SlideShare a Scribd company logo
1 of 3
Download to read offline
August
082019
This is an uncontrolled copy. Before use, make sure that this is the current version by visiting www.railsafe.org.au/safe-tracks
1 SafeTracks August 2019
Network Rules, Procedures and Forms
amendments
This information has been
prepared to give a summary of
amendments to Network Rules,
Network Procedures and
Network Forms.
Network Rules amendments
NGE 204 Network communication
Changes to differentiate between the
types of boxes used in forms i.e.
check boxes, numbered boxes and
assurance boxes.
NWT 300 Planning work in the rail
corridor
A reference to ‘a lack of trained
workers’ has been changed to ‘a lack
of Qualified Workers’.
The responsibilities of Protection
Officers for briefing workers have
been expanded to provide greater
detail.
Several instances of the term
‘adjacent line’ have been replaced
with the term’s definition.
The responsibilities of Protection
Officers for assessing safety workers
have been expanded to include
assessing the risk from road traffic.
Signal Key Switch (SKS) blocking has
been added to the methods for work
in the Danger Zone, and references
for related Network Procedures
added.
NWT 302 Local Possession Authority
Requirements and responsibilities
related to coordinated worksites and
Coordinating Protection Officers
have been added.
The responsibilities of Protection
Officers for briefing workers have
been expanded to provide greater
detail.
Requirements for protecting Local
Possession Authority (LPA) limits
have been amended to include:
• Signallers, if possible, preventing
unauthorised rail traffic from
exiting the LPA
• using possession limit markers
• extending the limits of an LPA
• managing intermediate access
points.
Requirements for using worksite
protection markers for protecting
worksites have been added.
Requirements for protecting
worksites within 500m of an LPA limit
have been expanded to include:
• the use of the use of worksite
protection markers
• prohibition on rail traffic
associated with such worksites
unless a Track Occupancy
Authority (TOA) adjoining the
limits has been authorised.
Requirements for protecting multiple
worksites have been amended to
include requirements for coordinated
worksites, and the use of worksite
protection markers and worksite
delineation markers.
NWT 306 Track Work Authority
Protection Officer responsibilities
have been amended to make them
the only person to speak to
Signallers and workers about
protection arrangements.
The requirements for identifying a
worksite’s location have been
amended:
• platforms are no longer valid
reference features
• the end of a terminal line can be
used as a reference feature.
The use of automatic signals to
protect worksites has been changed:
• a Handsignaller at a signal may
not be used for protection
• signal key switches and
associated Handsignaller may be
used for protection.
The placement of WORKSITE
warning signs has been clarified.
Partnering industry for Better Safety for all August 2019
This is an uncontrolled copy. Before use, make sure that this is the current version by visiting www.railsafe.org.ausafe-tracks
2 SafeTracks August 2019
NWT 312 Infrastructure Booking
Authority
Requirements for infrastructure being
permanently removed have been
added.
The requirements for compiling an
Infrastructure Booking Authority (IBA)
form now include the need to include
details of using uncommissioned
infrastructure.
NWT 320 Signal Key Switch Blocking
This new Network Rule prescribes the
rules for working in the Danger Zone
using Signal Key Switch Blocking.
NTR 400 Protecting rail traffic
Removed the requirement to place
railway track signals to protect rail
traffic outside the area bounded by
Waterfall, Macarthur, Emu Plains and
Cowan.
Existing instructions for protecting
rail traffic within the area bounded by
Waterfall, Macarthur, Emu Plains and
Cowan will be extended to the entire
Sydney Trains Network to ensure
consistency of application.
NSY 512 Manual block working
Clarified that a clearance
Handsignaller must be placed at the
exit-end limit signal if the entire
block to the first signal beyond
cannot be seen to be clear.
Clarified the signals that must not be
included on a CAN form as signals
that can be passed at STOP.
Network Procedures
amendments
NPR 700 Using a Local Possession
Authority
Procedure now includes:
• the use of possession limit
markers
• clarified instructions for clipping
and locking intermediate points
• the use of possession limit
markers, worksite protection
markers and worksite delineation
markers
• managing coordinated worksites
NPR 702 Using a Track Work Authority
The requirements for identifying a
worksite’s location have been
amended:
• platforms are no longer valid
reference features
• the end of a terminal line can be
used as a reference feature.
The instructions for the Protection
Officer confirming details from the
Signaller have changed.
Instructions for keeping an automatic
signal at stop include an option to
use a signal key switch, and
instructions have been added for
operating a signal key switch.
NPR 712 Protecting work from rail
traffic on adjacent lines
The glossary definition of the term
‘adjacent line’ has been included.
The use of Signal Key Switch (SKS)
Blocking to protect adjacent lines has
been added.
The demarcation fencing instructions
define approved demarcation
fencing, and include a description of
using a dedicated worker to keep
workers from straying out of their
worksite.
NPR 713 Placing temporary speed
signs
Temporary speed WARNING and
INTERMEDIATE WARNING signs
may no longer be black text on a
yellow background.
NPR 720 Protecting rail traffic
Instructions for delayed rail traffic
have been removed.
The use of railway track signals to
protect disabled rail traffic is no
longer required. A Qualified Worker
must, where practicable, be used
instead.
Instructions related to assisting rail
traffic have been added.
Instructions for protecting
obstructions have changed to allow a
Signaller to give assurance that rail
traffic has been prevented from
approaching the affected portion of
track instead of always requiring the
use of track-circuit shorting clips.
Separate instructions are given for
the use of railway track signals to
protect obstructions.
NPR 725 Using a large pilot staff and
NPR 726 Using half pilot staffs
An NRF 011 Worksite Warning form is
now required to be used if there are
more than six worksites in the
affected portion of track. The
previous limit was two worksites.
NPR 753 Using Signal Key Switch
Blocking
This new Network Procedure gives
instructions for using the Signal Key
Switch Blocking method of work on
track.
NPR 754 Using a signal key switch
This new Network Procedure gives
instructions for using signal key
switches.
Partnering industry for Better Safety for all August 2019
This is an uncontrolled copy. Before use, make sure that this is the current version by visiting www.railsafe.org.ausafe-tracks
3 SafeTracks August 2019
Network Forms amendments
If appropriate, in each of the Network
Forms:
• instructions have been added for
numbering forms
• the term ‘Train Controller’ has
been replaced by ‘Network
Controller’
• the term ‘check box’ has been
replaced by ‘numbered box’.
NRF 000 General information about
Network Forms
Changes to differentiate between the
types of boxes used in forms i.e.
check boxes, numbered boxes and
assurance boxes.
 NOTE
These changes are reflected in
each amended Network Form.
A reference to ’Train Controller‘ has been
change to ’Network Controller’.
NRF 003 Infrastructure Booking
Authority (IBA)
Details must be provided for using
uncommissioned infrastructure.
The requirement to include the date
that booking-out was advertised has
been removed.
People attesting to the booking-out
or booking-in of infrastructure or the
use of uncommissioned
infrastructure must now record their
depot/contact No. or location/panel,
and are no longer required to sign
the form.
NRF 004 Condition Affecting the
Network (CAN)
The signals at STOP instructions
have been reworded for additional
clarity.
NRF 005 Special Proceed Authority
(SPA)
The term ‘Train Controller’ has been
replaced by ‘Network Controller’.
There have been non-substantial
changes to improve clarity.
NRF 008 Pilot Staff Notice (PSN)
The form has been restructured and
amended:
• to make the form easier to
compile
• to include details of up to six
worksites on the adjacent line.
NRF 010 Pilot Staff Working
Introduction
The form has been restructured and
amended to make the form easier to
compile.
NRF 011 Worksite Warning
The number of worksites in a pilot
staff working section above which
this form must be issued has
changed from two to six.
The form has been restructured and
amended to make the form easier to
compile.
NRF 013 Temporary Rail Bond
Approval
The form has been restructured and
amended to make the form easier to
compile.
The requester and approver must
now enter the time and date they
requested or approved the
temporary rail bond.
NRF 014 Worksite protection pre-work
briefing
The Workplace Supervisor role
replaces the Site Supervisor role, and
more detailed instructions for the
Workplace Supervisor have been
added.
NRF 015 Worksite Protection Plan
The Workplace Supervisor role
replaces the Site Supervisor role.
A new form, NRF 015D Worksite
Protection Plan, has been
implemented specifically for work
using a Track Work Authority or
Signal Key Switch Blocking, and
instructions updated accordingly.
With the introduction of this new
form, NRF 015A will longer be used
for TWA.
Instructions for providing diagrams
and maps have been simplified.
The actual forms have been amended
to reflect changes to the related
Network Rules and Network
Procedures.
NRF 018 Absolute Signal Blocking
(ASB)
The actual form has been:
• amended to reflect changes to
the related Network Rules and
Network Procedures.
• restructured and amended to
make the form easier to compile.
The note relating to adjacent line
protection has been simplified.

More Related Content

Similar to Safe tracks 2019 08-network rules amendments

지브라스캐너 Zebra MP6000 2D 고정식 바코드스캐너 매뉴얼
지브라스캐너 Zebra MP6000 2D 고정식 바코드스캐너 매뉴얼지브라스캐너 Zebra MP6000 2D 고정식 바코드스캐너 매뉴얼
지브라스캐너 Zebra MP6000 2D 고정식 바코드스캐너 매뉴얼HION IT
 
Siemens s7 300 module data manual
Siemens s7 300 module data manualSiemens s7 300 module data manual
Siemens s7 300 module data manualsteven qi
 
Keynote: EASA regulation changes and the impact on MRO software
Keynote: EASA regulation changes and the impact on MRO softwareKeynote: EASA regulation changes and the impact on MRO software
Keynote: EASA regulation changes and the impact on MRO softwareEXSYN Aviation Solutions
 
IRJET-Analysis of Biangle Shaped Footing Subjected to Two Way Eccentric Loadi...
IRJET-Analysis of Biangle Shaped Footing Subjected to Two Way Eccentric Loadi...IRJET-Analysis of Biangle Shaped Footing Subjected to Two Way Eccentric Loadi...
IRJET-Analysis of Biangle Shaped Footing Subjected to Two Way Eccentric Loadi...IRJET Journal
 
Real Time Applications of Zigbee Technology
Real Time Applications of Zigbee TechnologyReal Time Applications of Zigbee Technology
Real Time Applications of Zigbee TechnologyIRJET Journal
 
Nfv orchestration open stack summit may2015 aricent
Nfv orchestration open stack summit may2015 aricentNfv orchestration open stack summit may2015 aricent
Nfv orchestration open stack summit may2015 aricentAricent
 
Revised Wagon Maintenance Manual.pdf
Revised Wagon Maintenance Manual.pdfRevised Wagon Maintenance Manual.pdf
Revised Wagon Maintenance Manual.pdfmajjisatish
 
Fault Management of Electrical Drives Onboard Ship using Power Line Communica...
Fault Management of Electrical Drives Onboard Ship using Power Line Communica...Fault Management of Electrical Drives Onboard Ship using Power Line Communica...
Fault Management of Electrical Drives Onboard Ship using Power Line Communica...IRJET Journal
 
GSM BSS dimensioning Alcatel
GSM BSS dimensioning AlcatelGSM BSS dimensioning Alcatel
GSM BSS dimensioning AlcatelRohit Chhabra
 
IPC J-STD-001HA-IPC-A-610HA_EN automotive addendum.pdf
IPC J-STD-001HA-IPC-A-610HA_EN automotive addendum.pdfIPC J-STD-001HA-IPC-A-610HA_EN automotive addendum.pdf
IPC J-STD-001HA-IPC-A-610HA_EN automotive addendum.pdfcdming
 
Transmission Line Conductor Asset Health Assessment with Non-Contact Monitori...
Transmission Line Conductor Asset Health Assessment with Non-Contact Monitori...Transmission Line Conductor Asset Health Assessment with Non-Contact Monitori...
Transmission Line Conductor Asset Health Assessment with Non-Contact Monitori...Power System Operation
 
Siemens s7 300-400-simatic net - ncm for industrial ethernet
Siemens s7 300-400-simatic net - ncm for industrial ethernetSiemens s7 300-400-simatic net - ncm for industrial ethernet
Siemens s7 300-400-simatic net - ncm for industrial ethernetDien Ha The
 
Real-life demands and examples of management and control in disaggregated opt...
Real-life demands and examples of management and control in disaggregated opt...Real-life demands and examples of management and control in disaggregated opt...
Real-life demands and examples of management and control in disaggregated opt...Adtran
 
Password Protected Circuit Breaker Using IoT
Password Protected Circuit Breaker Using IoTPassword Protected Circuit Breaker Using IoT
Password Protected Circuit Breaker Using IoTIRJET Journal
 
Modernization of Electrical Substation Automation Systems Using IEC61850
Modernization of Electrical Substation Automation Systems Using IEC61850Modernization of Electrical Substation Automation Systems Using IEC61850
Modernization of Electrical Substation Automation Systems Using IEC61850IRJET Journal
 
T-REC-E.425-199811-S!!PDF-E (1).pdf
T-REC-E.425-199811-S!!PDF-E (1).pdfT-REC-E.425-199811-S!!PDF-E (1).pdf
T-REC-E.425-199811-S!!PDF-E (1).pdfazmir70
 
Telecoms Service Assurance & Service Fulfillment with Neo4j Graph Database
Telecoms Service Assurance & Service Fulfillment with Neo4j Graph DatabaseTelecoms Service Assurance & Service Fulfillment with Neo4j Graph Database
Telecoms Service Assurance & Service Fulfillment with Neo4j Graph DatabaseNeo4j
 
IRJET- Build SDN with Openflow Controller
IRJET-  	  Build SDN with Openflow ControllerIRJET-  	  Build SDN with Openflow Controller
IRJET- Build SDN with Openflow ControllerIRJET Journal
 

Similar to Safe tracks 2019 08-network rules amendments (20)

지브라스캐너 Zebra MP6000 2D 고정식 바코드스캐너 매뉴얼
지브라스캐너 Zebra MP6000 2D 고정식 바코드스캐너 매뉴얼지브라스캐너 Zebra MP6000 2D 고정식 바코드스캐너 매뉴얼
지브라스캐너 Zebra MP6000 2D 고정식 바코드스캐너 매뉴얼
 
Siemens s7 300 module data manual
Siemens s7 300 module data manualSiemens s7 300 module data manual
Siemens s7 300 module data manual
 
Keynote: EASA regulation changes and the impact on MRO software
Keynote: EASA regulation changes and the impact on MRO softwareKeynote: EASA regulation changes and the impact on MRO software
Keynote: EASA regulation changes and the impact on MRO software
 
IRJET-Analysis of Biangle Shaped Footing Subjected to Two Way Eccentric Loadi...
IRJET-Analysis of Biangle Shaped Footing Subjected to Two Way Eccentric Loadi...IRJET-Analysis of Biangle Shaped Footing Subjected to Two Way Eccentric Loadi...
IRJET-Analysis of Biangle Shaped Footing Subjected to Two Way Eccentric Loadi...
 
Real Time Applications of Zigbee Technology
Real Time Applications of Zigbee TechnologyReal Time Applications of Zigbee Technology
Real Time Applications of Zigbee Technology
 
NETCONF YANG tutorial
NETCONF YANG tutorialNETCONF YANG tutorial
NETCONF YANG tutorial
 
Nfv orchestration open stack summit may2015 aricent
Nfv orchestration open stack summit may2015 aricentNfv orchestration open stack summit may2015 aricent
Nfv orchestration open stack summit may2015 aricent
 
Revised Wagon Maintenance Manual.pdf
Revised Wagon Maintenance Manual.pdfRevised Wagon Maintenance Manual.pdf
Revised Wagon Maintenance Manual.pdf
 
Fault Management of Electrical Drives Onboard Ship using Power Line Communica...
Fault Management of Electrical Drives Onboard Ship using Power Line Communica...Fault Management of Electrical Drives Onboard Ship using Power Line Communica...
Fault Management of Electrical Drives Onboard Ship using Power Line Communica...
 
GSM BSS dimensioning Alcatel
GSM BSS dimensioning AlcatelGSM BSS dimensioning Alcatel
GSM BSS dimensioning Alcatel
 
IPC J-STD-001HA-IPC-A-610HA_EN automotive addendum.pdf
IPC J-STD-001HA-IPC-A-610HA_EN automotive addendum.pdfIPC J-STD-001HA-IPC-A-610HA_EN automotive addendum.pdf
IPC J-STD-001HA-IPC-A-610HA_EN automotive addendum.pdf
 
Transmission Line Conductor Asset Health Assessment with Non-Contact Monitori...
Transmission Line Conductor Asset Health Assessment with Non-Contact Monitori...Transmission Line Conductor Asset Health Assessment with Non-Contact Monitori...
Transmission Line Conductor Asset Health Assessment with Non-Contact Monitori...
 
Siemens s7 300-400-simatic net - ncm for industrial ethernet
Siemens s7 300-400-simatic net - ncm for industrial ethernetSiemens s7 300-400-simatic net - ncm for industrial ethernet
Siemens s7 300-400-simatic net - ncm for industrial ethernet
 
Real-life demands and examples of management and control in disaggregated opt...
Real-life demands and examples of management and control in disaggregated opt...Real-life demands and examples of management and control in disaggregated opt...
Real-life demands and examples of management and control in disaggregated opt...
 
Password Protected Circuit Breaker Using IoT
Password Protected Circuit Breaker Using IoTPassword Protected Circuit Breaker Using IoT
Password Protected Circuit Breaker Using IoT
 
TR-069_Overview.ppt
TR-069_Overview.pptTR-069_Overview.ppt
TR-069_Overview.ppt
 
Modernization of Electrical Substation Automation Systems Using IEC61850
Modernization of Electrical Substation Automation Systems Using IEC61850Modernization of Electrical Substation Automation Systems Using IEC61850
Modernization of Electrical Substation Automation Systems Using IEC61850
 
T-REC-E.425-199811-S!!PDF-E (1).pdf
T-REC-E.425-199811-S!!PDF-E (1).pdfT-REC-E.425-199811-S!!PDF-E (1).pdf
T-REC-E.425-199811-S!!PDF-E (1).pdf
 
Telecoms Service Assurance & Service Fulfillment with Neo4j Graph Database
Telecoms Service Assurance & Service Fulfillment with Neo4j Graph DatabaseTelecoms Service Assurance & Service Fulfillment with Neo4j Graph Database
Telecoms Service Assurance & Service Fulfillment with Neo4j Graph Database
 
IRJET- Build SDN with Openflow Controller
IRJET-  	  Build SDN with Openflow ControllerIRJET-  	  Build SDN with Openflow Controller
IRJET- Build SDN with Openflow Controller
 

More from Garry Pepper

Infraworks social media policy v1.0
Infraworks social media policy v1.0Infraworks social media policy v1.0
Infraworks social media policy v1.0Garry Pepper
 
Safe notice 2019 003
Safe notice 2019 003Safe notice 2019 003
Safe notice 2019 003Garry Pepper
 
Artc safety alert no. 112
Artc safety alert no. 112Artc safety alert no. 112
Artc safety alert no. 112Garry Pepper
 
Safe notice permanent 009
Safe notice permanent 009Safe notice permanent 009
Safe notice permanent 009Garry Pepper
 
Changes to css script for toa
Changes to css script for toaChanges to css script for toa
Changes to css script for toaGarry Pepper
 
Safe tracks july 07
Safe tracks july 07Safe tracks july 07
Safe tracks july 07Garry Pepper
 
S afe notice 193 194 204
S afe notice 193 194 204S afe notice 193 194 204
S afe notice 193 194 204Garry Pepper
 
Plumbers sydney water work completions memo
Plumbers sydney water work completions memoPlumbers sydney water work completions memo
Plumbers sydney water work completions memoGarry Pepper
 
Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019Garry Pepper
 
Alert riw transition from pegasus to mta
Alert riw transition from pegasus to mtaAlert riw transition from pegasus to mta
Alert riw transition from pegasus to mtaGarry Pepper
 
Safe notice 192 191
Safe notice 192 191Safe notice 192 191
Safe notice 192 191Garry Pepper
 
Safe notice telegram 1027
Safe notice telegram 1027Safe notice telegram 1027
Safe notice telegram 1027Garry Pepper
 
Infraworks induction presentaion v4.0
Infraworks induction presentaion v4.0Infraworks induction presentaion v4.0
Infraworks induction presentaion v4.0Garry Pepper
 
Safe notice 178 189 206
Safe notice 178 189 206Safe notice 178 189 206
Safe notice 178 189 206Garry Pepper
 
Safe notice permanent 008 2019
Safe notice permanent 008 2019Safe notice permanent 008 2019
Safe notice permanent 008 2019Garry Pepper
 
Reminder to vote EA
Reminder to vote EAReminder to vote EA
Reminder to vote EAGarry Pepper
 
Safe notice 160 231 176 175
Safe notice 160 231 176 175Safe notice 160 231 176 175
Safe notice 160 231 176 175Garry Pepper
 
Safe notice permanent 007
Safe notice permanent 007Safe notice permanent 007
Safe notice permanent 007Garry Pepper
 
Mandatory wpp review checklist completion
Mandatory wpp review checklist completionMandatory wpp review checklist completion
Mandatory wpp review checklist completionGarry Pepper
 

More from Garry Pepper (20)

Laha memo
Laha memoLaha memo
Laha memo
 
Infraworks social media policy v1.0
Infraworks social media policy v1.0Infraworks social media policy v1.0
Infraworks social media policy v1.0
 
Safe notice 2019 003
Safe notice 2019 003Safe notice 2019 003
Safe notice 2019 003
 
Artc safety alert no. 112
Artc safety alert no. 112Artc safety alert no. 112
Artc safety alert no. 112
 
Safe notice permanent 009
Safe notice permanent 009Safe notice permanent 009
Safe notice permanent 009
 
Changes to css script for toa
Changes to css script for toaChanges to css script for toa
Changes to css script for toa
 
Safe tracks july 07
Safe tracks july 07Safe tracks july 07
Safe tracks july 07
 
S afe notice 193 194 204
S afe notice 193 194 204S afe notice 193 194 204
S afe notice 193 194 204
 
Plumbers sydney water work completions memo
Plumbers sydney water work completions memoPlumbers sydney water work completions memo
Plumbers sydney water work completions memo
 
Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019Lessons learnt electrical incident penrith wrp july 2019
Lessons learnt electrical incident penrith wrp july 2019
 
Alert riw transition from pegasus to mta
Alert riw transition from pegasus to mtaAlert riw transition from pegasus to mta
Alert riw transition from pegasus to mta
 
Safe notice 192 191
Safe notice 192 191Safe notice 192 191
Safe notice 192 191
 
Safe notice telegram 1027
Safe notice telegram 1027Safe notice telegram 1027
Safe notice telegram 1027
 
Infraworks induction presentaion v4.0
Infraworks induction presentaion v4.0Infraworks induction presentaion v4.0
Infraworks induction presentaion v4.0
 
Safe notice 178 189 206
Safe notice 178 189 206Safe notice 178 189 206
Safe notice 178 189 206
 
Safe notice permanent 008 2019
Safe notice permanent 008 2019Safe notice permanent 008 2019
Safe notice permanent 008 2019
 
Reminder to vote EA
Reminder to vote EAReminder to vote EA
Reminder to vote EA
 
Safe notice 160 231 176 175
Safe notice 160 231 176 175Safe notice 160 231 176 175
Safe notice 160 231 176 175
 
Safe notice permanent 007
Safe notice permanent 007Safe notice permanent 007
Safe notice permanent 007
 
Mandatory wpp review checklist completion
Mandatory wpp review checklist completionMandatory wpp review checklist completion
Mandatory wpp review checklist completion
 

Recently uploaded

Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 

Recently uploaded (20)

Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 

Safe tracks 2019 08-network rules amendments

  • 1. August 082019 This is an uncontrolled copy. Before use, make sure that this is the current version by visiting www.railsafe.org.au/safe-tracks 1 SafeTracks August 2019 Network Rules, Procedures and Forms amendments This information has been prepared to give a summary of amendments to Network Rules, Network Procedures and Network Forms. Network Rules amendments NGE 204 Network communication Changes to differentiate between the types of boxes used in forms i.e. check boxes, numbered boxes and assurance boxes. NWT 300 Planning work in the rail corridor A reference to ‘a lack of trained workers’ has been changed to ‘a lack of Qualified Workers’. The responsibilities of Protection Officers for briefing workers have been expanded to provide greater detail. Several instances of the term ‘adjacent line’ have been replaced with the term’s definition. The responsibilities of Protection Officers for assessing safety workers have been expanded to include assessing the risk from road traffic. Signal Key Switch (SKS) blocking has been added to the methods for work in the Danger Zone, and references for related Network Procedures added. NWT 302 Local Possession Authority Requirements and responsibilities related to coordinated worksites and Coordinating Protection Officers have been added. The responsibilities of Protection Officers for briefing workers have been expanded to provide greater detail. Requirements for protecting Local Possession Authority (LPA) limits have been amended to include: • Signallers, if possible, preventing unauthorised rail traffic from exiting the LPA • using possession limit markers • extending the limits of an LPA • managing intermediate access points. Requirements for using worksite protection markers for protecting worksites have been added. Requirements for protecting worksites within 500m of an LPA limit have been expanded to include: • the use of the use of worksite protection markers • prohibition on rail traffic associated with such worksites unless a Track Occupancy Authority (TOA) adjoining the limits has been authorised. Requirements for protecting multiple worksites have been amended to include requirements for coordinated worksites, and the use of worksite protection markers and worksite delineation markers. NWT 306 Track Work Authority Protection Officer responsibilities have been amended to make them the only person to speak to Signallers and workers about protection arrangements. The requirements for identifying a worksite’s location have been amended: • platforms are no longer valid reference features • the end of a terminal line can be used as a reference feature. The use of automatic signals to protect worksites has been changed: • a Handsignaller at a signal may not be used for protection • signal key switches and associated Handsignaller may be used for protection. The placement of WORKSITE warning signs has been clarified.
  • 2. Partnering industry for Better Safety for all August 2019 This is an uncontrolled copy. Before use, make sure that this is the current version by visiting www.railsafe.org.ausafe-tracks 2 SafeTracks August 2019 NWT 312 Infrastructure Booking Authority Requirements for infrastructure being permanently removed have been added. The requirements for compiling an Infrastructure Booking Authority (IBA) form now include the need to include details of using uncommissioned infrastructure. NWT 320 Signal Key Switch Blocking This new Network Rule prescribes the rules for working in the Danger Zone using Signal Key Switch Blocking. NTR 400 Protecting rail traffic Removed the requirement to place railway track signals to protect rail traffic outside the area bounded by Waterfall, Macarthur, Emu Plains and Cowan. Existing instructions for protecting rail traffic within the area bounded by Waterfall, Macarthur, Emu Plains and Cowan will be extended to the entire Sydney Trains Network to ensure consistency of application. NSY 512 Manual block working Clarified that a clearance Handsignaller must be placed at the exit-end limit signal if the entire block to the first signal beyond cannot be seen to be clear. Clarified the signals that must not be included on a CAN form as signals that can be passed at STOP. Network Procedures amendments NPR 700 Using a Local Possession Authority Procedure now includes: • the use of possession limit markers • clarified instructions for clipping and locking intermediate points • the use of possession limit markers, worksite protection markers and worksite delineation markers • managing coordinated worksites NPR 702 Using a Track Work Authority The requirements for identifying a worksite’s location have been amended: • platforms are no longer valid reference features • the end of a terminal line can be used as a reference feature. The instructions for the Protection Officer confirming details from the Signaller have changed. Instructions for keeping an automatic signal at stop include an option to use a signal key switch, and instructions have been added for operating a signal key switch. NPR 712 Protecting work from rail traffic on adjacent lines The glossary definition of the term ‘adjacent line’ has been included. The use of Signal Key Switch (SKS) Blocking to protect adjacent lines has been added. The demarcation fencing instructions define approved demarcation fencing, and include a description of using a dedicated worker to keep workers from straying out of their worksite. NPR 713 Placing temporary speed signs Temporary speed WARNING and INTERMEDIATE WARNING signs may no longer be black text on a yellow background. NPR 720 Protecting rail traffic Instructions for delayed rail traffic have been removed. The use of railway track signals to protect disabled rail traffic is no longer required. A Qualified Worker must, where practicable, be used instead. Instructions related to assisting rail traffic have been added. Instructions for protecting obstructions have changed to allow a Signaller to give assurance that rail traffic has been prevented from approaching the affected portion of track instead of always requiring the use of track-circuit shorting clips. Separate instructions are given for the use of railway track signals to protect obstructions. NPR 725 Using a large pilot staff and NPR 726 Using half pilot staffs An NRF 011 Worksite Warning form is now required to be used if there are more than six worksites in the affected portion of track. The previous limit was two worksites. NPR 753 Using Signal Key Switch Blocking This new Network Procedure gives instructions for using the Signal Key Switch Blocking method of work on track. NPR 754 Using a signal key switch This new Network Procedure gives instructions for using signal key switches.
  • 3. Partnering industry for Better Safety for all August 2019 This is an uncontrolled copy. Before use, make sure that this is the current version by visiting www.railsafe.org.ausafe-tracks 3 SafeTracks August 2019 Network Forms amendments If appropriate, in each of the Network Forms: • instructions have been added for numbering forms • the term ‘Train Controller’ has been replaced by ‘Network Controller’ • the term ‘check box’ has been replaced by ‘numbered box’. NRF 000 General information about Network Forms Changes to differentiate between the types of boxes used in forms i.e. check boxes, numbered boxes and assurance boxes.  NOTE These changes are reflected in each amended Network Form. A reference to ’Train Controller‘ has been change to ’Network Controller’. NRF 003 Infrastructure Booking Authority (IBA) Details must be provided for using uncommissioned infrastructure. The requirement to include the date that booking-out was advertised has been removed. People attesting to the booking-out or booking-in of infrastructure or the use of uncommissioned infrastructure must now record their depot/contact No. or location/panel, and are no longer required to sign the form. NRF 004 Condition Affecting the Network (CAN) The signals at STOP instructions have been reworded for additional clarity. NRF 005 Special Proceed Authority (SPA) The term ‘Train Controller’ has been replaced by ‘Network Controller’. There have been non-substantial changes to improve clarity. NRF 008 Pilot Staff Notice (PSN) The form has been restructured and amended: • to make the form easier to compile • to include details of up to six worksites on the adjacent line. NRF 010 Pilot Staff Working Introduction The form has been restructured and amended to make the form easier to compile. NRF 011 Worksite Warning The number of worksites in a pilot staff working section above which this form must be issued has changed from two to six. The form has been restructured and amended to make the form easier to compile. NRF 013 Temporary Rail Bond Approval The form has been restructured and amended to make the form easier to compile. The requester and approver must now enter the time and date they requested or approved the temporary rail bond. NRF 014 Worksite protection pre-work briefing The Workplace Supervisor role replaces the Site Supervisor role, and more detailed instructions for the Workplace Supervisor have been added. NRF 015 Worksite Protection Plan The Workplace Supervisor role replaces the Site Supervisor role. A new form, NRF 015D Worksite Protection Plan, has been implemented specifically for work using a Track Work Authority or Signal Key Switch Blocking, and instructions updated accordingly. With the introduction of this new form, NRF 015A will longer be used for TWA. Instructions for providing diagrams and maps have been simplified. The actual forms have been amended to reflect changes to the related Network Rules and Network Procedures. NRF 018 Absolute Signal Blocking (ASB) The actual form has been: • amended to reflect changes to the related Network Rules and Network Procedures. • restructured and amended to make the form easier to compile. The note relating to adjacent line protection has been simplified.