SERVICES AND CALCULATIONS
HIGH RISE RESIDENTIAL APARTMENTS- MARINA SKIES
ELECTRICAL SERVICES
ELECTRICAL SERVICES
Average Electrical load for a 2bhk- 5kv
Average Electrical load for a 3bhk- 6kv
Average electrical load for a 2.5bhk- 6kv
Total 3bhk units- 620
Total 2.5bhk units- 248
Total 2bhk units- 372
Total electrical load of 2bhk- 372 x 5= 1860kv
Total electrical load of 2.5bhk- 248 x 6= 1488kv
Total electrical load of 3bhk- 620 x 6= 3720kv
Total electrical load= 1860 + 1488 + 3720= 7068kv
ELECTRICAL SERVICES
OIL TYPE TRANSFORMER
OPEN TO SKY
DRY TYPE TRANSFORMER
CLOSED AREA DIESEL GENERATOR
ELECTRICAL SERVICES
No. of oil type transformers- 5 each capacity of 1250kv
Flow chart of electrical working system in a high rise:
Power supply HT room transformers main pc room
diesel generator room
Oil type transformer- open to sky- podium level
ELECTRICAL SERVICES
Dimensions of the required rooms:
• Main electrical panel room- 10m x 4m
• DG room- 20m x 18m
• Transformer placement area- 150sqm
• HT room near transformer- 80sqm
PLUMBING
WATER REQUIREMENT CALCULATION
Per day requirement per person- 150-200 litres
Considering 200 litres per person
Occupancy in 3bhk- 7
Occupancy in 2.5bhk- 6
Occupancy in 2bhk - 5
TOWER 1 AND 5
No of 3 bhk- 4
No of 2.5 bhk- 2
No of 2bhk- 1
WATER REQUIREMENT CALCULATION
TOWER 1 AND 5
Per floor for 3bhk day requirement- 4 x 7 x 200- 5600 litres
Per floor for 2.5bhk day requirement- 2 x 6 x 200- 2400 litres
Per floor for 2bhk day requirement- 1 x 5 x 200- 1000 litres
Total requirement per floor- 5600 + 2400 + 1000= 9000 litres
Per tower= 9000 x 31= 2,79,000 litres
Per cu ft ------ 26 litres
? ------ 2,79,000 litres
Volume required- 10,730.76 cuft = 303.86cum each tower
WATER REQUIREMENT CALCULATION
TOWER 2 AND 4
Per floor for 3bhk day requirement- 2 x 7 x 200- 2800 litres
Per floor for 2.5bhk day requirement- 2 x 6 x 200- 2400 litres
Per floor for 2bhk day requirement- 4 x 5 x 200- 4000litres
Total requirement per floor- 2800 + 2400 + 4000= 9200litres
Per tower= 9200 x 31= 2,85,200 litres
Per cu ft ------ 26 litres
? ------ 2,85,200 litres
Volume required- 10,969.23 cuft = 310.61cum
WATER REQUIREMENT CALCULATION
TOWER 3
Per floor for 3bhk day requirement- 8 x 7 x 200- 11,200 litres
Per floor for 2bhk day requirement- 2 x 5 x 200- 2000 litres
Total requirement per floor- 11,200 + 2000= 13200litres
Per tower= 13200x 31= 4,09,200 litres
Per cu ft ------ 26 litres
? ------ 4,09,200 litres
Volume required- 15,738.46 cuft = 445.66 cum
WATER REQUIREMENT CALCULATION
CAPACITY OF EACH TOWER:
TOWER 1: 2,79,000 litres
TOWER 2: 2,85,200 litres
TOWER 3: 4,09,200 litres
TOWER 4: 2,85,200 litres
TOWER 5: 2,79,000 litres
VOLUME FOR EACH TOWER:
TOWER 1: 303.86 cum
TOWER 2: 310.61 cum
TOWER 3: 445.66 cum
TOWER 4: 310.61 cum
TOWER 5: 303.86 cum
Total capacity: 15,37,600 litres
Total volume- 1674.6 cum
SEWAGE TREATMENT PLANT
75% VOLUME OF DAILY WATER REQUIREMENT IS CONSIDERED:
75% OF 1674.6 CUM =1255.95 CUM
Therefore total volume required for stp plant = 1255.95 cum
Area required for water treatment plant:
1674.6/ 3 =558.2 sqm
Total area required for raw water sump- 558.2 sqm
Area required for sewage treatment plant:
1255.96/3 = 418.65 sqm
Total area required for sewage treatment sump= 418.65sqm
MACHINE ROOM AREAS
WATER TREATMENT PLANT- 500 SQM
SEWAGE TREATMENT PLANT- 1500SQM
Both the machine rooms require double height..
WATER TREATMENT PLANT
SEWAGE TREATMENT PLANT
HVAC AND CELLAR OPENINGS
HVAC AND CELLAR OPENINGS
ACCORDING TO GO 168- 2% OF TOTAL BASEMENT AREA MUST BE LEFT
FOR NATURAL VENTILATION BY CREATING OPENINGS.
Basement area: 30,361.32 sqm
2% of basement area= 607.22sqm
Therefore 607.22 sqm must be left as basement openings from
podium open to sky for natural ventilation.
Means of mechanical ventilation should also be adopted in basement.
MECHANICAL VENTILATION
JET FANS EXHAUST FANS
HVAC PANEL ROOM AREA IN BASEMENT- 15SQM
ELEVATORS
ELEVATOR DIMENSIONS
Passenger lift dimensions- 1.7m x 2.2m
CAPACITY of passenger lift – 16 persons
Fire lift dimensions- 2.2m x 2.2m
Service lift dimensions- 1.4m x 1.7m
PASSANGER LIFT SERVICE LIFT FIRE LIFT
FIRE SAFETY
FIRE SERVICES
Capacity for sump- 500cum
Machine room area- 66sqm
Machines required for 500cum-
1 diesel pump
2 electric pump- 1 for hydrant and 1 for sprinkler
2 jockey pump- 1 for hydrant and 1 for sprinkler
Distance between each pump must be 1m- 1.9m
FIRE SERVICES
FIRE MACHINE ROOM
FIRE SERVICES
STAIRCASE WIDTH- 1.34M PROVIDED.
FIRE LIFT- 2.4M X 2.4M
FIRE SHAFT- 1.7M X 0.8M (SPRINKLER AND HYDRANT BASED PIPES)
PRESSURIZATION SHAFT- 1M X 1.2M
FIRE SERVICES
FIRE SHAFT PRESSURIZATION FAN
SHAFT DIMENSIONS- standards
• LC shaft- 1.1m x 0.45m
• Fire shaft- 1.7m x 0.8m
• Electrical shaft- 3m x 2m contains metre room and shaft- 0.65m x 2m
• Phe shaft- 1m x 0.6m
• Garbage chute- 1.1m x 0.6m

More Related Content

Similar to SERVICES AND CALCULATIONSaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa.pptx

Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentation
Ramendra Dhiman
 
Thermodynamics Unit 2 engineering pdf for all
Thermodynamics Unit 2 engineering pdf for allThermodynamics Unit 2 engineering pdf for all
Thermodynamics Unit 2 engineering pdf for all
kandhavela4
 

Similar to SERVICES AND CALCULATIONSaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa.pptx (20)

Designing an Uninterruptible Power Supply
Designing an Uninterruptible Power SupplyDesigning an Uninterruptible Power Supply
Designing an Uninterruptible Power Supply
 
Enertronic high voltage, power & automatism v01
Enertronic high voltage, power & automatism v01Enertronic high voltage, power & automatism v01
Enertronic high voltage, power & automatism v01
 
Hydro POWER PLANT
Hydro POWER PLANTHydro POWER PLANT
Hydro POWER PLANT
 
Indian scenario of super critical power plants issues and challenges by ntpc...
Indian scenario of super critical power plants  issues and challenges by ntpc...Indian scenario of super critical power plants  issues and challenges by ntpc...
Indian scenario of super critical power plants issues and challenges by ntpc...
 
Modern gas-fueled power generation
Modern gas-fueled power generationModern gas-fueled power generation
Modern gas-fueled power generation
 
CESC SGS project report
CESC SGS project reportCESC SGS project report
CESC SGS project report
 
GrameenPhone
GrameenPhoneGrameenPhone
GrameenPhone
 
vocational training at DVC andal
 vocational training at DVC andal vocational training at DVC andal
vocational training at DVC andal
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentation
 
12-ch_hy_circuits..ppt
12-ch_hy_circuits..ppt12-ch_hy_circuits..ppt
12-ch_hy_circuits..ppt
 
hyd ckt.ppt
hyd ckt.ppthyd ckt.ppt
hyd ckt.ppt
 
NTPC DADRI.
NTPC DADRI.NTPC DADRI.
NTPC DADRI.
 
Design Calculations for Solar Water Heating System
Design Calculations for Solar Water Heating SystemDesign Calculations for Solar Water Heating System
Design Calculations for Solar Water Heating System
 
Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kota
 
Vocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR UttarakhandVocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR Uttarakhand
 
193411716 study-on-steam-turbines
193411716 study-on-steam-turbines193411716 study-on-steam-turbines
193411716 study-on-steam-turbines
 
kstps training report
kstps training reportkstps training report
kstps training report
 
Thermodynamics Unit 2 engineering pdf for all
Thermodynamics Unit 2 engineering pdf for allThermodynamics Unit 2 engineering pdf for all
Thermodynamics Unit 2 engineering pdf for all
 
Ktps presentation
Ktps presentationKtps presentation
Ktps presentation
 
Coal to Electricity
Coal to Electricity Coal to Electricity
Coal to Electricity
 

Recently uploaded

一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
wpkuukw
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
gajnagarg
 
Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptx
balqisyamutia
 
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
eeanqy
 
Simple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptxSimple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptx
balqisyamutia
 
Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...
Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...
Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...
sriharipichandi
 
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
ehyxf
 
poliovirus-190801072449. pptx
poliovirus-190801072449.            pptxpoliovirus-190801072449.            pptx
poliovirus-190801072449. pptx
ssuser0ad194
 
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman MuscatAbortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 

Recently uploaded (20)

Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service AvailableCall Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
Call Girls Jalaun Just Call 8617370543 Top Class Call Girl Service Available
 
Independent Escorts Goregaon WhatsApp +91-9930687706, Best Service
Independent Escorts Goregaon WhatsApp +91-9930687706, Best ServiceIndependent Escorts Goregaon WhatsApp +91-9930687706, Best Service
Independent Escorts Goregaon WhatsApp +91-9930687706, Best Service
 
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
 
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
Just Call Vip call girls Fatehpur Escorts ☎️8617370543 Two shot with one girl...
 
Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptx
 
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
 
Simple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptxSimple Conference Style Presentation by Slidesgo.pptx
Simple Conference Style Presentation by Slidesgo.pptx
 
Lecture 01 Introduction To Multimedia.pptx
Lecture 01 Introduction To Multimedia.pptxLecture 01 Introduction To Multimedia.pptx
Lecture 01 Introduction To Multimedia.pptx
 
Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...
Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...
Anupama Kundoo Cost Effective detailed ppt with plans and elevations with det...
 
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
 
BLOCK CHAIN PROJECT block chain project
BLOCK CHAIN  PROJECT block chain projectBLOCK CHAIN  PROJECT block chain project
BLOCK CHAIN PROJECT block chain project
 
How to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdfHow to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdf
 
Essential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive GuideEssential UI/UX Design Principles: A Comprehensive Guide
Essential UI/UX Design Principles: A Comprehensive Guide
 
poliovirus-190801072449. pptx
poliovirus-190801072449.            pptxpoliovirus-190801072449.            pptx
poliovirus-190801072449. pptx
 
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEKLANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
 
Eye-Catching Web Design Crafting User Interfaces .docx
Eye-Catching Web Design Crafting User Interfaces .docxEye-Catching Web Design Crafting User Interfaces .docx
Eye-Catching Web Design Crafting User Interfaces .docx
 
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman MuscatAbortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
 
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptx
 

SERVICES AND CALCULATIONSaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa.pptx

  • 1. SERVICES AND CALCULATIONS HIGH RISE RESIDENTIAL APARTMENTS- MARINA SKIES
  • 3. ELECTRICAL SERVICES Average Electrical load for a 2bhk- 5kv Average Electrical load for a 3bhk- 6kv Average electrical load for a 2.5bhk- 6kv Total 3bhk units- 620 Total 2.5bhk units- 248 Total 2bhk units- 372 Total electrical load of 2bhk- 372 x 5= 1860kv Total electrical load of 2.5bhk- 248 x 6= 1488kv Total electrical load of 3bhk- 620 x 6= 3720kv Total electrical load= 1860 + 1488 + 3720= 7068kv
  • 4. ELECTRICAL SERVICES OIL TYPE TRANSFORMER OPEN TO SKY DRY TYPE TRANSFORMER CLOSED AREA DIESEL GENERATOR
  • 5. ELECTRICAL SERVICES No. of oil type transformers- 5 each capacity of 1250kv Flow chart of electrical working system in a high rise: Power supply HT room transformers main pc room diesel generator room Oil type transformer- open to sky- podium level
  • 6. ELECTRICAL SERVICES Dimensions of the required rooms: • Main electrical panel room- 10m x 4m • DG room- 20m x 18m • Transformer placement area- 150sqm • HT room near transformer- 80sqm
  • 8. WATER REQUIREMENT CALCULATION Per day requirement per person- 150-200 litres Considering 200 litres per person Occupancy in 3bhk- 7 Occupancy in 2.5bhk- 6 Occupancy in 2bhk - 5 TOWER 1 AND 5 No of 3 bhk- 4 No of 2.5 bhk- 2 No of 2bhk- 1
  • 9. WATER REQUIREMENT CALCULATION TOWER 1 AND 5 Per floor for 3bhk day requirement- 4 x 7 x 200- 5600 litres Per floor for 2.5bhk day requirement- 2 x 6 x 200- 2400 litres Per floor for 2bhk day requirement- 1 x 5 x 200- 1000 litres Total requirement per floor- 5600 + 2400 + 1000= 9000 litres Per tower= 9000 x 31= 2,79,000 litres Per cu ft ------ 26 litres ? ------ 2,79,000 litres Volume required- 10,730.76 cuft = 303.86cum each tower
  • 10. WATER REQUIREMENT CALCULATION TOWER 2 AND 4 Per floor for 3bhk day requirement- 2 x 7 x 200- 2800 litres Per floor for 2.5bhk day requirement- 2 x 6 x 200- 2400 litres Per floor for 2bhk day requirement- 4 x 5 x 200- 4000litres Total requirement per floor- 2800 + 2400 + 4000= 9200litres Per tower= 9200 x 31= 2,85,200 litres Per cu ft ------ 26 litres ? ------ 2,85,200 litres Volume required- 10,969.23 cuft = 310.61cum
  • 11. WATER REQUIREMENT CALCULATION TOWER 3 Per floor for 3bhk day requirement- 8 x 7 x 200- 11,200 litres Per floor for 2bhk day requirement- 2 x 5 x 200- 2000 litres Total requirement per floor- 11,200 + 2000= 13200litres Per tower= 13200x 31= 4,09,200 litres Per cu ft ------ 26 litres ? ------ 4,09,200 litres Volume required- 15,738.46 cuft = 445.66 cum
  • 12. WATER REQUIREMENT CALCULATION CAPACITY OF EACH TOWER: TOWER 1: 2,79,000 litres TOWER 2: 2,85,200 litres TOWER 3: 4,09,200 litres TOWER 4: 2,85,200 litres TOWER 5: 2,79,000 litres VOLUME FOR EACH TOWER: TOWER 1: 303.86 cum TOWER 2: 310.61 cum TOWER 3: 445.66 cum TOWER 4: 310.61 cum TOWER 5: 303.86 cum Total capacity: 15,37,600 litres Total volume- 1674.6 cum
  • 13. SEWAGE TREATMENT PLANT 75% VOLUME OF DAILY WATER REQUIREMENT IS CONSIDERED: 75% OF 1674.6 CUM =1255.95 CUM Therefore total volume required for stp plant = 1255.95 cum Area required for water treatment plant: 1674.6/ 3 =558.2 sqm Total area required for raw water sump- 558.2 sqm Area required for sewage treatment plant: 1255.96/3 = 418.65 sqm Total area required for sewage treatment sump= 418.65sqm
  • 14. MACHINE ROOM AREAS WATER TREATMENT PLANT- 500 SQM SEWAGE TREATMENT PLANT- 1500SQM Both the machine rooms require double height..
  • 17. HVAC AND CELLAR OPENINGS
  • 18. HVAC AND CELLAR OPENINGS ACCORDING TO GO 168- 2% OF TOTAL BASEMENT AREA MUST BE LEFT FOR NATURAL VENTILATION BY CREATING OPENINGS. Basement area: 30,361.32 sqm 2% of basement area= 607.22sqm Therefore 607.22 sqm must be left as basement openings from podium open to sky for natural ventilation. Means of mechanical ventilation should also be adopted in basement.
  • 19. MECHANICAL VENTILATION JET FANS EXHAUST FANS HVAC PANEL ROOM AREA IN BASEMENT- 15SQM
  • 21. ELEVATOR DIMENSIONS Passenger lift dimensions- 1.7m x 2.2m CAPACITY of passenger lift – 16 persons Fire lift dimensions- 2.2m x 2.2m Service lift dimensions- 1.4m x 1.7m PASSANGER LIFT SERVICE LIFT FIRE LIFT
  • 23. FIRE SERVICES Capacity for sump- 500cum Machine room area- 66sqm Machines required for 500cum- 1 diesel pump 2 electric pump- 1 for hydrant and 1 for sprinkler 2 jockey pump- 1 for hydrant and 1 for sprinkler Distance between each pump must be 1m- 1.9m
  • 25. FIRE SERVICES STAIRCASE WIDTH- 1.34M PROVIDED. FIRE LIFT- 2.4M X 2.4M FIRE SHAFT- 1.7M X 0.8M (SPRINKLER AND HYDRANT BASED PIPES) PRESSURIZATION SHAFT- 1M X 1.2M
  • 26. FIRE SERVICES FIRE SHAFT PRESSURIZATION FAN
  • 27. SHAFT DIMENSIONS- standards • LC shaft- 1.1m x 0.45m • Fire shaft- 1.7m x 0.8m • Electrical shaft- 3m x 2m contains metre room and shaft- 0.65m x 2m • Phe shaft- 1m x 0.6m • Garbage chute- 1.1m x 0.6m