
Erdenes Shivee Energy, LLC is established as a state and private
joint Mongolian company in accordance with an agreement between
Erdenes Mongol, LLC and Aq Sora, LLC on March 4, 2016.
Erdenes Shivee Energy, LLC was established to provide 1.2 billion
tons of productive capacity resource to the Shivee Energy Complex
Project of Energy Export based on strategical deposit, Shivee-Ovoo.
50 percent of the company is currently owned by Erdenes Mongol,
LLC, a stated owned enterprise and the other 50 percent is owned
by Aq Sora, LLC, a private entitiy that owns shares of Shine Shivee,
LLC. The establishment of Erdenes Shivee Energy, LLC is based
on the Cabinet discussion no. 64 dated on November 16, 2015 to
support the complex project to build a large scale ultra-high voltage
power plant, cross-border transmission lines and coal mine near the
strategical coal deposit, Shivee Ovoo.
On October 26, 2015, โ€œShivee Energy Complex Project of
Energy Exportโ€ project unit was established under the Ministry of
Energy of Mongolia and Erdenes Mongol, LLC by the Government
Resolution no. 422. The main goal of the Project Unit is to provide
the preparatory work of the Feasibilityt Study for renewable energy
power plant, thermal power plant, transmission line, water supply
and coal mine as well as to ensure project implementation.
Today, the companyโ€™s headquarters is located at Monnis tower, 13th
floor, Chinggis avenue-15, 1st khoroo, Sukhbaatar district, Ulaan-
baatar-14240, Mongolia. The headquarter office is responsible for
providing legal, accounting, administrative, engineering and geolog-
ical services, international and local procurement, liaison with regu-
latory authorities, logistics, translation, accounting, and coordination
of local and international suppliers and contractors.
Aq Sora
8
Shivee Energy integrated energy complex
Project
Overview
The Company intends to utilize its coal resources to build the
Shivee Energy Complex Project of Energy Export, which will
become the first energy export based project for Mongolia. The
complex project will be an important initiative for Mongolia,
where the countryโ€™s energy sector is underdeveloped. By bring-
ing a new idea of combining renewable energy with coal-based
energy in Mongolia, this project will significantly improve the
Mongolian economy and the energy sector.
By building a global scale power plant in Mongolia and exporting
the produced energy, our company will commence a new era in
the Mongolian energy sector. Furthermore, we will build an en-
vironmentally friendly wind farm and solar energy station within
the complex project using the abundant amount of renewable
energy resource of Mongolia. In addition to the project, there is
potential for the company to utilize economic value of CBM prior
to coal mining. This opportunity shall be researched and studied
thoroughly upon funding.
9
...Exporting the
produced energy...
The beginning
of a new era in the
Mongolian energy
sector
โ€œ
โ€œ
Shivee Energy integrated energy complex
Location
Exploration
History
The project is located in the Shivee Ovoo strategic coal deposit
area in Shivee-Gobi and Sumber soum of Gobi-Sumber province,
Mongolia, as shown in Figure-2. The project location lies 260 km to
the southeast of Ulaanbaatar, the capital city of Mongolia, 20 km
to the southeast of Choir City the provincial capital and 5 km to
the northeast of Shivee-Gobi soum.
From 1986-1988, a huge scale of complex and supplementary
geological exploration work that provides resources evaluation
of Shivee-Ovoo coal deposit. As a result of the exploration coal
resources within Shine Us area was discovered as defined category
of Measured and Indicated resources.
Preliminary exploration covering remained part of the deposit
Oekhii Tsagaan and Nogoon Toirom was carried out during 2007-
2010. In 2011-2012, detailed exploration work performed relating
to the result of the preliminary exploration and coal resources
approved by Mongolian Mineral Resources Professional Council in
2015.
Project location
Trans Mongolian
Railway
10
260km
Shivee Energy integrated energy complex
Resource Data
Resource clarification and calculation report for License no. 13311A,
13312A, 13313A was discussed and approved during the Mongolian
Mineral Resources Professional Council meeting on April 14, 2015.
Resource clarification and calculation report for License no. 20423A,
20421A, 20419A was discussed and approved during the Mongolian
Mineral Resource Professional Council meeting on August 21, 2015.
Approved resource report results are summarized as follows:
	 โ€ข Measured /A/, 		 24.41 Mt		
	 โ€ข Indicated /B/, 		 654.72 Mt
	 โ€ข Inferred /C/, 		 612.10 Mt
	 โ€ข A+B+C, 		 1,291.44 Mt
	 โ€ข Prognosis resource /P/, t 423.95 Mt
Further exploration is necessary for a complete research of the coal
deposit and increase the approved geological resource of the License
no. 20421A. In the case of License no. 20421A, further exploration is
being planned in order to bring P type resource to B, C type resource.
In the case of Nogoon Toirom deposit no. 2, further exploration of 65
drill holes of 22,710 meters of drilling is required.
In the case of Oekhii Tsagaan deposit, further exploration of 11 drill
holes of 3,710 meters of drilling is required. The above mentioned ex-
ploration will require about 9.1 billion MNT to execute. By transferring
the speculated P type resource to B, C type resource:
	 โ€ข Geological resource may increase by up to 70-80%
	 โ€ข Productive capacity resource may increase by
	 up to 50-60%
	 โ€ข NPV of the deposit may increase by up to 50-60%
11
Shivee Energy integrated energy complex
30 yearsShivee-1Nogoon toirom-2
31.Dec.
2015
20419A 549.41
License No. Area
Shine Us
Shine Us
Talbai-1
Talbai-2
07.Feb.
2008
30 years
30 years
30 years
30 years
30 years
27.Feb.
2008
27.Feb.
2008
Shine Us
Oekhii Tsagaan
Nogoon toirom-2
Talbai-3
Shiveegobi
Shiveegobi-1
31.Dec.
2015
31.Dec.
2015
Deposit Name Area name Granted
Date
Duration
13311A
13312A
13313A
20423A
20421A
Total
Mining Licences
12
2,781.20
1,238.11
269.73
7,862.7
5,447.2
18,148.35
Shivee Energy integrated energy complex
Project
Description
The goal of Shivee Energy Complex Project of Energy Export is to build
a large scale coal fired power plant in Mongolia and supply the produced
energy to domestic market and export into Peopleโ€™s Republic of China
via transmission lines. The complex project consists of 3 main compo-
nents. First, a coal mine with the capacity to extract 20 million tons of
coal per year. Second, a power plant with an installed capacity of 5,280
MW. Third, renewable power plants with an installed capacity of 15 per-
cent of the installed capacity of coal fired power plants. Lastly, transmis-
sion line with the capability to transmit 4,600 MW ยฑ660 kV UHV.
Since the northeast part of the project site is rich in wind energy and
southwest part of the project site is rich in solar energy, it is suitable to
incorporate solar and wind power plants to the complex project and
export renewable energy.
Currently, ESB Solar Energy, Ltd. obtained licenses to build 10 MW solar
plant and Aydiner Global, Ltd. obtained licenses to build 50.4 MW wind
power plant in the following areas in where our project is nearby in the
region.
13
Govisumber province
Cornerstone project
for Global Energy
Interconnection
โ€œ
โ€œ
Shivee Energy integrated energy complex
Regulatory
Environment
The Mongolian Law on Energy was adopted in February, 2001 in order to regulate matters
related to energy generation, transmission, distribution, and supply activities, construction of
energy facilities and energy consumption through utilization of energy resources.
The Mongolian Law on Renewable Energy was adopted in January, 2007 to regulate genera-
tion and supply of energy utilizing renewable energy sources.
The State Policy on Energy was announced in July, 2015 to promote and extend renewable
energy development in Mongolia. The Policy shall be implemented in two stages /2015-
2030/.
The State Policy on Energy is pursuing the following targets for renewable energy develop-
ment in Mongolia:
	 โ€ข to increase the share of renewable energy in the total energy supply to
	 20% by 2020 and to 30% by 2030.
	 โ€ข to create the legal and taxation environment for promoting investment in renew		
	 able energy
Moreover, the Government of Mongolia supports renewable energy development by exempt-
ing imported equipment and parts from customs duties and value-added taxes in 2016.
14
Shivee Energy integrated energy complex
Feasibility
Study
Aq Sora
15
Currently, State Grid Corporation of China, the worldโ€™s largest state owned utility
company established in 2002 by the State Council of China is carrying out feasibility study
of Shivee Energy Complex Project of Energy Export. State Grid Corporation of China pro-
vides power to over 1.1 billion people in 26 provinces and covers 88% of Chinaโ€™s national ter-
ritory. With an estimated total workforce of 1,800,000 and 330 billion USD in revenue, State
Grid Corporation of China was ranked 2nd in the Fortune Global 500 in 2016. Furthermore,
State Grid Corporation of China owns 40% of the Philippinesโ€™ power grid, 25% of Portugalโ€™s
power grid and 30% of Italyโ€™s power grid.
On November 10, 2015 The Ministry of Energy of Mongolia and State Grid Corporation of Chi-
na has signed an agreement to carry out the Feasibility Study for the Shivee Energy Com-
plex Project of Energy Export. In accordance with the agreement, State Grid Corporation of
China selected 3 different institutions in early 2016 through an international open tender to
carry out the Feasibility Study for the Shivee Energy Complex Project of Energy Export. The
3 institutions are currently carrying out the Feasibility Study of the 3 main components of
the complex project. 										
							`	`
First, Shandong Electric Power Engineering Consulting Institute Corporation, Ltd is carrying
out the Feasibility Study for the Power Plant and Transmission Line. Second, CCTEG Shen-
yang Engineering Company is carrying out the Feasibility Study for the Coal mine. Lastly, the
Inner Mongolia Water Resources and Hydropower Survey and Design Institute is carrying out
the Feasibility Study for the Water supply of the complex project.
Another organization with a vested interest in the Shivee Energy Complex Project of Energy
Export is the Global Energy Interconnection Development and Cooperation Organization
(GEIDCO). GEIDCO is a non-governmental, non-profit international organization among will-
ing firms, organizations and institutes dedicated to promoting sustainable development of
energy worldwide. The main goal of GEIDCO is to promote the establishment of the Global
Energy Interconnection system to meet the global demand for clean and green electricity.
In order to establish a Global Energy Interconnection system, GEIDCO is looking to establish
a regional power grid starting from Northeast Asia. Therefore, the Shivee Energy Complex
Project of Energy Export has a great potential to supply energy not only to Mongolia and
China but also to the Northeast Asian Power Grid and Global Energy Interconnection as well.
Shivee Energy integrated energy complex
Address: Monnis tower, 13th floor, Chinggis avenue-15,
	 1st khoroo, Sukhbaatar district,
	 Ulaanbaatar-14240, Mongolia
Web: 	 www.erdenes-shivee-energy.com
E-mail: info@erdenes-shivee-energy.com
16

More Related Content

What's hot

Enco Group Q3, 2017 - Tanzania coal mine and clean power presentation
Enco Group   Q3, 2017 - Tanzania coal mine and clean power presentation Enco Group   Q3, 2017 - Tanzania coal mine and clean power presentation
Enco Group Q3, 2017 - Tanzania coal mine and clean power presentation
Chris Kuntz
ย 
Global Gas Markets Over the Coming 10-20 Years
Global Gas Markets Over the Coming 10-20 YearsGlobal Gas Markets Over the Coming 10-20 Years
Global Gas Markets Over the Coming 10-20 Years
International Energy Agency
ย 
Prospect of Coal Based IGCC to Meet the Clean Energy Challenge
Prospect of Coal Based IGCC to Meet the Clean Energy ChallengeProspect of Coal Based IGCC to Meet the Clean Energy Challenge
Prospect of Coal Based IGCC to Meet the Clean Energy Challenge
IJERA Editor
ย 
Rapport complet "District Energy in Cities: Unlocking the Potential of Energy...
Rapport complet "District Energy in Cities: Unlocking the Potential of Energy...Rapport complet "District Energy in Cities: Unlocking the Potential of Energy...
Rapport complet "District Energy in Cities: Unlocking the Potential of Energy...
Pรดle Rรฉseaux de Chaleur - Cerema
ย 
Modernising the european lignite triangle
Modernising the european lignite triangleModernising the european lignite triangle
Modernising the european lignite triangle
Forum Energii
ย 
The Strategic Energy Technology Plan: at the heart of energy R&I in Europe
The Strategic Energy Technology Plan: at the heart of energy R&I in EuropeThe Strategic Energy Technology Plan: at the heart of energy R&I in Europe
The Strategic Energy Technology Plan: at the heart of energy R&I in Europe
Nuno Quental
ย 
Indonesia current gas market 2015 s
Indonesia current gas market 2015 sIndonesia current gas market 2015 s
Indonesia current gas market 2015 s
Furqon Hanief
ย 
Juncker zet jeugd in om klimaatomslag te bereiken
Juncker zet jeugd in om klimaatomslag te bereikenJuncker zet jeugd in om klimaatomslag te bereiken
Juncker zet jeugd in om klimaatomslag te bereiken
Thierry Debels
ย 
Wer 2013 1_coal
Wer 2013 1_coalWer 2013 1_coal
Wer 2013 1_coal
vhovo
ย 

What's hot (9)

Enco Group Q3, 2017 - Tanzania coal mine and clean power presentation
Enco Group   Q3, 2017 - Tanzania coal mine and clean power presentation Enco Group   Q3, 2017 - Tanzania coal mine and clean power presentation
Enco Group Q3, 2017 - Tanzania coal mine and clean power presentation
ย 
Global Gas Markets Over the Coming 10-20 Years
Global Gas Markets Over the Coming 10-20 YearsGlobal Gas Markets Over the Coming 10-20 Years
Global Gas Markets Over the Coming 10-20 Years
ย 
Prospect of Coal Based IGCC to Meet the Clean Energy Challenge
Prospect of Coal Based IGCC to Meet the Clean Energy ChallengeProspect of Coal Based IGCC to Meet the Clean Energy Challenge
Prospect of Coal Based IGCC to Meet the Clean Energy Challenge
ย 
Rapport complet "District Energy in Cities: Unlocking the Potential of Energy...
Rapport complet "District Energy in Cities: Unlocking the Potential of Energy...Rapport complet "District Energy in Cities: Unlocking the Potential of Energy...
Rapport complet "District Energy in Cities: Unlocking the Potential of Energy...
ย 
Modernising the european lignite triangle
Modernising the european lignite triangleModernising the european lignite triangle
Modernising the european lignite triangle
ย 
The Strategic Energy Technology Plan: at the heart of energy R&I in Europe
The Strategic Energy Technology Plan: at the heart of energy R&I in EuropeThe Strategic Energy Technology Plan: at the heart of energy R&I in Europe
The Strategic Energy Technology Plan: at the heart of energy R&I in Europe
ย 
Indonesia current gas market 2015 s
Indonesia current gas market 2015 sIndonesia current gas market 2015 s
Indonesia current gas market 2015 s
ย 
Juncker zet jeugd in om klimaatomslag te bereiken
Juncker zet jeugd in om klimaatomslag te bereikenJuncker zet jeugd in om klimaatomslag te bereiken
Juncker zet jeugd in om klimaatomslag te bereiken
ย 
Wer 2013 1_coal
Wer 2013 1_coalWer 2013 1_coal
Wer 2013 1_coal
ย 

Viewers also liked

ะจะธะฒัั ะญะฝะตั€ะถะธ ัั€ั‡ะธะผ ั…าฏั‡ะฝะธะน ะฝัะณะดััะฝ ั†ะพะณั†ะพะปะฑะพั€
ะจะธะฒัั ะญะฝะตั€ะถะธ ัั€ั‡ะธะผ ั…าฏั‡ะฝะธะน ะฝัะณะดััะฝ ั†ะพะณั†ะพะปะฑะพั€ะจะธะฒัั ะญะฝะตั€ะถะธ ัั€ั‡ะธะผ ั…าฏั‡ะฝะธะน ะฝัะณะดััะฝ ั†ะพะณั†ะพะปะฑะพั€
ะจะธะฒัั ะญะฝะตั€ะถะธ ัั€ั‡ะธะผ ั…าฏั‡ะฝะธะน ะฝัะณะดััะฝ ั†ะพะณั†ะพะปะฑะพั€
Tumee Gantumur
ย 
Empresas digitales en un paรญs analรณgico - Alvaro Guzman
Empresas digitales en un paรญs analรณgico -  Alvaro GuzmanEmpresas digitales en un paรญs analรณgico -  Alvaro Guzman
Empresas digitales en un paรญs analรณgico - Alvaro Guzman
agendadigitalbo
ย 
PROGRAMA DE FESTES D'INCA 2015
PROGRAMA DE FESTES D'INCA 2015PROGRAMA DE FESTES D'INCA 2015
PROGRAMA DE FESTES D'INCA 2015
Activa't Inca Associaciรณ Empresarial
ย 
Altdata garanti pos analytics
Altdata garanti pos analyticsAltdata garanti pos analytics
Altdata garanti pos analytics
Altan Atabarut, MSc.
ย 
Catalogo Lechuza Trend Collection 2011
Catalogo Lechuza Trend Collection 2011Catalogo Lechuza Trend Collection 2011
Catalogo Lechuza Trend Collection 2011DeDi
ย 
Ref plus tenancy form (static)
Ref plus tenancy form (static)Ref plus tenancy form (static)
Ref plus tenancy form (static)
Rex Villarin
ย 
Feedback Responsesfor Rrk
Feedback Responsesfor RrkFeedback Responsesfor Rrk
Feedback Responsesfor Rrkklaudijamedia
ย 
Using Open Badge 'Packs' to support teaching across the curriculum
Using Open Badge 'Packs' to support teaching across the curriculumUsing Open Badge 'Packs' to support teaching across the curriculum
Using Open Badge 'Packs' to support teaching across the curriculum
Matthew Rogers
ย 
La empresa 2.0 y la relaciรณn electrรณnica con los clientes
La empresa 2.0 y la relaciรณn electrรณnica con los clientesLa empresa 2.0 y la relaciรณn electrรณnica con los clientes
La empresa 2.0 y la relaciรณn electrรณnica con los clientes
Fernando Maciรก Domene
ย 
Presentacion premios concurso pintura aves nueva
Presentacion premios concurso pintura aves nuevaPresentacion premios concurso pintura aves nueva
Presentacion premios concurso pintura aves nueva
iesitaba
ย 
Mapping Manager
Mapping ManagerMapping Manager
Mapping Manager
AnalytiX DS
ย 
Juan y Tadeo Edad Media
Juan y Tadeo Edad MediaJuan y Tadeo Edad Media
Juan y Tadeo Edad Media
Marรญa Dolores Llana
ย 
El internet de las cosas
El internet de las cosasEl internet de las cosas
El internet de las cosas
Lisbeth Ladron De Guevara
ย 
Content Strategy Workshop :: "Mensch & Computer" conference 11. - 14.09.2011 ...
Content Strategy Workshop :: "Mensch & Computer" conference 11. - 14.09.2011 ...Content Strategy Workshop :: "Mensch & Computer" conference 11. - 14.09.2011 ...
Content Strategy Workshop :: "Mensch & Computer" conference 11. - 14.09.2011 ...
nikki tiedtke
ย 
Solicitud Conexiรณn Matemรกtica
Solicitud Conexiรณn MatemรกticaSolicitud Conexiรณn Matemรกtica
Solicitud Conexiรณn Matemรกtica
Mariรกngeles Esteban
ย 
El dibujo vectorial en aplicaciones y videojuegos
El dibujo vectorial en aplicaciones y videojuegosEl dibujo vectorial en aplicaciones y videojuegos
El dibujo vectorial en aplicaciones y videojuegos
Alicia Morรณn
ย 
Revista Tu Guรญa Central - Ediciรณn nรบmero 93, diciembre de 2016
Revista Tu Guรญa Central - Ediciรณn nรบmero 93, diciembre de 2016Revista Tu Guรญa Central - Ediciรณn nรบmero 93, diciembre de 2016
Revista Tu Guรญa Central - Ediciรณn nรบmero 93, diciembre de 2016
Tu Guรญa Central
ย 
Startup 2.0: A Silicon Valley Story (Oct 2009)
Startup 2.0: A Silicon Valley Story (Oct 2009)Startup 2.0: A Silicon Valley Story (Oct 2009)
Startup 2.0: A Silicon Valley Story (Oct 2009)
Dave McClure
ย 
Avaluo Cursos En Linea
Avaluo Cursos En LineaAvaluo Cursos En Linea
Avaluo Cursos En LineaDigetech.net
ย 
Caso cinciliacion
Caso cinciliacionCaso cinciliacion
Caso cinciliacion
Francito Honores
ย 

Viewers also liked (20)

ะจะธะฒัั ะญะฝะตั€ะถะธ ัั€ั‡ะธะผ ั…าฏั‡ะฝะธะน ะฝัะณะดััะฝ ั†ะพะณั†ะพะปะฑะพั€
ะจะธะฒัั ะญะฝะตั€ะถะธ ัั€ั‡ะธะผ ั…าฏั‡ะฝะธะน ะฝัะณะดััะฝ ั†ะพะณั†ะพะปะฑะพั€ะจะธะฒัั ะญะฝะตั€ะถะธ ัั€ั‡ะธะผ ั…าฏั‡ะฝะธะน ะฝัะณะดััะฝ ั†ะพะณั†ะพะปะฑะพั€
ะจะธะฒัั ะญะฝะตั€ะถะธ ัั€ั‡ะธะผ ั…าฏั‡ะฝะธะน ะฝัะณะดััะฝ ั†ะพะณั†ะพะปะฑะพั€
ย 
Empresas digitales en un paรญs analรณgico - Alvaro Guzman
Empresas digitales en un paรญs analรณgico -  Alvaro GuzmanEmpresas digitales en un paรญs analรณgico -  Alvaro Guzman
Empresas digitales en un paรญs analรณgico - Alvaro Guzman
ย 
PROGRAMA DE FESTES D'INCA 2015
PROGRAMA DE FESTES D'INCA 2015PROGRAMA DE FESTES D'INCA 2015
PROGRAMA DE FESTES D'INCA 2015
ย 
Altdata garanti pos analytics
Altdata garanti pos analyticsAltdata garanti pos analytics
Altdata garanti pos analytics
ย 
Catalogo Lechuza Trend Collection 2011
Catalogo Lechuza Trend Collection 2011Catalogo Lechuza Trend Collection 2011
Catalogo Lechuza Trend Collection 2011
ย 
Ref plus tenancy form (static)
Ref plus tenancy form (static)Ref plus tenancy form (static)
Ref plus tenancy form (static)
ย 
Feedback Responsesfor Rrk
Feedback Responsesfor RrkFeedback Responsesfor Rrk
Feedback Responsesfor Rrk
ย 
Using Open Badge 'Packs' to support teaching across the curriculum
Using Open Badge 'Packs' to support teaching across the curriculumUsing Open Badge 'Packs' to support teaching across the curriculum
Using Open Badge 'Packs' to support teaching across the curriculum
ย 
La empresa 2.0 y la relaciรณn electrรณnica con los clientes
La empresa 2.0 y la relaciรณn electrรณnica con los clientesLa empresa 2.0 y la relaciรณn electrรณnica con los clientes
La empresa 2.0 y la relaciรณn electrรณnica con los clientes
ย 
Presentacion premios concurso pintura aves nueva
Presentacion premios concurso pintura aves nuevaPresentacion premios concurso pintura aves nueva
Presentacion premios concurso pintura aves nueva
ย 
Mapping Manager
Mapping ManagerMapping Manager
Mapping Manager
ย 
Juan y Tadeo Edad Media
Juan y Tadeo Edad MediaJuan y Tadeo Edad Media
Juan y Tadeo Edad Media
ย 
El internet de las cosas
El internet de las cosasEl internet de las cosas
El internet de las cosas
ย 
Content Strategy Workshop :: "Mensch & Computer" conference 11. - 14.09.2011 ...
Content Strategy Workshop :: "Mensch & Computer" conference 11. - 14.09.2011 ...Content Strategy Workshop :: "Mensch & Computer" conference 11. - 14.09.2011 ...
Content Strategy Workshop :: "Mensch & Computer" conference 11. - 14.09.2011 ...
ย 
Solicitud Conexiรณn Matemรกtica
Solicitud Conexiรณn MatemรกticaSolicitud Conexiรณn Matemรกtica
Solicitud Conexiรณn Matemรกtica
ย 
El dibujo vectorial en aplicaciones y videojuegos
El dibujo vectorial en aplicaciones y videojuegosEl dibujo vectorial en aplicaciones y videojuegos
El dibujo vectorial en aplicaciones y videojuegos
ย 
Revista Tu Guรญa Central - Ediciรณn nรบmero 93, diciembre de 2016
Revista Tu Guรญa Central - Ediciรณn nรบmero 93, diciembre de 2016Revista Tu Guรญa Central - Ediciรณn nรบmero 93, diciembre de 2016
Revista Tu Guรญa Central - Ediciรณn nรบmero 93, diciembre de 2016
ย 
Startup 2.0: A Silicon Valley Story (Oct 2009)
Startup 2.0: A Silicon Valley Story (Oct 2009)Startup 2.0: A Silicon Valley Story (Oct 2009)
Startup 2.0: A Silicon Valley Story (Oct 2009)
ย 
Avaluo Cursos En Linea
Avaluo Cursos En LineaAvaluo Cursos En Linea
Avaluo Cursos En Linea
ย 
Caso cinciliacion
Caso cinciliacionCaso cinciliacion
Caso cinciliacion
ย 

Similar to Shivee Energy integrated energy complex

The Project
The ProjectThe Project
The Project
bayr baba
ย 
19.06.2013 Tavan Tolgoi Project, Batsuuri Yaichil
19.06.2013 Tavan Tolgoi Project, Batsuuri Yaichil19.06.2013 Tavan Tolgoi Project, Batsuuri Yaichil
19.06.2013 Tavan Tolgoi Project, Batsuuri Yaichil
The Business Council of Mongolia
ย 
25.03.2011, NEWSWIRE, Issue 160
25.03.2011, NEWSWIRE, Issue 16025.03.2011, NEWSWIRE, Issue 160
25.03.2011, NEWSWIRE, Issue 160
The Business Council of Mongolia
ย 
03.06.2011,NEWSWIRE, Issue 170
03.06.2011,NEWSWIRE, Issue 17003.06.2011,NEWSWIRE, Issue 170
03.06.2011,NEWSWIRE, Issue 170
The Business Council of Mongolia
ย 
21.01.2011, NEWSWIRE, Issue 152
21.01.2011, NEWSWIRE, Issue 15221.01.2011, NEWSWIRE, Issue 152
21.01.2011, NEWSWIRE, Issue 152
The Business Council of Mongolia
ย 
07.06.2013, NEWSWIRE, Issue 277
07.06.2013, NEWSWIRE, Issue 27707.06.2013, NEWSWIRE, Issue 277
07.06.2013, NEWSWIRE, Issue 277
The Business Council of Mongolia
ย 
02.05.2014 Spotlight presentations a chance to showcase your services and pr...
02.05.2014 Spotlight presentations  a chance to showcase your services and pr...02.05.2014 Spotlight presentations  a chance to showcase your services and pr...
02.05.2014 Spotlight presentations a chance to showcase your services and pr...
The Business Council of Mongolia
ย 
BCM NewsWire Issue 449
BCM NewsWire Issue 449BCM NewsWire Issue 449
BCM NewsWire Issue 449
The Business Council of Mongolia
ย 
01.08.2014, NEWSWIRE, Issue 336
01.08.2014, NEWSWIRE, Issue 33601.08.2014, NEWSWIRE, Issue 336
01.08.2014, NEWSWIRE, Issue 336
The Business Council of Mongolia
ย 
08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...
08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...
08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...
The Business Council of Mongolia
ย 
31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...
31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...
31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...
The Business Council of Mongolia
ย 
21.04.2016 strategic transformation erdenes mongol
21.04.2016 strategic transformation erdenes mongol21.04.2016 strategic transformation erdenes mongol
21.04.2016 strategic transformation erdenes mongol
The Business Council of Mongolia
ย 
03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...
03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...
03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...
The Business Council of Mongolia
ย 
12.08.2011, NEWSWIRE, Issue 180
12.08.2011, NEWSWIRE, Issue 18012.08.2011, NEWSWIRE, Issue 180
12.08.2011, NEWSWIRE, Issue 180
The Business Council of Mongolia
ย 
03.08.2012, NEWSWIRE, Issue 233
03.08.2012, NEWSWIRE, Issue 23303.08.2012, NEWSWIRE, Issue 233
03.08.2012, NEWSWIRE, Issue 233
The Business Council of Mongolia
ย 
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu
The Business Council of Mongolia
ย 
23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu
23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu
23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu
The Business Council of Mongolia
ย 
22.06.2012, NEWSWIRE, Issue 227
22.06.2012, NEWSWIRE, Issue 22722.06.2012, NEWSWIRE, Issue 227
22.06.2012, NEWSWIRE, Issue 227
The Business Council of Mongolia
ย 
03.07.2009, NEWSWIRE, Issue 76
03.07.2009, NEWSWIRE, Issue 7603.07.2009, NEWSWIRE, Issue 76
03.07.2009, NEWSWIRE, Issue 76
The Business Council of Mongolia
ย 
13.04.2012, NEWSWIRE, Issue 217
13.04.2012, NEWSWIRE, Issue 21713.04.2012, NEWSWIRE, Issue 217
13.04.2012, NEWSWIRE, Issue 217
The Business Council of Mongolia
ย 

Similar to Shivee Energy integrated energy complex (20)

The Project
The ProjectThe Project
The Project
ย 
19.06.2013 Tavan Tolgoi Project, Batsuuri Yaichil
19.06.2013 Tavan Tolgoi Project, Batsuuri Yaichil19.06.2013 Tavan Tolgoi Project, Batsuuri Yaichil
19.06.2013 Tavan Tolgoi Project, Batsuuri Yaichil
ย 
25.03.2011, NEWSWIRE, Issue 160
25.03.2011, NEWSWIRE, Issue 16025.03.2011, NEWSWIRE, Issue 160
25.03.2011, NEWSWIRE, Issue 160
ย 
03.06.2011,NEWSWIRE, Issue 170
03.06.2011,NEWSWIRE, Issue 17003.06.2011,NEWSWIRE, Issue 170
03.06.2011,NEWSWIRE, Issue 170
ย 
21.01.2011, NEWSWIRE, Issue 152
21.01.2011, NEWSWIRE, Issue 15221.01.2011, NEWSWIRE, Issue 152
21.01.2011, NEWSWIRE, Issue 152
ย 
07.06.2013, NEWSWIRE, Issue 277
07.06.2013, NEWSWIRE, Issue 27707.06.2013, NEWSWIRE, Issue 277
07.06.2013, NEWSWIRE, Issue 277
ย 
02.05.2014 Spotlight presentations a chance to showcase your services and pr...
02.05.2014 Spotlight presentations  a chance to showcase your services and pr...02.05.2014 Spotlight presentations  a chance to showcase your services and pr...
02.05.2014 Spotlight presentations a chance to showcase your services and pr...
ย 
BCM NewsWire Issue 449
BCM NewsWire Issue 449BCM NewsWire Issue 449
BCM NewsWire Issue 449
ย 
01.08.2014, NEWSWIRE, Issue 336
01.08.2014, NEWSWIRE, Issue 33601.08.2014, NEWSWIRE, Issue 336
01.08.2014, NEWSWIRE, Issue 336
ย 
08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...
08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...
08.31.2012, PRESENTATION, Mongolian Coal Mining Industry, Opportunities and C...
ย 
31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...
31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...
31.08.2012 Mongolian coal mining industry, opportunities and challenges, Mong...
ย 
21.04.2016 strategic transformation erdenes mongol
21.04.2016 strategic transformation erdenes mongol21.04.2016 strategic transformation erdenes mongol
21.04.2016 strategic transformation erdenes mongol
ย 
03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...
03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...
03.09.2014 Largest developing coking coal deposit in the world, Erdenes Tavan...
ย 
12.08.2011, NEWSWIRE, Issue 180
12.08.2011, NEWSWIRE, Issue 18012.08.2011, NEWSWIRE, Issue 180
12.08.2011, NEWSWIRE, Issue 180
ย 
03.08.2012, NEWSWIRE, Issue 233
03.08.2012, NEWSWIRE, Issue 23303.08.2012, NEWSWIRE, Issue 233
03.08.2012, NEWSWIRE, Issue 233
ย 
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu
2012, PRESENTATION, Building a leading mongolian coal producer, Batmunkh Batkhuu
ย 
23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu
23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu
23.03.2012 Building a leading Mongolian coal producer, Batmunkh Batkhuu
ย 
22.06.2012, NEWSWIRE, Issue 227
22.06.2012, NEWSWIRE, Issue 22722.06.2012, NEWSWIRE, Issue 227
22.06.2012, NEWSWIRE, Issue 227
ย 
03.07.2009, NEWSWIRE, Issue 76
03.07.2009, NEWSWIRE, Issue 7603.07.2009, NEWSWIRE, Issue 76
03.07.2009, NEWSWIRE, Issue 76
ย 
13.04.2012, NEWSWIRE, Issue 217
13.04.2012, NEWSWIRE, Issue 21713.04.2012, NEWSWIRE, Issue 217
13.04.2012, NEWSWIRE, Issue 217
ย 

Recently uploaded

Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
zoyaansari11365
ย 
Filing Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed GuideFiling Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed Guide
YourLegal Accounting
ย 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
ย 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
ย 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
ย 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
ย 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Jos Voskuil
ย 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
HajeJanKamps
ย 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
ย 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
ย 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
my Pandit
ย 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
ย 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
ย 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
ย 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
ย 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
ย 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
ย 
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
Kumar Satyam
ย 
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop.com LTD
ย 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
Erika906060
ย 

Recently uploaded (20)

Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111Introduction to Amazon company 111111111111
Introduction to Amazon company 111111111111
ย 
Filing Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed GuideFiling Your Delaware Franchise Tax A Detailed Guide
Filing Your Delaware Franchise Tax A Detailed Guide
ย 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
ย 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
ย 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
ย 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
ย 
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdfDigital Transformation in PLM - WHAT and HOW - for distribution.pdf
Digital Transformation in PLM - WHAT and HOW - for distribution.pdf
ย 
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deckPitch Deck Teardown: RAW Dating App's $3M Angel deck
Pitch Deck Teardown: RAW Dating App's $3M Angel deck
ย 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
ย 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
ย 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
ย 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
ย 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
ย 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
ย 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
ย 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
ย 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
ย 
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
ย 
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024
ย 
Attending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learnersAttending a job Interview for B1 and B2 Englsih learners
Attending a job Interview for B1 and B2 Englsih learners
ย 

Shivee Energy integrated energy complex

  • 1. Shivee Energy integrated energy complex
  • 2. ...As far as the production of energy, โ€œShivee Energyโ€ proj- ect is being implemented. First, we need to build 4 to 5 power plants to ensure the supply of energy over the next 10 years. By doing so, we will be capable of fully supplying domestic energy demands in the next 10 to 15 years. In the long run, once our energy supply exceeds domestic demand, we intend to export the excess energy. Under this requirement, we will continue to utilize our thermal coal. We have an abundant amount of natural resources, which are in high global demand and we have the opportunity to utilize and process those resources efficiently... Prime Minister of Mongolia, Erdenebat Jargaltulga โ€œ โ€œ 100-day report of the Government of Mongolia 27.10.2016
  • 3. Shivee Energy integrated energy complex Project Profile 2016
  • 4. Shivee Energy integrated energy complex Summary Introduction About Us Project Overview Location Exploration History Resource Data Mining Licenses Project Description Regulatory Environment Feasibility Study Contact Contents * Any information mentioned in this com- pany profile contains no conflict of interest and is intended for internal introductory purposes only. All data and information regarding operations are in the research stages and may change depending on the market conditions. 05 06 07 09 10 10 11 12 13 14 15 16
  • 5. Shivee Energy integrated energy complex Summary Resources: Renewable energy (wind, solar) Coal-1,303.1 Mt and Coal bed methane (CBM) Feasibility Study: Pre-feasibility Study- Completed in April, 2016 Feasibility Study- Expected to be completed in November, 2016 by State Grid Corporation of China Our aim: Our project aim is to build integrated eco-friendly and economical coal and renewable energy based power plant to supply energy to both domestic and Chinese market as well as Northeast Asia Project Developer: Erdenes Shivee Energy LLC Shareholders: Erdenes Mongol, LLC & Aq Sora, LLC Ulaanbaatar Russia China Mongolia Legend ESE project Transmission line Northeast Asia interconnection Coal mineWind power plant Solar power plant Japan South Korea 5
  • 6. Shivee Energy integrated energy complex Introduction Mongolia has enormous resources in terms of its mineral reserves and renewable energy such as wind and solar. Oyu Tolgoi (OT), in the South Gobi region of the country, is the worldโ€™s largest undeveloped cop- per-gold project and the reserve value of the asset is greater than the en- tire current GDP level of Mongolia. The government has signed an histor- ic agreement with Ivanhoe mines and Rio Tinto for the development of this project. Next biggest project is Tavan Tolgoi (TT) mine, which is the biggest coal operation in Mongolia. The government is now in process of selecting the strategic investment partner to take over the management of Mongolian state-owned firm in charge of TT coal deposit. It is estimated that the total coal resource of Mongolia is about 175 billion tons. As of today, there are 300 coal deposits within 15 coal basins in Mongolia. In addition to the coal resources, 12 active renewable energy projects including 5 wind energy and 7 solar energy projects now ac- complishing the research phase and ready to be implemented. Three of them are planned to be implemented in the area of Choir and Dornogobi region nearby Shivee-Ovoo, where our company plans to implement the Shivee Energy Complex Project of Energy Export. 6 Renewable Energy Projects in Mongolia Enormous amount of mineral reserves and renewable energy source in Shivee Energy project area โ€œ โ€œ Shivee energy project area
  • 7. Shivee Energy integrated energy complex 7 โ€œ15% of total installed capacity will be renewable energyโ€
  • 8. Shivee Energy integrated energy complex About Us Erdenes Shivee Energy, LLC is established as a state and private joint Mongolian company in accordance with an agreement between Erdenes Mongol, LLC and Aq Sora, LLC on March 4, 2016. Erdenes Shivee Energy, LLC was established to provide 1.2 billion tons of productive capacity resource to the Shivee Energy Complex Project of Energy Export based on strategical deposit, Shivee-Ovoo. 50 percent of the company is currently owned by Erdenes Mongol, LLC, a stated owned enterprise and the other 50 percent is owned by Aq Sora, LLC, a private entitiy that owns shares of Shine Shivee, LLC. The establishment of Erdenes Shivee Energy, LLC is based on the Cabinet discussion no. 64 dated on November 16, 2015 to support the complex project to build a large scale ultra-high voltage power plant, cross-border transmission lines and coal mine near the strategical coal deposit, Shivee Ovoo. On October 26, 2015, โ€œShivee Energy Complex Project of Energy Exportโ€ project unit was established under the Ministry of Energy of Mongolia and Erdenes Mongol, LLC by the Government Resolution no. 422. The main goal of the Project Unit is to provide the preparatory work of the Feasibilityt Study for renewable energy power plant, thermal power plant, transmission line, water supply and coal mine as well as to ensure project implementation. Today, the companyโ€™s headquarters is located at Monnis tower, 13th floor, Chinggis avenue-15, 1st khoroo, Sukhbaatar district, Ulaan- baatar-14240, Mongolia. The headquarter office is responsible for providing legal, accounting, administrative, engineering and geolog- ical services, international and local procurement, liaison with regu- latory authorities, logistics, translation, accounting, and coordination of local and international suppliers and contractors. Aq Sora 8
  • 9. Shivee Energy integrated energy complex Project Overview The Company intends to utilize its coal resources to build the Shivee Energy Complex Project of Energy Export, which will become the first energy export based project for Mongolia. The complex project will be an important initiative for Mongolia, where the countryโ€™s energy sector is underdeveloped. By bring- ing a new idea of combining renewable energy with coal-based energy in Mongolia, this project will significantly improve the Mongolian economy and the energy sector. By building a global scale power plant in Mongolia and exporting the produced energy, our company will commence a new era in the Mongolian energy sector. Furthermore, we will build an en- vironmentally friendly wind farm and solar energy station within the complex project using the abundant amount of renewable energy resource of Mongolia. In addition to the project, there is potential for the company to utilize economic value of CBM prior to coal mining. This opportunity shall be researched and studied thoroughly upon funding. 9 ...Exporting the produced energy... The beginning of a new era in the Mongolian energy sector โ€œ โ€œ
  • 10. Shivee Energy integrated energy complex Location Exploration History The project is located in the Shivee Ovoo strategic coal deposit area in Shivee-Gobi and Sumber soum of Gobi-Sumber province, Mongolia, as shown in Figure-2. The project location lies 260 km to the southeast of Ulaanbaatar, the capital city of Mongolia, 20 km to the southeast of Choir City the provincial capital and 5 km to the northeast of Shivee-Gobi soum. From 1986-1988, a huge scale of complex and supplementary geological exploration work that provides resources evaluation of Shivee-Ovoo coal deposit. As a result of the exploration coal resources within Shine Us area was discovered as defined category of Measured and Indicated resources. Preliminary exploration covering remained part of the deposit Oekhii Tsagaan and Nogoon Toirom was carried out during 2007- 2010. In 2011-2012, detailed exploration work performed relating to the result of the preliminary exploration and coal resources approved by Mongolian Mineral Resources Professional Council in 2015. Project location Trans Mongolian Railway 10 260km
  • 11. Shivee Energy integrated energy complex Resource Data Resource clarification and calculation report for License no. 13311A, 13312A, 13313A was discussed and approved during the Mongolian Mineral Resources Professional Council meeting on April 14, 2015. Resource clarification and calculation report for License no. 20423A, 20421A, 20419A was discussed and approved during the Mongolian Mineral Resource Professional Council meeting on August 21, 2015. Approved resource report results are summarized as follows: โ€ข Measured /A/, 24.41 Mt โ€ข Indicated /B/, 654.72 Mt โ€ข Inferred /C/, 612.10 Mt โ€ข A+B+C, 1,291.44 Mt โ€ข Prognosis resource /P/, t 423.95 Mt Further exploration is necessary for a complete research of the coal deposit and increase the approved geological resource of the License no. 20421A. In the case of License no. 20421A, further exploration is being planned in order to bring P type resource to B, C type resource. In the case of Nogoon Toirom deposit no. 2, further exploration of 65 drill holes of 22,710 meters of drilling is required. In the case of Oekhii Tsagaan deposit, further exploration of 11 drill holes of 3,710 meters of drilling is required. The above mentioned ex- ploration will require about 9.1 billion MNT to execute. By transferring the speculated P type resource to B, C type resource: โ€ข Geological resource may increase by up to 70-80% โ€ข Productive capacity resource may increase by up to 50-60% โ€ข NPV of the deposit may increase by up to 50-60% 11
  • 12. Shivee Energy integrated energy complex 30 yearsShivee-1Nogoon toirom-2 31.Dec. 2015 20419A 549.41 License No. Area Shine Us Shine Us Talbai-1 Talbai-2 07.Feb. 2008 30 years 30 years 30 years 30 years 30 years 27.Feb. 2008 27.Feb. 2008 Shine Us Oekhii Tsagaan Nogoon toirom-2 Talbai-3 Shiveegobi Shiveegobi-1 31.Dec. 2015 31.Dec. 2015 Deposit Name Area name Granted Date Duration 13311A 13312A 13313A 20423A 20421A Total Mining Licences 12 2,781.20 1,238.11 269.73 7,862.7 5,447.2 18,148.35
  • 13. Shivee Energy integrated energy complex Project Description The goal of Shivee Energy Complex Project of Energy Export is to build a large scale coal fired power plant in Mongolia and supply the produced energy to domestic market and export into Peopleโ€™s Republic of China via transmission lines. The complex project consists of 3 main compo- nents. First, a coal mine with the capacity to extract 20 million tons of coal per year. Second, a power plant with an installed capacity of 5,280 MW. Third, renewable power plants with an installed capacity of 15 per- cent of the installed capacity of coal fired power plants. Lastly, transmis- sion line with the capability to transmit 4,600 MW ยฑ660 kV UHV. Since the northeast part of the project site is rich in wind energy and southwest part of the project site is rich in solar energy, it is suitable to incorporate solar and wind power plants to the complex project and export renewable energy. Currently, ESB Solar Energy, Ltd. obtained licenses to build 10 MW solar plant and Aydiner Global, Ltd. obtained licenses to build 50.4 MW wind power plant in the following areas in where our project is nearby in the region. 13 Govisumber province Cornerstone project for Global Energy Interconnection โ€œ โ€œ
  • 14. Shivee Energy integrated energy complex Regulatory Environment The Mongolian Law on Energy was adopted in February, 2001 in order to regulate matters related to energy generation, transmission, distribution, and supply activities, construction of energy facilities and energy consumption through utilization of energy resources. The Mongolian Law on Renewable Energy was adopted in January, 2007 to regulate genera- tion and supply of energy utilizing renewable energy sources. The State Policy on Energy was announced in July, 2015 to promote and extend renewable energy development in Mongolia. The Policy shall be implemented in two stages /2015- 2030/. The State Policy on Energy is pursuing the following targets for renewable energy develop- ment in Mongolia: โ€ข to increase the share of renewable energy in the total energy supply to 20% by 2020 and to 30% by 2030. โ€ข to create the legal and taxation environment for promoting investment in renew able energy Moreover, the Government of Mongolia supports renewable energy development by exempt- ing imported equipment and parts from customs duties and value-added taxes in 2016. 14
  • 15. Shivee Energy integrated energy complex Feasibility Study Aq Sora 15 Currently, State Grid Corporation of China, the worldโ€™s largest state owned utility company established in 2002 by the State Council of China is carrying out feasibility study of Shivee Energy Complex Project of Energy Export. State Grid Corporation of China pro- vides power to over 1.1 billion people in 26 provinces and covers 88% of Chinaโ€™s national ter- ritory. With an estimated total workforce of 1,800,000 and 330 billion USD in revenue, State Grid Corporation of China was ranked 2nd in the Fortune Global 500 in 2016. Furthermore, State Grid Corporation of China owns 40% of the Philippinesโ€™ power grid, 25% of Portugalโ€™s power grid and 30% of Italyโ€™s power grid. On November 10, 2015 The Ministry of Energy of Mongolia and State Grid Corporation of Chi- na has signed an agreement to carry out the Feasibility Study for the Shivee Energy Com- plex Project of Energy Export. In accordance with the agreement, State Grid Corporation of China selected 3 different institutions in early 2016 through an international open tender to carry out the Feasibility Study for the Shivee Energy Complex Project of Energy Export. The 3 institutions are currently carrying out the Feasibility Study of the 3 main components of the complex project. ` ` First, Shandong Electric Power Engineering Consulting Institute Corporation, Ltd is carrying out the Feasibility Study for the Power Plant and Transmission Line. Second, CCTEG Shen- yang Engineering Company is carrying out the Feasibility Study for the Coal mine. Lastly, the Inner Mongolia Water Resources and Hydropower Survey and Design Institute is carrying out the Feasibility Study for the Water supply of the complex project. Another organization with a vested interest in the Shivee Energy Complex Project of Energy Export is the Global Energy Interconnection Development and Cooperation Organization (GEIDCO). GEIDCO is a non-governmental, non-profit international organization among will- ing firms, organizations and institutes dedicated to promoting sustainable development of energy worldwide. The main goal of GEIDCO is to promote the establishment of the Global Energy Interconnection system to meet the global demand for clean and green electricity. In order to establish a Global Energy Interconnection system, GEIDCO is looking to establish a regional power grid starting from Northeast Asia. Therefore, the Shivee Energy Complex Project of Energy Export has a great potential to supply energy not only to Mongolia and China but also to the Northeast Asian Power Grid and Global Energy Interconnection as well.
  • 16. Shivee Energy integrated energy complex Address: Monnis tower, 13th floor, Chinggis avenue-15, 1st khoroo, Sukhbaatar district, Ulaanbaatar-14240, Mongolia Web: www.erdenes-shivee-energy.com E-mail: info@erdenes-shivee-energy.com 16