scoping projects
                  to avoid stress, headaches and angry mobs



                                                 2013 - @LISASABINWILSON

Wednesday, February 20, 13
Lisa Sabin-Wilson
          •DESIGNER SINCE 1998
          •DEVELOPER SINCE 2007
          •AUTHOR: WORDPRESS FOR DUMMIES
          •CO-OWNER: WEBDEVSTUDIOS




                                           2013 - @LISASABINWILSON

Wednesday, February 20, 13
scoping....



                                2013 - @LISASABINWILSON

Wednesday, February 20, 13
a very important phase in
                 every project you do
                 design &
                 development
                                     2013 - @LISASABINWILSON

Wednesday, February 20, 13
If you do not have a Scoping
            Phase for every single
            project - prepare your self
            for stress, headaches and
            upset clients.

                                  2013 - @LISASABINWILSON

Wednesday, February 20, 13
Eliminate
             Assumptions
                • Saves time
                • Reduces headaches
                • Avoids hard feelings
                • Happy client
                • Happy developer




                                         2013 - @LISASABINWILSON

Wednesday, February 20, 13
Set
             Expectations
             Early
             • Keeps project realistic
             • Keeps projects on time
             • Avoids miscommunication
             • Happy client
             • Happy developer



                                         2013 - @LISASABINWILSON

Wednesday, February 20, 13
Document
             Project
             Requirements
             • Ready reference point for all
             • Eliminates “he said/she said”
             • Provides a work flow
             • Happy client
             • Happy developer



                                               2013 - @LISASABINWILSON

Wednesday, February 20, 13
NOT YOUR AVERAGE JOES
   PROJECT




                  HTTP://NYAJ.COM
   DATE                         CLIENT
                  JULY 2012              NOT YOUR AVERAGE JOES
Wednesday, February 20, 13
NOT YOUR AVERAGE JOE’S
   PROJECT




                  HTTP://NYAJ.COM
   DATE                         CLIENT
                  JULY 2012              NOT YOUR AVERAGE JOE’S
Wednesday, February 20, 13
INITIAL CLIENT CONTACT
                                         |
                             PRE-SALES DISCUSSIONS
                                         |
                              INITIAL REQUIREMENTS
                                         |
              Typical          STATEMENT OF WORK
                                         |
              work flow           DESIGN PROCESS
                                         |
                                 DESIGN APPROVAL
                                         |
                                   DEVELOPMENT
                                         |
                                      TESTING
                                         |
                                      GO LIVE!
                                            2013 - @LISASABINWILSON

Wednesday, February 20, 13
INITIAL CLIENT CONTACT
                                         |
                             PRE-SALES DISCUSSIONS
                                         |
                              INITIAL REQUIREMENTS
                                         |

        New-Typical
                                  SCOPING PHASE
                                         |
                               STATEMENT OF WORK

        work flow                         |
                                 DESIGN PROCESS
                                         |
                                 DESIGN APPROVAL
                                         |
                                   DEVELOPMENT
                                         |
                                      TESTING
                                         |
                                      GO LIVE!
Wednesday, February 20, 13
As the developer - YOU
                  have to take charge of the
                  scoping phase.


                                      2013 - @LISASABINWILSON

Wednesday, February 20, 13
WE BUILT A SITEMAP - WHICH WAS HELPFUL...
    BUT IT WASN’T ENOUGH                 2013 - @LISASABINWILSON

Wednesday, February 20, 13
WE HAD A 16 PAGE STATEMENT OF WORK
    BUT IT STILL WASN’T ENOUGH           2013 - @LISASABINWILSON

Wednesday, February 20, 13
PSD Files Acquired.
                                 DESIGN APPROVAL DONE!

                                                         2013 - @LISASABINWILSON

Wednesday, February 20, 13
A TOTAL OF 26 DIFFERENT PAGE VIEWS/LAYOUTS
    BELIEVE IT OR NOT ... THIS WAS STILL NOT ENOUGH   2013 - @LISASABINWILSON

Wednesday, February 20, 13
at this point?
                it is really tempting to dig
                right in and start
                developing this bad boy.

                                      2013 - @LISASABINWILSON

Wednesday, February 20, 13
the sooner you get it done...

               the sooner you get paid.
               the sooner you can update your portfolio.
               the sooner the client is happy.



                                                2013 - @LISASABINWILSON

Wednesday, February 20, 13
right?



                             2013 - @LISASABINWILSON

Wednesday, February 20, 13
What they wanted... ?

                                LISA NEEDS TO START DEVELOPMENT NOW
                                               BECAUSE
                             WE WANT THIS DONE & LIVE IN LESS THAN 30 DAYS.




                                                                   2013 - @LISASABINWILSON

Wednesday, February 20, 13
What they needed... ?
                                         STOP ... TAKE A BREATH ...

                              LISA NEEDS TO DEFINE THE SCOPE OF THE PROJECT
                             IN A WAY THAT TAKES QUESTIONS OUT OF THE ENTIRE
                                          DEVELOPMENT PROCESS.




                                                                      2013 - @LISASABINWILSON

Wednesday, February 20, 13
eliminate
               remove
      obliterate assumptions.

                             2013 - @LISASABINWILSON

Wednesday, February 20, 13
as a developer - I can
                 make assumptions with
                 the BEST of them


                                    2013 - @LISASABINWILSON

Wednesday, February 20, 13
assumptions are based on
               a persons own frame of
               reference.


                                  2013 - @LISASABINWILSON

Wednesday, February 20, 13
what i see in my head will
               be different from what you
               see in your head.


                                   2013 - @LISASABINWILSON

Wednesday, February 20, 13
interpretations will vary.



                                     2013 - @LISASABINWILSON

Wednesday, February 20, 13
For example . . .



                                      2013 - @LISASABINWILSON

Wednesday, February 20, 13
THE LANDING PAGE
    THERE IS A LOT GOING ON HERE   2013 - @LISASABINWILSON

Wednesday, February 20, 13
i made some assumptions
                             :(


                                    2013 - @LISASABINWILSON

Wednesday, February 20, 13
THE LANDING PAGE
    MORE PHOTOS? IT’S A SIDEBAR CAROUSEL - IT FLIPS THROUGH STAFF PHOTOS
Wednesday, February 20, 13
THE LANDING PAGE
    THE REALITY .... THE CLIENT’S INTENTION ? ...   2013 - @LISASABINWILSON

Wednesday, February 20, 13
THE LANDING PAGE
    THE REALITY .... IT’S A SLIDESHOW/CAROUSEL OF PHOTOS IN THE MAIN BODY
Wednesday, February 20, 13
a sidebar carousel
               is HUGELY different
               than a slideshow in the
               main content area.

                                   2013 - @LISASABINWILSON

Wednesday, February 20, 13
if i had gone with my
               initial assumption without
               discovering the clients
               intention ...

                                    2013 - @LISASABINWILSON

Wednesday, February 20, 13
i would have wasted time.



                                     2013 - @LISASABINWILSON

Wednesday, February 20, 13
i would have presented
                 incorrect work to the
                 client.


                                    2013 - @LISASABINWILSON

Wednesday, February 20, 13
i would risk the client
                 losing confidence in me.


                                    2013 - @LISASABINWILSON

Wednesday, February 20, 13
especially if i had made
                 my next assumption . . .


                                      2013 - @LISASABINWILSON

Wednesday, February 20, 13
THE LANDING PAGE
    REMEMBER THIS?           2013 - @LISASABINWILSON

Wednesday, February 20, 13
THE LANDING PAGE
    JOIN OUR EMAIL CLUB - - LINKS TO A PAGE WITH A SUBSCRIPTION FORM - RIGHT?
Wednesday, February 20, 13
THE LANDING PAGE
    NOT EXACTLY - CLICK IT AND IT OPENS INLINE - NO NEW PAGE LOAD.   2013 - @LISASABINWILSON

Wednesday, February 20, 13
THE NAVIGATION MENU
    LINKS TO INTERNAL PAGES?   2013 - @LISASABINWILSON

Wednesday, February 20, 13
THE LANDING PAGE
    NOPE! IT CONTAINS A FLY OUT MENU WITH SUB NAVIGATION   2013 - @LISASABINWILSON

Wednesday, February 20, 13
none of this was indicated

                             •INITIAL REQUIREMENTS
                             •STATEMENT OF WORK
                             •SITE MAP
                             •PSD FILES




                                                     2013 - @LISASABINWILSON

Wednesday, February 20, 13
a smart developer

                             •RECOGNIZES GAPS
                             •ASKS QUESTIONS
                             •SEEKS ANSWERS
                             •REQUIRES CLARIFICATION




                                                       2013 - @LISASABINWILSON

Wednesday, February 20, 13
i have not always been a
                 smart developer
                             •WASTED HOURS UPON HOURS
                             •FRUSTRATING BACK AND FORTH
                             •LOST MONEY
                             •FRUSTRATED CLIENTS
                             •SCOPE CREEP
                             •NEVER ENDING PROJECT


                                                           2013 - @LISASABINWILSON

Wednesday, February 20, 13
SCOPE CREEP
               where the requirements of the
               project keep piling up and up
               and up - before, during and
               after the project schedule.


                                     2013 - @LISASABINWILSON

Wednesday, February 20, 13
when you have your hands
                 on the approved design
                 files - get into the mind of
                 the user


                                      2013 - @LISASABINWILSON

Wednesday, February 20, 13
you know ....

                 the person who is actually
                 going to use the web site


                                     2013 - @LISASABINWILSON

Wednesday, February 20, 13
you will do yourself and
                 your client a favor if you
                 start asking questions
                 like...


                                       2013 - @LISASABINWILSON

Wednesday, February 20, 13
what
             happens
             when I click
             this?

                             2013 - @LISASABINWILSON

Wednesday, February 20, 13
how many photos
             are loaded into this
             carousel?

             what happens when i
             click “more photos?”

             does clicking on an
             individual photo take
             me anywhere?
                                     2013 - @LISASABINWILSON

Wednesday, February 20, 13
asking questions like
             these gives the client
             the chance to correct
             your assumptions...


             “oh no, that’s not for those photos ...
             it’s for the main photos on the left!”




                                                       2013 - @LISASABINWILSON

Wednesday, February 20, 13
so then you can
             clarify....

             •HOW MANY PHOTOS?
             •ARE THEY LINKED TO ANYTHING?
             •ARE THESE POSTS WITH
              FEATURED IMAGES?
             •DOES THIS HAPPEN ON OTHER
              PAGES?
             •OR JUST THE HOME PAGE?

                                             2013 - @LISASABINWILSON

Wednesday, February 20, 13
wherever
             there is an
             action
             indicated ...
             clarify it
                             2013 - @LISASABINWILSON

Wednesday, February 20, 13
Never be
             afraid to...
             ask questions
             get clarification
             correct your assumptions




                                        2013 - @LISASABINWILSON

Wednesday, February 20, 13
Scoping
             helps you
             determine
             which plugins to use
             custom plugin development needs
             theme framework or custom




                                               2013 - @LISASABINWILSON

Wednesday, February 20, 13
Doing so
             shows ...
             initiative
             motivation to do it right
             confidence
             thoroughness



                                         2013 - @LISASABINWILSON

Wednesday, February 20, 13
but wait ....

                 don’t stop at simply having
                 the conversation


                                     2013 - @LISASABINWILSON

Wednesday, February 20, 13
document it.




                                2013 - @LISASABINWILSON

Wednesday, February 20, 13
make it part of the
                 contract.



                                       2013 - @LISASABINWILSON

Wednesday, February 20, 13
YOU DO HAVE
                            YOUR CLIENTS
                     SIGN A CONTRACT, RIGHT???




                                                 2013 - @LISASABINWILSON

Wednesday, February 20, 13
before you lay down one
                single piece of code - get
                your client to sign off on it.


                                       2013 - @LISASABINWILSON

Wednesday, February 20, 13
find a
             method you
             prefer - but
             definitely
             document it
                             2013 - @LISASABINWILSON

Wednesday, February 20, 13
•AUDIO: RECORD THE CONVERSATION
        •OLD SCHOOL: SPREADSHEET
        •CONCEPT SHARE
        •HTTP://WWW.CONCEPTSHARE.COM
        •CAGE APP
        •HTTP://WWW.CAGEAPP.COM




                                          2013 - @LISASABINWILSON

Wednesday, February 20, 13
whatever method you
                 choose to use - make sure
                 you document the process


                                    2013 - @LISASABINWILSON

Wednesday, February 20, 13
Documenting each
                 element in the project
                 added approximately
                 2 hours.


                                     2013 - @LISASABINWILSON

Wednesday, February 20, 13
if it wasn’t documented
                                           ...
                                   it didn’t happen


                                               2013 - @LISASABINWILSON

Wednesday, February 20, 13
The End.
                   Questions?

                                THAT’S ME AT WORDCAMP PHILADELPHIA 2012 -
                                   I WON THE SPEAKER COSTUME CONTEST!



                                               2013 - @LISASABINWILSON

Wednesday, February 20, 13

Scoping Projects to avoid stress, headaches and angry mobs

  • 1.
    scoping projects to avoid stress, headaches and angry mobs 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 2.
    Lisa Sabin-Wilson •DESIGNER SINCE 1998 •DEVELOPER SINCE 2007 •AUTHOR: WORDPRESS FOR DUMMIES •CO-OWNER: WEBDEVSTUDIOS 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 3.
    scoping.... 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 4.
    a very importantphase in every project you do design & development 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 5.
    If you donot have a Scoping Phase for every single project - prepare your self for stress, headaches and upset clients. 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 6.
    Eliminate Assumptions • Saves time • Reduces headaches • Avoids hard feelings • Happy client • Happy developer 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 7.
    Set Expectations Early • Keeps project realistic • Keeps projects on time • Avoids miscommunication • Happy client • Happy developer 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 8.
    Document Project Requirements • Ready reference point for all • Eliminates “he said/she said” • Provides a work flow • Happy client • Happy developer 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 9.
    NOT YOUR AVERAGEJOES PROJECT HTTP://NYAJ.COM DATE CLIENT JULY 2012 NOT YOUR AVERAGE JOES Wednesday, February 20, 13
  • 10.
    NOT YOUR AVERAGEJOE’S PROJECT HTTP://NYAJ.COM DATE CLIENT JULY 2012 NOT YOUR AVERAGE JOE’S Wednesday, February 20, 13
  • 11.
    INITIAL CLIENT CONTACT | PRE-SALES DISCUSSIONS | INITIAL REQUIREMENTS | Typical STATEMENT OF WORK | work flow DESIGN PROCESS | DESIGN APPROVAL | DEVELOPMENT | TESTING | GO LIVE! 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 12.
    INITIAL CLIENT CONTACT | PRE-SALES DISCUSSIONS | INITIAL REQUIREMENTS | New-Typical SCOPING PHASE | STATEMENT OF WORK work flow | DESIGN PROCESS | DESIGN APPROVAL | DEVELOPMENT | TESTING | GO LIVE! Wednesday, February 20, 13
  • 13.
    As the developer- YOU have to take charge of the scoping phase. 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 14.
    WE BUILT ASITEMAP - WHICH WAS HELPFUL... BUT IT WASN’T ENOUGH 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 15.
    WE HAD A16 PAGE STATEMENT OF WORK BUT IT STILL WASN’T ENOUGH 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 16.
    PSD Files Acquired. DESIGN APPROVAL DONE! 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 17.
    A TOTAL OF26 DIFFERENT PAGE VIEWS/LAYOUTS BELIEVE IT OR NOT ... THIS WAS STILL NOT ENOUGH 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 18.
    at this point? it is really tempting to dig right in and start developing this bad boy. 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 19.
    the sooner youget it done... the sooner you get paid. the sooner you can update your portfolio. the sooner the client is happy. 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 20.
    right? 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 21.
    What they wanted...? LISA NEEDS TO START DEVELOPMENT NOW BECAUSE WE WANT THIS DONE & LIVE IN LESS THAN 30 DAYS. 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 22.
    What they needed...? STOP ... TAKE A BREATH ... LISA NEEDS TO DEFINE THE SCOPE OF THE PROJECT IN A WAY THAT TAKES QUESTIONS OUT OF THE ENTIRE DEVELOPMENT PROCESS. 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 23.
    eliminate remove obliterate assumptions. 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 24.
    as a developer- I can make assumptions with the BEST of them 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 25.
    assumptions are basedon a persons own frame of reference. 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 26.
    what i seein my head will be different from what you see in your head. 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 27.
    interpretations will vary. 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 28.
    For example .. . 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 29.
    THE LANDING PAGE THERE IS A LOT GOING ON HERE 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 30.
    i made someassumptions :( 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 31.
    THE LANDING PAGE MORE PHOTOS? IT’S A SIDEBAR CAROUSEL - IT FLIPS THROUGH STAFF PHOTOS Wednesday, February 20, 13
  • 32.
    THE LANDING PAGE THE REALITY .... THE CLIENT’S INTENTION ? ... 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 33.
    THE LANDING PAGE THE REALITY .... IT’S A SLIDESHOW/CAROUSEL OF PHOTOS IN THE MAIN BODY Wednesday, February 20, 13
  • 34.
    a sidebar carousel is HUGELY different than a slideshow in the main content area. 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 35.
    if i hadgone with my initial assumption without discovering the clients intention ... 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 36.
    i would havewasted time. 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 37.
    i would havepresented incorrect work to the client. 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 38.
    i would riskthe client losing confidence in me. 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 39.
    especially if ihad made my next assumption . . . 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 40.
    THE LANDING PAGE REMEMBER THIS? 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 41.
    THE LANDING PAGE JOIN OUR EMAIL CLUB - - LINKS TO A PAGE WITH A SUBSCRIPTION FORM - RIGHT? Wednesday, February 20, 13
  • 42.
    THE LANDING PAGE NOT EXACTLY - CLICK IT AND IT OPENS INLINE - NO NEW PAGE LOAD. 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 43.
    THE NAVIGATION MENU LINKS TO INTERNAL PAGES? 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 44.
    THE LANDING PAGE NOPE! IT CONTAINS A FLY OUT MENU WITH SUB NAVIGATION 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 45.
    none of thiswas indicated •INITIAL REQUIREMENTS •STATEMENT OF WORK •SITE MAP •PSD FILES 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 46.
    a smart developer •RECOGNIZES GAPS •ASKS QUESTIONS •SEEKS ANSWERS •REQUIRES CLARIFICATION 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 47.
    i have notalways been a smart developer •WASTED HOURS UPON HOURS •FRUSTRATING BACK AND FORTH •LOST MONEY •FRUSTRATED CLIENTS •SCOPE CREEP •NEVER ENDING PROJECT 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 48.
    SCOPE CREEP where the requirements of the project keep piling up and up and up - before, during and after the project schedule. 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 49.
    when you haveyour hands on the approved design files - get into the mind of the user 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 50.
    you know .... the person who is actually going to use the web site 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 51.
    you will doyourself and your client a favor if you start asking questions like... 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 52.
    what happens when I click this? 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 53.
    how many photos are loaded into this carousel? what happens when i click “more photos?” does clicking on an individual photo take me anywhere? 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 54.
    asking questions like these gives the client the chance to correct your assumptions... “oh no, that’s not for those photos ... it’s for the main photos on the left!” 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 55.
    so then youcan clarify.... •HOW MANY PHOTOS? •ARE THEY LINKED TO ANYTHING? •ARE THESE POSTS WITH FEATURED IMAGES? •DOES THIS HAPPEN ON OTHER PAGES? •OR JUST THE HOME PAGE? 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 56.
    wherever there is an action indicated ... clarify it 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 57.
    Never be afraid to... ask questions get clarification correct your assumptions 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 58.
    Scoping helps you determine which plugins to use custom plugin development needs theme framework or custom 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 59.
    Doing so shows ... initiative motivation to do it right confidence thoroughness 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 60.
    but wait .... don’t stop at simply having the conversation 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 61.
    document it. 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 62.
    make it partof the contract. 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 63.
    YOU DO HAVE YOUR CLIENTS SIGN A CONTRACT, RIGHT??? 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 64.
    before you laydown one single piece of code - get your client to sign off on it. 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 65.
    find a method you prefer - but definitely document it 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 66.
    •AUDIO: RECORD THECONVERSATION •OLD SCHOOL: SPREADSHEET •CONCEPT SHARE •HTTP://WWW.CONCEPTSHARE.COM •CAGE APP •HTTP://WWW.CAGEAPP.COM 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 67.
    whatever method you choose to use - make sure you document the process 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 68.
    Documenting each element in the project added approximately 2 hours. 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 69.
    if it wasn’tdocumented ... it didn’t happen 2013 - @LISASABINWILSON Wednesday, February 20, 13
  • 70.
    The End. Questions? THAT’S ME AT WORDCAMP PHILADELPHIA 2012 - I WON THE SPEAKER COSTUME CONTEST! 2013 - @LISASABINWILSON Wednesday, February 20, 13